Loading...
HomeMy WebLinkAbout2693 ECHO AVE; ; CB050864; Permit03-24-2065 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 03/24/2005 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB050864 Building Inspection Request Line (760) 602-2725 2693 ECHO AV CBAD RESDNTL Sub Type: SFD 2131621100 Lot#: 308 $317,456.00 Construction Type: NEW Reference*: CT02-14 1 Structure Type: SFD 3 Bathrooms: 3.5 CASSIA @ BRESSI PHS 3 PLAN1 3280 SF LIVING, 654 SF GARAGE Status: ISSUED Applied: 02/28/2005 Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: RMA Plan Approved: 03/24/2005 PY PC03-65 PC050016 Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Owner: GREYSTONE HOMES INC 1525 FARADAY AVE #300 CARLSBAD CA 92008 Building Permit $1,218.00 Meter Size Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00 Plan Check $791.70 Meter Fee $160.00 Add'l Plan Check Fee $0.00 SDCWA Fee $2,461.00 Plan Check Discount ($63.34) CFD Payoff Fee $2,848.90 Strong Motion Fee $31.75 PFF $5,777.70 Park in Lieu Fee $2,436.00 PFF (CFD Fund) $0.00 Park Fee $0.00 License Tax $0.00 LFM Fee $0.00 License Tax (CFD Fund) $0.00 Bridge Fee $0.00 Traffic Impact Fee $660.00 Other Bridge Fee $0.00 Traffic Impact (CFD Fund) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $168.00 Renewal Fee $0.00 ELECTRICAL TOTAL $60.00 Add'l Renewal Fee $0.00 MECHANICAL TOTAL $87.50 Other Building Fee $0.00 Housing Impact Fee $0.00 Pot. Water Con. Fee $2,999.00 Housing InLieu Fee $0.00 Meter Size D5/8 Housing Credit Fee $0.00 Add'l Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Reel. Water Con. Fee $0.00 Sewer Fee $1,735.00 Additional Fees $0.00 TOTAL PERMIT FEES $21,371.21 TotalFees: $21,371.21 Total Payments To Date: $0.00 Balance Due: $21,371.21 4558 03/24/05 0002 01 02 CGP 21371 ..21 Inspector: FINAL AP Date: —Ih 'PROy m AL. ^2. Clearance: NOTICE: Please take NOTICE Mat approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other requiied infomiation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar applkation processing or sen/tee fees in connection with this project. NOR DOES IT APPLY to any fees/exactions ot which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired. UNSCHEDULED BUILDING INSPECTION DATE ^11 0^ INSPECTOR PERMIT # PLAN CHECK # JOB ADDRESS Z^^^ g^/ZO ^ DESCRIPTION CODE DESCRIPTION ACT COMMENTS ^ ^ FOOTING OBSERVATION SUMMARY Leighton and Associates, Inc. A LEIGHTON GROUP COMPANY Project Name: S/^^' l2^c/i P/t - Date: LL-df^ Location: /^//a ^ /S^^/^/tii /> Project No.: ^'^/dOf dSf Plan File No.: Permit No.: Unit/Phase/Lotts): 3dl,SC)^ Referenced Geotechnical Report(s): Observation Summary ^./-M^- Initials A representative of Leighton and Associates observed onsite soil conditions. Soil conditions at L-ifCif' Date substantially in conformance with those assumed in the geotechnical report. 7 l4 Initials ^ representative of Leighton and Associates observed and measured footing excavation depth/width. Footing excavations extend to proper depth and bearing strata and are in general f^^'lf'of Date conformance with recommendations of the geotechnical report. ' " Initials A representative of Leighton and Associates measured footing setback from slope face. The Date setback was in general accordance with the recommendations of the geotechnical report. 2^ Initials S^-tMi*-<jnt^j /CC^t.i^ /-TO<^. ptiILitn«rv7l IHTS^ia/L. /--z^rr7<v)6 S <3<0t,y . Uu-of Date Notes to Superintendent/Foreman 1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended. Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period of time and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e., heavy rain, etc.), we should be contacted to perform additional site observations. Note to Building inspector 1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil expansion index test results are contained in the As-Graded Geotechnical Report provided at the completion of grading. r Leighton and Associates, Inc. Date 3930 R 1-05 FIELD COPY