HomeMy WebLinkAbout2674 Gateway Rd; ; CBCA2017-0018; PermitPermit
Print Date: 06/07/2019
Job Address: 2674 Gateway Rd
Permit Type: BLDG-Associated Permit Commerci Work Class:
Parcel No: 2132621900 Lot#:
Valuation: $491,111.00 Reference#:
Occupancy Group: Construction Type:
# Dwelling Units: Bathrooms:
Bedrooms: Orig. Plan Check#:
Plan Check#:
Project Title: UPTOWN BRESSI RANCH
Description: UPTOWN BRESSI: BUILDING H -8,300 SF RETAIL SHELL
Applicant:
SMlTH CONSULTING ARCHITECTS
NORMAN BARRffi
13280 Evening Creek Dr S
San Diego, CA 92128-4101
858-793-4777
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
BUILDING PLAN CHECK FEE (BLDG)
Owner:
BRESSI RETAIL LLC
130 Vantis Dr, 200
Aliso Viejo, CA 92656-2691
858-526-6655
COMMUNITY FACILITIES DISTRICT (CFD) FEE-NON-RES
ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
LOCAL FACILITIES MANAGEMENT ZONE (LFMZ) -ZONE 17
MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -inside CFD
581473 GREEN BUILDING STATE STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 1-1/2'' Displacement
SEWER BENEFIT AREA FEES -H
SEWER CONNECTION FEE (General Capacity all areas)
SWPPP INSPECTION FEE TIER 1-Medium BLDG
SWPPP PLAN REVIEW FEE TIER 1 -MEDIUM
TRAFFIC IMPACT Commercial-Industrial w/in CFO
WATER METER FEE 1-1/2" Displacement
WATER SERVICE CONNECTION FEE 1-1/2" DISPLACEMENT-?
WATER TREATMENT CAPACITY CHRG 1-1/2" Displacement
Total Fees: $124,603.48 Total Payments To Date:
New
4
DEV12023
VB
PC2017-0015
$124,603.48
Status:
Applied:
Issued:
Permit
Finaled:
Inspector:
Final
Inspection:
Balance Due:
{city of
Carlsbad
Permit No: CBCA2017-0018
Closed -Finaled
11/06/2017
04/19/2018
AKrog
6/7/2019 12:06:40PM
$0.00
$2,017.60
$612.32
$1,412.32
$0.00
$B9.00
$170.00
$3,320.00
$55.00
$8,938.22
$20.00
$15,297.00
$4,831.28
$4,305.74
$238.00
$56.00
$64,491.00
$606.00
$17,721.00
$423.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
PERMIT INSPECTION HISTORY REPORT (CBCA2017-0018)
Permit Type BLDG-Associated Pennit Commercial Application Date: 11/06/2017 Owner:
Work Class: New Issue Date: 04/19/2018 Subdivision:
Status: Closed -Finaled Expiration Date: 10/21/2019 Address:
IVR Number: 7496
Scheduled
Date
Actual
Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
04(2312019 04/23/2019
06/07/2019 06107(2019
June 07, 2019
BLDG-Fire Final 080891-2019
BLDG-Final
Inspection
Checklist Item
FIRE-Building Final
094099-2019
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Passed Cindy Wong
COMMENTS
Passed Andy Krogh
COMMENTS
BRESSI RETAIL LLC
267 4 Gateway Rd
Ca~sbad, CA 92009
Reinspection
Passed
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Complete
Complete
Page 2 of 2
PERMIT INSPECTION HISTORY REPORT (CBCA2017-0018)
Permit Type: BLDG-Associated Permit Commercial Application Date: 11/06/2017 Owner: BRESSI RETAIL LLC
Work Class: New Issue Date: 04/19/2018 Subdivision:
Status: Closed -Finaled Expiration Date: 10/21/2019 Address: 267 4 Gateway Rd
Carlsbad, CA 92009
IVR Number: 7496
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
06/04/2018 05/3112018 BLDG-21 059637-2018 Passed Andy Krogh Complete
Underground!Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency As noted on card Yes
06/08/2018 06!08/2018 BLDG-12 Steel/Bond 060484-2018 Passed Andy Krogh Complete
Beam
0711712018 07/1712018 BLDG-15 064163-2018 Failed Andy Krogh Reinspection Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
07/30/2018 07(30/2018 BLDG-14 065007-2018 Partial Pass Andy Krogh Reinspection Incomplete
Frame/Steel/Bolting/
Welding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Exterior Yes
BLDG-34 Rough 065008-2018 Partial Pass Andy Krogh Reinspection Incomplete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Exterior Yes
08/27/2018 08/27/2018 BLDG-16 Insulation 068164-2018 Failed Andy Krogh Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-24 068165-2018 Passed Andy Krogh Complete
Rough/Topout
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Roof drains Yes
09/19/2018 09/19/2018 BLDG-11 070435-2018 Passed Andy Krogh Complete
Foundation/Ftg/Pler
s (Rebar)
Checklist ltcm COMMENTS Passed
BLDG-Building Deficiency Trash enclosures Yes
10/09/2018 10/09/2018 BLDG-18 Exterior 072304-2018 Passed Andy Krogh Complete
Lath/Drywall
11/01/2018 11/01/2018 BLDG-33 Service 074887-2018 Passed Andy Krogh Complete
Change/Upgrade
BLDG-34 Rough 074885-2018 Passed Andy Krogh Complete
Electrical
June 07, 2019 Page 1 of 2
«~ ~ CI T V OF
CARLSBAD
Building Division INSPECTION RECORD • CBCA2017-0018
0 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
, 2674 GATEWAY RD
UPTCM'N BRESSI· BUILDING H-8.300 SF RETAIL SHELL
0 CALL BEFORE 3:00 pm FOR NEXT WORK DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca.gov/Bullding AND CLICK ON
"Request Inspection"
2132621900
PC2017-0015 111612011
DATE: U-fG\-i CBCA2017-0018
If "YES" is
please< that Division·s approval Is required PJ!Qr to reg__u~..tmg a Final Building Inspection. If you have any questions
ble divisions at the phone numbers provided below. After all required approvals are signed off-fax to 7GO-GO«-o .... uv. """"' to bll!g!nfil)ections@~adca. ov or bring in a COPY of this card to: 1635 Faraday Ave .. Carlsbad.
STORM WATER PRECON MEETING REQUIRED 760--602-2725 Allow 24 hours
IF MAAKEO '"YES", APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING
#24
#27
#23
#25
Fire Prevention
Planning/Landscape
MASONRY PRE GROUT
□ GROUT O WALL DRAINS
TILT PANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME □ FLOOR □ CEILING
cooE" POOLS
#51 POOL EXCAV / STEEL
#52 PLUMBING
#S3 ELEC /CONDUIT/WIRING
#54 EQUIPOTENTIAL BOND
#55 PREPLASTEJI / FEJIICE/ Al.ARMS
157 8UNfTE
Bl.DI-FINAL
760--602-4660
760-944-8463
760-438-3891
Date Ins or
Allow 48 hours
Allow 48 hours
Call before 2 pm
UNDERGROUND 111,12,21,31)
#82 DRYWALL.EXT LATH, GAS TES (17,18,23)
#83 ROOF SH EATING, EXT SHEAR (13,15)
A(S UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
A/5 OVERHEAD HYDROSTATIC
A(S FINAL
F / A ROUGH-IN
F/A FINAL
FIXED EXTINGUISHING SYSTEM ROUGH-IN
FIXED EXTING SYSTEM HYDROSTATIC TEST
FIXED EXTINGUISHING SYSTEM FINAL
MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
COPY OF CARD
REQUIRED
SEE IIACI( FOA SPECIAL NOTl:S