Loading...
HomeMy WebLinkAbout2689 ECHO AVE; ; CB050901; Permit03-24-2005 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/24/2005 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB050901 Building Inspection Request Line (760) 602-2725 2689 ECHO AV CBAD RESDNTL 2131621000 $358,952.00 Sub Type: SFD Lot #: 307 Construction Type: NEW Reference*: CT02-14 1 Structure Type: SFD 4 Bathrooms: 4 CASSIA @ BRESSI PHS 3, PLN 2 3710 SF LIV, 682SF GAR, 158 SF PRCH, Status: Applied: Entered By: Issued Inspect Area: Orig PC#: Plan Check*: ISSUED 02/28/2005 RMA Plan Approved: 03/24/2005 PY PC03-65 PC050016 Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Owner: GREYSTONE HOMES INC 1525 FARADAY AVE #300 CARLSBAD CA 92008 Building Permit $1,344.28 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $873.78 Meter Fee $160.00 Add'l Plan Check Fee $0.00 SDCWA Fee $2,461.00 Plan Check Discount ($69.90) CFD Payoff Fee $2,848.90 Strong Motion Fee $35.90 PFF $6,532.93 Park in Lieu Fee $2,436.00 PFF (CFD Fund) $0.00 Park Fee $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFD Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $660.00 Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $175.00 Renewal Fee $0.00 ELECTRICAL TOTAL $60.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $107.00 Other Building Fee $0.00 Housing Impact Fee $0.00 Pot. Water Con. Fee $2,999.00 Housing InLieu Fee $0.00 Meter Size D5/8 Housing Credit Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Reel. Water Con. Fee $0.00 Sewer Fee $1,735.00 Additional Fees $0.00 TOTAL PERMIT FEES $22,358.89 Total Fees: $22,358.89 Total Payments To Date: $0.00 Balance Due: $22,358.89 4558 03/24/05 0002 01 02 CGP 22358^89 Inspector: . -I ^ FINAL APPROVAL AJJMS!^ Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reseivations, or other exactions hereafter collectively referred to as "Yees/exactions." You have 90 days from the date this permit was issued to protest Imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required Information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or senrice fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenivise expired. City of Carlsbad BIdg Inspection Request For: 01/13/2006 Permit# CB050901 Title: CASSIA @ BRESSI PHS 3, PLN 2 Description: 3710 SF LIV, 682SF GAR, 158 SF PRCH, Inspector Assignment: PY Type: RESDNTL Sub Type: SFD Job Address: 2689 ECHOAV Suite: Lot 307 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Phone: 7605354398 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical ^4^ Act Comment Requested By: JOE Entered By: CHRISTINE Comments/Notices/Hold Associated PCRs/CVs Original PC# PC050016 Inspection Historv Date Description Act Insp Comments 01/11/2006 89 Final Combo NR PY 01/09/2006 23 Gas/Test/Repairs CA PY 01/09/2006 89 Final Combo CA PY 12/07/2005 39 Final Electrical PA BN EMR 11/14/2005 23 Gas/Test/Repairs CO BN LOW TEST 11/14/2005 39 Final Electrical NR BN 11/10/2005 23 Gas/Test/Repairs NR PY 11/10/2005 39 Final Electrical NR PY 11/09/2005 39 Final Electrical NR PY 11/01/2005 89 Final Combo NR PY 09/30/2005 17 Interior Lath/Drywall AP PC 09/30/2005 18 Exterior Lath/Drywall AP PC 09/21/2005 84 Rough Combo AP PY