Loading...
HomeMy WebLinkAbout2720 LOKER AVE W; J; CB152218; Permit,, City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-19-2015 Commercial/Industrial Permit Permit No: CB152218 Building Inspection Request Line (760) 602-2725 Job Address: 2720 LOKER AV WEST CBADSt J Permit Type: Tl Sub Type: IN DUST Status: ISSUED Applied: 07/15/2015 Entered By: JMA Parcel No: 2090812800 · Lot#: 0 Valuation: $4,158.00 Construction Type: 5B Occupancy Group: Reference# Plan Approved: 08/19/2015 Issued: 08/19/2015 lnsp·ect Area Project Title: QUALITY NETWORK: 96 SF Tl / SAME USE Applicant: INNOVATIVE TENANT IMPROVEMENTS INC 9195 CHESAPEAKE DR SAN DfEGO CA 92123 858 513-1167 Building Permit Add'I Building Permit Fee Plan Check Add'I Building Permit Fee Plan Check Discount Strong Motion Fee Park fee LFM Fee Bridge Fee BTD#2 Fee BTD#3 Fee. Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Site Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedidted Plan Review $70.24 $0.00 $49.17 $0.00 $0.00 $1.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1.00 $0.00 Total Fees: $263.34 Total Payments To Date: Plan Check #: Owner: FENTON H G COMPANY C/0 H G FENTON CO 7577 MISSION VALLEY RD#200 SAN DIEGO CA 92108 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWA Fee CFO Payoff Fee PFF (3105540) PFF (4305540) License 1ax (3104193) License tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee '(4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee Green Bldg Standards Plan Chk TOTAL PERMIT FEES $263.34 Balance Due: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $51.00 $46.00 $44.77 $0.00 $0.00 $0.00 $0.00 ?? ?? $263.34 $0.00 Inspector: FINAL APPROVAL Date: 1 ~/'-'/~1_£ Clearance: ------ NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred.to as "fees/exactions." You have 90 days from the date this permit was issued·to protest imposition of these fioes/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure wilrbar any subsequent legal action to attack, review, set aside, void, or annul their imposition. ~ Plan Check No.~ { S -Z.?J ~ « .. ~ Building Permit Application . - Est. Value t)Y~ ·I I ~q .oo ~ CITY OF 760-602-2717 / 271812719 I Plan Ck. Deposit CARLSBAD Fax 760-602-8558 Date 7/i.<f,-.(' lswPPP www.carlsbc1dca.gov . - JOB ADDRESS. SUITE#/SPACE#/UNIT# rPN 209 272Q Loker Ave., #J, Carlsbad, CA 92010 #J -081 -29 -00 CT/PROJECT# -ILOT# I PHASE# I# OF UNITS I# BEDR;MS ,. # BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP .Quality Network Components DESCRIPTION OF WORK: Include Square Feet of Aff~c~d Area(s) q0sr · Tenant Improvement EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) l DECKS (SF) FIREPLACE J AIR CONDITIONING l FIRE SPRINKLERS Commercial , Commercial NA NA NA YESO NofZ] YES[{]NoO YES[{JNoO ·APPLICANT NAME (Primary Contact) Innovative Tenant Improvements APPLICA_NT NAME (Secondary Contact) N/A ADDRESS 9195 Chesapeake Drive, ADDRESS CITY STATE / CITY STATE ZIP ' ' San DieAO CA 92123 PHONE IFAX 8s.i-s14.4300 PHONE 'FAX 858-513-1167 EMAIL tony@i.nnovativ~ti.com EMAIL PROPERTY'OWNER NAME HG Fenton Property Company CONTRACTOR BUS. NAME Innovative Tenant Improvements ADDRESS -ADDRESS 7577 Mission Valley Road 9195 Chesapeake Drive CITY STATE ZIP CITY STATE ZIP San Di_eAO CA 92108 San Dieao CA 92123 PHONE PHONE 619-400•0123 (AX 619-400-0111 858-513-1167 I FAX 858-87 4-4300 EMAIL EMAIL brenda@hgfenton.com tony@innovativeti.com ARCH/DESIGNER NAME & ADDRESS ISTATELIC. # STATELIC.# !CLASS B I CITY BUS. LIB 1230541 N/A NA 906968 (Sec, 7031.5 Business and Profes~ions Code: Any Cij:y or Cqun_ty which requires a permit to_cpnstruct, alter, improve, qemol1sh.or repair any structure, p_rror t9 its 1ss~ance, also re!J~ires the applicant for such permit to file a-s1gnecf statement tnat he 1s licensed pursuant to the prov1s1ons of the Contractor·s License.Law !Chapter 9, commending w1th.Sect1on 7000 of D1v1s1on 3 of the Business and Professions Code} or that he is exempt.therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit-subjects the applicant to a civil penalty of not more th~n five hundred dollars ($500}). 'f ~!K~iuci <,, ', , Workers' Compen~atlon Declaration: I hereby affinn.under penalty of perjury one of the to/towing declarations: D I have and' will maintain a certificate of consent lo self-Insure for workers' compensation as provided by SElCtlon 3700 of the Labor Code, for the perfonnance of the work for which this pennit is issued. lZ] I have· and will maintain workers' compensation, as required by-Section 3700 of the Labor Code, for the performance of the work for which this pennit is issued. My workers' compensation insurance carrier and policy number are: Insurance Co. The Zenith Polley No. 2071877004 Expiration Date 12/31/2015 This secllon need not be completed if the pennit is for one hundred dollars ($100) or less. ·D C:ertificate of Exemption: I certify that In the perfonnance of the work for which this pennit Is Issued, I shall not employ-any.person In any manner so as to become subject to the Workers' Compensation Laws of California. WARNIN~: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employerio criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, d . ages s r • f lion 3706 of. the Labor code, interest and attorney's fees. · J!S CONTRACTOR SIGNATURE :·:¢fuiw I hereby affinn that I afn exempt from Contractor's License Law for the following reason: ·D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not Intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through.his own employees, provided that such improvements are not Intended or offered for sale .. lf, however, the building or improvement Is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). D I, as owner of-the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who·bullds or Improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). D I am exempt under Section ____ .Business and Professions Code for this reason: 1.1 personally plan to provide.the major labor and materials for construction of the proposed property improvement. 0Yes 0No 2. I (have/ liave not),signed an application for a building permit for the proposed work. · 3. I have contracted with the following person (finn) to provide the proposed construc_tion (include name address I phone/ contractors' license number): 4. I-plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name I address/ phone I contractors' license number): 5. I will-provide some of the work, but I have contracted (hired) the following persons to.provide the work indicated (include name I address/ phone/ type of work}: J!S PR0PERT.Y OWNER SIGNATURE DAGENT DATE Is the applicant or fut_ure building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevenllon program under Se,tlons 25505, 25533 or 25534 of the Presley-Tanner .. Hazaraous Substance Account Act? Yes No , Is the applicant or future building' occ~pant required to obtain a permit from the air pollullon control dlslrlcl or air quallly management district? Yes No Is the fac/llty lo be constructed within 1,000 feet of the outer boundary of a school site? Yes No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UN~ESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLL)TION CONTROL DISTRICT. •,""' Lender's Address 081 ' ,,,,:)'"''''-":' I certify that I have read the application and statethattheabove lnfonnatlon Is correct and that the lnfonnatlon on the plans Is accuf!!te, I agree to comply with all City ordinances and State laws relating to bulldlng construction. I hereby authorize representative of the Cily of Carlsbad to enter upon the above mentkmed property for Inspection purposes. t ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories In height. / EXPIRATION: Every permit Issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void If the Icing or work authorized by such permit is not commenced within 180 days from the date of such permit or if building or work authorized by such permit is suspended or abandoned at any lime after the work I . · men~ a period of 180 days (Section 106.4.4 Uniform Building Code). fE5 APPLICANT'S SIGNATURE ;...,_.lr::=:ii-::f-~~ DATE / ~ °\ -ts- STOP: THIS SECTION NOT REQUIR FOR BUILDING PERMIT ISSU CE. Complete the following ONLY if a Certificate f Occupancy will be requested final inspection. Tenant Improvement \le., #J, Carlsbad. CA 92010 Inspection List Permit#: CB152218 Type: Tl Date Inspection Item 09/09/2015 89 Final Combo 09/09/2015 89 Final Combo 09/08/2015 89 Final Combo 09/08/2015 89 Final Combo 08/25/~015 17 Interior LathlDrywall 08/21/2015 21 Underground/Under Floor 08/21/2015 24 RoughfT6pout 08/21/2015 31 Underground/Conduit-Wlrin Thursday, September 10, 2015 INDUST Inspector Act RI PB AP RI PB NR PB AP PB AP PB AP PB AP QUALITY NETWORK: 96 SF Tl / SAME USE Comments COF COF Page 1 of 1 POOR . . QUALITY j.. . !: ~ . r . . , ,! . 0'RIGINAL S coo,:• BUILDING .. _·.'_:_;_._-.·_:·_.·.'._· . . I.~. ~OMRX-PiUi'tolil'. : .. ···· · .·o !ltour· . t:i:wAU.J>~it&: J . ._ < jUO 1llt.PN18.S . . ; ·. . .. tiFPO~.tiii~. · t._ . . #11 -coUllii(. . . . . . . f. . . ' . . ' ' ~'""-~ .. . L . '_. '. ·~· ,iu,.EM¥t. J:?'non a:csUMa · t , • . · ~15 ,~Qf$tlU.tlfl!C~ , · · . · J. : . :,:u. b:t.:-$tt~:,~m-: · f : .. . ·.:1f1f •1HSU«.Affl>N · '-. ; J . fli, . . ... it l.AT>fi #8.t ·UNDERQROUIID.f1:t;U,U:U,J:·> . · ! ·. #17 .' . -~-~~-~~·t1t;i;·· _1:,,;;·il'rlWl;:i;···i;;·· ;;-r.:· _'.'"". -:-".'""""fv::$~~rt~--,-~. ·'"'.' ... t_ -i.«82~-~DR'M~--Ml;jr.. ~ .. m~.u.~-.TH~-~i ,n.u~· =;_ 1[~.-.. ;1Sft;:ut=··.1i:1;:::.~::--_ -: _ _.1~~-;,..:;:...:.;..:..~.:.,;;_;_.,..-;,;,·~~;i . J .. :.: __ jSi P,ol)LiJ;W .. •011101m« . m. ROO~,$Jt~l1NG,:m;1_~~R(;i,J5) .. : .-_.t · .. . . .ffl PJ!.EP.~~. . "'4\ flWi~iP~1teo~JO;t1;c~-... 3;4;~, .:, , J : · : ,:;19 JjNt'l-•"". m.;£;=m= '-----_.),. '---~-l!!, N•a;:m,~.4,i~L. • · · · . , · . .: · ·--::g-, . · , . -. : Im · ·,_or· n,. FINAL;OCCU~N.fcyi~~9,~f.~,t·· · r ,. • :1-n · o.sewd'ti:lv.co o:,v® .. i . :.~i .UKQUGit~fu'N11QW~.o·Ma. . . ')i:4 . tof1,1ur. 1:1,W-•O W'l'I : . ··. hr' .ni:ai,s~WER:·Mlt · . . · ·· • ...,._ · -cfmnsr dW·-""8l · . ·' .. ··.i.'_.· .tit Wlltt:-MU~- , '' liii .. $0Wl: ili.ArtR· ·i. t _.~ . ...:::,~60$~···~· .!:.-'le!..~~: ·.;.:: ~t;::::i.PH::::::..· _.;.....;...,.......,.+------...,,...----....P~~..;._~~~~ . i .. H.O'i ~WARN.I.HG.. _f . . . . -Ji~l'iet.O.~YIOl.4~'. l ·. '.. ~ff~:t.0~· -.:.!·-YER~· ~~BAL~W~AA~lf~IN~G·:_· ·--__ -1,..._.._...;.,.......;.,1.-,--,..,.-----,-.-.~.,....;.i~=.:.:..............,.;..r.,-:---!-:-:-:-T*~:p,.-..,..,..,..I;J;,.:..:.~~~· 1 -'. '; ~ I . · · "o/.11:.wi i ~' ~ l ' ,,,,_....._-;..;,;_,,., John Le Vey === EsGil Corporation In <Partnersliip witli (j(Jvernment for (}Jui{ainiJ Safety DATE: 08/17/2015 JURISDICTION: Carlsbad PLAN CHECK NO.: cblS-2218 PROJECT ADDRESS: 2720 Loker Ave. Suite J PROJECT NAME: Quality Network Components SET: II D~LICANT A JURIS. D PLAN REVIEWER D FILE ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the che·ck list has been sent to: ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Mail Telephone Fax In Person ~ REMARKS: accessibility comments resolved by city staff By: John Le Vey EsGil Corporation D GA D EJ D MB D PC Enclosures: 08/11/2015 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 EsGil Corporation In IPartnersliip witli qovemment for <Bui{aing Safety DATE: 07/24/2015 JURISDICTION: Carlsbad PLAN CHECK NO.: cblS-2218 PROJECT ADDRESS: 2720 Loker Ave. Suite J PROJECT NAME: Quality Network Components SET; I D.)tPPLICANT ~JURIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 1:8:) The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: D EsGil Corporation staff did not advise the applicant that the plan check has been completed. ~ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: innovative Tenant Improvements Telephone#: 858-513-1167 ~ate cin cted: *~:l'Ar- 't,Mail ~leP.h~ Fax In Person D REMAR .--~ By: John Le Vey EsGil Corporation D GA D EJ D MB D PC Email: tony@innovativeti.com Enclosures: 07/20/2015 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 ' Carlsbad cb15-22l8 07/24/2015 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: cb15-2218 OCCUPANCY: B TYPE OF CONSTRUCTION: IIIB ALLOWABLE FLOOR AREA: SPRINKLERS?: Yes REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 07/15/2015 DATE INITIAL PLAN REVIEW COMPLETED: 07/24/2015 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: office ACTUALAREA: 95 STORIES: 1 HEIGHT: unnkown OCCUPANT LOAD: unknown DATE PLANS RECEIVED BY ESGIL CORPORATION: 07/20/2015 PLAN REVIEWER: John Le Vey This plan review is limited to the technical requirements contained in the· California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be requir~d prior to the issuance of a building permit. Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2012 lhternational Building· Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please_ note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. Carlsbad cblS-2218 07/24/2015 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. D~liver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Glazing in the following locations should be of safety glazing material in accordance With Section 2406.4 (see exceptions): Fixed or operable panels adjacent to a door where the nearest vertical edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. The new door at the Exit analysis Please provide an exit analysis plan (may be 8 1/2" x 11" or any convenient size). Show in this analysis the occupant load of each area, the general exit flow patterns (by using arrows), accumulated occupant loads and required exit widths. Section 107.2.3 Advisory Note : When alterations, structural repairs or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the following requirements, per Section 11 B-202.4: a) The area of specific alteration, repair or addition must comply as "new" construction. b) A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. • The path of travel shall include the existing parking. c) Existing toilet and bathing facilities that serve the remodeled area must be shown to comply with all accessibility features. d) Please address the following comments that are the result of the alterations. 2. Please explain the concrete being replaced at the suite entry area what the slope will be etc. Carlsbad cblS-2218 07/24/2015 3. It is obvious from the plans the restroom servicing the tenant improvement is not disabled accessible, please provide a dimensioned restroom plans showing the restroom to be accessible compliant. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of c.orrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: 0 Yes O No The jurisdiction has contracted with l=sgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact John Le Vey at Esgil Corporation. Thank you. ., .. ,. Carlsbad cblS-2218 07/24/2015 [DO NOT PAY-THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PREPARED BY: John Le Vey PLAN CHECK NO.: cblS-2218 DATE: 07/24/2015 BUILDING ADDRESS: 2720 Loker Ave. Suite J BUILDING OCCUPANCY: B BUILDING AREA Valuation Reg. PORTION ( Sq. Ft.) Multiplier Mod. Tl oer citv Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance ..-1 Plan Check Fee by Ordinance •I Type of ~eview: 0 Complete Review VALUE D Structural Only D Repetitive Fee 3Repeats D Other D Hourly EsGil Fee ----IHr.@• Comments: Sheet of ($) 4,159 4,159 $70.241 $45.661 $39.331 macvalue.doc + .. 4; ~·,-.-------------------------------------------------; «~1~ ,,,p.> ' -1/ ~ CITY OF CARLSBAD PLAN CHECK REVIEW TRANS MITT AL DATE:07/22/2015 PROJECT NAME: 96SFTI PLAN CHECK NO: 1 SET#: 1 ADDRESS: 2720 LOKER AVE STE_J VALUATION: $4159 Community & Economic Development 0epartment 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT iD: CB152218 APN: 209'0812900 This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: VALRAY NELSON A Final Inspection by the ENGINEERING Division is re.quired Yes I No This plan check review is NOT COMPLETE. l'tems missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: TONY@INNOVATIVETI.COM You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: ---... " ---. PLANNING ENGINEERING -. ,FIRI; .PR,~VENTION . 760-602-4610 760-602-4750 .. -· 760;602-4665.' : ·--' . . -· --,-" ··--. ·cnris Sexton Kathleen Lawrence Greg Ryan 760-602-4624 760-602-27 41 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov Gina Ruiz Linda Ontiveros Cindy Wong 160-602-4615 --760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov ---,1· ValRay Marshall Dominic Fieri ; 760-602-2741 760-602~4664 Va1Ray.Marsha11@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: .,. ...... ~----------------------....... ----------------------------;, «1 BUILDING PLANCHECK Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.tarlsbadca.gov ¥ CITY OF CARLSBAD . CHECKLIST QUICK-CHECK/APPROVAL ENGINEERING Plan Check for C8152218 Project Address: 2720 LOKER AVE STE J Project Description: 96 SF Tl PLUS HVAC ENGINEERING Contact : VALRA Y NELSON Phone: 760-602-27 41 0 RESIDENTIAL INTERIOR :=J RESIDENTIAL ADDITION MINOR (<$20,000.00) 0 CARLSBAD PREMIER OUTLETS O0THER: GYM Date:07/22/2015 APN:2090812900 Valuation: $4159 Email: VALRA Y .MARSHALL@CARLSBADCA.GOV Fax: 760-602-1052 [l]TENANTIMPROVEMENT LJ PLAZA CAMINO REAL 0 COMPLETE OFFICE BUILDING r •Ill~ j •~.•~a•-· 0 O -· • • -• • -•. ----• • -a~ --•·• -I• -• • -I a -a• -• • -a•~•• -• I 1 . · OFFICIAL USE ONLY · ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT I r . BY: VALRAY NELSON REMARKS: NO FEES ASSESSED DATE:07/22/2015 Notification of Engineering APPROVAL has been sent.to T0NY@INN0VATIVETI.C0M via VALRAY.N.ELSON@CARLSBAOCA.G0V on ,07/22/2015 ·, I --··-··-··-··-··-··-··-·· ........ ···--···--··--··-··-··-··-··-··-··---·· J:>36 Page 1 of 1 REV 4/30/11 . «~ ~ CITY OF CARLSBAD PLANNING DIVISION BUILDI.NG PLAN CHECK APPROVAL P-29 DATE: 7/20/15 PROJECT NAME: T.I. PROJECT ID: Development Services Planning Division 1635 Faraday Avenue (760} 602-4610 www.carlsbadca.2ov PLAN CHECK NO: CB152218 SET#: ADDRESS: 2720 LOKER AV W #J APN: IZ! This plan check review is complete and has been APPROVED by the PLANNING Division. · By: GINA RUIZ A Final Inspection by the PLANNING Division is required D Yes [ZI No You may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review i.s NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: TONY@INNOVATIVETI.COM For questions or clarifications on the attached checklist please contactthe following reviewer as marked: .. . ' --... .. .. PLANNING .. ENGlNEf;RING ·. :FIRE. PREVENTI.ON · ·· '. ' . ... ' . . . 1so:.G02-4e10 760'-602-2750 7604502-4665: . ' . .. .. : _. .. .. . -·· .. D Chris Sexton D Chris Glassen D Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christogher.Glassen@carlsbadca.gov Gregor}:'..Ryan@carlsbadca.gov ~ Gina Ruiz D ValRay Marshall D Cindy Wong 760-602-4675 760-602-27 41 760-602-4662 Gina.Ruiz@carlsbadca.gov ValRay:.Marshall@carlsbadca.gov Cy:nthia.Wong@carlsbadca.gov D D Linda Ontiveros D Dominic Fieri 760-602-2773 760-602-4664 Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: ' __ ,, -< £ «~<JP? ~ CITY OF CARLSBAD PLAN CHEakDG~ DEPT CQJ!Xunity&Economic REVIEW Development Department · 1635 Faraday Avenue TRANSMITTAL Carlsbad CA 92008 www.carlsbadca.gov DATE: 7-29-15 PROJECT NAME: Quallty Network Components PROJECT ID: PLAN CHECK NO: CB152218 SET#: 3 ADDRESS: 2720 Loker Ave. #J APN: ~ This plan check review is complete and has been APPROVED by the Fire Division. By: D. Flerl A Final Inspection by the Fire Division is required IZI Yes D No D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should Include corrections from all -divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: . -_, -. PLANNING ENGINEERING FIRE. PREVENTION 760-602-4610 760-602-2750 760,,602-4665 . -. D Chris Sexton D Kathleen Lawrence D Greg Ryan 760-602-4624 760-602-27 41 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.R)!an@carlsbadca.gov D Gina Ru·iz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carl&badca.gov Linda.Ontiveros@carlsbadca.gov C)!nthia.Wong@carlsbadca.gov D D [Z] Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: II . . . Carlsbad Fire Department BLDG. DEPT COPY Plan Review R~quirements Category: Tl , INDlJST Date of Report: 07~29"2015 Reviewed by: --4--=------· ____ _ Name: Address: INNOVATIVE TENANT IMPROVEMENTS INC 9195 CHESAPEAKE DR SANDIEGQ CA 92123 Permit#: CB152218 Job Name: QUALITY NETWORK; 96 SF TI/ Job Address: 2720 LOKER AV WEST CBAD St: J Couditions:-"- Cond: CON0008448 [MET] ~~~ ~~~ THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THlS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. I Entry: 07/29/2015 By: df Action: AP {Cityof Carlsbad U REASONABLE HARDSHIP EXCEPTION TO· DISABLED ACCESS REQUIREMENTS 8-30 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Permit# ~ \~-Z. 2.\~ Telephone 6 \ 9 -t\ 00 .. 6 , 23 It is request that the above named project be granted an exception from the accessibility requirements of the 2013 California Building Code, as s eclficall noted below: A. Section ltB-202.4 General Exception: Applicable to existing building where the construction cost at this tenant space over the last three years does not exceed the valuation threshold amount. The spedfic accessibility features that create a hardship may be exempted but not all the accessibility features. The area of alteration Itself ma not be exem ted. · Access features Item Provide,de.rcription below 1. Path of travel to entrance 2. ,Entrance 3. Pa\h of travel In bldg. to area of remodel 4. Elevator · 5. Sanitary facilities 6. ·Public Telephones if provided . 7. Drinking Fbu'ntalns if provided 8, Other (Parking, signage, etc.) Spedfy Does this feature meet the latest edition of Title 24? Valuation Threshold Amount $147,863.00 If so, what Is the cost of making feature accessible? Attach documentation -!:!?-$ $· $ $ $ $ $ $ fPle,,se oro1•(de tloc11111entntlo111 i.e.. sig11ed co1itl'qcts. fi11· nil co11stmctio11 costs listed 1 Total cost of·access features. provided (A) _,$'-''1...___,'-'---,--~":l-----l Total cost of construction of this p.roject and all other work performed $ over the last 3 years ln·thls tenant space (B) -=-..... .....,~=-.=-------l Alterations performed. over the.last three years in this tenant space. Include in total valuation B above unless 20% of valuation of . individual remodel has already beeh expended on access feature (provide docqm!;?ntation). Permit Number Date Description Valuation .B-29 Page 1 of:2 Rev. 02/14 ~I B. Specific Exceptions Do not use this portior,. ifpartA has been completed This part is generalry used for remodels exceeding the threshold amount and where Title 24 provides an exemption from specific accessibility features. Exceptions Requested Code Section/Exception Total Descriptio~ 'The cost of all construction contemplated is $ The access feature increases t4e cost of constructi'on by percentage of construction cost . Cost of Making Features Accessible Attach Documentation $ $ $ $ The Impact on financial feasibility of the project, if the requested exception is not approved is The facility is used by the general public. for the purpose of rovkJed (n ormation listed above State CPr Request Granted CJ General Unreasonable Hardship Exception request is approved based on Section 11 B-202.4-of the California Building Code Access features listed In part A of this form shall be provided as part of this permit. [J Specific Exception(s) request is approval based on Section(s) ____ ~--· All other·access features shall be provided as specified In the California Building Cocle. v,Jl~ $? Name of enforcingtfc;<!l -Please print ·signature of enforcing official 8-29 Page2 of2 Rev. 02/14 •. pocuSign Envelope ID: 32E986C7-8F61-4815-929C-AA2085ED9644 Project Location: Tenant Name: Project Description: EXHIBITE Authorization to Construct 2720 Loker Ave W, Suite J Quality Network Components Add wall in open area. Finishes to match existing. SV color TBD. (330} The project price is submitted in accordance with Section 2.2.5 of the Master Agreement Between Owner and Contractor for Tenant Improvement Work dated August 1, 2011. Documents: Per the documents provided in this exhibit. Pricing Dated: May 7, 2015, revised May 22, 2015, Proposal 2, and attached to this exhibit. Project Price: $3~,2:~5.35 + Alt 1: $~ Alt 2: $10,143.40) AR# 330-2720J To :pedite paymenia~~ ;!±;>!R~~ces ~ Commencement Date: June 29, 2015 Completion Date: August 21, 2015 September 3, 2015 Confirm Completion Date Brenda Wright Project Price and Scope of Work may be changed only by written change order signed by H.G. Fenton Company in accordance with Section 6 of the Master Agreement da~ed August 1, 2011. Project Price shall remain in effect for a period of six months from date of this Authorization to Construct. Approved and Authorized to Construct by: owner: H.G. FENTON PROPERTY COMPANY, a California corporation By: H.G. Fenton-Company Authorized Agent Bill Hooper Portfolio Manager r-:DocuSlgned by: ~~~ Michael P. Neal President and CEO 7/2/2015 7/2/2015 330 -IT! -2720 Loker Ave Ste J -Quality Network Wall -ATC -2015.06.29 Rev. 04.02.2013 Submitted by: Contractor: INNOVATIVE TENANT IMPROVEMENTS, a California corporation (!DocuSlgned by: By !°,:.~==~ Jon Jackson, CEO ~DocuSlgned by: By !::~~r!:!!'P Tony Caliger, CFO 6/25/2015 6/25/2015 Note: Two (2) Officer's signatures are required or a Corporate Resolution stating that One (1) Officer is authorized to sign on behalf of the corporation must be attached to this contract. E-1 I NN,OV.ATl~V£ 'TENAN'T IMPROV'EMENT'S,, I NC .. Unreasonable Hardship Exception to Disabled Access Requirements Calculation to show 20% allowance to be used for path of travel improvements Project Name: Est. #2 Project address: 2720 Loker Ave. W. #J, Carlsbad, CA 92008 Total cost of project: $ Less: Dumpsters $ Overhead & Profit $ Paint $ Carpet $ Plumbing Permit $ Plumbing Engineering $ Mechanical Permit $ T-24 Building Envelope $ Electrical Permit $ T-24 Electrical Engineering $ Building Permit $ Structural Engineering $ Subtotal: $ 20% of Subtotal: $ 28,829.40 375.00 2,620.86 301.50 5,700.24 192.00 186.00 1,200.00 1,500.00 16,753.80 3,350.76 20% allowance to be allocated for path of travel improvements: 9195 Chesapeake Drive, San Diego, CA 92123 www.lnnovativeti.com $ 3,350.76 Ph# (858) 513-1167 Fax# (858) 874-4300 Lie. # 906968 ,1' Innovative Tenant Improvements 9195 Chesapeake Drive San Diego, CA 92123 Phone (858) 513-1167 Fax (858) 874-4300 Lie.# 906968 f. , . , . ~, , __ J Gray shading signifies a Non-unit cost line item I O -2,501 Square Foot PROJECT: Proposal # 12720 Loker Ave. #J 2 lcarlsbad, CA 92010 Year Built: 1986 OWNER: HG Fenton Company Contact: Jon Dodge PHONE: 619-400-0138 Proposal Date: 5/7/2015 Revised Date: 5/22/2015 Estimated by: Jon Jackson Plan Date: May 1, 2015 FAX: 619-400-0111 Space Planner: Avent Design CSI DESCRIPTIONS TOTAL UNIT UNIT SUB CODES QTY PRICE TOTAL TOTAL $/SF Percentage ..... D ... 1--V-. 1--G""'E ... NO!'E ... RAL-c""'o"'"N ... D ... IO!'TI ... O'""N"'"'s-: ---------------------------i 1000 Superintendent/Construction cleanup 0-2,500sf projects this cost is to be set on a case by case basis / 6% of total DIV 2 SITE WORK 2000 Minimum trash removal -In lieu of dumpsters 2100 DEMOLITION: Interior partitions (8'-0" to 12'-0" High) Demo Flooring & base -direct glue down (no carpet pad) Remove carpet adhesive after carpet has been removed to prepare concrete for new hard-surface flooring Demo VCT or Sheet Vinyl & glue on slab (scrape concrete slab to remove glue) :,;' :; ··· i: ·,;,:Remove S-10 window from existing J :\:~ !location -to be relocated I:{'.',, · : . :~:·.Remove drywall from wet wall Iv .. ~ ,',:--\,-;open T-bar ceiling at fur wall for 1 '':, '" • : rollup door 2200 Clean up -Final (office & w.house) DIV 3 CONCRETE 3000 "".'"'·: , , ' ,J20% Hardship allowance for (ADA) ;,,, , _; ,· , .. . . , accessibility path of travel DIV. 6 CARPENTRY 6000 LT.I. Inc. 1,700 11 1,650 460 50 1 1 1 1,700 I I t~·---.:::,...-:1 $1,112.48 Section Total: I $1,112.48 0.654 6.000% $300.00 LS $300.00 Section Total: I.-----,$-3-00-.-00 ___ 0.-1--76,,.-i 1.618% $12.00 LF $0.37 SF $0.75 SF $0.75 SF $50.00 LS $45.00 LS $60.00 LS $0.16 SF $2,890.88 Allow 1 6f6 $132.00 $610.50 '$345.00 $37.50 $50.00 $45.00 $60.00 Section Total: I $272.00 Section Total: I $0.00 Section Total: I $1,280.00 0.753 6.904% $272.00 0.160 1.467% $0.00 0.000 0.000% 8/4/20151:14 PM ··~ ·~ ~ Backing for wall hung cabinets or shelving 12 $5.00 SF $60.00 Section Total: $60.00 0.035 0.324% MILLWORK: 6100 See Price Alternate #2 Section Total: $0.00 0.000 0.000% DIV? THERMAUMOISTURE PROTECTION: 7000 Roofing Section Total: $0.00 0.000 0.000% 7100 Insulation: Section Total: $0.00 0.000 0.000% DIVS DOORS/WINDOWS 8000 Doors/Frames/Hardware: New 3'0"x7'0" H.B. S.C. Legacy Walnut Door 1 $410.00 EA $410.00 Relocate existing and good condition 3'0''x7'0" H.B.S.C. (Non-Rated) 1 $128.00 EA $128.00 Section Total: $538.00 0.316 2.902% 8100 Glazing: Tempered interior glass in clip sash (S-10) frames 16 $15.50 SF $248.00 Relocate existing 4'0''x4'0" S-10 clip- sash window 1 $180.00 LS $180.00 Section Total: $428.00 0.252 2.308% 8200 Window Coverings: Building Standard -3 1/2" Vertical Blinds · 207 $2.05 SF 424.35 Add installation cost for orders less than 300-Square Feet 1 $75.00 LS 75.00 Section Total: $499.35 0.294 2.693% DIV9 FINISHES 9000 Drywall/Framing: Int. Partition 8' 6" to 9' O" High -(non- rated) 23 $43.50 LS $1,000.50 Misc. Drywall Patch & Repair at rollup door 4 $60.00 Hr. $240.00 Hang drywall on existing framing -wet wall 60 $1.25 SF $75.00 Cut-in new Door/Window rough opening into an existing wall 1 $100.00 EA $100.00 Frame & Finish cased opening or window opening 1 $191.00 EA $191.00 In-fill existing Door/Window rough opening 1 $176.00 EA $176.00 Section Total: $1,782.50 1.049 9.614% 9100 T-Bar/Acoustic: I.T.I. Inc. 2of6 8/4/20151:14 PM . t New Armstrong #2767D ceiling tiles to replace one damaged during removal & replacement -Note: this line combines with line below where labor already exists (for a total of $1.20sf) 100 $0.64 SF $64.00 · · Cut-in existing tegular ceiling tiles over new wall 1 $120.00 LS $120.00 Remove & Re-install existing ceiling tiles to provide access for work above eeiling 300 $0.56 SF $168.00 1·'"'.,;:;d7(::r;:::::1create soffit over rollup door for ',,•. ,/I,{.',"\~~ • ~,, ,\ ",-,,:1 1 $850.00 LS $850.00 ;.;tsitl~;,1,J,;::',J conditioned envelope Section Total: $1,202.00 0.707 6.483% 9200 Floor Covering: Shaw -Philadelphia (Speak-Out) 54445-45100, 54445-45301, 54445- 45501 & 54445-45500 1,280 $2.22 SF $2,841.60 Sheet Vinyl: Armstrong Corton flat lay 81 $3.17 SF $256.77 Self Cove: (Material & Labor) 28 $7.34 LF $205.52 Heat Weld (Rod & tabor) 8 $3.00 LF $24.00 4" Burke coved rubber base 395 $1.43 LF $564.85 V.C.T. Armstrong standard Excelon - Imperial Texture 540 $1.53 SF $826.20 Floor Prep 1 $150.00 LS $150.00 Moisture testing (Minimum 3 needed up to 3,000sf, then one per 1,000sf thereafter) 3 $102.00 EA $306.00 Section Total: $5,174.94 3.044 27.911% 9300 Paint Finish wall (un-occupied space) - Dunn Edwards "Sparta-Zero" Interior Velvet finish, "Swiss Coffee" (1-Coat walls) $0.25 SF $0.00 2-coatwalls 700 $0.45 SF $315.00 Section Total: $315.00 0.185 1.699% DIV10 SPECIAL TIES. 10000 Section Total: $0.00 0.000 0.000% DIV21 Fire Protection: 21000 Fire Sprinklers -Modifications to the heads near the new wall 1 $700.00 SF $700.00 ~~Plans and permit ;;:..J~.~t::l 1 $650.00 LS $650.00 '?l",':!'~~Fire Extinguishers 2A 10-BC L~~t.~.,;;;),' -.. 1 $85.00 EA $85.00 Section Total: $1,435.00 0.844 7.740% DIV22 MECHANICAL 22000 Plumbing: See Price Alternate #2 Section Total: $0.00 0.000 0.000% DIV23 Heating/Air Conditioning: 23000 I.T.I. Inc. 3of6 8/4/20151:14 PM t .... ~.:~:,;:~;;:"'.F,:)Relocate registers to be out of the f '~!Y'J~t-,<', Jway of the new separation wall ;;, l,'.\, ... ,~.:/r:Jl ··\~ ;1, • • • • ½)is';,/ :;Ji] without modifying the ducting, may $25.00 EA $50.00 r,·,,'./ii•";i '; end up on either side of the new wall 2 Mechanical Permit -$0.00 Allow NIC Section Total: I $50.00 0.029 0.270% DIV26 ELECTRICAL 26000 Relocate existing 2x4 Fluorescent light fixture 1 $77.00 EA $77.00 Re-wire (x06) existing lights to new switching 6 $45.00 LS $270.00 Motion sensor switch (duaO -for warehouse 1 $128.00 EA $128.00 Re-feed existing outlet in front office that will now be under the new window 1 $95.00 LS $95.00 T-24 Cale's & elect. Drawings -office area (no new load) -$0.38 SF NIC Electrical Permit 1 $186.00 Allow $186.00 Section Total: I $756.00 0.445 4.077% DIV.1 PLANS 1100 Title-24 Building envelope --LS NIC 1200 Draw construction documents --LS By others 1300 Administration fees to prepare & submit for misc. permits to city 1 130.00 LS $130.00 1400 Building Permit 1 1,500.00 Allow $1,500.00 1500 Plan Copies 1 20.00 LS $20.00 Section Total: I $1,650.00 0.971 SUBTOTAL: $16,855.27 9.915 90.909% Profit & Overhead -10% $1,685.53 0.991 9.091% TOTAL ESTIMATE: $18,540.80 10.906 100.000% EXCLUSIONS: -Any ADA deficiencies to the building or parking lot that are triggered by this tenant improvement that are not listed in the scope of work. -Any local, state and federal code upgrades that are needed that are not a part of this scope of work. -All work is to be performed during regular business hours. -Hazardous material detection, removal and disposal is excluded from this proposal if not otherwise stated (and is limited to the scope as defined) in the above proposal. -Supply, installation and moving of all tenant furniture, equipment, signage, appliances & furniture partition systems furniture are excluded from this proposal. -This proposal is predicated on this contractor's interpretation of plans, project requirements, project conditions and an agreeable form of contract between the owner and Innovative Tenant Improvements Inc. -Innovative Tenant Improvements Inc. has made every effort to follow the "intent" of the space plan. However, unforeseen and existing conditions not specifically detailed in the bid documents cannot be taken into account and, therefore, must be excluded from this proposal. This exclusion applies to all federal, state & city code requirements not detailed as part of the space plan. -Rework, repair & replacement of existing exterior windows, mullion system & window film is excluded. I.T.I. Inc. 4 of6 8/4/20151:14 PM -Telephone, data cabling, security, security hardware, audio & graphic eye system visual are not included as part of this proposal. -Fire sprinkler quote is based on new heads only. Branch line & main line relocations are excluded. Notes: No electrical Title-24 upgrades are triggered in this scope of work. No work is to be performed in the restroom with exception to replacing the sheet vinyl. It appears that there is a 2-pole 40amp breaker in the panel that is no longer being used, this space will be used for the new 2-pole 30amp breaker if price alt. #2 is accepted. Suite has been recently painted throughout, painting will be at effected areas only. No balance is to be performed on the HVAC system within the suite. All existing outlets to remain as is, no new to be installed. lfprice alternate#2 is accepted then an additional $1,750.28 to the ADA Hardship cost. Below are alternate requests that represent additional work that is not currently included in the overall scope of work as detailed in the above cost estimate. Please indicate on each of the individual signature lines by: Signature will represent an authorization to proceed with that specific price alternate. Or If line item is not desired; indicate with "Declined". Price alternate #1 -To relocate existing T-stat from front area to rear area; 1.1 -Relocate (x01) T-Stat to back-side of new wall: $ 1.2 -patch drywall from old T-stat location: $ 102.00 30.00 1.3 -Touch up paint drywall patch: No-Charge Subtotal: $ 132.00 10% OH&P: $ 13.20 Total Alternate #1: $ 145.20 Signature to accept price alternate #1_X..__ _______________ _ Price alternate #2 -Add a sink and 6If of cabinets in the front of the suite; NOTE: if this is accepted an additional $1,750.28 also needs to be added to the above ADA Hardship cost. LT.I. Inc. 2.1 -Add: Plumbing trench $ 2.2 -Add: Concrete Patch 40sf @ $22.50sf $ 2.3 -Add: Seal new concrete so flooring can be installed over $ 2.4 -Add: Trash removal $ 2.5-Add: Garbage Disposal $175 & outlet & sw. @$:101.00 $ 2.6 -Add: 6If of base and upper cabinets, with countertops @ $345If $ 2. 7 -Add: Break sink with rough $ 2.8 -Add: (x01) dedicated 20amp 120v GFCI Outlet $ 2.9 -Add: lnsta-hot 30amp $ 2.10 -Add:30amp 208v circuit for insta-hot $ 2.11 -Add: Hang drywall on existing framed wet wall $ 2.12 -Add: 4" rubber cove base -1 0lf@ $1.43If $ 2.13 -Add: paint -90sf@ $.43sf $ 2.14 -Add: Electrical engineering $ 2.15 -Add: permit costs for plumbing $ 2.16 -Add: wall backing for wall hung cabinets $ 2.17 -Add: Supervision $ 735.00 900.00 511.00 75.00 276.00 2,070.00 1,845.00 134.00 300.00 340.00 75.00 14.30 38.70 1,200.00 192.00 60.00 455.27 Subtotal: 10% OH&P: Total Alternate #2: $ 9,221.27 $ 922.13 $10,143.40 5 of6 8/4/20151:14 PM t LT.I. Inc. Signature to accept price alternate #2_X. ________________ _ Note: The above cost is derived without plans, a new cost estimate will be needed once construction documents are prepared and approved by the City of Carlsbad. 6 of6 8/4/20151:14 PM ! \ ! I ·( I· ! I ! I .... BillTo F, J. Brawley Concrete~ Inc. San Diego, CA 92113-2114 Telephone: 619-231-7778 CA License: CA 353080 lnpovative TemmL Improvements, Inc. 9195 Ch11supcakc .Drive Sun Diego CA 92i2:~ P.b.No. PJB 1540 Quantity Descrlplion f Provide labor and matcriul to complete contract. v.:f( ~'-l'61; .fiq151..1<6 Due.D?te 7/312015 -~k.. S~\\t < . ,r, 7..,t eris -Su->~(.., 7L[(d - _, - .. Thimkyou! I • lnvoite D<;1le Invoice# 7/3/2015 5997 Tenns PROJECT 1540 -lTl 5410 -2720 Lok. .. Rate Amount :r 16,740.0() 16,740.00 .. ,- . - Total ~r-- 74~ y \._ ~ ~-~ .1 ...... _ .. FJ Brawley Concrete Inc. April 13, 2015 Innovative Tenant Improvements 9195 Chesapeake Dr. San Diego, CA 92123 Tel (858) 513-1167 Fax(858) 874-4300 Attn: Tony Project: 2720 Loker Ave West suite L Carlsbad, CA Contract Proposal Proposal References Attached shop drawing dated 4/10/15 Scope of Work Furnish labor, equip. and materials to construct the following: 1. Saw cut, remove and replace non slope compliant path of travel sidewalks and entry landings. Price and Terms Base bld $ 15,240 Standard ITI billing Inclusions \ rd subcontract agreement, work schedule, af1d (a) 2500 psi concrete; (b} fabrication and installation of #3 rebar 24" each way; (b) clean up waste generated· by our work. Exclusions (a) Repair or relocation of buried Irrigation or electrical lines. 11868 National Avenue, San Diego, CA 92113 Tel. 619-231-7778 Fax. 619-231-4778 www.fjbrawleyconcretEl.com 1 of2 !nit. !nit.== ~-······-· ·------····---------------------------------- , . ·/ ;-··., . , F.J ~ Brawley Concrete 619•231•7778 ·• Fax 619°231°4778 . . . I '\. : /.r \~ l ·1868 NATIONAL AVl;NUE O SAN " 0 ,. ·:' ,:, '_ ' ' : ..• i.:~ •i ·. ·1 "'·····_., ' ' ' ' ', ,..._"'IE'· ,:'~'-' ,·~ , '.-'' ' 1 ,,· ,-··r4 · '., l:~.:,: ·:: ', : :, ·:· ' ': ' ' . . eta, ,---,,,- .. ~ ; :.:: ~~ .,., ... ...,... ~ - &- ~ ~ CITY OF PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov CARLSBAD B-18 Project Address: Permit No.: Information provided below refers to workbeing done,on the above mentioned permit only. This form must be completed and returned to the Building Division before the permit can be issued. · Building Dept. Fax: (760) 602-8558 Number of new or relocated fixtures, traps, or floor drains ....................................................... -l- New building sewer line? ......................................................................................... Yes __ No~ Number of new roof drains? ............................................................................................................... ~ Install/alter water line? ......................................................................................................................... ~ Number of new, water heaters? ......................................................................................................... _j_ Number of new, relocated ot replaced gas outiets? .................................................................... L Number of new hose bibs? .................................................................................................................. ~ Residential Permits: New/expanded service: Minor Remodel o-,,~_,., , Commercial/Industrial: Tenant Improvement: Numb~r Of existing amps involved in thisproiect: Number of new amps involved in this project: New Construdion: Amps per Panel: Single Phase ............................................................ .. Three Phase....................................... . .................... Number of new amperes _______ _ Three Phase 480 ......... . ..... ; ................................... Number of new amperes -------- Number of new furnaces, A/C, or heat Pl!mps? ............................................................................ tJI New or relocated duct wort?? ....... , .................................................................. Yes ~ No __ _ Number of new fireplaces? .................................................................................................................. ,!I!!_ Number of new exhaust fans? ............................................................................................................ _@__ Relocate/install vent? ............................................................................................................................ L Number of new exhaust hoods? ........................ , ...... ,; ........... ,............................................................. ¢ Number of new boilers or compressors? ......................................................... :. Number of HP ~ B-18 Page 1 of 1 Rev. 03/09 CB152218 2720 LOKERAVWEST J QUALITY NElWORK: 96 SF Tl / SAME USE ?•If·((~ To Plt17V1 LO/£ F, /c?.e / 7 /2.0/15 -PL.o..ri ta A'=-~sse< -1/2.2;,s -e:W--\@, r c 1 G01'L, ~/4/15"" -. R\)\=)\..ic.o..nt ~rnd\e.c\ Ullf'Wfo"no-b\.J.., 'nosa~ L~~t \f\, W(\\'5 lf'\'oO)t 8· f 9.1!-{?.;rijtJ g-.l 1. lr.... T L--O---. ·"~ ___,. Final Inspection required by: OPlan OCM&I SW 0tSSUED Approved BUILDING 9i PLANNING 7- ENGINEERING ·7- FIRE Expedite? Y(N) 1- DIGITAL FILES Reaulred7 y N HazMat APCD Health Forms/Fees Sent Encina Fire HazHealthAPCD PE&M School Sewer Stormwater Special Inspection CFO: y N LandUse: Density: lmpArea: . PFF: y N Comments Date Da· Budding 7-ZH-IS Planning Engineering Fire Need?