Loading...
HomeMy WebLinkAbout2746 AUBURN AVE; ; CB021951; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Building Inspection Request Line (760) 602-2725 07-25-2002 Residential Permit Permit No: CB021951 ' Job Address: Permit Type: RES D N T L SubType: RAD Status: APPROVED Parcel No: 1674201900 Lot#: 0 Applied: 06/28/2002 Valuation: $38,760.00 Construction Type: NEW Entered By: MDP Occupancy Group: Reference #: Plan Approved: 07/25/2002 # Dwelling Units: 0 Structure Type: Issued: Bedrooms: 0 Bathrooms: 0 Inspect Area: Project Title: HARRIS RESIDENCE Orig PC#: 380 SF ADDITION Plan Check#: Applicant: Owner: WORTHING INC. B. A. 690 CARLSBAD VILLAGE DR CARLSBAD. CA 92008 6 19-729-3965 2746 AUBURN AV CBAD HARRIS EDWARD J&ROSE L 2746 AUBURN AVE CARLSBAD CA 92008 Total Fees: $531.38 Total Payments To Date: $190.47 Balance Due: $340.91 Building Permit Add'l Buildina Permit Fee Plan Check " Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridae Fee BTD #2 Fie BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Recl. Water Con. Fee $293.03 $0.00 $190.47 $0.00 $0.00 $3.88 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Meter Size Add'l Recl. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing InLieu Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $20.00 $24.00 $0.00 $0.00 $0.00 $0.00 $0.00 $531.38 I I FINAL APPROVAL Inspector: Date: Clearance: NOT CE Please lake NOTICE that appmva 01 your pm~ecl InclJdes me ' mw loon' of lees oeoicallons reseNalons or Olher exaclons hereaher ColleCt vely rekmd lo as Ifeedexact ons ' You have 90 aays lnm' the dare Ins pml was .ssueo lo piolest imws Ion 01 lhese IeeYexanans If yo- pmlesl lnem you m.st bollow le prolest procedures set lolth In Gouernmenl Cooe Senon 66020(a, and f e tne prole51 an0 any Olner IBqJlIW Infomlion wln me C lq Manager lor pms ng n ammance wfh Cansoad Mun c pal Coae Sewon 3 32 030 Fa de 10 I me lollow that proced.re WI I mr any subsequenl egal anion lo allaCL review. set aside void. or annLl the,! lmw bon FOR OFFICE USE ONLY PLAN CHECK NO. 6 2- EST. VAL. Plan Ck. Deposit Validated By Date APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad, CA 92008 Business Name Iat this address) Legal Oercribtion Lot No. Subdivision NamelNumber Unit No. Phase No. Total X of units X Of Bedrooms #of Bathrooms ,, . ,, ,, , ISec. 7031.5 Business and Professions Code: Any City or County which requires B permit to COnLrUCt. alter. improve, demolish or repair any StrUCtUre. prior to its is~uance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to th8 provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Codel or that he is exempt therefrom. and the basis for the allsgsd Name Address City Telephone X Designer Name I Addrsrs Statelzip Telephone State License X Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: , ., ,, .. ,.. .. .e ~~ . . .... , ,, 0 of the work for which this permit is issued. I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code. for the performance I have and will maintain workers' COmDenSation. as rsauired bv Section 3700 Of the Labor Code. for the Dsrformance of the work for which this Dermit is (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS 1$1001 OR LESS) 0 to become subject to the Workers' Compensation Laws of California. WARNING: Failure thousand dollars IS1 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued. I shall not employ any person in any manner so 8s yer Io cn'minal penalties and civil finer up to one hundred of compensation. damages as provided for in Section 3106 of the code. terest and attorney's fees. DATE 0 yees with wages 88 their 5018 Compensation. will do the work and the StrUCtUre is not intended or offered for sale Ism. 7044, Business and Professions Code: The COntraCtOr'S LiCenSe Law does not apply to an owner Of property who builds or improves thereon. and who does such work himself or through his own employees. provided that such improvement5 are not intended or Offered for sale. If, however. the building or improvBment is sold within one year of completion. the owner-builder will have the burden Of proving that he did not build or improve for the purpose of sale). 0 I, as owner of the property. am exclusivsly contracting with licensed contractors to construct the project ISec. 7044. B~sines~ and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improve$ thereon, and contracts for Such projects with mntraaorlsl licensed pursuant to the Contractor's License Law). I, 8s owner of the property or m 0 1. 2. 3. 4. num em exempt under Section personally plan to provide the major labor and materials for ConDtiUCtion Of the proposed property improvement. YES UNO (have I have not) signed an application for a building permit for the propossd work. have contracted with the following pereon (firm) to provide the proposed construction linclude name I address I phone numbsr I contractors license number): Business and Professions Code for this reason: plan to provide portions Of the work. but I have hired the following perron to coordinate, SupBrvise and provide the major work linclude name I address I phone r I contractors license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated linclude name I address i phone number I type PROPERTY OWNER SIGNATURE DATE BUiiirduQiPrsM~ , ,, 1s the applicant or future building occupant required to submit B business Plan. acutely hazardous materials registration form or risk management and prewntion program under Sections 25505, 25533 or 25534 Of the Prerlsy-Tanner Hazardous Substance Account Act? YES NO 1s the applicant or future building occupant required to obtain a PBrmit from the air pollution control dilrict or air quality management district? YES NO 1s the facility to be constructed within 1.000 feet Of the outer boundary of a school site7 IF ANY OF THE ANSWERS ARE YES. A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUE0 UNLESS THE APPLICANT HAS MET OR IS MEETING THE YES NO LLUTION CONTROL OISTRICT. ,, ,, QUIREMENTS OF THE 0 I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued ISec. 3097li) Civil Code). LENDERS ADDRESS ,, ,, . . . . . . . . ... . . .. . LENDERS NAME I Certify that I have read the application and State that the abovs information is Correct and that the information on the plans is accurate. I agree to comply with all City Ordinances and State laws relating to building construction. I hereby authorize repreSentatiV85 of the City of Carlsbad to enter upon the above mentioned property for inspection purpo~e~. I ALSO AGREE TO SAVE, INDEMNIFY AN0 KEEP HARMLESS THE CITY OF CARLSBAO AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEOUENCE OF THE GRANTING OF THIS PERMIT. OSHA. An OSHA permit is required for excavations over 5'0" deep and demolition or Construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the building Onicial under the provisions of this Code shall expire by limitation and became null and void if the building or work authorized by such permit is not comm k authorized by Such permit is Suspended or abandoned at any time alter the work is commenc APPLICANT'S SIGNATURE DATE 47/k7b z r 04/10/2003 WORTHING INC, B. A. 690 CARLSBAD VILLAGE DR CARLSBAD, CA 92008 Re: Application Date: 06/28/2002 0:OO:OO Plan Check #: CB021951 Address: 2746 AUBURN AV Expiration Date: 06/28/2003 0:OO:OO Permit Type: RESDNTL Description: HARRIS RESIDENCE 380 SF ADDITION You applied to have your plans checked on the date noted above. To date, the related building permit has not been obtained. The original plan review application will expire as no building permit has been issued. Plans submitted and not retrieved from the building department prior to the plan check expiration date noted above will be destroved. The provisions of sections 304 (d) of the Uniform Building Code state: “Section 304 9d) Expiration of Plan Review Applications for which no permit is issued within one year following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.” In order to provide better service, please indicate your handling choice for the plans originally submitted and return this letter to the Building Department. __ Project Abandoned - I will pick up plans within 10 days - Project Abandoned - Plans may be destroyed. If you have any questions, please contact the Building Department at (760) 602-2718. Raenette Abbey Building Department v EsGil - Corporation Zn Tartncrship witfi ~ouernmnt for !Buil%ing Safety DATE: 07/23/02 J URl SDl CTl ON : Carlsbad PLAN CHECK NO.: 02-1951 APPLICANT P PLAN REVIEWER P FILE amlD SET: I1 PROJECT ADDRESS: 2746 Auburn Street PROJECT NAME: Room Addition for Harris Residence The plans transmitted herewith have been corrected where necessary and substantially comply The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list 0 The check list transmitted herewith is for your information. The plans are being held at Esgil The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant The applicant's copy of the check list has been sent to: with the jurisdiction's building codes. and should be corrected and resubmitted for a complete recheck. Corporation until corrected plans are submitted for recheck. contact person. Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: 1 Fax #: Mail Telephone Fax In Person REMARKS: 1) Soils stamp to be placed By: Ray Fuller Enclosures: Esgil Corporation GA 0 MB 0 EJ PC 07/16/02 tmsrntl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 - EsGil - Corporation Zn Tartncrship with GoUernmcnt for Bdfiding Safety DATE: 07 J 10102 J URl SDl CTl ON : Carlsbad PLAN CHECK NO.: 02-1951 PROJECT ADDRESS: 2746 Auburn Street SET I P-APPUCANT 0 PLAN REVIEWER 0 FILE PROJECT NAME: Room Addition for Harris Residence 0 The plans transmitted herewith have been corrected where necessary and substantially comply The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. 0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list with the jurisdiction's building codes. and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. 0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant The applicant's copy of the check list has been sent to: contact person. B.A. Worthing Post Office Box 1041 Carlsbad, Ca. 92018 0 Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: B.A. Worthing Telephone #: (760) 729-3965 Date contacted:? /,o/oz (by: 4 Mail -Telephone Fax/ In Person c] REMARKS: By: Ray Fuller Enclosures: Esgil Corporation 0 GA 0 MB 0 EJ 0 pc 07/01/02 Fax #: (760) 729-0784 tmsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 02-1951 or/ 10102 PLAN REVIEW CORRECTION LIST SINGLE FAMILY DWELLINGS AND DUPLEXES PROJECT ADDRESS: 2746 Auburn Street FLOOR AREA: Addition 380 STORIES: 2 HEIGHT: 22 ft per UBC REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 06/28/02 ESGIL CORPORATION: 07/01/02 DATE INITIAL PLAN REVIEW COMPLETED: 07/ 10/02 DATE PLANS RECEIVED BY PLAN REVIEWER: Ray Fuller FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinance by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Present California law mandates that residential construction comply with the 1998 edition of the California Building Code (Title 24), which adopts the following model codes: 1997 UBC, 1997 UPC, 1997 UMC and 1996 NEC (all effective 7/1/99). The above regulations apply to residential construction, regardless of the code editions adopted by ordinance. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process. please note on this list (or a cow) where each correction item has been addressed, Le., plan sheet number. specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. Carlsbad 02- 195 1 071 10102. PLANS 1. 2. 3. 4. 5. 6. 7. a. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92009, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculationsheports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Show either a existing or proposed smoke detector at lst floor. Specify connection from existing top plates to new i.e. some type of strap. The existing header sizes for 1” floor were not noted . Need to verify that they are adequate for additional roof and wall loads. The framing plan did not address the removal of existing stucco shear at the end wall and this coupled with additional %the loads from addition will need to be addressed. Assume braced wall panels will be required along this line and detailed and referenced extending to roof sheathing. Provide truss calculations for this project and truss numbers to be on plans. Specify size of existing floor joist to verify they are adequate for additional loading i.e. at the end wall where they were ripped and now proposing to support wall and some roof loads from gable end. CITY OF CARLSBAD REQUIRMENTS All new residential buildings, including additions, require a soils report. An update letter is required if the report is more than 3 years old. If a room addition is less than 1000 sq. ft. in area onlv one stow, then a soils report is not required. Carlsbad 02-1951 071 10102. 0 To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes 0 No 0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ray Fuller at Esgil Corporation. Thank you. Carlsbad 02-1951 071 10102 mm Addition 380 I VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 02-1951 PREPARED BY: Ray Fuller DATE: 071 10102 Valuation Reg. VALUE ($) Multiplier Mod. Per City Est. 38,760 I BUILDING ADDRESS: 2746 Auburn Street TOTALVALUE I 38,760 I I I I I Air Conditioning Fire Sprinklers Bldg. Permit Fee by Ordinance 1 V I Plan Check Fee by Ordinance Type of Review: Comdete Review 0 Structural Only 0 Repetitive Fee 3 Repeats 0 Other 0 Hourly 71 Hour Esgil Plan Review Fee $293.031 Comments: Sheet 1 of 1 macvalue.doc ~ City of Carlsbad The item you have submitted for review has been approved. The approval is based on plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. [? A Right-of-way permit is required prior to construction of the following improvements: BUILDING PLANCHECK CHECKLIST ched report of deficiencies e necessary corrections to plans for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. L- L4ate: j/dc By: By: Date: DATE: PLANCHECK NO.: CB dd - /9r/ PROJECT DESCRIPTION: ASSESSORS PARCEL NUMBER: /z77-42-/7 EST. VALUE: pm Date: I By: UTHORIZATION TO ISSUE BUILDING PERMIT ATTA~ENTS Dedication AQplication Dedication Checklist Improvement Application Improvement Checklist Future Improvement Agreement Grading Permit Application Grading Submittal Checklist Right-of-way Permit Application Right-of-way Permit Submittal Checklist and Information Sheet Sewer Fee Information Sheet ENGINEERING DEPT. CONTACT PERSON Karen Saul City of Carlsbad Name: Address: . 1635 Faraday Avenue, Carlsbad. CA 92008 Phone: (760) 602-2775 CFD INFORMATION Parcel Map No: of 6 /a Lots: Recordation: t)L"1( " sr4 Carlsbad Tract: '7 d, /, $2 , . ,, .. BUILDING PLANCHECK CHECKLIST SITE PLAN 0 1. Provide a fully dimensioned site plan drawn to scale. Show: North Arrow Existing & Proposed Structures Existing Street Improvements Property Lines --&z ATfAcH Right-of-way Width & Adjacent Streets Driveway widths Existing or proposed sewer lateral Existing or proposed water service Easements ,d Existing or proposed irrigation service r 0 2. Show on site plan: Brainaae Patterns ' 1. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. @ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building." Existing & Proposed Slopes and Topography Size, type, location, alignment of existing or proposed sewer and water service (5) that serves the project. Each unit requires a separate service, however, second dwelling units and apartment complexes are an exception. Sewer and water laterals should not be located within proposed driveways, per ' standards. 0 0 3. Include on title sheet: ~ Site address ' Assessor's Parcel Number Legal Description For commerciallindustrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION 2 BUILDING PLANCHECK CHECKLIST 1'' 2ND 3d DISCRETIONARY APPROVAL COMPLIANCE 0 0 0 4a. Project does not comply with the following Engineering Conditions of approval for Project No. ~~ 17 0 0 4b. All conditions are in compliance. Date: DEDICATION REQUIREMENTS 0 0 5. Dedication for all street Rights-of-way adjacent to the building site and any storm drain or utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $15,ooo, pursuant to Carlsbad @ Municipal Code Section 18.40.030. Dedication required as follows: Dedication required. Please have a registered Civil Engineer or Land Surveyor prepare the appropriate legal description together with an 8 %" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications be accept by mail or fax. Dedication completed by: Date: IMPROVEMENT REQUIREMENTS 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $75.ooo, pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: 0 0 0 Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the BUILDING PLANCHECK CHECKLIST lST *ND 3% checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: Date: 0 0 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $310 so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: 0 0 0 6c. Enclosed please find your Future Improvement Agreement. Please return agreement signed and notarized to the Engineering Department. Future Improvement Agreement completed by: Date: 0 0 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective imDrovements found adiacent to buildina site must be repaired to the satisfaction of the Citv InsDector Drior to occuDancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. 7a. Inadequate information available on Site Plan to make a determination on grading 0 0 0 0 requirements. Include accurate grading quantities (cut, fill import, export). 0 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. The Grading Permit must be issued and rouah grading approval obtained Drior to issuance of a Buildina Permit. NOTE: Grading Inspector sign off by: Date: 0 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) 4 .. BUILDING PLANCHECK CHECKLIST 2ND 3RD 0 0 7d .No Grading Permit required. 0 0 7e. If grading is not required, write "No Grading" on plot plan Y MISCELLANEOUS PERMITS 0 0 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or private work adjacent to the public Right-of-way. Types of work include. but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-way permit required for: 0 0 0 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water District, located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153, for assistance. Industrial Waste permit accepted by: Date: 0 0 0 10.NPDESPERMlT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever occurs first. 0 0 11. equired fees are attached No fees required WATER METER REVIEW 0 0 12a. Domestic(potab1e)Use Ensure that the meter proposed by the owner/developer is not oversized. Oversized meters are inaccurate during low-flow conditions. If it is oversized, for the life of the meter, the City will not accurately bill the owner for the water used. All single family dwelling units received "standard" 1" service with 5/8" service. 5 1ST 2ND 3RD BUILDING PLANCHECK CHECKLIST s If ownerldeveloper proposes a size other than the "standard, then owner/developer must provide potable water demand calculations, which include total fixture counts and maximum water demand in gallons per minute (gpm). A typical fixture count and water demand worksheet is attached. Once the gpm is provided, check against the "meter sizing schedule" to verify the anticipated meter size for the unit. s Maximum service and meter size is a 2" service with a 2 meter. s If a developer is proposing a meter greater than 2, suggest the installation of multiple 2" services as needed to provide the anticipated demand. (manifolds are considered on case by case basis to limit multiple trenching into the street). Irrigation Use (where recycled water is not available) All irrigation meters must be sized via irrigation calculations (in gpm) prior to approval. The developer must provide these calculations. Please follow these guidelines: 1. If the project is a newer development (newer than 1998). check the recent improvement plans and observe if the new irrigation service is reflected on the improvement sheets. If so, at the water meter station, the demand in gpm may be listed there. Irrigation services are listed with a circled "I", and potable water is typically a circled "W". The irrigation service should look like: STA 1+00 Install 2" service and 1.5: meter (estimated 100 gprn) 2. If the improvement plans do not list the irrigation meter and the serviceheter will be installed via another instrument such as the building plans or grading plans (w/ a right of way permit of course), then the applicant must provide irrigation calculations for estimated worst-case irrigation demand (largest zone with the farthest reach). Typically, Larry Black has already reviewed this if landscape plans have been prepared, but the applicant must provide the calculations to you for your use. Once you'have received a good example of irrigation calculations, keep a set for your reference. In general the calculations will include: Hydraulic grade line s s Elevation at point of connection (POC) Pressure at POC in pounds per square inch (PSI) Worse case zone (largest, farthest away from valve Total Sprinkler heads listed (with gpm use per head) Include a 10% residual pressure at point of connection 3. In general, all major sloped areas of a subdivisionlproject are to be irrigated via separate irrigation meters (unless the project is only SFD with no HOA). As long as the project is located within the City recycled water ,. * BUILDING PLANCHECK CHECKLIST 1ST 2ND . 3RD , service boundary, the City intends on switching these irrigation servicesheters to a new recycled water line in the future. 0 [7 0 12c. Irrigation Use (where recycled water is available) 1. Recycled water meters are sized the same as the irrigation meter above. 2. If a project fronts a street with recycled water, then they should be connecting to this line to irrigate slopes within the development. For subdivisions, this should have been identified, and implemented on the improvement plans. Installing recycled water meters is a benefit for the applicant since they are exempt from paying the San Diego County Water Capacity fees. However, if they front a street which the recycled water is there, but is not live (sometimes they are charged with potable water until recycled water is available), then the applicant must pay the San Diego Water Capacity Charge. If within three years, the recycled water line is charged with recycled water by CMWD, then the applicant can apply for a refund to the San Diego County Water Authority (SDCWA) for a refund. However, let the applicant know that we cannot guarantee the refund, and they must deal with the SDCWA for this. 0 0 0 13. Additional Comments: 7 RN. ,,,urn __ r. . PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Type of Project & Use: @a. &PTN. Net Project Density: Zoning: R--l General Plan: /'LL/lrJ\ Facilities Management Zone: 2 CFD (inlout) #-Date of participation: DU/AC Remaining net dev acres:- Circle One (For non-residential development: Type of land used created by this permit: 1 Leaend: Environmental Review Required: DATE OF COMPLETION: Item Complete 0 Item Incomplete - Needs your action YES - NO - 4YPE Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: 0 Discretionary Action Required: YES __ NO - /TYPE APPROVALIRESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: // o/o 0 Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES- NO- CA Coastal Commission Authority? YES- NO- If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego CA 92108-4402: (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Coastal Permit Determination Form already completed? YES- NO- If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) 2) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum Floor Plans). Complete Coastal Permit Determination Log as needed. - NO - B-fjo lnclusionary Housing Fee required: YES - (Effective date of lnclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES - NO - (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing YIN, Enter Fee, UPDATE!) H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 F .. V6U 0 do onu O& d0 Site Plan: , 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right- of-way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). 2. Provide legal description of property and assessor's parcel number. Policy 44 - Neighborhood 1. Applicability: YES NO 2. Project complies YES- NO -, Zoning: 1. Setbacks: Front: Required Shown Interior Side: Required Shown Street Side: , Required Shown Rear: Required Shown Top of slope: Required Shown 2. Accessory structure setbacks: Front: Required Shown Interior Side: Required Shown Street Side: Required Shown Rear: Required Shown Structure separation: Required Shown 3. Lot Coverage: Required Shown 4. Height: Required Shown OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER / DATE ?h?/p2 H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 ~~ CARLSBAD