Loading...
HomeMy WebLinkAbout2669 GATEWAY RD; BLDG E; CB072915; Permit05-19-2008 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No Building Inspection Request Line (760) 602-2725 CB072915 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title 2669 GATEWAY RD CBAD COMMIND Sub Type COMM 2131910800 Lot# 0 $31520100 Construction Type VN Reference # CT060024 BRESSIVILL-BLDG E 4980 SF RETAIL 530 SF 2 PERGOLAS 180 SF TRELLIS Status Applied Applicant MIKE MERRILL 1717KETTNERBLVD STE 100 SAN DIEGO 92101 619-814-0080 Plan Approved Issued Inspect Area Plan Check# Owner LNR BRESSI COMMERCIAL INC C/O LENNAR PARTNERS 4350 VON KARMAN AVE #200 NEWPORT BEACH CA 92660 ISSUED 11/19/2007 Entered By 04/23/2008 04/23/2008 PY PC 07-64 JMA Building Permit Add I Building Permit Fee Plan Check Add I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add I Renewal Fee Other Building Fee Pot Water Con Fee Meter Size Add I Pot Water Con Fee Reel Water Con Fee $1 322 01 Meter Size $0 00 Add'l Reel Water Con Fee $859 31 Meter Fee ($433 00) SDCWA Fee $0 00 CFD Payoff Fee $6619 PFF (3105540) $1 992 00 PFF (4305540) $000 License Tax (3104193) $0 00 License Tax (4304193) $000 Traffic Impact Fee (3105541) $000 Traffic Impact Fee (4305541) $0 00 PLUMBING TOTAL $0 00 ELECTRICAL TOTAL $0 00 MECHANICAL TOTAL $7 702 00 Master Drainage Fee D1 Sewer Fee $0 00 Redev Parking Fee $0 00 Additional Fees HMP Fee TOTAL PERMIT FEES $000 $225 00 $718800 $132039,' $5 736 66> $000 $000 $000 $1047000 $000 $91 00 $41000 $77 00 $000 $5 484 60 $000 $000 $000 $54 394 74 Total Fees $54,394 74 Total Payments To Date $54,394 74 Balance Due $000 r\ Inspector FINAL APPROVAL Date Clearance NOTICE Please take N|pTICE that approval of your project includes the lm|K>sition of fees dedications reservations or other exactions hereafter collectively referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack review set aside void or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired CltyofCarlsDad Final Building Inspection Dept Building Engineering Planning CMWD St Lite Fire Plan Check # Permit # Project Name Address Contact Person Sewer Dist Inspected x By L% Inspected By Inspected By Comments PC 07-64 CB072915 BRESSIVILL BLDG E 4980 SF RETAIL.530 SF 2 PERGOLAS 180 SF TRELLIS 2669 GATEWAY RD Phone CA Water Dist CA ' Si? Date / / f^i" — Inspected ZA///J 7 ' / ' Date Inspected Date Inspected Date Permit Type Sub Type Lot 0 Approved <^^ Approved Approved • 02/10/2009 COMMIND COMM Disapproved Disapproved Disapproved • • City of Carlsbad Final Building Inspection ICD 1 1 2009 Dept Building Engineering Planning CMWD St Lite Fire Plan Check# PC 07-64 Date 02/1-1/2009 O •• ~~*. Permit* CB072915 Permit Type COMMIND~~ '--^~- 1_ Project Name Address Contact Person Sewer Dist Inspected^ Bv (A Inspectea "• Bv Inspected Bv Comments BRESSI VILL -BLDG E 4980 SF RETAIL 530 SF 2 PERGOLAS, 180 SF TRELLIS 2669 GATEWAY RD DAVID OBRIEN Phone 7604451279 CA Water Dist CA ,-7 A Date \£~' Inspected 2 ~/3'O jf ' Date Inspected Date Inspected Sub Type COMM Lot 0 Approved ^x, Disapproved Approved Disapproved Approved Disapproved • • Page 1 of 1 Janeari Hawney - Bressi Ranch Village Center From: To: Date: Subject: Attachments: "Michael Elliott" <mikeelhott2@cox net> "Chnster Westman" <cwest@ci carlsbad ca us>, "Pete Dreibelbis" <pdrei@ci carlsbad ca us>, "Michele Masterson" <mmast@ci carlsbad ca us>, "Meghan Jacobson" <mjaco@ci carlsbad ca us>, "Christine Wauschek" <cwaus@ci carlsbad ca us>, "Janean Hawney" <Jhawn@ci carlsbad ca us>, <jjustus@schmidtdesign com>, <dplasch@grantgc com> 02/12/2009 6 25PM Bressi Ranch Village Center 182A - Bressi Ranch Village Center - Inspl doc Bressi Ranch Village Center Project Number CT 06-24 Drawing Number 452-9L Building A - 2641 Gateway Road - CB072908 Building B - 2647 Gateway Road - CB072910 Pad B - 2635 Gateway Road - CB072909 Building C - 2653 Gateway Road - CB072911 Building E - 2669 Gateway Road - CB072915 Landscape inspection comments arc attached Approved - Permit cards for buildings A, C and E and Pad B were signed Not ApproY$&«$ermit card for building B was not signed file //C \Documcnts and Settmgs\jhawn\Local Settmgs\Temp\XPgrpwise\4994698FGW- 02/13/2009 Inspection List Permit* CB072915 Type COMMIND COMM Date Inspection Item 02/11/2009 89 02/11/2009 89 02/10/2009 89 01/29/2009 89 12/08/2008 39 11/25/2008 39 11/04/2008 84 11/03/2008 84 10/31/2008 14 10/27/2008 11 10/27/200823 10/27/2008 39 10/22/2008 18 10/03/2008 17 10/01/2008 17 10/01/2008 18 09/18/2008 17 09/18/2008 18 09/18/200884 09/11/2008 14 09/11/2008 18 09/04/2008 1 5 08/19/2008 11 08/19/2008 15 08/19/2008 24 08/18/2008 24 08/14/2008 66 08/12/2008 11 08/11/2008 11 08/11/2008 13 08/11/2008 15 08/07/2008 1 1 08/07/2008 12 08/06/2008 13 07/21/2008 11 07/15/2008 11 06/04/2008 31 05/02/2008 81 04/30/2008 1 1 04/24/2008 21 Final Combo Final Combo Final Combo Final Combo Final Electrical Final Electrical Rough Combo Rough Combo Frame/Steel/Boltmg/Weldin Ftg/Foundation/Piers Gas/Test/Repairs Final Electrical Exterior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Rough Combo Frame/Steel/Bolting/Weldin Exterior Lath/Drywall Roof/Reroof Ftg/Foundation/Piers Roof/Reroof Rough/Topout Rough/Topout Grout Ftg/Foundation/Piers Ftg/Foundation/Piers Shear Panels/HDs Roof/Reroof Ftg/Foundation/Piers Steel/Bond Beam Shear Panels/HD's Ftg/Foundation/Piers Ftg/Foundation/Piers Underground/Conduit-Wirm Underground Combo Ftg/Foundation/Piers Underground/Under Floor Inspector Act PY - PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY JM PY PY PY PY RB AP Rl PA PA PA PA AP NR NR PA AP PA AP AP AP PA we we AP PA AP AP PA PA PA NR AP PA PA PA AP PA we AP AP PA PA AP PA AP BRESSI VILL -BLDG E 4980 SF RETAIL.530 SF 2 PERGOLAS, 180 SF TRE Comments paint roof vents EMR T-BAR 8 LIGHT POLE FTG EMR PERGOLAS PERGOLAS MANSARD REVISION LITE POLE FTGS MEASURE ROOF ? ROOF DRAINS TRASH ENCLOSURE trash enclosure light pole (3) and pergola LIGHT POLES LIGHT POLE FTGS PERGOLA FTG PERGOLA FTG parking lot light conduit from Bldg E interior post ftg Tuesday February 17 2009 Page 1 of 1 City of Carlsbad Bldg Inspection Request For 02/11/2009 PermiW CB072915 Title BRESSI VILL-BLDG E 4980 SF Description RETAIL.530 SF 2 PERGOLAS, 180 SF TRELLIS Inspector Assignment PY 2669 GATEWAY RD Lot Type COMMIND Sub Type COMM Job Address Suite Location OWNER LNR BRESSI COMMERCIAL INC Owner Remarks Phone 7604451279 Inspector Total Time CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By DAVID OBRIEN Entered By CHRISTINE Act Comments Comments/Notices/Holds Associated PCRs/CVs Original PC# PC 07-64 PCR08043 ISSUED BKHSSl RANCH Vll.l.AGl"; CT-NTER DI/TITRFD TRUSS SUBMHTAl. AI I. I5UII DINGS PCR08044 ISSUED BRKSSI RANCH Vll.l.AGl; CI-iN'lfcK RliVIO 13 PAGI.S( Dhl.TA 4) I'l.UMBING/l-l IX1 PCR08089 ISSUED BRHSSI RANCH VII.I. CliN Ul.DG 1 DLL.I: I F PARAPIH1 ADD MANSARD ROOC PCR08095 ISSUED BRFSSI RANCH Vll.l.AGl: CI-iN II R ADD DRAIN LINKS I OR l-'IRi; SPRINKI I.R RISl.R Inspection History Insp Comments PY PY paint roof vents EMR Date Description Act 02/10/2009 89 Final Combo PA 01/29/2009 89 Final Combo PA 12/08/2008 39 Final Electrical PA PY 11/25/2008 39 Final Electrical PA PY 11/04/2008 84 Rough Combo AP PY 11/03/2008 84 Rough Combo NR PY 10/31/2008 14 Frame/Steel/Bolting/Weldmg NR PY 10/27/2008 11 Ftg/Foundation/Piers PA PY 10/27/2008 23 Gas/Test/Repairs AP PY 10/27/2008 39 Final Electrical PA PY TBAR 8 LIGHT POLE FTG EMR City of Carlsbad Bldg Inspection Request For 12/08/2008 Permit* CB072915 Title BRESSI VILL -BLDG E 4980 SF Description RETAIL.530 SF 2 PERGOLAS, 180 SF TRELLIS Inspector Assignment PY Sub Type COMM 2669 GATEWAY RD Lot Type COMMIND Job Address Suite Location OWNER LNR BRESSI COMMERCIAL INC Owner Remarks STE 101 Phone 9092088193 Inspector Total Time Requested By PETE Entered By JANEAN CD Description 39 Final Electrical Act Comments Comments/Notices/Holds Date 11/25/2008 11/04/2008 11/03/2008 10/31/2008 10/27/2008 10/27/2008 10/27/2008 10/22/2008 10/03/2008 10/01/2008 10/01/2008 09/18/2008 09/18/2008 09/18/2008 09/11/2008 09/11/2008 Associated PCRs/CVs Original PC# PC 07-64 PCR08043 ISSUED BRESSI RANCH VILLAGE CENTER DEI-TERED TRUSS SUBMITTAI. ALL BUILDINGS PCR08044 ISSUED BRESSI RANCH VILLAGE CENTER REV TO 13 PAGESt DELTA 4) PLUMBING/EI.EC PCR08089 ISSUED BRESSI RANCH VILL CliN BLDG E DELETE PARAPET ADD MANSARD KOO PCR08095 ISSUED BRESSI RANCH VILLAGE CENTER ADD DRAIN LINES 1-OR FIRE SPRINKLER RISER Inspection History Description 39 Final Electrical 84 Rough Combo 84 Rough Combo 14 Frame/Steel/Bolting/Weldmg 11 Ftg/Foundation/Piers 23 Gas/Test/Repairs 39 Final Electrical 18 Exterior Lath/Drywall 17 Interior Lath/Drywall 17 Interior Lath/Drywall 18 Exterior Lath/Drywall 17 Interior Lath/Drywall 18 Exterior Lath/Drywall 84 Rough Combo 14 Frame/Steel/Bolting/Weldmg 18 Exterior Lath/Drywall Act PA AP NR NR PA AP PA AP AP AP PA we we AP PA AP Insp Comments PY PY T BAR PY PY PY 8 LIGHT POLE FTG PY PY EMR PY PERGOLAS PY PY PY PY PY PY PY PERGOLAS PY CITY OF CARLSBAD ELECTRIC AND GAS METER CLEARANCE INTER-DEPARTMENT ADDRESS o 1 S E O Service Equipment Only Reason, If Denied ELECTRIC METER GAS METER COMMERCIAL RESIDENCE NEW SERVICE RELOCATE TSPB TEMP P/P UP-GRADE TEST METER IRR PEDESTAL COMMERCIAL RESIDENCE TEST METER Buildmgflnspactor Signature Called In By YES NO YES NO YES NO Time Date Time Called In To CITY OF CARLSBAD ELECTRIC AND GAS METER CLEARANCE INTER-DEPARTMENT ADDRESS S E O Service Equipment Only Reason, If Denied ELECTRIC METER Si^tx /03 GAS METER COMMERCIAL RESIDENCE NEW SERVICE RELOCATE TSPB TEMP P/P UP-GRADE TEST METER IRR PEDESTAL COMMERCIAL RESIDENCE TEST METER Builing npector Signature Called In By is YES NO YES NO YES NO Time Date Time Called In To CITY OF CARLSBAD ELECTRIC AND GAS METER CLEARANCE INTER-DEPARTMENT ADDRESS S E O Service Equipment Only Reason, If Denied ELECTRIC METER GAS METER COMMERCIAL RESIDENCE NEW SERVICE RELOCATE TSPB TEMP P/P UP-GRADE TEST METER IRR PEDESTAL COMMERCIAL RESIDENCE TEST METER spector Signature Called In By YES NO YES NO Date Time Called In To 01 - 2.°( PROJECT DESIGN CONSULTANTS File 321905 May 1 2008 CITY OF CARLSBAD Building Department 1635 Faraday Avenue Carlsbad CA 92008-7314 SUBJECT Bressi Ranch Village Center - Form Certification for Building Shop E To Whom It May Concern Project Design Consultants has field verified the form positions for Building ShopJB as shown on Sheet 7 of the Grading and Erosion Control Plans of the above-referenced project Upon our review of the survey data collected on April 29 2008 the building footprint conforms horizontally and vertically within .'.0 1 feet to the approved design Sincerely Lawrence D Naiman LS Associate LS5163 Exp 6/30/09 OJ Insulation, LP Escondido (874) 2061 Aldergrove Ave Escondido, CA 92029 2 C o 7 Insulation Certificate Insulation is installed in the structure described below as follows Work Area Attic Area Wire Demising Walls Sound walls Exterior Walls and Rim Joists Attic Area - Batts Attic Area Batts Item Installed ISW17G Wire 17 Gauge 1/4 MI Spool R 11 16" x 96' Unfaced - CertaSound - Batts R 11 24" x 96' - Unfaced - CertaSound Batts R-19 15 25" x 48 Unfaced - Batts R-30 16" x 48" Unfaced - Batts R 30 24 x 48 - Unfaced - Batts Sq Feet 4920 2950 480 3440 4920 4920 * Fiberglass blow has no settling factor for R-values Job Name BRESSI RANCH VILLAGE CENTER Lot No Shop E Job Address EL FUERTE AND GATEWAY STREET CARLSBAD, CA 92008 Date Completed October 14, 2008 Insulation By •.ii'MEii www mtglmc com MTGL Proiect # \L\1 H /M O_ Permit #_C_ Report # Corporate ' 2992 E La Raima AvFSW A Anaheim CA 92806 Tel 7146322999 Fax 7146322974 Dispatch 800 491 2990 o/lmperial County, 7313 Carroll Rd Ste G San Diego CA92121 Tel 8585373999 Fax 858 537 3990 Dispatch 8888445060 Inland Empire 14467 Meridian Pkwy Bldg 2 A Riverside CA92518 Tel 951 653 4999 Fax 951 653 4666 Dispatch 800 491 2990 DAILY INSPECTION REPORT PG OF DSA/CITY File # DSA/OSHPD APPL #. DSA/LEA# Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection ROJECT NAME DATE ARCHITECT,TIME ARRIVED TIME DEPARTED ENGINEER 6S1T TRAVEL TIME 'LUNCH TIME CONTRACIOR SUB CONTRACTOR INSPECTION ADDRESS ADDRESS OF PROJECT TYPE OF INSPECTION U ENGINEERED'FILL a FOUNDATION i7l BACK FILL D BATCH PLANT Zi PT CONCRETE H SHOTCRETE SJ;CONCRETE Zl MASONRY U HIGH STRENGTH BOLTING Z1 WELDING D SHOP WELD C FIREPROOFING D ANCHOR/DOWEL C NDE FIELD III NDE SHOP Z CEILING WIREa DSA/OSHPD/PROJECT APPROVED DOCUMENTS AVAILABLE APPROVED PLANS YjKT N 'J SOIL REPORT YF1 NT.SPECS APPROVED SHOP DRAWING YU N L_ MAIERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS) S^cg\ - re/" CONTRACTORS EQUIPMENT / MANPOWER USED AREA GRID LINES PIECES INSPECTED ,P ^" ' ^fc \ O p iTO O'^QN, fWriWyx j STRUCTURAL NOTES DETAIL OR RFIS USED REMARKS. INCLUDING MEETINGS A\A I IV /x 1 i a'ft. TKP l?r J\cj ~7—sr REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE THE WORK WASvl WAS NOT G Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT> approved documents MATERIAL SAMPLING WASK WAS NOT D N/A~I Performed in accordance with DSA/OSHPD/PROJECT approved documents cc Proiect Architect Contractor Structural Engineer Building Department DSA Regional Office Owner School District THE WORK INSPECTED MET,? DID NOJJWEETa - THE requirements of the DSA/OSHPD/PRfjJF_CJi approved documents Samples taken Weather ruhi^v^Temp "7 \ ' Signature of Special Inspector \JlVDfJ Certification Verified by _/ www mtglinc com MTGL Project # V41H Permit# *• >>O "?• 1 Corporate 2992 E La Raima Ave Anaheim CA 92806 Tel 7146322999 Fax 7146322974 Dispatch 800 491 2990 San Diego/Imperial Coun Ste A 7313 Carroll Rd Ste G San Diego CA92121 Tel 8585373999 Fax 858 537 3990 Dispatch 8888445060 Inland Empire . 14467 Meridian Pkwy Bldg 2 A Riverside CA92518 Tel 951 653 4999 Fax 951 653 4666 Dispatch 800 491 2990 C>\ DAILY INSPECTION Report #_PG.DF DSA/CITY File # DSA/OSHPDAPPL#._ DSA/LEA# _ Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection PROJECT NAMt V^fr SV. .* DATE ARCHIILCV C.KArX jf TIME ARRIVED TiMfc DEPARTED ENGINEER TRAVEL TIME LUNCH TIME CONTRACTOR SUB CONTRACTOR;ONTRACTORRod V INSPECTION ADDRESS ADDRESS OF PROJECT TYPE OF INSPECTION I ; ENGINEERED FILL r. FOUNDATION '.1 BACK FILL BATCH PLANT i PT CONCRETE U SHOTCRETE ^CONCRETE "I MASONRY J HIGH STRENGTH BOLTING i I WELDING L SHOP WELD D FIREPROOFING H ANCHOR/DOWEL I . IMDE FIELD i NDESHOP i CEILING WIRE DSA/OSHPD/PROJECT APPROVED DOCUMENTS AVAILABLE APPROVED PLANS SOIL REPORT Y .1 IO N II SPECS Y«bN~ APPROVED SHOP DRAWING Y N U MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MAI ERIAL TEST REPORTS) bK~ Cxrf*V\t> bo CONTRACTORS EQUIPMENT/ MANPOWER USED AREA GRID IINES PIECES INSPECTED \A\ ^ov<?r;A r^>\ **\ STRUCTURAL NOILS DETAIL OR RFIS UStD yJ'i r l REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE THE WORK WAS;>fl WAS NOT ill Inspected in accordance with the requirements of the DSA/OSHPD/PROJECJ> approved documents —~"""" MATERIAL SAMPLING WAS.j WAS NOT N/Ai"l Performed in accordance with DSA/OSHPD/PROJECT approved documents cc Project Architect Contractor Structural Engineer Building Department DSA Regional Office Owner School District THE WORK INSPECTED METX DID NQTJ/IEET ~ THE requirements of the DSA/OSHPD/PR.OJECT?approved documents Samples taken Weather OV/lA/CA\ V Temp ^lo "?— Signature of Special Inspector Certification Verified by _. 3 3> i f$ Print Name Q1 -fJJL g" FOOTING OBSERVATION SUMMARY Leighton and Associates, Inc A LEIGHTON GROUP COMPANY Project Name _j Location <O=srU W<A , CA Plan File No Referenced Geotechnical Report(s) Date Project No '' Permit No Unit/Phase/Lot(s) Observation Summary Initials Date r A representative of Leighton and Associates observed onsite soil conditions Soil conditions at tne Slte are substantially in conformance with those assumed in the geotechnical report Initials ^ representative of Leighton and Associates observed and measured footing excavation depth/width Footing excavations extend to proper depth and bearing strata and are in general conformance with recommendations of the geotechnical report Initials A representative of Leighton and Associates measured footing setback from slope face The Date setback was in general accordance with the recommendations of the geotechnical report frv* •vy* Initials M--ZS aVDate Notes to Superintendent/Foreman 1 Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete 2 Based on expansion potential of underlying soils, presoakmg of soil below slabs may be recommended Consult the geotechnical report for presoakmg recommendations We note that clayey soils may take an extended period of time and the contractor should schedule accordingly 3 In the event of a site change subsequent to our footing observation and prior to concrete placement (i e , heavy ram, etc ), we should be contacted to perform additional site observations Note to Building inspector 1 Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil expansion index test results are contained in the As-Graded Geotechnical Report provided at the completion of grading For Leighton andxAssociates, Inc Date 3930 R 1 05 FIELD COPY