Loading...
HomeMy WebLinkAbout2746 LOKER AVE W; ; CB032793; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-01-2004 Commercial/Industrial Permit Permit No: CB032793 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2746 LOKER AV WEST CBAD Tl Sub Type: 2090810700 Lot#: $313,140.00 Construction Type: Reference #: MO BIO LABORATORIES-10,438 SF SHELL TO OFFICE/LAB INDUST 0 VN Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check#: Applicant: Owner: ARNETT CONSTRUCTION SUITE# 108 4010 MORENA BLVD 92117 858-270-4792 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Total Fees: $11,126.28 $1,205.68 $0.00 $783.69 $0.00 $0.00 $65.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Payments To Date: Meter Size Add'! Reel. Water Con. Fee Meter Fee SDCWA Fee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund} Traffic Impact Fee Traffic Impact (CFD Fund) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees TOTAL PERMIT FEES $783.69 Balance Due: ISSUED 10/08/2003 RMA 04/01/2004 04/01/2004 $0.00 $0.00 $0.00 $0.00 $5,699.15 $0.00 $0.00 $0.00 $1,160.00 $0.00 $174.00 $210.00 $128.50 $0.00 $1,699.50 $0.00 $0.00 $11,126.28 $10,342.59 8885 04/01/04 0002 01 02 Inspector: ~ FINAL APPROVAL Date: ef~/& If Clearance: ------ NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reseivations, or other exactions hereafter collectively referred to as '1ees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or seivice fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have oreviouslv been aiven a NOTICE similar to this or as to which the statute of limitations has oreviouslv otherwise exoired. f 4 .. FOR OFFICE USE ONLY +, PEkMIT APPLICATION PLAN CHECK NO. ce c, 1 :i 2v EST. VAL. 3/ {, J4CJ Plan Ck. Deposit r ~ &J r CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad CA 92008 Validated By ___ _,__ ______ _ 783.,59 '# of Bathrooms :~.~. ___ ~(;if-rtAgr P;J;_RSQJi_(!( differerit froliJ ~pt!li&a11!}._· _·_·_-__ -__ · --------~-· ·_·-_-_·:-_-_._-_-_·_··_-_--__ ·_. -_-_--_--:::=_-___ ___,_, ____ ·_-_·_-_-_ .. ~_ . 'l Name Address City State/Zip Telephone# ,3.~~ APPLICANT: o:_contractor .:·~g~ntforContractor :=:.:·· D Owner·--~=~=· D .. Agentft?LOwner ·~=-_-___ ........ __________ . . s~ Fax# ;_':':11.: J~\100. ... --~US::n~s~;t:1~E1m _.g,_9ity ~12,~P State/Zip --_tor:elephone#vz/q.:..J~'LSB.€l':·L_ ... "" --· ,4. PROPERTY OWNE~ · . . . . · . ·. . . · . . l O))fblo ~~e(' st/31-,\ flventcflLf«.10as fatditod ~Jr 9~f) ']Id) ~1:J:c, .9911 -----····-----' Name Address City State/Zip Telephone# :5,_ .. CQtiT~~T9~:.9QM~ANY'r~-AME ___ :===-=-~:: .. -.=.==... ___ 0 • ...,..----=-=== =-=-= ~~:-=-~~~~= ==:·~. _ ..... (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a . '" . alt of not more than five h~ !...~ [$5~. U) c~ M CJ Nam Adi:! ess ID {f!R.fJE. City~ 6fJD State/Zip °f:;l.ll, Telephone License Class ~ City Business License# __Lt-I (,,40:] Designer Name i'fuSuSt1 NE 'i)::S(atJ Address .;J+ '7 ~ 'F,'ll.ST ,:rve.. State License # <Ste.cup City SJt-tJ Q 63c State/Zip Cf,4-;Cj{)..[o/ Telephone# ft,(Cl . 7'f'-/. '=:$8"(- :e·. -, WORKER'S-COMPENSATION.-·. ----_,. ... '" "·-·-· ·-·-··------··· ·-.•. ··-·--,.,,. ....... ---··-····----·---·--,. ........ ,., ---· ·-·-· "" Workers· Compensation Declaration: I hereby affirm ~nder penalt}' of perjury one ofth~ following declarations: --"''" __ __.,.,_,,,,,, =v ·---.~---~--_,.,_ = .. , D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work f which this permit is issued. I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. My er's compensation in ranee carrier and po icy number are: . ,.. . L Insurance Company_'-JJl"""~-"'~=-~,.__ ______ Policy No._.t2C?J_g'::J167 Expiration Date_}D .. J.?L D~...,'~,__ __ _ (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) D CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to dollars($100,00 ) i a SIGNATURE_ ·7. ,. ·OWNE'R·BU E · ' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand en tionJ damages are provided for In Section 3706 of the Labor Code, interest and attorney's fees. ... --· ----· -----. -"..... . . --=·-·---_,,,.,,. .-, ---DATE~~~{--P<j~ ~.:.-~ ~: ~~-~-~; I, as owner of the property or my employees with wages as their sole compensation, will d the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). D I am exempt under Section ________ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. D YES D NO 2. I (have/have not) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number/ contractors license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number/ /ontractors license number):---------------------------------------------- 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name/ address/ phone number/ type of work): PROPERTY OWNER SIGNATURE ___________________________ DATE ___________ _ WHITE: File YELLOW: Applicant PINK: Finance . J ,: •, PERM!T APPLICATION CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad CA 92008 Page 2 of 2 !9_?_~~4~-~~ ~~~TJQ_N_!~~~!~E~Tl;.\Th~~~!~_G PERMIT~Y----.-~--, -" . ~--·-• --~=-:=~-:-----,. -----J Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration for or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D YES D NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D YES D NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D YES D NO IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. :8., CONSTRUCTION'.LENDING'AGENCY -,. ._, ------·· ·---·--... ··-, , .• ·--·---------________ ., ., '""' -----·· .. ~:~:-~ !hereby affirm that there-is a constructfo"n'iending agency for the performance of the work-for which this permit is issued (Sec. 3097(1)Civifcodei:-·------·-· . LENDER'S NAME __________________ _ LENDER'S ADDRESS ___________________ _ ,e; ____ APPLICANTCERTIFICATION ______ ,,_· -------~ _________ _ ______________ . , · _:_ ___ ...:__ ~:__:,J I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGEMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations of 5'0" deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commen d within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a f 180 days ion 106.4.4 niform Building Code). APPLICANT'S SIGNATU WHITE: File YELLOW: Applicant PINK: Finance FOR OFFICE USE ONLY .. ,--1 . PERMIT APPLICATION PLAN CHECK NO. ____ _ v-· CITY OF CARLSBAD BUILDING DEPARTMENT 1635 Faraday Ave., Carlsbad, CA 92008 EST. VAL. _________ _ Plan Ck. Deposit ________ _ Validated By __________ _ Date ____ .,._-----,-----,.-- Addre~s (include Bldg/Suite #) Business Name (at this address) Legal Description ·Lot No. Subdivision Name/Number Unit No. Phase No. Total # of units Assessor's Parcel # Existing Use Proposed Use Description of Work SQ. FT. #of Stories # of Bedrooms # of Bathrooms Name Address City State/Zip Telephone# Fax# Name ·Address . City State/Zip Telephone# Name Address . City S.tate/Zip · Telephone # ~EOINDTm~QQMtii~Njffl~~~~\S{:£Y3?~~~~..:.;;!~{:t~~~~~~~~:~~~~~~~~~~~~~~~~~~i]~li~l!~"§1m~n~::tifft;;~~~[~1 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code] or that he is exempt therefrom,. and the basis for the alleged xemp · n. Any violation of Se tion 7031.5 by any applicant for a permit subjects th applicant to a civil enalty of not more than five hundred dollars [$5001). '. ' . . ·, rt.1 . 2-l:,50 ~ 3{)\City State Zip City Bu~iness L!cense # -+,..;'--..a.......:.->.->-=- Designer Name Address City State/?ip Telephone State License # ;;::;;;:;;;:;;;;;:;;;::;;;.:;;;;;:;;;;;:;;;;;:;;;;;;;::::::;:; W~~~~Q~K@~if~MP~~$Lm9'.~~~d~~:;t~;Z~7:~:r;::r~,~~~"::~:r~i~~~-~~~it,~~:l~-:-~1¥~T30~~??fil~!~fb~i.%~2:~~~?;I~~~;0~f!::J!;::~~~ }'(1~:5~:2·:(;_:~~:~~ t:J . Workers' Compensation Declaration: I hereby affirm unqer penalty of perjury one of the followi.ng declarations: 0 . I have and will maintain a certificate of' consent to self-insure for. workers; compensation as provide.d by Section 3700 of the Labor Code, for the performance of the ~ork for which this permit is issued. 0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for-which this permit is issued. My worker's compensation insurance carrier and policy number are: Insurance Company · Policy No._____________ Expiration Date _______ _ (THIS ~TION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS [$100] OR LESS) e ·, co pe atlon coverage Is unlawful, and shall subject en employer to criminal penalties and cl ii fines up to one hundred illt!on tot e ost of compensa#on, damages as provided for In Section 37Q6 of the Labor code, intere t and attorn!ly's fees. DATE _ _.__.,_,_..,____,""'--+-~ ,~~JJ~~~~)~)-!{)~~~~~~~~z~~~~~it~~~t«~wr::-~:-=~~~~&£.~~;~~il~!;!i.~~~~1\~~~t '.~ri,t;~~1ii~~~~kt~~s2~ pt from the Contractor's License Law for the following reason: I, as o·wner of the property or my employees· with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec, 7044, Business and Professipns Code: The Contr;:ictor's License Law does not apply to an-owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year.of completion, the owner-builder will have the burden of proving that he did not build or improve for. the purpose of sale). -0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The ·contractor's License Law does not apply to an owner of property who buiids pr improves thereon, and contracts for such projects with contractcir(s) licensed pursuant to the Contractor's License Law) • .. 0 I am exempt under Section ______ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO 2. I (have/ have not) signed an application for a building permit for the _proposed work. · 3. I have contracted, with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number): 4. I plan to provide portions of the, work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone number I contractors license number>=------------------------------------------------- 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of·work): ' . PROPERTY OWNER SIGNATURE______________________ DATE ________ _ t[q.Nffit§t1tif~~~JIW&<:J1m@:UlffmiLEli':mt'lJJ!li1~1Nti8JiMLutim_iJ:m'~~t;i'.\'.'.:7:i+~i£!'~1t't~E~tt~!f'.f.ibs~1:1.t'.'.i?i:i1.2i2.i;::_;,:!'if~::-::" ls the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections·25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?~-O YES O NO Is the applicant or future building occ.upant required to obtain a permit from the air pollution control district or air quality management district? O YES O NO Is the facility to be con~tructed within 1,000 feet of the outer boundary of a school site? O YES O NO Apr 08 04 12:17p Mo Bio Laboratoratories 7609290109 p.2 ,LI To Whom it may concern; Re our permit number ; CB032793 P.O. Box 606, Solana Beach, CA 92075 (760) 929-9911 (800) 606-6246 I-AX (7 60) 929-0 l 09 www, mobio.com We would like to remove Arnett Contruction and add Gregg T.LaRocca Builders dba TSA Contracting. Liz Brolaski CFO Mo Bio Laboratories, Inc. 760~929-9911 vflM_ Lk~~ 4u;/t;,_ yl ~ ~ ~~ a/lJ-+'4~~,~ ~ ~ , .............. ~ ~L ql_ ~ ~M-~ ~~~L~~~. ' ·~ t-rlrt/o CilY of Carlsbad · Final Building Inspection Dept: Building Engineering Planning CMWD St Lite ,fire) Plan Check #: Permit#: Project Name: CB032793 MO BIO LABORATORIES-10,438 SF SHELL TO OFFICE/LAB Address: 2746 LOKER AV WEST Contact Person: PAT Phone: 8584371179 Sewer Dist: CA Water Dist: CA Date: 06/15/2004 Permit Type: Tl Sub Type: INDUST Lot: 0 .......................................................................................................................................................... ~:pecten 13dd_1_ Date 6/1/;y ~ Disapproved: __ Inspected: Approved: Inspected Date By: Inspected: Approved: Disapproved: __ Inspected Date By: Inspected: Approved: Disapproved: __ 111111111111111111111111111111111111111111111111111 II II••••••••••••••••••• 1111111111111 I 111111111111111 •••••• 111 •••••••••••••••••••••••••••• 111111111111111 Comments: ------------------------------- ,, City of Carlsbad Bldg Inspection Request For: 08/J.872004 /1 Permit# CB032793 Inspector Assignment: TP Title: MO BIO LABORATORIES-10,438 SF Description: SHELL TO OFFICE/LAB Type: Tl Job Address: Suite: Location: Sub Type: INDUST 2746 LOKER AV WEST Lot 0 JNTRACTOR LA ROCCO BUILDERS Owner: Remarks: Phone: 8587618180 Inspector: .J!_ Total Time: Requested By: MATT Entered By: CHRISTINE Act Comment CD 19 Description Final Structural Af}4:t ~6 29 39 49 -- Final Plumbing Final Electrical Final Mechanical E-- Associated PCRs/CVs PCR03229 ISSUED CARLSBAD OAKS BLDG C; Q.C. CORRECTIONS & ROOF FRAMING REV PCR03245 ISSUED CARLSBAD OAKS BLDG C; REV JAMB REIFORCEMENT lns1;1ection History Date Description Act lnsp Comments 06/18/2004 89 Final Combo co TP 06/16/2004 39 Final Electrical co TP 06/16/2004 89 Final Combo co TP 06/15/2004 89 Final Combo NS TP 06/10/2004 14 Frame/Steel/Bolting/Welding AP TP T-CEIL 06/10/2004 24 Rough/Topout WC TP 06/10/2004 34 Rough Electric AP TP CEIL LITES 06/10/2004 44 Rough/Ducts/Dampers AP TP DUCTS, PLMNS 06/07/2004 14 Frame/Steel/Bolting/Welding AP PD T CEIL 127, 129 06/07/2004 34 Rough Electric AP TP CEIL LITES 127,128 06/07/2004 34 Rough Electric AP TP DUCTS 127, 129 06/07/2004 34 Rough Electric AP T-P SUB PNLS, MSB 05/26/2004 14 Frame/Steel/Bolting/Welding AP TP T-CEIL (SEE CARD) 05/26/2004 17 Interior Lath/Drywall WC TP 05/26/2004 24 Rough/Topout WC TP City of Carlsbad Bldg Inspection Request For: 08/16/2004 Permit# CB032793 Inspector Assignment: TP 05/26/2004 34 Rough Electric AP TP CEIL LITES (SEE CARD) 05/26/2004 44 Rough/Ducts/Dampers AP TP DUCTS, PLUMNS 05/25/2004 17 Interior Lath/Drywall AP TP ANNEX SECT. 05/24/2004 17 Interior Lath/Drywall co PS BUILDING NOT SCRAPPED 05/24/2004 84 Rough Combo CA PS T-BAR 05/21/2004 17 Interior Lath/Drywall NR TP 05/13/2004 14 Frame/Steel/Bolting/Welding AP TP SEE CARD LOC 05/13/2004 34 Rough Electric AP TP 05/13/2004 44 Rough/Ducts/Dampers AP TP RR EXHST DUCT 05/10/2004 17 Interior Lath/Drywall AP PY 05/10/2004 24 Rough/Topout WC PY 05/10/2004 34 Rough Electric WC PY 05/10/2004 44 Rough/Ducts/Dampers WC PY 04/29/2004 14 Frame/Steel/Bolting/Welding AP TP SEE CARD LOG 04/29/2004 24 Rough/Topout AP TP SEE CARD LOC. 04/29/2004 44 Rough/Ducts/Dampers AP TP EXHST @ LAB (LOW) 04/28/?004 14 Frame/Steel/Bolting/Welding PA TP SEE CARD LOC. 04/28/2004 24 Rough/Topout NR TP 04/28/2004 34 Rough Electric PA TP SEE CARD LOC. 04/28/2004 44 Rough/Ducts/Dampers NR TP 04/27/2004 84 Rough Combo co TP 04/20/2004 31 Underground/Conduit-Wiring AP TP FLR BOXES 04/05/2004 14 Frame/Steel/Bolting/Welding NR TP NO WORK COMPLETE EsGil Corporation In CEartnersliip witli government for (}Juifaing Safety DATE: March 29, 2004 JURISDICTION: Carlsbad PLAN CHECK NO.: 03-2793 SET:IV Q APPLICANT Q/JURIS. Q PLAN REVIEWER Q FILE PROJECT ADDRESS: 2748 Loker Ave West PROJECT NAME: T. I. for MoBio Laboratory D D D D D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. PLEASE SEE REMARKS BELOW. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ' '~ The applicant's copy of the check list is enclosed for the jurisdiption to forward to the.applicant contact person. · The appli~ant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: ) Mail Telephone Fax In Person plans (on Owner set I~ on City set IV and on thirct. received by Esgi/ on3/29/04. By: Abe Doliente Esgil Corporation D GA D MB D EJ D PC Enclosures: 3/29/04 Fax#: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 • f/ // ]5'-11 112· ,'~ ~' '~ ' '~ ~' ' f/ // 11-~~ I rk 1 -II''~~ C-=._ =--=--=-=._ :::J = 2 -25 GA 3 5/8" STUDS SCREWED TOGETHER TO ENDS OF WALLS EXCEEDING 8' IN LENGTH. c:= = === : : 7 = 25 GA 3 5/8" STUDS DIAGONALLY AT CORNER TOP PLATE . WITH 3 -=l::l=6 -1/2"SCREWS AT EACH CONNECTING POINT 16'-6' ,s.'>. ,'~ ~' ' ZN~ u,~W\• llf / Crr'f ~ f/ // ' '~ s~, . '>-' f/ // COMPANY SPECIFICA TJONS CONTRACT ND. A UC us TINE fNTERIOR WALL BRACING DRAw'N BY PM. DATE DES_LGN GROUP CHECKED BY TJTLE ALTERNATE TO DETAIL 1 ON SHEET MO-BIO DESIGNED BY p M i--D-1, AUGUSTINE DESIGN GROUP · · sizE LAB FSCM ND. DVG ND. / FILE NAME DRAWINGS DATED 2/23/04. DESIGN ACTIVITY A CUSTOMER KLANG SCALE ·10A1E . ISHtET 1/4in "" 1ft 4 /21 /04 1 OF 2 .. DATE: March 3, 2004 JURISDICTION: Carlsbad PLAN CHECK NO.: 03-2793 EsGil c·orporation In <Partnersliip w#li government for <Bui(aing Safety SET: III PROJECT ADDRESS: 2748 Loker Ave West PROJECT NAME: T. I. for MoBio Laboratory 9-A'f:~ANT ~ D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ~ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ~ The applicant's copy of the check list has been sent to: Augustine Design Group 2272 First Ave, San Diego, CA 92101 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. ~ Esgil Corporation staff did advise the applicant that the plan check has been completed. ' . Person contacted: Jillon Augustine Telephone #:·619/744-5884 Datecontacted:~/2,/oLf.(by:f,A,c,) Fax#: -5898 Mail~ Telephone D REMARKS: Fa)I,....,-' In Person By: Abe Doliente (by Glen Adamek) Esgil Corporation ~ GA D MB D EJ O PC 2/26/04 Enclosures: trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 03-2793 March· 3, 2004 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PROJECT ADDRESS: 2748 Loker Ave West DATE PLAN RECEIVED BY ESGIL CORPORATION: 2/26/04 REVIEWED BY: Abe Doliente (by Glen Adamek) FOREWORD (PLEASE READ): PLAN CHECK NO.: 03-2793 SET: III DATE RECHECK COMPLETED: March 3, 2004 This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances ~nforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. B. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. C. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? DYes DNo Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. Carlsbad 03-2793 March 3, 2004 Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 17. Please see the following corrections for electrical, plumbing, mechanical and energy. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Abe Doliente (by Glen Adamek) at Esgil Corporation. Thank you. PLUMBING, MECHANICAL, AND ENERGY CORRECTIONS + JURISDICTION: Carlsbad + PLAN REVIEW NUMBER: 03-2793 PLAN REVIEWER: Glen Adamek DATE: 3/3/04 SET: III 1. Each sheet of the plans must be signed by the person responsible for their preparation, before the permits are issued. Business and Professions Code. The final set of plans to be reviewed just before the permits are issued. 4. No update to the report, and no response provided? Correct the ventilation requirements in the Fire Protection Technical Opinion & Report by Anne Marie Bland. The report 'Technical Reference 4' does not clearly address the maximum amount of each material in open use and if total amount is spilled the required ventilation rate and where each material is used and the ventilation required for each area of use. PLUMBING (2000 UNIFORM PLUMBING CODE) 5. The Site Plumbing Plans are missing from the plan package and no response provided? Please show the upstream sewer manhole rim elevation compared to the finished floor level. As per UPC, Section 710.1, provide backwater valves on all building drains which serve plumbing fixt1,.1res with flood rim elevations below the upstream . manhole rim elevations. Only fixtures with flood rim levels below the upstream manhole rim elevation may flow through a backwater valve. 6. No response provided? Provide complete water line sizing calculations, including the water pressure, pressure losses, water demands, and developed pipe lengths. UPC Section 610.0 and/or Appendix 'A'. Correct the calculations on sheet P1: A) Clearly show the developed pipe length from the water meter to the most distant fixture. B) Clearly show the minimum water pressure at the water meter. C) Clearly show the elevation difference between the elevation of the water meter and the highest water fixture. And the calculations of the pressure losses from the elevation difference. Carlsbad 03-2793 March 3, 2004 D) If UPC, Tables 6-4 and 6-7 are used for the fixture unit demands then use UPC, Table 6-5. The Pipe Sizing Chart on sheet P1 does not match UPC, Table 6-5. E) If UPC, Appendix A is to be used for water line sizing then correct the water line sizing calculations as follows: 1) Correct the fixture units as per UPC, Table A-2, (not UPC, Tables 6-4 and 6-7). 2) Provide the calculations for the maximum allowed friction loss per 100 feet of piping. 3) Correct the GPM values used as per UPC, Chart A-4. All values ~eem high? 3) Correct the water line sizing for maximum velocity as per UPC, Section 610.12.1: Maximum velocities in copper and copper alloy tube and fitting systems shall be limited to a maximum of eight (8) feet per second in cold water and five (5) feet per second in hot water. MECHANICAL (2000 UNIFORM MECHANICAL CODE) 15. The Fire Protection Technical Opinion & Report by Anne Marie Bland, states Flammable and/or Combustible Liquids, Class I; II, and/or Ill-A, are being used, but where is not clear. (In Rooms 106 and 107 only as per mechanical plans?) So, mechanical exhaust ventilation is required as per UBC, Section 1202.2.2. Please clearly show where the proposed Class I, II, and/or Ill-A, Flammable and/or Combustible Liquids are used and show the required exhaust ventilation systems. In Groups B, F, M, and S Occupancies, or.portions thereof, where Class I, II, or Ill-A liquids are used (in any amount), mechanical exhaust shall be provided sufficient to produce six air changes per hour. Such mechanical exhaust shall be taken from a point at or near the floor. ENERGY CONSERVATION 24. The new revised energy design, the EnergyPro 3.1 energy design, shows Process Loads in all area, but the required 'special documentation' as per the p~rt 3 of 3 of the PERF-1 form was not provided and it is not clear as to the heat producing equipment in each area producing the Process Loads used in the energy design? Please correct. The Trace 770 design calculations do not include heat output of equipment and a list of all the heat producing equipment. 27. Show the daylit areas and required daylit area lighting controls for new or relocated lighting in daylit areas. Title 24, Part 6, Section 131(c). The window and skylight daylit areas are not shown on the drawings and the required daylit area controls for windows and skylights are missing and correct the switching for daylit area controls in rooms #113/114, 124,126,153 and 152/154/155. Please correct the light switching on sheet E-3.1. 30. The corrected, completed and signed PERF-1 forms must be imprinted on the plans. ., \f Carlsbad 03-2793 March 3, 2004 31. The LTG-1 form on sheet E-0.1 must be signed by the Documentation Author and the Principal Lighting Designer. 32. The Documentation Author, the Principal Envelope Designer and the Principal Mechanical Designer must sign the corrected PERF-1 form on sheet M-0.1. Note: If you have any questions regarding this Plumbing, Mechanical, and Energy plan review list please contact Glen Adamek at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. EsGil Corporation In <Partnersliip witli government for <Bui{ain9 Safety DATE: January 21, 2004 JURISDICTION: Carlsbad PLAN CHECK NO.: 03-2793 PROJECT ADDRESS: 2748 Loker Ave West PROJECT NAME: T. I. for MoBio Laboratory SET: II D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. IZJ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. IZJ The applicant's copy of the check list has been sent to: Augustine Design Group 2272 First Ave, San Diego, CA 92101 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. l':8:] Esgi.l Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Jillon Augustine Telephone#: 619/744-5884 Date contacted: 1 /1-i le~ (by: FA,>-) Fax #: -5898 Mail ....;:f'elephone D REMARKS: Fax......-' In Person By: Abe Doliente Esgil Corporation fg] GA D MB D EJ D PC Enclosures: 1/12/04 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad 03-2793 January 21, 2004 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PROJECT ADDRESS: 2748 Loker Ave West DATE PLAN RECEIVED BY ESGIL CORPORATION: 1/12/04 REVIEWED BY: Abe Doliente FOREWORD (PLEASE READ): PLAN CHECK NO.: 03-2793 SET: II DATE RECHECK COMPLETED: January 21, 2004 This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. A. Please make all corrections on the original tracings and submit three new sets of prints to: Esgil Corp. or to the bldg. dept. of the juris. B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. C. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your reference. In case you did not keep a copy of the prior correction list, we have enclosed those pages containing the outstanding corrections. Please contact me if you have any questions regarding these items. D. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? OYes ONo ., Carlsbad 03-2793· January 21, 2004 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans 3:nd calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 17 ... Please see the following corrections for electrical, plumbing, mechanical and energy. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Abe Doliente at Esgil Corporation. Thank you. PLUMBING, MECHANICAL, AND ENERGY CORRECTIONS PLAN REVIEWER: Glen Adamek 1. Each sheet of the plans must be signed by the person responsible for their preparation, before the permits are issued. Business and Professions Code. The final set of plans to be reviewed just before the permits are issued. 2. Correct the "Plumbing Plan Check Notes" on sheet P-1 to show the 2001 California Energy Efficiency Standards (E.E.S.}, not the 1998 edition [Correct #2.C}, 2.E}, & 2.F)]. And the 2001 California Plumbing Code (using the 2000 UPC) not the 1998 [Correct #5]. 4. Correct the ventilation requirements in the Fire Protection Technical Opinion & Report by Anne Marie Bland. The report 'Technical Reference 4' does not clearly address the maximum amount of each material in open use and if total amount is spilled the required ventilation rate and where each material is used and the ventilation required for each area of use. Carlsbad 03-2793 January 21, 2004 PLUMBING (2000 UNIFORM PLUMBING CODE) 5. The Civil Drawings are missing from the plan package? Please show the upstream sewer manhole rim elevation compared to the finished floor level. As per UPC, Section 710.1, provide backwater valves on all building drains which serve plumbing fixtures with flood rim elevations below the upstream manhole rim elevations. Only fixtures with flood rim levels below the upstream manhole rim elevation may flow through a backwater valve. 6. Provide complete water line sizing calculations, including the water pressure, pressure losses, water demands, and developed pipe lengths. UPC Section 610.0 and/or Appendix 'A'. Correct the calculations on sheet P1: · A) Clearly show the developed pipe length from the water meter to the most distant fixture. B) Clearly show the minimum water pressure at the water meter. C) Clearly show the elevation difference between the elevation of the water meter and the highest water fixture. And the calculations of the pressure losses from the elevation difference. D) If UPC, Tables 6-4 and 6-7 are used for the fixture unit demands then use UPC, Table 6-5. The Pipe Sizing Chart on sheet P1 does not match UPC, Table 6-5. E) If UPC, Appendix A is to be used for water line sizing then correct the water line sizing calculations as follows: 1) Correct the fixture units as per UPC, Table A-2, (not UPC, Tables 6-4 and 6-7). 2) Provide the calculations for the maximum allowed friction loss per 100 feet of piping. 3) Correct the GPM values used as per UPC, Chart A-4. All values seem high? 3) Correct the water line sizing for maximum velocity as per UPC, Section 610.12.1: Maximum velocities in copper and copper alloy tube and fitting systems shall be limited to a maximum of eight (8) feet per second in cold water and five (5) feet per second in hot water. MECHANICAL (2000 UNIFORM MECHANICAL CODE) 12. Detail the required roof access ladder to the roof mounted HVAC equipment. UMC Section 910. No response and the required ladder supplying access to the roof is not shown on the drawings? 13. Detail the access and working clearances to HVAC equipment. UMC Section 903. No Note # 3 on sheet M4.1? Carlsbad 03-2793 January 21, 2004 15. The Fire Protection Technical Opinion & Report by Anne Marie Bland, states Flammable and/or Combustible Liquids, Class I, II, and/or Ill-A, are being used. So, mechanical exhaust ventilation is required as per UBC, Section 1202.2.2. Please clearly show where the proposed Class I, II, and/or Ill-A, Flammable and/or Combustible Liquids are used and show the required exhaust ventilation systems. In Groups B, F, M, and S Occupancies, or portions thereof, where Class I, II, or Ill-A liquids are used (in any amount), mechanical exhaust shall be provided sufficient to produce six air changes per hour. Such mechanical exhaust shall be taken from a point at or near the floor. 16. Detail disposal sites of main condensate drainage from air conditioning units. UMC Section 310.1 & UPC 807.2. Condensate drainage is not shown on the Plumbing Drawings. 18. Please provide cut-sheets and listing data for the Autoclaves, Incubators, Bio Safety Hoods, Flow Hood, Thelco Oven and Equatherm Oven, to allow for review of the required mechanical connections. If listing data and installation instructions can not be provided then provide a third party installation report will be required for the approval of the construction and installation of the proposed mechanical to approved standards before the equipment is installed as per UMC Section 304.0. 19. Provide the listing data and installation data for the proposed ovens (Thelco Oven and Equatherm Oven). If not listed, a third party installation report will be required for the approval of the construction and installation of the proposed ovens to approved standards. UMC Section 304.0 Not found in the package? 20. Note: Heat Pumps # HP-7 and HP-8 make-up one "air-moving system" totally over 2,000 CFM and Heat Pumps # HP-1, HP-3 and HP-4 make-up another "air-moving system" totally over 2,000 CFM, both systems require smoke detection in the supply air ducts for required shut-off of equipment. Please correct. Provide smoke detection in the supply air duct of an "air-moving system" for required shut-off of equipment for smoke control. UMC Section 609.2. An "air-moving system" is a system designed to provide heating, cooling, or ventilation in which one or more air-handling units are used to supply air to a common space or to draw air from a common plenum or space. UMC Section 203.0. 21. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6. See item # 15 above for required exhaust ventilation systems. Then show compliance with the following. Also, the plans show a exhaust canopy hood, clearly show what type of vapors, fumes and materials are proposed to be used under (or within) the hood. A) Detail the required make-up air as per UMC, Section 505.3. B) Detail the exhaust outlet clearances as per UMC, Sections 504.5 (Environmental) & 506.9 (Product conveying). C) Clearly show the type of material to be exhausted by each exhaust system. D) Clearly show the duct materials are suitable for the intended use. UMC, Section 506.1 &610.1. Carlsbad 03-2793 January 21, 2004 . . E) Clearly show the exhaust duct material and gage used for each duct size. See UMC Table 6-7. F) Separate and distinct systems shall be provided for incompatible materials. UMC Section 505.1 G) Detail ducts conveying explosives or flammable vapors, fumes or dusts shall extend directly to the exterior of the building without entering other spaces. UMC Section 505.1. H) I) J) K) L) M) N) Detail minimum duct conveying velocities as per UMC Section 505.2 and Table 5- 1. Detail duct cleanouts as per UMC Section 506.3. Detail required explosion venting of dust collection systems as per UMC Section 506.4 & 610.4. Detail duct support as per UMC Sections 506.5 & 610.5. Detail fire protection as per UMC Sections 506.6 & 610.6. Detail clearances from combustibles as per UMC Sections 506.7 & 610.7 . Detail protection from physical damage as per UMC Sections 506.8 & 610.8. 22. Return air shall not be obtained from the following locations: UMC Section 906.6. The Fire Protection Technical Opinion & Report by Anne Marie Bland, does not address compliance with compliance with UMC Section 906.6 in labs. A) Where it will pick up objectionable odors, fumes, or flammable vapors. ENERGY CONSERVATION 23. Not corrected? The PERF-1 form still shows the conditioned floor area to be 8,207 square feet. The L TG-1 and L TG-2 forms on sheet E-0.1 still shows the conditioned floor area to be 10,704 square feet. Why the difference (2,497 square feet and 30%)? Please correct. 24. The new energy design, the EnergyPro 3.1 energy design, shows 0.50 watts per squired foot Process Loads in all area, but the required 'special documentation' as per the part 3 of 3 of the PERF-1 form was not provided and the plans do not show the required equipment in all area providing 0.5 watts of heat in all areas? Please correct. 27. Show the daylit areas and required daylit area lighting controls for new or relocated lighting in daylit areas. Title 24, Part 6, Section 131(c). The skylight daylit areas are not shown and the required daylit area controls for skylights are missing and correct the switching for daylit area controls in rooms #124, 126, 153 and 154. 30. The corrected, completed and signed PERF-1, ENV-1, L TG-1, and MECH-1 forms must be imprinted on the plans. Carlsbad 03-2793 January 21, 2004 31. The Documentation Author and the Principal Lighting Designer must sign the corrected L TG-1 form on sheet E-0.1. 32. The Documentation Author, the Principal Envelope Designer and the Principal Mechanical Designer must sign the corrected PERF-1 form on sheet M-0.1. 33. Complete energy plan check will be done when complete corrected energy designs are provided. Note: If you have any questions regarding this Plumbing, Mechanical, and Energy plan review list please contact Glen Adamek at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. ' EsGil Corporation In (J!artnersliip witli <}overnment for (}Jui(tfing Safety DATE: October 23, 2003 JURISDICTION: Carlsbad PLAN CHECK NO.: 03-2793 PROJECT ADDRESS: 2748 Loker Ave West PROJECT NAME: T. I. for MoBio Laboratory SET:I Cl APPLICANT ~- D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [gj The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [gj The applicant's copy of the check list has been sent to: Augustine Design Group 2272 First Ave, San Diego, CA 92101 D Esgil Corporation staff did not advise the applicant that the plan check has been completed. [2J Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Jillon Augustine { De:fbble) Telephone#: 619/7 44-5884 Date contacted: 10/z.Lf/ 03>(by: te--) Fax #: -5898 Mail 0elephone.J Faxv In Person D REMARKS: By: Abe Doliente Esgil Corporation IX! GA IX! MB O EJ O PC Enclosures: 10/9/03 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 "'I ,1 Carlsbad 03-2793 October 23, 2003 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 03-2793 OCCUPANCY: B TYPE OF CONSTRUCTION: V-N ALLOWABLE FLOOR AREA: Existing SPRINKLERS?: Yes REMARKS: JURISDICTION: Carlsbad USE: Office, laboratory ACTUAL AREA: 10,438 SF STORIES: 1 HEIGHT: OCCUPANT LOAD: 105 DATE PLANS RECEIVED BY JURISDICTION: DATE PLANS RECEIVED BY ESGIL CORPORATION: 10/9/03 DATE INITIAL PLAN REVIEW COMPLETED: October 23, 2003 PLAN REVIEWER: Abe Doliente FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1997 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1997 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list {or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section. etc. Be sure to enclose the marked up list when you submit the revised plans. TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot . J ,, Carlsbad 03-2793 October 23, 2003 1. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects. For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad f?uilding Department for routing to their Planning, Engineering and Fire Departments. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 2. Provide a statement on the Title Sheet of the plans stating that this project shall comply with the 2001 edition of the California Building Code (Title 24 ), which adopts the 1997 UBC, 2000 UMC, 2000 UPC and the 1999 NEC. 3. Provide a note on the plans indicating if any hazardous materials will be stored and/or used within the building which exceed the quantities listed in UBC Tables 3-D and 3-E. 4. The tenant space and new and/or existing facilities serving the remodeled area must be accessible to and functional for the physically disabled. See the attached correction sheet. Title 24. 5. Rooms with more than 10 occupants may have one exit through one adjoining room. Revise exits to comply. Section 1004.2.2. Recheck rooms 126 ands 127. 6. For exit access purposes, hallways shall be considered as intervening rooms. Section 1004.3.3.1. The hallway may have to be considered as a corridor (and thus possibly fire-rated) under the following conditions: a) If occupants from a room or area (having a cumulative occupant load of 10 or more) have already exited through an intervening room, and the next component of the exit access is into a hallway, that hallway would represent too many intervening rooms. Section 1004.2.2. b) If a room or area requires two exits, only one exit may be through an intervening room. Section 1004.2.2. If the other exit is into a hallway, that hallway would have to comply with the corridor provisions of Section 1004.3.4. 7. Exit corridors shall not be interrupted by intervening rooms. Foyers, lobbies or reception rooms constructed as for corridors shall not be construed as intervening rooms. Section 1004.3.4.4. t Carlsbad 03-2793 October 23, 2003 8. Corridors shall have walls and ceilings of one-hour construction. Show compliance or clearly show on plans which of the following exceptions from Section 1004.3.4.3 has been satisfied: 9. Corridors shall have interior door openings protected by tight-fitting smoke and draft control assemblies rated 20 minutes. Doors shall be maintained self-closing or be automatic closing by action of a smoke detector per Section 713.2. Doors shall be gasketed to provide a smoke and draft seal where the door meets the stop on sides and top. Section 1004.3.4.3.2.1. 10. The total area of windows in any portion of an interior corridor shall not exceed 25 percent of the area of a common wall with any room. Such openings shall be protected by fixed glazing listed and labeled for a fire-protection rating of at least 3/4-hour. Section 1004.3.4.3.2.2. 11. Show rated corridors, lobbies, reception or foyers cross-hatched on the floor plans. 12. Provide a complete architectural section of the corridor, showing all fire-resistive materials and details of construction for all floor, walls, roof and all penetrations. Section 1004.3.4. 13. Duct penetrations of fire-rated corridor construction shall have smoke and fire dampers per Sections 713.1 O and 713.11. 14. If a room with an exhaust fan has a door opening into a rated corridor, show how makeup air will be provided to the room. The door cannot be undercut, nor can a louver in the door be provided. Section 1004.3.4.3.2.1. 15. Provisions in Chapter 7 require special treatment of penetrations at fire-resistive assemblies. Provide typical details on the plans showing how the fire-resistive integrity will be maintained at the following conditions (Include the manufacturers' names and ICBO numbers (or equal) for any sealant): THROUGH-PENETRATIONS (through the entire assembly): Fire-resistive walls shall have penetrations protected with through-penetration fire stops having an F-rating, T-rating or complying with UBC Standard 7-1, depending on their locations, sizes and combustibility. Fire resistive floor/ceiling assemblies shall have penetrations protected with through-penetration fire stops having and F-rating, T-rating or complying with UBC Standard 7-1, depending on their sizes, combustibility and whether the penetrations are in walls above. Carlsbad 03-2793 October 23, 2003 MEMBRANE-PENETRATIONS (through only one side of an assembly): Fire-resistive walls shall have penetrations protected with membrane-penetration fire stops having an F-rating or complying with USC Standard 7-1, depending on their size and combustibility. Limited steel electrical outlet boxes (not exceeding 16 sq. in., nor more than 100 sq. in. for any 100 sq. ft. of wall) require no protection. Fire-resistive floors or ceilings having penetrations shall comply with Section 710. NOTE: The plans should indicate the various fire-stop ratings required for all penetrations. 16. Provide a note on the plans stating: "Penetrations of fire-resistive walls, floor-- ceilings and roof-ceilings shall be protected as required in USC Sections 709 and 710." • MISCELLANEOUS 17. Please see the following corrections for electrical, plumbing, mechanical and energy. 18. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 19. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No D The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Abe Doliente at Esgil Corporation. Thank you._ Carlsbad 03-2793 October 23, 2003 PLUMBING, MECHANICAL, AND ENERGY CORRECTIONS PLAN REVIEWER: Glen Adamek 1. Each sheet of the plans must be signed by the person responsible for their preparation, before the permits are issued. Business and Professions Code. 2. Correct the statement on the Title Sheet of the plans stating that this project shall comply with the 2001 edition of the California Building Code (Title 24), which adopts the 1997 UBC, 2000 UMC, 2000 UPC and the 1999 NEC. 3. Clearly show the limits of the required fire rated corridors. Then address the following: a) Show the required smoke and fire dampers for duct openings into the required fire rated corridors as per UBC, Sections 713.10 and 713.11. b) The fire rated corridors are not to be used to convey air to or from rooms. UMC Section 602.1 4. Provide data on proposed hazardous material to be stored and used. UBC, Section 307 and UFC. a) Clearly show types of hazardous material is being stored or used. Provide a list of the proposed hazardous materials as per the types in UBC, Tables 3-D, and 3-E. Provide the material safety data sheets (MSDS). b) Clearly show the amounts of each type of hazardous material to be stored and in use. c) Clearly show where in the buildings each type of hazardous material is being stored or used. PLUMBING (2000 UNIFORM PLUMBING CODE) 5. Please show the upstream sewer manhole rim elevation. As per UPC, Section:710.1, provide backwater valves on all building drains which serve plumbing fixtures with flood rim elevations below the upstream manhole rim elevations. Only fixtures with flood rim levels below the upstream manhole rim elevation may flow through a backwater valve. 6. Provide complete water line sizing calculations, including the water pressure, pressure losses, water demands, and developed pipe lengths. UPC Section 610.0 and Appendix 'A'. 7. All water closet seats, except those within dwelling units, shall be of the open front type as per UPC, Section 409.2.2. 8. Shower control valves must be pressure balance or thermostatic mixing valves. UPC Section 420.0. ) Carlsbad 03-2793 October 23, 2003 9. Show the shower control valve and shower head locations comply with UPC, Section 412.11. 10. As per UPC, Section 603.4.5: Water supply inlets to tanks, vets, sumps, swimming pools and other receptors shall be protected by one of following means: 1. An approved airgap; 2. A listed vacuum breaker installed on the discharge side of the last valve with the critical level not less than six (6) inches or in accordance with its listing; 3. A backflow preventer suitable for the contamination or pollution, installed in accordance with the requirements for that type of devise or assembly as set forth in this chapter. ,. 11. Show 1/4 inch per 12 inch slope on drain and waste lines. UPC Section 708.0. The 1 % slope is not permitted for the horizontal waste lines less than 4 inches. MECHANICAL (2000 UNIFORM MECHANICAL CODE) 12. Detail the required roof access ladder to the roof mounted HVAC equipment. UMC Section 910. _:;_,,- 13. Detail the access and working clearances to HVAC equipment. UMC Section 903 14. Provide mechanical ventilation in all rooms capable of supplying outside air at a minimum rate of 15 cubic feet per minute per occupant. UBC Section 1202.2.1 -~ 15. In Groups B, F, M, and S Occupancies, or portions thereof, where Class I, II, or Ill-A liquids are used (in any amount), mechanical exhaust shall be provided sufficient to produce six air changes per hour. Such mechanical exhaust shall be taken from a point at or near the floor. UBC Section 1202.2.2. 16. Detail disposal sites of main condensate drainage from air conditioning units. UMC Section 310.1 & UPC 807.2. {! 17. Detail the overflow (secondary) condensate discharge from air conditioning units that are in a ceiling space to readily observed locations. UMC Section 310.2. 18. Please provide cut-sheets and listing data for the Autoclaves, Incubators, Bio Safety Hoods, Flow Hood, Thelco Oven and Equatherm Oven, to allow for review of the required mechanical connections. r," Carlsbad 03-2793 October 23, 2003 19. Provide the listing data and installation data for the proposed ovens (Thelco Oven and Equatherm Oven). If not listed, a third party installation report will be required for the approval of the construction and installation of the proposed ovens to approved standards. UMC Section 304.0 20. Provide smoke detection in the supply air duct of an "air-moving system" for required shut-off of equipment for smoke control. UMC Section 609.2. An ''air- moving system" is a system designed to provide heating, cooling, or ventilation in which one or more air-handling units are used to supply air to a common space or to draw air from a common plenum or space. UMC Section 203.0. 21. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6. a) Detail the required make-up air as per UMC, Section 505.3. b) Detail the exhaust outlet clearances as per UMC, Sections 504.5 (Environmental) & 506.9 (Product conveying). c) d) e) f) g) h) i) j) k) I) m) n) Clearly show the type of material to be exhausted by each exhaust ~ystem. Clearly show the duct materials are suitable for the intended use. UMC, Section 506.1 & 610.1. Clearly show the exhaust duct material and gage used for each duct size. See UMC Table 6-7. Separate and distinct systems shall be provided for incompatible rpaterials. UMC Section 505.1 .,:;· Detail ducts conveying explosives or flammable vapors, fumes or dusts shall extend directly to the exterior of the building without entering other spaces. UMC Section 505.1. Detail minimum duct conveying velocities as per UMC Section 505.2 and Table 5-1. Detail duct cleanouts as per UMC Section 506.3. ;._; Detail required explosion venting of dust collection systems as per UMC Section 506.4 & 610.4. Detail duct support as per UMC Sections 506.5 & 610.5. Detail fire protection as per UMC Sections 506.6 & 610.6. Detail clearances from combustibles as per UMC Sections 506.7 & 610.7. Detail protection from physical damage as per UMC Sections 506.8 & 610.8. Carlsbad 03-2793 October 23, 2003 22. Return air shall not be obtained from the following locations: UMC Section 906.6. a) Where it will pick up objectionable odors, fumes, or flammable vapors. b) A hazardous or unsanitary location, or a refrigeration machinery room. c) An area having a volume less than 25 percent of the entire volume served by the supply air system, unless there is a sufficient permanent communication opening to areas having a volume equal to the required 25 percent. Appropriately sized transfer grills or door undercuts may be used to provide the required opening. EXCEPTION: Such opening when used for a warm-air furnace in a dwelling unit may be reduced to no less than 50 percent of the required area, provided the balance of the required return air is taken from a room or hall having at least three doors leading to other rooms served by the furnace. d) A room or space containing fuel-burning equipment. EXCEPTIONS: i), Fireplaces, fireplace appliances, residential cooking appliances, direct- vent appliances. Enclosed furnaces and domestic-type clothes dryers. ii) A listed vented wall furnace. iii) A blower-type system where: a) The return air is taken from a room or space having a volume exceeding 1 cubic foot for each 10 Btu/hr, b) At least 75 percent of the supply air is discharged back into the same room or space, and c) The return-air inlet shall not be located within 1 O feet of any appliance firebox or draft diverter in the same enclosed room or confined space. e) A closet, bathroom, toilet room, or kitchen. ENERGY CONSERVATION 23. The PERF-1 form shows the conditioned floor area to be 8,207 square feet. The L TG-1 and LTG-2 forms on sheet E-0.1 shows the conditioned floor area to be 10,704 square feet. Why the difference? Please correct. 24. The envelope energy design in the EnergyPro 3.1 energy design does not show the skylights. Please correct. 25. The ene_rgy design shows all exterior walls are wood framed with R-11 insulations. But the ··drawings show all exterior walls are concrete with metal furring & R- 11 insulation below the ceiling level. Please correct. .. Carlsbad 03-2793 October 23, 2003 26. The Mandatory Automatic Controls section of the L TG-1 part 2 of 3 on sheet E-0.1 is blank? Please correct to list: a) Provide automatic shut-off controls for lighting as per Title 24, Part 6, Section 131(d). b) Detail required exterior lighting controls. "Exterior lighting controlled from a lighting panel within the building shall be controlled by a directional photocell or astronomical time switch that automatically turns off exterior lighting when daylight is available." 27. Show the daylit areas and required daylit area lighting controls for new or relocated lighting in daylit areas. Title 24, Part 6, Section 131 (c). 28. Show bi-level lighting controls as per Title 24, Part 6, Section 131 (b ). 29. The L TG-1 forms do not show the Portable Lighting for Office #150. Please correct. 30. The corrected, completed and signed PERF-1, ENV-1, LTG-1, and MECH-1 forms must be imprinted on the plans. 31. The Documentation Author and the Principal Lighting Designer must sign the corrected LTG-1 form on sheet E-0.1. 32. The Dci'cumentation Author, the Principal Envelope Designer and the Principal Mechanical Designer must sign the corrected PERF-1 form on sheet M-0.1. 33. Complete energy plan check will be done when complete corrected energy designs are provided. Note: If you hc;1ve any questions regarding this Electrical, Plumbing, Mechanical, and Energy plan review list please contact Glen Adamek at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. ·t· ·, Carlsbad 03~2793 October 23, 2003 + ELECTRICAL PLAN REVIEW + 1999 NEC + .PLAN REVIEWER: Morteza Beheshti 1. Show the ampere interrupting capacity (AIC) ratings of the service and subservice equipment. NEC 110-9 2. Show or note on the plans the method used to limit fault currents to 10,000 amps on branch circuits. NEC 230-208 3. Provide· GFI protected receptacle(s) within 25 feet of HP #5 or #6 on the roof. NEC 210-8(b)2 & 210-63. 4. Provide emergency illumination in the bathrooms. UBC 1012.2,& NEC 700-16. Note: If you have any questions regarding this electrical plan review list please contact Morteza Beheshti at (858) 560-1468. To speed the review process, note on this list (or~-copy) where the corrected items have been addressed on the plans. ,, Carlsbad 03-2793 October 23, 2003 DISABLED ACCESS REVIEW LIST DEPARTMENT OF STATE ARCHITECT TITLE 24 The following disabled access items are taken from the 2001 edition of California Building Code, Title 24. Per Section 101.17.11, all publicly and privately funded public accommodations and commercial facilities shall be accessible to persons with disabilities. NOTE: All Figures and Tables referenced in this checklist are printed in the California Building Code, Title 24. • REMODELS, ADDITIONS AND REPAIRS 1. When alterations, structural repairs or modifications or additions are made to an existing building, that building, or portion of the building affected, is required to comply with all of the requirements for new buildings, per Section 1134B.2. These requirements apply as follows: a) The area of specific alteration, repair or addition must comply as "new" construction. b) A primary entrance to the building and the primary path of travel to the altered area, must be shown to comply with all accessibility features. c) Existing sanitary facilities that serve the remodeled area must be shown to comply with all accessibility features. d) Existing drinking fountains (if any) must be shown to comply with all accessibility features. e) Existing public telephones (if any) must be shown to comply with all · accessibility features. ' Carlsbad 03-2793 October 23, 2003 jvALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 03-2793 PREPARED BY: Abe Doliente DATE: October 23, 2003 BUILDING ADDRESS: 2748 Loker Ave West BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: V-N BUILDING AREA Valuation Reg. VALUE PORTION ( Sq. Ft.) Multiplier Mod. Office & lab T.I. 10438 ' Air Conditioning Fire Sprinklers •. TOTAL VALUE Jurisdiction Code cb By Ordinance Bldg. Permit Fee by Ordinance • I Plan Check Fee by Ordinance : • I Type of Review: 0 Complete Review D Structural Only D Repetitive Fee 3Repeats Comments: ··~ D Other D Hourly I Hour * Esgil Plan Review Fee ($) 313,140 313,140 $1,205.681 $783.691 $675.181 Sheet 1 of 1 macvalue.doc BUILDING PLANCHECK CHECKLIST DATE: /(3 -/ :f: -0_3 ~ PLANCHECK NO.: CB {)3-!J.-7:93 BUILDING ADDRESS: -~£~?f:.1.-4~9C-=----==L-O=k-=--..<.::..1~~;:;__0-J_e..,...S'-"-f ___ _ PROJECT DESCRIPTION: ASSESSOR'S PARCEL NUMBER: fJ.o?C(! "(56/--Q:f= EST. VALUE: ENGINEERING DEPARTMENT APPROVAL The item you have submitted for review has been approved. The approval is based on · plans, information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, ml!st be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to build. D A Right-of-Way permit is required prior to construction of the following improvements: DENIAL Please se~t attached report of deficiencies marked wi D. ake necessary corrections to plans or specifi a · s for compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. B~ Date: fo/lJ/t:O By: Date: By: Date: FOR OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT: By: ATTACHMENTS D Dedication Application D Dedication Checklist D Improvement Application D Improvement Checklist D Future Improvement Agreement D Grading Permit Application D Grading Submittal Checklist D Right-of-Way Permit Application D Right-of-Way Permit Submittal Checklist and Information Sheet D Sewer Fee Information Sheet Date: J_ ,.-,// -d/ Name: ENGINEERING DEPT. CONTACT PERSON TANIYA BARROWS City of Carlsbad Address: 1635 Faraday Avenue, Carlsbad, CA 92008 Phone: (760) 602-2773 CFD INFORMATION Parcel Map No: Lots: Recordation: Carlsbad Tract: 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-2720 • FAX (760) 602-8562 @ F:IBUILDING PLANCHECK CKLST FORM.doc 1 Rev. 7/14/00 D D BUILDING PLANCHECK CHECKLIST SITE PLAN 1. Provide a fully dimensioned site plan drawn to scale. Show: A. North Arrow F. Right-of-Way Width & Adjacent Streets 8. Existing & Proposed Structures G. Driveway widths C. Existing Street Improvements H. Existing or proposed sewer lateral D. Property Lines I. Existing or proposed water service E. Easements J. Existing or proposed irrigation service 2. Show on site plan: A. Drainage Patterns 1. Building pad surface drainage must maintain a minimum slope of one percent towards an adjoining street or an approved drainage course. 2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive drainage of 2% to swale 5' away from building." B. Existing & Proposed Slopes and Topography C. Size, type, location, alignment of existing or proposed sewer and water service (s) that serves the project. Each unit requires a separate service, however, second dwelling units and apartment complexes are an exception. D. Sewer and water laterals should not be located within proposed driveways, per ~ standards. ~ ~ 3. Include on tttle sheet: ~eaddress · -?I-12 W. A~~essor's Parcel Number _5Zf2 --tr v · C. Legal Description F:IBUILDING PLANCHECK CKLST FORM.doc For commercial/industrial buildings and tenant improvement projects, include: total building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. EXISTING PERMIT NUMBER DESCRIPTION 2 Rev. 7/14/00 BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD DISCRETIONARY APPROVAL COMPLIANCE D D D 4a. Project does not comply with the following Engineering Conditions of approval for Project No .. _______________________ _ D D D 4b. All conditions are in compliance. Date: _________ _ D D D D D D F:IBUILOING PLANCHECK CKLST FORM.doc DEDICATION REQUIREMENTS 5. Dedication for all street Rights-:of-Way adjacent to the building site and any storm drain or.utility easements on the building site is required for all new buildings and for remodels with a value at or exceeding $ 15,000 , pursuant to Carlsbad Municipal Code Section 18.40.030. Dedication required as follows: ________________ _ Dedication required. Please have a registered Civil Engineer or Land ·surveyor prepare the appropriate legal description together with an 8 ½" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications will not be accept by mail or fax. Dedication completed by:____________ Date: ___ _ IMPROVEMENT REQUIREMENTS 6a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the construction exceeds $ 75,000 , pursuant to Carlsbad Municipal Code Section 18.40.040. Public improvements required as follows: ____________ _ Attached .please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a ·separate plan check process. The completed application form and the requirements on the 3 Rev. 7/14/00 D. D D D D D D D D D D D D D D D D D F:\BUILDING PLANCHE:CK CKLST FORM.doc BUILDING PLANCHECK CHECKLIST 1. checklist must be submUted in person. Applications by mail or fax are not · accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit. Improvement Plans signed by: _________ _ Date: ---- 6b. Construction of the public improvements may be deferred pursuant to Carlsbad Municipal Code Section 18.40. Please submit a recent property title report or current grant deed on the property and processing fee of $310 so we may prepare the necessary Neighborhood Improvement Agreement. This agreement must be signed, notarized and approved by the City prior to issuance of a Building permit. Future public improvements required as follows: 6c. Enclosed please find your Neighborhood Improvement Agreement. Please return agreement signed and notarized to the Engin·eering Department. Neighborhood Improvement Agreement completed by: Date: 6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective improvements found adjacent to building site must be repaired to the satisfaction of the City Inspector prior to occupancy. GRADING PERMIT REQUIREMENTS The conditions that invoke the need for a grading permit are found in Section 11. 06. 030 of the Municipal Code. 7a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). 7b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. Grading Inspector sign off by: Date: ---------- 7c. Graded Pad Certification required. (Note: Pad certification may be required even if a grading permit is not required.) 4 Rev. 7/14/00 BUILDING PLANCHECK CHECKLIST 1ST 2ND 3RD D D D 7d .No Grading Permit required. D D D 7e. If grading is not required, write "No Grading" on plot plan. D D D D D D D D D D D D F:\BUILDING PLANCHECK CKLST FORM.doc MISCELLANEOUS PERMITS 8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: street improvements, tree trimming, driveway construction, tying into public storm drain, sewer and water utilities. Right-of-Way permit required for: 9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsbad sewer service area, you need to contact the Carlsbad Municipal Water _District, located at 5950 El Cam'ino Real, Carlsbad, CA 92008. District personnel can provide forms and assistance, and will check to see if your business enterprise is on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153, for assistance. Industrial Waste permit-accepted by: Date: 10. NPDES PERMIT Complies with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The applicant shall provide best management practices to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved by the City Engineer prior to issuance of grading or building permit, whichever i occurs first. · ~ , • .J/;I nl/?/1)~ ~cJ ,"6& a ~ <2.dJt-W(l}YJ 11 uired fees are attached " 't ~ · n--",-,.."'-J.d.Ge.> b yt--1 ees required 0~ S~~(e_ ~ · -o -V, I WATER METER REVIEW u ~. (o~ka1 vOw-ehale1Se., eJc.) 12a. Domestic (potable) Use Ensure that the meter proposed by the owner/developer is not oversized. Oversized meters are inaccurate during low-flow conditions. If it is oversized, for the life of the meter, the City will not accurately bill the owner for the water used. • All single family dwelling units received "standard" 1" service with 5/8" service. 5 Rev. 7/14/00 ... D D D F:IBUILDING PLANCHECK CKLST FORM.doc BUILDING PLANCHECK CHECKLIST • If owner/developer proposes a size other than the "standard", then owner/developer must provide potable water demand calculations, which include total fixture counts and maximum water demand in gallons per minute (gpm). A typical fixture count and water demand worksheet is attached. Once the gpm is provided, check against the "meter sizing schedule" to verify the anticipated meter size for the unit. • Maximum service and meter size is a 2" service with a 2" meter. • If a developer is proposing a meter greater than 2", suggest the installation of multiple 2" services as needed to provide the anticipated demand. (manifolds are considered on case by case basis to limit multiple trenching into the street). 12b. Irrigation Use (where recycled water is not available) All irrigation meters must be sized via irrigation calculations (in gpm) prior to approval. The developer must provide these calculations. Please follow these guidelines: 1. If the project is a newer development (newer than 1998), check the recent improv~ment plans and observe if the new irrigation service is reflected on the improvement sheets. If so, at the water meter station, the demand in gpm may be listed there. Irrigation services are listed with a circled "I", and potable water is typically a circled "W". The irrigation service should look like: STA 1+00 Install 2" service and 1.5: meter (estimated 100 gpm) 2. If the improvement plans do not list the irrigation meter and the service/meter will be installed via another instrument such as the building plans or grading plans (w/ a right of way permit of course), then the applicant must provide irrigation calculations for estimated worst-case irrigation demand (largest zone with the farthest reach). Typically, Larry Black has already reviewed this if landscape plans have been prepared, but the applicant must provide the calculations to you for your use. Once you have received a good example of irrigation calculations, keep a set for your reference. In general the calculations will include: • Hydraulic grade line • Elevation at point of connection (POC) • Pressure at POC in pounds per square inch (PSI) • Worse case zone (largest, farthest away from valve • Total Sprinkler heads listed (with gpm use per head) • Include a 10% residual pressure at point of connection 3. In general, all major sloped areas of a subdivision/project are to be irrigated via separate irrigation meters (unless the project is only SFD with no HOA). As long as the project is located within the City recycled water 6 Rev. 7/14/00 • 1ST 2ND 3RD D D D 12c. F:IBUILDING PLANCHECK CKLST FORM.doc BUILDING PLANCHECK CHECKLIST service boundary, the City intends on switching these irrigation services/meters to a new recycled water line in the future. Irrigation Use (where recycled water is available) 1. Recycled water meters are sized the same as the irrigation meter above. 2. If a project fronts a street with recycled water, then they should be connecting to this line to irrigate slopes within the development. For subdivisions, this should have been identified, and implemented on the improvement plans. Installing recycled water meters is a benefit for the applicant since they are exempt from paying the San Diego County Water Capacity fees. However, if they front a street which the recycled water is there, but is not live (sometimes they ar:e charged with potable water until recycled water is available), then the applicant must pay the San Diego Water Capacity Charge. If within three years, the recycled water line is charged with recycled water by CMWD, then the applicant can apply for a refund to the San Diego County Water Authority (SDCWA) for a refund. However, let the applicant know that we cannot guarantee the refund, and they must deal with the SDCWA for this. 7 Rev. 7114/00 ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET D Estimate based on unconfirmed information from applicant. D Calculation based on building plancheck plan submittal. Address: £.--=ell: fo&.c ~ uJ, Bldg. Permit No. ffi CJ 3 -[)._,+C/3 Prepared by: =rb Date: / 0 /t j1 <Pchecked by: ____ Date:---- EDU CALCULATIONS: List types and square footages for all uses. Types of Use: 6.ee.-Jg.. ~ . Sq. Ft./Unit~: Se09J !}-EDU's: / . &S- Types of Use:_______ Sq. Ft./Units: _______ EDU's: _____ _ ADT CALCULATIONS: List types and square footages for all uses. Types of Use: '.See YcJ {b Sq. Ft./Units: ::;:u?2--~ tJ--ADT's: ~ 9 Types of Use: ______ _ Sq. Ft./Units: _______ ADT's: _____ _ FEES REQUIRED: _ WITHIN CFD@o bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D 1. PARK-IN-LIEU FEE PARK AREA & #: __ _ FEE/UNIT:____ X NO. UNITS: __ _ =$ ____ _ jlt-2. TRAFFIC IMPACT FEE ADT's/UNITS: c9. q X FEE/ADT: Lj 0 =$ lJC;,o D 3. BRIDGE AND THOROUGHFARE FEE (DIST. #1 __ DIST. #2 DIST.#3__) ADT's/UNITS: ___ _ X FEE/ADT: __ _ =$ ____ _ D 4. FACILITIES MANAGEMENT FEE ZONE:, __ _ UNIT/SQ.FT.: ___ _ X FEE/SQ.FT./UNIT: __ _ =$ ____ _ ~ 5. SEWER FEE EDU's: /.(6 X FEE/EDU: Cf cJ.1 BENEFIT AREA: ~ EDU's: . /.{_p~. X FEE/EDU: / 63 =$ /{otf, 15' D 6. SEWER LATERAL ($2,500) =$ ____ _ D 7. DRAINAGE FEES PLDA~--HIGH ___ /LOW __ ACRES: ___ _ X FEE/AC: __ _ =$ ____ _ D 8. POTABLE WATER FEES UNITS CODE CONNECTION FEE METER FEE SDCWAFEE IRRIGATION 1 of 2 F:IFEE CALCULATION WORKSHEET.doc Rev. 7/14/00 I ., I ... ENGINEERING DEPARTMENT FEE CALCULATION WORKSHEET D 9. RECLAIMED WATER FEES UNITS CODE . CONNECTION FEE METER FEE TOTAL OF ABOVE FEES*: $ --------- *NOTE: This calculation sheet is NOT a complete list of all fees which may be due. Dedications and Improvements may also be required with Building Permits. a ~tee, = 03 o3 f/:1 ware h.@u~::. \ Cf't1/ t/7 @ ~ AJc:> ik. CW;t~ Lab = :)t.J"J I t/1 W\ilnCA}a-C.~i :: l +Jq !/J @---/JQ) ~ ~?F A:v, ~ c3 ~{Ce_ .:::. Lf~ ~ lj 3 I ~(9 C!J J...ab =: ;;Lt/Cf/ ($) z cA 0 /CX2J(j} 2 ¢f2 6Dll c:.:::---· :!0~ ==-:J-.3 9 /~a>~ t,._)tls~tL = ~ z-""t,36' 5'"ot10 ---- [ • U?'::) f 1)0 15 F:IFEE CALCULATION WORKSHEET.doc Rev. 7114/00 C: C: C: "' "' "' a: a: a: DD DD DD ~DD PLANNING DEPARTMENT BUILDING PLAN CHECK REVIEW CHECKLIST Plan Check No. CB Q> tf 7°!) Address J: / l(8 Planner Gre~r Phone (760) 602-4629 APN: 11!-, ~/ -£1':") Type of ~& Use: _____ -,H~ Net Project Density: _______ D_U~/A~C- Zoning:J). M General Plan: ij~ .-Facilities Management Zone: ___ _ CFO (in/out) # ~ate of participation:_P ____ Remainin_g net dev acres: __ _ Circle One (For non-residential development: Type of land used created by this permit: ____________________ ) Legend: ~ Item Complete D Item Incomplete -Needs your action Environmental Review Required: YES NO TYPE ---- DATE OF COMPLETION: ________ _ Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES NO TYPE ---- APPROVAL/RESO. NO. _______ DATE __ _ PROJECT NO. _________ _ OTHER RELATED CASES: ___________________ _ Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: ----------------------- Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES __ NO CA Coastal Commission Authority? YES__ NO If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103, San Diego CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Coastal Permit Determination Form already completed? YES NO If NO, complete Coastal Permit Determination Form now. Coastal Permit Determination Log #: Follow-Up Actions: 1) Stamp Building Plans as II Exempt" or II Coastal Permit Required" (at minimum Floor Plans). 2) Complete Coastal Permit Determination Log as needed. lnclusionary Housing Fee required: YES NO (Effective date of lnclusionary Housing Ordinance -May 21, 1993.) Data Entry Completed? YES __ NO __ (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y /N, Enter Fee, UPDATE!) H:\ADMIN\COUNTER\BldgPlnchkRevChklst Rev 9/01 DO o·o: D·D Do· 1. Prqvide a fully dimensional site plan drawn to .scale. Show: North arrow, pr:ope·rty lines, easements, existing and proposed ·structure·s, streets, existing street improvements,._right- of-way width, d1men.sional setbacks .and existing topographical lines (including a.II side anc;l rear y.ard slopes).· 2. Provide leg·al description of p·roperty ·and asse~sor's parcel number. Polley .44 -Neighborhood Architectural Design Guidelines 1. Appliqabllity: YES"""'. _____ N0 .... ____ ~----- 2. Project complies YES NO_-,----'--_ ZOni.ng: 1. 'setbacks; Fro11t: Interior Side:· ·Street Side: Rear: . Top of slope: · R~quired -----'------Shown _____ _ Required Shown ,---,---------,-'----,- Required'_------'--Shown _____ _ Reqµir~d Shown ....,....-"-'--,-----,---,..------'---R~quired, ShoV)ln --,---,--,--,----------------'~ 2. Accessory str:uctl!re setbaqks: Front: Required Shown -.,.--,----------.Interior Side: Required Shown -----'----Street Side: Required Shown ------,,--Rear: ·Required. Shown ------$tructure separatio,n: Recn:iireq Shown---'---,--- 3. Lot Cov~rc1ge: 'Required ~-----,---Shown -'-------,- 4. H~ight: Shown -------,- ',i, 0 5 .. P~rking: (~o Residential Gl,lest Spaces Required --,---'----,----,--,-- Additional Comment~ Correction #1 -Please show ·on Sheet 1 the total number of parking spaces provided and reguir~d on site .for each. use pe·r Ch.apter 2.1 .44: . Cor:rection #'2. _: Is there any pr:opos9.d roof m6uhted .eauipmerrt. associated. with this building -permit?. If so, will the equipment be screened by an .e_xisting parapet. wall or is new screening material required? Please see the attached handouts for examples· .. OK TO IS$UE AND ENTER!:O APPROVAL INTO C,OMPUTER .H:\ADMIN\COUNT>ER\BldgPlochkRevChklst Rev 9/01 - Carlsbad F.ire Department 032793 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review Requirements Category: Fire Prevention (760) 602-4660 Date of Report: _o_s1_23_12_o_o_4 _______ _ Building Plan Reviewed by: ·Name: Augustine Design Address: 2272 First Avenue City, State: San Diego CA 92101 Plan Checker: Job #: 032793 Job Name: Mo Bio Laboratories Bldg #: CB032793 -----------------=c.-- Job Address: 274jtl.oker Avenue W S t e. or Bldg. No. ~ Approved D Approved Subject to D I ncof11plete Review FD Job# The item you have submitted for review has beep approved. The approval is based on plans, information and/ or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes and standards. Please review carefully all comments attached as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. The item you have submitted for review has been approved subject to the attached conditions. The approval is based on plans, information and/or specifications provided in your submittal. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Please resubmit to this office the necessary plans and / or specifications required to indicate compliance with applicable codes and standards. The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and / or standards. Please review carefully all comments attached. Please resubmit the necessary plans and / or specifications to this office for review and approval. 1st 032793 2nd FD File# 3rd Other Agency ID Cttrlst;ad .Fi re Department 032793 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review Requirements Category: Fire Prevention (760) 602-4660 Date of Report: _0_11_2s_12_0_0_4 _______ _ Building Plan Reviewed by: Name: Augustine Design Address: 2272 First Avenue City, State: San Diego CA 92101 Plan Checker: Job#: 032793 Job Name: Mo Bio Laboratories Bldg#: CB032793 ------------------ Job Address: 2748 Loker Avenue W Ste. or Bldg. No. D Approved D Approved Subject to IZ! Incomplete Review FD Job# The item you have submitted for review has been approved. The approval is based on plans, information and/ or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes and standards. Please review carefully all comments attached as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. The item you have submitted for review has been approved subject to the attached conditions. The approval is based on plans, information and/or specifications provided in your submittal. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Please resubmit to this office the necessary plans and/ or specifications required to indicate compliance with applicable codes and standards. The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and / or standards. Please review carefully all comments attached. Please resubmit the necessary plans and / or specifications to this office for review and approval. 1st 032793 2nd FD File# 3rd Other Agency ID Re:;:-uirJte~ts Category: Building Plan Page 1 ' ' Requirement: Pending 05.14 Provide Technical Report To determine the acceptability of technologies, processes, products, facilities, materials and uses attending the design, operation or use of a building or premises subject to the inspection of the department, the Chief is authorized to require the owner or the person in possession or control of the building or premises to provide, without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire-safety specialty organization acceptable to the Chief and the owner and shall analyze the fire-safety properties of the design, operation or use of the building or premises and the facilities and appurtances situated thereon, to recommend necessary changes. 01/28/04 Ca.r!§bad. Fire Department 032793 1635 Faraday Ave. Carlsbad, CA 92008 Plan Review Requirements Category: Fire Prevention (760) 602-4660 Date of Report: _1 _11_03_/2_0_0_3 _______ _ Building Plan Reviewed by: Name: Augustine Design Address: 2272 First Avenue City, State: San Diego CA 92101 Plan Checker: Job #: 032793 Job Name: Mo Bio Laboratories Bldg#: CB032793 ------------------=-- Job Address: 2748 Loker Avenue W Ste. or Bldg. No. D Approved D Approved Subject to ~ Incomplete Review FD Job# The item you have submitted for review has been approved. The approval is based on plans, information and / or specifications provided in your submittal; therefore any changes to these items after this date, including field modifications, must be reviewed by this office to insure continued conformance with applicable codes and standards. Please review carefully all comments attached as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. The item you have submitted for review has been approved subject to the attached conditions. The approval is based on plans, information and/or specifications provided in your submittal. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. Please resubmit to this 9ffice the necessary plans and I or specifications required to indicate compliance with applicable codes and standards. The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/ or standards. Please review carefully all comments attached. Please resubmit the necessary plans and / or specifications to this office for review and approval. 1st 032793 2nd FD File# 3rd Other Agency ID Req,u{ff.;JTlents Category: r-' Building Plan Page 1 J I Requirement: Pending 05.14 Provide Technical Report To determine the acceptability of technologies, processes, products, facilities, materials and uses attending the design, operation or use of a building or premises subject to the inspection of the department, the Chief is authorized to require the owner or the person in possession or control of the building or premises to provide, without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire-safety specialty organization acceptable to the Chief and the owner and shall analyze the fire-safety properties of the design, operation or use of the building or premises and the facilities and appurtances situated thereon, to recommend necessary changes. 11/03/03 \ IPERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-11 PROJECT NAME DATE Mo Bio Building Carlsbad Oaks Lot 7 10/2/2003 PROJECT ADDRESS Loker Avenue West Carlsbad PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Bllildinf:J Permit-# TKG Consulting Engineers (858) 597-0555 DOCUMENTATION AUTHOR TELEPHONE Checked ·by/Qate TKG Consulting Engineers (858) 597-0555 Enforcement Agency Use- GENERAL INFORMATION DATE OF PLANS ,,BUILDING CONDITIONED FLOOR AREA I CLIMATE ZONE 7 101003 8,207 Sq.Ft. BUILDING TYPE [Z] NONRESIDENTIAL D HIGH RISE RESIDENTIAL D HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION [X] NEW CONSTRUCTION D ADDITION D ALTERATION D EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using the performance compliance approach. DOCUMENTATION AUTHOR SIGNATURE /J/ DATf /.. / R an Braun ~ /tf/2/??3 The Principal Designers hereby certify that the proposed buil · g de ign represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. L TG. MECH. D D D D D D D D 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. D 3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures t---------------------j PRINCIPAL ENVELOPE DESIGNER -NAME TKG Consultin En ineers LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Tlits-Srrbmn·t,,,rt------------; Required Forms PRINCIPAL LIGHTING DESIGNER -NAME SIGNATURE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measur.es PRINCIPAL MECHANICAL DESIGNER -NAME TKG Consultin En ineers Requi d Form Run Initiation Time: 10/01/ EnergyPro 3.1 By EnergySoft User Number: 3111 LIC. NO. DATE t-----------------------l 1065049762 Job Number: 23113 Page:1 of 11 C!J o_] :1-?f .J IPERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-1f PROJECT NAME DATE Mo Bio Building Carlsbad Oaks -Lot 7 3/26/2004 PROJECT ADDRESS .. 2746 Loker Avenue West Carlsbad : l;luildin~ Per~it:# . . PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Augustine Design Group-Jillon Augustine (619) 7 44-5884 .. DOCUMENTATION AUTHOR TELEPHONE , ~he~ketO:iytbate TKG Consulting Engineers (858) 597-0555 . . Enforcement Agerjj::y US\'! GENERAL INFORMATION DATE OF PLANS .,BUILDING CONDITIONED FLOOR AREA 101003 8,859sq.Ft. I CLIMATE ZONE 7 BUILDING TYPE [X] NONRESIDENTIAL D HIGH RISE RESIDENTIAL D HOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION [X] NEW CONSTRUCTION D ADDITION D ALTERATION D EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using the performance compliance approach. The Principal Designers hereby certify that the proposed build" design represented in the construction documents and modelled .. for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. L TG. MECH. D D D 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. D D D 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. D D O 3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures f------------------------1 Required Forms ENV-1 PRINCIPAL ENVELOPE DESIGNER-NAME SIGNATURE LIC. NO. DATE Au ustine Desi n Grou -Jillon Au ustine LIGHTING COMPLIANCE Required Forms PRINCIPAL LIGHTING DESIGNER -NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ,__ __________________ ___, Required Forms MECH-2 MECH-3 PRINCIPAL MECHANICAL DESIGNER -NAME TKG Consultin En ineers-Todd Sorbo Run Initiation Time: 03/26/04 09:39:48 Run Code: 1080322788 I EnergyPro 3.1 By EnergySoft User Number: 3111 Job Number: 23113 Page:1 of 11 .. l _) u 35 115-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-5 GENERAL INFORMATION {Create Rooms-Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 100 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Htg. SchedulE Is There Carpet?: NO Location: None 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. 4* LW Concrete 1.786 hr·ft2-°F/Btu ~ Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) I ntiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Roof-1 100 ft2 Wall-1 185 ft2 Computer System 135.00W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION (Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 96.00 cfm 96.00 cfm To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins 90 0 Frame Wall, 3* Ins Cooling Only (Design) U Val Alpha i~~ Type 0.050 0.90 0.080 0.90 1.00 Glass External Area U Val Shad Shading Adj Temp/ !nterdr.ial ~ha mg Overhang -None None Overhang -None None ...,) \..) Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat Perm Loss Tmp Tmp Len Coef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 37 of 37 C>~.1..7~ 1 124-Laboratory ENTERED VALUES ROOM BY ROOM ByTKG HP-2 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 504 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Gig. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule Laboratory 2 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling . 15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... None Cooling HeatinQ Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 5 Incubator 264.00W 1 Roof-1 504 ft2 4 Microwave 400.00W 3 Thermocyclers 1,282.00W 2 Computer 145.00 W 1 Heatblocks 600.00W 3 Wall-3 51 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Room~Air(l_owaj Main Supply ... CoolinQ Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Gig Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Lc,ads) Adj Temp/ Const Type/ Glass U Val Alpha '¾~~ Type sxternal ~ernal Dir Tilt Schedule Area U Val Shad hading admg Cooling Only (Design) o 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) 199 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 21 1.00 0.73 Overhang -None None 1/4* Pc} Pc} Sen Rm Ffe,1} ~ad re/ 9001 ¥eat Pem boss mp mp en oef 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 1 of 37 2 Wall-2 50 ft2 289 0 Frame Wall, 3* Ins Wall-1 288 ft2 244 O Frame Wall, 3* Ins Project Name: Mo Bio Laboratory ENTERED VALUES ROOM BY ROOM ByTKG 0.080 0.90 1.00 Single Coated 1/4* 0.080 0.90 1.00 Single Coated 1/4* Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO 21 1.00 0.73 Overhang -None None 120 1.00 0.73 Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 2 of 37 2 125-Storage ENTERED VALUES ROOM BY ROOM ByTKG HP-1 GENERAL INFORMATION {Create Roe>ms -_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 95 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 2 Wall-2 131 ft2 1 Roof-1 95 ft2 1 Wall-1 59 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION (Create Room~~_Airflowaj Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Adj Temp/ Const Type/ Glass 1 Grn~ §merna !mer[lal Dir Tilt Schedule U Val Alpha Re Type Area U Val Shad admg admr:i 244 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None 270 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None SPc} Pc} en Rm ife1} ~ad re/ yool ~eat Pfm boss mp mp en oef Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 3 of 37 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Cr~ate Rooms -Internal Loads) Size ... Floor area 220 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Htg. SchedulE Is There Carpet?: NO Location: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1.786 hr·ft2-°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 2 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Create Rooms -Airflows) Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Area/ U Val Alpha 'We~ Type No Description Amount Dir Tilt Schedule 1 Roof-1 220 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 1 Wall-1 144 ft2 270 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Area 64 Adj Temp/ Pc} Pc} Sen Rm P1} Re ~~~ smernal U Val Shad ading Wi\eraal ading 9001 ~eat PI.rm boss mp mp en oef Overhang -None None 1.00 0. 73 Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 4 of 37 4 127-Conference ENTERED VALUES ROOM BY ROOM ByTKG HP-1 GENERAL INFORMATION {Create Rooms -Roo111s) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 330 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat... Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 6 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Wall-1 279 ft2 Roof-1 330 ft2 AIRFLOW INFORMATION {Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Adj Temp/ Const Type/ Glass Gm~ smernal Wfie~al Dir Tilt Schedule U Val Alpha Re Type Area U Val Shad admg a mg 270 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 116 1.00 0.73 Overhang -None None 1/4* 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None s~~} Ff'J} P1} Re 9001 ~eat Pfm mp mp en ~r2} 6~~1 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 5 of 37 5 133-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-3 GENERAL INFORMATION {Creatf)_Rooms -_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 185 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. SchedulE NO Location: None 4* LW Concrete 1.786 hr·ft2·cF/Btu 75 CF 68 CF 50 % 90 CF 55 CF None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION .{_G_@ate _Roorns_-,_Airflowsj Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%} Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi~c; Lqads) Const Type/ Area/ U Val Alpha 1{~~ Type No Description Amount Dir Tilt Schedule 2 Wall-12 155 ft2 270 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* 1 Computer System 135.00W Cooling Only (Design) 1 Wall-11 124 ft2 270 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* Roof -1 185 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Area 12 30 Adj Temp/ Pc} Pc} Sen Rm p<v Re ~ad re/ ~fiternal U Val Shad admg imeroal adm!'.l 9001 ~eat P1:_fm boss mp mp en oef 1.00 0. 73 Overhang -None None 0 0 0 0.00 1.00 0.73 Overhang -None MoBioCanopy Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 6 of 37 6 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Booms -Rooms) PEOPLE AND LIGHTS {Create Rooms -lnter_nal Load_s) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 297 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat. .. Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2-°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 1 Computer System 135.00W 3 Wall-12 203 ft2 2 Wall-2 288 ft2 Wall-11 162 ft2 Roof-1 297 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION (Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi~c Loads) Const Type/ Dir Tilt Schedule Cooling Only (Design) 270 0 Frame Wall, 3* Ins 6 0 Frame Wall, 3* Ins 270 0 Frame Wall, 3* Ins 0 90 4* Wood, 4* Ins U Val Alpha ~~~ Type 0.080 0.90 1.00 Single Coated 1/4* 0.080 0.90 1.00 Single Coated 1/4* 0.080 0.90 1.00 .Single Coated 1/4* 0.050 0.90 Glass External Area U Val Shad Shading Adj Temp/ Internal ~hading 48 1.00 0.73 Overhang -None None 168 1.00 0.73 Overhang -None None 120 1.00 0.73 Overhang-None MoBioCanopy Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat P!;lrm Loss Tmp Tmp Len Coef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 7 of 37 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Rooms-Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 153 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. SchedulE NO Location: None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Cre~te R_gom~ Airt'lows) Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... CoolinQ Heating Aux Supply ... CoolinQ HeatinQ To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Area/ Const Type/ U Val Alpha ~~~ Type No Description Amount Dir Tilt Schedule Computer System 135.00 W Cooling Only (Design) Roof-1 153 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Wall-1 203ft2 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shading Adj Temp/ [Dternal ::;hading Overhang -None None 60 1.00 0.73 Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat Perm Loss Tmp Tmp Len Coef 0 0 0 0.00 TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 8 of 37 8 102-Office ENTERED VALUES ROOM BY ROOM ByTKG HP-4 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 216 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avi:i. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat... Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None CoolinQ . 15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... None Cooling Heatini:i Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Wall-1 279 ft2 1 Computer System 135.00W 1 Roof-1 216 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION !..Q_r_eate Rooms -Airflowsl Main Supply ... Coolini:i Heating Aux Supply ... Coolini:i Heatini:i To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi§c L9ad~) Const Type/ Glass Adj Temp/ Dir Tilt Schedule U Val Alpha ~~~ Type Area smernal !mernal U Val Shad adIni:i adini:i 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 90 1.00 0. 73 Overhang -None None 1/4* Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat Perm Loss Tmp Tmp Len Coef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 9 of 37 9 104-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-4 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 142 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avi:i. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation... None Coolini:i 100.00 % Clg Airflow Heating 100.00 % Clg Airflow Schedule Available (100%) Infiltration ... Cooling Heatini:i Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Computer System 135.00W Wall-1 212 ft2 Roof-1 142 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION !f_re.ite Rooms -Airflows) Main Supply ... Coolini:i Heating Aux Supply ... Coolini:i Heatini:i To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate 100.00 % Clg Airflow Schedule ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Adj Temp/ Const Type/ Glass Dir Tilt Schedule U Val Alpha i~~ Type Area smernal ill\ernal U Val Shad admi:i admQ Cooling Only (Design) 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 88 1.00 0.73 Overhang -None None 1/4* 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Pc} Pc} Sen Rm ife1} ~ad re/ rool ~eat Prm mp mp en boss oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 10 of 37 10 106-Lab ENTERED VALUES ROOM BY ROOM ByTKG HP-7 GENERAL INFORMATION {Create Roo_ms -Rooms) PEOPLE AND LIGHTS (Create Rooms :Jnte1'11al Loads) Size ... Floor area 226 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 9.0 ft Thermostat... Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. Schedule NO Location: None 4* LW Concrete 1. 786 hr·ft2• °F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Create Rooms -Airflows) Ventilation ... None Cooling 100.00 % Gig Airflow Heating 100.00 % Gig Airflow Schedule Available (100%} Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Gig Airflow Schedule Available (100%) Room Exhaust... Rate 100.00 % Clg Airflow Schedule ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc L~,ws) Area/ Const Type/ U Val Alpha<¾~~ Type No Description Amount Dir Tilt Schedule Roof -1 226 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Wall-1 356 ft2 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Area Adj Temp/ Pc} Pc} Sen Rm P1} ~ad Re · re/ Sfiternal U Val Shad ading ~ternal hading 9001 ~eat Pirm boss mp mp en oef Overhang -None None Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 11 of 37 11 107-0ffice-Labeling ENTERED VALUES ROOM BY ROOM ByTKG HP-7 GENERAL INFORMATION ~reate Rooms -_Rooms) PEOPLE AND 'LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 108 ft2 18.0 ft 9.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 · Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 100.00 % Clg Airflow Heating 100.00 % Clg Airflow Schedule Available (100%) Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 3 Copier 250.00W 1 Roof-1 108 ft2 2 Hard Drive 65.00W 1 Wall-1 113 ft2 1 Monitor 80.00W 2 Wall-2 84 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Crejlte Room~_: Airflow~) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate 100.00 % Clg Airflow Schedule ROOM COMPONENTS {Create Rooms -Roofs1 Walls1 Partn/Floors1 Misc Loads) Adj Temp/ Const Type/ Glass U Val Alpha~~~ Type ~mernal i:mernal Dir Tilt Schedule Area U Val Shad admg admg Cooling Only (Design) o 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Cooling Only (Design) 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None Cooling Only (Design) 48 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None Pc} Pc} Sen Rm ife'v ~ad re/ 1001 ~eat Ptrm boss mp mp en oef 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 12 of 37 12 108-Office ENTERED VALUES ROOM BY ROOM ByTKG HP-7 GENERAL INFORMATION {Create Rooms -_Booms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 60 ft2 18.0 ft 9.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat... Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling . 15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 2 Wall-2 144 ft2 1 Wall-1 138 ft2 1 Computer System 135.00W 1 Roof-1 60 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION (Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 cfm ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Adj Temp/ Const Type/ Glass U Val Alpha Gife~ Type ~mernal ~~enial Dir Tilt Schedule Area U Val Shad admg admr;i 90 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None 48 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Pc} Pc} Sen Rm Ffe<v ~ad re/ 9001 ¥eat P1rm boss mp mp en oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 13 of 37 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Rooms-Rooms) PEOPLE AND LIGHTS {Cre_ate R_oof!IS -!ntel'rlal l...oacl_s) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 630 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedUIE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 4 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Areal No Description Amount Roof-1 630 ft2 Wall-1 234 ft2 Work Station 220.00W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION ~reateRooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 1.25 cfm/sq ft 1.25 cfm/sq ft To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 cfm ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Glass Adj Temp/ Dir Tilt Schedule U Val Alpha i~~ Type Area ~mernal ~ten,al U Val Shad admg hading 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None 90 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None Cooling Only (Design) Pc} Pc} Sen Rm Pl} Re ~ad re/ yool ~eat Pt:_rm boss mp mp en oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 14 of 37 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS LCre_ate Rooms -Jnternal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 1,023 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 4 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 2 Heat Gun 320.00W 1 Roof-1 1,023 ft2 1 Wall-1 540ft2 1 Impulse Sealer 80.00W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION (Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 1.25 cfm/sq ft 1.25 cfm/sq ft To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 cfm ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi~c L9ads) Const Type/ Glass Adj Temp/ U Val Alpha i~~ Type smer11al ~ternal Dir Tilt Schedule Area U Val Shad admg hading Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None 90 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Overhang -None None Cooling Only (Design) Pc} Pc} Sen Rm Pl} Re ~fc1 9001 ~eat Prm boss mp mp en oef 0 0 0 0.00 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 15 of 37 15 116-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-5 GENERAL INFORMATION {Creat~RoQ_ms-_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 100 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat... Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. SchedulE NO Location: None 4* LW Concrete 1. 786 hr·ft2• °F /Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION (Create Rooms -Airflowaj Ventilation ... None Cooling 15.00 cfm/person Heating 15. 00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 60.00 cfm 60.00 cfm To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Area/ Const Type/ Glass U Val Alpha i~~ Type No Description Amount Dir Tilt Schedule Area Computer System 135.00W Cooling Only (Design) Roof-1 100 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Adj Temp/ Pc} Pc} Sen Rm rfe<v ~ad re/ smernal U Val Shad ading ~teroal hading 9001 ~eat Pr_fm boss mp mp en oef 0 0 0 0.00 Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 16 of 37 16 Leased Space ENTERED VALUES ROOM BY ROOM ByTKG HP-9 GENERAL INFORMATION_jCreate Rooms -_Boq_ms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 1,190 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat... Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Htg. SchedulE Is There Carpet?: NO Location: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule Warehouse 200 sq ft/person Cooling Only (Design) Sensible Latent 275 Btu/h 275 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION .{freate Rooms -Airflows) Ventilation ... None Cooling .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Area/ Const Type/ Description Amount Dir Tilt Schedule U Val Alpha im~ Type No 3 Wall-2 522 ft2 244 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* 1 Roof-1 1,190 ft2 O 90 4* Wood, 4* Ins 0.050 0.90 2 Wall-1 486 ft2 180 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 1/4* Computer Systems 405.00W Cooling Only (Design) Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Area 150 90 Adj Temp/ Pc} Pc} Sen Rm Ffe<v ~rs ~ternal U Val Shad hading IB\ernal admg yool ~eat PI.rm boss mp mp en oef 1.00 0.73 Overhang -None None Overhang -None None 1.00 0.73 Overhang -None None 0 0 0 0.00 TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 17 of 37 17 11 a-storage ENTERED VALUES ROOM BY ROOM ByTKG HP-5 GENERAL INFORMATION {Create Rooms -_Roo_ms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 95 ft2 18.0 ft 6.0 ft Room Mass/avQ. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None CoolinQ 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling HeatinQ Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount Roof-1 95 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION ffireate Rooms_-Airflows) Main Supply ... CoolinQ Heating Aux Supply ... CoolinQ HeatinQ 60.00 cfm 60.00 cfm To be calculated To be calculated Vav Minimum ... R• %C~~~~ Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha i~~ Type 0.050 0.90 Glass External Area U Val Shad ShadmQ Adj Temp/ mhten:ial ::;1 admQ Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat Perm Lossf Tmp Tmp Len Coe Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 18 of 37 ENTERED VALUES ROOM BY ROOM ByTKG GENERAL INFORMATION {Create Rooms :Rooms) PEOPLE AND LIGHTS .{_Create Ro_oms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 365 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling . 15 cfm/sq ft 0.15 cfm/sq ft Available (100%} Heating Schedule Infiltration ... None Cooling Heating Schedule 0.00 cfm 0.00 cfm Available (100%) Area/ No Description Amount 3 Micro Centrifuge 261.00 W 1 Microwave Oven 800.00W 6 Mini Centrifuge 174.00 W 10 Spectrophotometer 195.00 W with Printer 9 Vacuum Pump 302.00W 8 Incubator No Two 264.00W 7 Incubator 264.00W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Rooms -Airflowaj Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%} Room Exhaust... Rate Schedule 0.00 cfm ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ U Val Alpha ~~~ Type Dir Tilt Schedule Adj Temp/ Glass 1 Sfiterna !mernal Area U Val Shad adIm:i admg Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) s~m ifrii} ife<v ~tc~ ~ool ~eat PI.rm boss mp mp en oef 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 19 of 37 ENTERED VALUES ROOM BY ROOM ByTKG ------------------------------------------------------------------------------------------------------------. -------------------------------. --. --- 18 119-R&D Laboratory HP-5 --------------------------------------------------------------------------------------------------------------------------------5 Heating Block 4 Centrifuge 2 Analytical Balance 1 Roof-1 300.00W 264.00W 14.00W 365 ft2 Project Name: Mo Bio Laboratory Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Overhang -None None 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 20 of 37 19 120-Lab ENTERED VALUES ROOM BY ROOM ByTKG HP-5 GENERAL INFORMATION {Create Rooms :_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 124 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Htg. Schedule Is There Carpet?: NO Location: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Create Rooms -Airflows) Ventilation... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 105.00 cfm 105.00 cfm To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Area/ Const Type/ Description Amount Dir Tilt Schedule U Val Alpha ~~~ Type No 1 Heatblock 100.00W Cooling Only (Design) 1 Roof-1 124 ft2 O 90 4* Wood, 4* Ins 0.050 0.90 2 Picofuge 87.00W Cooling Only (Design) Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Adj Temp/ s~m rfJ} Ffe'v ~ad re/ sxternal Area U Val Shad hadmi:i !meroal admi:i i;;ool ~eat Pfm boss mp mp en oef 0 0 0 0.00 Overhang -None None 0 0 0 0.00 TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 21 of 37 20 112-Lab ENTERED VALUES ROOM BY ROOM ByTKG HP-6 GENERAL INFORMATION {Create Rooms-Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 116 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Gig. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount 1 Vacuum 2 Incubator 1 Roof -1 302.00W 264.00W 116 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Rooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Gig Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Dir Tilt Schedule Cooling Only (Design) Cooling Only (Design) U Val Alpha <¾~~ Type 0 90 4* Wood, 4* Ins 0.050 0.90 Glass External Area U Val Shad Shading Adj Temp/ [nterdoal ::;na mg Overhang -None None s~m if~} ife<v ~~~ Cool Heat Perm Loss Tmp Tmp Len Coef 0 0 0 0 0 0.00 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 22 of 37 21 122-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-3 GENERAL INFORMATION {Create Rooms -_Rooms) PEOPLE AND LIGHTS .(freate Ros,ms _:_ lntemal Loads) Size ... Floor area 106 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Htg. SchedulE Is There Carpet?: NO Location: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1. 786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Crea.te Rgom~-Airflows) Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Load~) Area/ Const Type/ U Val Alpha G~~~ Type No Description Amount Dir Tilt Schedule 1 Computer System 135.00 W Cooling Only (Design) 1 Roof-1 106 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass Area Adj Temp/ Pc} Pc} Sen Rm rfe<v ~ad re/ smernal U Val Shad admg ~ternal hadmi:i 9001 ~eat Pt.rm boss mp mp en oef 0 0 0 0.00 Overhang -None None TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 23 of 37 22 123-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-3 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {.Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 106 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount Roof-1 Computer System 106 ft2 135.00 W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION .{_Create Roorn~ Airfloy.,sJ Main Supply ... Cooling HElating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Dir Tilt Schedule U Val Alpha irn~ Type 0 90 4* Wood, 4* Ins 0.050 0.90 Cooling Only (Design) Glass External Area U Val Shad Shading Adj Temp/ lnternal Shading Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat Pl;!rm Loss Tmp Tmp Len Coef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 24 of 37 23 111-Lab ENTERED VALUES ROOM BY ROOM ByTKG HP-6 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 238 ff 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Thelco Oven 4,200.00W Roof-1 238 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Rooms -_Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Glass Adj Temp/ Dir Tilt Schedule U Val Alpha ~i~ Type Area ~mernal ~ten:ial U Val Shad admg hading Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Pc} Pc} Sen Rm P1} Re ~ad re/ 9001 ~eat Pfm mp mp en boss oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 25 of 37 24 110-Media Lab ENTERED VALUES ROOM BY ROOM ByTKG HP-6 GENERAL INFORMATION {Create Rooms -Roo_ms) PEOPLE AND LIGHTS {Create Rooms -Internal Load_s) Size ... Floor area 154 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat... Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. Schedule NO Location: None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV ¾Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION (Create Rooms -Airflows) Ventilation ... None Cooling 100.00 % Clg Airflow Heating 100.00 % Clg Airflow Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating 200.00 cfm 200.00 cfm To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate 100.00 % Clg Airflow Schedule ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) No Description Roof-1 Area/ Amount 154 ft2 Project Name: Mo Bio Laboratory Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha i~~ Type 0.050 0.90 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shading Adj Temp/ l11teraal Shading Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat P~rm Loss Tmp Tmp Len Coef TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 26 of 37 25 105-Office ENTERED VALUES ROOM BY ROOM ByTKG HP-4 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS (Create Rooms -Internal, Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 136 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount Roof-1 136 ft2 Wall-1 212ft2 Computer System 135.00W Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Rgoms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc L~ads) Const Type/ U Val Alpha <¾i~ Type Dir Tilt Schedule Adj Temp/ Glass §mernal !mernal Area U Val Shad adini:t ad1ni:i 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None 6 0 Frame Wall, 3* Ins 0.080 0.90 1.00 Single Coated 30 1.00 0. 73 Overhang -None None 1/4* Cooling Only (Design) Pc} Pc} Sen Rm P1} Re ~ad re/ 9001 ~eat Pt.rm boss mp mp en oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 27 of 37 ENTERED VALUES ROOM BY ROOM ByTKG - GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 86 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Gig. Schedule: Is There Carpet?: Room Mass/avQ. Slab Cnstr Type: Acoustical Ceiling Res. Htg. Schedule NO Location: None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 0 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION lCre~te Rgoms_:_Airflows_) Ventilation... None CoolinQ .15 cfm/sq ft 0,.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling HeatinQ Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... CoolinQ Heating Aux Supply ... CoolinQ HeatinQ To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Gig Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Area/ Const Type/ Glass U Val Alpha i~~ Type No Description Amount Dir Tilt Schedule Area Roof-1 86 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Refrigerator 810.00 W Cooling Only (Design) Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Adj Temp/ s~g} if~} Ffe'v ~ad re/ smernal U Val Shad admQ IB;erl]al ad1nQ 9001 ~eat Pr_fm boss mp mp en oef Overhang -None None 0 0 0 0.00 TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 28 of 37 _.......... 27 131-Storage-File ENTERED VALUES ROOM BY ROOM ByTKG HP-3 GENERAL INFORMATION {Create Ro<>ms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 74 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 0 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount Roof-1 74 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION LCreate_Roort1!L-_Airflows_l Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha ~~~ Type 0.050 0.90 Glass External Area U Val Shad ShadinQ Adj Temp/ !nternal ~hadlnQ Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat P~rm Loss Tmp Tmp Len Coef Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 29 of 37 ~ 28 132-0ffice ENTERED VALUES ROOM BY ROOM ByTKG HP-3 .... GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 93 ft2 18.0 ft 6.0 ft Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat. .. Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2-°F/Btu Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... None Cooling Heating Schedule 0.00 air changes/hr 0.00 air changes/hr Available (100%) Area/ No Description Amount 1 Computer System 135.00W 1 Roof-1 93 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION .{£reate R_ooms -Airflows) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, MiJ;J:~Lo~ds) Adj Temp/ Const Type/ Glass U Val Alpha '¾~~ Type s~ternal ~ter[lal Dir Tilt Schedule Area U Val Shad adinQ hadinQ Cooling Only (Design) 0 90 4* Wood, 4* Ins 0.050 0.90 Overhang -None None Pc} Pc} Sen Rm Ffe1} ~ad re/ rool ¥eat PI.rm boss mp mp en oef 0 0 0 0.00 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 30 of 37 ~ 29 129-Mens Restroom ENTERED VALUES ROOM BY ROOM ByTKG HP-3 #' .... ...... GENERAL INFORMATION {Create Rooms-Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 218 ft2 Design ... Height... Fir-Fir 18.0 ft Plenum 6.0 ft Cooling DB: Heating DB: Relative humidity 75 °F 68 °F 50 % People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Thermostat...Clg driftpoint: 90 °F 55 °F None Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. NO None 4* LW Concrete 1.786 hr·ft2·°F/Btu Htg driftpoint: Clg. Schedule: Htg. SchedulE Location: None Room Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Create Rooms -Airflows) Ventilation ... None Cooling 325.00 cfm Heating 325.00 cfm Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate 325.00 cfm Schedule ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc L~oads) Area/ Const Type/ No Description Amount Dir Tilt Schedule U Val Alpha GR~~ Type 1 Roof-1 218 ft2 0 90 4* Wood, 4* Ins 0.050 0.90 Project Name: Mo Bio Laboratory Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shading Adj Temp/ mternal Shading Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat Perm Loss Tmp Tmp Len Coef TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 31 of 37 ~ 30 130-Womens Restroom ENTERED VALUES ROOM BY ROOM ByTKG HP-3 • ,,. ,~ ' .. GENERAL INFORMATION {Create Rooms -_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 218 ft2 18.0 ft 6.0 ft 1 1 Room Mass/avg. Slab Cnstr Type: 4* LW Concrete Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Clg. Schedule: Htg. Schedule Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Cooling 325.00 cfm Heating 325.00 cfm Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount Roof-1 218 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION tCreate R9om~ AirfLowsj Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate 325.00 cfm Schedule ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, MiscLoads) Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha i~~ Type 0.050 0.90 Glass External Area U Val Shad Shading Adj Temp/ Internal :5hadmg Overhang -None None s~~} i=fJ} Ffe<v ~~s Cool Heat P~rm Loss Tmp Tmp Len Coef Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 32 of 37 31 103-Hallway ENTERED VALUES ROOM BY ROOM ByTKG ,., ,-"'~ HP-3 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 350 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Is There Carpet?: Room Mass/avg. Slab Cnstr Type: Acoustical Ceiling Res. Htg. Schedule NO Location: None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 1 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Cre_ate RQo_m~Airflows_) Ventilation ... None Cooling 15.00 cfm/person Heating 15.00 cfm/person Schedule Available (100%) Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, MiscLoads) No Description Roof-1 Area/ Amount 350 ft2 Project Name: Mo Bio Laboratory Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha '¾~~ Type 0.050 0.90 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shading Adj Temp/ !nterdnal :sna mi:i Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat Perm Loss Tmp Tmp Len Coef TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 33 of 37 32 128-Hallway ENTERED VALUES ROOM BY ROOM ByTKG ~ _/~' - HP-3 GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 136 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier Htg driftpoint: Rooms per zone Clg. Schedule: Htg. SchedulE Is There Carpet?: NO Location: Room Mass/avi:i. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 0 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION {Create Rooms -Airflows) Ventilation ... None Coolini:i .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Misc Loads) No Description Roof-1 Area/ Amount 136 ft2 Project Name: Mo Bio Laboratory Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha<¾~~ Type 0.050 0.90 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shading Adj Temp/ Lnterdnal ~ha mg Overhang -None None Pct Pct Pct Rad Sen/ Rm/ Ret/ Frei Cool Heat Perm Loss Tmp Tmp Len Coef TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 34 of 37 33 121-Hallway ENTERED VALUES ROOM BY ROOM ByTKG HP-3 ., ,,..,,"-,---' f • I GENERAL INFORMATION {Create Rooms -Rooms) PEOPLE AND LIGHTS {Create Ro<>ms -Internal Loads) Size ... Floor area Height... Fir-Fir Plenum Duplicate ... Floor multiplier Rooms per zone Is There Carpet?: NO None 235 ft2 18.0 ft 6.0 ft 1 1 Room Mass/av!'.). Slab Cnstr Type: 4* LW Concrete · Design ... Cooling DB: Heating DB: Relative humidity Thermostat...Clg driftpoint: Htg driftpoint: Gig. Schedule: Htg. SchedulE Location: 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule General Office Space 0 People Cooling Only (Design) Sensible Latent 250 Btu/h 200 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 Acoustical Ceiling Res. 1.786 hr·ft2·°F/Btu Ventilation ... None Coolin!'.! .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heating Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) No Description Area/ Amount Roof-1 235 ft2 Project Name: Mo Bio Laboratory AIRFLOW INFORMATION {Create Rooms_-_Airflows_l Main Supply ... Cooling Heating Aux Supply ... Cooling Heating To be calculated To be calculated To be calculated To be calculated Vav Minimum ... Rate % Gig Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi~c Loads) Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha ~i~ Type 0.050 0.90 Glass External Area U Val Shad Shading Adj Temp/ !nterdrtal ~ha mg Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat Perm Loss Tmp Tmp Len Coef Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 35 of 37 34 117-Storage ENTERED VALUES ROOM BY ROOM ByTKG HP-8 4,, 'S A -~ GENERAL INFORMATION {Create Rooms -_Rooms) PEOPLE AND LIGHTS {Create Rooms -Internal Loads) Size ... Floor area 100 ft2 Design ... Cooling DB: Heating DB: Height... Fir-Fir 18.0 ft Relative humidity Plenum 6.0 ft Thermostat...Clg driftpoint: Duplicate ... Floor multiplier 1 Htg driftpoint: Rooms per zone 1 Clg. Schedule: Htg. Schedule Is There Carpet?: NO Location: Room Mass/av9. Slab Cnstr Type: Acoustical Ceiling Res. None 4* LW Concrete 1.786 hr·ft2·°F/Btu 75 °F 68 °F 50 % 90 °F 55 °F None None Room People... Activity: Density Schedule None 0 People Cooling Only (Design) Sensible Latent 250 Btu/h 250 Btu/h Lighting ... Type: Recessed fluorescent, not vented, 80% load to space Schedule Cooling Only (Design) Fixture Type RECFL-NV %Load to RA 20 % Lighting Amount 1.5 W/sq ft Ballast Factor 1.0 AIRFLOW INFORMATION LCreateRoon,s__:_Airflows1 Ventilation ... None Coolin9 .15 cfm/sq ft 0.15 cfm/sq ft Available (100%) Heating Schedule Infiltration ... Cooling Heatin9 Schedule None 0.00 air changes/hr 0.00 air changes/hr Available (100%) Main Supply ... Coolin9 Heating Aux Supply ... Coolin9 Heatin9 1.25 cfm/sq ft 1.25 cfm/sq ft To be calculated To be calculated Vav Minimum ... Rate % Clg Airflow Schedule Available (100%) Room Exhaust... Rate Schedule 0.00 air changes/hr ROOM COMPONENTS (Create Rooms -Roofs, Walls, Partn/Floors, Mi§c LQads) No Description Roof-1 Area/ Amount 100 ft2 Project Name: Mo Bio Laboratory Const Type/ Dir Tilt Schedule 0 90 4* Wood, 4* Ins U Val Alpha '¾~~ Type 0.050 0.90 Dataset Name: C:\Documents and Settings\rbraun\Desktop\TRACE AND ENERGY PRO CALCS\MOBIO Glass External Area U Val Shad Shadm9 Adj Temp/ [nternal ~hadin9 Overhang -None None Pct Pct Pct Rad Sen/ Rm/ ReU Frei Cool Heat Perm Loss Tmp Tmp Len Coef TRACE® 700 v4.1 calculated at 09:40 AM on 03/26/2004 Alternative -1 Entered Values Room information page 36 of 37