HomeMy WebLinkAbout2719 BRESSI RANCH WAY; ; CB043033; Permit02-09-2005
Job Address:
Permit Type:
Parcel No: Valuation:
Occupancy Group: 09/17/2004
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Building Inspection Request Line (760) 602-2725
Residential Permit Permit No: CB043033
271 9 BRESSI RANCH WY CBAD
RESDNTL SubType: SFD Status: ISSUED 2131502200 Lot #: 187 Applied: 07/20/2004
$261,520.00 Construction Type: NEW Entered By: SB
Reference #: CT02-14 Plan Approved:
1 Structure Type: SFD Issued: 09/17/2004
3 Bathrooms: 3 Inspect Area: RB
HEATHER CT@ BRESSI PHS 1 PLN 1 Orig PC#: PCO3-64
281 2 SF LIVING,475 SF GARAGE, 625 SF PORCH Plan Check#: PCO4-88
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner:
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount Strong Motion Fee
Park in Lieu Fee
Park Fee LFM Fee
Bridge Fee
Other Bridge Fee BTD #2 Fee
BTD #3 Fee
Renewal Fee Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$1,045.52
$0.00
$679.59 $0.00
$0.00
$26.15
$2,436.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
0518
$0.00
$0.00
Meter Size
Addl Recl. Water Con. Fee
Meter Fee SDCWA Fee CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund) Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Housing Credit Fee Master Drainage Fee Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$140.00
$2,004.00 $1,814.19
$4,759.66
$0.00
$0.00 $0.00
$660.00
$0.00
$0.00 $1 54.00
$60.00
$78.50
$0.00
$0.00
$0.00
$0.00
$1,735.00 $20.00
$18,611.61
Total Fees: $1 8,611.61 Total Payments To Date: $1 8,611.61 Balance Due: $0.00
Inspector: Date: Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "feeslexactions" You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which YOU have Dreviouslv been aiven a NOTICE similar to this. or as to which the statute of limitations has Dreviouslv otherwise exoired.
City of Carlsbad Bldg
For: 05/02/2005
Permit# CB043033
Title: HEATHER CT8 BRESSI PHS 1 PLN 1
Inspection Request
Description: 2812 SF LIVING,475 SF GARAGE, 625 SF PORCH
Type: RESDNTL SubType: SFD
Inspector Assignment: RB
Job Address:
Suite:
Locat ion :
APPLICANT
Owner:
Remarks:
Total Time:
CD
19
29
Phone: 7605356490
2719 BRESSI RANCH WY
Lot 187
GREYSTONE HOMES
GREYSTONE HOMES INC
Requested By: KEVIN
Entered By: KAREN
Description Act Comment
Final Structural
Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRsKVs
Date
04/28/2005
04/25/2005
04/07/2005
04/05/2005
02/22/2005
02/16/2005
02/08/2005
01 /25/2005
01/18/2005
01/14/2005
0111 1/2005
01 /07/2005
01/07/2005
11/03/2004
1011 512004
09/21/2004
Inspection History
Description
89 Final Combo
89 Final Combo
39 Final Electrical
39 Final Electrical
82 Drywall/Ext LatNGas Test
16 Insulation
84 RoughCombo
13 Shear PanelsIHDs
15 RoofIReroof
15 RoofIReroof
15 RoofIReroof
13 Shear PanelslHD's
15 RoofIReroof
81 Underground Combo
81 Underground Combo
21 UndergroundIUnder Floor
Act
co
co
AP
NR
AP
AP
AP
AP
AP
NS
NS
NS
NS
AP
NR
AP
lnsp Comments
BN RELEASE GAS
RB EMR
RB
RB
RB
RB
RB
RB
RB ROLL TO TUES
RB TOOWET
RB RAlM
RB
RB
RB
RB
JM FINAL OK - NEED ENGINEERING FINAL APPROVAL
MISSING SETBACK CERTS & HARDWARE NOT PER PLAN