HomeMy WebLinkAbout2720 LOKER AVE W; J; CB152218; Permit,, City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
08-19-2015 Commercial/Industrial Permit Permit No: CB152218
Building Inspection Request Line (760) 602-2725
Job Address: 2720 LOKER AV WEST CBADSt J
Permit Type: Tl Sub Type: IN DUST Status: ISSUED
Applied: 07/15/2015
Entered By: JMA
Parcel No: 2090812800 · Lot#: 0
Valuation: $4,158.00 Construction Type: 5B
Occupancy Group: Reference# Plan Approved: 08/19/2015
Issued: 08/19/2015
lnsp·ect Area
Project Title: QUALITY NETWORK: 96 SF Tl /
SAME USE
Applicant:
INNOVATIVE TENANT IMPROVEMENTS INC
9195 CHESAPEAKE DR
SAN DfEGO CA 92123
858 513-1167
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Building Permit Fee
Plan Check Discount
Strong Motion Fee
Park fee
LFM Fee
Bridge Fee
BTD#2 Fee
BTD#3 Fee.
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Site
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Fire Expedidted Plan Review
$70.24
$0.00
$49.17
$0.00
$0.00
$1.16
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1.00
$0.00
Total Fees: $263.34 Total Payments To Date:
Plan Check #:
Owner:
FENTON H G COMPANY
C/0 H G FENTON CO
7577 MISSION VALLEY RD#200
SAN DIEGO CA 92108
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License 1ax (3104193)
License tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee '(4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
Green Bldg Standards Plan Chk
TOTAL PERMIT FEES
$263.34 Balance Due:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$51.00
$46.00
$44.77
$0.00
$0.00
$0.00
$0.00
??
??
$263.34
$0.00
Inspector:
FINAL APPROVAL
Date: 1 ~/'-'/~1_£ Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred.to as "fees/exactions." You have 90 days from the date this permit was issued·to protest imposition of these fioes/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure wilrbar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
~ Plan Check No.~ { S -Z.?J ~ « .. ~ Building Permit Application . -
Est. Value t)Y~ ·I I ~q .oo ~ CITY OF 760-602-2717 / 271812719 I
Plan Ck. Deposit CARLSBAD Fax 760-602-8558
Date 7/i.<f,-.(' lswPPP www.carlsbc1dca.gov
. -
JOB ADDRESS. SUITE#/SPACE#/UNIT#
rPN 209 272Q Loker Ave., #J, Carlsbad, CA 92010 #J -081 -29 -00
CT/PROJECT# -ILOT# I PHASE# I# OF UNITS I# BEDR;MS
,. # BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP
.Quality Network Components
DESCRIPTION OF WORK: Include Square Feet of Aff~c~d Area(s)
q0sr · Tenant Improvement
EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) l DECKS (SF) FIREPLACE J AIR CONDITIONING l FIRE SPRINKLERS
Commercial , Commercial NA NA NA YESO NofZ] YES[{]NoO YES[{JNoO
·APPLICANT NAME (Primary Contact) Innovative Tenant Improvements APPLICA_NT NAME (Secondary Contact) N/A
ADDRESS 9195 Chesapeake Drive,
ADDRESS
CITY STATE / CITY STATE ZIP
' '
San DieAO CA 92123
PHONE IFAX 8s.i-s14.4300
PHONE 'FAX 858-513-1167
EMAIL tony@i.nnovativ~ti.com EMAIL
PROPERTY'OWNER NAME HG Fenton Property Company CONTRACTOR BUS. NAME Innovative Tenant Improvements
ADDRESS -ADDRESS
7577 Mission Valley Road 9195 Chesapeake Drive
CITY STATE ZIP CITY STATE ZIP
San Di_eAO CA 92108 San Dieao CA 92123
PHONE PHONE
619-400•0123 (AX 619-400-0111 858-513-1167 I FAX 858-87 4-4300
EMAIL EMAIL
brenda@hgfenton.com tony@innovativeti.com
ARCH/DESIGNER NAME & ADDRESS ISTATELIC. # STATELIC.# !CLASS B I CITY BUS. LIB 1230541 N/A NA 906968
(Sec, 7031.5 Business and Profes~ions Code: Any Cij:y or Cqun_ty which requires a permit to_cpnstruct, alter, improve, qemol1sh.or repair any structure, p_rror t9 its 1ss~ance, also re!J~ires the applicant for such permit to file a-s1gnecf statement tnat he 1s licensed pursuant to the prov1s1ons of the Contractor·s License.Law !Chapter 9, commending w1th.Sect1on 7000 of D1v1s1on 3 of the Business and Professions Code} or that he is exempt.therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit-subjects the applicant to a civil penalty of not more th~n five hundred dollars ($500}).
'f ~!K~iuci <,, ', ,
Workers' Compen~atlon Declaration: I hereby affinn.under penalty of perjury one of the to/towing declarations: D I have and' will maintain a certificate of consent lo self-Insure for workers' compensation as provided by SElCtlon 3700 of the Labor Code, for the perfonnance of the work for which this pennit is issued.
lZ] I have· and will maintain workers' compensation, as required by-Section 3700 of the Labor Code, for the performance of the work for which this pennit is issued. My workers' compensation insurance carrier and policy
number are: Insurance Co. The Zenith Polley No. 2071877004 Expiration Date 12/31/2015
This secllon need not be completed if the pennit is for one hundred dollars ($100) or less. ·D C:ertificate of Exemption: I certify that In the perfonnance of the work for which this pennit Is Issued, I shall not employ-any.person In any manner so as to become subject to the Workers' Compensation Laws of
California. WARNIN~: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employerio criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, d . ages s r • f lion 3706 of. the Labor code, interest and attorney's fees. ·
J!S CONTRACTOR SIGNATURE
:·:¢fuiw
I hereby affinn that I afn exempt from Contractor's License Law for the following reason: ·D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not Intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through.his own employees, provided that such improvements are not Intended or offered for
sale .. lf, however, the building or improvement Is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). D I, as owner of-the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who·bullds or Improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
D I am exempt under Section ____ .Business and Professions Code for this reason:
1.1 personally plan to provide.the major labor and materials for construction of the proposed property improvement. 0Yes 0No
2. I (have/ liave not),signed an application for a building permit for the proposed work. ·
3. I have contracted with the following person (finn) to provide the proposed construc_tion (include name address I phone/ contractors' license number):
4. I-plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address/ phone I contractors' license number):
5. I will-provide some of the work, but I have contracted (hired) the following persons to.provide the work indicated (include name I address/ phone/ type of work}:
J!S PR0PERT.Y OWNER SIGNATURE DAGENT DATE
Is the applicant or fut_ure building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevenllon program under Se,tlons 25505, 25533 or 25534 of the
Presley-Tanner .. Hazaraous Substance Account Act? Yes No ,
Is the applicant or future building' occ~pant required to obtain a permit from the air pollullon control dlslrlcl or air quallly management district? Yes No
Is the fac/llty lo be constructed within 1,000 feet of the outer boundary of a school site? Yes No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UN~ESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLL)TION CONTROL DISTRICT.
•,""'
Lender's Address 081
' ,,,,:)'"''''-":'
I certify that I have read the application and statethattheabove lnfonnatlon Is correct and that the lnfonnatlon on the plans Is accuf!!te, I agree to comply with all City ordinances and State laws relating to bulldlng construction.
I hereby authorize representative of the Cily of Carlsbad to enter upon the above mentkmed property for Inspection purposes. t ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories In height. /
EXPIRATION: Every permit Issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void If the Icing or work authorized by such permit is not commenced within
180 days from the date of such permit or if building or work authorized by such permit is suspended or abandoned at any lime after the work I . · men~ a period of 180 days (Section 106.4.4 Uniform Building Code).
fE5 APPLICANT'S SIGNATURE ;...,_.lr::=:ii-::f-~~ DATE / ~ °\ -ts-
STOP: THIS SECTION NOT REQUIR FOR BUILDING PERMIT ISSU CE.
Complete the following ONLY if a Certificate f Occupancy will be requested final inspection.
Tenant Improvement
\le., #J, Carlsbad. CA 92010
Inspection List
Permit#: CB152218 Type: Tl
Date Inspection Item
09/09/2015 89 Final Combo
09/09/2015 89 Final Combo
09/08/2015 89 Final Combo
09/08/2015 89 Final Combo
08/25/~015 17 Interior LathlDrywall
08/21/2015 21 Underground/Under Floor
08/21/2015 24 RoughfT6pout
08/21/2015 31 Underground/Conduit-Wlrin
Thursday, September 10, 2015
INDUST
Inspector Act
RI
PB AP
RI
PB NR
PB AP
PB AP
PB AP
PB AP
QUALITY NETWORK: 96 SF Tl /
SAME USE
Comments
COF
COF
Page 1 of 1
POOR . .
QUALITY
j.. .
!: ~ . r .
. , ,! .
0'RIGINAL S
coo,:• BUILDING
.. _·.'_:_;_._-.·_:·_.·.'._· . . I.~. ~OMRX-PiUi'tolil'. : .. ···· · .·o !ltour· . t:i:wAU.J>~it&:
J . ._ < jUO 1llt.PN18.S .
. ; ·. . .. tiFPO~.tiii~. · t._ . . #11 -coUllii(. . . . . . . f. . . ' . . ' ' ~'""-~ .. . L . '_. '. ·~· ,iu,.EM¥t. J:?'non a:csUMa · t , • . · ~15 ,~Qf$tlU.tlfl!C~ , · · . ·
J. : . :,:u. b:t.:-$tt~:,~m-: · f : .. . ·.:1f1f •1HSU«.Affl>N · '-. ; J . fli, . . ... it l.AT>fi #8.t ·UNDERQROUIID.f1:t;U,U:U,J:·> .
· ! ·. #17 .' . -~-~~-~~·t1t;i;·· _1:,,;;·il'rlWl;:i;···i;;·· ;;-r.:· _'.'"". -:-".'""""fv::$~~rt~--,-~. ·'"'.' ... t_ -i.«82~-~DR'M~--Ml;jr.. ~ .. m~.u.~-.TH~-~i ,n.u~· =;_ 1[~.-.. ;1Sft;:ut=··.1i:1;:::.~::--_ -: _ _.1~~-;,..:;:...:.;..:..~.:.,;;_;_.,..-;,;,·~~;i . J .. :.: __ jSi P,ol)LiJ;W .. •011101m« . m. ROO~,$Jt~l1NG,:m;1_~~R(;i,J5) .. :
.-_.t · .. . . .ffl PJ!.EP.~~. . "'4\ flWi~iP~1teo~JO;t1;c~-... 3;4;~, .:,
, J : · : ,:;19 JjNt'l-•"". m.;£;=m= '-----_.),. '---~-l!!, N•a;:m,~.4,i~L. • · · · . , · . .: · ·--::g-, . · , . -. : Im · ·,_or· n,. FINAL;OCCU~N.fcyi~~9,~f.~,t··
· r ,. • :1-n · o.sewd'ti:lv.co o:,v®
.. i . :.~i .UKQUGit~fu'N11QW~.o·Ma.
. . ')i:4 . tof1,1ur. 1:1,W-•O W'l'I
: . ··. hr' .ni:ai,s~WER:·Mlt · . . · ·· • ...,._ · -cfmnsr dW·-""8l ·
. ·' .. ··.i.'_.· .tit Wlltt:-MU~-
, '' liii .. $0Wl: ili.ArtR·
·i. t _.~ . ...:::,~60$~···~· .!:.-'le!..~~: ·.;.:: ~t;::::i.PH::::::..· _.;.....;...,.......,.+------...,,...----....P~~..;._~~~~
. i .. H.O'i ~WARN.I.HG..
_f . . . . -Ji~l'iet.O.~YIOl.4~'. l ·. '.. ~ff~:t.0~· -.:.!·-YER~· ~~BAL~W~AA~lf~IN~G·:_· ·--__ -1,..._.._...;.,.......;.,1.-,--,..,.-----,-.-.~.,....;.i~=.:.:..............,.;..r.,-:---!-:-:-:-T*~:p,.-..,..,..,..I;J;,.:..:.~~~·
1 -'. '; ~ I . · · "o/.11:.wi
i ~' ~ l ' ,,,,_....._-;..;,;_,,.,
John Le Vey ===
EsGil Corporation
In <Partnersliip witli (j(Jvernment for (}Jui{ainiJ Safety
DATE: 08/17/2015
JURISDICTION: Carlsbad
PLAN CHECK NO.: cblS-2218
PROJECT ADDRESS: 2720 Loker Ave. Suite J
PROJECT NAME: Quality Network Components
SET: II
D~LICANT A JURIS.
D PLAN REVIEWER
D FILE
~ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the che·ck list has been sent to:
~ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
D EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email:
Mail Telephone Fax In Person
~ REMARKS: accessibility comments resolved by city staff
By: John Le Vey
EsGil Corporation
D GA D EJ D MB D PC
Enclosures:
08/11/2015
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In IPartnersliip witli qovemment for <Bui{aing Safety
DATE: 07/24/2015
JURISDICTION: Carlsbad
PLAN CHECK NO.: cblS-2218
PROJECT ADDRESS: 2720 Loker Ave. Suite J
PROJECT NAME: Quality Network Components
SET; I
D.)tPPLICANT
~JURIS.
D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
1:8:) The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
D EsGil Corporation staff did not advise the applicant that the plan check has been completed.
~ EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: innovative Tenant Improvements Telephone#: 858-513-1167
~ate cin cted: *~:l'Ar-
't,Mail ~leP.h~ Fax In Person
D REMAR .--~
By: John Le Vey
EsGil Corporation
D GA D EJ D MB D PC
Email: tony@innovativeti.com
Enclosures:
07/20/2015
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
' Carlsbad cb15-22l8
07/24/2015
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: cb15-2218
OCCUPANCY: B
TYPE OF CONSTRUCTION: IIIB
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Yes
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 07/15/2015
DATE INITIAL PLAN REVIEW
COMPLETED: 07/24/2015
FOREWORD (PLEASE READ):
JURISDICTION: Carlsbad
USE: office
ACTUALAREA: 95
STORIES: 1
HEIGHT: unnkown
OCCUPANT LOAD: unknown
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 07/20/2015
PLAN REVIEWER: John Le Vey
This plan review is limited to the technical requirements contained in the· California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be requir~d prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 lhternational Building· Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please_ note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
Carlsbad cblS-2218
07/24/2015
Please make all corrections, as requested in the correction list. Submit FOUR new
complete sets of plans for commercial/industrial projects (THREE sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. D~liver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
1. Glazing in the following locations should be of safety glazing material in
accordance With Section 2406.4 (see exceptions):
Fixed or operable panels adjacent to a door where the nearest vertical edge of
the glazing is within a 24-inch arc of either vertical edge of the door in a closed
position and where the bottom exposed edge of the glazing is less than 60
inches above the walking surface. The new door at the Exit analysis Please
provide an exit analysis plan (may be 8 1/2" x 11" or any convenient size). Show
in this analysis the occupant load of each area, the general exit flow patterns (by
using arrows), accumulated occupant loads and required exit widths. Section
107.2.3
Advisory Note : When alterations, structural repairs or additions are made to an
existing building, that building, or portion of the building affected, is required to
comply with all of the following requirements, per Section 11 B-202.4:
a) The area of specific alteration, repair or addition must comply as "new"
construction.
b) A primary entrance to the building and the primary path of travel to the
altered area, must be shown to comply with all accessibility features.
• The path of travel shall include the existing parking.
c) Existing toilet and bathing facilities that serve the remodeled area must be
shown to comply with all accessibility features.
d) Please address the following comments that are the result of the
alterations.
2. Please explain the concrete being replaced at the suite entry area what the slope
will be etc.
Carlsbad cblS-2218
07/24/2015
3. It is obvious from the plans the restroom servicing the tenant improvement is not
disabled accessible, please provide a dimensioned restroom plans showing the
restroom to be accessible compliant.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of c.orrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate: 0 Yes O No
The jurisdiction has contracted with l=sgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact John Le Vey at
Esgil Corporation. Thank you.
., .. ,.
Carlsbad cblS-2218
07/24/2015
[DO NOT PAY-THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad
PREPARED BY: John Le Vey
PLAN CHECK NO.: cblS-2218
DATE: 07/24/2015
BUILDING ADDRESS: 2720 Loker Ave. Suite J
BUILDING OCCUPANCY: B
BUILDING AREA Valuation Reg.
PORTION ( Sq. Ft.) Multiplier Mod.
Tl oer citv
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Bldg. Permit Fee by Ordinance ..-1
Plan Check Fee by Ordinance •I
Type of ~eview: 0 Complete Review
VALUE
D Structural Only
D Repetitive Fee
3Repeats
D Other
D Hourly
EsGil Fee ----IHr.@•
Comments: Sheet of
($)
4,159
4,159
$70.241
$45.661
$39.331
macvalue.doc +
.. 4; ~·,-.-------------------------------------------------;
«~1~ ,,,p.> ' -1/ ~ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANS MITT AL
DATE:07/22/2015 PROJECT NAME: 96SFTI
PLAN CHECK NO: 1 SET#: 1 ADDRESS: 2720 LOKER AVE STE_J
VALUATION: $4159
Community & Economic
Development 0epartment
1635 Faraday Avenue
Carlsbad CA 92008
www.carlsbadca.gov
PROJECT iD: CB152218
APN: 209'0812900
This plan check review is complete and has been APPROVED by the ENGINEERING
Division.
By: VALRAY NELSON
A Final Inspection by the ENGINEERING Division is re.quired Yes I No
This plan check review is NOT COMPLETE. l'tems missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: TONY@INNOVATIVETI.COM
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
---... " ---.
PLANNING ENGINEERING -. ,FIRI; .PR,~VENTION .
760-602-4610 760-602-4750 .. -· 760;602-4665.' :
·--'
. . -· --,-" ··--.
·cnris Sexton Kathleen Lawrence Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov
Gina Ruiz Linda Ontiveros Cindy Wong
160-602-4615 --760-602-2773 760-602-4662
Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov
---,1· ValRay Marshall Dominic Fieri ;
760-602-2741 760-602~4664
Va1Ray.Marsha11@carlsbadca.gov Dominic.Fieri@carlsbadca.gov
Remarks:
.,. ...... ~----------------------....... ----------------------------;,
«1 BUILDING PLANCHECK Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.tarlsbadca.gov
¥ CITY OF
CARLSBAD
. CHECKLIST
QUICK-CHECK/APPROVAL
ENGINEERING Plan Check for C8152218
Project Address: 2720 LOKER AVE STE J
Project Description: 96 SF Tl PLUS HVAC
ENGINEERING Contact : VALRA Y NELSON
Phone: 760-602-27 41
0 RESIDENTIAL INTERIOR
:=J RESIDENTIAL ADDITION MINOR
(<$20,000.00)
0 CARLSBAD PREMIER OUTLETS
O0THER: GYM
Date:07/22/2015
APN:2090812900
Valuation: $4159
Email: VALRA Y .MARSHALL@CARLSBADCA.GOV
Fax: 760-602-1052
[l]TENANTIMPROVEMENT
LJ PLAZA CAMINO REAL
0 COMPLETE OFFICE BUILDING
r •Ill~ j •~.•~a•-· 0 O -· • • -• • -•. ----• • -a~ --•·• -I• -• • -I a -a• -• • -a•~•• -• I 1
. · OFFICIAL USE ONLY
· ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
I
r .
BY: VALRAY NELSON
REMARKS: NO FEES ASSESSED
DATE:07/22/2015
Notification of Engineering APPROVAL has been sent.to T0NY@INN0VATIVETI.C0M
via VALRAY.N.ELSON@CARLSBAOCA.G0V on ,07/22/2015
·,
I --··-··-··-··-··-··-··-·· ........ ···--···--··--··-··-··-··-··-··-··---··
J:>36 Page 1 of 1 REV 4/30/11
.
«~ ~ CITY OF
CARLSBAD
PLANNING DIVISION
BUILDI.NG PLAN CHECK
APPROVAL
P-29
DATE: 7/20/15 PROJECT NAME: T.I. PROJECT ID:
Development Services
Planning Division
1635 Faraday Avenue
(760} 602-4610
www.carlsbadca.2ov
PLAN CHECK NO: CB152218 SET#: ADDRESS: 2720 LOKER AV W #J APN:
IZ! This plan check review is complete and has been APPROVED by the PLANNING
Division. ·
By: GINA RUIZ
A Final Inspection by the PLANNING Division is required D Yes [ZI No
You may a/so have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should include corrections from all divisions.
D This plan check review i.s NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check APPROVAL has been sent to: TONY@INNOVATIVETI.COM
For questions or clarifications on the attached checklist please contactthe following reviewer as marked:
.. . ' --... .. ..
PLANNING .. ENGlNEf;RING ·. :FIRE. PREVENTI.ON · ·· '. ' . ...
' . . . 1so:.G02-4e10 760'-602-2750 7604502-4665: . ' . .. .. : _. .. .. . -·· ..
D Chris Sexton D Chris Glassen D Greg Ryan
760-602-4624 760-602-2784 760-602-4663
Chris.Sexton@carlsbadca.gov Christogher.Glassen@carlsbadca.gov Gregor}:'..Ryan@carlsbadca.gov
~ Gina Ruiz D ValRay Marshall D Cindy Wong
760-602-4675 760-602-27 41 760-602-4662
Gina.Ruiz@carlsbadca.gov ValRay:.Marshall@carlsbadca.gov Cy:nthia.Wong@carlsbadca.gov
D D Linda Ontiveros D Dominic Fieri
760-602-2773 760-602-4664
Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov
Remarks:
' __ ,, -< £
«~<JP? ~ CITY OF
CARLSBAD
PLAN CHEakDG~ DEPT CQJ!Xunity&Economic
REVIEW Development Department
· 1635 Faraday Avenue
TRANSMITTAL Carlsbad CA 92008
www.carlsbadca.gov
DATE: 7-29-15 PROJECT NAME: Quallty Network Components PROJECT ID:
PLAN CHECK NO: CB152218 SET#: 3 ADDRESS: 2720 Loker Ave. #J APN:
~ This plan check review is complete and has been APPROVED by the Fire Division.
By: D. Flerl
A Final Inspection by the Fire Division is required IZI Yes D No
D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance of a building permit.
Resubmitted plans should Include corrections from all -divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
. -_, -.
PLANNING ENGINEERING FIRE. PREVENTION
760-602-4610 760-602-2750 760,,602-4665
. -.
D Chris Sexton D Kathleen Lawrence D Greg Ryan
760-602-4624 760-602-27 41 760-602-4663
Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.R)!an@carlsbadca.gov
D Gina Ru·iz D Linda Ontiveros D Cindy Wong
760-602-4675 760-602-2773 760-602-4662
Gina.Ruiz@carl&badca.gov Linda.Ontiveros@carlsbadca.gov C)!nthia.Wong@carlsbadca.gov
D D [Z] Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Remarks:
II . . .
Carlsbad Fire Department BLDG. DEPT COPY
Plan Review R~quirements Category: Tl , INDlJST
Date of Report: 07~29"2015 Reviewed by: --4--=------· ____ _
Name:
Address:
INNOVATIVE TENANT IMPROVEMENTS INC
9195 CHESAPEAKE DR
SANDIEGQ CA
92123
Permit#: CB152218
Job Name: QUALITY NETWORK; 96 SF TI/
Job Address: 2720 LOKER AV WEST CBAD St: J
Couditions:-"-
Cond: CON0008448
[MET]
~~~ ~~~
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT.
THlS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. I
Entry: 07/29/2015 By: df Action: AP
{Cityof
Carlsbad
U REASONABLE
HARDSHIP EXCEPTION
TO· DISABLED ACCESS
REQUIREMENTS
8-30
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Permit# ~ \~-Z. 2.\~
Telephone 6 \ 9 -t\ 00 .. 6 , 23
It is request that the above named project be granted an exception from the accessibility requirements of the 2013 California Building
Code, as s eclficall noted below:
A. Section ltB-202.4 General Exception: Applicable to existing building where the construction cost at
this tenant space over the last three years does not exceed the valuation threshold amount. The spedfic
accessibility features that create a hardship may be exempted but not all the accessibility features. The
area of alteration Itself ma not be exem ted.
· Access features Item
Provide,de.rcription below
1. Path of travel to entrance
2. ,Entrance
3. Pa\h of travel In bldg. to area of remodel
4. Elevator
· 5. Sanitary facilities
6. ·Public Telephones if provided
. 7. Drinking Fbu'ntalns if provided
8, Other (Parking, signage, etc.) Spedfy
Does this feature meet the
latest edition of Title 24?
Valuation Threshold Amount
$147,863.00
If so, what Is the cost of making
feature accessible?
Attach documentation
-!:!?-$
$·
$
$
$
$
$
$
fPle,,se oro1•(de tloc11111entntlo111 i.e.. sig11ed co1itl'qcts. fi11· nil co11stmctio11 costs listed 1
Total cost of·access features. provided (A) _,$'-''1...___,'-'---,--~":l-----l
Total cost of construction of this p.roject and all other work performed $
over the last 3 years ln·thls tenant space (B) -=-..... .....,~=-.=-------l
Alterations performed. over the.last three years in this tenant space. Include in total valuation B above unless 20% of valuation of
. individual remodel has already beeh expended on access feature (provide docqm!;?ntation).
Permit Number Date Description Valuation
.B-29 Page 1 of:2 Rev. 02/14
~I
B. Specific Exceptions Do not use this portior,. ifpartA has been completed
This part is generalry used for remodels exceeding the threshold amount and where Title 24 provides an exemption from specific
accessibility features.
Exceptions Requested Code Section/Exception
Total
Descriptio~
'The cost of all construction contemplated is $
The access feature increases t4e cost of constructi'on by percentage of construction cost
. Cost of Making Features Accessible
Attach Documentation
$
$
$
$
The Impact on financial feasibility of the project, if the requested exception is not approved is
The facility is used by the general public. for the purpose of
rovkJed (n ormation listed above
State
CPr
Request Granted
CJ General Unreasonable Hardship Exception request is approved based on Section 11 B-202.4-of the California Building Code Access
features listed In part A of this form shall be provided as part of this permit.
[J Specific Exception(s) request is approval based on Section(s) ____ ~--· All other·access features shall be provided as
specified In the California Building Cocle.
v,Jl~ $?
Name of enforcingtfc;<!l -Please print ·signature of enforcing official
8-29 Page2 of2 Rev. 02/14
•. pocuSign Envelope ID: 32E986C7-8F61-4815-929C-AA2085ED9644
Project Location:
Tenant Name:
Project Description:
EXHIBITE
Authorization to Construct
2720 Loker Ave W, Suite J
Quality Network Components
Add wall in open area. Finishes to match existing. SV color TBD.
(330}
The project price is submitted in accordance with Section 2.2.5 of the Master Agreement Between Owner
and Contractor for Tenant Improvement Work dated August 1, 2011.
Documents: Per the documents provided in this exhibit.
Pricing Dated: May 7, 2015, revised May 22, 2015, Proposal 2, and attached to this exhibit.
Project Price: $3~,2:~5.35 + Alt 1: $~ Alt 2: $10,143.40) AR# 330-2720J
To :pedite paymenia~~ ;!±;>!R~~ces ~
Commencement Date: June 29, 2015
Completion Date: August 21, 2015 September 3, 2015
Confirm Completion Date Brenda Wright
Project Price and Scope of Work may be changed only by written change order signed by H.G. Fenton
Company in accordance with Section 6 of the Master Agreement da~ed August 1, 2011. Project Price
shall remain in effect for a period of six months from date of this Authorization to Construct.
Approved and Authorized to Construct by:
owner:
H.G. FENTON PROPERTY COMPANY,
a California corporation
By: H.G. Fenton-Company
Authorized Agent
Bill Hooper
Portfolio Manager
r-:DocuSlgned by:
~~~ Michael P. Neal
President and CEO
7/2/2015
7/2/2015
330 -IT! -2720 Loker Ave Ste J -Quality Network Wall -ATC -2015.06.29
Rev. 04.02.2013
Submitted by:
Contractor:
INNOVATIVE TENANT IMPROVEMENTS,
a California corporation
(!DocuSlgned by:
By !°,:.~==~
Jon Jackson, CEO
~DocuSlgned by:
By !::~~r!:!!'P
Tony Caliger, CFO
6/25/2015
6/25/2015
Note: Two (2) Officer's signatures are required or a Corporate Resolution
stating that One (1) Officer is authorized to sign on behalf of the
corporation must be attached to this contract.
E-1
I NN,OV.ATl~V£ 'TENAN'T
IMPROV'EMENT'S,, I NC ..
Unreasonable Hardship Exception to Disabled Access Requirements
Calculation to show 20% allowance to be used for path of travel improvements
Project Name: Est. #2
Project address: 2720 Loker Ave. W. #J, Carlsbad, CA 92008
Total cost of project: $
Less:
Dumpsters $
Overhead & Profit $
Paint $
Carpet $
Plumbing Permit $
Plumbing Engineering $
Mechanical Permit $
T-24 Building Envelope $
Electrical Permit $
T-24 Electrical Engineering $
Building Permit $
Structural Engineering $
Subtotal: $
20% of Subtotal: $
28,829.40
375.00
2,620.86
301.50
5,700.24
192.00
186.00
1,200.00
1,500.00
16,753.80
3,350.76
20% allowance to be allocated for path of travel improvements:
9195 Chesapeake Drive, San Diego, CA 92123
www.lnnovativeti.com
$ 3,350.76
Ph# (858) 513-1167 Fax# (858) 874-4300
Lie. # 906968
,1'
Innovative Tenant Improvements
9195 Chesapeake Drive
San Diego, CA 92123
Phone (858) 513-1167
Fax (858) 874-4300
Lie.# 906968
f. , . , . ~, , __ J Gray shading signifies a Non-unit cost line item I O -2,501 Square Foot
PROJECT:
Proposal # 12720 Loker Ave. #J
2 lcarlsbad, CA 92010
Year Built: 1986
OWNER: HG Fenton Company
Contact: Jon Dodge
PHONE: 619-400-0138
Proposal Date: 5/7/2015
Revised Date: 5/22/2015
Estimated by: Jon Jackson
Plan Date: May 1, 2015
FAX: 619-400-0111 Space Planner: Avent Design
CSI DESCRIPTIONS TOTAL UNIT UNIT SUB
CODES QTY PRICE TOTAL TOTAL $/SF Percentage
..... D ... 1--V-. 1--G""'E ... NO!'E ... RAL-c""'o"'"N ... D ... IO!'TI ... O'""N"'"'s-: ---------------------------i
1000 Superintendent/Construction cleanup
0-2,500sf projects this cost is to be
set on a case by case basis / 6% of
total
DIV 2 SITE WORK
2000
Minimum trash removal -In lieu of
dumpsters
2100 DEMOLITION:
Interior partitions (8'-0" to 12'-0" High)
Demo Flooring & base -direct glue
down (no carpet pad)
Remove carpet adhesive after carpet
has been removed to prepare
concrete for new hard-surface flooring
Demo VCT or Sheet Vinyl & glue on
slab (scrape concrete slab to remove
glue)
:,;' :; ··· i: ·,;,:Remove S-10 window from existing
J :\:~ !location -to be relocated
I:{'.',, · : . :~:·.Remove drywall from wet wall
Iv .. ~ ,',:--\,-;open T-bar ceiling at fur wall for
1
'':, '" • : rollup door
2200 Clean up -Final (office & w.house)
DIV 3 CONCRETE
3000
"".'"'·: , , ' ,J20% Hardship allowance for (ADA)
;,,, , _; ,· , .. . . , accessibility path of travel
DIV. 6 CARPENTRY
6000
LT.I. Inc.
1,700
11
1,650
460
50
1
1
1
1,700
I I
t~·---.:::,...-:1
$1,112.48
Section Total: I $1,112.48 0.654 6.000%
$300.00 LS $300.00
Section Total: I.-----,$-3-00-.-00 ___ 0.-1--76,,.-i 1.618%
$12.00 LF
$0.37 SF
$0.75 SF
$0.75 SF
$50.00 LS
$45.00 LS
$60.00 LS
$0.16 SF
$2,890.88 Allow
1 6f6
$132.00
$610.50
'$345.00
$37.50
$50.00
$45.00
$60.00
Section Total: I
$272.00
Section Total: I
$0.00
Section Total: I
$1,280.00 0.753 6.904%
$272.00 0.160 1.467%
$0.00 0.000 0.000%
8/4/20151:14 PM
··~ ·~ ~
Backing for wall hung cabinets or
shelving 12 $5.00 SF $60.00
Section Total: $60.00 0.035 0.324%
MILLWORK:
6100 See Price Alternate #2
Section Total: $0.00 0.000 0.000%
DIV? THERMAUMOISTURE
PROTECTION:
7000
Roofing
Section Total: $0.00 0.000 0.000%
7100 Insulation:
Section Total: $0.00 0.000 0.000%
DIVS DOORS/WINDOWS
8000
Doors/Frames/Hardware:
New 3'0"x7'0" H.B. S.C. Legacy
Walnut Door 1 $410.00 EA $410.00
Relocate existing and good condition
3'0''x7'0" H.B.S.C. (Non-Rated) 1 $128.00 EA $128.00
Section Total: $538.00 0.316 2.902%
8100 Glazing:
Tempered interior glass in clip sash
(S-10) frames 16 $15.50 SF $248.00
Relocate existing 4'0''x4'0" S-10 clip-
sash window 1 $180.00 LS $180.00
Section Total: $428.00 0.252 2.308%
8200 Window Coverings:
Building Standard -3 1/2" Vertical
Blinds · 207 $2.05 SF 424.35
Add installation cost for orders less
than 300-Square Feet 1 $75.00 LS 75.00
Section Total: $499.35 0.294 2.693%
DIV9 FINISHES
9000
Drywall/Framing:
Int. Partition 8' 6" to 9' O" High -(non-
rated) 23 $43.50 LS $1,000.50
Misc. Drywall Patch & Repair at rollup
door 4 $60.00 Hr. $240.00
Hang drywall on existing framing -wet
wall 60 $1.25 SF $75.00
Cut-in new Door/Window rough
opening into an existing wall 1 $100.00 EA $100.00
Frame & Finish cased opening or
window opening 1 $191.00 EA $191.00
In-fill existing Door/Window rough
opening 1 $176.00 EA $176.00
Section Total: $1,782.50 1.049 9.614%
9100 T-Bar/Acoustic:
I.T.I. Inc. 2of6 8/4/20151:14 PM
. t
New Armstrong #2767D ceiling tiles
to replace one damaged during
removal & replacement -Note: this
line combines with line below where
labor already exists (for a total of
$1.20sf) 100 $0.64 SF $64.00
· · Cut-in existing tegular ceiling tiles
over new wall 1 $120.00 LS $120.00
Remove & Re-install existing ceiling
tiles to provide access for work above
eeiling 300 $0.56 SF $168.00
1·'"'.,;:;d7(::r;:::::1create soffit over rollup door for
',,•. ,/I,{.',"\~~ • ~,, ,\ ",-,,:1 1 $850.00 LS $850.00 ;.;tsitl~;,1,J,;::',J conditioned envelope
Section Total: $1,202.00 0.707 6.483%
9200 Floor Covering:
Shaw -Philadelphia (Speak-Out)
54445-45100, 54445-45301, 54445-
45501 & 54445-45500 1,280 $2.22 SF $2,841.60
Sheet Vinyl:
Armstrong Corton flat lay 81 $3.17 SF $256.77
Self Cove: (Material & Labor) 28 $7.34 LF $205.52
Heat Weld (Rod & tabor) 8 $3.00 LF $24.00
4" Burke coved rubber base 395 $1.43 LF $564.85
V.C.T. Armstrong standard Excelon -
Imperial Texture 540 $1.53 SF $826.20
Floor Prep 1 $150.00 LS $150.00
Moisture testing (Minimum 3 needed
up to 3,000sf, then one per 1,000sf
thereafter) 3 $102.00 EA $306.00
Section Total: $5,174.94 3.044 27.911%
9300 Paint
Finish wall (un-occupied space) -
Dunn Edwards "Sparta-Zero" Interior
Velvet finish, "Swiss Coffee" (1-Coat
walls) $0.25 SF $0.00
2-coatwalls 700 $0.45 SF $315.00
Section Total: $315.00 0.185 1.699%
DIV10 SPECIAL TIES.
10000
Section Total: $0.00 0.000 0.000%
DIV21 Fire Protection:
21000
Fire Sprinklers -Modifications to the
heads near the new wall 1 $700.00 SF $700.00
~~Plans and permit ;;:..J~.~t::l 1 $650.00 LS $650.00
'?l",':!'~~Fire Extinguishers 2A 10-BC L~~t.~.,;;;),' -.. 1 $85.00 EA $85.00
Section Total: $1,435.00 0.844 7.740%
DIV22 MECHANICAL
22000
Plumbing: See Price Alternate #2
Section Total: $0.00 0.000 0.000%
DIV23 Heating/Air Conditioning:
23000
I.T.I. Inc. 3of6 8/4/20151:14 PM
t ....
~.:~:,;:~;;:"'.F,:)Relocate registers to be out of the
f '~!Y'J~t-,<', Jway of the new separation wall
;;, l,'.\, ... ,~.:/r:Jl ··\~ ;1, • • • • ½)is';,/ :;Ji] without modifying the ducting, may
$25.00 EA $50.00 r,·,,'./ii•";i '; end up on either side of the new wall 2
Mechanical Permit -$0.00 Allow NIC
Section Total: I $50.00 0.029 0.270%
DIV26 ELECTRICAL
26000
Relocate existing 2x4 Fluorescent
light fixture 1 $77.00 EA $77.00
Re-wire (x06) existing lights to new
switching 6 $45.00 LS $270.00
Motion sensor switch (duaO -for
warehouse 1 $128.00 EA $128.00
Re-feed existing outlet in front office
that will now be under the new
window 1 $95.00 LS $95.00
T-24 Cale's & elect. Drawings -office
area (no new load) -$0.38 SF NIC
Electrical Permit 1 $186.00 Allow $186.00
Section Total: I $756.00 0.445 4.077%
DIV.1 PLANS
1100 Title-24 Building envelope --LS NIC
1200 Draw construction documents --LS By others
1300 Administration fees to prepare &
submit for misc. permits to city 1 130.00 LS $130.00
1400 Building Permit 1 1,500.00 Allow $1,500.00
1500 Plan Copies 1 20.00 LS $20.00
Section Total: I $1,650.00 0.971
SUBTOTAL: $16,855.27 9.915 90.909%
Profit & Overhead -10% $1,685.53 0.991 9.091%
TOTAL ESTIMATE: $18,540.80 10.906 100.000%
EXCLUSIONS:
-Any ADA deficiencies to the building or parking lot that are triggered by this tenant improvement that are
not listed in the scope of work.
-Any local, state and federal code upgrades that are needed that are not a part of this scope of work.
-All work is to be performed during regular business hours.
-Hazardous material detection, removal and disposal is excluded from this proposal if not otherwise
stated (and is limited to the scope as defined) in the above proposal.
-Supply, installation and moving of all tenant furniture, equipment, signage, appliances & furniture
partition systems furniture are excluded from this proposal.
-This proposal is predicated on this contractor's interpretation of plans, project requirements,
project conditions and an agreeable form of contract between the owner and Innovative Tenant
Improvements Inc.
-Innovative Tenant Improvements Inc. has made every effort to follow the "intent" of the space plan.
However, unforeseen and existing conditions not specifically detailed in the bid documents cannot
be taken into account and, therefore, must be excluded from this proposal. This exclusion applies to
all federal, state & city code requirements not detailed as part of the space plan.
-Rework, repair & replacement of existing exterior windows, mullion system & window film is
excluded.
I.T.I. Inc. 4 of6 8/4/20151:14 PM
-Telephone, data cabling, security, security hardware, audio & graphic eye system visual are not
included as part of this proposal.
-Fire sprinkler quote is based on new heads only. Branch line & main line relocations are excluded.
Notes:
No electrical Title-24 upgrades are triggered in this scope of work.
No work is to be performed in the restroom with exception to replacing the sheet vinyl.
It appears that there is a 2-pole 40amp breaker in the panel that is no longer being used, this space will be
used for the new 2-pole 30amp breaker if price alt. #2 is accepted.
Suite has been recently painted throughout, painting will be at effected areas only.
No balance is to be performed on the HVAC system within the suite.
All existing outlets to remain as is, no new to be installed.
lfprice alternate#2 is accepted then an additional $1,750.28 to the ADA Hardship cost.
Below are alternate requests that represent additional work that is not currently included in the overall scope
of work as detailed in the above cost estimate. Please indicate on each of the individual signature lines by:
Signature will represent an authorization to proceed with that specific price alternate. Or If line item is not
desired; indicate with "Declined".
Price alternate #1 -To relocate existing T-stat from front area to rear area;
1.1 -Relocate (x01) T-Stat to back-side of new wall: $
1.2 -patch drywall from old T-stat location: $
102.00
30.00
1.3 -Touch up paint drywall patch: No-Charge
Subtotal: $ 132.00
10% OH&P: $ 13.20
Total Alternate #1: $ 145.20
Signature to accept price alternate #1_X..__ _______________ _
Price alternate #2 -Add a sink and 6If of cabinets in the front of the suite; NOTE: if this is accepted an
additional $1,750.28 also needs to be added to the above ADA Hardship cost.
LT.I. Inc.
2.1 -Add: Plumbing trench $
2.2 -Add: Concrete Patch 40sf @ $22.50sf $
2.3 -Add: Seal new concrete so flooring can be installed over $
2.4 -Add: Trash removal $
2.5-Add: Garbage Disposal $175 & outlet & sw. @$:101.00 $
2.6 -Add: 6If of base and upper cabinets, with countertops @ $345If $
2. 7 -Add: Break sink with rough $
2.8 -Add: (x01) dedicated 20amp 120v GFCI Outlet $
2.9 -Add: lnsta-hot 30amp $
2.10 -Add:30amp 208v circuit for insta-hot $
2.11 -Add: Hang drywall on existing framed wet wall $
2.12 -Add: 4" rubber cove base -1 0lf@ $1.43If $
2.13 -Add: paint -90sf@ $.43sf $
2.14 -Add: Electrical engineering $
2.15 -Add: permit costs for plumbing $
2.16 -Add: wall backing for wall hung cabinets $
2.17 -Add: Supervision $
735.00
900.00
511.00
75.00
276.00
2,070.00
1,845.00
134.00
300.00
340.00
75.00
14.30
38.70
1,200.00
192.00
60.00
455.27
Subtotal:
10% OH&P:
Total Alternate #2:
$ 9,221.27
$ 922.13
$10,143.40
5 of6 8/4/20151:14 PM
t
LT.I. Inc.
Signature to accept price alternate #2_X. ________________ _
Note:
The above cost is derived without plans, a new cost estimate will be needed once construction documents are
prepared and approved by the City of Carlsbad.
6 of6 8/4/20151:14 PM
!
\
! I
·(
I·
! I !
I ....
BillTo
F, J. Brawley Concrete~ Inc.
San Diego, CA 92113-2114
Telephone: 619-231-7778
CA License: CA 353080
lnpovative TemmL Improvements, Inc.
9195 Ch11supcakc .Drive
Sun Diego CA 92i2:~
P.b.No.
PJB 1540
Quantity Descrlplion
f Provide labor and matcriul to complete contract.
v.:f( ~'-l'61; .fiq151..1<6
Due.D?te
7/312015
-~k.. S~\\t < . ,r, 7..,t eris -Su->~(.., 7L[(d -
_, -
..
Thimkyou!
I •
lnvoite
D<;1le Invoice#
7/3/2015 5997
Tenns PROJECT
1540 -lTl 5410 -2720 Lok. ..
Rate Amount
:r 16,740.0() 16,740.00
.. ,-
.
-
Total ~r--
74~
y
\._ ~
~-~ .1 ...... _ ..
FJ Brawley Concrete Inc.
April 13, 2015
Innovative Tenant Improvements
9195 Chesapeake Dr.
San Diego, CA 92123
Tel (858) 513-1167 Fax(858) 874-4300
Attn: Tony
Project: 2720 Loker Ave West suite L
Carlsbad, CA
Contract Proposal
Proposal References
Attached shop drawing dated 4/10/15
Scope of Work
Furnish labor, equip. and materials to construct the following:
1. Saw cut, remove and replace non slope compliant path of travel sidewalks and entry landings.
Price and Terms
Base bld $ 15,240
Standard ITI billing
Inclusions
\
rd subcontract agreement, work schedule, af1d
(a) 2500 psi concrete; (b} fabrication and installation of #3 rebar 24" each way; (b) clean up waste
generated· by our work.
Exclusions
(a) Repair or relocation of buried Irrigation or electrical lines.
11868 National Avenue, San Diego, CA 92113 Tel. 619-231-7778 Fax. 619-231-4778
www.fjbrawleyconcretEl.com
1 of2
!nit.
!nit.==
~-······-· ·------····----------------------------------
, . ·/ ;-··., . ,
F.J ~ Brawley Concrete
619•231•7778 ·• Fax 619°231°4778
. . . I '\. : /.r
\~
l ·1868 NATIONAL AVl;NUE O SAN
"
0
,.
·:' ,:, '_ ' ' :
..• i.:~ •i ·. ·1 "'·····_., ' ' '
' ',
,..._"'IE'· ,:'~'-'
,·~ , '.-''
' 1 ,,· ,-··r4 · '., l:~.:,: ·:: ', : :, ·:· ' ':
' ' .
. eta, ,---,,,-
.. ~
; :.:: ~~
.,., ... ...,... ~ -
&-
~ ~ CITY OF
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov CARLSBAD B-18
Project Address: Permit No.:
Information provided below refers to workbeing done,on the above mentioned permit only.
This form must be completed and returned to the Building Division before the permit can be issued.
· Building Dept. Fax: (760) 602-8558
Number of new or relocated fixtures, traps, or floor drains ....................................................... -l-
New building sewer line? ......................................................................................... Yes __ No~
Number of new roof drains? ............................................................................................................... ~
Install/alter water line? ......................................................................................................................... ~
Number of new, water heaters? ......................................................................................................... _j_
Number of new, relocated ot replaced gas outiets? .................................................................... L
Number of new hose bibs? .................................................................................................................. ~
Residential Permits:
New/expanded service:
Minor Remodel o-,,~_,.,
, Commercial/Industrial:
Tenant Improvement: Numb~r Of existing amps involved in thisproiect:
Number of new amps involved in this project:
New Construdion: Amps per Panel:
Single Phase ............................................................ ..
Three Phase....................................... . .................... Number of new amperes _______ _
Three Phase 480 ......... . ..... ; ................................... Number of new amperes --------
Number of new furnaces, A/C, or heat Pl!mps? ............................................................................ tJI
New or relocated duct wort?? ....... , .................................................................. Yes ~ No __ _
Number of new fireplaces? .................................................................................................................. ,!I!!_
Number of new exhaust fans? ............................................................................................................ _@__
Relocate/install vent? ............................................................................................................................ L
Number of new exhaust hoods? ........................ , ...... ,; ........... ,............................................................. ¢
Number of new boilers or compressors? ......................................................... :. Number of HP ~
B-18 Page 1 of 1 Rev. 03/09
CB152218 2720 LOKERAVWEST J
QUALITY NElWORK: 96 SF Tl /
SAME USE
?•If·((~ To Plt17V1 LO/£ F, /c?.e
/
7 /2.0/15 -PL.o..ri ta A'=-~sse<
-1/2.2;,s -e:W--\@, r c
1 G01'L,
~/4/15"" -. R\)\=)\..ic.o..nt ~rnd\e.c\ Ullf'Wfo"no-b\.J.., 'nosa~
L~~t \f\, W(\\'5 lf'\'oO)t
8· f 9.1!-{?.;rijtJ
g-.l 1. lr.... T L--O---.
·"~ ___,.
Final Inspection required by:
OPlan OCM&I
SW 0tSSUED
Approved
BUILDING 9i
PLANNING 7-
ENGINEERING ·7-
FIRE Expedite? Y(N) 1-
DIGITAL FILES Reaulred7 y N
HazMat
APCD
Health
Forms/Fees Sent
Encina
Fire
HazHealthAPCD
PE&M
School
Sewer
Stormwater
Special Inspection
CFO: y N
LandUse: Density: lmpArea:
.
PFF: y N
Comments Date Da·
Budding 7-ZH-IS
Planning
Engineering
Fire
Need?