HomeMy WebLinkAbout2689 ECHO AVE; ; CB050901; Permit03-24-2005
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
03/24/2005
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB050901
Building Inspection Request Line (760) 602-2725
2689 ECHO AV CBAD
RESDNTL
2131621000
$358,952.00
Sub Type: SFD
Lot #: 307
Construction Type: NEW
Reference*: CT02-14
1 Structure Type: SFD
4 Bathrooms: 4
CASSIA @ BRESSI PHS 3, PLN 2
3710 SF LIV, 682SF GAR, 158 SF PRCH,
Status:
Applied:
Entered By:
Issued
Inspect Area:
Orig PC#:
Plan Check*:
ISSUED
02/28/2005
RMA
Plan Approved:
03/24/2005
PY
PC03-65
PC050016
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Building Permit $1,344.28 Meter Size
Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Check $873.78 Meter Fee $160.00
Add'l Plan Check Fee $0.00 SDCWA Fee $2,461.00
Plan Check Discount ($69.90) CFD Payoff Fee $2,848.90
Strong Motion Fee $35.90 PFF $6,532.93
Park in Lieu Fee $2,436.00 PFF (CFD Fund) $0.00
Park Fee $0.00 License Tax $0.00
LFM Fee $0.00 License Tax (CFD Fund) $0.00
Bridge Fee $0.00 Traffic Impact Fee $660.00
Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $175.00
Renewal Fee $0.00 ELECTRICAL TOTAL $60.00
Add'l Renewal Fee $0.00 MECHANICAL TOTAL $107.00
Other Building Fee $0.00 Housing Impact Fee $0.00
Pot. Water Con. Fee $2,999.00 Housing InLieu Fee $0.00
Meter Size D5/8 Housing Credit Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Reel. Water Con. Fee $0.00 Sewer Fee $1,735.00
Additional Fees $0.00
TOTAL PERMIT FEES $22,358.89
Total Fees: $22,358.89 Total Payments To Date: $0.00 Balance Due: $22,358.89
4558 03/24/05 0002 01 02
CGP 22358^89
Inspector:
. -I ^ FINAL APPROVAL
AJJMS!^ Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reseivations, or other exactions hereafter collectively
referred to as "Yees/exactions." You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required Information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or senrice fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenivise expired.
City of Carlsbad BIdg Inspection Request
For: 01/13/2006
Permit# CB050901
Title: CASSIA @ BRESSI PHS 3, PLN 2
Description: 3710 SF LIV, 682SF GAR, 158 SF PRCH,
Inspector Assignment: PY
Type: RESDNTL Sub Type: SFD
Job Address: 2689 ECHOAV
Suite: Lot 307
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Phone: 7605354398
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
^4^
Act Comment
Requested By: JOE
Entered By: CHRISTINE
Comments/Notices/Hold
Associated PCRs/CVs Original PC# PC050016
Inspection Historv
Date Description Act Insp Comments
01/11/2006 89 Final Combo NR PY
01/09/2006 23 Gas/Test/Repairs CA PY
01/09/2006 89 Final Combo CA PY
12/07/2005 39 Final Electrical PA BN EMR
11/14/2005 23 Gas/Test/Repairs CO BN LOW TEST
11/14/2005 39 Final Electrical NR BN
11/10/2005 23 Gas/Test/Repairs NR PY
11/10/2005 39 Final Electrical NR PY
11/09/2005 39 Final Electrical NR PY
11/01/2005 89 Final Combo NR PY
09/30/2005 17 Interior Lath/Drywall AP PC
09/30/2005 18 Exterior Lath/Drywall AP PC
09/21/2005 84 Rough Combo AP PY