Loading...
HomeMy WebLinkAbout2743 PALMETTO DR; ; CB043163; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-19-20p4 Residential Permit Permit No: CB043163 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 08/19/2004 2743 PALMETTO DR CBAD RESDNTL Sub Type: Lot#: 2131800500 $191,671.00 Construction Type: Reference #: SFD 429 VN CT01-14 Status: Applied: Entered By: # Dwelling Units: Structure Type: SFD Issued: Bedrooms: 3 Bathrooms: 3 Inspect Area: Project Title: PRIMROSE@BRESSI -PA 12-PHASE 1 Orig PC#: PLAN 1-2095 SF,475 SF GAR,13 SF PORCH Plan Check#: Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92009 760-804-7700 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $829.92 $0.00 $539.45 $0.00 ($43.16) $19.17 $2,436.00 $0.00 · $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 Owner: Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFO Fund) Traffic Impact Fee Traffic Impact (CFO Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES ISSUED 07/20/2004 RMA Plan Approved: 08/19/2004 PC03-63 PC040089 $0.00 $160.00 $2,004.00 $2,848.90 $3,488.41 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $140.00 $60.00 $72.00 $0.00 $0.00 $0.00 $0.00 $1,735.00 $0.00 $17,948.69 Total Fees: $17,948.69 Total Payments To Date: $0.00 Balance Due: $17,948.69 Inspector: FIN~LAf~L Date:V-V 9329 08/19/04 0002 01 CGP Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reseivations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infom,ation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor pjanning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES lT APPLY to any f I x i n of whi h hav r vi I b iv n N Tl E imil r hi r whi h h u l"mi i h vi I 02 1'943-9 City of Carlsbad Bldg Inspection Request For: 05/17/2005 Permit# CB043163 Title: PRIMROSE@BRESSI -PA 12-PHASE 1 Description: PLAN 1-2095 SF,475 SF GAR,13 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2743 PALMETTO DR Suite: Lot 429 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description Act Comment 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs/CVs lns!1ection History Date Description Act lnsp Comments 05/04/2005 39 Final Electrical PA PC EMR Inspector Assignment: PC --- Phone: 7606441604 Inspector: L Requested By: TREVOR Entered By: CHRISTINE 03/21/2005 21 Underground/Under Floor CA PC PREV. SIGNED OFF 03/18/2005 17 Interior Lath/Drywall AP PC 03/18/2005 84 Rough Combo WC PC 03/16/2005 17 Interior Lath/Drywall NR PC 03/14/2005 16 l nsulation AP PC 03/14/2005 84 Rough Combo AP PC 03/11/2005 84 Rough Combo co PC METAL F.S.@ F.P. FLUE. AND D.S.@ CHASE -OK TO INSUL 03/10/2005 84 Rough Combo NR PC 02/28/2005 83 Roof Sheathing/Ext Shear AP PC 11/17/2004 11 Ftg/Foundation/Piers AP RB 11/17/2004 81 Underground Combo AP RB 11/08/2004 81 Underground Combo CA PS BY DOUG 10/25/2004 81 Underground Combo NR PS PER KEVIN 10/22/2004 11 Ftg/Foundation/Piers CA PS BY KEVIN TOO WET 10/20/2004 11 Ftg/Foundation/Piers CA PS RAIN OUT City of Carlsbad Bldg Inspection Request For: 05/04/2005 Permit# CB043163 Title: PRIMROSE@BRESSI -PA 12-PHASE 1 Description: PLAN 1-2095 SF,475 SF GAR,13 SF PORCH Type: RESDNTL Sub Type: SFD Job Address: 2743 PALMETTO DR Suite: Lot 429 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description 39 Final Electrical ~ Comment Associated PCRs/CVs lnsgection Histo~ Date Description Act lnsp Comments Inspector Assignment: PC --- Phone: 7606441604 Inspector: _L:_ Requested By: TREVOR Entered By: CHRISTINE -~f- 03/21/2005 21 Underground/Under Floor CA PC PREV. SIGNED OFF 03/18/2005 17 Interior Lath/Drywall AP PC 03/18/2005 84 Rough Combo WC PC 03/16/2005 17 Interior Lath/Drywall NR PC 03/14/2005 16 Insulation AP PC 03/14/2005 84 Rough Combo AP PC 03/11/2005 84 Rough Combo co PC METAL F.S. @ F.P. FLUE. AND D.S.@ CHASE -OK TO INSUL 03/10/2005 84 Rough Combo NR PC 02/28/2005 83 Roof Sheathing/Ext Shear AP PC 11/17/2004 11 Ftg/Foundation/Piers AP RB 11/17/2004 81 Underground Combo AP RB 11/08/2004 81 Underground Combo CA PS BY DOUG 10/25/2004 81 Underground Combo NR PS PER KEVIN 10/22/2004 11 Ftg/Foundation/Piers CA PS BY KEVIN TOO WET 10/20/2004 11 Ftg/Foundation/Piers CA PS RAIN OUT 10/18/2004 11 Ftg/Foundation/Piers NR PY 10/05/2004 21 Underground/Under Floor AP PY .Jun 01 05 Ol:33p p.3 108 ADDRESS: --.. -" . -·-·. --·-.. ·-. -... LOT NO./SUITE: -- ::>WNERS NAME: CB043163 2743 PALMETTO OR CBAD DAll% JS@CCYJWID'. · PRIMRO' iE@BRESSl -PA 12-PHASE 1 NST. PLAN 1-'.i 095 SF,475 SF GAR,13 SF PORCH t RESDNTl SFO CONTRACTO!< BUILDING I I.Qt#; 42~ GREYSTONE HOMES OTHER l APPROVED TO COVER Type of Inspection Date Inspector Notes BUILOINC FOUNOATION J 1.,, I '7/ v7 ----REINFORCED STEEL 1, _____ '/ '--L> MASONRY □ CROUT □ WALL DRAINS TILT PANELS POUR STRIPS COlUMN 1-00TINGS 1 SI..JBfRAME □FLOOR Cl CEILINC ROOI' SHEATHING -l'I "-. ~~ --EXT. SHEAR PANELS ~-I '--' FRAME fl) ~ ~ l _.,-{ '} ~~~~ Jl?'-Wr f-1.....(~ INSULATION ~ ~ \.J ~-f I j ~.r "Rti ~··· --n.1.111 t7 U6'iF EXTERIOR LA TH -~,...-l ).....fJ~ r .,,/ ,11. "~t, ....._ -• , A r.v..,'-"1> INTERIOR LATH & DRYWALL r~ ~{ )J '-'J K .. . FINAL ' Pl.UMBINC I -~EWER AND BUCO □PUCO -.. 7' l(t}i. 11{ • (UNDERGROUND □WASTE ow ,TER / V.J /11v· ~ TOP OUT 0 WASTE □WATER .i1"C.. ..l =--·: ...... .T -- TUB AND SHOWER PAN --~~ ~AS TEST CJ GAS PIPl'-IG --'-7-1 y-1') { l"'l~ -:,ATER HEATER , 0 SOI.AR WA ER FINAL ELECTRICAL 0 ELECTRIC UNDERGROUND q,(JF •R 1(.-/'1,,,,l?W" r-.D ROUGH .ELECTRIC WALLS z{_..d-~ ---RQUGH ELECTRIC CEIi.iN<; ~ -,~ J!il.iLECTRlC Sl;RVICE □ TEMPORAR ~ b~ ~ (J:l BON01NG □POOL IJ - FINAL MECHANICAL IJNDERGROUND DUCTS & P!P!NG □ OLICT & PLEM,O REF. PIPING 6\ ...It~. -----HE..-,T -AIR COND. SYSTEMS "Y\i~ ti ./ YENTILA TING SYSTEMS _ .,,.,-- FINAL CAU FOR FINAL INSPECTION WHEN A• LAPPROMIATE «EMS AAOVE Ha11E BEEN Al'PROYED FINAL Sign When Appropriate ~....,""" r7 ./ , Building Dept. (Inspections) (760) &o2-2725 .. 1 ~ ·- Fire Department (760) ;()2--4660 Planning Department (760) ~15-!>708 ,#" Engineering Dept. (l1'1$pectiom) (760) U3-l89l ~\"'l..\t\~ ~ Building ln.spedors {7am-4pm) (760) ,l',02-2700 CMWO (760) 43&--2722 btt 715 l b---1\ '\..\..' \ ~~ (' ..Q,.c,.., ~--------------------------------- 1 I I I I I I I I I I I I I I I I l I I I l l t , l I l I l I BANKER INSULATION OF CALIFORNIA, INC. 2357 VINEY AHO AVENI JE ESCONDIDO CA 92029-1220 Thi~~ ic to f"'artif" th-:it tnc11l!.iti,,n h':>~ "'ear. inch,llort in ronfnrm':lnro u1ith ,•11rrent ont\rm, I ,Uy,J ''"' I, ....,.~ ...... ., a.1n.,u. lh. .. Ut'IL41.tVii UiJtti.J U ., ... I Hlt..tt.tAIIV"-1 HI ""'''' .. ,.,,., •• ,MU'UV ....... '\,,tJ!il .... v,av•~y rettnbtlon~ f"~ln-"Orr,i-.:1 .t\.nminictr,;i.til.10 r-,,rto. ·rrt-10 ?A ot"'-tC nf f•.,lrfr,ruio:.1 ·1n tho. h11ilrlir,11 !:JUi•'U I .~> flj''1)j II I uYA I l'\,HI .... ..., ... IALl'WV .....-vuw1 I,,.. 'v ,L.'"I' ~ ... ,,,.. \./t 'h .. .lMtit ... lltltM, II .. ~ UUU'\.Ailtl~ located at: GHEYSTONE HOMES b1reet 2743 PALMETTO DH Lot tJ ----Tract City PHIMROSE PA12 CAHLSBAO __ , ________ ....... ~11......-..~ .. ,-11., ____ _ Exterior: Manut.acturer JOHNS ~ANVILLE Thickness/Type Ceilings (Batts): Manufacturer JOHNS MANVILLE Toicknessffype Olno.1" In· i:)1\./lfllll I I • 3.5 R-Value 6.25 R--Value ....... nu.-t:.-. ,,♦, ,r·ar-iliulU H;\ \,1.UI I _______ Minimum Thickness ___ R-Value Square Footage Covered Number of Bags used (bags per 1000 square feet) (Foam S(l.alant per "Tille 2411 air infiltration requirements.) Floors: Manufacturer JOHNS MANVILLE Toicknessfrype Slab on Grade: Manufacturer TI··ckn"S"'ff' In" ______ I II , C ~11 Jl"v Width of Insulation Inches Foundation V'Jalls: Manufacturer -----Thicknessffype General Contractor 3.5 California Contractor•:;; License # Date: -------- (Signature) (Trtle) Insulation Contractor-Banker Insulation of California, Inc. Caftfomia Contractor's License #552601 ~ 0:-Jte: ~~---- Sig~ Contrnf!t Secrntary H-Value RV;lue R--V.olue 13 13 .__., ~ ~ ·---·-----=---=--~ _ __, -----~ ----------·----