HomeMy WebLinkAbout2738 LOKER AVE W; ; CB900313; Permit„02/26/90 16:27 BUILDING P R I, T'': :. 88U
Page 1 of 1 Development No
JobAddress: 2738 LOKERAV WEST Str:. Fl: Ste:
Permit Type INDUSTRIAL BUILDING 364 02/26/90 0001 01 02
H Parcel No C-PR1T 27910 00
Valuation4 335,137
condtruction Type: VN
..
.. .,
0ccupancy.Group: .' B2 ,Ciass Code:, PD328 . .Status: ISSUED
Description BLDG .F 14895 SFIND/SPRINKLER -. Applied : 02/22/90 '
:SHELL NO ENERGY.. : . •Apr/Issue. ,: '02/26/90
Validated By.: CD
Plan CheckNumber > CB890932 - .••
CONTRACTOR : ROEL CONSTRUCTION . -Lic.. C NO 6.19 297-4156
3366 KURTZ AVENUE .-
-
SAN DIEGO, (4\ ,ç
4OWNER : CARLSBAD CROSSROADS LTD &3f,çLic. ..
*** Fees Required Fee s'o11ected &Credi. ts
80-727 00
100
Total Fees:. 28A.2.7...00 . Total Payments.: \ - .809.00 1- -J / -. • , ' • t, .# •
/ Balance Due: 27.,918.00
Fee description I -
E
.(
. ts ,Fe/Unit . xt,'fee Data
Building Permit * 1466.00
Plan'Check I \ '---(J *V(rfll 1(V.'JI I - •
1 Strong'Motion -Fee \• P4I 'V/ 1 '
50.00.
Enter ."Y'- to AutocalcPFF\ / 11730_00 Y
Traffic Impact Fee 'Y'°,''894..0O 7' 894-. 00
. TO Bridge
'ter Mumr'01j's\ 4/i7 . 1966.00 1966:00
MFF . (./7r2 5.105V 0) .. 5105.00
* BUILDING TOTAL N. UI? 0 V'S'28122 00
Enter *--"Y” for Electric-Issue Fee . 5.00 1
Three Phase Per AMP . . •>1200.00 .50 600:00 -
* ELECTRICAL TOTAL ($10 Minimum) 605 00
44
I ,;.•,. ,4S
. .. .
- -. ,•, .-,, • . . •• . .
-• p - - ,• • - .•'. - - 1
- r
-' 3 - •f • ,_ ••-- , * • •. . 3. •,,
1'• . -
* ' • -- .
.* ••-: - • I • - *,•, ,.- .3-'
._ . •-. - 3
-
I.,
S ¶ -
. -• - CITY OF,CARLSBAD . .•
2075 Las Palmas Dr, Carlsbad CA 92009 (619) 438-1161
* p. ••5
. p. - • 4 - '• 15 • - - - p - -.•. -'I 5_._ •. - -
p. t - •.
-
CITY OF CARLSBAD
INSPECTION REQUEST
PERNIT# CB900313 FOR 10/19/90 INSPECTOR AREA TP
DESCRIPTION: BLDG F 14895 SF IND/SPRINKLER PLANCK# CB890932
SHELL NO ENERGY 0CC GRP
TYPE: INDUST CONSTR. TYPE NEW
JOB ADDRESS:. 2738 LOKER AV WEST STR: FL: STE:
APPLICANT: HCH PARTNERS PHONE: 619 278-5750
CONTRACTOR: ROEL CONSTRUCTION ' PHONE: 619 297-4156
OWNER: CARLSBAD CROSSROADS LTD PHONE:
REMARKS: T1/MH/RAY/431-7233 INSPECTOR
SPECIAL INSTRUCT:
TOTAL TIME:
--RELATED PERMITS-- PERNIT# TYPE STATUS
RW900039 ROW ISSUED
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural AP
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
***** INSPECTION HISTORY *****
DATE DESCRIPTION ACT INSP COMMENTS
082290 Final Combo CO TP
081090 Rough Electric AP TP SERVICE GEAR/H METER
061890 Ftg/Foundation/Piers AP TP POUR STRIP
061890 Steel/Bond Beam AP TP
061290 Roof/Reroof AP TP
060490 Roof/Reroof NS TP
050890 Ftg/Foundation/Piers AP TP T.U. PANELS
042690 Ftg/Foundation/Piers AP TP COLNN FRONTS
041390 Shear Panels/HD's AP TP TU PANELS,
032190 Ftg/Foundation/Piers , AP PD SLAB
032090 Ftg/Foundation/Piers AP PD BLDG F COMPLETE
031690 Steel/Bond Beam AP TP PART
031690 Ftg/Foundation/Piers AP TP PART
031490 Steel/Bond Beam AP TP
031490 Ftg/Foundation/Piers AP TP P1
031390 Underground/Under Floor AP TP
031290 Underground/Under Floor AP TP. -
031290 Sewer/Water Service AP TP
030990 Steel/Bond Beam AP TP
030990 Ftg/Fouridation/Piers AP TP .
II
FINAL BUILDING INSPECTION
DEPT BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB900313 DATE:. 08/17/90
PERMIT#: CB900313 . PERMIT TYPE: INDUST
PROJECT NAME: BLDG F 14895 SF IND/SPRINKLER
SHELL NO ENERGY
ADDRESS: 2738 LOKER AV WEST
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233 .
SEWER DIST: CA WATER DIST: CA
INSPECTED DATE -
BY: . INSPECTED: T. 1990APPROVED DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED . DISAPPROVED -
INSPECTED DATE
BY: . INSPECTED: APPROVED - DISAPPROVED -
COMMENTS: Wtr District
Engineeringg Department
(619) 422-Q267
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE NING U/M WATER
PLAN CHECK#: CB906313 DATE: 08/17/90
PERMIT#: CB900313 PERMIT TYPE: INDUST
PROJECT NAME: BLDG F 14895 SF IND/SPRINKLER
SHELL NO ENERGY
ADDRESS: ¶1 AVTWEST
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233
SEWER DIST: CA WATER DIST: CA
INSPECTED DATE
BY: INSPECTED: / " APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
COMMENTS:
a
RECEIVED AU2 2 7990
FINAL BUILDING INSPECTION
DEPT: • BUILDING ENGINEERING (.PLANNING U/M WATER
PLAN CHECK#:. CB900313 • • DATE: 08/17/90
PERMiT#: CB900313 •
PERNIT'TYPE INDUST:
PROJECT NAME: B 14895 SF IND/SPRINKLER
SHELL NO ENERGY • •
ADDRESS: •
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233
SEWER DIST: CA WATER DIST: CA
INSPECTDfi DATE
BY: INSPECTED: 'j74()APPROVED DISAPPROVED
INSPECED) DATE.
BY: INSPECTED: APPROVED DISAPPROVED -'
INSPECTED • DATE
BY: INSPECTED: APPROVED DISAPPROVED
COMMENTS:
V.
FINAL BUILDING INSPECTION
DEPT: BUILDING IERING4 FIRE PLANNING U/M WATER
PLAN CHECK#: CB900313 DATE: 08/17/90
PERNIT#: CB900313 PERMIT TYPE: INDUST
PROJECT NAME: iBLPSM14895 SF IND/SPRINKLER
SHELL NO ENERGY
ADDRESS
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233
SEWER DIST: CA WATER DIST: CA
-BY: INSPECTED:
INSPEQ$DATE
APPROVED DISAPPROVED _'
3j~~
I
BY:
NSPE~rf DATE
1L44;::::I- INSPECTED APPROVED L-"DISAPPROVED -
INSPECTED DATE.
BY: INSPECTED: APPROVED DISAPPROVED
----------------------------------------
COMMENTS:
il1 LI/2 i'91i2 ow
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB900313 DATE: 08/17/90
PERNIT#: CB900313 PERMIT TYPE: INDUST
PROJECT NAME: BLDG F 14895 SF IND/SPRINKLER
SHELL NO ENERGY
ADDRESS: 2738 LOKER AV WEST :
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233
SEWER DIST: CA WATER DIST: CA
INSPECTED DATE
BY: INSPECTED: AUG. 241990 APPROVED DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED -
COMMENTS: or District
Engineering Department
FINAL BUILDING INSPECTION -
DEPT: BUILDING ENGINEERING FIRE PLANNING C'U7M WATER
PLAN CHECK#: CB900313 - S DATE: 08/17/90
PERMIT#: CB900313 S PERMIT TYPE: INDUST
PROJECT NAME: BLDG,F'i4895 SF IND/SPRINKLER
SHELL NO ENERGY S -
ADDRESS: 2738IKERAV WEST
-5----,- - -S - , -
CONTACT PERSON/PHONE#: T1/MH/RAY/431-7233
SEWER DIST: CA WATER DIST: CA
INSPECTED
S -
---------------------------DATE --D 3 c —--------
S
BY: INSPECTED: 3 -2 '- APPROVED DISAPPROVED
INSPECTED DATE '
BY:
-
INSPECTED: APPROVED DISAPPROVED -
INSPECTED DATE S
BY: INSPECTED: APPROVED - DISAPPROVED -.
COMMENTS: • S
<ON
/? 4
5
5
. 5 199O \
- - - S • -.
\'
)LT1 S
•
55
(
45 5
'S
S
•
•55•
S
5.
I
-
American Engineering Laboratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695-3730
FAX (619) 695-6712
San Diego • Corona • Modesto • Yucca Valley • Apple 40",
To: ROEL CONSTRUCTION COMPANY, INCt Date: May 17, 1
3366 Kurtz St.
San Diego, CA 92110
ATTN: Derek Davis
Project: CARLSBAD CROSSROADS, PHASE II
BUILDINGS"F-G-H-I-J
Carlsbad, CA
Project #:
Gentlemen
Enclosed are the inspection reports for, the week (s) ending: 5/5/90,
5/12/90
All work monitored by our inspectors was done in accordance with
applicable cods and specifications, unless otherwise noted.
Should you have any further questions, please do not hesitate to
contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
PATRICK MCGRATH - Laboratory Supervisor ,
1-ROEL CONSTRUCTION S S S
1HI&ASSOC.
[1-CITY OF 7AD
1-STTCROI-X-CAPITAL CORP.
Page 1 o
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project #
Project Name (per plans)
Project Address (legal) 49 ?3 '
Architect — // e H t 4i
Engineer
Contractor /OCL t7'.
Report No.
3IIOS5 1"• Building Permit No. J
4a6 Plan File No.____________
Govt. Contract No.
OSA or OSHPD #
Other
INSPECTION CODE MAT'L SAMPLING OTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
OSHPD P11 Concrete Cylinders . - Rinf.: Rebar 461C 6A-4 0 ..._. Plan & Specs
— GSA P11 Cement — Rinf.: W.W.F. ____________________________ Clearances
— Specialty P49 — Mortar Samples Rinf.: Tendons _____________________________ Positions
— Mechanical PlO Grout Samples Conc.: Mix fl/psi — Sizes'
Electrical P09 ._ Masonry Prisms — Conc.: Mix fl/psi — Laps
Rooting P17 — Masonry Block Conc.: Mix fl/psi ___________________________ Future Continuity fl/psi
Concrete P12 Fireproofing — Grout: Mix fl/psi -_________________________ Consolidation
Masonry P13 __. Units (block or brick) — Mortar: Type/psi — Mortar Batching
— Struct Steel P15 — Asphaltic Concrete Units: Block _______________________________ — Electrode Storage
Prestress Conc P14 Rooting Units: Brick _______________________________ Torque Applied
Pile Driving P16 .............. Reinf. Steel Steel
Fireproofing P47 Steel — H.S. Bolts
Waterproofing P48 H.S. Bolts — Metal Decking
Electrodes Non-Destructive P31 Tendon (PT Strands)
Soils Technician P22' — Other Fireproofing
Corrective action required Batch Plant P18 — Other _____________ — Other ________________________________________
Bolt Pull-Out P33 ,............ Other ____________ __________________________________________ Corrections completed
INSPECTION DATE:
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, Complies with approved plans, specifications and applicable sections of
the building codes. report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
- I
INSPECTOR NAME NAME P11 I '—'(f 'Ti INSPECTOR COMPANY I.D. NO.
INSPECTOR SIGNATURE CERT. If 3 DATE A14' ii, 0
NOTE: Inspections based on 4 hour tnimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
Page 1 of
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
Project #
Project Ni
Project Address (legal)
Architect
Engineer
Contractor
Report No.
Building Permit No. 90 3/
Plan File No.
Govt. Contract No.
OSA or OSHPD #.
Other
INSPECTION REPORT
INSPECTION CODE
OSHPD Pit
MAT'L SAMPLING OTY
.X2 Concrete Cylinders ....3........
MATERIAL DESCRIPTION
..... Rint.: Rebar a- £ 0
INSPECTION CHECKLIST
Plan & Specs
- USA P11 Cement Rinf.: W.W.F. Clearances
Specially P49 Mortar Samples - Rint.: Tendons _____________________________ - Positions
Mechanical PlO Grout Samples Conc.: Mix #/psi ___________________________ Sizes
Electrical P09 - Masonry Prisms Conc.: Mix #/psi Laps
Rooting P17 - Masonry Block Conc.: Mix #/psi ___________________________ Future Continuity #/psi
Concrete P12 - Fireproofing Grout: Mix #/psi ____________________________ Consolidation
- Masonry P13 Units (block or brick) Mortar: Type/psi Mortar Batching
- Struct Steel P15 Asphaltic Concrete Units: Block Electrode Storage
Prestress Conc P14 _. Rooting - Units: Brick Torque Applied
Pile Driving P16 Reint. Sleet Sleet
Fireproofing P47 - Sleet - H.S. Bolts
Waterproofing P48 - H.S. Bolts . - Metal Decking
- Non-Destructive P31 - Tendon (PT Strands) - Electrodes
Fireproofing - Soils Technician P22. Other
......._ Corrective action required Batch Plant P18 - Other - Other
- Bolt Pull-Out P33 Other Corrections completed
INSPECTION DATE: /14Y '7 /g90
ILP LIJI ,i <i ,. ,Air , -- ,1,.i LI o
(4)3,_!J11 a2,s'1_,3aW./,_) I II #,-S!,i 1 L/,k)3
10 A1 T Ofrie A •19,l ~i2Ctrc 4 od ,9jd 4 7.
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of
the buildingcodes,3 )report covers the locations of the work inspected only and does not Constitute engineering opinion or project Control.
INSPECTOR NAME
INSPECTOR SIGNATURE
NOTE: Inspections based on 4 hour
3:30 p.m. on weekdays.
INSPECTOR COMPANY I.D. NO.
CER4# /$ DATEH4Y 1,/O
nimum, 8 Ilour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
American Engineering Labratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695-3730
FAX (619) 695-6712
San Diego • Corona • Modesto • Yucca Valley • Apple Valley
To: IROEL CONSTRUCTION COMPANY, .J1 Date: May 17, 1990
3366 Kurtz St.
San Diego, CA 92110
ATTN: Derek Davis
Project: CARLSBAD_CROSSROADS, PHASE II
.JThUILDINGS "F-CHJ"
Carlsbad, CA
Project #: .1-1-342
RECEIVED
MAY 18 1990
Gentlemen: . MUNICIPAL PROJEDTS
DlVIIO
Enclosed are the inspection reports for the week (s) ending: 5/12/90
All work monitored by our inspectors was done in accordance with
applicable codes and specifications, unless otherwise noted.
Should you haye any further questions, please do not hesitate to
contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
ç4
PATRICK MCGRATH - Laboratory Supervisor
1-ROEL CONSTRUCTION
1-HCH & ASSOC.
1-CITY OF CARLSBAD
I-ST. CROIX CAPITAL CORP.
Page lof /
AMERICAN ENGINEERINb LABORATORIES, INC.
.2-1940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business CIr. Or., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project #
Project Name (per plans) /. .'& .-_. 1- 40-:5 S i-..-&
Project Address (legal) -2 ,9114n ib e .
Architect H1 /1 -i
Engineer
Contractor t2te.j d tc/' afirz&.
Report No.
Building Permit No. _____________________
Plan File No.
Govt. Contract No.
OSA or OSHPD # -
Other
INSPECTION CODE MAIL SAMPLING OTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
OSHPD P11 _Concrete Cylinders i..... flint.: Rebar . Plan & Specs
USA P11 — Cement — Rint.: W.W.F. ____________________________ Clearances
Specially P49 Mortar Samples flint.: Tendons _____________________________ Positions
Mechanical PlO — Grout Samples — Conc.: Mix #/psi ___________________________ Sizes
Electrical P09 — Masonry Prisms — Conc.: Mix #Ipsl Laps
Roofing P17 — Masonry Block — Conc.: Mix #/psl Future Continuity #1 Si
Concrete P12 — Fireproofing — Grout: Mix #/psi Consolidation tJ &rk.A.aJ
— Masonry P13 Units (block or brick) — Mortar: Type/psi ___________________________ Mortar Batching
Strucl Steel P15 — Asphaltic Concrete Units: Block _______________________________ — Electrode Storage
Prestress Conc P14 — Rooting Units: Brick _______________________________ Torque Applied
— Pile Driving P16 — Reinf. Steel — Steel
Fireproofing P47 — Sleet — H.S. Bolts
— Waterproofing P48 — H.S. Boils — Metal Decking
— Non-Destructive P31 — Tendon (PT Strands) — Electrodes
Soils Technician P22 Other Fireproofing
Corrective action required Batch Plant P18 — Other _____________ — Other _____________________________________
Bolt Pull-Out P33 — Other ____________ __________________________________________ Corrections completed
INSPECTION DATE: -.C/f--? O 43 y0d.- LL_Et,-_- _Ly-_
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of
the building codes. This report covers the locations of the work inspected only and does not Constitute engineering opinion or project control.
INSPECTOR NAME cl' INSPECTOR COMPANY I.D. NO.
(Print Clearly)
Al / .
INSPECTOR SIGNATURE C.--' /'4L.& 4- CERT. #_V_16? DATE
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all Cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
American Engineering Laboratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695-3730
FAX (619) 695-6712
San Diego' ' Corona • Modesto • Yucca Valley • Apple Valley
To: \JROEL CONSTRUCTION COMPANY,
336Kurtz St.
San Diego, CA 92110
ATTN: Derek Davis
Project: CARLSA.RO,SSRQADS, PHASE II
tLDINGS HF_G4Jt
Carlsbad, CA
12
Date: May 8,1
go 0 73
74
Id
CO Project : 1-1-342
Gentlemen:
Enclosed are the inspection reports for the week (s) ending: 4/21/90,
4/28/90,
5/5/90
All work monitored by our inspectors was done in accordance with
applicable codes and specifications, unless otherwise noted.
Should you have any further questions, please do not hesitate to
contact our office.
AMERICAN ENGINEERING LABORATORIES, INC.
G&4 72f
PATRICK MCGRATH - Laboratory Supervisor
1-ROEL CONSTRUCTION
1-HCH & ASSOC.
1--CITY OF CARLSBAD
1-ST. CROIX CAPITAL CORP.
Project #_/V 3
Page 1 of
AMERICAN ENGINEERING LABORATORIES, INC.
o 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business dr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego. CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Report No. b
Project Name (per plans)
Project Address (legal) -
173
Architect.__.______
Engineer (..iF1'
fibContractor tEL. 17
W Ec 7
Building Permit No.
Plan File No.
Govt. Contract No.
OSA or OSHPD # -
Other
INSPECTION CODE MAT'L SAMPLING Y MATERIAL DESCRIPTION INSPECTION CHECKLIST
OSHPD P11 Concrete Cylinders - Rin!.: Rebar _____________________________ - Plan & Specs
- OSA P11 Cement Rint.: W.W.F. ____________________________ Clearances
Specialty P49 Mortar Samples Rint.: Tendons ' - Positions
- Mechanical PlO - Grout Samples - Conc.: Mix h/psi ___________________________ Sizes
- Electrical P09 Masonry Prisms - Conc.: Mix #/psi Laps
Rooting P17 - Masonry Block Conc.: Mix h/psi ___________________________ Future Continuity h/psi
_ Concrete P12 Fireproofing Grout: Mix h/psi __________________________ Consolidation
Masonry P13 Units (block or brick) Mortar: Type/psi - Mortar Batching
Struct Steel P15 -. Asphaltic Concrete - Units: Block _______________________________ Electrode Storage
Prestress Conc P14 - Rooting - Units: Brick _______________________________ Torque Applied
Pile Driving P16 - Reint. Steel - Steel
Fireproofing P47 Steel - H.S. Bolts
Waterproofing P48
- Non-Destructive P31
- H.S. Bolts .
Tendon (PT Strands)
- Metal Decking
- Electrodes
Soils Technician P22 Other ____________ - Fireproofing . ,.. -
CorrectiLá tin required
- Batch Plant P18 - Other ____________ Other _____________________________________
Bolt Pull-Out P33 Other
INSPECTION DATE: Ii',2r/ /1, /99ü
)1,sg-,L1I) ?Li'T 01 A7ac be-. Ls
) /1?4,t. (,,E I 77/-M ? mo/ Z- /
i?P/9g.2ç /o yid ol cer / 57o[ ci
A AId / ~. £Th I / dyI/dLs Tb1 k2êL) ,1-
e,7t,1im,t.
&0aL , p7 d.
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, Complies with approved plans, specifications and applicable sections of
the building codel. ib ~is report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME 444' t'; INSPECTOR COMPANY I.D. NO.
INSPECTOR SIGNATURE CRT g9-1/9;? V- 'E_ DATE q-4- -
NOTE: Inspections based on 4 hour minin' m, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
Page 1 of
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350S
'
. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project# A .
Project Name (per plant) 4i'l5a34t'V" 2cS e41"
Project Address (legal) .2 '73 $' 2o,2"7t- /7ti( 1.VE.S 7
Architect
Report No. D 05O
Building Permit No.
Plan File No.
Govt. Contract No.
Engineer .
OSA or OSHPD #
Contraátor /2pC-/
.:',
Other
INSPECTION CODE MAIL SAMPLING ITY MATERIAL DESCRIPTION INSPECTION CHECKLIST
OSHPD P11 Y Concrete Cylinders ..L. Flint.: Rebar _______________________________ Plan & Specs
OSA P11 Cement Rift.: W.W.F. ______________________________ Clearances
- Specially P49 .._L Mortar Samples - Rift.: Tendons _____________________________ Positions
Mechanical PlO - Grout Samples Conc.: Mix 4/psi ___________________________ Sizes
Electrical P09 - Masonry Prisms Conc.: Mix 4/psi ___________________________ ._... Laps
Rooting P17 - Masonry Block - Conc.: Mix 4/psi . Future Contlnuiy 4/psi
Concrete P12 Fireproofing - Grout: Mix 4/psi Consolidation________________________
Masonry P13 ...L Units (block or brick) - Mortar: Type/psi - Mortar Batching -
Struct Steel P15 Asphaltic Concrete - Units: Block _______________________________ Electrode Storage -
Prestress Conc P14 Rooting Units: Brick _____________________________ -
,
-. Pile Driving P16 - Reinl. Steel Steel
Fireproofing P47 Sleet - H.S. Bolts
Waterproofing P48 H.S. Bolts - Metal Decking -
Electrodes Non-Destructive P31 Tendon (PT Strands)
Soils Technician P22 Other Fireproofing
Corrective action required -- Batch Plant P18 Other _____________ Other .
- Bolt Pull-Out P33 Other _____________ __________________________________________ Corrections completed
INSPECTION DATE: 1i'1,-iL g ', 1990
I. ~j'6s-7O /p,t,ciivT it- ,0,iu /s i 174i,t C -4
Ii6,I) fo h!jyr P/,1! 1) ,9 S I*Z— P/wc I 1/6 d iOi
2. of 4,c- 14Aict 47
Ac /ifl- 5.cerc / 4,4 ,i , 6ei'7
/ 4f4vdf wd T?cT
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, Complies with approved plans, specifications and applicable sections of
the building codes. This report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME i?4u,Li 2 k'4 5 INSPECTOR COMPANY I.D. NO.
INSPECTOR SIGNATURE . 3 4 DATE
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays. '
Page lof
AMERICAN ENGINEERING LABORATORIES, INC.
0 7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business CIr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project# ) -
Project Name (per plans) le.-LI L r4tc if
Project Address (legal) Lo \4
Architect
Engineer
Contractor.
Report No
Building Permit No. 9
Plan File No.
Govt. Contract No.
OSA or OSHPD #.
Other
INSPECTION CODE
- OSHPD P11
MAT'L SAMPLING OTY
- Concrete Cylinders
MATERIAL DESCRIPTION
Rebar ?L- C" Q
INSPECTION CHECKLIST
..t Plan & Specs -
— OSA P11 - Cement - Rinf.: W.W.F. ..., Clearances
Specialty P49 Mortar Samples Rift.: Tendons ...,X. Positions
Mechanical PlO Grout Samples Conc.: Mix #/psi ...._ Sizes
Electrical P09 Masonry Prisms - Conc.: Mix #/psi
Rooting . P17 Masonry Block - Conc.: Mix #/psi Future Continuity It/psi
Concrete P12 Fireproofing Grout: Mix #/psi - Consolidation
Masonry P13 Units (block or brick) Mortar: Type/psi - Mortar Batching
Struct Sleet P15 - Asphaltic Concrete Units: Block _______________________________ Electrode Storage
- Prestress Conc P14 Roofing - Units: Brick _______________________________ - Torque Applied
- Pile Driving P16 Reint. Steel - Sleet
H.S. Bolts - Fireproofing P47 Sleet
Waterproofing P48 ............L H.S. Botts - Metal Decking
- Electrodes Non-Destructive P31 Tendon (PT Strands)
- Soils Technician P22 Other - Fireproofing
Corrective action required Batch Plant P18 Other _____________ Other _____________________________________
- Bolt Pull-Out P33 Other - Corrections completed
INSPECTION DATE:
~Wnr-,IL Will
43 - T -\--f L4i $'T44 7f 41..'—(
CERTIFICATION OF COMPLIANCE:iII of the reported'work unless otherwise noted mpites with approved plans, specifications and applicable sections of
the building codes. This report Covell the locations of the work inspected only and dot-not constitute engineering opinion or project Control.
INSPECTOR NAME /- 1..d(Z.O,L INSPECTOR COMPANY I.D. NO. (Print Clearly) SINSPECTOR SIGNATUR CERT. # M DATE
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
American Engineering Laboratories, Inc.
7940 Arjons Drive, Suite A
San Diego, CA 92126
Telephone (619) 695.3730
FAX (619) 695-6712
San Diego . Corona • Modesto • Yucca Valley • Apple Valley
To: ROEL CONSTRUCTION COMPANY,-INC. Date: April 25,1990
3366 Kurtz St.
San Diego, CA 92110
ATTN: Derek Davis
Project: CARLSBAD CROSSROADS, PHASE II
BUILDINGS "F-G-H-I-J"
Carlsbad,
Project #: * 1-1-342
Gentlemen:-
Enclosed are the inspection reports for the week (s) ending: 4/21/90
All work monitored by our inspectors was done in accordance with
applicable cod0s and specifications, unless otherwise noted.
Should you have any further questions, please do. not hesitate to
contact our office. .
.
AMERICAN ENGINEERING LABORATORIES, INC.
c?4 72f1 .
PATRICK MCGRATH - Laboratory Supervisor .
1-ROEL CONSTRUCTION •
1-HCH & ASSOC. •• . .
41-CITY OF CARLSBAD • . • -. •
* 1-ST. CROIX CAPITAL CORP.... • ••
Page 1 of .1
AMERICAN ENGINEERING LABORATORIES, INC.
/7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project Name (per plans) Z___s
Project Address (legal)4—
Architect 1,4C!J4 4 .
Engineer
Contractor
Report No.
Building Permit No. "
Plan File No.
Govt. Contract No.
OSAorOSI-IPD#
Other
INSPECTION CODE MATT SAMPLING OTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
- OSHPD P11 - Concrete Cylinders ..Rinf.: Rebar .S.. Plan & Specs
- OSA P11 - Cement ' Rinf.: W.W.F. ______________________________ j. Clearances
Specialty P49 - Mortar Samples - Rinf.: Tendons - Positions
Mechanical PlO - Grout Samples Conc.: Mix #/psi __________________________ Sizes
Electrical P09 Masonry Prisms - Conc.: Mix #/psi IV= Laps
Rooting P17 - Masonry Block - Conc.: Mix 11/psi - Future Continuity 11/psi
,... Concrete P12 - Fireproofing Grout: Mix 11/psi . Consolidation
- Masonry P13 Units (block or brick) Mortar: Type/psi ___________________________ Mortar Batching
Struct Steel P15 Asphaltic Concrete Units: Block ' - Electrode Storage
Prestress Conc P14 Rooting Units: Brick _______________________________ ___.. Torque Applied
Pile Driving P16 Relnt. Steel Steel
H.S. Bolts - Fireproofing P47 Steel
- Waterproofing P48 H.S. Bolts - Metal Decking
Electrodes Non-Destructive . P31 - Tendon (PT Strands)
- Soils Technician 'P22 - Other , - Fireproofing
Corrective action required Batch Plant P18 Other . - Other
Bolt Pull-Out P33 - Other ' - Corrections completed
'I
INSPECTION DATE: 4—i- ?ô. r ,
,Ai1 AJ, J4t' ,&).C'ii, )?
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, complies with approved plans, specifications and applicable sections of
the building codes. This report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME iJ2.% 1 Z74-41(r INSPECTOR COMPANY I.D. NO. (Print Clearly)
INSPECTOR SIGNATURE C___Lf.A.tl tb...5I.Le4LL, CERT. # ? 3"/PJ DATE
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellatio'ns. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
4. Page lof /
Project 4
Project Name (per plans)
Project Address (legal) -
Architect
Engineer
Contractor
AMERICAN ENGINEERING LABORATORIES, INC.
-7r4O Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Mr. Dr., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
-z Report No.
Building Permit No
C Plan File No.
Govt. Contract No.
OSA or OSHPD #
Other
INSPECTION CODE MATT SAMPLING OTY MATERIAL DESCRIPTION INSPECTION CHECKLIST
OSHPD P11 Concrete Cylinders Rlnf.: Rebar _____________________________ - Plan & Specs
OSA P11 Cement - Rlnf.: W.W.F. _________________________ Clearances
Specialty P49 - Mortar Samples - Rlnf.: Tendons _____________________________ Positions
- Mechanical PlO Grout Samples . - Conc.: Mix 4/psi - Sizes
Electrical P09 Masonry Prisms Conc.: Mix 4/psi - Laps
- Roofing P17 Masonry Block - Conc.: Mix 4/psi ___________________________ Future Continuity 4/psi
.4 Concrete P12 Fireproofing - Grout: Mix 4/psi - Consolidation
- Masonry P13 - Units (block or brick) - Mortar: Type/psi Mortar Batching
Struct Steel P15 Asphaltic Concrete - Units: Block _______________________________ - Electrode Storage
Prestress Conc P14 - Roofing - Units: Brick _______________________________ - Torque Applied
Pile Driving P16 - Reinf. Steel - Steel
Fireproofing P47 - Steel - H.S. Bolts
Waterproofing P48 - H.S. Bolts - Metal Decking
Electrodes - Non-Destructive P31 - Tendon (PT Strands)
- Soils Technician P22 - Other _____________ Fireproofing
Corrective action required Batch Plant P18 Other _____________ Other _____________________________________
- Bolt Pull-Out P33 - Other _____________ - Corrections completed
INSPECTION DATE:
CERTIFICATION OF COMPLIANCE: All of the reported work, Unless otherwise noted, complies with approved plans, specifications and applicable sections of
the building codes. This report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME 6-UL- ZZ4 11 4S INSPECTOR COMPANY I.D. NO.
(Print clearly)
INSPECTOR SIGNATURE c2 Zi3!Ll4.0 CERT. # DATE '4' v'
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
Page lof
1
AMERICAN ENGINEERING LABORATORIES, INC.
7940 Arjons Dr., Ste. A 0 350 S. Maple St., Unit K 0 515 Galaxy Way 0 58945 Business Ctr. Or., Unit A 0 13641 John Glenn Rd., Ste. C
San Diego, CA 92126 Corona, CA 91720 Modesto, CA 95356 Yucca Valley, CA 92284 Apple Valley, CA 92307
(619) 695-3730 (714) 272-4230 (209) 576-0813 (619) 228-1754 (619) 247-8445
INSPECTION REPORT
Project # 1 3 L4!
Project Name (per plans) CA RLS &A U C.v2_oS (-cAOc
Project Address (Iegal)Z.135 Lc(çE-fz AJE C44u.. A-cj CA
Architect flCF
II
Engineer
Contractor 2oL Crr.
Report No.
Building Permit No. _go 314.
Plan File No.
Govt. Contract No.
OSA or OSI-IPD # -
Other
INSPECTION CODE
OSHPD. P11
MAIL SAMPLING OTY
)e.. Concrete Cylinders
MATERIAL DESCRIPTION
Rinf.: Rebar _______________________________
INSPECTION CHECKLIST
Plan & Specs
- USA P11 - Cement . Rint.: W.W.F. ... Clearances
Specialty P49
Mechanical PlO
- Mortar Samples
Grout Samples
_.. Rift.: Tendons
)1. Conc.: Mix #/psi
Positions
- Sizes
Electrical P09 - Masonry Prisms Conc.: Mix #/psi Laps
Rooting P17 - Masoiry Block Conc.: Mix #/psi ______________________ Future Continuity #/psi
-)( Concrete Fireproofing Grout: Mix #/psi ____________________________ Con3olidalion
Masànry P13 Units (block or brick) Mortar: Type/psi Mortar Batching
Struct Steel P15 - Asphaltic Concrete .._....... - Units: Block _______________________________ _.__ Electrode Storage -__-
- Prestress Conc P14 - Rooting - Units: Brick _______________________________ . Torquc Applied
- Pile Driving P16 - Reint. Steel -- Steel
Fireproofing P47 Steel -- H.S. Bolts
Waterproofing P48 H.S. Bolts — Metal Decking -
Non-Destructive P31 Tendon (PT Strands) - Electrodes
- Fireproofing - Soils Technician - P22 Other
- Corrective action required Batch Plant P18 Other ..........._ Other ________________________________________
Bolt Pull-Out P33 Other ______________________________________ Corrections completed -
INSPECTION DATE:i I\1RI_I_._I
• 3.J-21 S-13-c,S-5 --z _.S-2-1S-3,S-- '-}•-1,_,I.J-4
0-3 4-'tD ,4- 2. icypL c.L 4W101Z fA4P !'O.o
CERTIFICATION OF COMPLIANCE: All of the reported work, unless otherwise noted, Complies with approved plans, specifications and applicable Sections of
the building codes. This report covers the locations of the work inspected only and does not constitute engineering opinion or project control.
INSPECTOR NAME I"4 4IJI_t-..iI4i_cr INSPECTOR COMPANY I.D. NO.
(Print Clearly) G28-S
INSPECTOR SIGNATURE OJ 4JVv1__k1-_.ki CERT. If :ZC42.I' _49 DATE _2_-
NOTE: Inspections based on 4 hour minimum, 8 hour minimum after 4 hours, 2 hour minimum for all cancellations. Overtime effective on Saturday and after
3:30 p.m. on weekdays.
// • . .. qoo,
/
Pat ei7//1'/ jurjsaictionear(6d
/ ..- Prepared. by,t Bldg.. Dept.
7 . .
VALUATION AND PLAN CHECK FEE 9 Esgil
PLAN CHECK No._32.
- BUILDING ADDRESS 7O-j73 L-0- La A,
S APPLICANT/CONTACT - PHONE NO.________________
BUILDING OCCUPANCY
- DESIGNER 'PHONE .
S TYPE OF CONSTRUCTION CONTRACTOR PHONE___________
BUILDING PORTION BUILDING AREA VALUATION
MULTIPLIER
VALUE
id (+) S •• )4 12 .75.
9Sjot,
MF Ev
Air Conditioninz
Commercial ••• . . . •
: •
Residential • - _________________ ____________ _____________________ Res. or Comm.
Fire SDrinklers
S
5 •
-
-
•
.
Total Value . - / 3 7 -
Building Permit Fee. $ S . $
Plan Check Fee $ . ' $
COMHEN TS: S • . . . S • • )
• .
•• SHEET /OF 5 ' 12/87