Loading...
HomeMy WebLinkAbout2744 CARLSBAD BLVD; 201; CB030101; Permit0-01 -2003 Job Address: Permit Type: Parcel Mo: Valuation: Occupancy Group: 10/01/2O03 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Residential Permit Building Inspection Request Line (760) 602-2725 2744 CARLSBAD BL CBAD COMRES Lot#; $2,827,767.00 Construction Type: Reference #: V1 CT010010 Status: Applied: Entered By: Permit No; CB030101 ISSUED 10/21/2002 SB Approved: 10 Structure Type: MF5+ 30 Bathrooms: 30 VILL BY SEA BLDG10 24640 LIV 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS Issued: 10/01/2003 Inspect Area: Orig PC#: PC02-50 Plan Check#: Applicant: ANASTASI CONSTRUCTION 1200 AVIATION BLVD REDONDO BEACH CA 902278 310-376-8077 CO Owner: Building Permit AdcPI Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot, Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Red- Water Con, Fee Meter Size Add'* Rec/. Water Con. Fee $6,759.09 Meter Fee $0.00 SDCWA Fee $4,393.41 CFD Payoff Fee $0.00 PFF $0.00 PFF (CFD Fund) $593.83 License Tax $24,350.00 License Tax <CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Redev Parking Fee $0.00 Housing Impact Fee $48,000.00 Housing InLieu Fee D5/8 Housing Credit Fee $0.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees $0.00 TOTAL PERMIT FEES $2.800.00 $40,080.00 $0.00 $51.465.36 $47,506.49 $0.00 $0.00 $11,294.40 $10,425.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $31,092.36 $0.00 $276,760.54 Total Fees: $278,760.54 Total Payments To Date:$0.00 Balance Due: $278,760.54 5524 10/01/03 0002 01 02 CGP 278740-54 CttyifCirUbad Final Building Inspection Oept: Building Engineering CMWD St Lite Fire Plan Check »: Permit*: Project Name; CB030101 VILL BY SEA BLDG 10 24640 LIV Date: 03/29/2005 Permit Type: COMRES Sub Type; 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS Address: Contact Person: Sewer Diet: Inspected By: C ''tf Inspected A By: *£#// Inspected By: 2744 CARLSBAD BL LARRY CA 3of>tff ? 3^5 Phone: 3103453658 Water Diet: CA Date i/ / / Inspected: /V/^f Date — i Inspected: /// /&£ Date Inspected: Lot: 0 Approved: Disapproved: ^ Approved: r Disapproved: Approved: Disapproved: Comments:fr JULY 11,2005 TO: BUILDING DEPARTMENT FROM: Assistant Planner, Redevelopment Department VILLAGE BY THE SEA (RP 01-06/CDP 01-16/CT 01-10) APN: 203-172-06, 07, 08,11,12,16, 21 & 23 PLAN CHECK NO. CB030101 I have completed the final building inspection for Building 10 of Village by the 'Sea. All incomplete items listed in Building Department Memo dated April 5, 2005 have been completed. Therefore the Housing & Redevelopment Department supports the building final of Building 10. If you have any questions, please contact me at x2813. CLIFF JONES CttyifCirlsftiri Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check*: Permit #: CB030101 Project Name: VILL BY SEA BLDG10 24640 LIV 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS Date: 03/29/2005 Permit Type: COMRES Sub Type: Address: Contact Person: Sewer Dtst: Inspected^ Inspected By: Inspected By: Comments: 2744 CARLSBAD BL LARRY Phone: 3103453658 CA Water CHst: CA /) > Date ^/ f L<^faf,tA4^s Inspected: J( 1 >f L " Date Inspected: Date Inspected: Lot: 0 *? Approved: Disapproved: Approved: Disapproved: Approved: Disapproved: CltyifCarisbad Final Building Inspection Dept: Building Engineering Planning CMWD StLite Fire Plan Check #: Permit tt: Project Name; Address: Contact Person: Sewtr Oist: Inspected Bv: £_ /if\ Inspected Bv: Inspected Bv: Comments: CB030101 VILL BY SEA BLDG10 24640 LIV 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS 2744 CARLSBAD BL LARRY Phone: 3103453658 CA Water Oist: CA Date y, f ~5ot9fS Inspected: /*J ft£ Date Inspected: Date Inspected: ^^H * ^^ 4 I J <9tI'&^'fr*- /"«taV*f Ho ottMi*9* Jj^dDk /ill Date: Permit Type: Sub Type: Lot: 0 Approved: Approved: Approved: »* JLfc-J Af 03^9/2005 COMRES Disapproved: *^^ Disapproved: Disapproved: ,;ic ioor Inspection List Permit*; CB030101 Type: COM RES Date Inspection Item 07/28/2005 89 07/1 5/2005 29 04/1 4/2005 89 04/1 2/2005 23 04/1 2/2005 89 04/05/2005 89 04/04/2005 44 04/04/2005 49 04/01/2005 44 04/01/2005 49 03/29/2005 23 03/29/2005 89 03/21/2005 23 03/1 7/2005 23 03/1 5/2005 24 03/1 5/2005 44 03/10/2005 39 03/10/2005 84 03/07/2005 34 03/07/2005 39 01/27/2005 14 01/18/2005 17 01/18/2005 18 01/18/2005 18 01/14/2005 17 01/12/2005 17 01/12/2005 18 01/11/2005 17 01/07/2005 18 01/06/2005 18 01/04/2005 16 01/03/2005 16 01/03/2005 17 12/28/2004 14 12/28/2004 16 12/27/2004 14 12/27/2004 16 12/23/2004 14 12/23/2004 16 12/22/2004 14 12/22/2004 16 12/20/2004 14 12/20/2004 16 Final Combo Final Plumbing Final Combo Gas/Tesf Repairs Final Combo Final Combo Rough/Ducts/Dampers Final Mechanical Rough/Ducts/Dampers Final Mechanical Gas/Test/Repairs Final Combo Gas/Test/Repairs Gas/Test/Repairs Rough/Top out Rough/Ducts/Dampers Final Electrical Rough Combo Rough Electric Final Electrical Frame/Steel/Bolting/We Idin Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Exterior Lath/Drywall Insulation Insulation Interior Lath/Drywall Frame/Steel/Bolting/Weldin Insulation Frame/SteeVBolting/Weldin Insulation Frame/Ste el/Bolt ing AVeldin Insulation Frame/Steel/Bolting/Weldin Insulation Frame/SteeVBotting/W el din Insulation Inspector Act PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PC PC PC PC PC PC PC PD PY PY PY PY PY PY RB RB PY PY PY PY PY PY AP NR AP CO CO PA we we CA CA PA NR AP PA we we PA we we PA we AP AP AP NR PA PA PA CA NR NR NR NR AP PA PA PA NR NR CO PA AP NR VILL BY SEA BLOG1 0 24640 LIV 6160 GAR 3390 DCK 8680 RETAIL 10 LIV Comments OK TO FINAL PER PAUL YORK UNIT 203 FOR MODEL USE ONLY 2 @ west end 1 each top & bottom ALL BUT FAR RIGHTS 2 TOP & BOTTOM TOP 5 ONLY EMR 205-209 200 - 204 UNITS EMR GARAGES ENTIRE BLDG UNITS 204-209 GARAGES NOT READY SO, HALF OF WEST SIDE DW UNITS 200 THRU 203 UNIT 204 HAS ENG TO DELETE DBL SHRWALL UNITS 204 OK SHEAR NAIL 1-6410 Friday, July 29, 2005 Page 1 of 3 12/17/2004 14 12/16/2004 14 12/15/2004 14 12/14/2004 14 12/13/2004 17 12/O7/2004 17 12/03/2004 13 12/03/2004 16 11/24/2004 16 11/18/2004 24 11/17/2004 16 11/16/2004 22 11/02/2004 13 10/19/2004 24 10/18/2004 24 10/08/2004 16 10/07/2004 24 10/06/2004 24 10/05/2004 16 10/05/2004 24 10/04/2004 24 09/29/2004 13 09/28/2004 13 09/27/2004 13 09/23/2004 13 09/23/2004 24 09/22/2004 13 09/22/2004 24 09/21/2004 24 09/20/2004 13 09/20/2004 24 09/15/2004 24 09/14/2004 24 09/13/2004 17 09/09/2004 13 08/26/2004 13 08/09/2004 13 08/02/2004 16 07/28/2004 13 07/20/2004 17 06/09/2004 13 06/09/2004 15 06/03/2004 15 06/02/2004 15 05/25/2004 15 04/19/2004 14 03/29/2004 14 03/25/2004 14 03/24/2004 14 03/22/2004 14 02/12/2004 11 Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weld in Frame/Sleel/Bolting/Weldin F rame/Steel/Bolting/Weldin Interior Lath/Drywall Interior Lath/Drywall Shear Panels/HD'a Insulation Insulation Rough/Topout Insulation Sewer/Water Service Shear Panels/HD's Rough/Topout Rough/Topout Insulation Rough/Topout Rough/Topout Insulation Rough/Top out Rough/Topout Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Rough/Topout Shear Panels/HD's Rough/Topout Rough/Topout Shear Panels/HD's Rough/Topout Rougn/Topout Rough/Topout Interior Lath/Drywall Shear Panels/HD's Shear Panels/HD's Shear Panels/HD's Insulation Shear Panels/HD's Interior Lath/Drywall Shear Panels/HD's Roof/Reroof Roof/Reroof Roof/Reroof Roof/Reroof Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Frame/Steel/Sotting/Weldin Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Ftg/Foundation/Piers PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PA PA NR PI PA PA AP AP PA AP PA NR PA NS CA PA PA NS PA NR CA NR CA PA NS NS we PA NS NR PA PA NS NR CO CO NR NR CA we we PA PA PA NR PA PA PA NR NR AP 1ST 3 UNITS LID @ RETAIL AREA LID AT RETAIL AREA (PARTIAL) RETAIL AREA LID LID AT RETAIL AREA PRE-LIM 4 & 5 UNITS FROM THE NORTH END 1ST FLOOR RETAIL SIDE 1ST FIVE UNITS FROMS SOUTH END 3 UNITS FROM SOUTEND ROOF DECK DRAINS DRAFT STOP SHEATHING NEED TRUSS FIX 3RD FLOOR SHEATHING FLOOR SHEATHING 2ND FLOOR FLOOH SHEATHING SLAB Friday, July 29, 2005 Page 2 of 3 01/30/2004 11 Ftg/Foundation/Piers PY CA 01/29/2004 11 Ftg/Foundation/Piers PY AP 01/28/2004 11 Ftg/Foundation/Piers PY CO 01/27/2004 11 Ftg/Foundation/Piers PY NS 01/23/2004 11 Ftg/Foundalion/Piers PY PA 01/22/2004 11 Ftg/Foundation/Piers PY NR 01/21/2004 11 Fig/Foundation/Piers PY NS 01/20/2004 11 Ftg/Foundation/Piers PS CA 01/O7/2004 21 Underground/Under Floor JM AP 12/24/200321 Underground/Under Floor PY AP 12/19/200321 Underground/Under Floor PY PA ALREADY DONE FOOTING OK NO SLAB MISSING HD, NEED SOILS REPORT PARTIAL FTG STREET SIDE ONLY BY ARON ON SITE RESIDENTIAL SIDE COMPLETE LAST 5 RETAIL UNITS 5 RET AIL UNIT @ NORTH END Friday, July 29, 2005 Page 3 of 3 City of Carlsbad Bldg Inspection Request For: 04/14/2005 Permit* CB030101 Title: VILL BY SEA BLDG10 24640 LIV Description: 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS Inspector Assignment: PY 2744 CARLSBAD BL Lot Type: COMRES Sub Type: Job Address: Suite: Location: APPLICANT ANASTASI CONSTRUCTION CO Owner: ANASTASI DEVELOPMENT CO L L C Remarks: RESET FROM WEDNES. Phone: 310B433658 Inspector. Total Time:Requested By: LARRY Entered By: CHRISTINE CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Act Comment PCR03140 PCR04051 Associated PCRs/CVs ISSUED VILLAGE BY THE SEA REVS1ON/; CLARIFICATION TO PLAN BLDQS 2-9 ISSUED ANASTASI- VILLAGE BY THE SEA; DEFFERED TRUSS SUBMITTAL Inspection History Comments UNIT 203 FOR MODEL USE ONLY 2 @ west end 1 each top & bottom ALL BUT FAR RIGHTS 2 TOP & BOTTOM TOP 5 ONLY EMR 205-209 Date 04/12/2005 04/12/2O05 04TO5/2005 04/04/2O05 04/04/2O05 04/01 /2O05 04/01/2O05 03/29/2O05 03/29/2005 03/21/2O05 03/17/2O05 03/15/2005 03/15/2O05 03/10/2005 03/10/2005 Description 23 89 89 44 49 44 49 23 89 23 23 24 44 39 34 Gas/Test/Repairs Final Combo Final Combo Rough/Ducts/Dampers Final Mechanical Rough/Ducts/Dampers Final Mechanical Gas/Test/Repairs Final Combo Gas/Test/Repairs Gas/Test/Repairs RougtVTopout Rough/Ducls/Dampers Final Electrical Rough Combo Act CO CO PA we WC CA CA PA NR AP PA WC WC PA WC Jnsp PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY April 5. 2005 TO: BUILDING DEPARTMENT FROM: Assistant Planner, Redevelopment Department VILLAGEBYTHESEA(RP01-06/CDP01-06/CT01-10) APN: 203-172-06, 07,08,11,12,16,21,23 PERMIT NO. CB030101 I have completed the plan check for the above referenced project. The Housing and Redevelopment Commission approved this project on August 6, 2002. The following incomplete items were identified on the approved plans and must be included in the project prior to the issuance of the building permit: Incomplete Items: 1. Top bricklayer on wall on northwest storefront along Carlsbad Blvd. is missing (layer of brown glue is exposed). 2. No window balcony projections for 3rd level condominium units, on front elevation along Carlsbad Blvd. 3. Trellises are missing on storefront columns. 4. No flowerpots installed above trellises located on storefront columns. 5. Awnings over business storefronts are not present. 6. Plantings not planted along the corner of Carlsbad Blvd. and Beech Ave. 7. No monument sign installed on corner of Carlsbad Blvd and Beech St. 8. Guest and customer parking spaces in the rear of building #10 (east elevation) have not been striped. 9. No trellis overhead structure over building #7 & #8, building #3 & #4 (see 11 on plans). 10. No trellis over spa (see 19 on plans). 11. No striped parking along Christiansen Way. 12. Need to attach wood trellises to building along Christiansen Way. 13. No concrete trellis pad between building #5 & #1 (see 26 on plans). 14. No flowering pot in front of building #1 along Christensen Way (see 25 on plans). 15. Clean up blue spray paint along edges of monument sign along Christiansen Way and Washington Street. Items Needing Further Explanation: 16. No "crosswalk enhanced paving" (see 7E on plans) between building #5 & #6 along Christiansen Way. The applicant indicated on the approved site plan that the driveway crosswalk was to be laid with colored concrete. Applicant must explain why this construction detail was not feasible for this project. 17. No "enhanced paving" next to parking spaces in front of building #1. The applicant indicated on the approved site plan that enhanced sidewalk paving extension was to be split with a brick paver herringbone pattern. Applicant must explain why this construction detail was not feasible for this project. CLIFF JONES C: Debbie Fountain, Housing & Redevelopment Director Mike Black, Landscape Plan Check Consultant Attachments