Loading...
HomeMy WebLinkAbout2742 FARADAY AVE; RW; CB071502; PermitC I City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 06-01-2007 Retaining Wall Permit Permit No: CB071502 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: Project Title: 2742 FARADAY AV CBAD St: RW RETAIN Lot#: 0000000000 $2,090.00 Construction Type: 55SF UTILITY RET. WALL (CITY) 0 NEW Applicant: Owner: TC CONSTRUCTION COMPANY, INC. 10510 PROSPECT AV SANTEE, CA 92071 619-448-4560 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Strong Motion Fee Renewal Fee Add'I Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES Total Fees: $76.55 Total Payments To Date: Inspector: FINAL APPROVAL Date: 0 t ( Loto<a Status: Applied: Entered By: Plan Approved: Issued: Plan Check#: Inspect Area: $76.55 Balance Due: ,, ''. ISSUED 05/31/2007 JMA 06/01/2007 06/01/2007 $45.79 $0.00 $29.76 $0.00 $1.00 $0.00 $0.00 $0.00 $0.00 $76.55 , i , · ·, \ I Clearance: $0.00 NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions " You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 332 030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been oiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired. City of Carlsbad Bldg Inspection Request For: 01/04/2008 Permit# CB071502 Title: 55SF UTILITY RET. WALL (CITY) Description: Type: RETAIN Sub Type: Job Address: 2742 FARADAY AV Suite: RW Lot: 0 Location: APPLICANT TC CONSTRUCTION COMPANY, INC. Owner: Remarks: Total Time: CD Description Act Comments 69 Final Masonry Comments/Notices/Holds Associated PCRs/CVs Original PC# lnsgection Histo[Y Date Description Act lnsp Comments Inspector Assignment: MC --- Phone: 6193188505 Inspector: /y{t_ Requested By: FRAN Entered By: CHRISTINE 07/03/2007 69 Final Masonry PA MC NEED GUARDRAIL 06/18/2007 66 Grout AP MC SECOND LIFT 06/13/2007 62 Steel/Bond Beam AP PD grout 1st lift 06/06/2007 61 Footing AP MC MADE TWO STOPS, CITY STAND. LEVEL BACKFILL .. "' FIELD MEMO MEMO NO. ---- PROJECT NAME __:Cu=--, lc..:....s b='--"'A'--...::..lb_~.....;;l)___._tk=-'-'-<i_V\_~_v;'-"',1...:.:..(/\=rl'-, ,---.:....:."~------'-'' mc...;:p:....,_r .;:_o \).:...:::e;;..:..Vv':.....:e:...:...r\....!..+..e....5 -------- C0RRESP6ND1NG 0'-':442-· 712 · D<o e, FIELD REPORT NO.-------------PROJECT NO. . lk w,,\\ J CI v 5 ho j I o 1...~ • .. .. DISTRIBUTION YES NO SUPERINTENDENT ICLIENTl 'i 'ft\ 60Y1-iu \,.. i. FOREMAN (CONTRACTOR) GEOCON REPRESENTATIVE JOB TRAILER Jvne -z. -z. t '2ov1_ DATE OTHER T108 I IX-IXIX I RSS 6960 FLANDERS DRIVE· SAN DIEGO, CALIFORNIA 92121·2974 • PHONEl858l 558-6900 • FAX18581 558-6159 FIELD REPORT 0 GRADING O TRENCH BACKFILL PAGE OF---- DA Y OF WE EK_._tt,._,i-=Jo.=-~+---- DA TE J,111e. 'Z'Z, U>v~ REPORT NO PROJECT NAME ~\ G..,\s OcJ:., ~or,>--.· f;,<J.,."I f.dc impc:i'lcll'lr l\'R' PROJECT NO. 0(,#2. · ?:Z.. OG, e, 0 CLIENT ' PHONE PROJECT MANAGER FIELD TECHNICIAN/AUTHOR u lec.~b:~ ~ .. .,~. £". AWo.,od" a, Go..,Xc-lt.'Z. N C CONTRACTOR PHONE PROJECT BRIEFING 0 YES DATE H A BY 0 PREVIOUSLY BRIEFED N G CONTRACTOR'S SUPERINTENDENT/FOREMAN PLANS AND SPECIFICATIONS 0 UNCHANGED E TITLE D EQUIPMENT WORKING ANO TYPE OF COMPACTOR BY \.i.. ... J l,le10.lcer APPROVAL DATE REV. DATE WEATHER SOURCE OF FILL FOLLOW-UP INVENTORY DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT: LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: WHAT IN PARTICULAR SHOULD BE OBSERVED, CHECKED, OR TESTED DURING NEXT VISIT? WAS A MEMO ISSUED TODAY? 0 YES 0 NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES -INDICATE ACTIVITIES YOU DID ANO DID NOT OBSERVE. DOCUMENT CONVERSATIONS, OBSERVATIONS, OR OCCURRENCES. DEEMED SIGNIFICANT TO THE PROGRESS OF WORK, BE SPECIFIC AS TO WHO, WHAT, WHEN, ANOWHERE. i:-,.-Ja.'l JVY\<.. ·u ' Z0o1 11-re.+o..,n.:~ we.JI o.."\ 2.142 fa. <c-Jo. ') A:1e.. 1/,l(j.~ ~cJ. kllt"J ~·,\" a..tf(vX, rz 't11.J.Q,, of' h~:l l'oVe r.:.r; to.b, ~(.. Wro..ry~d Cf~~l...J (.:>.., k.. -Sfo..k. p-kJ D.Gt. ""°'I) 11.l)ed ~ bi.t.~ RI\ ti.. wt;.l\ I ,,_ k.J lo.lo.c..ke, .... ~,., .,,.,J t;, (i),.,. r=-d~O'lt - - -- - -- --- --- ------- ------------------ ------- -------- FIELD TECH~N (PRINT) .I ·t GDfl7A t."t DA~i l, / 1.-i. o=f HO,RS 0 . T. -&-LIST ON-SITE VISITORS NUMBER OF DENSITY TESTS TAKEN I CLIENT REPRESENTATIVE SIGNATURE \JOTICE: The professional engineer is represented on site solely to observe operations of the contractor identified, form opinions about the adequacy Jf those operations, and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's Jbligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction. N:\WPJOB\TYP\FIELD\T110FLO.RPT (B/99) FIELD MEMO MEMO NO. ---- PROJECT NAME _ __,C.'"'--'n:.J....r.,_..ls"-l-,,,__.d......_...:.Oa=k'-'.,-'-N..,.o.....,r!ci..;h.__-_...:...cFo::....:.r...:...c'.l&=-....;)l--'-A-'-"v-"-e '-Y1ut.:~· -'i'-'-w."4'p'-'-[..,,_O~i.;:.e...:.c~..:.:..{'-'-'(j'-'-ts.L...--------- CORRESPOND1NG 1 PROJECT NO. --"OC"-0411-...L....L.::c.-·~1 ..:;:_'l__,· o=<i--"'.f>'-------FIELD REPORT NO.-------------- A d,.,\t..)\ bt16 obb i><Yrd :&r -,~ r .... to.;._ VI.'.. t'IC\ w~ I\ 0-~ rtA. 2. -:r;,oAoc.11 1\-r. ) l ''" V\ l>-." .II l,c ~¥1 ~'(IP(.• l (1'1 fo<"" wdh I(,., e10\.f< WG I I)t\, fl Artl\.l r:, ,,)~A ?:) MP C r . DISTRIBUTION YES NO SUPERINTENDENT (CLIENT! ,6;:) ~;\ Cto1'z.alez.. FOREMAN (CONTRACTOR) GEOCON REPRESENTATIVE JOB TRAILER J11~e '2 I • 1 001 DATE OTHER T108 I IX-IXIX I RSS 6960 FLANDERS DRIVE • SAN DIEGO, CALIFORNIA 92121-297 4 • PHONE I 8581 558-6900 -FAX I 85BJ 558-6159 Q GRADING PROJECT NAME Q CLIENT u N C H A N G E 0 CONTRACTOR CONTRACTOR'S SUPERINTENDENT/FOREMAN EQUIPMENT WORKING ANO TYPE OF COMPACTOR FOLLOW-UP INVENTORY FIELD REPORT PROJECT NO. PROJECT MANAGER E:'. f\lvo.rc...do PHONE PROJECT BRIEFING O YES BY PLANS AND SPECIFICATIONS PAGE OF DAY OF WEEK J},1lr5da.J DATE Jv11c. f I, Uo"'t REPORT NO. FIELO TECHNICIAN/AUTHOR DATE _________ _ 0 PREVIOUSLY BRIEFED 0 UNCHANGED TITLE------------------------- APPROVAL DATE REV. DATE WEATHER------------------------ SOURCE OF FILL DID YOU REVIEW PREVIOUS FOLLOW-UP FIELD REPORT? 0 YES 0 NO LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT:---------------------------------- LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP: ________________________________________ _ WHAT IN PARTICULAR SHOULD BE OBSERVED, CHECKED, OR TESTED DURING~ VISIT? WAS A MEMO ISSUED TODAY7 0 YES O NO MEMO NO. CONTRACTOR/FIELD TECHNICIAN ACTIVITIES -INDICATE ACTIVITIES YOU DID AND Q!Ql:lQI OBSERVE. DOCUMENT CONVERSATIONS, OBSERVATIONS, OR OCCURRENCES, DEEMED SIGNIFICANT TO THE PROGRESS OF WORK, BE SPECIFIC AS TO WHO, WHAT, WHEN, AND WHERE. T~vr~do.1 j\/1)~ 'l.l, 'ZODY' · 1 wa~ o.~ll~J. 1142. ~rodj Ave . . L1-~"' ~~ ,n NUMBER OF DENSITY TESTS TAKEN -8 . b) _Qroc..<>r-• -------------------_______________________ .. --------------- ------------- DAT HOURS 0. T. LIST ON-SITE VISITORS C. i, 0 I -e-- CLIENT REPRESENTATIVE SIGNATURE NOTICE: The professional engineer is represented on site solely to observe operations of the contractor identified, form opinions about the adequacy of those operations, and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction. N:\WPJOB\TYP\FIELD\T110FLD.RPT (8/991 ,-{' ... /\ \JI\ v\ W~ .... L , ( GEOCON 1'NCORPORATED 6960 FLANDERS DRIVE !,C, C GEOTECHNICAL CONSULT ANTS !~ • SAN DIEGO, CALIFORNIA 92121-297 4 • TEL (858) 558-6900 • FAX (858) 558-6159 • FOUNDATION OBSERVATION REPORT PROJECT NAME : ----'~~W.:_c.___:__,;cc___:-_---'--'---'--'-------"'--"-----"----=--=-----------PROJECT NO. --'--'--=-~,,,t.::__;-,_•__.:::.._..;2=:-_ _,_7 8 LOCA TION : ---------------------DATE: ---=---__c._h_o ..:._7 ___ _ FOUNDATION LOCATION (if not entire building) , ·;, ). I. ..... , '";; r /,. .,.. f-_J PLAN FILE NO. PERMIT NOS : D ADDITIONAL OBSERVATION REQUIRED FOUNDATION TYPE : 0 CONVENTIONAL D SUBSTANTIAL CONFORMANCE D POST-TENSIONED • PURPOSE OF OBSERVATION D Verify soil conditions exposed are similar to those anticipated D Verify footing excavations extend to minimum depth recommended in soil report D Verify foundation reinforcement complies with minimum recommended in soil report D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report D Verify footings have been extended to an appropriate bearing strata D Other-------------------------------------- • SOIL REPORT RECOMMENDATIONS BASED ON : D Expansion Condition 0 VERY LOW 0 LOW 0 MEDIUM 0 HIGH 0 VERY HIGH D Fill Geometry ----------------------------------- 0 Other :---------------------~---------------- • MINIMUM FOUNDATION RECOMMENDATIONS : D Footing Depth : D 12 Inches D 18 Inches D 24 Inches I OTHER ________ ___:_/_, ___ _ Footing Reinforcement: D No.4 T&B D 2-No.4 T&B D 2-No.5 T&B D Post-Tensioned OTHER : _____ _ Interior Slab Reinforcement : D 6x6-10/10 D 6x6-6/6 D No.3@241nches D No.3@181nches D Post-Tensioned Slab Bedding Material and Thickness : ------------Vapor Barrier : Foundation Width : 2 j' • OBSERVATIONS: 0 Substantial conformance with Soil Reports (see "Purpose of Observation") 0 Substantial conformance with Foundation Plans. Identify : -------------------- D Other NOTE · IT IS ASSUMED THAT All FOOTING EXCAVATIONS Will SE aEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT T~ SOIL MoisTURE CONTENT Will SE MAINTAINED J I FIELD COPIES TO I GEOCON REPRESENTATIVE