Loading...
HomeMy WebLinkAbout2691 BRESSI RANCH WAY; ; CB041639; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 You are hereby FURTHER NOTIFIED that your right to protest the specified feeskxactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any 05-1 4-2004 Retaining Wall Permit Permit No: CB041639 Building Inspection Request Line (760) 602-2725 Bwei Raficki by Job Address: Permit Type: RETAIN Status: ISSUED Parcel No: 21 31 501 500 Lot#: 180 Applied: 04/21/2004 Valuation: $5,938.00 Construction Type: NEW Entered By: SB Reference #: CT02-14 Plan Approved: 05/14/2004 Issued: 05/14/2004 Project Title: BRESSI RANCH PA 8 --377 SF Plan Check#: PCO4-37 2691 WFWEMM€ WY CBAD RETAIN WALL PER CITY AND/OR SDRS C-I Inspect Area: Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Owner: Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Strong Motion Fee Renewal Fee Add'l Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES $68.89 $1 14.67 $44.78 $0.00 $1 .oo $0.00 $0.00 $0.00 $0.00 $229.34 Total Fees: $229.34 Total Payments To Date: $0.00 Balance Due: $229.34 PEWIT HAS WIRED IN ACCOREANCE WIT" C.B.C. SECTION 106.4.4 AS AMENDE5 BY C.M.C.18.04.030 DATE \-.\~IGNATURE &- FINAL APPROVAL Insoector: Date: Clearance: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Building fnspection Request Line (760) 602-2725 02-09-2005 Retaining Wall Permit Permit No: CB041639 Job Address: Permit Type: RETAIN Status: ISSUED Parcel No: 2131501500 Lot #: 180 Applied: 0412 112004 Valuation: $5,938.00 Construction Type: NEW Entered By: SB Reference #: CT02-14 Plan Approved: 0511 412004 Issued: 05/14/2004 Project Title: BRESSI RANCH PA 8 -377 SF Plan Check#: PCO4-37 PS 2691 BRESSI RANCH WY CBAD RETAIN WALL PER CITY AND/OR SDRS C-1 Inspect Area: Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Owner: Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Strong Motion Fee Renewal Fee Add'l Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES $68.89 $1 14.67 $44.78 $0.00 $1 .oo $0.00 $0.00 $0.00 $0.00 $229.34 Total Fees: $229.34 Total Payments To Date: $229.34 Balance Due: $0.00 FINAL APPROVAL Inspector: Date: Clearance: NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications reservations, or other exactions hereafter collectively referred to as 'feeslexactions " You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any olher required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified feesiexactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any feesiexactions of which YOU have Dreviouslv been aiven a NOTICE similar to this, or as to which the statute of limitations has Dreviouslv otherwise exDired -\ v- City of Carlsbad April 7,2005 Permit Number: CB041639 Issue Date: 5/14/04 RE: BUILDING PERMIT EXPIRATION ADDRESS: 2691 BRESSI RANCH WY PERMIT TYPE: RETAIN PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE Our records indicate that your building permit will expire by limitation of time on 5/26/05. The provisions of UBC, Section 106.4.4 as amended by the Carlsbad Municipal Code state: “EXPIRATION. Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit (unless issued prior to 7/1/99 which is one year from date of permit), or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of 180 days or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit. Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within 180 days of the date of permit issuance. Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each 180 day period upon the initial commencement of work authorized by such permit. Before such work can be recommenced, a new permit shall be obtained to do so, and the fee, therefore, shall be one-half the amount required for a new permit for such work, and provided that no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new permit fee. Any person holding an unexpired permit may apply for an extension of the time within which work may commence under that permit when the permittee is unable to commence work within the time period required by this section for good and satisfactory reasons. The Building Official may extend the time for action by the permittee for a period not exceeding 180 days on written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken. No permit shall be extended more than once. Please check below indicating your intentions and return this letter to us. Project abandoned. A new permit will be obtained prior to commencing work. No fee extension requested for 180 days. (attach a letter of explanation) Renewal permit requested. If the project has been completed and only a final inspection is needed, please call the inspection request line at If you have any questions, please contact the Building Inspection Department at (760) 602-2700. (760) 602-2725. Christine Wauschek Office Specialist 1635 Faraday Avenue * Carlsbad, CA 92008-7314 (760) 602-2700 FAX (760) 602-8560 @ November 3,2004 Permit Number: CB041639 Issue Date: 05/14/04 GREYSTONE HOMES INC KEITHKANDHAHN 1525 FARADAY #300 CARLSBADCA 92008 RE: BUILDING PERMIT EXPIRATION ADDRESS: 2691 GARDENLANE WY PLEASE CALL FOR AN INSPECTION IF WORK IS COMPLETE PERMIT TYPE: RETAIN Our records indicate that your building permit will expire by limitation of time on 12/26/04. The provisions of UBC, Section 106.4.4 as amended by the Carlshad Municipal Code state: “EXPIRATION. Every permit issued by the Building Official under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit (unless issued prior to 7/1/99 which is one year from date of permit), or if the building or work authorized by such permit is stopped at any time after the work is commenced for a period of 180 days or if the building or work authorized by such permit exceeds three calendar years from the issuance date of permit. Work shall be presumed to have commenced if the permittee has obtained a required inspection approval of work authorized by the permit by the Building Official within 180 days of the date of permit issuance. Work shall be presumed to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official within each 180 day period upon the initial commencement of work authorized by such permit. Before such work can be recommenced, a new permit shall be obtained to do so, and the fee, therefore, shall be one-half the amount required for a new permit for such work, and provided that no changes have been made or will be made in the original plans and specifications for such work, and provided further that such suspension or abandonment has not exceeded one year. In order to renew action on a permit after expiration, the permittee shall pay a new permit fee. Any person holding an unexpired permit may apply for an extension of the time within which work may commence under that permit when the permittee is unable to commence work within the time period required by this section for good and satisfactory reasons. The Building Official may extend the time for action by the permittee for a period not exceeding 180 days on written request by the permittee showing that circumstances beyond the control of the permittee have prevented action from being taken. No permit shall be extended more than once. Please check below indicating your intentions and return this letter to us. Project abandoned. A new permit will be obtained prior to commencing work. No fee extension requested for 180 days. (attach a letter of explanation) Renewal permit requested. If the project has been completed and only a final inspection is needed, please call the inspection request line at If you have any questions, please contact the Building Inspection Department at (760) 602-2700. (760) 602-2725. Christine Wauschek Office Specialist 1635 Faraday Avenue Carlsbad, CA 92008-7314 - (760) 602-2700 FAX (760) 602-8560 @ City of Carlsbad Bldg Inspection Request For: 06/29/2004 Permit# CB041639 Title: BRESSI RANCH PA 8 -377 SF Description: RETAIN WALL PER CITY AND/OR SDRS C-1 Type: RETAIN Sub Type: Job Address: 2691 GARDENLANE WY Suite: Lot 180 Location: APPLICANT GREYSTONE HOMES Owner: Remarks: Total Time: CD Description 66 Grout Inspector Assignment: PS Phone: 7605228206 Inspector: 25 Requested By: PAUL Entered By: CHRISTINE Associated PCRs/CVs InsDection Historv Date Description Act lnsp Comments 06/24/2004 61 Footing AP PS 06/21/2004 62 SteeVBond Beam CA PS