Loading...
HomeMy WebLinkAbout2756 CARLSBAD BLVD; 102; CB023832; Permit05-14-2003 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 05/14/2003 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB023832 Building Inspection Request Line (760) 602-2725 2756 CARLSBAD BL CBAD RESDNTL Sub Type: CONDO Lot #: 0 $542,146,00 Construction Type: V1 Reference*: CT01-1Q 4 Structure Type: MF2-4 12 Bathrooms: 12 VILLAGE BY THE SEA BLDG 7 4 UNITS= 6048SF HAB 2436SF GAR 404SF DCK Status: Applied: Entered By: ISSUED 10/21/2002 SB Plan Approved: Applicant; ANASTASI CONSTRUCTION 1200 AVIATION BLVD REDONDO BEACH CA 902278 310-376-8077 CO Owner: Issued: 05/14/2003 Inspect Area: Orig PC#: PC020050 Plan Check#: 5140 05/14/03 0002 01 CGP 02 62335-12 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $1,890.79 Meter Size $0.00 Add! Reel. Water Con. Fee $1,229.01 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $54.21 PFF $9,740.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $9,600.00 Housing InLieu Fee D5/8 Housing Credit Fee $0.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $560.00 $8,016.00 $0.00 $9,867.06 $9,108.05 $0.00 $0.00 $1,443.84 $1,628.16 $0.00 $567.00 $210.00 $181.00 $0.00 $0.00 $0.00 $0.00 $8,240.00 $0.00 $62,335.12 Total Fees: $62,335.12 Total Payments To Date:$0,00 Balance Due: $62,335.12 Inspector:Date:Clearance: * NOTICE; Please lake NOTICE tan approval of your project Includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as fees/exactions.* Aou have 90 days from the date this permit was issued to protest imposition of these fees/exactions, If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City if Carlsbad Final Building Inspection Dept: Building Engineering P Plan Check S: Permit*: CB023832 Project Name: VILLAGE BY THE SEA BLDG 7 4 UNITS= 6048SF HAB 2436SF GAR 404SF DCK Address: 2756 CARLSBAD BL Contact Person: Phone: Sewer Dist: CA Water Dist: CA CMWD StLite Fire Date:08/12/2004 Permit Type: RESDNTL Sub Type: CONDO Lot: Inspected/) f) By: L. - '< U 1 ^ Inspected By: Inspected By: Comments: S&2. &Ti Date Inspected: V* /Z Date Inspected: Date Inspected: &£//W /w/»>*^ ./ G r- Approved: Approved: Approved: Disapproved: (/^^ Disapproved: Disapproved: August 12,2004 TO: BUILDING DEPARTMENT FROM: Management Analyst, Housing & Redevelopment Department CB023832 - Final Inspection, Village by the Sea, Building 7 I received the request for final inspection for the above referenced project. The Housing and Redevelopment Department cannot approve the request at this time. The developer of the project is required to complete the community recreation amenities and exterior landscaping prior to the issuance of any further certificates of occupancy for this project. Further, the developer must also satisfy their requirements under the City's Inclusionary Housing Ordinance. Until both of these items are resolved, the Housing and Redevelopment Department requests that no final certificates of occupancy be issued for this project. If you have any questions, please contact me at x2817. Thank you for your assistance on this matter. CRAIG D. RUIZ Inspection List Permit#: CB023832 Type: RESDNTL CONDO Date Inspection Item Inspector Act 09/08/2004 89 09/08/2004 89 08/31/2004 89 08/30/2004 89 08/20/2004 23 08/11/2004 39 06/14/2004 11 04/01/2004 18 03/29/2004 16 03/29/2004 17 03/29/2004 18 03/15/2004 16 03/12/2004 84 03/10/2004 84 03/09/2004 84 03/08/2004 84 02/23/2004 13 02/19/2004 16 02/18/2004 16 02/17/2004 16 02/12/2004 16 02/10/2004 14 02/09/2004 14 02/05/2004 13 02/04/2004 24 02/02/2004 24 01/30/2004 24 01/07/2004 11 01/07/2004 15 01/06/2004 15 01/02/2004 11 01/02/2004 14 12/15/2003 14 11/24/2003 14 11/19/2003 14 11/19/2003 63 10/22/2003 11 10/17/2003 12 10/10/2003 11 10/10/2003 12 09/24/2003 62 09/24/2003 66 09/23/2003 62 Final Combo Final Combo Final Combo Final Combo Gas/Test/Repairs Final Electrical Ftg/Foundation/Piers Exterior Lath/Drywall Insulation Interior Lath/Drywail Exterior Lath/Drywal! Insulation Rough Combo Rough Combo Rough Combo Rough Combo Shear Panels/HD's Insulation Insulation Insulation Insulation Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Shear Panels/HD's Rough/Topout Rough/Top out Rough/Topout Ftg/Foundation/Piers Roof/Re roof Roof/Re roof Ftg/Fou n dation/Pie rs Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Walls Ftg/Foundation/Piers Steel/Bond Beam Ftg/Foundation/Piers Steel/Bond Beam Steel/Bond Beam Grout Steel/Bond Beam PY - PY PY PY PY PY PY PY PY PY PY PY PY PY py PY PY PY PY PY PY PY PY PY PY PY JM JM JM PY PY PY PY PY PY PY PD PY PY PY PY PY NR R! PA CO AP PA AP AP we AP NR AP AP CO NR NR PA we PA NR NR PA NR PA AP NS NR AP AP NR AP we PA PA NR PA AP PA AP AP we AP we VILLAGE BY THE SEA BLDG 7 4 UNITS* 6048SF HAB 2436SF GAR 404S Comments NEED ALL DEPTS NEED ALL DEPTS SPA GAS LINE EMR RETAIN WALLS PRELIM DOUBLE SHEAR WALLS OK TO BUILD DROPS OUT OF TIME OK TO POUR UTILITY RM OK TO COVER ELEC ROOM FLOOR SHEATHING FLOOR SHEATHING GROUT @ WING WALL SLAB & RETAIN WALL @ END COLUMNS AT GARAGE Tuesday, September 21, 2004 Page 1 of 2 09/22/2003 62 Steel/Bond Beam PY WC 09/22/2003 66 Grout PY AP 09/15/2003 62 Steel/Bond Beam PY WC 09/15/2003 66 Grout PY PA 09/04/2003 62 Steel/Bond Beam PY AP WALL STEEL 09/03/2003 62 Steel/Bond Beam PY AP WALL STEEL 08/15/2003 11 Ftg/Foundation/Piers PY PA RETAIN WALL FTGS 08/08/2003 11 Ftg/Foundation/Piers PY CO MISSING #7 REBAR Tuesday, September 21, 2004 Page 2 of 2 City of Carlsbad Bldg Inspection Request For 08/11/2004 Permits CB023832 Title: VILLAGE BY THE SEA BLDG 7 Description: 4 UNITS= 6048SF HAB 2436SF GAR 404SF DCK Sub Type: CONDO Inspector Assignment: PY 2756 CARLSBAD BL Lot 0 Type: RESDNTL Job Address: Suite: Location: APPLICANT ANASTASI CONSTRUCTION CO Owner: Remarks: Phone: 3103453621 Inspector: Total Time:Requested By: ARON Entered By: CHRISTINE CD Description 39 Final Electrical Act Comment tfr Associated PCRs/CVs Inspection History Date 06/14/2004 04/01/2004 03/29/2004 03/29/2004 03/29/2004 03/15/2004 03/12/2004 03/10/2004 03/09/2004 03/08/2004 02/23/2004 02/19/2004 02/18/2004 02/17/2004 02/12/2004 02/10/2004 02/09/2004 02/05/2004 02/04/2004 02/02/2004 01/30/2004 01/07/2004 Description 1 1 Rg/Foundation/Piers 18 Exterior Lath/Drywall 16 Insulation 17 Interior Lath/Drywall 18 Exterior Lath/Drywall 16 Insulation 84 Rough Combo 84 Rough Combo 84 Rough Combo 84 Rough Combo 13 Shear Panels/HD's 16 Insulation 16 Insulation 16 Insulation 16 Insulation 14 Frame/Steel/Bolting/Welding 14 Frame/Steel/Bolting/Welding 13 Shear Panels/HD's 24 Rough/Topout 24 Rough/Topout 24 Rough/Topout 1 1 Ftg/Foundation/Piers Act AP AP we AP NR AP AP CO NR NR PA we PA NR NR PA NR PA AP NS NR AP Insp Comments PY RETAIN WALLS PY PY PY PY PY PY PY PY PY PY PY PY PRELIM PY PY PY DOUBLE SHEAR WALLS OK TO BUILD DROPS PY PY PY PY OUT OF TIME PY JM OK TO POUR UTILITY RM