Loading...
HomeMy WebLinkAbout2712 ANTA CT; ; CB091317; Permit05^26-2010 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: Applicant: MIKE LLOYD 760-631-4457 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB091317 Building Inspection Request Line (760) 602-2725 2712ANTACTCBAD RESDNTL 2153104100 $291,648.00 1 Sub Type: DUP Lot #: 0 Construction Type: 5B Reference #: Structure Type: MF2-4 Bathrooms: 3 ONE OF TWO DUPLEX UNITS: (B) 2710SF GAR//499SF GARAGE//117SF DECK Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Orig PC#: Plan Check # ISSUED 08/11/2009 JMA 05/26/2010 05/26/2010 PC090023 Owner: MADSEN REVOCABLE TRUST 10-28-97 71490BELISCOCIR CARLSBAD CA 92009 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2-Fee BTD#3Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee ; $1,344.81 Meter Size $0.00 Add'l Reel. Water Con. Fee $874.13 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $29.16 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $310.00 License Tax (4304193) $530.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $0.00 Housing InLieu Fee $7,988.00 Housing Credit Fee D1 Master Drainage Fee $0.00 Sewer Fee $0.00 Additional Fees $8.00 TOTAL PERMIT FEES $0.00 $403.00 $7,188.00 $0.00 $5,307.99 $4,899.69 $0.00 $0.00 $1,245.50 $1,404.50 $0.00 $188.00 $60.00 $106.50 $2,925.00 $0.00 $0.00 $355.92 $0.00 ($7,135.00) $28,033.20 Total Fees: $28,033.20 Total Payments To Date:$28,033.20 Balance Due:$0.00 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City of Carlsbad final Building Inspection Dept: Building Plan Check #: Permit*: Project Name: .zngineermg aing CMWD St Lite Address: CB091317 ONE OF TWO DUPLEX UNITS: (B) 2710 SF 7/499 SF GARAGE//117 SF DECK 2712ANTACT 'Date: ' 02/25/2011 Permit Type: RESDNTL Sub Type: DUP Lot: Contact Person: ED Sewer Dist:LC Phone: 6199224125 Water Dist: CA Inspected By: Inspected By: Inspected By: Date Inspected: Date Inspected: Date Inspected: .Approved: .Approved: .Approved: Disapproved: Disapproved: Disapproved: Comments: City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit #: Project Name: Address: Contact Person: Sewer Dist: Inspected *f Bv: [4 Inspected Bv: Inspected Bv: Comments: CB091317 ONE OF TWO DUPLEX UNITS: (B) 2710 SF //499 SF GARAGE//1 17 SF DECK 2712ANTACT ED Phone: 6199224125 LC Water Dist: CA rO Date ' / / &A0*^ Inspected: ^T-H. \1d>\\ 1 ' 11 Date Inspected: Date Inspected: Date: Permit Type: Sub Type: Lot: 0 Approved: u^ Approved: Approved: 02/25/201 1 RESDNTL DUP Disapproved: Disapproved: Disapproved: City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire OP 03 -07 Plan Check*: Permitft Project Name: Address: Contact Person: Sewer Dist: Inspected • By; (Jf\AM Inspected By: Inspected BY: Comments: CB091317 ONE OF TWO DUPLEX UNITS: (B) 2710 SF //499 SF GARAGE//117 SF DECK 2712ANTACT ED Phone: 6199224125 LC Water Dist: CA | t Date i 1 * .x3€JUr*V. Inspected: ^/SL^Ii Date Inspected: Date Inspected: Date: ' Permit Type: Sub Type: Lot: 0 / Approved: */ Approved: Approved: 02/25/2011 RESDNTL DUP Disapproved: Disapproved: Disapproved: City of Carlsbad Bldg Inspection Request For: 03/02/2011 Permit* CB091317 Title: ONE OF TWO DUPLEX UNITS: (B) Description: 2710 SF //499 SF GARAGE//117 SF DECK Type: RESDNTL Sub Type: DUP Job Address: 2712 ANTA CT Suite: Lot: 0 Location: OWNER MADSEN REVOCABLE TRUST 10-28-97 Owner: Remarks: Inspector Assignment: TP Phone: 6199224125 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: ED Entered By: CHRISTINE Act Comments Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# PC090023 Date 02/25/2011 02/24/2011 10/21/2010 10/05/2010 10/05/2010 09/29/2010 09/22/2010 09/22/2010 09/22/2010 09/22/2010 09/22/2010 09/22/2010 09/10/2010 Inspection History Description 89 Final Combo 19 Final Structural 17 Interior Lath/Drywall 17 Interior Lath/Drywall 22 Sewer/Water Service 16 Insulation 14 Frame/Steel/Bolting/Welding 15 Roof/Reroof 24 Rough/Topout 34 Rough Electric 34 Rough Electric 39 Final Electrical 13 Shear Panels/HD's Act PI CA AP PA AP AP PA we AP AP PA we AP Insp TP TP TP TP TP TP TP TP TP TP TP TP MC Comments GAS METER RELEASE CALLED FOR INSPECTION 1ST LAYER DMZ SOUND WALL WATER MTR. TO BLDG. OK TO DRY IN City of Carlsbad Bldg Inspection Request For: 03/02/2011 Permit* CB091317 09/10/2010 27 Shower Pan/Roman Tubs WC MC 09/10/2010 84 Rough Combo WC MC 08/17/2010 15.Roof/Reroof AP PD 08/02/2010 15 Roof/Reroof PA TP 07/12/2010 14 Frame/Steel/Bolting/Welding AP TP 07/08/2010 14 Frame/Steel/Bolting/Welding PA PD 06/17/2010 11 Ftg/Foundation/Piers AP TP 06/17/2010 12 Steel/Bond Beam AP TP 06/17/2010 31 Underground/Conduit-Wiring AP TP 06/09/2010 21 Underground/Under Floor AP TP 06/09/2010 22 Sewer/Water Service AP TP Inspector Assignment: TP NAILING FOR CAL FILL SECTS ONLY FLR SHTING OK TO SHEET FLR UFFER Fron:CAL TECH ENOR OB/16/2010 11:33 K707 P. 001/001 ENGINEERING"DESIGN GROUP 2121 Monitor Road, San Marcos, California 92069 • (7wfw9~.73ol "• Fax: (760) 480-7477 - vmm.de8lgngraupa!oam FOOTING OBSERVATION SUMMARY Date: Project Name: Address: Footing Location: June 15,2010 Madsen Duplex Corner of Cantil and Anta, Carlsbad, California Building Footings Reference: Code: "Limited Geotechnical Investigation, New Madsen Duplex, located at Northea*st 2007 CBC Observation of Summary: A representative of E.D.G. observed on-site soil conditions. Soil conditions for the g$- — Initials proposed footings are substantially in conformance with the referenced soils report. A representative of E.D.G. observed and measured footing excavation depth/width for the proposed footings. Footing excavations extend to proper depth and competent bearing Initials strata, and are acceptable for new footing. A representative of E.D.G. measured footing setback from slope face. The setback was in Initials generally found to be acceptable in consideration of site soil conditions. Notes to Superintendent/Foreman 1 . Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing concrete. 2, Slab subgrade should be soaked to 2% above optimum prior to the placement of visqueen. 3. In the event of a site change subsequent to our footing/caisson observation and prior to concrete placement (i.e., heavy rain, etc.), we should be contacted to perform additional site observations. 1. i to Building Inspector Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil expansion index test results are contained in the As-Graded Geotechnical Report provided at the completion of grading (IF APPLICABLE). Representative of ENGINEERING DESIGN GROUP Date ENGINEERINGDESIGN GROUP GEOTECHNICAL. CIVIL STRUCTURAL S ARCHITECTURAL CONSULTANTS FOR REStBITIAL S COMMERCIAL CONSTRUCTION 2121 Mohtiel Road San Marcos CA -92069 Office (760) 839-7302 FAX (760) 480-7477 E-mail: ENGDG@aol.com DAILY FIELD REPORT PROJECT ADDRESS _ EQUIPMENT . DATE <LA .PROJECT NO. NAME / COMPANY -CONTACTS DESCRIPTION OF FIELD OPERATIONS op €. FIELD DENSITY TESTS TAKEN FAILURES -RETESTS Arrive: Depart A __r.<v D \-^ A D A D A D TOTAL DAILY MRS