HomeMy WebLinkAbout2714 ARLAND RD; ; CB131522; Permit09-02-2014
Job Address:
Permit Type;
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB131522
Building Inspection Request Line (760) 602-2725
2714 ARLAND RD CBAD
RESDNTL Sub Type: SFD Status: FINAL
1561303300 Lot#: 0 Applied: 06/24/2013
$283,967.00 Constuction Type: 5B Entered By: JMA
Reference #: Plan Approved: 09/05/2013
1 Structure Type: Issued: 09/05/2013
0 Bathrooms: 0 Inspect Area: MC
Orig PC #: Plan Check #: PC130035
LOOSEN: NEW SFD: 2571 SF LV/
422 SF PATIO COVER/ 98 SF DECK-ABANDON & BACKFILL SEPTIC
TANK @ EXISTING GARAGE
Applicant:
CAROLINE DOOLEY
STEC
2979 STATE ST
CARLSBAD CA 92008-2366
760-815-8748
Owner:
LOOSEN
2710 ARLAND RD
CARLSBAD CA 92008
Building Permit $1,416.90 Meter Size
Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Checlc $991.83 Meter Fee $0.00
Add'l Plan Check Fee ($990.00) SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $28.40 PFF (3105540) $5,168.20
Park in Lieu Fee $0.00 PFF (4305540) $4,770.65
Park Fee $0.00 License Tax (3104193) $0.00
LFM Fee $0.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,870.00
Other Bridge Fee $0.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $200.00
Renewal Fee $0.00 ELECTRICAL TOTAL $57.00
Add'l Renewal Fee $0.00 MECHANICAL TOTAL $78.28
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing InLieu Fee $0.00
Pot. Water Con. Fee $0.00 Housing Credit Fee $0.00
Meter Size Master Drainage Fee $5,526.09
Add'l Pot. Water Con. Fee $0.00 Sewer Fee $842.00
Reel. Water Con. Fee $0.00 Additional Fees $100.88
Green BIdg Stands (SB1473) Fee $8.00 Fire Sprinkler Fees $0.00
Green BIdg Stands Plan Chk Fee $0.00
TOTAL PERMIT FEES $21,068.23
Total Fees: $21,068.23 Total Payments to Date $21,068.23 Balance Due: $0.00
Inspector:
FINAL APPROVi
Date; / ' Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this pemiit was Issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad [Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their Imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or sen/ice fees in connection with this project. NOR DOES IT APPLY toany
fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previouslv othenwise expired.
09-05-2013
Job Address;
Permit Type:
Parcel No:
Reference #:
CB#:
Project Title:
Applicant:
ANDREA LOOSEN
760-213-8841
Emergency Contact:
ANDREA LOOSEN
760-213-8841
City of Carisbad
1635 Faraday Av Carlsbad.CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW130227
2714 ARLAND RDCBAD
SWPPP
1561303300
CB131522
LOOSEN; 2300 SF NEW SFD
Lot#:
Status:
Applied:
Entered By;
Issued:
Inspect Area:
Tier:
Priority:
Owner:
FRY FAMILY TRUST 06-18-01
2710 ARLAND RD
CARLSBADCA 92008
ISSUED
06/24/2013
JMA
09/05/2013
1
L
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$47.00
$56.00
$0.00
TOTAL PERMIT FEES $103.00
Total Fees: $103.00 Total Payments To Date: $103.00 Balance Due: $0.00
sl6N^f^R£
Inspection List
Permit*: CBI31522 Type: RESDNTL SFD LOOSEN: NEW SFD: 2300 SF LV/
258 SF GAR/ 422 SF PATIO COVER/ 98 SF
Date Inspection Item Inspector Act Comments
07/22/2014 89 Final Combo PD AP
07/22/2014 89 Final Combo PD AP
07/01/2014 14 Frame/Steel/Bolting/Weldin MC AP MASTER BED DECK
06/04/2014 21 Underground/Under Floor MC AP EXISTING GARAGE TO NEW LOWER
PUMP.
03/04/2014 27 Shower Pan/Roman Tubs MC AP
03/04/2014 82 Drywall/Ext Lath/Gas Test MC AP
02/27/2014 16 Insulation MC AP
02/24/2014 84 Rough Combo MC AP DOUBLE CHECK EGRESS WINDOWS
AT BEDROOMS
02/19/2014 22 Sewer/Water Service MC AP BUILDING WATER SUPPLY FROM
METER
02/18/2014 13 Shear Panels/HD's PD AP
01/17/2014 21 Underground/Under Floor PD AP
12/13/2013 15 Roof/Reroof MC AP
11/19/2013 13 Shear Panels/HD's MC CO
11/19/2013 15 Roof/Reroof MC PA SHEATHING NAILING ONLY
11/19/2013 83 Roof Sheathing/Ext Shear MC WC
10/18/2013 14 Frame/Steel/BoltingAA/eldin MC PA SUB-FLOOR
10/18/2013 24 Rough/Topout MC PA BELOW SUB-FLOOR
10/11/2013 11 Ftg/Foundation/Piers PD AP
10/02/2013 21 Underground/Under Floor MC PA AT S.O.G. ONLY
10/02/2013 31 Underground/Conduit-Wirin MC PA CONDUIT AT S.O.G. ONLY
09/26/2013 11 Ftg/Foundation/Piers MC PA SEE CARD
09/10/2013 92 Compliance Investigation MC WC
Friday, August 29, 2014 Page 1 of 1
01-07-2014
City of Carlsbad
1635 Faraday Av Carlsbad.CA 92008
Plan Check Revision Permit No:PCRl3166
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC #:
Project Title:
2714 ARLAND RD CBAD
PCR
1561303300 Lot#;
$0.00 Construction Type: 5B
Applicant:
CAROLINE DOOLEY
STEC
2979 STATE ST
CARLSBAD CA 92008
760 815-8748
PC130035
LOOSEN RES-CONVERT SINGLE CAR
GARAGE TO BEDROOM ( APPROX*:29e-SF) & EXPAND
Owner:
LOOSEN RON&BARBARA
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
12/26/2013
RMA
01/07/2014
01/07/2014
1340 OAK AVE
CARLSBAD CA 92008
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
$312.50
$0.00
$0.00
Total Fees; $312.50 Total Payments To Date: $312.50 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter coiiectively
refen'ed to as "fees/exactions." You have 90 days from the date this permil was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees In connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previouslv othenvise expired.
CITY OF
PLAN CHECK REVISION Development Services
Building Division CITY OF APPLICATION 1635 FaradayAvenue
CARLSBAD B-15 760-602-2719
www.carlsbadca.gov
Plan Check Revision No. ^^~^^^\^ ^ (o Original Plan Check No
Project Address. Date
Contact r^)n) ^iy Phl,UO -^/,r-^7>// Fax
Email C^r^UKz^<^t iCa^l/iUjMip Uy. umy
Contact Address. S-h^^ ^iU C City C^IS^AA Zip Iti^^^'
General Scope of Work plAl Car £\ClrA.^-C rj}IA\r^rM, jt? ]^l-ocm - Ij^^aj/lJ. p^A^
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 • Elements revised:
Brians • Calculations • Soils • Energy • Other.
2.
Describe revisions in detail
3.
List page(s) wliere
each revision is
shown
4.
List revised sheets
that replace
existing sheets
, 5- 7 ^ ^--z
5. Does this revision, in any way, alter the exterior of the project? [^3^es
6. Does this revision add ANY new floor area(s)? Q^es DNo
7 • Does this revision affect any fire related issues? O Yes
8. (s this a complete set? • Yes
^Signature
• No
1635 FaradayAvenue, Carlsbad, CA 92008 : 760-602- 2719 Fax: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
PLANNING DiVISION Development Services
Planning Division BUILDING PLAN CHECK Development Services
Planning Division
^ CITY Oh REVIEW CHECKLIST 1635 FaradayAvenue
CARLSBAD P-28 (760) 602-4610
www.carlsbadca.eov
DATE: 6-25-13 PROJECTNAME: PROJECTID:
PLAN CHECK NO: PC 13-35 SET#: 1 ADDRESS: 2710 & 2714 Arland Dr APN: 156-130-33
[]] This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required DYes • No
You may aiso have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
^ This plan check review is NOT COIVIPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: carollne@carolinedooley.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
X Chris Sexton
760-602-4624
Ch ris.Sexto n@ca ris bad ca .gov
I 1 Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
i Greg Ryan
760-602-4663
Gregorv.Rvan@carlsbadca.gov
1 1 Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
Linda Ontiveros
760-602-2773
Linda.Ontiveros@carisbadca.gov
Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
• Dominic Fieri
760-602-4664
Dominlc.Fieri@carlsbadca.gov
Remarks:
REVIEW #:
Plan Check No. PC 13-35 Address 2710 & 2714 Arland Dr Date 6-25-13 Review # ^
Planner Chris Sexton Phone (760) 602-4624
Type of Project & Use: new sfr, acc structure to sdu Net Project Densitv: 1.0 DU/AC
Zoning: RJ. General Pian: RLM Facilities IVIanagement Zone: 1
CFD (in/out) #_Date of participation: Remaining net dev acres:
(For non-residential development: Type of land use created by this permit: )
2 3 Legend: IEI Item Complete • Item Incomplete - Needs your action
• • Environmental Review Required: YES • NO • TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
• • Discretionary Action Required: YES • NO • TYPE
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
^ D n Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES • NO D
CA Coastal Commission Authority? YES • NO O
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
lEI • • Habitat Management Plan
Data Entry Completed? YES • NO •
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of
Habitat Type impacted/taken, UPDATE!)
13 Q • Inclusionary Housing Fee required: YES Q NO Q
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES • NO •
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
• • • Housing Tracking Form (form P-20) completed: YES • NO • N/A •
p-28 Page 2 of 3 07/11
Site Plan:
IE! • • Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44 - Neighborhood Architectural Design Guidelines
• • 1. Applicability: YES • NO S
• • 2. Project complies: YES lEI NOO
• •
Zoning:
1. Setbacks: proposed sfr
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required 20: Shown 20'
Required 5^ Shown 5'10"
Required N/A Shown N/A
Required 11.6' Shown 11'8"
Required Shown
2. Accessory structure setbacks: detached garage with sdu above/existing garage
Front:
Interior Side:
Street Side:
Rear:
Structure separation:
Required 201 Shown 20'
Required 151 Shown 5^
Required N/A Shown N/A
Required 11.6' Shown 11.6'+
Required 1£ Shown HD*
• • 3. Lot Coverage: Required <40% Shown .09%
K • • 4. Height: sfr Required, Shown
Detached garage with sdu above Required <30' with min. 3:12 Shown 21'3"
5. Parking: Spaces Required 2 Shown
(breakdown by uses for commercial and industrial projects required)
Second Dwelling Unit Spaces Required 1 Shown 1
Additional Comments 1) Please fill out the attached form P-20 and return to the planner. 2)
Please show the dimension on the site plan from the existinq garage to the proposed single-
family residence. There needs to be a 10 foot separation. 3) Please show how the detached
garage/sdu is architecturally compatible with the main unit. 4) Please indicate on the site
plan where the two parking spaces will be for the sinqle-family residence.
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTEF>AgJt^felDATES-^'7-i3
p-28 Page 3 of 3 07/11
02-12-2014
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision Permit No:PCR14012
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
PC #:
Project Title:
2714 ARLAND RD CBAD
PCR
1561303300 Lot#: 0
$0.00 Construction Type: NEW
PC130035
LOOSEN RES- REVISE TRUSS CALCS
FOR FAU IN ATTIC
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
02/04/2014
RMA
02/12/2014
02/12/2014
Applicant:
DAVE MORGAN
Owner:
LOOSEN RON&BARBARA
1347 OAK AB
CARLSBAD CA 92008
760 717-1354
1340 OAK AVE
CARLSBAD CA 92008
Plan Check Revision Fee
Fire Expedited Plan Review
Additional Fees
$225.00
$0.00
$0.00
Total Fees: $225.00 Total Payments To Date: $225.00 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information vi/ith the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has oreviouslv otherwise expired.
^ CITY OF
CARLSBAD
PLAN CHECK REVISION
APPLICATION
B-15
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Plan Check Revision No. _Original Plan Check No..
Project Address ^/V ^Mih i^O/^ Date ^/^^//
Contact"bA^HOl^g/ViCf Ph lU).7n-j3^ Fax
Email
Contact Address. . City.
General Scope of Work llluSS OUg-OLAnQN/- \X^ l^l6M CPU M£ix3 CPd^ST^iJCm^
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 • Elements revised:
• Plans • Calculations • Soils • Energy ^ other T^l^^ gAU2ULi4TT<£^
2.
Describe revisions in detail
3.
List page(s) where
each revision is
shown
4.
List revised sheets
that replace
existing sheets
jHt-£i90^gflrL--772A£S 6iM^ MOT'
TlfJH^^ ThE^ //^ -THE. MTIC- uo4^iCLJiJ
u9t^ iS^^^H^ ^^J tUf PflOMirm}) 07=^
5 • Does this revision, in any way, alter the exterior of the project? • Yes
6. Does this revision add ANY new fioor areafs)? • Yes ^ No
T. Does this revision affect any fire related issues? • Yes ^ No
8. Is this a compl^set? /] ^ Yes • No Cop '^Q>^ C-vW^
^Signature-
^ No
1635 Faraday Avenue, Carlsbad, jLA 92008 Ngh: 760-602- 2719 Fix: 760-602-8558 Email: building@carlsbadca.gov
www.carlsbadca.gov
EsGil Corporation
In (Partnersliip with government for (BuiCcfing Safety
DATE: 2/10/2014 • APPLICANT
juRjs?;>
JURISDICTION: City of Carlsbad • PLAN REVIEWER
• FILE
PLAN CHECK NO.: PC13-35 (Rev#3) - PCR14-012 SET: I
PROJECT ADDRESS: 2714 Arland Rd.
PROJECT NAME: Loosen Residence Remodel & Addition Revision
^ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
EsGil Corporation staff did not advise the applicant that the plan check has been completed.
I I EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email: Fax #:
Mail Telephone Fax In Person
^ REMARKS: Revised roof truss plans & calculations are under this plan change.
By: ALI SADRE, S.E. (FOR D.Y.) Enclosures: Original approved plan
EsGil Corporation
• GA • EJ • MB • PC 2/4
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
City ofCarlsbad PC13-35 (Rev#3) - PCR14-012
2/10/2014
[DO NOT PAY- THIS IS NOTAN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad PLANCHECKNO.: PC13-35
(Rev#3) - PCR14-012
PREPARED BY: ALI SADRE, S.E. (FOR D.Y.) DATE: 2/10/2014
BUILDING ADDRESS: 2714 Arland Rd.
BUILDING OCCUPANCY: R3/U TYPE OF CONSTRUCTION: V-B
BUILDING
PORTION
AREA
( Sq. Ft)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Roof Truss
Plans & Calc's.
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb r
By Ordinance
BIdg. Permit Fee by Ordinance
I Plan Check Fee by Ordinance
Type of Review: F"
"3
Complete Review
$225.00
r structural Only
r Repetitive Fee
^ Repeats
Based on hourly rate
r other
p. Hourly
EsGil Fee
1.5
$120.00
Hrs. @
$180.00
Comments:
Sheet 1 of 1
;( NO EXCEPTIONS TAKEN • REVISE AND RESUBMIT
EXCEPTIONS AS NOTED • REJECTED
:r. THIS SUBMITTAL NOT REQUIRED AND NOT REVIEWED
This review is only for general conformance with the design concept of the project and
genera! compliance with the information given in the Contract Documents Corrections or
comments made on the shop drawings during this review do not relieve the contractor from
compliance with the requirements of the plans and specifications Approval of a specific item
chali not include approval of an assembly of which the item is a component. Contractor is
responsible for; dimensions to be confirmed and correlated at the jobsite; information that
pertains solely to the fabncation process or to the means, methods, techniques, sequences
and procedures of construction; coordination of the Work of all trades; and for pertorming all
.vork in a safe and satisfactory manner.
PARKER STRUCTURAL ENGINEERING, INC.
OATE 2, 1'-l BY df JOB/SUBMITTAL # I 3 ( ^' - df " >CS
1^
'^\Ss
• SWSON
• SON
• SI^•=^
• SIWSON
• SIMPSON
• sitf>saN
SIW>SQN - SINPS3N
- SIMPSON
• SIMPSON
• SWSON
• SWSON
LUS^3
LUS28
t+tJS£Q-<?
LUS29
Lusee
LLJS5B
LUSSB
LUS28
LUSSe
^1
*^ MORGAN GROUP BUILDING COMPANY
to
® Copynght CompuTrus Inc. 2006
-ROJECT J.TLE
8827
1 / 11042013 CHECKED a Y
Eu JERV LOCATION
CARLSBAD, CA 92008
SCALE
0.08"- r
IS'SUEDATE
02/03/14
R£VISI0fJ-1
ABOVE PLAN PROVIDED HOR TRUSS
PLACEMENT ONLY REFER TO
TRUSS CALCULATIONS AND
ENGINEERED STRUCTURAL
DRAVI/INGS FOR ALL FURTHER
INFORMATION, BUILDING
DESIGNER/fcNGlNEER UF KbCOHD
RESPONSIBLE FOS ALL NON-TRUSS
TO TRUSS CONNECTIONS- BUILDING
DESIGNER/ENGINEER GF RECORD TO
REVIEW AND APPROVE OF ALL
DESIGNS PRIOR TO CONSTRUCTION
Ramona Lumber Company. Inc
P.l). Boi{ 1561) - «i*niuri.s. C A v;iH^5
{7ftOj 7g<J-lO80 •' FA-.X 7S<>-4<'>5.^
All designs are property of RAMONA LUMBER CO.INC. All designs are null and void if not fabricated by RAMONA LUMBER CO.INC.
lllli This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC; 2x4 OF #1&BTR BC: 2x4 OF #1&BTR
WEBS: 2X4 DF STUD
TC LATERAL SUPPORT BC LATERAL SUPPORT 12'0C. 12"0C. UON.
UON.
OVERHANGS: 31.1" 0.0"
Connector plate prefix designators: C,CN,C1B,CN18 (or no prefix) = CompuTrus, Ino M,M20HS,M18HS,U16 MiTek MT series
TRUSS SPAN 13'- 11.0" LOAD DURATION INCREASE =1.25
SPACED 24.0" O.C.
LOADINQ
LL( 20.0)+DL( 14.0) ON TOP CHORD = 34.0 PSF DL ON BOTTOM CHORD = 5.0 PSF
TOTAL LOAD = 39.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEINO MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP ANO BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/6DF/Cq=1.00 1- 2=( -16) 54 2-5=(-615) 1353 5-3=(0) 246
2- 3=1-950) 168 5-4=(-615) 1363 3- 4=(-924) 137
BEARING LOCATIONS
0'- 0.0" 13'- 11.0'
MAX VERT MAX HORZ REACTIONS REACTIONS
-48/ 716V -1958/ 195BH -1/ 543V -1958/ 1958H
BRG
BRG
0' 13* 0.0"
11.0"
BRG
SIZE 3.50'
3.50'
1.15 DF/ 0.87 DF/
REQUIRED BRG AREA
SQ.IN. (SPECIES) 1.15 DF ( 625
0.87 DF ( 625)
1.77 HF/ 1.69 SPF 1.34 HF/ 1.26 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL DEFL = -0.038" 9 -2'- 6.6" Allowed = 0.269" MAX DL CREEP DEFL = -0.040" e -2'- 6.6" Allowed = 0.346" MAX TL CREEP DEFL = -0.077' e -2'- 6,6' AUowed = 0.346"
MAX HORIZ, MAX HORIZ. LL DEFL TL DEFL 0,017" 9 -0.023" 9 3.5" 3.5"
IcoND. 2: 2nnn.nn LBS DRAG LOAD.
7-02 6-09
4.00 1
12 12
Wind; 65 mph, h=15ft, TCDL=8.4,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2. Exp.C, MWFRS,
interior zone, load duration factor=1.6, Truss designed for wind loads in the plane of the truss only.
iMax CSI: TC:0.73 BC:0.30 Web:0.08l
3 4.00
st F4 o
7-02 6-09
2-06 13-11
JOB NAME: LOOSEN • A2 Scale: 0.3838
Truss: A2
DES. BY; BS
DATE: 11/5/2013
SEQ.: 5717808
TRANS ID: 383688
II
WARNINGS:
1. Builder and erection contractor sho Jid be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be installed where shown -i-.
3. Additional temporary bracing to insure stability during construction
Is the responsibility of the erector. Additional permanent bracing of
the overall structure la the responsibility of the buliding designer.
4. No load should be applied to any component until after ai bracing and
fasteners are complete and at no time should any loads greater than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no reeponaibiilty for the
fabrication, handlmg, shipment and installation of components.
6. This design is furnished subject to the limitations set fbrth by
TPIA/VTCA in BCSI, copies of which wSI be furrtished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
QENERAL NOTES, uniess othenvise noted;
1. This design Is based only upon the parameters shown and Is for an Individual
building component. Applicability of design parameters and proper
Incorporation of component is the responsibility of the building designer. 2. Design assumes the top and bottom chords to be laterally braced at
2' o.c. and at 10' o.c. respectively unless braced throughout their tength by
continuous sheathing such as plywood sheathing(TC) and/or drywall(BC). 3. 2x Impact bridging or lateral bracing required where shown + *
4. installation of truss is the rssponsibility of the respective contractor.
5. Design assumes trusses are to be used In a non-corrosive environment, and are for "dry condition" of use.
6. Design assumes full bearing at all supports shown. Shim or wedge if
necessary. 7. Design assumes adequate drainage is provided.
6. Plates shall be located on both faces of truss, and placed so their center
lines coincide with joint center lines.
9. Digits indicate size of plate In inches. 10. For basic connector pfate design values see ESR-1311, ESR-1988 (MiTelt) |
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TO: 2x4 DF #1&BTR
BC: 2x4 DF #1&BTR WEBS: 2x4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON. 8C LATERAL SUPPORT <= 12"0C. UON.
OVERHANGS: 31.1' 0.0"
Connector plate prefix designators:
C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,VI16 = MiTek MT series
TRUSS SPAN 13'- 11.0"
LOAD DURATION INCREASE = 1.25 SPACED 24.0" O.C.
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
LIMITED STORAGE DOES NOT APPLV DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEINQ MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING
LOCATIONS
0'- 0.0" 13'- 11.0"
CBC2010/IBC2009
1- 2= 2- 3= 3- 4=
MAX VERT
REACTIONS -128/ 583V
-57/ 445V
MAX MEMBER FORCES
-23) 43 2-5=(-54) -703 77 5-4=(-54)
-707) 75
4WR/6DF/Cq=1.00 605 5-3=(0) 246
605
BRG ^ BRG @
MAX HORZ
REACTIONS 66/ 54H
66/ 54H
- 0.0"
- 11.0"
BRG
SIZE 3.50'
3.50'
0.93 DF/ 0.71 OF/
REQUIRED BRG AREA SQ.IN. (SPECIES)
0.93 DF ( 625 0.71 DF ( 625)
1.44 HF/ 1.37 SPF 1,10 HF/ 1,05 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/ieO MAX LL DEFL = -0,038' S -2'- 6,6' Allowed = 0,259" MAX DL CREEP DEFL = -0.020' 9 -2'- 6,6" Allowed = 0.346"
MAX TL CREEP OEFL = -0.057' 9 -2'- 6.6" Allowed = 0,346"
MAX HORIZ. LL DEFL = 0.006" » 13'
MAX HORIZ. TL DEFL = 0,010" 9 13'
7.5"
7.5"
Wind:
7-02 6-09
12 12
85 mph, h=15ft, TC0L=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat,2, Exp.C, MWFRS,
Interior zone, load duration factor=1,6. Truss designed for wind loads
in the plane of the truss only.
[Max CSI: TC:0.56 BC:0.29 Web:Q.0Bl
4.00 M-4X5
i 4.00
1^4
7-02 6-09
2-06 13-11
JOB NAME: LOOSEN - A3 Scale: 0.3965
Truss: A3
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717809
TRANS ID: 383688
lllililHIl
WARNINGS:
1. Buikter snd eracffon contractor slwuld be advised ofsH General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be installed where shown +.
3. Additional temporary bracing to Insure stability during construction
is the responsibility of the erector. Additional permanent bracing of
the overall structure is the responsibility of the buiiding designer.
4. No load should be applied to any component until after all bracing and
fasteners are complete and at no time should any loads greater than
design loads be applied to any component.
5. CompuTrus has no controi over and assumes no responsibility for the
fabrication, handling, shipment and installation of components.
6. This design is furnished subject to the limitations set fbrth by
TPI/WTCA in BCSI, copies of which wili be furnished upon request.
MiTek USA, lnc7CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, unless othenvise noted:
f. Trtte design Is based on/y upon trte pa^imters shown and Is for an ln<ilvkiu8l
buliding component. Applicability of design parameters and proper
Incorporation of component is the responsibility of the building designer. 2. Design assumes the top and bottom chords to be lateraHy braced at
2' o.c. and at 10' o.c. respectively unless braced throughout their length by
continuous sheathing such as plywood sheathing(TC) and/or drywall(BC).
3. 2x Impact bridging or lateral bracing required where shown •*• + 4. installation of truss is the responsibility of the respective contractor.
5. Design assumes trusses are to be used in a non-corrosive environment,
and are fbr "dry condition" of use.
6. Design assumes full bearing at all supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage is provided. 8. Plates shall be located on both faces of truss, and placed so their center
lines coincide with Joint center lines.
9. Digits indicate size of plate in inches.
10. For basic connector plate design values see ESR-1311, ESR-19B8 (MiTelt)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC; 2x4 DF (fl&BTR
BC; 2x4 DF #1&BTfl WEBS: 2X4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
13-11-00 STUB TERMINAL HIP SETBACK 7-02-00 FROM END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UNIF LL( BC UNIF LL( 40.0)+DL( 0.0)+DL(
LOADING
14.0)= 54.0 PLF 22.9 = 22.9 PLF
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1,00
1- 2=1-2024) 298 1-5=(-264) 1838 5-2=(0) 350 2- 3= -2010 300 5-3=(-264) 1838
3- 4= -22) 42
0,0" TO 13'- 11,0" V
0.0" TO 13'- 11.0" V
OVERHANGS: 0.0" 31.1"
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
( 2 ) complete trusses required. Join together 2 ply with 3"x.l31 DIA GUN
nails staggered at: 9" oc in 1 row(s) throughout 2x4 top chords,
9" oc in 1 row(s) throughout 2x4 bottom chords, 9" oc in 1 row(s) throughout 2x4 webs.
TC CONC LL( 589.3)+DL( 206.2)= 795.5 LBS 9 6'- 9.0"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP ANO BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING LOCATIONS
0'- 0.0" 13'- 11.0"
MAX VERT REACTIONS
-116/ 945V -180/ 1058V
MAX HORZ REACTIONS -54/ 66H -54/ 66H
BAG 9 0'- 0.0"
BRG ? 13'- 11.0"
BRG
SIZE 3.50'
3.50'
1.51 DF/ 1.69 DF/
REQUIRED BRG AREA
SQ.IN. (SPECIES) 1.51 DF ( 625)
1.69 DF ( 625)
2.33 HF/ 2.22 SPF 2.61 HF/ 2.49 SPF
6-09
12
4.CO [
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.030' i 6'- 9.0" Allowed = 0.667"
MAX DL CREEP DEFL = -0.026' 9 6'- 9.0' Allowed = 0,889" MAX TL CREEP OEFL = -0.056' 9 6'- 9,0" Allowed = 0,889"
MAX HORIZ. LL DEFL = 0,010" 9 13'-MAX HORIZ. TL DEFL = 0.016" ? 13'-7.5"
7.5"
7-02
795.50# 12
4,00
M-4x5
Wind: 85 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads
in the plane of the truss only.
iMax CSI: TC:0.38 BC:0.?5 Weh:0.05l
6-09 7-02
13-11 2-06
JOB NAME: LOOSEN - A4 Scale: 0.4345
Truss: A4
DES. BY; BS
DATE: 11/5/2013
SEQ.: 5717810
TRANS ID; 383688
III
WARNINGS:
1. BuikJer and erection contractor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Installed where shown +.
3. Additional temporary bracing to Insure stability during construction
is the responsibility of the erector. Additional permanent bracing of
the overaU structure Is the responsibility of itie builtiing designer.
4. No load should be applied to any component until after ail bracing and
^steners are complete and at no time should any loads greater than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and installation of components.
6. This design is furnished subjectto the limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MITek USA, Inc./ConnpuTrus Software 7.6.5(1L)-E
GENERAL NOTES, unless otherwise noted;
1. This design is based only upon the parameters shown and Is for an individual
building component. Applicability of design parameters and proper incorporation of component is the responsibility of the buiiding designer.
2. Design assumes the top and bottom chonjs to be laterally braced at
2' o.c. and at 10' o.c. respectively unless braced throughout their length by continuous sheathing such as plywood sheathing(TC) and/or drywall(BC).
3. 2x impact bridging or laural bracing requlrsd whara sbown *• *
4. Installation of tnjss is the responsibyity of the respective con^ctor.
5. Design assumes trusses are to be used in a non-corrosive environment, and are for "dry condition" of use.
6. Design assumes full bearing at all supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage is provided,
6. Plates shall be located on both faces of truss, and placed so their center
lines coincide with joint center lines. 9. Digits indicate size of plate In Inches.
10. For basic connector plate design values see ESR-1311, ESR-1988 (MiTek)
I This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC: 2x4 DF #1&BTR BC: 2x4 DF #1&BTR
WEBS: 2x4 OF STUD
TC LATERAL SUPPORT
BC LATERAL SUPPORT
14-04-00 TERMINAL HIP SETBACK 7-02-00 FROM END WAIL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
OVERHANGS: 31.1"
12"0C. UON.
12"0C. UON.
31.1"
TC UNIF LL( BC UNIF LL 40.0)+DL(
0.0)+DL(
28.0)
22.9
LOADING = 68.0 PLF
= 22.9 PLF
0.0" TO 14'
0.0" TO 14' 4.0" V 4.0" V
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1,00 1- 2=( -16) 54 2-6= -18) 2348 6-3=(0) 360
2- 3= -2568 28 6-4=(-18) 2348 3- 4=(-2568) 28
4- 5=( -16) 54
Connector plate prefix designators: C,CN,C1B,CN18 (or no prefix) = CompuTrus, Ino
M,M20HS,M1BHS,M16 = MiTek MT series
( 2 ) complete trusses required. Join together 2 ply with 3"x.131 DIA GUN
nails staggered at: 9' oc in 1 row(s) throughout 2x4 top chords,
9" oc in 1 row s throughout 2x4 bottom chords, 9' oc in 1 rowjs) throughout 2x4 webs.
TC CONC LL( 589.3)+DL( 412.5)= 1001.7 LBS g 7'- 2.0'
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING LOCATIONS
0'- 0.0" 14'- 4.0"
MAX VERT
REACTIONS -39/ 1306V
-39/ 1306V
BRG » BRG f
MAX HORZ
REACTIONS -66/ 66H
-66/ 66H
'- 0.0" '- 4.0"
BRG
SIZE 3.50'
3.50'
2.09 OF/ 2,09 OF/
REQUIRED GRG AREA
SQ.IN. (SPECIES) 2.09 DF ( 625)
2.09 DF ( 625)
3,22 HF/ 3,07 SPF 3,22 HF/ 3,07 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = -0.033' 9 7'- 2,0' Allowed = 0,688" MAX OL CREEP DEFL = -0,047' e 7'- 2,0' Allowed = 0.917"
MAX TL CREEP DEFL = -0.080' 9 7'- 2.0' Allowed = 0.917"
MAX HORIZ. MAX HORIZ. LL DEFL : TL DEFL
0.011" 9
0.021" 9 14'-14'-0.5" 0.5"
7-02
12
4.00 IIM-4X4
7-02
1001.70#
Wind: 65 mph, h=15ft, TCDL=8,4,BCDL=3,0, ASCE 7-05,
Enclosed, Cat,2, Exp,0, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
IMax CSI: TC:n.51 60:0.29 Weh:0.06l 12
4, 00
4,0"
st
7-02 7-02
2-06 14-04 2-06
JOB NAME: LOOSEN Scale: 0,4187
Truss: A
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717806
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection contractor should be advised of all General Notes
artd Warnings before construction oommertces.
2. 2x4 compression web bradng must be installed where shown *.
3. Additional temporary bracing to insure stability during consbuction
Is the responsibility of the erector. Additional permanent bracing of
the overall structure is the responsibility of the building designer.
4. No load should be apf^ied to any component until after ail bracing and
fasteners are complete and at no time shouM any loads greater Vnan
design toads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and installation of components.
6. This design is furnished subject to the imitations set forth by
TPIA/VTCA in BCSI, copies of which wHI be furnished upon request.
MITek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, unless othenvise noted:
1. This design is based only upon the parameters shown and Is for an Indivkluai buUding corrsponem Applicabia of design parameters and proper
Incorporation of component Is the responsibNIty of the building designer.
2. Design assumes the top and bottom chords to be laterally braced at 2' o.c. and at 10' o.c. respectively unless braced throughout their lan^h by
continuous sheathing such as plywood she8thlng{TC) and/or drywall(BC].
3. 2x Impact bridging or lateral bracing required where shown + *
4. Installatton of truss is the rssponsibility of the respective contractor. 5. Design assumes trusses are to be used in a non-con'osive environment,
and are for "dry condition" of usa.
6. Design assumes full bearing at all supports shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provkled.
6. Plates shall be located on both faces of truss, and placed so their center lines coinckle with joint center tines.
9. Digits indicate size of plate In Inches.
10. For basic connector pfate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC: 2x4 DF #18LBTR
BC; 2x4 DF #UBTR WEBS: 2x4 DF STUD
TC LATERAL SUPPORT <= BC LATERAL SUPPORT <=
OVERHANGS: 31.1"
12"0C. UON.
12"0C. UON.
31.1"
LLI
TRUSS SPAN 14'- 4.0" LOAD DURATION INCREASE =1.25
SPACED 24.0" O.C.
LOADING
20.0)+DL( 14.0) ON TOP CHORD = 34.0 PSF OL ON BOTTOM CHORD = 5.0 PSF
TOTAL LOAD = 39.0 PSF
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREHENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP ANO BOTTOM CHORD LIVE LOAOS ACT NON-CONCURRENTLY.
BEARING
LOCATIONS 0'- 0.0"
14'- 4.0"
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00 1- 2=( -16) 54 2-6=(0) 780 6-3=(0) 253
2- 3= -904 0 6-4=(0) 780 3- 4= -904) 0
4- 5= -16) 54
MAX VERT
REACTIONS -47/ 712V -47/ 712V
BRG @ 6RQ 9
MAX HORZ
REACTIONS -66/ 66H
•66/ 66H
0'- 0.0" 4'- 4.0"
BRG REQUIRED BRG AREA
SIZE SQ.IN. (SPECIES) 3.50' 1.14 DF ( 625)
3,50' 1.14 DF ( 625)
1.14 DF/
1.14 OF/ 1.76 HF/ 1.68 SPF 1.76 HF/ 1.68 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180
MAX LL OEFL = -0.038' 9 -2'- 6,6' Allowed = 0,259" MAX DL CREEP DEFL = -0.040' i -2'- 6,6' Allowed = 0,346"
MAX TL CREEP DEFL = -0.077' i -2'- 6.6" Allowed = 0.346"
MAX HORIZ. LL DEFL = 0.007" 9 14'
MAX HORIZ. TL OEFL = 0.014" 9 14'
0.5"
0.5"
7-02
12
4.00 [
1~
I1M-4X4
4.0"
7-02
Wind; 85 mph, h=15ft, TCDL=B.4,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS,
interior zone, load duration factor=1,6. Truss designed for wind loads in the plane of the truss only.
12
"=3 4
IMax CSI: TC:n.74 BC:0.32 Weh:0.Qfll
00
7-02 7-02
2-06 14-04 2-06
JOB NAME: LOOSEN - Al Scale: 0.40E2
Truss: Al
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717807
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection cont-actor should be advised of alt General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Installed where shown +.
3. Additional temporary bracing to insure stabiHty during construction
is the responsibility of the erector. Additkinal permanent bracing of
the overall structure Is the responsibility of the building designer.
4. No load should be applied to any component until after alt bracing and
fasteners are comptete and at no time shoukl any loads greater than
design loads be applied to any componant.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and installatbn of components.
6. This design is furnished subject to the limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MITek USA. Inc/CompuTrus Software 7.6.5(1 L)-E
QENERAL NOTES, unless othenvise noted;
1. This design is based only upon the parameters shown and is for an indivkluai
building component. Applicability of design parameters and proper incorporation of component is the responsibility of the buikjing designer.
2. Design assumes the top and bottom chords to be lateraBy braced at
2' o.c. and et 10' o.c. respectively unless braced throughout their tenoth by continuous sheathing such as plywood sheathing(TC) and/or drywaltfBC).
3. 2x Impact bridging or lateral bracing required where shown + +
4. Instaltation of tmss is the responsibilrty of the respective contractor. 5. Design assumes trusses are to be used in a non-corrosive environment,
and are for "dry condition" of use.
6. Design assumes full bearing at alt supports shown. Shim or wedge if necessary. 7. Design assumes adequate drainage is provkled.
S. Plates shall be located on both faces of truss, and pfaced so their center
lines coincide with joint center lines. 9. Digits indicate size of plate in Inches.
10. For basic connector pfate design values see ESR-1311, ESR-1988 (I^ITek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC: 2X4 OF #18iBTR
BC; 2x4 DF #1&BTR WEBS: 2x4 DF STAND
TC LATERAL SUPPORT <= 12'0C. UON. BC LATERAL SUPPORT <= 12'0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON. FOR ALL FUT TOP CHORD AREAS NOT SHEATHED
OVERHANGS: 31,1" 0.0'
Connector plate prefix designators;
C,CN,C18,CN18 (or no prefix) = CompuTrus, Ino M,M20HS,M1BHS,M16 = MiTek MT series
TRUSS SPAN 25'- 11.5"
LOAD DURATION INCREASE = 1.25 SPACED 24.0' O.C.
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREHENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOAOS ACT NON-CONCURRENTLY,
1- 2=(
2- 3=(
3- 4=( 4- 5=(
5- 6=( 6- 7=(
7- 8=(
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/G0F/Cq=1,00
23) 43 3404) 420
2719) 358 2841) 369
2841) 372 2719 364
3404) 461
BEARING
LOCATIONS 0'- 0.0"
25'- 11.5"
9=(-386) 319
9-10=(-390) 3202
10- 11=(-333) 2589 11- 12=(-375) 2855
12- 13=(-339) 2589 13- 14= -433) 3202
14- 8=(-429) 3199
3=
3- 10= 4- 10=
4- 11 =
11- 5= 5- 12=
12- 6= 13- 6=
, 0) (-617)
168
53
MAX VERT REACTIONS
-160/ 95ev •111/ 825V
BRG ? BRG Ei
MAX HORZ REACTIONS
-110/ 98H -110/ 98H
0.0" 11.5"
0'
25'
0) 234
( -76) 519 • -42) 26
-31) 19 -70) 518
-13) 234
BRG
SIZE 5.50"
3.50"
1.53 DF/ 1.32 DF/
13- 7=
7-14= -623)
0)
119
168
REQUIRED BRG AREA SQ.IN. (SPECIES)
1.53 DF ( 625) 1,32 DF ( 625)
2.37 HF/ 2.25 SPF 2.04 HF/ 1.94 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL OEFL = -0.349" 9 13'- 0.8" Allowed = 1.260" MAX DL CREEP OEFL = -0.315" 9 13'- 0.8" Allowed = 1.681"
MAX TL CREEP DEFL = -0.664" » 13'- 0.8" Allowed = 1.681"
12-00 2-01-08
t 1-
11-10
MAX HORIZ. LL DEFL = 0.180" ? 25'-MAX HORIZ. TL DEFL = 0.289' 9 25'-8.0" 8.0'
3t
Wind: 85 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6.
Truss designed for wind loads in the plane of the truss only.
IMax CSI: TC:0.54 BC:0.50 Web:0.2BI
o
12 '2,00 2.00 '
12
0T11-12 OT11-12
6-04-08 4-10-12 '1-07-08' 4-10-12 6-02-08
2-06 12-03 -4-1-07-08 12-01
2-06 25-11-08
JOB NAME: LOOSEN - B2 Scale; 0,2472
Truss: B2
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717812
TRANS ID: 383688
illilllliiilll
WARNINGS:
1. Bulkier and erection cont'actor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Installed where shown *.
3. Additional temporary bracing to Insure stability during construction
is the resiponsibility of the erector. Additional permanent bracing of
the overall structure is the responsibility of the building designer.
4. No load should be applied to any component until after aH bracing and
fasteners are complete and at no time shoukl any toads greater than
design toads be applied to any component.
5. CompuTrus has no contral over and assumes no responsibility forthe
fabrication, handling, shipment and inslallation of components.
6. This design is fumished subjectto the limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, unless otherwise noted:
1. This design is based only upon the parameters shown and Is for an Indivkluai
buliding component. Applicability of design parameters and proper incorporation of component is the responsibility of the buikiing designer.
2. Design assumes the top and bottom chords to be laterally braced at
2' O.C. and at 10' o.c. respectively unfass braced throughout their length by continuous sheallTing such as plywood sheathing(7C) andlor rtrywaM/BCJ.
3. 2x Impact bridging or fateral bracing required where shown '•• *
4. Installation of truss is the rssponsibility of the respective contractor.
5. Design assumes trusses are to be used in a non-contisive environment, and are for "dry condition" of use.
6. Design assumes full bearing at all supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage ie provided.
8. Plates shalt be tocated on both faces of truss, and pfaced so their center
lines coincide witii joint center tines. 9. Digits incNcate size of plate In Inches.
10. For basic connector plate design values see ESR-1311, ESR-1988 (H/liTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC; 2x4 OF #1&BTfl
BC: 2x6 DF 1*2
WEBS: 2x4 OF STAND
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
NOTE; 2x4 BRACING AT 24"0C UON. FOR
ALL FLAT TOP CHORD AREAS NOT SHEATHED
26-01-08 HIP BC SETBACK 10-00-00 FROM END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UN:
TC UN
TC UN
BC UN
BC UN
BC UN
IF LL(
IF LLj
IF LLj
IF LL(
IF LL(
IF LL{
40.0)+DL(
120.0 +DL
40.0)+DL(
0.0)+DL(
0.0)+DL(
0.0)+DL(
14.0)=
42.0)=
14.0)=
10.0)=
30.0)=
10.0 =
LOADING
54.0 PLF
162.0 PLF
54.0 PLF
10.0 PLF
30.0 PLF
10.0 PLF
0,0"
0.0"
1,5"
0.0"
0.0"
1.5" TO
OVERHANGS; 31.1" 31.1"
BC CONC LL(
BC CONC LL(
600.0)+DL(
600.0)+DL(
360.0)= 960.0 LBS » 10'-
360.0)= 960.0 LBS 9 16'-
10'-16'-
26'-10'-16'-
26'-
0.0' 1.5"
0.0' 1.5'
1.5' 0.0' 1.5"
1.5'
1- 2^
2- 3^ 3- 4:
4- 5^ 5- 6^
6- 7' 7- B^ 8- 9
9- 10
10-11^
^i-10332!
^(•11145) ^ -13137)
• -13146) •(-13146)
•(•13137) •(-11145)
;M0332j
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
42 2-12=(-1623) 9807 12- 3=(-364) 102 1716 12-13= -1641) 9900 3-13= -210) 960
1914 13-14= -1654 10860 4-13= 0 249 2283 14-15=(-2508i 13731 4-14=(-723) 3915
2292 15-16= -1854 10860 14- 5= -102 93 2292 16-17=(-1641) 9900 14- 6=(-648) 237
2283 17-10=(-1623) 9807 6-15=(-648) 237 1914 - •- • "
9-17=(-384) 102
1716 42
7-15=(-102) 93
15- 8= -723 3915 16- 8=( 0) 249
16- 9=(-210 960
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus,
M,M20HS,M18HS,M16 = MiTek MT series Inc
( 3 ) complete trusses required.
Join together 3 ply with 3"x.131 DIA GUN nails staggered at:
9" oc in 1 row(s) throughout 2x4 top chords, 9" oc in 2 row sj throughout 2x6 bottom chords, 9" oc in 1 row(s) throughout 2x4 webs.
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING LOCATIONS
0'- 0.0' 26'- 1.5"
MAX VERT
REACTIONS -405/ 2301V
-405/ 2301V
BRG E> BRG »
MAX HORZ REACTIONS
-95/ 95H -95/ 95H
'- 0.0"
'- 1.5"
BRG SIZE
5.50' 5.50'
3.68 DF/ 3.68 DF/
REQUIRED BRG AREA
SQ.IN, (SPECIES) 3.68 DF ( 625)
3.68 DF i 625)
5.68 HF/ 5.41 SPF 6.68 HF/ 5.41 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL OEFL = -0,427' e 13'- 0,8' Allowed = 1.260"
MAX DL CREEP DEFL = -0.383' 8 13'- O.B" Allowed = 1,681" MAX TL CREEP DEFL = -0,810' 0 13'- 0,8' Allowed = 1,661"
MAX HORIZ. LL DEFL MAX HORIZ, TL DEFL 0,189" 9 25'- 8,0"
0.302" 9 25'- 8,0"
10-00 6-01-08 10-00
5-10-10 4-01-06 0-04-12 2-08
ft
2-08 0-04-12 4-01-06 5-10-10
12
4,00
M-3x12
M-7X10 M-1x3 M-2.5x4 M-1X3
_6 Z_
M-7X10 12
Wind: 85 mph, h=15ft, TC0L=4,2,8CDL=3,0, ASCE 7-OS,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1,6.
Truss designed for wind loads in the plane of the truss only,
IMax CSI: TC;n.43 BC;0.77 Web:0.53l
! 4.00
M-3X6 M-3x6
2-06 26-01-08 2-06
JOB NAME: LOOSEN - B4 Scale; 0.2339
Truss: B4
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717814
TRANS ID: 383688
llllllllllllllllillilllll
WARNINGS:
1. Bulkier and erection contractor should be advised of att General Notes
and Warnings before construction commences,
2. 2x4 compression web bracing must be instalted where shown
3. Addittonal temporary bracing to Insure stabiHty during consti'uction is the responsibility of the erector. Additionat permanent bradng of the overall structure is the responsibility of the building designer.
4. No toad should be applied to any component until after all brecing and
fasteners are complete and at no time shoukl any loads greater than
design loads be applied to any component.
5. CompuTrus has no contral over and assumes no responsibility for the
fabrication, handling, shipment and instaltation of components.
6. This design is furnished subject to the limitationfi set forth by
TPI/WTCA in BCSI, copies of which witt be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7,6.5(1L)-E
GENERAL NOTES, untess othenvise noted:
1. This design is based onty upon the parameters shown and is for an individual building component. Applicability of design parameters and proper Incorporation of component is the responsibility of the building designer. 2. Design assumes ^ top and bottom chonis to be laterally braced at 2' o.c. and at 10' o.c, respectively unless braced throughout their length by continuous sheathing such as plywood sheathing(TC) and/or drywatl(BC]. 3. 2x Impact bridging or lateral bracing required where shcnvn + + 4. Installation of truss is the responsibyity of the respective contractor. 5. Design assumes trusses are to be used in a non-corrosive environment, and are for "dry condition" of use. 6. Design assumes hA\ bearing at alt supports shown. Shim or wedge if necessary. 7. Design assumes adequate drainage is provkted. 8. Plates shall be tocated on both faces of truss, and pfaced so their center lines coincide with joint center lines. 9. Digits indicate size of plate in inches. 10. For basic connector ptate design values see ESR-1311, ESR-1988 (MiTek)
Ill This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC; 2x4 DF #18iBTR
BC; 2x6 DF #2 WEBS: 2x4 DF STAND
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"DC. UON.
NOTE; 2x4 BRACING AT 24'OC UON. FOR ALL FLAT TOP CHORD AREAS NOT SHEATHED
25-11-08 STUB HIP BC SETBACK 10-00-00 FROM END WALL
OVERHANGS: 0.0" 31,1"
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc
M,M20HS,M18HS,M16 = MiTek MT series
( 3 ) complete trusses required. Join tooether 3 ply with 3"x.131 DIA GUN nails staggered at:
9' oc in 1 row(s) throughout 2x4 top chords,
9" oc In 2 rowisi throughout 2x6 bottom chords, 9" oc in 1 row(s) throughout 2x4 webs.
9-10
TC UNIF LL(
TC UNIF LL TC UNIF LL
BC UNIF LL BC UNIF LL,
BC UNIF LL(
54.0 10.0
30.0 10.0
BC CONC LL( 600.0)+DL( 360.0)= 960.0 LBS 9 9'- 10.0"
BC CONC LL( 600,0)+DL( 360,0)= 960,0 LBS 9 15'- 11,5" ADDL: BC CONC LL+DL= 900,0 LBS 9 2'- 0,0"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
NOTE: TRUSS NOT SYMMETRICAL
ORIENTATION AS SHOWN,
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
^ — •• - • -• --- •- g=(.222) 1017
16= -396 105
1.25 (Non-Rep) 1 2=( -11832) 1986 1 11 = -1887) 11292 11 2=( 363 1.25 (Non-Rep)
2 3= -11778) 2034 11 12=( -1899) 11292 2 12=1 -531) 54
3 4= -13827) 2409 12 13=1 -1971) 11496 3 12=1 -30 342 PLF 0'- 0.0" TO 9'-10.0" V 4 5=( -13836) 2418 13 14=1 -2613) 14301 3 13=1 •738) 4029
PLF 9'- 10.0" TO 15'-11.5" V 5 6={ -13587) 2373 14 15= -1917) 11208 13 4=( -87) 93 PLF 15'- 11.5" TO 25'-11.5" V 6 7=! -13578) 2361 15 16=( -1695) 10200 13 5=1 -513) 213
PLF 0'- 0.0" TO 9'-10.0" V 7 8=( -11505) 1980 16 9=( -1677) 10104 5 14=( -810) 264 PLF 9'- 10.0" TO 15'-11.5" V 8 9=( -10644) 1773 -1677) 6 14=( -96) 93
PLF 15'- 11.5" TO 25'-11.5" V 9 10=( -21) 42 14 7=1 -750) 4068 -21) 15 7= 0) 240
BEARING
LOCATIONS 0'- 0,0'
25'- 11.5"
MAX VERT
REACTIONS -485/ 3017V
•416/ 2371V
BRG 9 BRG 9
MAX HORZ
REACTIONS -83/ 95H
•83/ 95H
'- 0.0" '- 11.5"
BRG
SIZE 3.50'
5.50"
4.83 DF/ 3.79 DF/
REQUIRED BRG AREA
SQ.IN. (SPECIES) 4.83 DF ( 625
3.79 OF ( 625)
7.45 HF/ 7.10 SPF 5.86 HF/ 6.58 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/1B0
MAX LL DEFL = -0.427' 9 12'- 10.7" Allowed = 1.260" MAX DL CREEP DEFL = -0.446' 9 12'- 10.7" Allowed = 1.681"
MAX TL CREEP DEFL = -0,873' 9 12'- 10,7' Allowed = 1,681"
MAX HORIZ. LL DEFL = 0,189" 9 25' MAX HORIZ, TL DEFL = 0.322" 9 25' 6,0" 6.0"
5-08-10
f-
4-01-06 0-04-12 2-08
6-01-08 10-00
12
4.00
M-1X3
M-7X10 4
2-08 0-04-12 4-01-06
tt
5-10-10
Wind; 85 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7-05, Enclosed, Cat,2, Exp,C, MWFRS, interior zone, load duration factor=1.6, Truss designed for wind loads in the plane of the truss only.
12 iHax CSI: TC:0.46 80:0.96 Web;0.55l
M-2,5X4 M-lxiS M-7X10
_5_
M-3X6
; 4.00
M-3X12+
it
.900# i960#
JLL
5-06-14 3-06-06 0-11-12
^
5-07-08 0-11-12 3-06-06
-4
5-08-14
10-01 5-07-08 10-03 2-06
4 ^
25-11-08 2-06
JOB NAME: LOOSEN - B Scale: 0,2424
Truss: B
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717811
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection contractor shouid be advised of att General Notes
and Warnings before constructkin commences.
2. 2x4 compression web bracing must be tnstalfad where shown *.
3. Additionat temporary bracing to insure stability during construction
Is the responsibility of tiie erector. Additional permanent bracing of
the overall structure is the responsibitity of the building designer.
4. No load should be applied to any component until after att bracing and
fasteners are compiete and a! no time shouid any Joads grsaiBr than
design loads be applied to any component.
5. CompuTrus has no contral over and assumes no responsibility for the
fabrication, handling, shipment and instaltation of components.
6. This design is fumished subject to tiie limitations set fbrth by
TPI/WTCA in BCSI, copies of which wilt be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7,6.5(1L)-E
GENERAL NOTES, unfass othenMse noted:
1. This design is based only upon the parameters shown and is for an Indlvkjual buikiing component. ApptlcabltIV of design parameters and proper
incorporation of component Is ^e responsibitity of the buikiing designer.
2. Design assumes the top and bottom chords to be lateraHy braced at
2' o.c. and at 10' ox. respectively unless braced throughout ttieir length by
continuous sheathing such as plywood sheathing(TC) and/or drywati(BC).
3. 2x Impact bridging or lateral bracing required where shown + * 4. Instalfation of truss is the responsibility of the respective contractor.
5. Design assumes trusses are to be used In a non-corrosive environment,
and are for "dry condition" of use. 6. Design assumes full bearing at aU supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage is provided. 8. Plates Shalt be tocated on both faces of truss, and placed so their center
lines coinckle with joint center tines.
9. Digits indicate size of plate in inches.
10. For basic connector plate design values see ESR-1311, ESR-ie88 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUM6ER SPECIFICATIONS TRUSS SPAN 30'- 0.0" CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
TC; 2x4 OF lHliBTR LOAD DURATION INCREASE = 1.25 1- 2=(-2261) 371 1 12=( -759 2273 2-12=(-137) 148 BC: 2x4 DF #1&BTR SPACED 24,0" 0,C, 2- 3=(-2135 316 12 13=1 -436 2821 3-12= -32 462
WEBS; 2X4 OF STUD 3- 4= 0 0 13 14=1 -434 2840 12- 5= -838 153 LOADING 3- 5= -2059 297 14 10=1 -666 2311 5-13=1-121 241
TC LATERAL SUPPORT <= 12"0C, UON. LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF 5- 6= -2870 411 13- 6= -131 230
ac LATERAL SUPPORT <= 12"0C. UON. DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
6- 8=(-2119) 292
7- 8=( 0) 0 8- 9= -2196 311
6-14=(-810) 156
14- 8=( -27) 482 14- 9=(-178) 105
NOTE: 2x4 BRACING AT 24"0C UON. FOR LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 9-10= -2400 354
ALL FLAT TOP CHORD AREAS NOT SHEATHED REQUIREMENTS OF CBC 2010 NOT BEING MET. 10-11=( -23 43
OVERHANGS: 0,0" 31,1"
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY,
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix] = CompuTrus, Inc
M,M20HS,M18HS,M16 = MiTek MT series
BEARING
LOCATIONS 0'- 0.0'
30'- 0.0'
MAX VERT
REACTIONS -144/ 960V
-182/ 1089V
BRG
BRG
MAX HORZ REACTIONS -1981/ 1981H
-1981/ 19B1H
BRG REQUIRED BRG AREA SIZE SQ.IN, (SPECIES)
3.50' 1.54 OF ( 625 3.50' 1.74 DF 625
0'-
30'-
0.0" 0.0" 1.54 DF/ 1.74 DF/ 2.37 HF/ 2.26 SPF 2.69 HF/ 2.56 SPF
** For hanger specs. - See approved plans VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = -0.230' 9 14'- 10.2' Allowed = 1,471"
MAX OL CREEP DEFL = -0,209' 9 14'- 10,2' Allowed = 1,961" MAX TL CREEP DEFL = -0.436" 9 14'- 10,2' Allowed = 1.961"
MAX HORIZ, LL DEFL
MAX HORIZ, TL DEFL
0,059" 9
0.094" 9
8,5"
8.5"
8-03-08 13-01-08
it
ICOND. 2: 2000.00 LB.S DRAG LOAD. I
Wind: 85 mph, h=15ft, TCDL=4.2,BCDL=3,0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=l,6. Truss designed for wind loads
in the plane of the truss only,
IMax CSI: TC:0.33 BC:D.46 Web;Q.50l
^2
30-00 2-06
JOB NAME: LOOSEN - 09 Scale; 0.2346
Truss: C9
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717825
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection conti'actor shouid be advised of aM General Notes
and Warnings before constructkin commences.
2. 2x4 compression web bracing must be instalted where shown +.
3. Additionat temporary bracing to insure stability during consti'uction
is the responsibity of the erector. Additionat permanent bracing of
the overall sfa'ucture Is the responsibility of the building designer.
4. No load should be applied to any component until after att bracing and
fasteners are comptete and at no ttme shoukl any loads greater than
design toads be applied to any component.
5. CompuTrus has no control over and assumes no responsibillly for the
fabrication, handling, shipment and instaltation of components.
6. This design Is fumished subject to the limitations set fbrth by
TPI/WTCA in BCSI, copies of which wilt be furnished upon request.
MiTek USA, incXompuTrus Softvi/are 7.6.5(1L)-E
GENERAL NOTES, unless othenvise noted:
1. Thts design is based onty upon the parameters shown and Is for an indivkluai
building component. Applicability of design parameters and proper
incorporation of component is the responsibHtty of the building designer. 2. Design assumes ttie top and bottom chords bD be laterally braced at
2' o.c. and at 10' ox, respectively uniess braced throughout ttieir tength by
continuous sheathlf^ such as plywood shBathing(TG) and/or drywaltfBC).
3. 2x Impact bridging or lateral bracing required where shown "t- '*•
4. Installation of truss is the responsibility of the respective contractor.
5. Design assumes trusses are to be used in a non-corrosive environment,
and ara for "dry condition" of use. 6. Design assumes full bearing at alt supports shown. Shim or wedge if
necessary.
7. Design assumes adeguate drainage is provkJed. 8. Plates shatt be tocated on both faces of truss, and placed so their center
lines coinckle with joint center lines.
9. Digits indicate size of plate in Inches.
10. For basic connector ptate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC: 2x4 DF #18iBTR
BC; 2x4 DF #1SBTR WEBS; 2X4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON. FOR
ALL FUT TOP CHORD AREAS NOT SHEATHED
30-03-08 HIP SETBACK 8-00-00 FROM END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
CBC201D/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1,00
TC UNIF LL(
TC UNIF LL TC UNIF LL( BC UNIF LL(
40.0)+DL(
100.0 +DL 40.0j+DL( 0.0)+DL(
LOADINQ
14.0)= 54.0 PLF 35.0 = 135.0 PLF
14.0)= 54.0 PLF 25.0)= 25.0 PLF 22'-
0'-
0.0" TO
0.0" TO 3.5" TO
0.0" TO
TC CONC LL( TC CONC LL(
373.3)+DL(
373.3j+DL(
130.7)
130.7 504,0 LBS 9 504,0 LBS 9 22'
22'-30'-30'-
0,0" 3.5"
0.0"
3.5" 3.5" 3.5"
1- 2=
2- 3= 3- 4=
4- 5= 5- 6=
6- 7= 7- 8=
8- 9= 9- 10=
-22) 42 2-11=( -856) 4274
-4590) 930 11-12=1-1502 6234 -4496
-4384 -6332) 1442
3- 11 =
4- 11 = 4 12-13= -1502 6234 11- 5= -2038
862 13- 9= -856 4274 5-12= 0
-32) 84
•158 1078
4384) 4496)
4590
( -22)
882 914 930
42
12- 6=( 0
6-13=(-2038 13- 7=( -158) 1078
13- 8= -32) ••
680
242 242
680
OVERHANGS: 31.1" 31.1"
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
( 2 ) complete trusses required.
Join together 2 ply with 3"x.131 DIA GUN nails staggered at: 9" oc in 1 row(s) throughout 2x4 top chords,
9" oc in 1 rowis throughout 2x4 bottom chords, 9" 00 in 1 row(s) throughout 2x4 webs.
BEARING
LOCATIONS
0'- 0.0" 30'- 3.6"
MAX VERT REACTIONS
-357/ 1B97V -357/ 1B97V
BRG 9 0'
BRG 9 30'
MAX HORZ REACTIONS -84/ 84H
-84/ 84H
0.0"
3.5"
BRG SIZE
3.50' 3.50'
3.04 DF/ 3.04 DF/
REQUIRED BRG AREA SQ.IN. (SPECIES)
3.04 DF ( 625 3.04 DF ( 625)
4.68 HF/ 4.46 SPF
4.68 HF/ 4.46 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.245* 9 15'- 1.7' Allowed = 1.485"
MAX DL CREEP DEFL = -0.240' 9 15'- 1.7" Allowed = 1.981" MAX TL CREEP OEFL = -0.484' 9 15'- 1,7' Allowed' 1,981"
MAX HORIZ, LL DEFL = 0.061" 9 30' MAX HORIZ. TL DEFL = 0.100" 9 30' 0.0" 0.0"
4-03-08
Wind: 85 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat,2, Exp.C, MWFRS, interior zone, load duration factor=1,6. Truss designed for wind loads
in the plane of the truss only.
IMax CSI; TC:Q,41 BC;0,49 Web;0,61l
it
7-05 7-08-12
M-5x6(S)
^
7-08-12 7-05
2-06 30-03-08 2-06
JOB NAME: LOOSEN Scale: 0.2404
Truss; C
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717816
TRANS ID: 383688
WARNINGS:
1. BuiMer and erection contractor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be installed where shown +.
3. Additional temporary bracing to Insure stability during construction
Is ths responsibility of ^ erectisr. Additionat permanent bradng of
the overall structure is the responsibitity of the building designer.
4. No load should be applied to any component until after all bracing and
fasteners are complete and at no time shoukl any kiads greater tiian
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibillly for the
fabrk:ation, handling, shipment and installatbn of components.
6. This design is furnished subject to tiie limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc./CompuTrus Software 7.6.5{1L)-E
GENERAL NOT^S, unless othenvise noted:
1. This design is based only upon the paranrteters shown and is for an IndlvkJuat
building component. Applicability of design parameters and proper
Inoorpor^on of component Is tfw responsibility of the building designer.
2. Design assumes tiie top and bottom chonjs to be laterally braced at
2' o.c. and at 10' o.c. respectively untess braced throughout ttieir length by continuous sheathing such as plywood sheathing(TC) and/or drywatt(BC).
3. 2x Impect bricking or lateral bracing required whera shewn ••• +
4. Installation of truss is the responsibility of the respective contractor.
5. Design assumes trusses are to be used in a norvcomsslve environment, and ara for "dry conditton" of use.
6. Design assumes full bearing at aH supports shown. Shim or wedge If
necessary. 7. Design assumes adequate drainage is provkled.
8. Plates Shalt be located on both faces of truss, and placed so their center
tines coinckle with joint center lines, 9. Digits indicate size of ptate in inches.
10. For basic connector plate design values see eSR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC: 2x4 OF #18iBTR BC: 2x4 DF #UBTR
WEBS: 2X4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON. BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON. FOR ALL FLAT TOP CHORD AREAS NOT SHEATHED
OVERHANGS: 25.1" 0.0"
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc
M,M20HS,M18HS,M16 = MiTek MT series
TRUSS SPAN 30'- 3,5'
LOAD DURATION INCREASE = 1.25 SPACED 24.0" O.C.
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM OHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY. BEARING LOCATIONS
0'- 0.0" 30'- 3.5"
CBC201 1- 2=
2- 3= 3- 4=
4- 5= 4- 6=
6- 7= 7- 9= 8- 9=(
9- 10=( 10-11=
18) -2426) -2224 0}
-2147 -2923) -2147) 0)
-2224 -2426)
34 2-12=(-685) 2327 3-12=(
467 12-13= -574 2888 4-12=( 420 13-14= -577 2888 12- 6^
0/IBC2009 MAX MEM6ER FORCES 4WR/6DF/Cq=1.00
. . .... _
•44) 490
827 195 13=(-123) 232
13- 7= -123) 232 7-14=i-815j 188
14- 9=( -50) 490 14-10=(-177) 105
0 397
552 406 0 429 494
14-11= -666 2308 6
MAX VERT REACTIONS
-208/ 1069V -179/ 969V
BRG 9 BRG 9
MAX HORZ
REACTIONS -1981/ 1981H
-1981/ 1981H
0'-30'-0.0" 3.5"
BRG
SIZE 3.50'
3.50'
1.71 DF/
1.65 DF/
REQUIRED BRG AREA
SQ.IN, (SPECIES) 1.71 DF ( 625
1.55 DF ( 625)
2.64 HF/ 2.52 SPF
2.39 HF/ 2.28 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/1B0
MAX LL DEFL = -0.242' 9 15'- 1.7' Allowed = 1.486" MAX DL CREEP DEFL = -0,219' 9 15'- 1.7' Allowed = 1,981"
MAX TL CREEP OEFL = -0,458' 9 15'- 1,7' Allowed = 1.981"
MAX HORIZ, LL DEFL ^
MAX HORIZ, TL DEFL
0,061" 9
0.097" 9
30'-
30'-
0.0"
0,0'
10-00 10-03-08 10-00
it
ICOND. 2: 2000.00 LBS DRAG LOAD, I
Wind; 65 mph, h=15ft, TC0L=4.2,BCDL=3,0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS,
interior zone, load duration factor=1,6. Truss designed for wind loads
in the plane of the truss only.
IMax CSI: TC:Q.29 BC:0.4fi Web:0.50l
'llll-2.5x6
12
M-3X8
13 ^
0.25"
14
M-3x8 M-2.5x|'
7-05 7-08-12
M-5x6(S)
^
7-08-12
Jl
7-05
2-00 30-03-08
JOB NAME: LOOSEN - 01 Scale; 0.2237
Truss: 01
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717817
TRANS ID: 383688
WARNINGS:
1. BulMer and erection conb-actor should be advised of alt General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Installed where shown +.
3. Additional temporary bracing to insure stability during construction
Is the responsibitity of the erector. Additional permanent bracing of
the overall stiiicture is the responsibility of the building designer.
4. No toad should be applied to any component until after alt bracing and
t^sffenefs are complete and at no time shouid any loads greator than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and installation of components.
6. This design is fumished subjectto ttie Nmitations set forth by
TPI/WTCA in BCSI, copies of which wilt be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, unless othenwise noted:
1. This design Is based only upon the parameters shown and is for an indivkluai
building component. Applicability of design parameters and proper incorporation of component is the responsibility of the building designer.
2. Design assumes the top and bottom chords to be laterally braced at
2' o.c. and at 10' o.c. respectively unlese braced throughout their length by
continuous sheathing su(^ as plywood sheathtng(TC) and/or drywalt(BC).
3. 2x Impact brklging or latere bracing required whera shown + *
4. Installation of truss is the responsibflity of the respective contractor. 5. Design assumes trusses are to be used in a norvcorroslve environment,
and are for "dry condition" of use.
6. Design assumes full bearing at aH supports shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provkled,
8. Plates shall be located on both faces or truss, and placed so their center lines coinckle with joint center lines.
9. Digits indicate size of plate In Inches.
10. For basic connector plate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TO: 2x4 DF #1&BTR
BC: 2x4 DF #1&BTfl WEBS: 2x4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON. BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON, FOR
ALL FUT TOP CHORD AREAS NOT SHEATHED
30-00-00 STUB HIP SETBACK 8-00-00 FROM END WALL
LOAD DURATION INCREASE = 1,25 (Non-Rep)
TC UNIF LL( TC UNIF LL
TC UNIF LL( BC UNIF LL(
40.0)+DL( 100.0 +DL(
40.0)+0L( 0.0)+DL(
LOADING
14.0)= 54.0 PLF 35.0)= 135.0 PLF
14.D)= 54.0 PLF 25.0)= 25.0 PLF
0'-7'-
22'-0'-
0.0" TO 8.5" TO
0.0" TO 0.0" TO
TC CONC LL(
TC CONC LL
373.3)+DL( 373,3)+DL( 130,7)
130,7
504,0 LBS 9
504,0 LBS 9
7'-22'-
7'-22'-
30'-30'-
8.5" 0.0"
8.5" 0.0" 0.0"
0.0"
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/QDF/Cq=1,00 1- 2=(-4292) 918 1-10=( -842) 3952 2-10= -18) 170
2- 3= -4332) 906 10-11=(-1494) 6110 3-10=( -160) 1026 3- 4= -4220) 874 11-12=(-1496) 6146 10- 4= -2080) 682
4- 5= -8226) 1434 12- 8=( -854) 4228 4-11= 0) 260 5- 6= -4332) 880 11- 5= 0) 228
6- 7=(-4444) 912 5-12=(-2014) 678 7- 8=(-4540) 926 12- 6=( -156) 1062
8- 9=( -22) 42 12- 7=( -36) 82
OVERHANGS: 0,0' 31,1"
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MITek MT series
** For hanger specs, - See approved plans
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
( 2 ) complete trusses required. Join together 2 ply with 3"x.131 OIA GUN
nails staggered at; 9' oc in 1 row(sl throughout 2x4 top chords, 9" oc in 1 rowjs) throughout 2x4 bottom chords, 9" oc in 1 row(s) throughout 2x4 webs.
BEARINQ LOCATIONS
0'- 0.0" 30'- 0,0'
MAX VERT REACTIONS •324/ 1770V
-355/ 1887V
BRG 9
BRG 9
0'-
30'-
MAX HORZ REACTIONS -72/ B4H
-72/ 84H
0.0"
0.0"
BRG SIZE
3.50' 3.50'
2.83 DF/
3.02 DF/
REQUIRED BRG AREA SQ.IN, (SPECIES)
2,83 OF ( 625 3,02 DF ( 625)
4.37 HF/ 4.16 SPF
4.66 HF/ 4.44 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/1B0 MAX LL DEFL = -0.234' 9 14'- 10.2' Allowed = MAX DL CREEP DEFL = -0.229' 9 14'- 10.2" Allowed =
MAX TL CREEP DEFL = -0.463' 9 14'- 10.2' Allowed =
1.471"
1.961" 1.961"
MAX HORIZ.
MAX HORIZ.
LL DEFL =
TL DEFL = 0.059" 9
o.oge* 9
8.5"
8.6"
Wind; 65 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat,2, Exp.C, MWFRS, interior zone, load duration factor=1.6.
Truss designed for wind loads in the plane of the truss only.
7-08-08 14-03-08
it 10
M-3x8
7-01-08 7-08-12
M-5x6(S)
^
7-08-12 7-05
30-00 2-06
JOB NAME: LOOSEN - 08 Scale: 0,2599
Truss: C8
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717824
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection conb'actor should be advised of att General Notes
and Warnings before construction commences.
2. 2x4 ojmpresslon web bracing must be Installed where shown *.
3. Addttionat temporary bracing to insure stability during construction
is the responsibility of the erector. Additionat permanent bracing of
the overall structure is the responsibility of the building designer.
4. No load should be applied to any component until after att brecing and
fasteners are com^Hete and at no time shoukl any toads greater than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for ttie
^brication, handling, shipment and I'nslaffafi'on of componente.
6. This design is fumished subject to ttie limitations set forth by
TPI/WTCA in BCSI, copies of which witt be furnished upon request.
MiTek USA. IncJCompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, untess othenAhse noted:
1. This design is based only upon the parameters shown and ts for an indivkiuat building component. Applicability of design parameters and proper
incorporation of component is the responsibility of the building designer.
2. Design assumes ttie top and bottom chords to be laterally braced at
2' o.c. and at 10' o.c. respectively unless braced throughout their len^h by
continuous sheathing such as plywood sheathlng(TC) and/or drywalt(BC).
3. 2x Impact bridging or lateral bracing required whera shown + + 4. tnstaHatfon of truss is ttie responsibility of the respective conti'actor.
5. Design assumes trusses are to be used In a non-corrosive environmeni,
and are for "dry condition" of use.
6. Design assumes full bearing at alt supports shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provkled. 8. Ptates shall be located on both faces of truss, and placed so their center
tines coincide with joint center lines.
9. Digits Indicate size of plate in Inches.
10. For basic connector p^te design values see ESR-1311. ESR-19B8 ((^iTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TRUSS SPAN 30'- 0.0" CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
TC; 2x4 OF #1&BTfl LOAD DURATION INCREASE = 1.25 1- 2=( -18) 34 2-12=(-544) 2222 3-12=(-178) 28
BC: 2x4 DF #1&BTR SPACED 24.0" O.C, 2- 3=1 -2400 593 12-13= -777) 2840 4-12=( -75) 482 WEBS: 2x4 DF STUD 3- 4=1 -2196 552 13-14= -775) 2821 12- 6=(-805) 274
LOADING 4- 5=1 0 14-11=1-536) 2070 6-13=1 0 154 TC LATERAL SUPPORT <= 12"0C. UON. LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF 4- 6=1 •2119 527 13- 7=( 0 173
BC LATERAL SUPPORT <= 12"0C. UON. DL ON BOTTOM CHORD = 5.0 PSF 6- 7=1 -2870) 752 7-14=(-838) 278 TOTAL LOAD = 32.0 PSF 7- 9=1 6- 9=1 -2059)
0
523 0
14- 9=( -76) 462
14-10=( -78) 75
NOTE: 2x4 BRACING AT 24"0C UON. FOR LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 9-10=1 -2135 548
ALL FUT TOP CHORD AREAS NOT SHEATHED REQUIREMENTS OF CBC 2010 NOT BEINQ MET, 10-11=1 -2261) 586
OVERHANGS: 25.1' 0.0"
Staple or equal at non-structural
vertical members (uon).
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, M,M20HS,M18HS,M16 = MiTek MT series
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY, BEARING
LOCATIONS 0'- 0.0'
30'- 0.0'
Inc
MAX VERT
REACTIONS -253/ 1060V
-225/ 960V
BRG I BRG I
MAX HORZ
REACTIONS -160/ 43H
-160/ 43H
0.0" 0.0"
0'
30'
BRG SIZE
3.50' 3.50'
1.70 DF/ 1.54 DF/
REQUIRED BRG AREA SQ.IN. (SPECIES) 1.70 DF ( 625 1.54 DF ( 625)
2.62 HF/ 2.49 SPF 2.37 HF/ 2.26 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL OEFL = -0.230' 9 15'- 1.7' Allowed = 1.471"
MAX OL CREEP DEFL = -0,205' 9 15'- 1.7' Allowed = 1,961" MAX TL CREEP DEFL = -0.436' 9 15'- 1.7' Allowed = 1.961"
MAX HORIZ, LL DEFL MAX HORIZ, TL OEFL 0,069" 9
0,094" 9
8,5"
8,5"
12-00 6-03-08 11-08-08
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7-05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration faotor=1,6. Truss designed for wind loads in the plane of the truss only.
f IMax CSI: TC;0.2a BC;n.46 Web;Q.50i
4-00-08 3-06-04 4-01-06 0-11-05
f—^
5-00-11 0-11-06 4-01-04
--f—f
3-06-04
12
3-09
st
7-05 7-08-12 7-08-12 7-01-08
2-00 30-00
JOB NAME: LOOSEN - 02 Scale: 0.2259
Truss: 02
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717818
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection conb^ctor shouid be advised of all General Notes
and Warnings before constructton commences.
2. 2x4 compressk)n web bracing must be Installed where shown +.
3. Additional temporary bracing to Irtsure stability during construction
is the responsibility of the erector. Addltton^ permanent bracing of
the overall structijre Is the responalbttlty of the building designer.
4. No load should be applied to any component until after all bracing and
fasteners are comptete and at r\o time shoukl any kiads greater ttian
design loads ba applied fo any component.
5. CompuTrus has no control over and assumes no responsi'bi'% for the
fabrication, handling, shipment and installation of components.
6. This design is furnished subject to ttie limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, untess otherwise noted;
1. This design is based onty upon the parameters shown and Is for an Indivkluai
buikiing component Applicability of design parameters and proper
Incorporation of component Is tfie responsfbHKy of the buiidirig designer.
2. Design assumes the top and bottom chonls to be tatersRy braced at
2' o.c. and at 10' o.c. respectively unless braced throughout ttieir length by
continuous sheathing such as plywood sheathing(TC) and/or drywalt{BC).
3. 2x Impact brklging or tateral bracing required whera shewn * *
4. InstaHatkin of truss is the rssponsibility of the respective contractor.
5. Design assumes trusses are to be used in a non-con^slve environment,
and are for "dry conditton" of use.
6. Design assumes full bearing at aH supports shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provkled. 8. Plates shall be located on both faces of truss, and placed so their center lines coincide with joint center tines.
9. Digits indicate size of plate in inches. 10. For basic connector pfate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TRUSS SPAN 30'- 0,0' CBC2010/IBC2009 MAX
TC: 2x4 DF #1&BTR LOAD DURATION INCREASE = 1.25 1- 2=( •18) 34 2-
BC: 2x4 DF #1&BTR SPACED 24.0" O.C. 2- 3= -2400) 724 12-WEBS: 2x4 DF STUD 3- 4= -2196) 690 13-
LOADING 4- 5= -2119) 664 14-TC LATERAL SUPPORT <= 12"0C. UON. LL( 20.0)iDL( 7.0) ON TOP CHORD = 27.0 PSF 4- 6= °! 0
BC LATERAL SUPPORT <= 12"0C. UON. DL ON BOTTOM CHORD = 5.0 PSF 5- 8=1 -2870) 989 TOTAL LOAD = 32.0 PSF 7- 9=(
8- 9= -2059) 0
656 NOTE; 2x4 BRACING AT 24'OC UON. FOR LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL 9-10= -2135) 683
ALL FLAT TOP CHORD AREAS NOT SHEATHED REQUIREMENTS OF CBC 2010 NOT BEINQ MET, 10-11=1 -2261) 710
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP
OVERHANGS; 25.1' 0,0" AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY, BEARING MAX VERT MAX
-1015) 2840
-1012 2821 -651) 2070
Staple or equal at non-structural vertical members (uon).
Connector plate prefix designators:
C,CN,C18.CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek HT series
3- 12=1-178 4- 12=(-119
12- 5=(-805
5- 13=( 0 13- 8=( 0 8-14=(-838
14- 9=(-119 14-10=( -78
1.00
19 482
386 154
173 392 462
75
LOCATIONS 0' 30' 0.0" 0.0'
REACTIONS -299/ 1060V -272/ 960V
BRG 9 BRG 9
REACTIONS
-106/ 44H -108/ 44H
0'-
30'-
0.0"
0.0"
BRG SIZE
3.50' 3.50'
1.70 DF/ 1.54 OF/
REQUIREO BRG AREA SQ.IN. (SPECIES) 1.70 DF ( 625)
1.54 DF I 625)
2.62 HF/ 2.49 SPF 2.37 HF/ 2.26 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.230' 9 15'- 1.7' Allowed = 1.471"
MAX DL CREEP DEFL = -0.205' 9 15'- 1.7" Allowed = 1.961" MAX TL CREEP DEFL = -0.436' 9 15'- 1.7' Allowed = 1.961"
MAX HORIZ, LL DEFL = 0,069" 9 29'-
MAX HORIZ, TL OEFL = 0,094" 9 29'-
8,5"
8,5"
14-00
4-00-08 3-06-04 5-00-11 1-04-0
^ ^ ^ f
2-03-08
f-
13-08-08
1,-04-09 5-00-11
t 1
-06-04
Wind: 65 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7-Enclosed, Cat.2, Exp.C, MWFRS,
interior zone, load duration factor=1,6. Truss designed for wind loads
in the plane of the truss only.
05,
3-09
st
IMax CSI: TC:n.2a ac:0.46 Web:0.50l
7-05 7-08-12 7-08-12 7-01-08
> ^
2-00 30-00
JOB NAME: LOOSEN - 03 Scale; 0.225B
Truss: 03
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717819
TRANS ID: 383688
WARNINGS:
1. Bulkier and erection conb'actor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be installed where shown +.
3. Addittonal temporary bracing to Insure stability during consti'uction
is the responsibility of ttie erector. Addttional permanent bracing of
the overall structure Is the responsibility of the building designer.
4. No load should be applied to any component until after aH bracing and
fasteners are Kimplete snd at no time should any loads greater than
design toads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for ttie
fabrication, handling, shipment and installation of components.
6. This design is furnished subject to the limitations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, unless otherwise noted;
1. This design Is based onty upon tha parameters shown and Is for an indivkiuat
buliding componenL Applicability of design parameters and proper
incorporation of component is the responsibHtty of the building designer.
2. Design assumes the top and bottom chords to be laterally braced at
2' o.c, and at 10' o.c. respectively unless braced throughout ttieir length by
continuous sheathing such as plywood sheathtng(TC) and/or dryw8lt(BC). 3. 2x Impact bridging or lateral bracing required whera shown + •••
4. InstaHatlon of truss Is the responsibility of the respective conti-actor.
5. Design assumes trusses are to be used In a non-corrosive environment,
and are for "dry condition" of use.
6. Design assumes full bearing at aH supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage is provkled. 8. Plates shatt be tocated on both faces of truss, and placed so their center
lines coinckle with joint center lines.
9. Digits incHcato size of plate in inches. 10. For basic connector ptate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC: 2x4 DF #1&BTR BC: 2x4 DF #1&BTR
WEBS; 2X4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON. SC LATERAL SUPPORT <= 12"0C. UON.
NOTE; 2x4 BRACING AT 24'OC UON. FOR ALL FLAT TOP CHORD AREAS NOT SHEATHED
OVERHANGS: 0.0" 31,1"
TRUSS SPAN 30'- 0,0" LOAD DURATION INCREASE = 1,25
SPACED 24,0" 0,C,
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF DL ON BOTTOM CHORD = 5.0 PSF
TOTAL LOAD = 32.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
CBC201 1- 2=
2- 3= 3- 4=
3^ 5= 5^ 6=
6- 8=( 7- 8=(
8- 9=( 9- 10= 10-11=
0/IBC2009 MAX MEMBER FORCES 4WR/6DF/Cq^ -2261) 584 1-12=(-534) 2070 2-12=( -79
-2135 546 12-13= -772) 2821 3-12 0 0 13-14= -772 2840 12- 5^
-2059) 521 14-10=(-528) 2222 5-13 2870) 746
-2119) 521 0) 0
-2196) 546 -2400 578
•23) 43
76 B38
0 13- 6=( 0 6-14=1-810
14- 8=( -72 14- 9=(-178
1.00
75 462
276 173
154 276
) 462 ) 17
Staple or equal at non-structural vertical members (uon).
Connector plate prefix designators: C,CN,C18,CN18 (or no prefixT = CompuTrus, Inc
M,M20HS,M18HS,M16 = MiTek MT series
** For hanger specs, - See approved plans
BEARING LOCATIONS
0'- 0.0" 30'- 0.0'
MAX VERT MAX HORZ
REACTIONS REACTIONS -224/ 960V -152/ 45H -261/ 1089V -152/ 45H
BRG 9 0'•
BRG 9 30' -
0.0" 0.0"
BRG SIZE
3.50' 3.50'
1.54 DF/ 1.74 DF/
REQUIRED BRG AREA SQ.IN. (SPECIES) 1.54 DF ( 625
1.74 DF ( 625)
2.37 HF/ 2.26 SPF 2.69 HF/ 2.56 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL DEFL = -0.230" 9 14'- 10.2' Allowed = 1.471" MAX DL CREEP OEFL = -0.205' 9 14'- 10.2' Allowed = 1.961" MAX TL CREEP DEFL = -0,436' 9 14'- 10,2" Allowed = 1.961"
MAX HORIZ, LL DEFL
MAX HORIZ, TL DEFL
0,059° 9 29'
0.094" 9 29'
6.5"
8.5"
11-08-08 6-03-08 12-00
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS,
interior zone, load duration factor=1.6, Truss designed for wind loads
in the plane of the truss only.
3-06-04 4-01-08 0-11-03 5-00-11 0-11-03 4-01-08 3-06-04 4-00-08
it
IMax CSI; TC;(1.3a BC:D.4fi Web:0.50l
7-01-08 7-08-12 7-08-12 7-05
30-00 2-06
JOB NAME: LOOSEN - 06 Scale; 0.2347
Truss: 06
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717822
TRANS ID: 383688
illlili
WARNINGS:
1. Bulkier and erection conti-actor should be advised of alt General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Instelted whera shown
3. Additional temporary bracing to Insure stebility during consbxictlon
Is the responsibility of the erector. Additional permanent bracing of
the overall structure Is the responsibitity of the building designer.
4. No toad shouto be app^ec^ io any component un(^ afler aiV draofng and
fasteners are comptete and at no time shoukl any toads greater than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and insteltation of components.
6. This design is furnished subject to the timttetions set forth by
TPI/WTCA in BCSI, copies of which wlH be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, untoss othen^se noted;
1. This design Is based onty upon the parameters shown and Is for an Indivtoual
building component. Applicability of design parameters and proper
incorporation of component is the responsibility of the buitoing designer.
2. Design assumes ^e top and bottom chords to be laterally braced at 2' o.c. and at 10' o.c. respectively untoss braced throughout ttieir length by
continuous sheathing such as plywood sheathing(TC) and/or drywatt(BC).
3. 2x Impact brklging or lateral bracing required whera shown -t- + 4. Instalation of tmesis ^responsMity of the respective contractor.
5. Design assumes trusses are to be used in a non-con^slve environment,
and are fbr "dry condition" of use. 6. Design assumes full bearing at aH supports shown. Shim or wedge if
necessary.
7. Design assumes adequate drainage is provkled. 8. Ptates shall be located on both faces of truss, and placed so their center
lines coinckle with joint center lines.
9. Digits indicate size of ptate in inches. 10. For basto connector ptate design values see ESR-1311, ESR-1988 (MITek)
Willi This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TO: 2x4 DF #1&BTR
BC: 2x4 DF #1&BTR WEBS: 2x4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON. FOR
ALL FLAT TOP CHORD AREAS NOT SHEATHED
LLI
TRUSS SPAN 30'- 0.0" LOAD DURATION INCREASE = 1.25
SPACED 24.0" O.C.
LOADING 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
CBC20
1- 2
OVERHANGS: 0,0" 31,1"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
7- 8= 8- 9=
9- 10= 10-11=
10/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
- - - -— - - --• 75
462 190
173 154
192 j 462
26
-2261) 459 1-12=(-419) 2070 -2135 412 12-13= -562) 2821
0 0 13-14= " "
-2059 389 14-10= -2870 537 -2119) 386
0) 0 -2196) 408
-2400 447 -23) 43
-561) 2840 -405) 2222
2- 12= 3- 12=
12- 5= 5- 13=
13- 6= 6- 14=
14- 8= 14- 9=
-44
-838
0)
-Bio)
( -39) (-178)
Connector plata prefix designators:
C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
•* For hanger specs, - See approved plans
BEARING LOCATIONS
0'- 0.0"
30'- 0.0"
MAX VERT REACTIONS
-177/ 960V -215/ 1089V
MAX HORZ REACTIONS
-112/ 44H -112/ 44H
BAG 9 0' • BRG 9 30'-0.0" 0.0"
BRG SIZE
3.50' 3.50'
1.54 DF/
1.74 OF/
REQUIRED BRG AREA SQ.IN. (SPECIES)
1.54 DF ( 625) 1.74 DF ( 625)
2.37 HF/ 2.26 SPF
2.69 HF/ 2.56 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/1B0
MAX LL DEFL = -0.230' 9 14'- 10.2' Allowed = 1.471"
MAX DL CREEP OEFL = -0.205' 9 14'- 10,2' Allowed = 1,961" MAX TL CREEP DEFL = -0,436' 9 14'- 10,2" Allowed = 1,961"
MAX HORIZ, LL DEFL = 0,059" 9 29' MAX HORIZ, TL DEFL = 0.094" 9 29' 8,5" 8,5"
9-08-08 10-03-08 10-00
3-09 3-06-04 2-05-04 2-07-07
1 f
5-00-11 2-07-07 2-05-04 3-06-04
^ ^ f-
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1,6. Truss designed for wind loads in the plane of the truss only.
IMax CSI: TC:0.33 BC:0.4fi Web:0.50l 4-00-08
M-4x6
3t
M-1X3
12
M-3X8
7-01-08 7-08-12
0.25"
M-5x6(S)
7-08-12 7-05
30-00 2-06
JOB NAI^E: LOOSEN - 07 Scale; 0.2473
Truss: C7
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717823
TRANS ID: 383688
llllllilllllillillll
WARNINGS:
1. Bulkier and erection contactor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be instalted where shown
3. Additional temporary bracing to insure stebility during construction
is the rasponsibillty of the erector. Addittonal permanent bracing of
the overall sti-ucture Is the responsibility of the building designer.
4. No toad shouto be applied to any component until after aH bracing and
fasteners are complete and at no tima shouto any toads greater ttian
design loads be applied fo any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handling, shipment and insteltation of components.
6. This design is furnished subject to the Itmitetions set forth isy
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, unless othenvise noted;
1. This design ts based only upon the parameters shown and ts for an indivtoual
buikiing component. Applicability of design parameters and proper
incorporation of component Is the responsibility of the buitoing designer.
2. Design assumes top and bottom chonls to be lateraHy braced at 2' o.c. and at 10' o.c. reapst^lvety unleas bracad throi^fitout ihetr i9r^cfih by
continuous sheathing such as plywood sheathtng(TC} and/or drywaN(BC).
3. 2x Impact bridging or lateral brecing required where shown + * 4. Instellatton of truss is the responsibility of the respective conti-actor.
5. Design assumes trusses are to be used In a non-corrosive envlrorment,
and are for "dry conditton" of usa.
6. Design assumes full bearing at alt supporte shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provtoed. 8. Ptates shall be tocated on both faces of truss, and istaced so their center
tines coinctoe with joint center lines.
9. Digits Indicate size of plate in Inches.
10. For basic connector plate design values see ESR-1311, ESR-1986 (MiTek)
II This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC: 2x4 DF #1&BTR BC: 2x4 OF #1&BTR
WEBS: 2x4 OF STUD
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"OC UON. FOR ALL FLAT TOP CHORD AREAS NOT SHEATHED
OVERHANGS: 0,0" 25,1"
Unbalanced live loads have been considered for this design.
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus,
M,M20HS,M18HS,11116 = MiTek MT series
TRUSS SPAN 30'- 0.0" LOAD DURATION INCREASE =1.25
SPACED 24.0" O.C,
LOADING LL( 20,0)+DL( 7,0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
BC CONC LL( 75.0)+DL( 0.0)= 75.0 LBS 9 14'- 10.3"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY,
BEARING LOCATIONS
0'- 0,0" 30'- 0,0"
Inc
CBC2010/IBC2009
2=(-2357) 369 3=1-1906 323 10-11
4=1 0 0
MAX MEMBER FORCES 4WR/GDF/Cq=1,00
1-10=(-352) 2164 10- 2=( -51) 187 354) 2163 2-11= -604) 102
11-12=(-292) 1766 3-11= -1 326 1766) 292 12-13= -351) 2237 12- 6= -3 330
8=( 0 0 13- B=(-349 2239 12- 7= -672 80 7=(-1906) 323 7-13=( -37) 204
8=(-2425) 387 9= -18) 34
MAX VERT MAX HORZ REACTIONS REACTIONS
-157/ 99BV -127/ 90H -166/ 1097V -127/ 90H
BRG {
BRG I
0'
30' 0,0"
0.0"
SRQ SIZE
3,50" 3,50"
1.60 OF/
1.75 DF/
REQUIRED BRG AREA SQ.IN, (SPECIES) 1.60 DF ( 625 1,75 DF ( 625)
2.46 HF/ 2.35 SPF 2.71 HF/ 2.58 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL DEFL = -0.493' 9 17'- 10.3' Allowed = 1.471"
MAX DL CREEP DEFL = -0.179' 9 12'- 7.0' Allowed = 1.961"
MAX TL CREEP DEFL = -0.635' 9 17'- 10.3" Allowed = 1,961"
MAX HORIZ.
MAX HORIZ,
LL DEFL :
TL DEFL ' 0.061" 9 29' 0,079" 9 29' 8.5"
8,5"
13-08-08
7-00-08
2-03-08
f 1
1-06-12 2-03-08 1-06-12
14-00
7-02-04
3t
Wind; 65 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat,2, Exp.C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
IMax CSI; TC;0.62 BC:0.81 Web:0.38l
Jl
6-10-12 5-01-04 5-08-08 5-01-04 7-02-04
30-00 2-00
JOB NAME: LOOSEN - 05 Scale; 0.2385
Truss: 05
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717821
TRANS ID: 383688
WARNINGS: 1. Bultoer and erection contractor should be advised of aH General Notes and Warnings before construction commences. 2. 2x4 cornpresston web bracing must be instatled where shown *.
3. Additional temporary bracing to Insure stebility during constiiictton
is the responsibility ofthe erector. Additional permanent bracing of
the overall structure Is the responsibility of the building designer.
4. No load shouto be appttod fo any component until after att bracing and fasteners are comii^ete and at no time shouto any toads greater than design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabricatton, handling, shipment and instellatton of components.
6. This design is furnished subject to tiie timltetions set forth by
TPt/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc./CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, untess othenvise noted: 1. This design is based only upon the parameters shown and is for an indivtoual building component. Applicability of design parameters and proper Incorporation of component is the responsibilify of the building designer. 2. Design assumes ttie top and bottom chonjs to be lateraHy braced at 2' o.c. and at 10' o.c. respectivety unless braced throughout their ten^h by continuous sheathing such as plywood sheathing(TC) and/or drywall(6C]. 3. 2x Impact bridging or teteral bracing required whera shown -•• * 4. Instaltation of truss is the responsibility of the respective conti-actor. 5. Design assumes bijsses are to be used in a non-corrosive environment, and are for "dry condition" of use. 6. Design assumes M bearing at ad supports shown. Shim or wedge if necessary. 7. Design assumes adequate drainage is provtoed. 8. Ptotes shall be located on both faces of truss, and placed so their center tines coinctoe with joint center lines. 9. Diglte indicate size of plate in Inches. 10. For basto connector plate design values see ESR-1311, ESR-1966 (lUliTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC; 2x4 DF #1&BTR
BC: 2x4 DF #1&BTR WEBS: 2x4 DF STUD
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
NOTE: 2x4 BRACING AT 24"0C UON. FOR „,
ALL FUT TOP CHORD AREAS NOT SHEATHED *
OVERHANGS: 0.0" 31.1"
** For hanger specs. - See approved plans
Unbalanced live loads have been considered for this design.
Connector plate prefix designators:
C,CN,C18,CN18 or no prefix) = CompuTrus, Inc M,M20HS,lil18HS,M16 = MiTek MT series
TRUSS SPAN 30'- 0,0"
LOAD DURATION INCREASE =1.25 SPACED 24.0" O.C.
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5,0 PSF TOTAL LOAD = 32.0 PSF
BC CONC LL( 75.0)+DL( 0.0)= 75.0 LBS 9 14'- 10.3"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKEO FOR 10PSF LIVE LOAD, TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY,
CBC2010/IBC2009
1- 2=1-2357) 472
2- 3= -1905 412
MAX MEMBER FORCES
1- 9=(-430) 2164 9-10= -432 2163
4WR/GDF/Cq=1,00
0] -571
3- 5=(-1455) 189 11-12=(-424) 2235 11- 5=( 0]
4- 5= -353 212 12- 7=(-422) 2237 11- 6= -637
3- 4= -354 212 10-11= -378 1771
2= 2- 10=
3- 10=
5- 6=1-1911) 412 6- 7=(-2424) 466
7- B=( -23) 43
6-12=
190 90
315 338
57 201
BEARING
LOCATIONS 0'. 0,0"
30'- 0,0"
MAX VERT REACTIONS
•187/ 998V •224/ 1126V
BRG
BRG
MAX HORZ REACTIONS
-107/ 119H -107/ 119H
0'-
30'-
0.0"
0.0"
BRG SIZE
3.50' 3.50'
1.60 DF/
1.80 DF/
REQUIRED BRG AREA SQ.IN. (SPECIES)
1,60 DF ( 625 1.80 DF i 625)
2,46 HF/ 2.35 SPF
2.78 HF/ 2.65 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180
MAX LL DEFL = -0.242' 9 17'- 10.3' Allowed = 1.471" MAX DL CREEP DEFL = -0.129' 9 17'- 10.3" Allowed = 1.961"
MAX TL CREEP DEFL = -0.371' 9 17'- 10.3" Allowed = 1.961"
MAX HORIZ. LL DEFL = 0.051" 9 29'
MAX HORIZ. TL DEFL = 0.079" 9 29'
Wind;
8.5" 8.5"
14-10-04 15-01-12
7-00-08 5-01-04 2-08-08 2-08-08
-t 1 f-
5-03 7-02-04
85 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat,2, Exp,C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
IMax CSI; TC:0.61 BC;D.46 WebToTeTl
12 12
4.00
M-4X6 M-4X6
M-2.5x4 M-2.5x4
it J\
6-10-12 5-01-04 5-08-08 5-01-04 7-02-04
30-00 2-06
JOB NAME: LOOSEN - 04 Scale; 0.2221
Truss: 04
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717820
TRANS ID: 383688
II
WARNINGS:
1. Builder and erection contractor should be advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be installed where shown
3. Additional temporary bracing to insure stebility during construction
is the responsibitity of the erector. Additionat permanent bracing of
the overall structure Is tiie responsibility of the building designer.
4. No toad shouto be applied to any component until after aH bracing and
fasteners are complete and at no time shouto any toads greater than
design toads be applied to any componenl.
5. CompuTrus has no control over and assumes no responsibility for the
labncatm, handlif^, shipment and instellation of components.
6. This design Is furnished subject to the Gmltetions set forth by
TPI/WTCA in BCSI, copies of which wiH bs furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-E
GENERAL NOTES, untoss othenvise noted:
1. This design Is based onty upon the parameters shown and Is for an Indivtoual
buitoing component. Applicability of design parameters and proper
incorporation of component is ths rasponsibHIty of the building designer. 2. Design assumes tfie top and bottom chords to be toteraHy braced at
2' o.c. and at 10' o.c. respectively untoss braced throughout their length by
continuous sheathing such as plywood 5heathlng(TC} and/or drywaH(BC). 3. 2x Impact bridging or lateriri bracing required whera shown + ^
4. InsteHatton of truss Is the responsibility of the respective contractor.
5. Design assumes trusses are to be used in a non-comisive environment, and are for "dry conditton" of use.
6. Design assumes full bearing at aH supporte shown. Shim or wedge if
necessary.
7. Desfgn assumes adequate drainage is provtoed.
8. Ptotes shatt be tocated on both faces of truss, and ptoced so their center
tines coincide with joint center lines.
9. Digits incficate size of piste in inches. 10. For basto connector plate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LMBEfi SPECIFianONS TC: 2x4 DF #1&BTR BC: 2x8 DF SS WEBS; 2x4 DF STUD
TC UTERAL SUPPORT <= 12"0C. UON. BC UTERAL SUPPORT <= 12"0C. UON.
23-00-00 GIRDER SUPPORTING 30-00-00 FROM 0-00-00 TO 23-00-00 GIRDER SUPPORTING 8-00-00 FROM 16-00-00 TO LOAD DURATION INCREASE = 1.25 (Non-Rep)
14-00-00 23-00-00
NOTE: 2x4 BRACING AT 24'OC UON. FOR ALL FUT TOP CHORD AREAS NOT SHEATHED
TC UNIF LL( BC UNIF LL BC UNIF LL BC UNIF LL
40.0)+DL( 273.3 +DL 0.0 +DL 60.0 +DL
LOADING 14.0)= 54.0 PLF 178.0 = 451.3 PLF 10.0 = 10.0 PLF
36.0 = 96.0 PLF
0.0" TO 0.0' TO 0.0" TO
0.0" TO
0.0" V 0.0' V 0.0" V
0.0' V
1- 2= 2- 3= 3- 4= 4- 5=
5- 6= 6- 7= 7- 8=
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1,00 •16671) 2226 1- 9=(-2103) 15798 9- 2=( -24) 789 -15315 2115 9-10= -2103 15747 -2265 16374 15093 2076 10-11 -17448 2385 11-12= -2202 164D1
-17697 2427 12- 7= -2193 16368 -17268 2322 -18 33
2- 10= -1362
3- 10= -621 10- 4= -2163 4- 11 = 11- 5= 11- 6=1 -126 6-12=( -552
123 4638 237 195) 2130 717 5397
477 135
OVERHANGS; 0,0" 25.1'
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,lil18HS,M16 = MiTek MT series
JT 0: Heel to plate corner = 1.75" JT 0; Heel to plate corner = 5.75"
ADDL; BC CONC LL+DL= 2743.0 LBS 9 15'- 0.0" ADDL: BC CONC LLtDL= 868.0 LBS 9 15'- 0.0' ADDL: BC CONC LLtDL= 1125.0 LBS 9 14'- 0.0"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKEO FOR 10PSF LIVE LOAD. TOP AND SOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
( 3 ) complete trusses required. Join together 3 ply with 3"x.131 DIA GUN nails staggered at: 9' oc in 1 row(s) throughout 2x4 top chords, 9' oc in 2 row s throughout 2x8 bottom chords, 9" oc in 1 row(sj throughout 2x4 webs.
BEARING
LOCATIONS 0'- 0,0" 23'- 0.0"
MAX VERT
REACTIONS -913/ 6839V -874/ 6320V
BRG
BRG
MAX HORZ REACTIONS
•74/ 83H -74/ 83H
BRG SIZE 3,50" 3,50"
REQUIRED BRG AREA
SQ,IN. (SPECIES) 10,94 DF ( 625 10.11 DF ( 625
0'-
23'-
0,0" 0,0" 10,94 DF/ 16,89 HF/16.09 SPF
10.11 OF/ 15.60 HF/14.87 SPF
HANGERS BY OTHERS TO APPLY CONC, LOAD(S) EQUALLY
TO ALL MEMBERS. PROJECT ENGINEER TO REVIEW AND INSURE
THAT CONNECTION TRANSFERS LOAD TO PLY OPPOSITE HANGER.
8-10-08
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = 0.140" 9 11'- 6.0' Allowed = 1.121"
MAX DL CREEP DEFL = -0.385" 9 14'- 8.5" Allowed = 1.494" MAX TL CREEP DEFL = -0,512" 9 11'- 6,0" Allowed = 1,494"
MAX HORIZ, LL DEFL = -0,025" 9 22' MAX HORIZ. TL DEFL = 0.070" 9 22'
Wind:
6,5" 8.5"
8-10-08
85 mph, h=15ft. TCDL=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
it
:M-4x4 M-1.5x3
4-11-06 3-04-02
0.25
M-10x12(S)
-4-
1125# 2743#
6-05 3-04-02 4-11-06
23-00 2-00
JOB NAME: LOOSEN - DG Scale; 0,3212
Truss: DG
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717827
TRANS ID: 383688
WARNINGS:
1. Bultoer and erectton con&actor should be advised of ati General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be instelled whera shown *.
3. Additional temporary bracing to Insure stebility during construction
Is the responsibitity of the erector. Additional permanent bracing of
the overall sbiicture is the responsibility of the building designer.
4. No load shouto be appttod to any component untH after aH bracing and
fasteners are comptete and at no time shouto any toads greater than
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for ttie
tebrlcation, liandling, shipment and instellation of components,
6. This design is fumished subject to ttie Kmitetions set forth by
TPI/WTCA in BCSI, copies of which wiH be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, unless othenMse noted:
1. This design Is based only upon the parameters shown and Is for an Indivtoual \ building component. Applicabili^ of design parameters and proper
Incorporation of component is the responsibHtty of thie building designer.
2. Design assumes the top and bottom chords to be lateraHy braced at
2' o.c. and at 10' o.c. respectively untoss braced throughout ^eir lenoth by continuous sheathing such as plywood 5heathing(TC) and/or drywall(BC).
3. 2x Impact bridging or tateral bracing required where shown +
4. insteHatlon of truss is the responsibility of the respective contractor.
5. Design assumes tiusses are to be used In a non-corrosive environment,
and are for "dry condition" of use.
6. Design assumes full bearing at aH supporte shown. Shim or wedge if necessary.
7. Design assumes adequate drainage Is provided,
6. Ptates shall be tocated on both faces of truss, and ptoced so their center
tines coinctoe with joint center lines. 9. Digits indicate size of plate in Inches.
10. For basic connector plate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC; 2x4 DF #1&BTR BC: 2x4 DF #18.BTR
WEBS; 2x4 DF STAND
TC LATERAL SUPPORT <= 12"0C. UON. BC LATERAL SUPPORT <= 12'0C. UON. LLI
OVERHANGS: 31.1' 0.0"
TRUSS SPAN 14'- 0.0" LOAD DURATION INCREASE =1.25
SPACED 24,0" D,C,
LOADING 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 32.0 PSF
Connector plate prefix designators:
C,CN,C18,CN18 (or no prefix) = CompuTrus, M,M20HS,M18HS,M16 = MiTek MT series Inc
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET,
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD, TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY,
BEARING LOCATIONS
0'- 0.0' 14'- 0.0"
** For hanger specs. - See approved plans
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
1- 2=( -23) 43 2-5=(-138) 1156 5-3=(-4) 461 2- 3= -1264 160 5-4=(-137) 1155
3- 4= -1266 157
MAX VERT
REACTIONS -133/ 602V
-57/ 448V
BRG 9 BRG 9 0'-
14'-
MAX HORZ
REACTIONS -72/ 53H
-72/ 53H
0.0" 0.0"
BRG
SIZE 3.50'
3.50'
0,96 DF/ 0.72 OF/
REQUIRED BRG AREA SQ.IN. (SPECIES)
0.96 DF ( 625 0.72 DF { 625)
1.49 HF/ 1.42 SPF 1.11 HF/ 1,05 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = -0.072' 9 7'- 1,7" Allowed = 0,671"
MAX OL CREEP DEFL = -0.066' 9 7'- 1,7' Allowed = 0,894" MAX TL CREEP DEFL = -0,138' 9 7'- 1,7" Allowed = 0.894"
MAX HORIZ, MAX HORIZ. LL DEFL TL DEFL ' 0,037" 9 0,059" 9 13' 13' 8.5" 8.5"
7-01-12 6-10-04
4,00 [
12 12
M-4X5 14,00
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7-05, Enclosed, Cat.2. Exp.C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads
in the plane of the truss only.
IMax CSI: TC:0.62 BC:D.36 Web:0.19l
st
2,5x4
12
• 2.00 2,00 •
12
2-06 7-01-12 6-10-04
2-06 14-00
JOB NAME: LOOSEN - E2 Scale; 0,3745
Truss: E2
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717830
TRANS ID: 383688
iliiiniin
WARNINGS:
1. Bultoer and erection contractor should bs advised of all General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be instatled where shown
3. Additional temporary bracing to insure steblUty during consti^Jctlon
Is ths resporwlbillty of the erector. Additionat permanent bracing of
the overall structure is the responsibitity of the building designer.
4. No load shouto be applied to eny component until after afl bracing and
fasteners are complete and at no time shouto any toads greater ttian
design toads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for ttie
fabrication, handling, shipment and insteltation of components.
S. This dssign Is fumished subject to the limitetions set fbrth by
TPI/WTCA in BCSI, copies of which wHt be furnished upon request.
MiTek USA, Inc./CompuTrus Software 7.6.4-SP4(1L)-E
GENERAL NOTES, unless othenvise noted:
1. This design Is based only upon the parameters shown and Is for an Indivtoual
bidtoing component. Applicability of design parameters and proper Incorporation of component is the responsibility of the buitoing designer.
2. Design assumes ttie top and bottom chords to be lateraHy braced at
2' o.c. and at 10' o.c, respectivety untoss braced throughout their tength by continuous sheathing such as plywood sheath!ng(TC) and/or drywsIt{BC).
3. 2x Impact bridging or latere bracing required where shown + •>-
4. tnstaltotton of truss Is the responsibility of the respective contractor. 5. Design assumes trusses are to be used in a norvcorroslve environment,
and are for "dry conditton" of use.
6. Design assumes full bearing at aH supporte shown. Shim or wedge if
necessary. 7. Design assumes adequate drainage is provtoed.
8. Plates shall ba locatsd on both faces of truss, and placed so their center
tines coincide with joint center tines.
9. Digite indicate size of plate in inches. 10. For basic connector plate design values see ESR-1311, ESR-1988 (MITek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TO: 2x4 OF illBTR BC; 2x4 DF #1&BTR
WEBS: 2X4 DF STAND
TC LATERAL SUPPORT <= 12"0C. UON. BC LATERAL SUPPORT <= 12"0C. UON.
OVERHANGS: 31.1" 31.1"
Connector plate prefix designators;
C,CN,C18,CN1B (or no prefix) = CompuTrus, Ino M,M20HS,M18HS,M16 = MiTek MT series
( 2 ) complete trusses required. Join together 2 ply with 3"x.131 DIA GUN nails staggered at:
9' oc in 1 row(s) throughout 2x4 top chords, 9" 00 in 1 rowjs) throughout 2x4 bottom chords,
9" 00 in 1 rowjs) throughout 2x4 webs.
14-03-08 HIP CG SETBACK 4-00-00 FROH END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UNIF LL(
TC UNIF LL( TC UNIF LL(
BC UNIF LL( BC UNIF LL(
BC UNIF LL
40.0)+DL(
60.0 +DL 40.0)+DL(
0.0)+DL( 0.0)+0L(
O.0)+DL(
28.0
42.0)= 2B.0)=
10.0 = 15.0)=
10.0)=
LOADING 68,0 PLF
102,0 PLF 68.0 PLF
10.0 PLF 15.0 PLF
10.0 PLF
0'-4'-
10'-0'-
4'-10'-
0.0" TO
0.0" TO 3.5" TO
0.0" TO 0.0' TO
3.5' TO
BC CONC LL( 8C CONC LLj 80.0)+DL( BO.Oi+DLj 76.0)= 156.0 LBS 9 4' 76.0)= 156.0 LBS 9 10'
4'-10'-
14'-4'-
10'-14'-
0.0' 3.6"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
4-00 6-03-08
0.0" V
3.5" V 3.5" V
0.0" V 3.5" V
3.5" V
4-00
12
4.00
3-01-10 3-01-14
BEARING LOCATIONS
0'- 0.0' 14'- 3.5"
C6C2010/IBC2009 MAX MEMBER FORCES 4(ffl/GDF/Cq=1,00 2=1 -16) 54
3= -3572 374 4= -3312 344
5= -3312 344 6= -3572 374
7= -16 54
2- 8=(-812) 4084 8- 3=( -74) 924
8- 9=(-578) 3950 8- 4=(-928j 408 9- 6=(-812) 4084 4- 9= -930 410
9- 5=j -74) 924
MAX VERT MAX HORZ
REACTIONS REACTIONS -105/ 1009V -2000/ 2000H
-105/ 1009V -2000/ 2000H
BRG 9 BRG 9 0'-14'-0.0' 3.5'
BRG SIZE
3.50' 3.50'
1,61 DF/
1.61 OF/
REQUIRED BRG AREA
SQ.IN. (SPECIES) 1.61 DF ( 625)
1.61 DF j 625)
2,49 HF/ 2,37 SPF
2,49 HF/ 2.37 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL OEFL = -0.104' 9 7'- 1.7' Allowed = 0.685" MAX OL CREEP DEFL = -0.149' 9 10'- 3.5' Allowed = 0.914"
MAX TL CREEP DEFL = -0.249' 9 7'- 1.7' Allowed = 0.914"
MAX HORIZ.
MAX HORIZ. LL DEFL = TL DEFL =
0.044" 9
0.085" 9 14'-14'-0.0" 0.0"
4-00
4-00
InOND. 2: 2000.00 LBS DRAG LOAD. I
Wind: 85 mph, h=15ft, TCDL=B.4,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS,
interior zone, load duration factor=1,6. Truss designed for wind loads in the plane of the truss only.
IMax CSI: TC:0.24 BC:0.31 Web:0.19i 12
4 00
M-3X8
st
M-5X6
M-5X12
M-2.5x4 M-5X6
4 5
-r t '—-——IIIi;^ -r^
M-5X12
M-3X8
12
> 2,00
,156# .156#
2,00 •
12
2-06 4-00 6-03-08 4-00 2-06
2-06 14-03-08 2-06
JOB NAME: LOOSEN Scale; 0.3691
Truss: E
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717828
TRANS ID: 383688
WARNINGS:
1. Bultoer and erectton conttactor shouto be advised of ail Generat Notes
and Warnings before oonstruction commences.
2. 2x4 compression web bracing must be installed where shown +.
3. Additionat temporary bracing to insure stebility during construction
is the responsibility of tha erector. Additional pernrianent bracing of
the overall structure Is the responsibility of the building designer.
4. No toad should be appttod to any component until after afl bracing and
fasteners are complete and at no time shouto any toads greater ttian
design loads be applied to any component.
5. CompuTrus tias no control over and assumes no responsibility for ttie
fabrication, handling, shipment and instattetion of components.
6. This design is fumished subject to tiie Hmitetions set fdrth by
TPIAVTCA in BCSI, copies of which will be furnished upon request,
MiTek USA, Inc/CompuTrus Software 7.6.4-SP4(1L)-E
GENERAL NOTES, untess othenvise noted:
1. This design ts based onty upon the parameters shown and is for an individual
buitoing component. Applicability of design parameters and proper Incorporation of component is the responsibitity of the buitoing designer.
2. Design assumes the top and bottom chords to be laterally braced a!
2' o.c. and at 10' o.c. raspectively untoss braced throughout their length by
continuous sheathing such as plywood 5heathlng(TC) and/or drywall(BC). 3. 2x Impact bridging or lateral bracing required whera shcMn -••
4. InstaHatton of truss Is ^ responsibitity of the respective confractor.
5. Design assumes busses are to be used in a non-corrosive environment, and ara for "dry conditton" of use.
6. Design assumes full bearing at aH supporte shown. Shim or wedge if
necessary. 7. Design assumes »tequate drainage is povtoed,
8. Plates shatt be located on both faces of tru&s, and ptoced so their center
lines coinctoe with Joint center lines. 9. Digite IncHi^to size of plate In Inches.
10. For basic connector plate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC; 2X4 DF #1&BTR
BC: 2x4 DF #UBTR WEBS: 2X4 DF STAND
TC LATERAL SUPPORT <= 12"0C. UON.
BC LATERAL SUPPORT <= 12"0C. UON.
OVERHANGS; 31.1' 0.0"
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M2DHS,H18HS,M16 = MiTek MT series
TRUSS SPAN 14'- 0.0" LOAD DURATION INCREASE = 1.25
SPACED 24.0" O.C.
LOADING
LL( 20.0)+DL( 14.0) ON TOP CHORD = 34.0 PSF
DL ON BOTTOM CHORD = 5.0 PSF TOTAL LOAD = 39.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP
AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING LOCATIONS
0'- 0.0' 14'- 0.0'
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00
1- 2=( -16) 54 2^6=(0) 1612 6-3=( 0) 316
2- 3= -1748 0 6-7= 0) 1585 3-7= -25 21 3- 4=j-1562) 0 7-5=j0) 1588 7^4=j oj 317 4- 5=(-1726) 0
MAX VERT REACTIONS
-44/ 740V -1/ 546V
BRG BRG
0' 14'
MAX HORZ REACTIONS
-64/ 45H -64/ 45H
0.0" 0.0"
BRG SIZE 3.50'
3.50'
1.18 OF/
0,87 OF/
REQUIRED BRG AREA SQ,IN, (SPECIES)
1.18 DF ( 625) 0.87 DF ( 625)
1.83 HF/ 1.74 SPF
1,35 HF/ 1.28 SPF
For hanger specs. • See approved plans
<
•f
12
4,00
6-00
6-03-08
2-03-08
f-
2-00
5-08-08
5-08-08
12
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL DEFL = -0.079' 9 6'- 0,0' Allowed = 0,671"
MAX DL CREEP DEFL = -0.113' 9 6'- 0,0' Allowed = 0,894" MAX TL CREEP DEFL = -0.192' 9 6'- 0,0' Allowed = 0.894"
MAX HORIZ. LL DEFL = 0.040" 9 13'
MAX HORIZ. TL DEFL = 0.079" 9 13'
8.5"
8.5"
; 4.00
Wind; 85 mph, h=15ft, TCDL=8.4,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6.
Truss designed for wind loads in the plane of the truss only.
IMax CSI; TC:0.S2 BC;0.a3 Weh:0.13l
M-5X12 M-5x6
M-3x8
st
M-2.5x4
12 = 2.00 2.00 =
12
2-06 6-00 2-03-08 5-08-08
2-06 14-00
JOB NAME: LOOSEN - El Scale; 0.3817
Truss: El
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717829
TRANS ID: 383688
illlllllllillllll
WARNINGS:
1. Bultoer and erection contractor should be advised of all General h4otes
and Warnings before construction commences.
2. 2x4 compression web bracing must t>e installed where shown
3. Additional temporary bracing to insure stebiHty during consti-uctton
is the responsibility of ttie erector. Addittonal permanent bracing of
the overaH structore is the responsibility of the buitoing designer.
4. No toad shoukd be appttod to any component until after aH bracing and
fasteners are complete and at no time shouto any kjads greater than
design loads be appttod to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabricatton, handling, shipment and insteltotion of comporwnts.
6. This design is furnished subject to ttie Hmitetions set forth by
TPt/WTCA in BCSI, copies of which wiH be furnished upon request.
MITek USA. Inc/CompuTrus Software 7.6.4-SP4(1L)-E
GENERAL NOTES, untess othenvise noted:
1. This design is based only upon ttie parameters shown and is for an Indivtoual
buitoing component. Applicability of design parameters and proper
incorporation of component is the responsibHtty of the building designer.
2. Design assumes ttie top and bottom chords to be lateraHy braced at
2' o.a and at 10' o.c. respectively untoss braced throughout ttieir length by
continuous sheathing such as plyvmod sheathing(TC) and/or drywatt(BC). 3. 2x Impact bridging or toteral bracing required whera shown *
4. Instetfation of truss is the rasponsibHIty of tha respective contractor.
5. Design assumes tnjsses are to be used in a non-con^sive environment,
and are for "dry conditton" of use. 6. Design assumes full bMring at aH supporte shown. Shim or wedge If
necessary.
7. Design assumes adequate drainage is provtoed. 6. Plates shall be tocated on both faces of truss, and ptoced so their center
lines coinctoe with joint center tines.
9. Digite indicate size of plete In inches. 10. For basic connector plate design values see ESR-1311, ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC; 2x4 DF #1&BTR
BC: 2x4 DF #1&BTR
WEBS; 2x4 DF STAND
TC LATERAL SUPPORT 24'OC, UON.
BC LATERAL SUPPORT <= 12"0C. UON.
8-10-08 MONO HIP SETBACK 8-00-00 FROM END WALL LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UNIF LL{ 40.0)+DL( TC UNIF LL 100.0 +DL
BC UNIF LL 0.0 +01-
LOAOING 14.0)= 54.0 PLF 35.0 = 135.0 PLF 25.0 = 25.0 PLF
0.0" TO 8'-0.0" TO B'-0.0" TO 8'-
0.0" V 10.5" V 10.5" V
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1,00 1- 2=( -23) 43 2-5=( 0) 205 3-5=(-129) 59 2- 3= -279 0 5-6= -55) 33 6-4= 0 442
3- 4= -199 0 4-6= -462 0
OVERHANGS: 31,1" 0.0"
Connector plate prefix designators: C,CN,C18.CN18 (or no prefixT = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
TC CONC LL( 373.3)+DL( 130.7)= 504.0 LBS 9 B'- 0.0"
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEINQ MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
8-00
BEARING LOCATIONS 0'- 0.0' 8'- 10.5'
MAX VERT REACTIONS -79/ 500V
-19/ 371V
MAX HORZ REACTIONS -66/ 60H -66 / 60H
BRG 9 0'- 0.0" m $ 8'- (0,5"
BRG SIZE 3,50" 3.50'
0.80 OF/
0.5B OF/
REQUIRED BRG AREA SO.IN. (SPECIES) 0,80 DF ( 625 0,59 DF j 625)
1,23 HF/ 1.18 SPF
0.92 HF/ 0.87 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = -0.038" 9 -2'- 6.6" Allowed = 0.259" MAX DL CREEP DEFL = -0.020" 9 -2'- 6.6' Allowed = 0.346" MAX TL CREEP DEFL = -0.057" 9 -2'- 6.6' Allowed = 0.346"
MAX HORIZ. MAX HORIZ. LL DEFL = TL DEFL = 0.001' 9 0.002" 9 8'- 8.1
12
4.00: M-4X6
0-10-08
^504#
st
Wind: 85 mph, h=15ft, TCDL=4,2,8CDL=3,0, ASCE 7-05, Enclosed, Cat.2, Exp.C, IMFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
IMax CST: TC;n..'iB RC:n.4.1 Weh;0.1Bi
7-06-12 1-03-12
2-06 8-10-08
JOB NAME: LOOSEN Scale: 0.4966
Truss: F
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717831
TRANS ID: 383688
•IIIIIIIII
WARNINGS:
1. Bultoer and erection conttactor should be advised of alt General Notes
and Warnings before construction commences.
2. 2x4 compresston web bracing must be instelled where shown +.
3. Additional temporary bracing fo insure stebiHty during consbuction
Is the responsibility of ths erector. Addittonal permanent bracing of
the overaH structure is the responsibility of the building designer.
4. No load shouto be applied to any component until after aH bradng and
fasteners are comptete and at no time shouto any toads greater than
design toads be applied to any component.
5. CompuTrus has no control over and assumes no responsibiUty for the
fabrication, handling, shipment and instellation of components.
6. This design is fumished subject to Uie Kmitetions set fortti by
TPt/WTCA in BCSI, coptos of which wiH be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, untoss othenvise noted:
1. This design is based onty upon the parameters shown and Is for an Indivtoual bidtoing component. ApplicabiUty of design paranieters and proper
Incorporation of component is the responsibHtty of tlie buitoing designer.
2. Design assumes ttie top and bottom chords to be lateraHy braced at
2' o.c. and at 10' o.c. respectively untoss braced throughout ttieir length by
continuous sheathing such as plywood sheathing(TC) and/or dryw3tt(BC).
3. 2x Impact bridging or tateral bracing required where shown + + 4. InsteHatton of truss is the responsibHtty of the respective contractor.
5. Design assumes tnjsses are to be used In a non-conostve environment,
and are for "dry condition" of use.
6. Design assumes fuH bearing at aH supporte shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provtoed.
6. Ptotes shatt be tocated on both foces of tmss, and ptoced so their center tines coinctoe with joint center tines.
9. Digite indicato size of ptote in inches.
10. For basto connector plate design values see ESR-1311, ESR-igse (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMeER SPECIFICATIONS TC: 2x4 DF #1&BTR
BC; 2x6 DF #2 WEBS: 2x4 DF STAND
TC LATERAL SUPPORT <= 12"0C,
BC LATERAL SUPPORT <= 12"0C,
8-10-08 GIRDER SUPPORTING 14-00-00 LOAD DURATION INCREASE = 1.25 (Non-Rep)
UON.
UON.
TC UNIF LL( BC UNIF LL( 40.0)+DL( 120.0)+DL(
LOADING
14.0)= 54.0 PLF 82.0 = 202.0 PLF
0.0' TO
0.0' TO 10.5" V 10.5" V
CBC2010/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00 1- 2=(-2170 304 1-5=(-286) 2024 5-2=( -126) 1152
2- 3=( -40 40 5-6= -276 1936 2-6= -2056 296 3- 4= 0 0 6-7=( -76 64 6-3=( -146 40
Connector plate prefix designators; C,CN,C1B,CN18 (or no prefix) = CompuTrus, Inc
M,M20HS,M18HS,M16 = MiTek MT series
( 2 ) complete trusses required. Join tooether 2 ply with 3"x.131 DIA GUN
nails staggered at: 9" oc in 1 row(s) throughout 2x4 top chords,
9' 00 in 2 rowjs throughout 2x6 bottom chords, 9" oc in 1 row(s) throughout 2x4 webs.
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING LOCATIONS
0'- 0.0' B'- 10.5'
MAX VERT REACTIONS
-160/ 1157V -157/ 1115V
BRG 9 BRQ 9
MAX HORZ REACTIONS
-76/ 64H -76/ 64H
0'-8'-
0.0'
10,5'
BRG SIZE
3.50' 3.50'
1.85 DF/
1.78 DF/
REQUIRED BRG AREA
SQ.IN. (SPECIES)
1.85 DF ( 625) 1.78 DF ( 625)
2.86 HF/ 2.72 SPF 2.75 HF/ 2.62 SPF
4-01-09 3-10-03 0-10-12
-i f 12
4.00 :
M-2.5x4
it
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL DEFL = -0.034' 9 3'- 11,8' Allowed = 0,415" MAX DL CREEP DEFL = -0.031' 9 3'- 11,8" Allowed = 0,553" MAX TL CREEP OEFL = -0.065' 9 3'- 11,8' Allowed = 0,553"
MAX HORIZ. LL DEFL = 0.004" 9 6'- 8.8"
MAX HORIZ. TL DEFL = 0.007" 9 8'- 8.8"
Wind: 85 mph, h=15ft, TCOL=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2. Exp.C, MWFRS, interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only,
iMax CSI: TC:Q.08 BC:0.62 Web:0.31l
3-11-13 3-10-03 1-00-08
8-10-08
JOB NAME: LOOSEN - FG Scale: 0.4915
Truss: FG
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717832
TRANS ID: 383688
WARNINGS:
1. Bultoer and erection conttactor should be advised of att General Notes
and Warnings before constructton commences.
2. 2x4 compression web bracing must be instelted where shown +.
3. Additional temporary bracing to insure stebility during constiuction
Is the responsibility of the erector. Additional permanent bracing of
the overaH stnjctijre is the responsibility of the building designer.
4. No load shouto be applied to eny component until after aH bracing and
fasteners are comptete and at no lime shouto any toads greater ttian
design loads be applied to any component.
5. CompuTrus has no control over and assumes no responsibility for the
fabrication, handHng, shipment and insteltetton of componente.
6. This design is fumished subject to the Hmitetions set forth tiy
TPI/WTCA in BCSI, copies of which wiH be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, untoss othenvise noted:
1. This design Is based onty upon the parametere shown and ts for an Indivtouat
buitoing component. Applicability of design parameters and proper incorporation of component is the responsibiitty of the building designer.
2. Design assumes Xrve top and bottom chords to be toteraHy braced at
2' o.c, and at 10' o.c, respectively untoss braced throughout ttieir tength by continuous sheaUiing such as plywood sheathlng(TC) and/or drywall(BC).
3. 2x Impact bridging or lateral bracing required where shown + +
4. Instaitotton of truss to the rasponsibHIty of the respective conttactor.
5. Design assumes trusses are to be used in a non-conosive envtronment, and are for "dry conditton' of use.
6. Design assumes fuN bearing at aH supporte shown. Shim or wedge if
necessary. 7. Design assumes adequate drainage is povtoed.
8. Ptotes Shalt be tocated on both foces of truss, and ptoced so their center
tines colnckto with joint center tines. 9. Digits Indicato size of plate in inches.
10. For basto connector ptote design values see ESR-1311, ESR-1988 (l^fliTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC: 2x4 DF #14BTR BC: 2x4 DF #1&BTR
WEBS; 2X4 DF STAND
TC LATERAL SUPPORT BC LATERAL SUPPORT
OVERHANGS: 0.0"
12"0C. UON.
12"0C. UON.
31.1"
Connector plate prefix designators: C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M20HS,M18HS,M16 = MiTek MT series
TRUSS SPAN 25'- 11,5"
LOAD DURATION INCREASE = 1.25 SPACED 24.0" O.C,
LOADING
LL( 20.0)+DL( 7.0) ON TOP CHORD = 27.0 PSF DL ON BOTTOM CHORD = 5.0 PSF
TOTAL LOAD = 32.0 PSF
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING
LOCATIONS 0'- 0.0" 25'- 11.5"
CBC2010/IBC2009 1- 2= -3494) 474
2- 3= -2469 335 3- 4=(-2469 334
3546) 450 -23 4- 5=
5
4WR/GDF/Cq=1.00
43
MAX VERT
REACTIONS -112/ 831V -167/ 961V
8RG 9
BRQ 9
MAX MEMBER FORCES 1- 7=(-441) 3291
7- 8= -446 3290
8- 9=(-421 3343 9- 5=(-416 3345 8- 4=j-1007
7- 2=(
2- 8= 8- 3=
0
•958 •135
4- 9=
MAX HORZ REACTIONS
-93/ 106H •93/ 106H
0'- 0.0"
5'- 11.5"
BRG SIZE
3.50" 3.50'
1.33 Ofl
1,54 OF/
217
159 1277
109 221
REQUIRED BRG AREA SQ.IN, (SPECIES)
1,33 DF ( 625) 1,54 DF ( 625)
2,05 HF/ 1.95 SPF
2,37 HF/ 2,26 SPF
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180
MAX LL DEFL = -0.371' 9 12'- 10,7' Allowed = 1.269' MAX OL CREEP OEFL = -0.335' 9 12'- 10,7' Allowed = 1,692"
MAX TL CREEP DEFL = -0.706' 9 12'- 10.7' Allowed = 1.692"
12-10-12 13-00-12
MAX HORIZ. LL DEFL = 0.192" 9 25'
MAX HORIZ. TL DEFL = 0.308" 9 25' 8.0" 8.0"
7-02-04 5-08-08 5-08-08 7-04-04
it
^Wind; 85 mph, h=15ft, T0DL=4.2,BCDL=3.0, ASCE 7-05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6, I Truss designed for wind loads in the plane of the truss only.
IMax CSI: TC:0.77 80:0.52 Web;0.fiT1
M-3x8
Jl
7-00-08 5-10-04 5-10-04 7-02-08
12-10-12 13-00-12 2-06
25-11-08 2-06
JOB NAME: LOOSEN - B3 Scale; 0.2586
Truss: B3
DES. BY; BS
DATE: 11/5/2013
SEQ.: 5717813
TRANS ID: 383688
WARNINGS:
1. Builder and erection contt-actor should bs advised of alt General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be Instatled where shown +.
3. Additional temporary bracing to insure stebity during constructton
is the responsibility of the erector. Additional permanent bracing of
the overall structure is the responsibility of the building designer.
4. No toed should be appttod to any component until after aH bracing and
fasteners are complete and at no time shouto any toads greater than
design loads be appltod to any component.
5. CompuTrus has no control over and assumes no responsibitity for the
tebrk;atton, handting, shipment and instellation ot componente.
6. This design is fumished subject to the timttetions set forth by
TPt/WTCA in BCSI, copies of which wilt be furnished upon request.
MiTek USA, Inc./CompuTrus Softvi/are 7.6.5(1L)-E
OENERAL NOTES, unless othenAfise noted:
1. Thts design is based only upon the parametere shown and ts for an Indivtouat
buitoing component. Applicablttty of design parameters and proper
Incorporation of component is the responsibility of the building designer.
2. Design assumes the top and bottom chords to be lateraHy braced at 2' o.c. and at 10' o.c. respectrvety untoss brsced throughout ttieir tength by
continuous sheathing such as plywood sheathing(TC) and/or drywaH(BC).
3. 2x Impact bridging or lateral bracing required where shown ••- ->-
4. InsteHation of truss Is ttie responsibility of the respective conttactor. 5. Design assumes trusses are fo be used in a non-corrosive environment,
and are tor "dry condition" of use.
6. Design assumes full bearing at alt supporte shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provtoed.
8. Ptates shall be located on both faces of truss, and ptoced so their center tines coinckle with joint center lines.
d. Digite Indicate size of plate In Inches.
10. For basto connector plate design vatoes see ESR-1311. ESR-1988 (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TO: 2x4 DF #1&BTR BC: 2x4 DF #1&BTfl
WEBS; 2x4 DF STAND
TC LATERAL SUPPORT BC LATERAL SUPPORT
5-04-06 CORNER GIRDER SETBACK 4-00-00 FROM END WALL LOAD DURATION INCREASE = 1.25 (Non^Rep)
12"0C. 12"0C. UON. UON.
TC UNIF LL(
BC UNIF LL
59.7)+DL( 0.0)+DL( 20,9] 14.9
LOADINQ = 80.5 PLF
= 14.9 PLF 0'-0'-0.0" 0.0" 4.4' I 4.4" I
OVERHANGS; 43.2' 0.0"
Connector plate prefix designators:
C,CN,C18,CN18 (or no prefix) = CompuTrus, Inc M,M2CHS,M1BHS,U16 = MiTek MT series
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARING
LOCATIONS 0'- 0.0'
5'- 7.9"
CBC2010/IBC2flfl9 MAX MEIilSEfi FORCES m/SOF/Cq=UOO
1- 2=(-23) 44 2-4=(-47) 9 3-4=(-137) 77
2- 3=(-44) 29
MAX VERT
REACTIONS -218/ 374V
-62/ 164V
BRG 9
BRQ 9
MAX HORZ REACTIONS •47/ 16H •47/ 16H
D'^ 0.0"
5'- 7,9"
BRG SIZE
4.94' 3.50'
0.60 OF/
0.26 DF/
REQUIRED BRG AREA
SQ.IN. (SPECIES) 0.60 DF ( 625)
0.12 DF (1400)
0.92 HF/ 0.88 SPF 0.40 HF/ 0.38 SPF
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180
MAX LL DEFL = -0.145' 9 -3'- 6.8' Allowed = 0.360" MAX DL CREEP OEFL = •0.076' 9 -l'- 6,8' Allowed = 0,480"
MAX TL CREEP DEFL = -0.222' 9 •S'- 6,8' Allowed = 0,480"
MAX HORIZ,
MAX HORIZ,
LL DEFL
TL DEFL
0,000" 9 0,000" 9 4,9"
4,9"
5-06-02 0-01-12
—fi
2.83 I
12
Wind; 85 mph, h=15ft, TCDL=4.2,BCDL=3.0, ASCE 7-05, Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration faotor=1.6. Truss designed for wind loads
in the plane of the truss only.
IMax CSI: TC;0.71 BC;0.16 Web:0.03l
M-1x3
12 1,41
3-06-07 5-07-14
JOB NAME: LOOSEN - 0-GIRD Scale; 0,5558
Truss: C-GIRD
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717826
TRANS ID: 383688
WARNINGS:
1. Bultoer and erection contractor should bs advised of att General Notes
and Warnings before construction commences.
2. 2x4 compression web bracing must be instelted where shown +.
3. Additional temporary bracing fo insure stebility during construction
is the responsibility of ttie erector. Additbnal permanent bracing of
the overall structijre is the responsibility of the building designer.
4. No load shouto be applied to any component until after aH bracing and
fasteners are comptete and at no ttme shouto any toads greater tiian
design loads be appltod to any component.
5. CompuTrus tias no control over and assumes no responsibility for the
fabrication, handHng, shipment and insteltation of components.
6. This design is fumished subject to the Hmitetions set forth by
TPt/WTCA in BCSI, copies of which wiH be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1 L)-E
GENERAL NOTES, untoss othenvise noted:
1. This design is based onty upon the parameters shown and is for an Indivtouat
building component. Apptlcabltlty of design parameters and proper
incorporation of component is ttie responsibHtty of the building designer.
2. Design assumes ttie fop and bottom chords to be laterally braced at 2' o.c. and at 10' o.c. respectively untoss braced throughout their tength by
continuous sheathing such as plywood sheathing(TC] and/or drywaH(BC}.
3. 2x Impact bridging or toteral bracing required where shown -*• + 4. InstaHatton of truss is the responsibility of the respective conb^ctor.
5. Design asujmes busses are to be used in a non-corosive environment,
and are for "dry condifion" of use.
6. Design assumes fuH bearing at aH supporte shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provtoed.
6. Ptates shatt be tocated on both faces of truss, and ptoced so their center tines coinckto with joint center tines.
9. Digite indicate size of ptate tn inches.
10. For basto connector plate design values see ESR-1311, ESR-1968 (MITek)
B -This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS TC: 2x4 OF #UBTR BC; 2x4 DF #UBTR WEBS: 2x4 DF STAND
TC LATERAL SUPPORT <= 12"0C, UON, BC LATERAL SUPPORT <= 12"0C. UON,
Connector plate prefix designators: C,CN,C18,CN18 or no prefix) = CompuTrus, M,M20HS,M18HS,M16 = MITek MT series
10-08^11 CORNER GIRDER SETBACK 7-07-00 FROM END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UNIF LL( BC UNIF LL 107.2)+DL( 0.0)+DL(
LOADING
37.5)= 144.8 PLF 26,8 = 26.8 PLF
0.0" TO 10'
0.0" TO 10'
.7' I
.7" I
Inc
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL
REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHOBO CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY,
CBC2010/IBC2009 MAX MEMBER FORCES 4Wfl/GDF/Cq=1.00 1- 2=( -33) 8 1-5=(-535) 913 1-2= -986) 561 4-6=(-217) 103
2- 3=1-1165) 470 5-6=(-518) 1126 2-5= 0) 239 3- 4=( -66) 32 5-3= 0 263 3-6-i-1126 517
BEARING LOCATIONS 0'^ 0,0" 11'^ 0,2"
MAX VERT REACTIONS -242/ 380V
-225/ 608V
BRG BRG
MAX HORZ REACTIONS -107/ 39H -107/ 39H
0'-11'-0,0" 0,2"
BRG SIZE 7,75" 3,50"
0,61 DF/ 0,97 DF/
REQUIRED BRG AREA SQ,IN. (SPECIES) 0.61 DF ( 625) 0.43 DF (1400)
0.94 HF/ 0,89 SPF 1,50 HF/ 1,43 SPF
2-02-12 4-05-07 4-04
2.83 c
12
1/1-1x3
VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 MAX LL OEFL = -0.046' 9 6'- 7.8' Allowed = 0.504" MAX DL CREEP DEFL = -0.029' 9 4'- 8.1' Allowed = 0.672"
MAX TL CREEP DEFL = -0.057" 9 6'- 7.8" Allowed = 0.672"
MAX HORIZ. LL OEFL = 0.012' 9 10'- 10,4' MAX HORIZ, TL DEFL = 0,014' 9 10'- 10,4'
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3.0, ASCE 7-05, Enclosed, Cat,2, Exp.C, MWFRS,
interior zone, load duration factor=1.6. Truss designed for wind loads in the plane of the truss only.
IMax CSI; TC:0.32 BC;D.31 WebTOs]
4-07-15 6-04-04
11-00-03
JOB NAME: LOOSEN - B1-0GIRD Scale: 0.4835
Truss: B1-GGIRD
DES. BY: BS
DATE: 1/30/2014
SEQ.: 5808591
TRANS ID: 390111
WARNINGS:
1. Builder and erection contractor should be advised of all General Notes
and Warnings before consti'uction commences.
2. 2x4 compresston web bracing must be instelled where shown +.
3. Additional temporary bracing to insure Btability during construction
is the responsibility of ttie erector. Additional permanent bracing of
the overall sb-ucture is the responsibility of the building designer.
4. No load should be applied to any component until after all bracfng and
fasteners are complete and at no time should any toads greater than
design toads be appttod to any component.
5. CompuTrus has no control over and assumes no responsibiitty for the
fabrication, handting, shipment and InsteHation of componente.
6. This design is furnished subject to the Hmltations set forth by
TPI/WTCA in BCSI, copies of which will be furnished upon request.
MiTek USA, Inc/CompuTrus Software 7.6.5(1L)-2
GENERAL NOTES, untess ottienwise noted:
f. This design is based only upon the parameters shown and is for an Indivtoual
buitoing component. Applicabttity of design parametere and proper
incorporation of component Is the responsibility of the buitoing designer.
2. Design assumes the top and bottom chords to be toteraHy braced at
2' o.c. and at 10' o.c. respectivety untess braced throughout their tongth by continuous sheathing such as plywood sheattiing(TC) and/or drywalt(BC).
3. 2x Impact bridging or tateral bracing required where shown '*•
4. InstaHatton of truss Is tha responstoWty ot the respective contractor.
5. Design assumes trusses are to be used in a non-conosive environment, and ara for "dry condition" of use. 6. Design assumes full bearing at alt supports shown. Shim or wedge if necessary.
7. Design assumes adequate drainage is provided. 8. Plates shatt be tocated on botti faces of tmss, and ptoced so their center tines coincide with joint center flnes. 9. Digite indicate size of ptote in inches. 10. For basic connector plate design values see ESR-1311, ESR-1S8B (MiTek)
This design prepared from computer input by
RAMONA LUMBER RT
LUMBER SPECIFICATIONS
TC; 2x4 OF #1&flTR
BC: 2x4 DF /(1&BTR
WEBS: 2x4 DF STAND
TC LATERAL SUPPORT <= 12'0C. UON.
BC LATERAL SUPPORT <= 12'0C. UON.
13-10-03 CORNER GIRDER SETBACK 10-00-00 FROM END WALL
LOAD DURATION INCREASE = 1.25 (Non-Rep)
TC UNIF LL( 80 UNIF LL( 144.4)+DL(
0.0)+0L(
LOADING 50.5)= 195.0 PLF
36.1)= 36.1 PLF
0.0" TO 13'
0.0" TO 13'
10.2' I
10.2' I
OVERHANGS: 44.0' 0.0'
Connector plate prefix designators; C,CN,C18,CN18 (or no prefix) = CompuTrus,
M,M20HS,M18HS,M16 = MiTek MT series Inc
LIMITED STORAGE DOES NOT APPLY DUE TO THE SPATIAL REQUIREMENTS OF CBC 2010 NOT BEING MET.
BOTTOM CHORD CHECKED FOR 10PSF LIVE LOAD. TOP AND BOTTOM CHORD LIVE LOADS ACT NON-CONCURRENTLY.
BEARINQ LOCATIONS
0'- 0.0'
14'- 1.7'
CBC2D10/IBC2009 MAX MEMBER FORCES 4WR/GDF/Cq=1.00 1- 2=( -23) 45 2-6=(-963) 3115 3-6=( -416) 264
2- 3=(-3220) 1017 6-7=(-725) 2255 6-4=( 0) 639
3- 4=(-2792) 737 4-7={-2261) 722 4- 5=( -97) 40 5-7=( -301) 125
MAX VERT REACTIONS
-359/ 815V -296/ 1055V
BRQ 9
BRG 9
0'-14'-
MAX HORZ
REACTIONS 88/ 39H
88/ 39H
0.0' 1.7'
BRG
SIZE 7.75"
3.50'
1.30 OF/
1.69 OF/
REOUIRED BRG AREA SQ.IN. (SPECIES)
1.30 DF ( 625)
0.75 DF (1400)
2.01 HF/ 1.92 SPF
2.60 HF/ 2.48 SPF
5-09-03 4-00-08 4-04
2,83 I
VERTICAL DEFLECTION LIMITS; LL=L/240, TL=L/180 MAX LL DEFL = -0.247" 9 5'- 8.8" Allowed = 0.660"
MAX DL CREEP DEFL = -0.162" 9 5'- 8.8" Allowed = 0.880" MAX TL CREEP DEFL = -0.313" 9 5'- 8.8" Allowed = 0.880"
MAX HORIZ. LL DEFL = 0.041' 9 13'^ 11.9'
MAX HORIZ, TL DEFL = 0,047' 9 13'^ 11,9"
Wind: 85 mph, h=15ft, TCDL=4,2,BCDL=3,0, ASCE 7^05,
Enclosed, Cat.2, Exp.C, MWFRS, interior zone, load duration factor=1.6,
Truss designed for wind loads in the plane of the truss only.
^ IMax CSI: TC:0.87 BC:0.53 Web:0.76l
M-1.5x4
st
specs, - See approved plans
12 1,41
7-09-07 6-04-04
3-07-03 14-01-11
JOB NAME: LOOSEN - B-CGIRD Scale; 0,3725
Truss: B-CGIRD
DES. BY: BS
DATE: 11/5/2013
SEQ.: 5717815
TRANS ID: 383688
WARNINGS:
1. Bultoer and erection conttactor shouid be advised of aH General Notes
and Warnings before construction commences.
2. 2x4 comprasston web bracing must tw instelted wtiere shown -f.
3. Additional temporary bracing to insure stebiHty during consbuction
is ttie rasponsiblHty of the erector. Additional permanent bracing of
the overaH structure is the responsibHtty of the building designer.
4. No toad should be applied to any component until after aH bracing and
fasteners are complete and at no lime should any toads greater ttian
design toads be applied to any component.
5. CompuTrus has no contitd over and assumes no responsibility for ttie
fabricatton, handting, shipment and insteltetton of componente.
6. This design is fumished subject to the Hmitetions set torth by
TPt/WTCA in BCSI, copies of which wHI be furnished upon requesL
MiTek USA, IncXompuTrus Software 7.6.5(1 L)-Z
GENEIML NOTES, untess othenMse noted: 1. Thto design is based onty upon the parametera shown and Is for an indivtouat building component. Applicability of design parameters and proper incorporation of component Is ttie responsibHtty of the buitoing designer. 2. Design assumes the top and bottom chords to be lateraHy braced at 2' o.c and at 10' o.c. respectively untoss braced ttiroughout ttieir len^ by continuous sheathing such as plywood sheathing(TC) and/or drywall(BC). 3. 2x Impact bridging or toteral bracing required whera shovim '•• '*-4. InsteHatton of truss is ttie rasponsibHIty of the raspective contractor. 5. Design assumes trusses are to be used in a non-corrostve environmeni, and are for "dry conditton" of usa. 6. Design assumes fuH bearing at aH supporte shown. Shim or wedge if necessary. 7. Design assumes adequate drainage is provtoed. 8. Ptotes shall be located on both faces of tmss, and ptoced so their center tines coinckto with joint center tines. 9. Digits indicate size of plate in inches. 10. For baste connector ptote design values see ESR-1311, ESR-1988 (MiTek)