HomeMy WebLinkAbout2744 CARLSBAD BLVD; 207; CB030101; Permit0-01-2003
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
10/01/2003
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Residential Permit Permit No: CB030101
Building Inspection Request Line (760) 602-2725
2744 CARLSBAD BL CBAD
COMRES
Lot#: 0
$2,827,767.00 Construction Type: V1
Reference #: CT010010
10 Structure Type: MF5+
30 Bathrooms: 30
VILL BY SEA BLDG10 24640 LIV
6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS
Status: ISSUED
Applied: 10/21/2002
Entered By: SB
Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check#:
10/01/2003
PC02-50
Applicant:
ANASTASI CONSTRUCTION
1200 AVIATIONBLVD
REDONDO BEACH CA
902278
310-376-8077
CO
Owner:
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pol. Water Con. Fee
Meter Size
Add'] Pot. Water Con. Fee
Reel. Water Con. Fee
Meter Size
Add'l Reef. Water Con. Fee
$6,759.09 Meter Fee
$0.00 SDCWA Fee
$4,393.41 CFD Payoff Fee
$0.00 PFF
$0.00 PFF (CFD Fund)
$593.83 License Tax
$24,350.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Redev Parking Fee
$0.00 Housing Impact Fee
$48,000.00 Housing InLieu Fee
D5/8 Housing Credit Fee
$0.00 Master Drainage Fee
$0.00 Sewer Fee
Additional Fees
$0.00 TOTAL PERMIT FEES
$2,800.00
$40,080.00
$0.00
$51.465.36
$47.506.49
$0.00
$0.00
$11,294.40
$10,425.60
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$31,092.36
$0.00
$278,760.54
Total Fees: $278,760.54 Total Payments To Date:$0.00 Balance Due: $278,760.54
5524 10/01/03 0002 01 02
CGR 2787*50.54
ClUti Carlsbad
Final Building Inspection
Dept: Building Engineering PUwtHOfl CMWD St Lite Fire
Plan Check #:
Permit*:
Project Name:
Address:
Contact Person:
Sewer Dlsl:
Inspected fc.
BV /?/#
Inspected, ~
Bv: ^yrtj
Inspected
Bv:
Comments:,
CB030101
VILL BY SEA BLDG1 0 24640 LIV
6160 GAR 3390 DCK8680 RETAIL 10 LIV UNITS
2744 CARLSBAD BL
LARRY Phone: 3103453658
CA Water Dist: CA
Date y
fof>eS Insoected: /V '/3$
n Date -2 i
.3et«£ Inspected: /" A7^
Date
Inspected:
P/^~ r*Ar Ho fiUUi. ^M. n
Date: 03/29/2005
Permit Type: COMRES
Sub Type:
Lot: 0
Approved: Disapproved: ^
Approved: r Disapproved:
Approved: Disapproved:
&*c> da.Y»/ /^p^il C ^00^
^> y ^
JULY 11, 2005
TO: BUILDING DEPARTMENT
FROM: Assistant Planner, Redevelopment Department
VILLAGE BY THE SEA (RP 01-06/CDP 01-16/CT 01-10)
APN: 203-172-06,07,08,11,12,16,21 &23
PLAN CHECK NO. CB030101
I have completed the final building inspection for Building 10 of Village by the
Sea. All incomplete items listed in Building Department Memo dated April 5,
2005 have been completed. Therefore the Housing & Redevelopment
Department supports the building final of Building 10.
If you have any questions, please contact me at x2813.
CLIFF JONES
CityifCarlsfeari
Final Building inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check*:
Permit #:
Project Name:
Address:
Contact Person:
Sewer Dist:
Inspected^
By: /M •
Inspected
By:
Inspected
By:
Comments:
CB030101
VILL BY SEA BLDG10 24640 LlV
6160 GAR 3390 DCK 8680 RETAIL 10 LlV UNITS
2744 CARLSBAD BL
LARRY Phone: 31 03453658
CA Water CHst: CA
/) ' °ate I/C^fyfaf.tAJ^s inspected: f > >/W"
Date
Inspected:
Date
Inspected:
Date: 03/29/2005
Permit Type: COMRES
Sub Type:
Lot: 0
Approved: Disapproved:
Approved: Disapproved:
Approved: Disapproved:
GltyriCirtsbad
Final Building Inspection
Dept: Building Engineering Planning CMWD St Lite Fire
Plan Check ft:
Permit ft
Project Name;
Address:
Contact Person:
Sewer Dist:
Inspected fim
Bv {/iff
inspected
Bv:
Inspected
Bv:
Comments:
CB030101
VILL BY SEA BLDG10 24640 LIV
6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS
2744 CARLSBAD BL
LARRY Phone: 31 03453658
CA Water Dist: CA
Date £,
"3ex*tf Inspected: ^ M /Of
Date
Inspected:
Date
Inspected:
P/^^. r*&f *. Kxuv. £«*. ,*
Date:
Permit Type:
Sub Type:
Lot: 0
Approved:
Approved:
_ Approved:
<M> *U«J At
03/29/2005
COMRES
Disapproved: ^
Disapproved:
Disapproved:
Mil C ^OQS"
atrr
Inspection List
Permit#; CB030101 Type: COMRES
Date Inspection Item
07/28/2005 89
07/15/2005 29
04/14/2005 89
04/1 2/2005 23
04/12/2005 89
04/05/2005 89
04/04/2005 44
04/04/2005 49
04/01/2005 44
04/01/2005 49
03/29/2005 23
03/29/2005 89
03/21/2005 23
03/1 7/2005 23
03/1 5/2005 24
03/1 5/2005 44
03/10/2005 39
03/10/2005 84
03/07/2005 34
03/07/2005 39
01/27/2005 14
01/18/2005 17
01/18/2005 18
01/18/2005 18
01/14/2005 17
01/12/2005 17
01/12/2005 18
01/11/2005 17
01/07/2005 18
01/06/2005 18
01/04/2005 16
01/03/2005 16
01/03/2005 17
12/28/2004 14
12/28/2004 16
12/27/2004 14
12/27/2004 16
12/23/2004 14
12/23/2004 16
12/22/2004 14
12/22/2004 16
12/20/2004 14
12/20/2004 16
Final Combo
Final Plumbing
Final Combo
Gas/Test/Repairs
Final Combo
Final Combo
Rough/Ducts/Dampers
Final Mechanical
Rough/Ducts/Dampers
Final Mechanical
Gas/Test/Repairs
Final Combo
Gas/Test/Repairs
Gas/Test/Repairs
Rough/Top out
Rough/Ducts/Dampers
Final Electrical
Rough Combo
Rough Electric
Final Electrical
Frame/Sleel/Bolting/Weldin
Interior Lath/Drywall
Exterior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Exterior Lath/Drywall
Insulation
Insulation
Interior Lath/Drywall
Frame/Steel/Bolting/We Idin
Insulation
Frame/Steel/ Bolting/Weld in
Insulation
Frame/Steel/Bolting/Weldin
Insulation
Frame/Steel/Bolt ing/Wei din
Insulation
Frame/Steel/Bolting/We Idin
Insulation
Inspector Act
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PC
PC
PC
PC
PC
PC
PC
PD
PY
PY
PY
PY
PY
PY
RB
RB
PY
PY
PY
PY
PY
PY
AP
NR
AP
CO
CO
PA
we
we
CA
CA
PA
NR
AP
PA
we
we
PA
we
we
PA
we
AP
AP
AP
NR
PA
PA
PA
CA
NR
NR
NR
NR
AP
PA
PA
PA
NR
NR
CO
PA
AP
NR
VILL BY SEA BLDG1 0 24640 LIV
6160 GAR 3390 DCK 8680 RETAIL 10 LIV
Comments
OK TO FINAL PER PAUL YORK
UNIT 203 FOR MODEL USE ONLY
2 @ west end 1 each top & bottom
ALL BUT FAR RIGHTS 2 TOP &
TOP 5 ONLY
EMR 205-209
200 - 204 UNITS
EMR
GARAGES
ENTIRE BLDG
BOTTOM
UNITS 204-209 GARAGES NOT READY
SO, HALF OF WEST SIDE
DW UNITS 200 THRU 203
UNIT 204 HAS ENG TO DELETE
SHRWALL
UNITS 204 OK
SHEAR NAIL
1-6&10
DBL
Friday, July 29, 2005 Page 1 of 3
12/17/2004 14
12/16/2004 14
12/15/2004 14
12/14/2004 14
12/13/2004 17
12/07/2004 17
12/03/2004 13
12/03/2004 16
11/24/2004 16
11/18/2004 24
11/17/2004 16
11/16/2004 22
11/02/2004 13
10/19/2004 24
10/18/2004 24
10/08/2004 16
10/07/2004 24
10/06/2004 24
10/05/2004 16
10/05/2004 24
10/04/2004 24
09/29/2004 13
09/28/2004 13
09/27/2004 13
09/23/2004 13
09/23/2004 24
09/22/2004 13
09/22/2004 24
09/21/2004 24
09/20/2004 13
09/20/2004 24
09/15/2004 24
09/14/2004 24
09/13/2004 17
09/09/2004 13
08/26/2004 13
08/09/2004 13
08/02/2004 16
07/28/2004 13
07/20/2004 17
06/09/2004 13
06/09/2004 15
06/03/2004 15
06/02/2004 15
05/25/2004 15
04/19/2004 14
03/29/2004 14
03/25/2004 14
03/24/2004 14
03/22/2004 14
02/12/2004 11
Frame/Steal/Bolting/W eldin
Frame/Steel/Bolting/Weldin
Frame/S tee l/Bolting/W eldin
Frame/Steel/Bolting/We I din
Interior Lath/Drywalt
Interior Lath/Drywall
Shear Panels/HD's
Insulation
Insulation
Rough/Top out
Insulation
Sewer/Water Service
Shear Panels/HD's
Rough/Top out
Rough/Topout
Insulation
Rough/Topout
Rough/Topout
Insulation
Roughn~opout
Rough/Topout
Shear Panels/HD's
Shear Panels/HD's
Shear Panels/HD's
Shear Panels/HD's
Rough/Topout
Shear Panets/HD's
Rough/Topout
Rough/Topout
Shear Panels/HD's
Rough/Topout
Rough/Topout
Rough/Topout
Interior Lath/D/ywall
Shear Panels/HD's
Shear Panels/HD's
Shear Panels/HD's
Insulation
Shear Panels/HD's
Interior Lath/Drywall
Shear Panels/HD's
Roof/Re roof
Roof/Reroof
Roof/Reroof
Roof/Reroof
Fra me/Steel/Bolt ing/Weldin
Frame/Steel/Bolt ing/We Idin
Frame/Ste el/Bolt ing/Weldin
Frame/Steel/Bolting/Weldin
F rame/Ste el/Boltin g/Weld i n
Ftg/Foundation/Piers
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PA
PA
NR
PI
PA
PA
AP
AP
PA
AP
PA
NR
PA
NS
CA
PA
PA
NS
PA
NR
CA
NR
CA
PA
NS
NS
we
PA
NS
NR
PA
PA
NS
NR
CO
CO
NR
NR
CA
we
we
PA
PA
PA
NR
PA
PA
PA
NR
NR
AP
1ST 3 UNITS
LID @ RETAIL AREA
LID AT RETAIL AREA (PARTIAL)
RETAIL AREA LID
LID AT RETAIL AREA
PRE-LIM
4 & 5 UNITS FROM THE NORTH END
1ST FLOOR RETAIL SIDE
1ST FIVE UNITS FROMS SOUTH END
3 UNITS FROM SOUTEND
ROOF DECK DRAINS
DRAFT STOP
SHEATHING
NEED TRUSS FIX
3RD FLOOR SHEATHING
FLOOR SHEATHING 2ND FLOOR
FLOOR SHEATHING
SLAB
Friday. July 29, 2005 Page 2 ol 3
01/30/2004 11
01/29/2004 11
01/28/2004 11
01/27/2004 11
01/23/2004 11
01/22/2004 11
01/21/2004 11
01/20/2004 11
01/07/2004 21
12/24/2003 21
12/19/2003 21
Ftg/Fo undation/Pie rs
Fig/Foundation/Piers
Ftg/Foundation/Piers
Ftg/Fo undat ion/Piers
Ftg/Foundation/Piers
Ftg/Fo u n dation/Pi e rs
Fig/Foundation/Piers
Fig/Foundation/Piers
Underground/Under Floor
Underground/Under Floor
Underground/Under Floor
PY
PY
PY
PY
PY
PY
PY
PS
JM
PY
PY
CA
AP
CO
NS
PA
NR
NS
CA
AP
AP
PA
ALREADY DONE
FOOTING OK NO SLAB
MISSING HD, NEED SOILS REPORT
PARTIAL FTG STREET SIDE ONLY
BY ARON ON SITE
RESIDENTIAL SIDE COMPLETE
LAST 5 RETAIL UNITS
5 RETAIL UNIT @ NORTH END
Friday, July 29, 2005 Page 3 of 3
City of Carlsbad Bldg Inspection Request
For: 04/14/2005
Permits CB030101
Title: VILL BY SEA BLDG10 24640 LIV
Description: 6160 GAR 3390 DCK 8680 RETAIL 10 LIV UNITS
Inspector Assignment: PY
2744 CARLSBAD BL
Lot 0
Type: COMRES Sub Type:
Job Address:
Suite:
Location:
APPLICANT ANASTASI CONSTRUCTION CO
Owner: ANASTASI DEVELOPMENT CO L L C
Remarks: RESET FROM WEDNES.
Phone: 3103433658
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: LARRY
Entered By: CHRISTINE
Act Comment
PCR03140
PCR04051
Date
04/12/2005
04/12/2005
04/05/2005
04/04/2005
04/04/2005
04/01/2005
04/01/2005
03/29/2005
03/29/2005
03/21/2005
03/17/2005
03/15/2005
03/15/2005
03/10/2005
03/10/2005
24 Rough/Topout
44 Rough/Ducts/Dampers
39 Final Electrical
84 Rough Combo
Act
CO
CO
PA
we
we
CA
CA
PA
NR
AP
PA
we
we
PA
we
Insp
PY
PY
Comments
Associated PCRs/CVs
ISSUED VILLAGE BY THE SEA REVS1ON/; CLARIFICATION TO PLAN BLDGS 2-9
ISSUED ANASTASI- VILLAGE BY THE SEA; DEFFERED TRUSS SUBMITTAL
Inspection History
Description
23 Gas/TesfRepairs
89 Final Combo
89 Final Combo
44 Rough/Ducts/Dampers
49 Final Mechanical
44 Rough/Ducts/Dampers
49 Final Mechanical
23 Gas/Test/Repairs
89 Final Combo
23 Gasn"est/Repairs
23 Gas/Test/Repairs
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
UNIT 203 FOR MODEL USE ONLY
2 @ west end 1 each top & bottom
ALL BUT FAR RIGHTS 2 TOP & BOTTOM
TOP 5 ONLY
EMR 205-209
April 5, 2005
TO: BUILDING DEPARTMENT
FROM: Assistant Planner, Redevelopment Department
VILLAGE BY THE SEA (RP 01-06/CDP 01-06/CT 01-10) APN: 203-172-06,
07,08,11,12,16,21,23
PERMIT NO. CB030101
I have completed the plan check for the above referenced project. The Housing
and Redevelopment Commission approved this project on August 6, 2002. The
following incomplete items were identified on the approved plans and must be
included in the project prior to the issuance of the building permit:
Incomplete Items:
1. Top bricklayer on wall on northwest storefront along Carlsbad Blvd. is
missing (layer of brown glue is exposed).
2. No window balcony projections for 3rd level condominium units, on front
elevation along Carlsbad Blvd.
3. Trellises are missing on storefront columns.
4. No flowerpots installed above trellises located on storefront columns.
5. Awnings over business storefronts are not present.
6. Plantings not planted along the corner of Carlsbad Blvd. and Beech
Ave.
7. No monument sign installed on corner of Carlsbad Blvd and Beech St.
8. Guest and customer parking spaces in the rear of building #10 (east
elevation) have not been striped.
9. No trellis overhead structure over building #7 & #8, building #3 & #4
(see 11 on plans).
10. No trellis over spa (see 19 on plans).
11. No striped parking along Christiansen Way.
12. Need to attach wood trellises to building along Christiansen Way.
13. No concrete trellis pad between building #5 & #1 (see 26 on plans).
14. No flowering pot in front of building #1 along Christensen Way (see 25
on plans).
15. Clean up blue spray paint along edges of monument sign along
Christiansen Way and Washington Street.
Items Needing Further Explanation:
16. No "crosswalk enhanced paving" (see 7E on plans) between building
#5 & #6 along Christiansen Way. The applicant indicated on the
approved site plan that the driveway crosswalk was to be laid with
colored concrete. Applicant must explain why this construction detail
was not feasible for this project.
17. No "enhanced paving" next to parking spaces in front of building #1.
The applicant indicated on the approved site plan that enhanced
sidewalk paving extension was to be split with a brick paver
herringbone pattern. Applicant must explain why this construction
detail was not feasible for this project.
CLIFF JONES
C: Debbie Fountain, Housing & Redevelopment Director
Mike Black, Landscape Plan Check Consultant
Attachments