HomeMy WebLinkAbout2669 GATEWAY RD; BLDG E; CB072915; Permit05-19-2008
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CB072915
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
2669 GATEWAY RD CBAD
COMMIND Sub Type COMM
2131910800 Lot# 0
$31520100 Construction Type VN
Reference # CT060024
BRESSIVILL-BLDG E 4980 SF
RETAIL 530 SF 2 PERGOLAS 180 SF TRELLIS
Status
Applied
Applicant
MIKE MERRILL
1717KETTNERBLVD
STE 100
SAN DIEGO 92101
619-814-0080
Plan Approved
Issued
Inspect Area
Plan Check#
Owner
LNR BRESSI COMMERCIAL INC
C/O LENNAR PARTNERS
4350 VON KARMAN AVE #200
NEWPORT BEACH CA 92660
ISSUED
11/19/2007
Entered By
04/23/2008
04/23/2008
PY
PC 07-64
JMA
Building Permit
Add I Building Permit Fee
Plan Check
Add I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add I Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add I Pot Water Con Fee
Reel Water Con Fee
$1 322 01 Meter Size
$0 00 Add'l Reel Water Con Fee
$859 31 Meter Fee
($433 00) SDCWA Fee
$0 00 CFD Payoff Fee
$6619 PFF (3105540)
$1 992 00 PFF (4305540)
$000 License Tax (3104193)
$0 00 License Tax (4304193)
$000 Traffic Impact Fee (3105541)
$000 Traffic Impact Fee (4305541)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$7 702 00 Master Drainage Fee
D1 Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
HMP Fee
TOTAL PERMIT FEES
$000
$225 00
$718800
$132039,'
$5 736 66>
$000
$000
$000
$1047000
$000
$91 00
$41000
$77 00
$000
$5 484 60
$000
$000
$000
$54 394 74
Total Fees $54,394 74 Total Payments To Date $54,394 74 Balance Due $000
r\
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please take N|pTICE that approval of your project includes the lm|K>sition of fees dedications reservations or other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
CltyofCarlsDad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite Fire
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected x
By L%
Inspected
By
Inspected
By
Comments
PC 07-64
CB072915
BRESSIVILL BLDG E 4980 SF
RETAIL.530 SF 2 PERGOLAS 180 SF TRELLIS
2669 GATEWAY RD
Phone
CA Water Dist CA
' Si? Date / /
f^i" — Inspected ZA///J 7
' / '
Date
Inspected
Date
Inspected
Date
Permit Type
Sub Type
Lot 0
Approved <^^
Approved
Approved
•
02/10/2009
COMMIND
COMM
Disapproved
Disapproved
Disapproved
• •
City of Carlsbad
Final Building Inspection
ICD 1 1 2009
Dept Building Engineering Planning CMWD St Lite Fire
Plan Check# PC 07-64 Date 02/1-1/2009 O •• ~~*.
Permit* CB072915 Permit Type COMMIND~~ '--^~- 1_
Project Name
Address
Contact Person
Sewer Dist
Inspected^
Bv (A
Inspectea "•
Bv
Inspected
Bv
Comments
BRESSI VILL -BLDG E 4980 SF
RETAIL 530 SF 2 PERGOLAS, 180 SF TRELLIS
2669 GATEWAY RD
DAVID OBRIEN Phone 7604451279
CA Water Dist CA
,-7 A Date
\£~' Inspected 2 ~/3'O jf
' Date
Inspected
Date
Inspected
Sub Type COMM
Lot 0
Approved ^x, Disapproved
Approved Disapproved
Approved Disapproved
• •
Page 1 of 1
Janeari Hawney - Bressi Ranch Village Center
From:
To:
Date:
Subject:
Attachments:
"Michael Elliott" <mikeelhott2@cox net>
"Chnster Westman" <cwest@ci carlsbad ca us>, "Pete
Dreibelbis" <pdrei@ci carlsbad ca us>, "Michele Masterson"
<mmast@ci carlsbad ca us>, "Meghan Jacobson"
<mjaco@ci carlsbad ca us>, "Christine Wauschek"
<cwaus@ci carlsbad ca us>, "Janean Hawney"
<Jhawn@ci carlsbad ca us>, <jjustus@schmidtdesign com>,
<dplasch@grantgc com>
02/12/2009 6 25PM
Bressi Ranch Village Center
182A - Bressi Ranch Village Center - Inspl doc
Bressi Ranch Village Center
Project Number CT 06-24
Drawing Number 452-9L
Building A - 2641 Gateway Road - CB072908
Building B - 2647 Gateway Road - CB072910
Pad B - 2635 Gateway Road - CB072909
Building C - 2653 Gateway Road - CB072911
Building E - 2669 Gateway Road - CB072915
Landscape inspection comments arc attached
Approved - Permit cards for buildings A, C and E and Pad B were signed
Not ApproY$&«$ermit card for building B was not signed
file //C \Documcnts and Settmgs\jhawn\Local Settmgs\Temp\XPgrpwise\4994698FGW- 02/13/2009
Inspection List
Permit* CB072915 Type COMMIND COMM
Date Inspection Item
02/11/2009 89
02/11/2009 89
02/10/2009 89
01/29/2009 89
12/08/2008 39
11/25/2008 39
11/04/2008 84
11/03/2008 84
10/31/2008 14
10/27/2008 11
10/27/200823
10/27/2008 39
10/22/2008 18
10/03/2008 17
10/01/2008 17
10/01/2008 18
09/18/2008 17
09/18/2008 18
09/18/200884
09/11/2008 14
09/11/2008 18
09/04/2008 1 5
08/19/2008 11
08/19/2008 15
08/19/2008 24
08/18/2008 24
08/14/2008 66
08/12/2008 11
08/11/2008 11
08/11/2008 13
08/11/2008 15
08/07/2008 1 1
08/07/2008 12
08/06/2008 13
07/21/2008 11
07/15/2008 11
06/04/2008 31
05/02/2008 81
04/30/2008 1 1
04/24/2008 21
Final Combo
Final Combo
Final Combo
Final Combo
Final Electrical
Final Electrical
Rough Combo
Rough Combo
Frame/Steel/Boltmg/Weldin
Ftg/Foundation/Piers
Gas/Test/Repairs
Final Electrical
Exterior Lath/Drywall
Interior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Rough Combo
Frame/Steel/Bolting/Weldin
Exterior Lath/Drywall
Roof/Reroof
Ftg/Foundation/Piers
Roof/Reroof
Rough/Topout
Rough/Topout
Grout
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Shear Panels/HDs
Roof/Reroof
Ftg/Foundation/Piers
Steel/Bond Beam
Shear Panels/HD's
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Underground/Conduit-Wirm
Underground Combo
Ftg/Foundation/Piers
Underground/Under Floor
Inspector Act
PY
-
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
JM
PY
PY
PY
PY
RB
AP
Rl
PA
PA
PA
PA
AP
NR
NR
PA
AP
PA
AP
AP
AP
PA
we
we
AP
PA
AP
AP
PA
PA
PA
NR
AP
PA
PA
PA
AP
PA
we
AP
AP
PA
PA
AP
PA
AP
BRESSI VILL -BLDG E 4980 SF
RETAIL.530 SF 2 PERGOLAS, 180 SF TRE
Comments
paint roof vents
EMR
T-BAR
8 LIGHT POLE FTG
EMR
PERGOLAS
PERGOLAS
MANSARD REVISION
LITE POLE FTGS
MEASURE ROOF ?
ROOF DRAINS
TRASH ENCLOSURE
trash enclosure light pole (3) and pergola
LIGHT POLES
LIGHT POLE FTGS
PERGOLA FTG
PERGOLA FTG
parking lot light conduit from Bldg E
interior post ftg
Tuesday February 17 2009 Page 1 of 1
City of Carlsbad Bldg Inspection Request
For 02/11/2009
PermiW CB072915
Title BRESSI VILL-BLDG E 4980 SF
Description RETAIL.530 SF 2 PERGOLAS, 180 SF TRELLIS
Inspector Assignment PY
2669 GATEWAY RD
Lot
Type COMMIND Sub Type COMM
Job Address
Suite
Location
OWNER LNR BRESSI COMMERCIAL INC
Owner
Remarks
Phone 7604451279
Inspector
Total Time
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By DAVID OBRIEN
Entered By CHRISTINE
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC 07-64
PCR08043 ISSUED BKHSSl RANCH Vll.l.AGl"; CT-NTER DI/TITRFD TRUSS SUBMHTAl. AI I. I5UII DINGS
PCR08044 ISSUED BRKSSI RANCH Vll.l.AGl; CI-iN'lfcK RliVIO 13 PAGI.S( Dhl.TA 4) I'l.UMBING/l-l IX1
PCR08089 ISSUED BRHSSI RANCH VII.I. CliN Ul.DG 1 DLL.I: I F PARAPIH1 ADD MANSARD ROOC
PCR08095 ISSUED BRFSSI RANCH Vll.l.AGl: CI-iN II R ADD DRAIN LINKS I OR l-'IRi; SPRINKI I.R RISl.R
Inspection History
Insp Comments
PY
PY paint roof vents
EMR
Date Description Act
02/10/2009 89 Final Combo PA
01/29/2009 89 Final Combo PA
12/08/2008 39 Final Electrical PA PY
11/25/2008 39 Final Electrical PA PY
11/04/2008 84 Rough Combo AP PY
11/03/2008 84 Rough Combo NR PY
10/31/2008 14 Frame/Steel/Bolting/Weldmg NR PY
10/27/2008 11 Ftg/Foundation/Piers PA PY
10/27/2008 23 Gas/Test/Repairs AP PY
10/27/2008 39 Final Electrical PA PY
TBAR
8 LIGHT POLE FTG
EMR
City of Carlsbad Bldg Inspection Request
For 12/08/2008
Permit* CB072915
Title BRESSI VILL -BLDG E 4980 SF
Description RETAIL.530 SF 2 PERGOLAS, 180 SF TRELLIS
Inspector Assignment PY
Sub Type COMM
2669 GATEWAY RD
Lot
Type COMMIND
Job Address
Suite
Location
OWNER LNR BRESSI COMMERCIAL INC
Owner
Remarks STE 101
Phone 9092088193
Inspector
Total Time Requested By PETE
Entered By JANEAN
CD Description
39 Final Electrical
Act Comments
Comments/Notices/Holds
Date
11/25/2008
11/04/2008
11/03/2008
10/31/2008
10/27/2008
10/27/2008
10/27/2008
10/22/2008
10/03/2008
10/01/2008
10/01/2008
09/18/2008
09/18/2008
09/18/2008
09/11/2008
09/11/2008
Associated PCRs/CVs Original PC# PC 07-64
PCR08043 ISSUED BRESSI RANCH VILLAGE CENTER DEI-TERED TRUSS SUBMITTAI. ALL BUILDINGS
PCR08044 ISSUED BRESSI RANCH VILLAGE CENTER REV TO 13 PAGESt DELTA 4) PLUMBING/EI.EC
PCR08089 ISSUED BRESSI RANCH VILL CliN BLDG E DELETE PARAPET ADD MANSARD KOO
PCR08095 ISSUED BRESSI RANCH VILLAGE CENTER ADD DRAIN LINES 1-OR FIRE SPRINKLER RISER
Inspection History
Description
39 Final Electrical
84 Rough Combo
84 Rough Combo
14 Frame/Steel/Bolting/Weldmg
11 Ftg/Foundation/Piers
23 Gas/Test/Repairs
39 Final Electrical
18 Exterior Lath/Drywall
17 Interior Lath/Drywall
17 Interior Lath/Drywall
18 Exterior Lath/Drywall
17 Interior Lath/Drywall
18 Exterior Lath/Drywall
84 Rough Combo
14 Frame/Steel/Bolting/Weldmg
18 Exterior Lath/Drywall
Act
PA
AP
NR
NR
PA
AP
PA
AP
AP
AP
PA
we
we
AP
PA
AP
Insp Comments
PY
PY T BAR
PY
PY
PY 8 LIGHT POLE FTG
PY
PY EMR
PY PERGOLAS
PY
PY
PY
PY
PY
PY
PY PERGOLAS
PY
CITY OF CARLSBAD
ELECTRIC AND GAS METER CLEARANCE
INTER-DEPARTMENT
ADDRESS
o 1
S E O Service Equipment Only
Reason, If Denied
ELECTRIC METER
GAS METER
COMMERCIAL
RESIDENCE
NEW SERVICE
RELOCATE
TSPB
TEMP P/P
UP-GRADE
TEST METER
IRR PEDESTAL
COMMERCIAL
RESIDENCE
TEST METER
Buildmgflnspactor Signature
Called In By
YES
NO
YES
NO
YES
NO
Time
Date Time
Called In To
CITY OF CARLSBAD
ELECTRIC AND GAS METER CLEARANCE
INTER-DEPARTMENT
ADDRESS
S E O Service Equipment Only
Reason, If Denied
ELECTRIC METER
Si^tx
/03
GAS METER
COMMERCIAL
RESIDENCE
NEW SERVICE
RELOCATE
TSPB
TEMP P/P
UP-GRADE
TEST METER
IRR PEDESTAL
COMMERCIAL
RESIDENCE
TEST METER
Builing npector Signature
Called In By
is
YES
NO
YES
NO
YES
NO
Time
Date Time
Called In To
CITY OF CARLSBAD
ELECTRIC AND GAS METER CLEARANCE
INTER-DEPARTMENT
ADDRESS
S E O Service Equipment Only
Reason, If Denied
ELECTRIC METER
GAS METER
COMMERCIAL
RESIDENCE
NEW SERVICE
RELOCATE
TSPB
TEMP P/P
UP-GRADE
TEST METER
IRR PEDESTAL
COMMERCIAL
RESIDENCE
TEST METER
spector Signature
Called In By
YES
NO
YES
NO
Date Time
Called In To
01 - 2.°(
PROJECT DESIGN CONSULTANTS
File 321905
May 1 2008
CITY OF CARLSBAD
Building Department
1635 Faraday Avenue
Carlsbad CA 92008-7314
SUBJECT Bressi Ranch Village Center - Form Certification for Building Shop E
To Whom It May Concern
Project Design Consultants has field verified the form positions for Building ShopJB as shown on
Sheet 7 of the Grading and Erosion Control Plans of the above-referenced project Upon our
review of the survey data collected on April 29 2008 the building footprint conforms horizontally
and vertically within .'.0 1 feet to the approved design
Sincerely
Lawrence D Naiman LS
Associate
LS5163 Exp 6/30/09
OJ Insulation, LP Escondido (874)
2061 Aldergrove Ave
Escondido, CA 92029
2 C
o 7
Insulation Certificate
Insulation is installed in the structure described below as follows
Work Area
Attic Area Wire
Demising Walls
Sound walls
Exterior Walls and Rim Joists
Attic Area - Batts
Attic Area Batts
Item Installed
ISW17G Wire 17 Gauge 1/4 MI Spool
R 11 16" x 96' Unfaced - CertaSound - Batts
R 11 24" x 96' - Unfaced - CertaSound Batts
R-19 15 25" x 48 Unfaced - Batts
R-30 16" x 48" Unfaced - Batts
R 30 24 x 48 - Unfaced - Batts
Sq Feet
4920
2950
480
3440
4920
4920
* Fiberglass blow has no settling factor for R-values
Job Name BRESSI RANCH VILLAGE CENTER
Lot No Shop E
Job Address EL FUERTE AND GATEWAY STREET
CARLSBAD, CA 92008
Date Completed October 14, 2008
Insulation By
•.ii'MEii
www mtglmc com
MTGL Proiect # \L\1 H /M O_
Permit #_C_
Report #
Corporate '
2992 E La Raima AvFSW A
Anaheim CA 92806
Tel 7146322999
Fax 7146322974
Dispatch 800 491 2990
o/lmperial County,
7313 Carroll Rd Ste G
San Diego CA92121
Tel 8585373999
Fax 858 537 3990
Dispatch 8888445060
Inland Empire
14467 Meridian Pkwy Bldg 2 A
Riverside CA92518
Tel 951 653 4999
Fax 951 653 4666
Dispatch 800 491 2990
DAILY INSPECTION
REPORT
PG OF
DSA/CITY File #
DSA/OSHPD APPL #.
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
ROJECT NAME DATE
ARCHITECT,TIME ARRIVED TIME DEPARTED
ENGINEER
6S1T
TRAVEL TIME 'LUNCH TIME
CONTRACIOR SUB CONTRACTOR
INSPECTION ADDRESS ADDRESS OF PROJECT
TYPE OF INSPECTION
U ENGINEERED'FILL
a FOUNDATION
i7l BACK FILL
D BATCH PLANT
Zi PT CONCRETE
H SHOTCRETE
SJ;CONCRETE
Zl MASONRY
U HIGH STRENGTH BOLTING
Z1 WELDING
D SHOP WELD
C FIREPROOFING
D ANCHOR/DOWEL
C NDE FIELD
III NDE SHOP
Z CEILING WIREa
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
AVAILABLE
APPROVED PLANS YjKT N 'J
SOIL REPORT YF1 NT.SPECS
APPROVED SHOP DRAWING YU N L_
MAIERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS)
S^cg\ - re/"
CONTRACTORS EQUIPMENT / MANPOWER USED
AREA GRID LINES PIECES INSPECTED
,P ^" ' ^fc \ O
p
iTO O'^QN,
fWriWyx j
STRUCTURAL NOTES DETAIL OR RFIS USED
REMARKS. INCLUDING MEETINGS
A\A I IV /x 1 i a'ft.
TKP l?r J\cj
~7—sr
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WASvl WAS NOT G
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT>
approved documents
MATERIAL SAMPLING WASK WAS NOT D N/A~I
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Proiect Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED MET,? DID NOJJWEETa -
THE requirements of the DSA/OSHPD/PRfjJF_CJi approved documents
Samples taken
Weather ruhi^v^Temp "7 \ '
Signature of Special Inspector
\JlVDfJ
Certification
Verified by _/
www mtglinc com
MTGL Project # V41H
Permit# *• >>O "?• 1
Corporate
2992 E La Raima Ave
Anaheim CA 92806
Tel 7146322999
Fax 7146322974
Dispatch 800 491 2990
San Diego/Imperial Coun
Ste A 7313 Carroll Rd Ste G
San Diego CA92121
Tel 8585373999
Fax 858 537 3990
Dispatch 8888445060
Inland Empire
. 14467 Meridian Pkwy Bldg 2 A
Riverside CA92518
Tel 951 653 4999
Fax 951 653 4666
Dispatch 800 491 2990
C>\
DAILY INSPECTION
Report #_PG.DF
DSA/CITY File #
DSA/OSHPDAPPL#._
DSA/LEA# _
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
PROJECT NAMt
V^fr SV. .*
DATE
ARCHIILCV
C.KArX
jf TIME ARRIVED TiMfc DEPARTED
ENGINEER TRAVEL TIME LUNCH TIME
CONTRACTOR SUB CONTRACTOR;ONTRACTORRod V
INSPECTION ADDRESS ADDRESS OF PROJECT
TYPE OF INSPECTION
I ; ENGINEERED FILL
r. FOUNDATION
'.1 BACK FILL
BATCH PLANT
i PT CONCRETE
U SHOTCRETE
^CONCRETE
"I MASONRY
J HIGH STRENGTH BOLTING
i I WELDING
L SHOP WELD
D FIREPROOFING
H ANCHOR/DOWEL
I . IMDE FIELD
i NDESHOP
i CEILING WIRE
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
AVAILABLE
APPROVED PLANS
SOIL REPORT Y .1 IO
N II
SPECS Y«bN~
APPROVED SHOP DRAWING Y N U
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MAI ERIAL TEST REPORTS)
bK~ Cxrf*V\t> bo
CONTRACTORS EQUIPMENT/ MANPOWER USED
AREA GRID IINES PIECES INSPECTED
\A\ ^ov<?r;A r^>\
**\
STRUCTURAL NOILS DETAIL OR RFIS UStD
yJ'i r l
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS;>fl WAS NOT ill
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECJ>
approved documents —~""""
MATERIAL SAMPLING WAS.j WAS NOT N/Ai"l
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED METX DID NQTJ/IEET ~
THE requirements of the DSA/OSHPD/PR.OJECT?approved documents
Samples taken
Weather OV/lA/CA\ V Temp ^lo "?—
Signature of Special Inspector
Certification
Verified by
_. 3 3> i f$
Print Name
Q1 -fJJL g"
FOOTING OBSERVATION SUMMARY
Leighton and Associates, Inc
A LEIGHTON GROUP COMPANY
Project Name _j
Location <O=srU W<A , CA
Plan File No
Referenced Geotechnical Report(s)
Date
Project No ''
Permit No Unit/Phase/Lot(s)
Observation Summary
Initials
Date
r
A representative of Leighton and Associates observed onsite soil conditions Soil conditions at
tne Slte are substantially in conformance with those assumed in the geotechnical report
Initials ^ representative of Leighton and Associates observed and measured footing excavation
depth/width Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report
Initials A representative of Leighton and Associates measured footing setback from slope face The
Date setback was in general accordance with the recommendations of the geotechnical report
frv* •vy* Initials
M--ZS aVDate
Notes to Superintendent/Foreman
1 Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete
2 Based on expansion potential of underlying soils, presoakmg of soil below slabs may be recommended
Consult the geotechnical report for presoakmg recommendations We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly
3 In the event of a site change subsequent to our footing observation and prior to concrete placement (i e ,
heavy ram, etc ), we should be contacted to perform additional site observations
Note to Building inspector
1 Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading
For Leighton andxAssociates, Inc Date
3930 R 1 05
FIELD COPY