Loading...
HomeMy WebLinkAbout2719 BRESSI RANCH WAY; ; CB043033; Permit02-09-2005 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 09/17/2004 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Building Inspection Request Line (760) 602-2725 Residential Permit Permit No: CB043033 271 9 BRESSI RANCH WY CBAD RESDNTL SubType: SFD Status: ISSUED 2131502200 Lot #: 187 Applied: 07/20/2004 $261,520.00 Construction Type: NEW Entered By: SB Reference #: CT02-14 Plan Approved: 1 Structure Type: SFD Issued: 09/17/2004 3 Bathrooms: 3 Inspect Area: RB HEATHER CT@ BRESSI PHS 1 PLN 1 Orig PC#: PCO3-64 281 2 SF LIVING,475 SF GARAGE, 625 SF PORCH Plan Check#: PCO4-88 Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Owner: Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $1,045.52 $0.00 $679.59 $0.00 $0.00 $26.15 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 0518 $0.00 $0.00 Meter Size Addl Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $140.00 $2,004.00 $1,814.19 $4,759.66 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $1 54.00 $60.00 $78.50 $0.00 $0.00 $0.00 $0.00 $1,735.00 $20.00 $18,611.61 Total Fees: $1 8,611.61 Total Payments To Date: $1 8,611.61 Balance Due: $0.00 Inspector: Date: Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "feeslexactions" You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified feedexactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which YOU have Dreviouslv been aiven a NOTICE similar to this. or as to which the statute of limitations has Dreviouslv otherwise exoired. City of Carlsbad Bldg For: 05/02/2005 Permit# CB043033 Title: HEATHER CT8 BRESSI PHS 1 PLN 1 Inspection Request Description: 2812 SF LIVING,475 SF GARAGE, 625 SF PORCH Type: RESDNTL SubType: SFD Inspector Assignment: RB Job Address: Suite: Locat ion : APPLICANT Owner: Remarks: Total Time: CD 19 29 Phone: 7605356490 2719 BRESSI RANCH WY Lot 187 GREYSTONE HOMES GREYSTONE HOMES INC Requested By: KEVIN Entered By: KAREN Description Act Comment Final Structural Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRsKVs Date 04/28/2005 04/25/2005 04/07/2005 04/05/2005 02/22/2005 02/16/2005 02/08/2005 01 /25/2005 01/18/2005 01/14/2005 0111 1/2005 01 /07/2005 01/07/2005 11/03/2004 1011 512004 09/21/2004 Inspection History Description 89 Final Combo 89 Final Combo 39 Final Electrical 39 Final Electrical 82 Drywall/Ext LatNGas Test 16 Insulation 84 RoughCombo 13 Shear PanelsIHDs 15 RoofIReroof 15 RoofIReroof 15 RoofIReroof 13 Shear PanelslHD's 15 RoofIReroof 81 Underground Combo 81 Underground Combo 21 UndergroundIUnder Floor Act co co AP NR AP AP AP AP AP NS NS NS NS AP NR AP lnsp Comments BN RELEASE GAS RB EMR RB RB RB RB RB RB RB ROLL TO TUES RB TOOWET RB RAlM RB RB RB RB JM FINAL OK - NEED ENGINEERING FINAL APPROVAL MISSING SETBACK CERTS & HARDWARE NOT PER PLAN