HomeMy WebLinkAbout2672 PEPPERTREE WAY; ; CB050852; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
05-06-2(}05 Retaining Wall Permit Permit No: CB050852
' Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
2672 PEPPERTREE WY CBAD
RETAIN Status:
Lot#: 195 Applied:
Valuation:
2131503000
$3,568.00 Construction Type: NEW Entered By:
Reference #: Plan Approved:
Issued:
Project Title: HEATHER CT LOT 195 223 SF Plan Check#:
RETAIN WALUCITY STDS/LEVEL BACKFILL
Applicant:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Strong Motion Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Total Fees: $89.26 Total Payments To Date: $0.00 Balance Due:
ISSUED
03/16/2005
KG
05/06/2005
05/06/2005
PC050035
Inspect Area:
$53.49
$0.00
$34.77
$0.00
$1.00
$0.00
$0.00
$0.00
$0.00
$89.26
$89.26
7701 05/06/05 0002 01.
CGF"
Inspector:
FINAL APPROVAL
Date: /r M · t'(:, Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES lT APPLY to any
I f whi
02
89-26
. • City of Carlsbad Bldg Inspection Request
For: 01/24/2006 .
Permit# CB050852
Title: HEATHER CT LOT 195 223 SF
Description: RETAIN WALL/CITY STDS/LEVEL BACKFILL
Type: RETAIN Sub Type:
Job Address:
Suite:
Location:
2672 PEPPERTREE WY
Lot 195
APPLICANT GREYSTONE HOMES INC
Owner: BECKELHIMER WILLIAM J&TAMI L
Remarks: CAN YOU FINAL?
Total Time:
CD Description
69 Final Masonry
Comments/Notices/Hold
Phone:
Inspector: -----
Requested By: CHRISTINE
Entered By: CHRISTINE
Associated PCRs/CVs Original PC# PC050035
lnsQection Histoey
Date Description Act lnsp Comments
07/26/2005 65 Retaining Walls AP RB FRENCH DRAIN
07/07/2005 66 Grout AP RB
06/30/2005 61 Footing AP RB
-;: FOOTING OBSERVATION SUMMARY ... .
Leightoh ~nd Associates, Inc.
A LEIGHTON GROUP COMPANY
Project Name: /3tu.«1 ih1l".-d fe·Y Date:
Location: --P,r.tf?t?~ ~iJJ'rLJ Project No.: 7
Plan File No.: ________ Permit No.: _____ Unit/Phaselk.£t(s):
Referenced Geotechnical Report(s):
,rs-1,,,t.1-r-l:) ~ or {U)LL 1, H 1--f1,-;~ torut:»t& , t--<iT-J 111r , )::.,t--t-1() "i.tJ. a r -1-1,J, , I
13& f2 B,taulf , 6f ~ ~ ;::::,nc,, lt.mtJJH(...,. &"~ If-: Zt:M 4: > ' I ~ I '
Observation Summary
z,t:,t/ Initials A representative of Leighton and Associates observed onsite soil conditions. Soil conditions at
lo ·,,?-9-cJDate the site are substantially in conformance with those assumed in the geotechnical report.
l,c.)H Initials
l,;9• ornate
A representative of Leighton and Associates observed and measured footing excavation
depth/width. Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report.
Initials ----
Date
A representative of Leighton and Associates measured footing setback from slope face. The
setback was in general accordance with the recommendations of the geotechnical report.
----
ZA-) J-1 Initials
t,.•;9-c.S-Date
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended.
Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e.,
heavy rain, etc.), we should be contacted to perform additional site observations.
Note to Building inspector
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading.
Date
FIELD COPY
3930 R 1-05