HomeMy WebLinkAbout2734 ASCOT AVE; ; CB051879; Permit'07-29-2005
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
07/29/2005
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB051879
Building Inspection Request Line (760) 602-2725
2734 ASCOT AV CBAD
RESDNTL Sub Type: SFD
2131813300 Lot#: 485
$251,692.00 Construction Type: VN
Reference*: CT02-14
1 Structure Type: SFD
4 Bathrooms: 3
PRIMROSE@BRESSI -PA 12-PHASE 4
PLAN 4- 2605 SF.476 SF GAR.83 SF PORCH, 53 SF DECK
Status: ISSUED
Applied: 05/02/2005
Entered By: SB
Plan Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Checktf:
07/29/2005
PC
PC03-63
PC05-51
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$1,014.72 Meter Size
$0.00 Add'l Reel. Water Con. Fee
$659.57 Meter Fee
$0.00 SDCWA Fee
($52.77) CFD Payoff Fee
$25.17 PFF (3105540)
$2,436.00 PFF (4305540)
$0.00 License Tax (3104193)
$0.00 License Tax (4304193) -,
$0.00 Traffic Impact Fee (3105541)
$0.00 Traffic Impact Fee (4305541)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$2,999.00 Housing InLieu Fee
D5/8 Housing Credit Fee
$0.00 Master Drainage Fee
$0.00 Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$160.00
$2,461.00
$2,848.90
$4,580.79
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$140.00
$60.00
$52.50
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$19,779.88
Total Fees: $19,779.88 Total Payments To Date:$0.00 Balance Due:$19,779.88
3648 07/29/05 0002 01 02
CGR 19779-
Inspector:
FIN ALA
Date: Zl
ROUAL
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which YOU have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
CALL PRIOR TO 4:00 P.M FOR NEXT WORK DAY INSPECTION
BUILDING INSPECTION: (760) 602-2725
JOB ADDRESS:, 08001879 Z734 ASCOT A V C8AO
OWNERS NAME P™MROSE@BRESSI -PA 12-PHASE 4
PLAN 4- 2605 SF.476 SF GAR.83 SF PORCH
USE/OCCUPANi RESDNTL SFD
LOW: 485 GREYSTONE HOMES
BUILDING
OTHER
LOT NO7SUITE:
TYPE CONST. DATE
CONTRACTOR
APPROVED TO COVER
Type of Inspection
BUILDING
FOUNDATION
REINFORCED STEEL
MASONRY
Cl GROUT D WALL DRAINS
TILT PANELS
POUR STRIPS
COLUMN FOOTINGS
SUBFRAME D FLOOR D CEILING
ROOF SHEATHING
EXT. SHEAR PANELS
FRAME
INSULATION
EXTERIOR LATH
INTERIOR LATH & DRYWALL
FINAL
PLUMBING
O-8CWER AND BL/CO (B-Pt/CO
UNDERGROUND IfiJVKSTE &WATER
TOP OUT O WASTE D WATER
TLJB AND SHOWER PAN
^3£iA5 TEST D GAS PIPING
D WATER HEATER D SOLAR WATER
FINAL
_^ ELKIKKAL f
/StLECTRIC UNDERGROUND )5JUFER
CROUCH ELECTRIC WALLS '
ROUGH ELECTRIC CEILING
rj^CTRIC SERVICE O TEMPORARY
D BONDING D POOL
FINAL
MECHANICAL
UNDERGROUND DUCTS & PIPING
a DUCT & PLEM.D REF. PIPING
HEAT - AIR COND. SYSTEMS
VENTILATING SYSTEMS
FINAL
Date
r -tfA Ks {£2*
2**'
{("I ^*trfT
]t>Vi^k
rL-li^ph^u
tr\ \fv\
1 '\%$tr*'i
4t*(Lt+5
t^-
t^t'"7-^'S~
^xT/lx<;if
V7 -V" **
'Z^^tp-^lf
^-
^--^*"
. Inspector Notes
V ^
~
w J$//
FT -S
*—*
t^-3f~~^o^T-—t. —
^-^— "^ w
V s
tfK. ^
[' ._— — •"
_4I
Pw--^
'
^~~*~^1
,Lf
\(. '
>
CALL FOR HNAL INSPECTION WHfN ALL AmtOMfctrEJTEMS AgOVfMAVf gBEN APPROVED
FINAL Sign When Appropriate
Building Dept. (Inspections) (760) 602-2725
Fire Department (760) 602-4660
Planning Department (760) 81 5*706
Engineering Dept. (Inspections) (760) 438O891
Building Inspectors (7anv4pm) (760) 602-2700
CMWD (760) 438-2722 Ext 71 51
?7^W?
calwlfe* '
"&ii\o H\o
I
G&$!
cOf^
&rt *TT» rri6'iRr*1 V r |
10 3EWd it>61^0809,!,
City of Carlsbad Bldg Inspection Request
For: 02/23/2006
Permit# CB051879
Title: PRIMROSE@BRESSI -PA 12-PHASE 4
Description: PLAN 4- 2605 SF,476 SF GAR,83 SF PORCH, 53 SF DECK
Inspector Assignment: PC
2734 ASCOT AV
Lot 485
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Phone: 7606441604
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: TREVOR PETERSON
Entered By: CHRISTINE
Comment
A
\
** 11 ^^ 1
//
Comments/Notices/Hold
Associated PCRs/CVs Original PC# PC05-51
Inspection History
Date Description
02/22/2006 39 Final Electrical
02/06/2006 39 Final Electrical
01/31/2006 39 Final Electrical
12/27/2005 82 Drywall/Ext Lath/Gas Test
12/19/2005 16 Insulation
12/16/2005 84 Rough Combo
12/01/2005 13 Shear Panels/HD's
12/01/2005 15 Roof/Reroof
11/28/2005 13 Shear Panels/HD's
11/28/2005 15 Roof/Reroof
09/27/2005 11 Ftg/Foundation/Piers
09/27/2005 31 Underground/Conduit-Wiring
09/14/2005 21 Underground/Under Floor
Act Insp
WC PC
WC PC
PA PC
AP PC
AP PC
AP PC
AP PC
WC PC
CO PC
AP PC
AP PC
AP PC
AP BN
Comments
AGAIN
ALREADY
EMR
SIGNED OFF
SEE AT FRAME
F.S. @ F.P. MISSING
Inspection List
Permit*: CB051879 Type: RESDNTL SFD PRIMROSE@BRESSI -PA 12-PHASE 4
PLAN 4- 2605 SF.476 SF GAR.83 SF PORC
Date Inspection Item
03/20/2006 89
02/23/2006 89
02/22/2006 39
02/06/2006 39
01/31/2006 39
12/27/2005 82
12/19/2005 16
12/16/2005 84
12/01/2005 13
12/01/2005 15
11/28/2005 13
11/28/2005 15
09/27/2005 11
09/27/2005 31
09/14/2005 21
09/14/2005 22
Final Combo
Final Combo
Final Electrical
Final Electrical
Final Electrical
Drywall/Ext Lath/Gas Test
Insulation
Rough Combo
Shear Panels/HD's
Roof/Reroof
Shear Panels/HD's
Roof/Reroof
Ftg/Foundation/Piers
Underground/Conduit-Wirin
Underground/Under Floor
Sewer/Water Service
Inspector Act
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
PC
BN
BN
AP
NR
we
we
PA
AP
AP
AP
AP
we
CO
AP
AP
AP
AP
AP
Comments
FINAL PER PHIL
NO ELECT.
AGAIN
ALREADY SIGNED OFF
EMR
SEE AT FRAME
F.S. @F.P. MISSING
Tuesday, March 21. 2006 Page 1 of 1