Loading...
HomeMy WebLinkAbout2704 LA GOLONDRINA; ; CB910636; PermitBUILDING PERMIT 10/17/91 15:58 Page 1 of 1 Job Address: 2704 LA GOLONDRINA ST Str Permit Type: RESIDENTAL ADD/ALT (OVER S10K) Parcel No: 215-541-02-00 Valuation: 10,271 Construction Type: VN Occupancy Group: R3 Class Code: Description: 118 SF DINE/MSTR BR&BATH + 169 SF DECK Appl/Ownr : CAMPBELL, W.J. & IRMA 13046 cA1TflPT.Z PT. SAN DIEGO, CA 92130 - -. OWNER : CAMPBELL, W. & IRMA /. •Lic. OWNER *** Fees Required **VA ' F:e VC1i e cted & Credits Fees: 2 41 2. 00 Adjustments: U0 41 / Total Credits,- Total Fees: / 22. 00 Tta1 PavI1e1t: -Etlinc Due.: Fee description / Units Fee/Unit Building Permit / V Plan Check Strong Motion Fee * BUILDING TOTAL Enter Y" for Plumbing Issue FeeS > / Each Plumbing Fixture or Tra p > 4 0 250 * PLUMBING TOTAL "D / . Enter "Y " for Electric Issue Fee > V - Enter Y" for Remodel V V V * ELECTRICAL TOTAL ($10 Minimum) . V Permit No: CB910636 Project No: A9100764 Development No: Fl: Ste: 4870 10/17/91 0001 01 02 C-PRMT 160.00 eja Status: ISSUED Applied: 04/19/91 Apr/Issue: 10/17/91 Validated By: KZH 619-481-3294 .00 82.00 160.00 Ext fee Data ------------ 126.00 82.00 1.00 209.00 7.50 Y 10.00 18.00 5.00 Y 10.00 Y 15.00 -fjNAPPROVAL IN SP. J$U, DATE CLEARANCE_ CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 PERMIT APPLICATION City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 619 438-1161 1. PERMIT TYPE A - 0 COMMERCIAL ONEW DTENANT IMPROVEMENT B - 0 INDUSTRIAL DNEW n TE N AN T IMPROVEMENT C .. 'RESIDENTIAL DAPARTMENT DCONDo SINGLE FAMILY DWELLING ADDITION/ALTERATION [I DUPLEX DDEMOLITION DRELOCATION [-]MOBILE HOME []ELECTRICAL DPIUMBING DMECHANICAL DPOOL DSPA []RETAINING WALL DSOLAR DOTHER,5 -- - — - - - - -- --- - .. ,_..__.._ kl_ EST. VAL / 22 Ti PLAN CK DEPOSIT - VALID. BY DATE 9-/1 Lit I VHI .L71 7.]. 'it."ii (ii. tJ C-PRMT 8141-00 ce /5'5'q !Jddress &, av14 SY) no. LI Nearest Cross Streets CHECK BELCEJ IF SUBMITTED: 02 Energy Calcs 2 Structural Catcs 02 Soils Report Di Addressed Envelope - ASSESSOR'S PARCEL EXISTING USE PROPOSED USE I DESCRIPTION OF WORK O BLDG. SQ. FTG. ///1it.rf .na t/3j3'dge./* OF STORIES CONTACT PE1ON NAME 66 ADDRESS j704- GLo 1'FJ* CITY 4IL.?jl STATE ZIP CODE q DAY TELEPHONE SIGNATU& I FOR CONTRACTOR OWNER ]AGENT FOR OWNE APPLIC NT []CONTRACTOR NAMEW ,ç, b . ii ADDRESS 7....7o -c7L.a,v Cote Is G CITY STATE PROPERTY OWNER OWNER NAME jm A- C ITY (JfL5BdP CONTRACTOR NAME Ila CITY ZIP CODE 90q DAY TELEPHONE OLESSEE I1TENANT ADDRESSl7O4 'm/I1I j-r, ZIP CODE 92C DAY TELEPHONE STATE ADDRESS STATE ZIP CODE DAY TELEPHONE STATE LIC. N LICENSE CLASS CITY BUSINESS LIC. N kJ /f7-)'4vtf 5L5 DATE fY SIGNAME AUUKLS SI VIA J ir STATE ZIP CODE DAY TELEPHONE STATE LIC. N - Workers' Compensation Declaration: I hereby affirm that I have a certificate of consent to sett-insure issued by the Director 00 IndustriaL ReLations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C). INSURANCE COMPANY POLICY NO. EXPIRATION DATE Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. SIGNATURE DATE 8. OWNER-BUILDER DECLARATION Owner-Builder Declaration: I hereby affirm that I am exempt from the Contractor's License Law for the following reason: 0 I as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon,, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). 0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and Contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). 0 I am exempt under Section Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Cede) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001). SIGNATURE DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES ONO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES DNO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? DYES ONO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec 3097(5) Civil Code). LENDER'S NAME LENDER'S ADDRESS APPLICANT'S SIGNATURE I certify that I have read the application and state that the above information is correct. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code). AUR [:]CONTRACTOR DRY PHONE APPYOVED BY: DATE WHITE: File YELLOW: Applicant PINK: Finance Ilk CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB910636 FOR 01/22/92 DESCRIPTION: 118 SF DINE/MSTR BR&BATH + 169 SF DECK TYPE: RADMAJ JOB ADDRESS: 2704 LA GOLONDRINA ST APPLICANT: MRS CONTRACTOR: OWNER: CAMPBELL, W.J. & IRMA REMARKS: MH/BOB/431-1268 SPECIAL INSTRUCT: INSPECTOR AREA TP PLANCK# CB910636 0CC GRP CONSTR. TYPE VN STR: FL: STE: PHONE: PHONE: PHONE: INSPECTOR TOTAL TIME: CD LVL DESCRIPTION 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical ACT COMMENTS ?MM ***** INSPECTION HISTORY ***** DATE 121691 121391 121391 121191 121191 121091 121091 121091 121091 120691 120491 102591 102591 DESCRIPTION Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Rough/Ducts/Dampers Insulation Frame/Steel/Bolting/Welding Rough/Topout Rough Electric Rough/Ducts/Dampers Rough Combo Shear Panels/HD's Ftg/Foundation/Piers Steel/Bond Beam ACT INSP AP TP CO TP AP TP AP TP AP TP AP TP AP TP AP TP CO TP CO TP AP TP AP TP AP TP COMMENTS BATH FAN DUCTS SEE JOB CARD OK TO WRAP ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 560-1468 DATE: QL- ctq l JURISDICTION: PLAN CHECK NO: SET: Ii] PROJECT ADDRESS: 2 70 La.. PROJECT NAME: Spt A,t-i-- P&PLICANT JURISDICTI PLAN CHECK FILE COPY UPS DESIGNER The plans transmitted herewith have been corrected where Ynecessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply El with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. fl The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. U The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. fl The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. LI The applicant's copy of the check list has been sent to: 01 Esgil staff didnot advise the applicant contact person that plan check has been completed. LI Esgil staff did advise applicant that the plan check has been completed. Person contacted:_____________________ Date contacted: Telephone # []REMARKS: By: Enclosures: E IL CORPORATIONe. 0GA 0CM ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 560-1468 DATE: 7, // J URIS DI CT I JURISDICTION: PLAN CHECKER FILE COPY PLAN CHECK NO: //--a, a SET: UPS DESIGNER PROJECT ADDRESS: -2-74 1-,4 Lcfiri&/L4 ' PROJECT NAME: JUL)7/J The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. L The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. , The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. fl The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. ME The applicant's copy of the check list has been sent to: ii nit (mPi 27ô4- IA 5,- A Ni, 9Zac Esgil staff did not advise the applicant contact person that plan check has been completed. fl Esgil staff did advise applicant that the plan check has been completed. Person contacted: Date contacted: Telephone # REMARKS: Enclosures: SGIL CORP IGA AA LjR"flDM, JURISDICTION: 4/&5E4,0 Date plans received by plan checker:___________ PLAN CHECK NO.:i21:Date plan recheck completed: -7/_ By: ,411hL PROJECT ADDRESS: 22 4 e4 (jj c /J,ii,4 -T7-- TO: rA fnOOL7-L_ '2764-_t4 /.u,.&iDdQ./AJ14 _S7_(L.L_i,ei'i,'9 RECHECK PLANCORRECTIONSHEET FOREWORD:PLEASEREAD Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The items shown below need before the plans will be the Uniform Building Code, county or city law. clarification, modification or change. All items have to be satisfied in conformance with the cited codes and regulations. Per Sec. 303(c), of the approval of the plans does not permit the violation of any state, A. PLANS Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: c,,2 CeP6rbi?n/6_~Zo mi TELcO)_Ch,i _gzjz3 To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this check sheet with the revised plans. The following items have not been resolved from previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the still outstanding corrections. Please contact me if you have any questions regarding these items. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made to the plans not resulting from this correction list? Please check. _Yes No / 'p Form No. RPCS.41290 ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO, CA 92123 (619) 560-1468 DATE: rAA JURISDICTION: LD PLAN CHECK NO: SET: PROJECT ADDRESS: 4. U P Lr4P PROJECT NAME: p fl/c)p.\ RISDIcTION jEILE COPY U? S flDESIC-cER o The plans transmitted herewith have been corrected where U necessary and substantially coily with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's-building codes when minor deficien- cies identified are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corp. until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: 4 ikKM (- ELL 2:704 G1DL,JD gj tJA Sr. c-.4gzLA aPa. CA L )2A3 sA q Z9 Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff did advise applicant that the plan check has been completed. Person contacted: Date contacted: Telephone In REMARKS: By: Enclosures: ESGIL CO11P0RAT7 D ,4iJ GA AA RN 0DM /i PLAN (EXX NO: q I - (z JURISDICTION:&R LAD TO: 1,1J AAA CA 0 F Ez=LL IIIIIIIIIIIIIII LLtAD,Pti1 FLOOR AREA: IIUUi _ 4-1-7,D STORIES: SI1IGLE FAMILY AND DUPLEX IQELLINGS FOREWORD: PLEASE RFAD Plan check is limited to technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the handicapped. The plan check is based on regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances by the Planning Department, Engineering Department, Fire Department or other departments. Present California law mandates that residential construction comply with Title 21 and the following model codes: 1988 UBC (eff. 1/1/90) 1988 UPC (eff. 1/1/90) 1987 NEC (eff. 10/28/87) 1988 UNC (eff. 1/1/90) The above regulations apply to residential construction, regardless of the code editions adopted by ordinance. The circled items listed need clarification, modification or change. All items have to be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303(c), 1988 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To steed uD the recheck Drocess. note on this list for a copy) where each correction item has been addressedi.e.,plansheet,specification,etc.Be sure to enclose the marked ut list when you submit the revised plans . Date plans received by jurisdiction: Date plans received by Esgil Corporation: Date initial plan check completed: -\-U_ BY: J1LJ_A-r\L_ Applicant contact person: W1 _ Telephone: 4N List No. 10, General Single Family Dwelling and Duplex Without Supplements. (1988 UBC) Please make all corrections on the original tracings and submi t two new sets of prints, and any original plan sets that nay have been returned to you by the jurisdiction, to: Esgil Corporation, 9920 Chesapeake Drive, Suite P203, San Diego, California 92123, (619) 560-1468. Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the, jurisdiction, to: The jurisdiction's building department. 3/ Indicate on the Title Sheet of the plans, the name of the legal owner and name of person responsible for the preparation of the plans. Section 302(a)7. 1'. All sheets of plans must be signed by the person responsible for their preparation. (California Business and Professions Code). Plans, specifications and calculations shall be signed by the California state licensed engineer or architect responsible for their preparation, for plans deviating from conventional wood frame construction. Specify expiration date of license. (California Business and Professions Code). Specify on the Title Sheet of the plans the gross floor area of each element of this project including dwelling, garage, carport, patio, deck and balcony. Section 302(d). Provide a statement on the Title Sheet of the plans that this project shall comply withTitle 24 and 1988 UBC, UMC and UPC and 1987 NEC. Submit fully dimensioned plot plan drawn to scale showing location, size, and use of all existingand proposed structures on the lot. Identify property lines and show lot dimensions and all easements. Show location of all cut or fill slopes. Show finish floor elevations and show elevations of adjacent finish grade. Show drainage patterns with minimum slopes. Section 302(d). Indicate distance from property lines to proposed building. Section 302(d). Show on the title sheet all structures, pools, walls, etc. included under this application. Any portion of the project shown on the site plan that is not included with the building permit application filed should be clearly identified as 'not included.' l. Clearly show if the lower level is a basement or a story, based on the definitions in Sections 403 and 420. Plot the finish grade (as defined) on the elevations and dimension the distance to the floor above, for story determination. On the cover sheet of the plans, specify any / items requiring special inspection, in a format similar to that shown below or sticky back. REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with Sec.306 of the Uniform Building Code. ITDi REQ. IF R92-ARKS CIEC =1 SOILS C0MPLLCE PRIOR TO FOUNDATION INS?. STRUCTURAL CONCRETE OVER 2500 PSI PRESTRESSED STEEL FIELD WELDING HIGH STRENGTH BOLTS EXPANSION ANCHORS SPECIAL MASONRY SPRAYED ON FIRE PROOFING PILES/CAISSONS DESIGNER-SPECIFIED Exterior walls closer than 3 feet to property / lines shall be one-hour rated construction and / have no openings. Table 5-A. 1/19190 141 Exterior walls closer than 3 feet to a property / line shall have 30 inch parapets when the floor area per floor exceeds 1,000 square feet. Section 1709. Projections, including eaves, may not extend / more than 12 inches into the 3 foot setback from the property line. Section 1710. I . Eaves over required windows shall be not less / than 30 inches from the side and rear property / lines. Section 504. 1). Plastic skylights shall not be installed within / that portion of a roof located within a distance to property line where openings in exterior walls are prohibited or required to be protected. Section 5207 (a) 7. 11. Projections, including eaves, shall be one- hour fire-resistive construction, heavy timber or of noncombustible material if they project into the 3' setback area from the property line. Section 1710. 19. Show location of permanently wired smoke detector: Centrally located in corridor or area giving access to sleeping rooms. On each story. C. In the basement. When sleeping rooms are upstairs, at the upper level in close proximity to the stair. In rooms adjacent to hallways serving bedrooms, when such rooms have a ceiling height 24 inches or more above the ceiling height in the hallway. NOTE: Detectors shall sound an alarm audible in all sleeping areas of the unit. Section 1210 20. When the valuation of a room addition or repair exceeds $1,000, or when sleeping rooms are created, smoke detectors shall be provided at existing bedrooms per item 19 above. Section 1210. GENERAL RESIDENTIAL REQUIREMENTS Habitable rooms, other than kitchens, shall contain at least 70 square feet of floor area. At least one room shall have not less than 120 square feet of floor area. Section 1207 (b). 2. Window area must be at least 1/10 of the floor area and a minimum of 10 square feet per Section 1205 (a). Appears to be deficient in openable window area in habitable rooms must / be 1/20 of the floor area and a minimum of 5 square feet. In bathrooms, laundry rooms and similar rooms 1/20 of area is required and minimum is 1.5 sq. ft. Section 1205 (a). 2j. At least 1/2 of the common wall must be open / and have an opening not less than 25 sq. ft. nor one tenth of the floor area of the interior room if light and ventilation is being supplied from an adjacent room. Section 1205 (a). 2. Required windows shall not open into a roofed / porch unless the ceiling height is at least 7 feet, the longer side is at least 65% open, and the porch abuts a street, yard or court. Section 1205 (a). 24. Provide mechanical ventilation capable of / providing five air changes per hour in I bathrooms, water closet compartments, laundry rooms and similar rooms if required openable windows are not provided. Section 1205 (c). 4. Show discharge point for exhaust air to be at / least 5 feet from any mechanical ventilating intake. Section 1205(c). 21. Ductless fans cannot be used in bathrooms if a / tub or shower is present. Section 1205(c). No habitable room, other than a kitchen, shall be less than 7'0" in any dimension. Section 1207 (c). Show that ceiling height for habitable rooms is a minimum of 7'6". Section 1207 (a). Show ceiling height for laundry rooms, hallways, corridors, and bathrooms is a minimum of 7'011 . Section 1207 (a). Dimension on the plans the 30" clear width for water closet compartments and 24" clearance in front of water closet. Section 511 (a). 33. Specify safety glazing for glazing in hazardous locations such as glass doors. glazing adjacent to doors and glazing adjacent to walking surfaces. Section 5406. 3/. Glazing, in the same wall plane as a door, must be safety glazing if within 12" of the door and less than 60" above the walking surface, unless the glazing is leaded or faceted glass. Section 5406 (d) 6. 35. Glazing in shower and tub enclosures shall be tempered, laminated or approved plastic (including windows within 5 feet of tub or shower floor). Section 5406 (d) 5. 2/12/90 S 3 31. Sleeping rooms shall have a window or exterior I door for emergency exit. Sill height shall not exceed 44 above the floor. The window must have an openable area of at least 5.7 square feet with the minimum openable width 20" and the minimum openable height 24". Section 120. Basements in dwelling units shall comly with / the above (even if not designated as sleeping roors). Section 120k. Walls and floors separating units in a duplex / shall be ci one-hour fire-resistive construction. Sectjcn 1202(b). 9. A mezzanine is an intermediate floor and nay not have a floor area exceeding 33 1/3 percent of the total floor area in the room below.. The mezzanine floor must have a clear height of 7 feet, above and below, and must have the long side open to the room below except for posts and protective walls or railings not exceeding 42" in height. Section 1716. jO. The loft you show does not comply as a / mezzanine floor and is, by Uniform Building Code definition, a story. Section 1716. EXITS, STK1J5AYS, AND RAILINGS Ll. Floors above the second story shall have not / less than 2 exits. Exceptions: 1. Occupied / roofs may have one exit if such occupied areas are less than 500 square feet and located no higher than immediately above the second story. 2. When the third floor within a unit does not exceed 500 sq. ft., only one exit need be provided. Section 3303(a). 42. Required exit doorways shall be not less than / 36" in width and not less than 6'8" in height, / and shall be capable of opening at least 90 degrees. Section 3304 (f). Provide 36" high protective railing for J porches, balconies, and open sides of stair J landings. Openings between railings shall be less than 611. Section 1711.. 4&. Show how guardrail connection details are / adequate to support 20 pounds per lineal foot at a right angle to the toprai1. Table 23-B. Provide stairway and landing details. Section 3306 (b), (c) and (p). Maximum rise is 7' and minimum run is 11". When the stairs serves less than 10 occupants, or serves an unoccupied roof, rise may be 8" na.ximum and run 9" mm n ijrm. Minimum headroom is 6'8". C. Minimum width is 36". All handrails per Section 3306 (j), shall satisfy the following: Provide handrail for stairways with 4 or more risers. Handrail shall be 2" to 38" above the nosing of treads. C. The handgrip portion of handrail shall be not less than 1 1/2", nor more than 2" in cross-sectional dimension. Every stairway landing shall have a dimension, measured in the direction of travel, at least equal to the stairway width. Such dimension need not exceed 36 inches. Section 3306 (g), 3304 (.1). 48[. An interior door may open inward at the top J step of a stairway provided the top step is f not more than 7 1/2" lower than the floor level. Section 3304 (1). Provide details of winding stairway complying with Section 3306 (d): Minimum tread is 6 inches at any point and minimum 9 inches at a point 12 inches from where the treads are narrowest. Maximum rise is 8 inches. C. Minimum width is 36 inches. 5 /10/90 4 5j. Provide spiral stairway details, per Section / 3306 (f): Minimum run is 7 1/2 inches measured at a point 12 inches from where the treads are the narrowest. Maximum rise is 9 1/2 inches. Maximum clear opening between risers is 6 inches. C. Minimum headroom is 6 feet 8 inches d. The tread must provide a clear walking area measuring at least 26 inches from the outer edge of the supporting colum to the inner edge of the handrail. /51. Spiral stairways may not be used for required exits when the area served is greeter than 400 sq. ft. Section 3306 (f). Provide I.C.B.0. Research Report and number for metal stairway, or submit plans and calculations and approved fabricator registered with the building department or note that the stairway fabrication plans shall be submitted to and approved by the building official prior to installation. Exterior stairways shall not project into the 3 / foot setback from the property lines. Section 3306 (n). 51e. The walls and soffits of the enclosed usable I space under interior stairs shall be protected / on the enclosed side as required for one-hour fire-resistive construction. Section 3306 (in). 5. Within units, show that corridors have a f minimum width of 36 inches. Section 3305 (b). Provide skylight details to show compliance / with Sections 3401 and 5207 or provide I.C.B.0. approval number. Plastic skylights must be separated from each ~3_ other by at least 4 feet. Section 5207 (a) 6. Show attic ventilation. Minimum vent area is / 1/I50 of attic area or 1/300 of attic area if at least 50% of the required vent is at least 3 feet above e.ave vents or cornice vents. Show required area and area provided. Section 3205 (c). XASOXRY 6. Provide fireplace construction details or note / construction to be per attached fireplace standard drawing. Chapter 37. Show anchored veneer support and connections / attached to wood in Seismic Zones 3 and 4, comply with Section 3006 (d)1 and Section 2515 (a). Show ties and t9 wire in horizontal joints. Show height and cdnstruction details of all masonry walls. Chapter 24. PPtAtb (7k)AJ Show floor and roof connections to masonry / walls. Connection shall resist 200 pounds per lineal foot or the actual design load, / whichever is greater. Cross grain tension or bending in wood ledgers is not permitted. Section 2310. 61. Show a minimum 2" air space and flashing / between planter and building walls. Section 2516 (c) 7. GARAGE AND CARPORTS ,Ø. Specify roof slope. Roof slope is not adequate for roof type specified. Table 32-B,C,D and E. Specify roof material and application. Chapter 7 32. 4. Specify I.C.B.0. or U.L. approval number for / roof materials not covered in U.B.C., e.g., tile, etc. Section 107. Specify minimum 1/4 inch per foot roof slope / for drainage or design to support accumulated water. Section 3207 (a) and Section 2305 (f). 4. Show roof drains and overflows. Section 3207. Garage requires one-hour fire protection on / the garage side of walls and ceiling common to / the dwelling. Table 5-B, Section 503 (d). 7/. All elements supporting floor above garage, / including walls supporting floor joists, must have one-hour fire-resistive protection on the garage side. Section 503 (b) /2. Show 1 3/8" solid core self-closing door for / openings between garage and dwelling. Section 503(d). 3. Garages are not permitted to open into a room / used for sleeping purposes. Section 1104. 12/18/90 5 An occupancy separation is not required between / carport and residence, provided the carport is I open on two or more sides and has no enclosed uses above. Section 503 (a) Exception 3. 7A. Show garage framing sections, size of header / over garage opening, lateral cross bracing at / plate line, method bracing garage front and holddowns if required. Chapter 23. NOTE: Maximum shear panel height-to-width ratio is 3 1/2 to 1 for plywood. Table 25-I. 7d. Doors nay open into the garage only if the / floor or landing in the garage is not more.than / one inch lower than the door threshold. Section 3304 (i). Provide an 18" raised platform for any FAU, / water heater, or other device in the garage which may generate a flame or spark. UNC Section 508, UPC Section 1310 (a). 78. Per soils report, note on the plan the soils classification, whether or not the soil is expansive and note the allowable bearing value. Section 2905 (c).P,j I r.JuItb rzP1 ACQrnOIJ 7j. The foundation plan does not comply with the / soils report recommendations for this project. Please review the report and modify design, notes and details as required to show compliance:____________________________________ 80. Provide notes on the foundation plan listing the soils report recommendation for foundations, slab and building pad preparation. 4. Provide a letter from the soils engineer / confirming that the foundation plan, grading plan and specifications have been reviewed and that it has been determined that the recommendations in the soils report are properly incorporated into the construction documents (when required by the soil report). The soils engineer recommended that he/she review the foundation excavations. Note on the foundation plan that "Prior to the contractor requesting a Building Department foundation inspection, the soils engineer shall advise the building official in writing that: The building pad was prepared in accordance with the soils report, The utility trenches have been properly backfilled and compacted, and The foundation excavations comply with the intent of the soils report". 3. Show height of all foundation walls. Chapter / 23. Show height of retained earth on all / foundation walls. Chapter 23. If cut or fill slopes exist, show distance of / foundation to edge of cut or fill slopes and I show steepness and heights of cuts and fills. Chapter 29. 6. Note on plans that wood shall be 6" minimum above finish grade. Section 2907 (a). §7. Note on plans that surface water will drain / away from building and show drainage pattern / and key elevations. Section 2905 (f). 8/• Dimension foundation per U.B.C. Table 29A: Floors Footing Supported* Stenwall Width Depth Thickness 1 6" 12" 12" 6" 2 8" 15" 18" 7" 3 10" 18" 24" 8" Foundations may support a roof in addition to the floors. Where only a roof is supported, use foundation for one floor. 8. Show foundation sills to be pressure treated, or equal. Section 2516 (c) 3. Show foundation bolt size and spacing. / Section 2907 (f). 94. Specify size, I.C.B.0. number and manufacturer / of power driven pins. Show edge and end distances and spacing. Section 302 (d). 2/13/90 6 94. If required, show size, inbedment and location / of hold down anchors on foundation plan. Section 302 (d). 9/3. If hold downs are required, note on plan that / hold down anchors must be tied in place prior to foundation inspection. Section 305 (e) 1. 91. Show adequate footings under all bearing walls / and shear walls. Section 2907 (b). Show on the plans stepped footings for slopes / steeper than 1:10. Section 2907 (c). g4. Show minimum 18" clearance from grade to bottom / of floor joists and minimum 12" clearance to bottom of girders. Section 2516 (c) 2. Show pier size, spacing and depth into / undisturbed soil. Table 29-A. /8. Show minimum underfloor access of 18" x 24". / Section 2516 (c). Show minimum underfloor ventilation equal to 1 / sq. ft. for each 150 sq. ft. of underfloor / area. Openings shall be as close to corners as / practicable and shall provide cross ventilation on at least two approximately opposite sides. Section 2516 (c) 6. FRAMING 0. Show wall bracing. Every exterior wood stud / wall and main cross-stud partition shall be braced at each end at least every 25 feet of length with 1 x 4 diagonal let-in braces or equivalent. Section 2517 (g) 3, Table 25-V. 11. In 2-story buildings, shear panels at the first / story (at least 48 inches in width) shall be I located at each end or as near thereto as possible and comprise at least 25 percent of the linear length of the wall, or provide design. Section 2517(g)3, Table 25-V. 1l2. Note cross bridging or blocking. Floor joists / and rafters 12" or more in depth shall be I supported laterally by bridging at intervals not exceeding 8 feet, unless both edges are held inline. Sec. 2506 (h),2517 (d) 6. 113. Show blocking at ends and at supports of floor / joists, rafters and trusses at exterior walls. Section 2517 (d) 3, 2517 (h) 6. l$4. Bearing partitions, perpendicular to joists, / shall not be offset from supporting girders, / beams, walls or partitions, more than the depth of the joist. Section 2517 (d) 5. Show rafter ties. Rafter ties shall be spaced / not more than 4 feet on center and be just / above the ceiling joists, where rafters and ceiling joists are not parallel. Section 2517 (h) 4. 1/6. Show rafter purlin braces to be not less than / 45 degrees to the horizontal. Section 2517 (h) 5. 107. Show double top plate with minimum 48" lap splice. Section 2517 (g) 2. 108 Show nailing will be in compliance with Table 25-Q. 109. Show or note fire stops at the following locations per Section 2516 (f): In concealed spaces of stud walls and partitions, including furred spaces, at the ceiling and floor levels and at 10 foot intervals along the length of the wall; t'JI4Af iJo -nJ-*T At all interconnections between concealed / vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings; ç/. In concealed spaces between stair / stringers at the top and bottom of the / run and between studs along and inline with the run of stairs if the walls under the stairs are unfinished; and d. In openings around vents, pipes, ducts, / chimneys, fireplaces and similar openings / which afford a passage for fire at ceiling and floor levels, with noncombustible materials. 1/0. In duplexes, draft stops shall be provided in / floor-ceiling assemblies and attics in line / with walls separating units and separating units from coon areas. 111. Show stud size and spacing. Maximum allowable stud heights: Bearing wall: 2 x4 and 2 x 6 max. 10'; Non-bearing: 2 x 4 max. 141 , 2 x 6 max. 201 . Table 25-R-3. l,li. Studs supporting two floors, a roof and / ceiling must be 3 x 4 or 2 x 6 at 16" o.c. Table 25-R-3. i3. Note on A.I.T.C. Certificate of Compliance for / glued laminated wood members shall be given to the building inspector prior to installation. Section 2505. 2/12/90 7 1114 Detail all post-to-beam and post-to-footing connections and reference the detail to the plan. Section 2516 (in). Detail shear transfer connections, including / roof and floor diaphragms, to shear walls. Section 2513. Specify nail size and spacing for all shear / walls, floor and roof diaphragms. Indicate required blocking. Maintain maximum diaphragm dimension ratios. [Tables 25 I, J, K and Section 4714 (d)]. 1/17. Provide truss details and truss calculations / for this project. Specify truss identification numbers on the plans. 1j8. Show 1/2" minimum clearance between top plate of interior partitions and bottom chord of trusses. (To ensure loading will be as designed). 119 Provide roof framing plan and floor framing K lan. Section 302 çd).j rn c-i rJY Ei- 1 0. Provide framing sections through Section 302 (d). ljl. Specify all header sizes for opening over 4' / wide. Section 2517 (g) 5. 112. Provide calculations for main vertical and / horizontal framing members and post footings. Section 302 (b). l3. Provide calculations for lateral loads, shear / panels, shear transfer and related. Section 302 (b). 114. In Seismic Zones 3 and 4, the allowable shear / wall values for drywall in Table 47-I must be / reduced 50 percent when considering earthquake loads. This does not apply to wind loads. Footnote 1. 125. Show on the plans all structural requirements developed in the structural calculations. Section 302 (d). (See comments below or at end.) wj -ii Fi,r TuSE i1_ @r e PELi - 3EE .-c2 u-r\ Qi. ei -t ltS. Columns and posts located on concrete or / masonry floors or decks exposed to the weather I or to water splash or in basements and which support permanent structures shall be supported by concrete piers or metal pedestals projecting above floors unless approved wood of natural resistance to decay or treated wood is used. Section 2516 (c) 4. 127 Individual concrete or masonry piers shall project at least 8 inches above exposed ground unless the columns or posts which they support are of approved wood of natural resistance to decay or treated wood is used. Section 2516 (c) 4. 12. Show location of attic access with minimum / size 22" x 30". Section 3205. 1j9. Show draft separation for attic areas between I units in a duplex. Section 2516 (f). l0. Specify plywood and/or particle board thickness, grade and panel identification index. Table 25-S. 11. When roof pitch is less than 3:12, design / ridge as a beam. Section 2517 (h). i42. If foundation cripple wall studs are less than / 14" high, framing shall be solid blocking, or sheathed with plywood. Section 2517 (g) 4. Cripple wall studs exceeding 4 feet in height ( shall be 3 inch by 4 inch or 2 inches by 6 inches when supporting 2 stories. Section 2517 (g) 4. Show plywood sheathing over exposed eaves, or / other weather exposed areas, is "bonded with I exterior glue." Plywood used for exterior wall covering shall be the exterior type. Section 2516 (i), 2516(g)3. 15. Detail truss layout for 30" x 30" attic / access, if required for equipment in the attic. ]J3 6. Ridges, hips, and valleys shall be at least I one size larger than supported rafters. Section 2517 (h) 3. 17. In open beam construction, provide strap ties across the beams at the ridge support. / Section 2501 (b). All heating, ventilating, and cooling systems and appliances shall comply with the Uniform Mechanical Code. 2/12/90 8 Show the size, location and type of all heating FT.JCAL (iJj. ELECMCAL CODE) / and cooling appliances or systems. / All wiring shall comply with the National l'9. Show source f combustion air to furnace, per Electrical Code. Chapter 6, UMC. / Every dwelling unit shall be provided with heating facilities capable of maintaining a room temperature of 70 degrees F. at 3 feet above the floor in all habitable rooms'. Show basis for compliance. UBC, Sec. 1212. ill. Show minim 30" deep unobstructed working space in front of furnace. Section 505, UMC. 11/2. Furnace shall not be installed in any bedroom, bathroom or in a cicset or confined space with access only through such room unless specified as direct vent appliance, enclosed furnace or electric heating appliance. Section 7014 UMC. l/3. Show I.C.LO. approval number for prefab / fireplace. Show height of chimney above roof per I.C.B.0. approval or Table 37-B. t Show access to the attic containing equipment to be miniDum 30 inches by 30 inches. The opening may be 22 inches by 30 inches if the equipment can be removed through such opening. Section 708 UMC. Where equipment is installed in the attic, the / distance from the attic access to such equipment shall not exceed 20 feet. Note that passageway to the attic furnace shall be unobstructed and have continuous solid flooring not less than 24 inches wide. Section 708 UMC. lu. Show permanent electrical outlet and lighting / fixture controlled by a switch for the attic furnace. Section 708 UMC. l8. Show details to comply' with Section 709 for furnace under the floor, or Section 710 for roof or outside furnace. 1/9. Note on plan: Gas vents and non-combustible piping, in walls, passing through three floors or less shall be effectively draft stopped at each floor or ceiling. USC, Section 1706 (a) 6. 10. Provide dryer vent to outside. UMC, Section I 1903. /5l. Show on the plan the amperage of the / electrical service, the location of the service panel and the location of any sub- panels. If service is over 200 amps, submit single line diagram, panel schedule and load calculations. 1/5'2. Show location of all electrical receptacles. Electrical receptacle locations and/or spacing is not adequate in crc' AJJ i \Jg)J .'J&7O &LIOfU( DoO, Show at least one convenience outlet other than outlets for laundry, etc., outdoors, in garages and basements. NEC, Art. 210-52. S Note convenience outlets inbathrooms, kitchen counter top(s) within 6 jeet ot the kitchen sink,outdoors, and in garages and basements (other than for laundry and similar equipment)' shall be GFI protected. NEC, Art. 210-8. 1%6. Note electrical system ground to be provided / per NEC, Art. 250-81. prixgm(u1iIFci4Ft,tP'(BIW_CODE) l5j. Show water heater size, type and location on / plans. UPC, Section 1301. 15k. Show source for providing combustion air to I fuel burning water heater. If wall openings in an enclosure are used, at least one-half of the required opening area shall extend into the upper twelve inches of the enclosure and one-half within the lower twelve inches. UPC, Section 1307. 19. Fuel combustion water heater shall not be / installed in bath or bedroom or in a closet opening into bath or bedroom. UPC, Section 1309. l0. Provide adequate barrier to protect water / heater from vehicle damage. An 18" platform for the water heater does not satisfy this requirement. UPC, Section 1310. 1. Show I and P valve on water heater and show / route of discharge line to exterior. UPC, Section 1007 (e). ELji.e f'ecIip._/- _$w/7-1HLDt//17_ 42 rjJ __IIJ,/&j Fi A/Z1741.... i/D-7ô 1/19/90 9 112. Show that water heater is adequately braced to / resist seismic forces, when not connected by rigid pipe. UMC Section 504(d). 143. Show shower stall can accommodate a 30" circle ( and has a minimum floor area of 1,024 sq. in. UPC 909 (d). Provide clothes washer hook-up for each unit. / Title 24, Part 3. l5. Show details of duplex common (party) walls and / floor/ceiling assemblies to achieve a Sound I Transmission Class (SIC) rating in walls of 50 decibels and an Impact Insulation Class (IIC) rating on floor/ceiling of 50 decibels. Title 24. 16. Show how penetrations of assemblies for piping, / electrical devices, recessed cabinets, bathtubs, soffits, or heating ventilating, or exhaust ducts shall be sealed, lined, or insulated to maintain required sound transmission rating. Title 24. 1k7. Provide insulation in walls and ceiling to achieve SIC of 50 between garage and living area if garage use is not controlled by resident. Title 24. ERGY CONSMATION 168 Provide plans, calculations and worksheets to show compliance with current energy standards. 169 The regulations require a properly completed and properly signed Form CF-1R to be either imprinted on the plans, taped to the plans or "sticky backed" on the plans, to allow the building inspector to readily compare the actual construction with the requirements of the approved energy design. 170 All energy items shown on the plans must be in agreement with the information shown on the properly completed Form CF-1R. S Specify on the building plans all of the mandatory energy conservation requirements as listed on the enclosure titled, "Mandatory Energy. Conservation Reouirements". Show the make, model and efficiency of the / space heating (or cooling) system and provide heat loss calculations if the output exceeds 45,000 BTU/Hr. 173 For room additions, show that the glazing area of the addition does not exceed 16% of the newly-conditioned floor area, plus glazing removed or relocated due to the addition. 174. Provide fluorescent general lighting in kitchen-(-) per CAC, Title 24, 2-5352(J). Ai5o ,T' F/3Th(2A(Y1 S 1/5. Please see additional corrections, or remarks, / on the following page. To speed up the recheck process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please check. __Yes No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to perform the plan check for your project. If you have any questions regarding these plan check items, please contact -. 4L4EiJ AA/ L.. at Esgil Corporation. Thank you. / 7S. /&-L//fi 121EE FT,AJc (ICOLI4 flo,JS -tv 514ôW 4/i&EP 1ô,.I717-104 gg O &,77O,1 Z9O7(j) Z.A. iZ2 I Q_--0 't? PLA,'Ji '¼) .5 J4L) ti2fr74 SLiqt& &Ufv'/t/AI7 -fti iUii-1 03 72AItJb.D L&Uf77p,J - F y-rj,g 7-&7, 2/12/90 10 Certificate of Compliance: Residential (Page 1 of 2) CF-1R Project Title Date Project ess Building Pcrmit I Dc.cumenl&Uon Author Telephone Ocdc4 By/ Date CornpllLnce Method (?acbgc, Point System or Computer) Ctlrnale Zone Eformt Agency Use Only GENERAL INFORMATION Total Conditioned Floor Area: ft2 BuildingType: Single Family - Hotel/Motel (check one or more) Multi-Family (less than 4 stories) Addition Multi-Family (4 or more stories) - Existing-Plus-Addition Front Entry Orientation: North / East I South / West / All Orientations (circle one or more) Number of Dwelling Units: Floor Construction Type: Slab! Raised Floor (circle one or both) Infiltration Control: Standard/Tight (circle one) BUILDING SHELL INSULATION Component Insulation Location/Comments Type R-Value (attic, to garage, typical. etc.) Wall .............. Wall .............. Roof ............. Roof ............. Floor ............. Floor ............. Slab Edge GLAZING Shading Devices Glazing Area Glass Type Interior Exterior Overhang Framing Type Orientation (s (single, double) (roller blind. etc.) (shadescren. etc.) (yes/no) (metal/wood) Front.... Front.... Left...... Left...... Rear..... Rear..... Right.... Right.... Skylight ....... Skylight ....... THERMAL MASS Type/Covering Area Thickness (slableDsed. tile. etc.) (sf) (inches) Location/Description (kitchefi. bath. etc.) Date; Jurisdiction_______________ Prepared by; j Bldg. Dept. &c4u ArJ- VALUATION AND PLAN CHECK FEE 0 Esi1 PLAN CHECK NO.- BUILDING ADDR ESS -17ô4 1-il APPLICANT/CONTACT PHONE NO.__________________ BUILDING OCCUPANCY DESIGNER PHONE______________ TYPE OF CONSTRUCTION CONTRACTOR PHONE BUILDING PORTION BUILDING AREA VALUATION ?ULTIPLIER VALUE IM EVtJ'.Ws /IS th Air _Conditionin Commercial -Residential Res. or Comm. - Fire Sprinklers -- Total Value Bui1djnc Permit Fee $_ __/Z,,o Plan Check Fee S COMMENTS: SHEET ' OF I 12/87 BUILDING PLNCHECK ENGINEERING CHECKLIST DATE: 2L 14PR )( ITEM COMPLETE (I) PLANCHECK NO. CtO( ITEM INCOMPLETE NEEDS YOUR ACTION 1 2 3 2T04 LA LONbP Ni T ITEM SELECTED S R T D D #- F- N. 2-B4-O2 C C C PROJECT ID:___________________________ H H H E E E LEGAL REQUIREMENTS K K K Site Plan 1. Provide a fully dimensioned site plan drawn to scale. Show: north arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, / right-of-way width and dimension setbacks. L?i E 2. Show on site plan: Finish floor elevations, pad elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes, driveway with percent (%) grade and / drainage patterns. 3. Provide legal description and Assessors Parcel Number. FV Discretionary Approval Compliance LI 4. No Discretionary approvals were required. LI LI LI 5. Project complies with all Engineering Conditions of Approval for Project No.________________ LI LI LI 6. Project does not comply with the following Engineering Conditions of Approval for Project No.___________________ Conditions complied with by: Date: qA ________ Field Review LI LI LI 7. Field review completed. No issues raised. LI LI LI 8. Field review completed. The following issues or discrepancies with the site plan were found: LI LI LI A. Site lacks adequate public improvements LI LI LI B. Existing drainage improvements not shown or in conflict with site plan. LI E LI C. Site is served by overhead power lines. P:\D0CS\M1SF0RMS\FRM0010.DH REV. 02/27/91 E E D. Grading is required to access site, create pad or provide for ultimate street improvement. 000 E. Site access visibility problems exist. Provide onsite turnaround or engineered solution to problem. F. Other:___________________________________________ Dedication Requirements 9. No dedication required. LII LII 10. Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8½" x 11" plat map and submit with a title report and the required processing fee. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. The description of the dedication is as follows: Dedication completed, Date By: NO Improvement Requirements F-1 F-1 11. No public improvements required. SPECIAL NOTE: Damaged or defective improvements found adiacent to building site must be repaired to the satisfaction of the City inspector prior to occupancy. F-10012. Public improvements required. This project requires construction of public improvements pursuant to Section 18.40 of the City Code. Please have a registered Civil Engineer prepare appropriate improvement plans and submit for separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. The required improvements are:_______ Improvement plans signed, Date: by: P:\D0CS\MISF0RMS\FRM0010.DH REV. 02/27/91 LJ U L_J 13. Improvements are required. Construction of the public improvements may be deferred in accordance with Section 18.40 of the City Code. Please submit a letter requesting deferral of the required improvements together with a recent title report on the property and the appropriate processing fee so we may prepare the necessary Future Improvement Agreement. The Future Improvement Agreement must be signed, notarized and approved by the City prior to issuance of a Building Permit. Future Improvement Agreement completed, Date:____________ By: LI LII LI 13a. Inadequate information available on site plan to make a determination on grading requirements. Please provide more detailed proposed and existing elevations and contours. Include accurate estimates of the grading quantities (cut, fill, import, export). LI LI 14. No grading required as determined by the information provided on the site plan. LI LI LI 15. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted for separate plan check and approval through the Engineering Department. NOTE: The Grading Permit must be issued and aradina substantially com1ete and found acceptable to the City Inspector prior to issuance of Building Permits. Grading Inspector sign off. Date: by: Miscellaneous Permits LI LI 16. Right-of-Way Permit not required. LI LI LI 17. Right-of-Way Permit required. A separate Right-of-Way Permit issued by the Engineering Department is required for the following: f'LI LI Sewer Permit is not required. LILILI 19. Sewer Permit is required. A sewer Permit is required concurrent with Building Permit issuance. The fee required is noted below in the fees section. Industrial Waste Permit is not required. P:\D0CS\M1SF0RMS\FRM0010.DH REV. 02/27/91 21. Industrial Waste Permit is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a Building Permits. Permits must be issued prior to occupancy. Industrial Waster Permit accepted - Date: By: Fees Required E] N/A 27. Park-in-Lieu Fee Quadrant: Fee per Unit: Total Fees: 0 Traffic Impact Fee Fee Per Unit: Total Fee:— E] Nji3 Bridge and Thorough fare Fee Fee Per Unit: Total Fee: — E] f(Pt Public Facilities Fee required. F1 N/1 Facilities Management Fee Zone: Fee: o N1Ic Sewer Fees Permit No. EDTJ's Benefit Area: Fee: 0 t'.J/A 28. Sewer Lateral Required: Fee: 0 29. REMARKS: ENGINEERING AUTHORIZATION TO ISSUE PERMIT BY: S .CHEbEU_DATE: 21 #PQ P\D0CS\MISF0RMS\FRM0010.DH REV. 02/27/91 PLANNING CHECKLIST Plan Check No. 9'/ Address 27/ Lc& cIo,cJr;t 5. Planner Qck Phone 438-1161 ext. 'I I (Name) APN: Type of Project and Use F d1.'e I(; Zone Facilities Managemeet Zone Leg - ) U U L .c U C U C [tern Complete Item Incomplete - Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency was identified 0iEE1 0 Environmental Review Required: YES NO DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval 0/0 0 Discretionary Action Required: YES NO APPROVAL/RESO. NO. DATE: PROJECT NO. OTHER RELATED CASES: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval 6 Califoa Coastal Commission Pt Required: YES - NO DATE OF APPROVAL: San Diego Coast District, 1333 Camino Del Rio South, Suite 125, San Diego, CA. 92108-3520 (619) 297-9740 Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval 'a . Zoning: 1. '1 El Landscape Plan Required: YES ___ NO See attached submittal requirements for landscape plans Site Plan: 2 x0o "Wo Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of-way width and dimensioned setbacks. Show on Site Plan: Finish floor elevations, elevations of finish grade adjacent to building, existing topographical lines, existing and proposed slopes and driveway. Setbacks: Front: Int.tide: Street Side: Rear: Lot coverage: Height: Parking: Required 2O' Shown /5' Required 2' Shown 7' (o.k.) Required Shown — Required (. ' Shown 3' Required Shown Required 3 / Shown ,g / Spaces Required Shown Guest Spaces Required Shown Provide legal description of property. Provide assessor's parcel number. El 0 (2 Additional Comments OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE q - PLNCK.FRM