Loading...
HomeMy WebLinkAbout2732 LOKER AVE W; ; CB051280; Permit05-11-2005 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB051280 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2732 LOKER AV WEST CBAD Tl Sub Type: COMM 0000000000 Lot #: 0 $3,410.00 Construction Type: NEW Reference #: HISAMITSU PHARMACEUTIAL 110 SF Tl OFFICE/MANUF TO SAME Applicant: SHIMIZU AMERICA CORP STE800 800 WILSHIRE BLVD 90017 213 362-7500 Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check*: ISSUED 04/05/2005 SB 05/11/2005 05/11/2005 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $53.49 Meter Size $0.00 Add'l Reel. Water Con. Fee $34.77 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $1.00 PFF $0.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $24.00 $0.00 $0.00 $0.00 $0.00 $133.26 Total Fees:$133.26 Total Payments To Date:$34.77 Balance Due:$98.49 BUILDING PLANS IN STORAGE ATTACHED 8046 05/11/05 0002 01 02 CGP 98« 49 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(3), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any tees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.