HomeMy WebLinkAbout2712 ANTA CT; ; CB091317; Permit05^26-2010
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
Applicant:
MIKE LLOYD
760-631-4457
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB091317
Building Inspection Request Line (760) 602-2725
2712ANTACTCBAD
RESDNTL
2153104100
$291,648.00
1
Sub Type: DUP
Lot #: 0
Construction Type: 5B
Reference #:
Structure Type: MF2-4
Bathrooms: 3
ONE OF TWO DUPLEX UNITS: (B)
2710SF GAR//499SF GARAGE//117SF DECK
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check #
ISSUED
08/11/2009
JMA
05/26/2010
05/26/2010
PC090023
Owner:
MADSEN REVOCABLE TRUST 10-28-97
71490BELISCOCIR
CARLSBAD CA 92009
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2-Fee
BTD#3Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
; $1,344.81 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$874.13 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$29.16 PFF (3105540)
$0.00 PFF (4305540)
$0.00 License Tax (3104193)
$310.00 License Tax (4304193)
$530.00 Traffic Impact Fee (3105541)
$0.00 Traffic Impact Fee (4305541)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$0.00 Housing InLieu Fee
$7,988.00 Housing Credit Fee
D1 Master Drainage Fee
$0.00 Sewer Fee
$0.00 Additional Fees
$8.00
TOTAL PERMIT FEES
$0.00
$403.00
$7,188.00
$0.00
$5,307.99
$4,899.69
$0.00
$0.00
$1,245.50
$1,404.50
$0.00
$188.00
$60.00
$106.50
$2,925.00
$0.00
$0.00
$355.92
$0.00
($7,135.00)
$28,033.20
Total Fees: $28,033.20 Total Payments To Date:$28,033.20 Balance Due:$0.00
Inspector:
FINAL APPROVAL
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
City of Carlsbad
final Building Inspection
Dept: Building
Plan Check #:
Permit*:
Project Name:
.zngineermg aing CMWD St Lite
Address:
CB091317
ONE OF TWO DUPLEX UNITS: (B)
2710 SF 7/499 SF GARAGE//117 SF DECK
2712ANTACT
'Date: ' 02/25/2011
Permit Type: RESDNTL
Sub Type: DUP
Lot:
Contact Person: ED
Sewer Dist:LC
Phone: 6199224125
Water Dist: CA
Inspected
By:
Inspected
By:
Inspected
By:
Date
Inspected:
Date
Inspected:
Date
Inspected:
.Approved:
.Approved:
.Approved:
Disapproved:
Disapproved:
Disapproved:
Comments:
City of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check #:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected *f
Bv: [4
Inspected
Bv:
Inspected
Bv:
Comments:
CB091317
ONE OF TWO DUPLEX UNITS: (B)
2710 SF //499 SF GARAGE//1 17 SF DECK
2712ANTACT
ED Phone: 6199224125
LC Water Dist: CA
rO Date ' / /
&A0*^ Inspected: ^T-H. \1d>\\
1 ' 11 Date
Inspected:
Date
Inspected:
Date:
Permit Type:
Sub Type:
Lot: 0
Approved: u^
Approved:
Approved:
02/25/201 1
RESDNTL
DUP
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
OP 03 -07
Plan Check*:
Permitft
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected •
By; (Jf\AM
Inspected
By:
Inspected
BY:
Comments:
CB091317
ONE OF TWO DUPLEX UNITS: (B)
2710 SF //499 SF GARAGE//117 SF DECK
2712ANTACT
ED Phone: 6199224125
LC Water Dist: CA
| t Date i 1
* .x3€JUr*V. Inspected: ^/SL^Ii
Date
Inspected:
Date
Inspected:
Date: '
Permit Type:
Sub Type:
Lot: 0
/ Approved: */
Approved:
Approved:
02/25/2011
RESDNTL
DUP
Disapproved:
Disapproved:
Disapproved:
City of Carlsbad Bldg Inspection Request
For: 03/02/2011
Permit* CB091317
Title: ONE OF TWO DUPLEX UNITS: (B)
Description: 2710 SF //499 SF GARAGE//117 SF DECK
Type: RESDNTL Sub Type: DUP
Job Address: 2712 ANTA CT
Suite: Lot: 0
Location:
OWNER MADSEN REVOCABLE TRUST 10-28-97
Owner:
Remarks:
Inspector Assignment: TP
Phone: 6199224125
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: ED
Entered By: CHRISTINE
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs/SWPPPs Original PC# PC090023
Date
02/25/2011
02/24/2011
10/21/2010
10/05/2010
10/05/2010
09/29/2010
09/22/2010
09/22/2010
09/22/2010
09/22/2010
09/22/2010
09/22/2010
09/10/2010
Inspection History
Description
89 Final Combo
19 Final Structural
17 Interior Lath/Drywall
17 Interior Lath/Drywall
22 Sewer/Water Service
16 Insulation
14 Frame/Steel/Bolting/Welding
15 Roof/Reroof
24 Rough/Topout
34 Rough Electric
34 Rough Electric
39 Final Electrical
13 Shear Panels/HD's
Act
PI
CA
AP
PA
AP
AP
PA
we
AP
AP
PA
we
AP
Insp
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
TP
MC
Comments
GAS METER RELEASE
CALLED FOR INSPECTION
1ST LAYER DMZ SOUND WALL
WATER MTR. TO BLDG.
OK TO DRY IN
City of Carlsbad Bldg Inspection Request
For: 03/02/2011
Permit* CB091317
09/10/2010 27 Shower Pan/Roman Tubs WC MC
09/10/2010 84 Rough Combo WC MC
08/17/2010 15.Roof/Reroof AP PD
08/02/2010 15 Roof/Reroof PA TP
07/12/2010 14 Frame/Steel/Bolting/Welding AP TP
07/08/2010 14 Frame/Steel/Bolting/Welding PA PD
06/17/2010 11 Ftg/Foundation/Piers AP TP
06/17/2010 12 Steel/Bond Beam AP TP
06/17/2010 31 Underground/Conduit-Wiring AP TP
06/09/2010 21 Underground/Under Floor AP TP
06/09/2010 22 Sewer/Water Service AP TP
Inspector Assignment: TP
NAILING FOR CAL FILL SECTS ONLY
FLR SHTING
OK TO SHEET FLR
UFFER
Fron:CAL TECH ENOR OB/16/2010 11:33 K707 P. 001/001
ENGINEERING"DESIGN GROUP
2121 Monitor Road, San Marcos, California 92069 • (7wfw9~.73ol "• Fax: (760) 480-7477 - vmm.de8lgngraupa!oam
FOOTING OBSERVATION SUMMARY
Date:
Project Name:
Address:
Footing Location:
June 15,2010
Madsen Duplex
Corner of Cantil and Anta, Carlsbad, California
Building Footings
Reference:
Code:
"Limited Geotechnical Investigation, New Madsen Duplex, located at Northea*st
2007 CBC
Observation of Summary:
A representative of E.D.G. observed on-site soil conditions. Soil conditions for the
g$- — Initials proposed footings are substantially in conformance with the referenced soils report.
A representative of E.D.G. observed and measured footing excavation depth/width for the
proposed footings. Footing excavations extend to proper depth and competent bearing
Initials strata, and are acceptable for new footing.
A representative of E.D.G. measured footing setback from slope face. The setback was in
Initials generally found to be acceptable in consideration of site soil conditions.
Notes to Superintendent/Foreman
1 . Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2, Slab subgrade should be soaked to 2% above optimum prior to the placement of visqueen.
3. In the event of a site change subsequent to our footing/caisson observation and prior to concrete placement
(i.e., heavy rain, etc.), we should be contacted to perform additional site observations.
1.
i to Building Inspector
Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil expansion
index test results are contained in the As-Graded Geotechnical Report provided at the completion of grading
(IF APPLICABLE).
Representative of ENGINEERING DESIGN GROUP Date
ENGINEERINGDESIGN GROUP
GEOTECHNICAL. CIVIL STRUCTURAL S ARCHITECTURAL CONSULTANTS
FOR REStBITIAL S COMMERCIAL CONSTRUCTION
2121 Mohtiel Road
San Marcos CA -92069
Office (760) 839-7302
FAX (760) 480-7477
E-mail: ENGDG@aol.com
DAILY FIELD REPORT
PROJECT
ADDRESS _
EQUIPMENT
. DATE
<LA
.PROJECT NO.
NAME / COMPANY -CONTACTS
DESCRIPTION OF FIELD OPERATIONS
op
€.
FIELD DENSITY TESTS TAKEN FAILURES -RETESTS
Arrive:
Depart
A __r.<v
D \-^
A
D
A
D
A
D
TOTAL DAILY MRS