HomeMy WebLinkAbout2742 FARADAY AVE; RW; CB071502; PermitC I City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
06-01-2007 Retaining Wall Permit Permit No: CB071502
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
2742 FARADAY AV CBAD St: RW
RETAIN
Lot#: 0000000000
$2,090.00 Construction Type:
55SF UTILITY RET. WALL (CITY)
0
NEW
Applicant: Owner:
TC CONSTRUCTION COMPANY, INC.
10510 PROSPECT AV
SANTEE, CA 92071
619-448-4560
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Strong Motion Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Additional Fees
TOTAL PERMIT FEES
Total Fees: $76.55 Total Payments To Date:
Inspector:
FINAL APPROVAL
Date: 0 t ( Loto<a
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Plan Check#:
Inspect Area:
$76.55 Balance Due:
,, ''.
ISSUED
05/31/2007
JMA
06/01/2007
06/01/2007
$45.79
$0.00
$29.76
$0.00
$1.00
$0.00
$0.00
$0.00
$0.00
$76.55
, i , · ·, \ I
Clearance:
$0.00
NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions " You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 332 030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been oiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired.
City of Carlsbad Bldg Inspection Request
For: 01/04/2008
Permit# CB071502
Title: 55SF UTILITY RET. WALL (CITY)
Description:
Type: RETAIN Sub Type:
Job Address: 2742 FARADAY AV
Suite: RW Lot: 0
Location:
APPLICANT TC CONSTRUCTION COMPANY, INC.
Owner:
Remarks:
Total Time:
CD Description Act Comments
69 Final Masonry
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
lnsgection Histo[Y
Date Description Act lnsp Comments
Inspector Assignment: MC ---
Phone: 6193188505
Inspector: /y{t_
Requested By: FRAN
Entered By: CHRISTINE
07/03/2007 69 Final Masonry PA MC NEED GUARDRAIL
06/18/2007 66 Grout AP MC SECOND LIFT
06/13/2007 62 Steel/Bond Beam AP PD grout 1st lift
06/06/2007 61 Footing AP MC MADE TWO STOPS, CITY STAND. LEVEL BACKFILL
.. "'
FIELD MEMO MEMO NO. ----
PROJECT NAME __:Cu=--, lc..:....s b='--"'A'--...::..lb_~.....;;l)___._tk=-'-'-<i_V\_~_v;'-"',1...:.:..(/\=rl'-, ,---.:....:."~------'-'' mc...;:p:....,_r .;:_o \).:...:::e;;..:..Vv':.....:e:...:...r\....!..+..e....5 --------
C0RRESP6ND1NG
0'-':442-· 712 · D<o e, FIELD REPORT NO.-------------PROJECT NO.
. lk w,,\\ J
CI v 5 ho j I o 1...~ •
.. ..
DISTRIBUTION YES NO
SUPERINTENDENT ICLIENTl 'i 'ft\ 60Y1-iu \,.. i.
FOREMAN (CONTRACTOR) GEOCON REPRESENTATIVE
JOB TRAILER Jvne -z. -z. t '2ov1_
DATE
OTHER
T108 I IX-IXIX I RSS 6960 FLANDERS DRIVE· SAN DIEGO, CALIFORNIA 92121·2974 • PHONEl858l 558-6900 • FAX18581 558-6159
FIELD REPORT
0 GRADING O TRENCH BACKFILL
PAGE OF----
DA Y OF WE EK_._tt,._,i-=Jo.=-~+----
DA TE J,111e. 'Z'Z, U>v~
REPORT NO
PROJECT NAME ~\ G..,\s OcJ:., ~or,>--.· f;,<J.,."I f.dc impc:i'lcll'lr l\'R'
PROJECT NO. 0(,#2. · ?:Z.. OG, e,
0 CLIENT ' PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR
u lec.~b:~ ~ .. .,~. £". AWo.,od" a, Go..,Xc-lt.'Z. N
C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H
A BY 0 PREVIOUSLY BRIEFED
N
G CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED
E TITLE
D
EQUIPMENT WORKING ANO TYPE OF COMPACTOR BY
\.i.. ... J l,le10.lcer APPROVAL DATE REV. DATE
WEATHER
SOURCE OF FILL
FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO
LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT:
LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP:
WHAT IN PARTICULAR SHOULD BE OBSERVED, CHECKED, OR TESTED DURING NEXT VISIT?
WAS A MEMO ISSUED TODAY? 0 YES 0 NO MEMO NO.
CONTRACTOR/FIELD TECHNICIAN ACTIVITIES -INDICATE ACTIVITIES YOU DID ANO DID NOT OBSERVE. DOCUMENT CONVERSATIONS, OBSERVATIONS, OR OCCURRENCES. DEEMED SIGNIFICANT TO THE PROGRESS OF WORK, BE SPECIFIC AS TO WHO, WHAT, WHEN, ANOWHERE.
i:-,.-Ja.'l
JVY\<.. ·u ' Z0o1
11-re.+o..,n.:~ we.JI o.."\ 2.142 fa. <c-Jo. ') A:1e.. 1/,l(j.~ ~cJ. kllt"J ~·,\" a..tf(vX, rz 't11.J.Q,,
of' h~:l l'oVe r.:.r; to.b, ~(.. Wro..ry~d Cf~~l...J (.:>.., k.. -Sfo..k. p-kJ D.Gt. ""°'I) 11.l)ed ~ bi.t.~ RI\ ti.. wt;.l\ I ,,_ k.J lo.lo.c..ke, .... ~,., .,,.,J t;, (i),.,. r=-d~O'lt
-
-
--
-
--
---
---
-------
------------------
-------
--------
FIELD TECH~N (PRINT) .I ·t GDfl7A t."t DA~i l, / 1.-i. o=f HO,RS 0 . T. -&-LIST ON-SITE VISITORS
NUMBER OF DENSITY TESTS TAKEN I CLIENT REPRESENTATIVE
SIGNATURE
\JOTICE: The professional engineer is represented on site solely to observe operations of the contractor identified, form opinions about the adequacy
Jf those operations, and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's
Jbligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction.
N:\WPJOB\TYP\FIELD\T110FLO.RPT (B/99)
FIELD MEMO MEMO NO. ----
PROJECT NAME _ __,C.'"'--'n:.J....r.,_..ls"-l-,,,__.d......_...:.Oa=k'-'.,-'-N..,.o.....,r!ci..;h.__-_...:...cFo::....:.r...:...c'.l&=-....;)l--'-A-'-"v-"-e '-Y1ut.:~· -'i'-'-w."4'p'-'-[..,,_O~i.;:.e...:.c~..:.:..{'-'-'(j'-'-ts.L...---------
CORRESPOND1NG 1
PROJECT NO. --"OC"-0411-...L....L.::c.-·~1 ..:;:_'l__,· o=<i--"'.f>'-------FIELD REPORT NO.--------------
A d,.,\t..)\ bt16 obb i><Yrd :&r -,~ r .... to.;._ VI.'.. t'IC\ w~ I\ 0-~ rtA. 2. -:r;,oAoc.11 1\-r.
) l
''" V\ l>-." .II l,c ~¥1 ~'(IP(.• l (1'1 fo<"" wdh I(,., e10\.f< WG I I)t\, fl
Artl\.l r:, ,,)~A ?:) MP C r .
DISTRIBUTION YES NO
SUPERINTENDENT (CLIENT! ,6;:)
~;\ Cto1'z.alez..
FOREMAN (CONTRACTOR) GEOCON REPRESENTATIVE
JOB TRAILER J11~e '2 I • 1 001
DATE
OTHER
T108 I IX-IXIX I RSS 6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-297 4 • PHONE I 8581 558-6900 -FAX I 85BJ 558-6159
Q GRADING
PROJECT NAME
Q CLIENT
u
N
C
H
A
N
G
E
0
CONTRACTOR
CONTRACTOR'S SUPERINTENDENT/FOREMAN
EQUIPMENT WORKING ANO TYPE OF COMPACTOR
FOLLOW-UP INVENTORY
FIELD REPORT
PROJECT NO.
PROJECT MANAGER
E:'. f\lvo.rc...do
PHONE PROJECT BRIEFING O YES
BY
PLANS AND SPECIFICATIONS
PAGE OF
DAY OF WEEK J},1lr5da.J
DATE Jv11c. f I, Uo"'t
REPORT NO.
FIELO TECHNICIAN/AUTHOR
DATE _________ _
0 PREVIOUSLY BRIEFED
0 UNCHANGED
TITLE-------------------------
APPROVAL DATE REV. DATE
WEATHER------------------------
SOURCE OF FILL
DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO
LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT:----------------------------------
LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: ________________________________________ _
WHAT IN PARTICULAR SHOULD BE OBSERVED, CHECKED, OR TESTED DURING~ VISIT?
WAS A MEMO ISSUED TODAY7 0 YES O NO MEMO NO.
CONTRACTOR/FIELD TECHNICIAN ACTIVITIES -INDICATE ACTIVITIES YOU DID AND Q!Ql:lQI OBSERVE. DOCUMENT CONVERSATIONS, OBSERVATIONS,
OR OCCURRENCES, DEEMED SIGNIFICANT TO THE PROGRESS OF WORK, BE SPECIFIC AS TO WHO, WHAT, WHEN, AND WHERE.
T~vr~do.1
j\/1)~ 'l.l, 'ZODY'
· 1 wa~ o.~ll~J.
1142. ~rodj Ave .
. L1-~"' ~~ ,n
NUMBER OF DENSITY TESTS TAKEN -8 .
b) _Qroc..<>r-•
-------------------_______________________ ..
---------------
-------------
DAT HOURS 0. T. LIST ON-SITE VISITORS
C. i, 0 I -e--
CLIENT REPRESENTATIVE
SIGNATURE
NOTICE: The professional engineer is represented on site solely to observe operations of the contractor identified, form opinions about the adequacy
of those operations, and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction.
N:\WPJOB\TYP\FIELD\T110FLD.RPT (8/991
,-{' ... /\ \JI\ v\
W~ .... L , ( GEOCON
1'NCORPORATED
6960 FLANDERS DRIVE
!,C, C GEOTECHNICAL CONSULT ANTS !~
• SAN DIEGO, CALIFORNIA 92121-297 4 • TEL (858) 558-6900 • FAX (858) 558-6159 •
FOUNDATION OBSERVATION REPORT
PROJECT NAME : ----'~~W.:_c.___:__,;cc___:-_---'--'---'--'-------"'--"-----"----=--=-----------PROJECT NO. --'--'--=-~,,,t.::__;-,_•__.:::.._..;2=:-_ _,_7 8
LOCA TION : ---------------------DATE: ---=---__c._h_o ..:._7 ___ _
FOUNDATION LOCATION (if not entire building) , ·;, ). I. ..... , '";; r /,. .,.. f-_J
PLAN FILE NO. PERMIT NOS :
D ADDITIONAL OBSERVATION REQUIRED
FOUNDATION TYPE :
0 CONVENTIONAL D SUBSTANTIAL CONFORMANCE D POST-TENSIONED
• PURPOSE OF OBSERVATION
D Verify soil conditions exposed are similar to those anticipated
D Verify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report
D Verify footings have been extended to an appropriate bearing strata
D Other--------------------------------------
• SOIL REPORT RECOMMENDATIONS BASED ON :
D Expansion Condition 0 VERY LOW 0 LOW 0 MEDIUM 0 HIGH 0 VERY HIGH
D Fill Geometry -----------------------------------
0 Other :---------------------~----------------
• MINIMUM FOUNDATION RECOMMENDATIONS :
D Footing Depth : D 12 Inches D 18 Inches D 24 Inches
I OTHER ________ ___:_/_, ___ _
Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B D Post-Tensioned OTHER : _____ _
Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches D Post-Tensioned
Slab Bedding Material and Thickness : ------------Vapor Barrier :
Foundation Width :
2 j'
• OBSERVATIONS:
0 Substantial conformance with Soil Reports (see "Purpose of Observation")
0 Substantial conformance with Foundation Plans. Identify : --------------------
D Other
NOTE · IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will SE aEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT T~ SOIL MoisTURE CONTENT Will SE MAINTAINED
J I
FIELD COPIES TO I GEOCON REPRESENTATIVE