HomeMy WebLinkAbout2693 ECHO AVE; ; CB050864; Permit03-24-2065
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
03/24/2005
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB050864
Building Inspection Request Line (760) 602-2725
2693 ECHO AV CBAD
RESDNTL Sub Type: SFD
2131621100 Lot#: 308
$317,456.00 Construction Type: NEW
Reference*: CT02-14
1 Structure Type: SFD
3 Bathrooms: 3.5
CASSIA @ BRESSI PHS 3 PLAN1
3280 SF LIVING, 654 SF GARAGE
Status: ISSUED
Applied: 02/28/2005
Entered By:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
RMA
Plan Approved:
03/24/2005
PY
PC03-65
PC050016
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Building Permit $1,218.00 Meter Size
Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Check $791.70 Meter Fee $160.00
Add'l Plan Check Fee $0.00 SDCWA Fee $2,461.00
Plan Check Discount ($63.34) CFD Payoff Fee $2,848.90
Strong Motion Fee $31.75 PFF $5,777.70
Park in Lieu Fee $2,436.00 PFF (CFD Fund) $0.00
Park Fee $0.00 License Tax $0.00
LFM Fee $0.00 License Tax (CFD Fund) $0.00
Bridge Fee $0.00 Traffic Impact Fee $660.00
Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $168.00
Renewal Fee $0.00 ELECTRICAL TOTAL $60.00
Add'l Renewal Fee $0.00 MECHANICAL TOTAL $87.50
Other Building Fee $0.00 Housing Impact Fee $0.00
Pot. Water Con. Fee $2,999.00 Housing InLieu Fee $0.00
Meter Size D5/8 Housing Credit Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Reel. Water Con. Fee $0.00 Sewer Fee $1,735.00
Additional Fees $0.00
TOTAL PERMIT FEES $21,371.21
TotalFees: $21,371.21 Total Payments To Date: $0.00 Balance Due: $21,371.21
4558 03/24/05 0002 01 02
CGP 21371 ..21
Inspector:
FINAL AP
Date: —Ih
'PROy
m
AL.
^2. Clearance:
NOTICE: Please take NOTICE Mat approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other requiied infomiation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar applkation processing or sen/tee fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions ot which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired.
UNSCHEDULED BUILDING INSPECTION
DATE ^11 0^ INSPECTOR
PERMIT # PLAN CHECK #
JOB ADDRESS Z^^^ g^/ZO ^
DESCRIPTION
CODE DESCRIPTION ACT COMMENTS
^ ^
FOOTING OBSERVATION SUMMARY
Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
Project Name: S/^^' l2^c/i P/t - Date: LL-df^
Location: /^//a ^ /S^^/^/tii /> Project No.: ^'^/dOf dSf
Plan File No.: Permit No.: Unit/Phase/Lotts): 3dl,SC)^
Referenced Geotechnical Report(s):
Observation Summary
^./-M^- Initials A representative of Leighton and Associates observed onsite soil conditions. Soil conditions at
L-ifCif' Date substantially in conformance with those assumed in the geotechnical report.
7 l4 Initials ^ representative of Leighton and Associates observed and measured footing excavation
depth/width. Footing excavations extend to proper depth and bearing strata and are in general
f^^'lf'of Date conformance with recommendations of the geotechnical report.
' " Initials A representative of Leighton and Associates measured footing setback from slope face. The
Date setback was in general accordance with the recommendations of the geotechnical report.
2^ Initials S^-tMi*-<jnt^j /CC^t.i^ /-TO<^. ptiILitn«rv7l IHTS^ia/L. /--z^rr7<v)6 S <3<0t,y .
Uu-of Date
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended.
Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e.,
heavy rain, etc.), we should be contacted to perform additional site observations.
Note to Building inspector
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading.
r Leighton and Associates, Inc. Date
3930 R 1-05
FIELD COPY