Loading...
HomeMy WebLinkAbout2765 LOKER AVE W; ; CB152695; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-30-2015 Miscellaneous Permit Permit No: CB152695 Building Inspection Request Line (760) 602-2725 Job Address:2765 LOKER AV WEST CBAD Permit Type:MISC Subtype:REROOF Status:ISSUED Parcel No:2090811800 Lot #:0 Applied:08/20/2015 Valuation:$143,590.00 Entered By:SLE Reference #:Plan Approved:08/20/2015 PC#:Issued:08/20/2015 Inspect Area:PB Project Title:SENTRE PARTNERS: REROOF REMOVE EXISTING MINERAL SURFACE, INSTALL BUILT UP Applicant:Owner: BLIGH PACIFIC REALTY ASSOCIATES FUND VIII L P C/O TA ASSOCIATES REALTY 11043 FOREST PLACE 1301 DOVE ST #860 SANTA FE SPRINGS, CA90670 NEWPORT BEACH CA 92660 213-944-9753 Miscelaneous Fee #1 $1,347.00 Miscelaneous Fee #2 $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $1,347.00 Total Fees:$1,347.00 Total Payments To Date:$1,347.00 Balance Due:$0.00 ...6:ZABri FINAL APPROVAL Inspector:Date:/Z -.)0 -15-- Clearance: NOTICE:Please take NOTICE thataward ci ,orproject indudes the "Irrpcsitiorf dfees, dedcations, reservations,aother eactions hereafter cdledively nafenedto as 'Tees/exactions."You have 90 days from the date this pemit was issued to protest inpositiondthese fees/exactions.If you protest them you rrtst fdIoN the protest prcceires set forth in Gzvemrent Ccde Section 66020(a), and file the protest aid any other regired inforrrelion with the Qty Manager fa processing in cs...wrdate v‘ith Calsbad Rinicipal Code Section 3.M.030.Failure totinily falai/that pircearewill ba-any subsequent legal action to attack, review, set as void,a ariltheir imposition. Yaras herebyRRTI-ER NOTIFIED thatyar right to protest the specified fees/exactions DOES NOT APPLY to water and sewer comedian fees and capacity changes, ricr playing, coning, gracing or other similes application pro:swing a service fees in connection with this project.NOR DOES IT APPLYto any fees/eacticris of which you have crevictslv been civen a NOTICE sirrilar to this.a as to which the statute of linitations has onavicuav otherwiseached • REROOFING SUPPLEMENTAL BUILDING PERMIT APPLICATION 1.JOB ADDRESS:2?4.s-- 4tvc 2.TYPE OF BUILDING:RESIDENTIAL COMMERCIAL X 3.ROOF SLOPE: RISE (2_INCHES IN 12 INCHES 4.NUMBER OF EXISTING ROOF COVERING (CIRCLE ONE)0 2 3 5.TYPE OF EXISTING ROOF COVERING /6-it..R..SHEATHING /4)yw oed *6. NEW ROOF MATERIAL /3 U.CLASS WEIGHT PER SQ. 7.NUMBER OF SQUARES st2-0 8.TRADE NAME 4.cc MANUFACTURER 072.4".ofro' 9.ROOF SYSTEM LISTING: UL NO.of hilt I I.C.C.E.S. Report # ASTM 10. IS THE EXISTING STRUCTURAL DESIGN SUFFICIENT TO SUSTAIN THE WEIGHT OF THE PROPOSED ROOF?41:6P NO All roof coverings are required to be CLASS A.Combustible roof coverings of any type or classification are prohibited. I understand the following inspections are required: Tear Off/Pre-Inspection prior to install new roof covering .Final Inspection I agree to provide a ladder extending at least 2 rungs above the roof for inspection. Signature NZ-Oe-i Date 8-020 -13— Contractor&.,i.(4444:Owner Contractor Name A kc Act:5 *6.Rolled Roofing, Standard/Lite Tile, Asphalt/Comp fiberglass, Built Up, Other B-10 Page 6 of 6 Rev. 04/14 ••••••••••••••• J • CITY OF CARLSBAD POLICIES AND PROCEDURES NUMBER:97-50 SUBJECT:Re-Roof Sheathing Inspections During inclement Weather EFFECTIVE: 12/15/97 SECTION:BUILDING DIVISION SUPERSEDES: PURPOSE:To set forth the allowable procedure for re-roof inspections during periods of inclement weather. INTENT:The intent of this policy is to establish a uniform procedure for inspecting the underlayment installation for re-roof projects while protecting the house from the threat of inclement weather.It is not the intent of this policy to allow roof sheathing to be covered without inspection during periods of dry weather or when there is no threat of inclement weather. BACKGROUND: The threat of wet weather prompts many homeowners to contract to have their house re- roofed.In most cases this involves removing the old roof material and installing new underlayment (Plywood or proprietary OSB Board). A building permit and "tear off' inspection is required prior to placing the roofing materials. POLICY:During periods of inclement weather, or when there is a threat of rain, roof sheathing on re-roof projects may be covered with a single layer of asphalt saturated felt and "dried in"prior to the roof sheathing inspection subject to the following conditions: 1.The roof shall not be loaded with roof covering materials until the sheathing has been approved. 2.The roofing contractor shall schedule a sheathing inspection and provide the inspector access to the roof sheathing. a.The roofing contractor shall provide an appropriate sized ladder on site for the inspection. b.The contractor shall call the morning of the inspection and inform the inspector of the circumstances of the inspection and arrange for either an a.m. or p.m. inspection. c. The roofing contractor must have an employee on site during the inspection to reveal portions of the new underlayment to the satisfaction of the inspector. d.If structural reinforcement to the roof framing is necessary, the repairs shall be shown to the inspector at that time. e.In the event the inspector determines the sheathing is nailed improperly, the roof sheathing shall be fully exposed an re-nailed.A re-inspection is then required. Initiated By:Approved By: B-10 Page 5 of 6 Rev. 04/14 1417 Johns Manville CR Cool Roof Cap Sheets -The peace of mind that comes with the long, solid history the Easiest Way to Title 24 Compliance of bituminous roof systems The relatively recent development of single ply, self-adhering and When compliance with California's Title 24 regulations is required,other roofing systems has brought many benefits to the building and roofing industries. Many owners, specifiers and contractorsandabituminous roofing system is preferred,are still most comfortable with the multi-ply redundancy of a nthere is no easier solution than JM's CR sheets.asphalt bituminous roofing system. CR cap sheets are white mineral-surfaced, and white CR cap sheets have an enhanced top surface for added tough- acrylic-coated. They are used as the uppermost finish ply in ness and are Title 24-compliant. The white acrylic coating is fac- a variety of built-up and SBS roofing systems. The unique,tory-applied over the mineral granules, increasing the coatingsUV-resistant coating. provides extra..protection to the membrane adhesion while retaining the granules' protective benefits.and underlying asphalt. It provides a reflective, emissive surface that meets California's Title 24 and LEED requirements.Brighter and Whiter—To Keep the Roof Cooler The greater reflectivity and emissivity of GlasKap CR means theWith reflectivity rated at 0.76 and emissivity rated at OZ.roof stays cooler, consumes less energy and reduces demand CR cap sheets meet all requirements for compliance with California's during peak periods. The more solar energy reflected back toTitle 24 regulations and qualifies for LEED points.CR cap sheets have the sky and heat shed from the surface causes less heat to bestrong UL and FM ratings for both fire and wind uplift transferred into the building. Tide 24 •01°°%:=idlik.0.01st%7------ This sirachist masts ClInn"124 a RV ''. C e)US jAil*CR Cap Sheets vs. Traditional Cap Sheets ssniashsihiniquirssnonts.when ii .`"APPROVED ENERGY STAR iF —1-- -----°F +50°F Before CR cap sheets, the options for achieving Title 24 compliance (-1-280c)* included applying a field coating over an asphalt system, or ,...' switching to a TPO or PVC single ply system. Now with CR cap .:... • sheets, you have a sheet that is manufactured by Johns Manville .. •- . ••-,, with full Title 24 compliance and installs like standard BUR and -......„ SBS cap sheets.....-......_...,-,,,.••.:.. .—•••-•-• A capsheets meetICR Tirequirementstle24 through the standard „ IR .......• • firi prescriptive approach, which means a specifier, contractor or L `‘'building owner need only show that each building product meets or exceeds the prescriptive requirement. JM provides the prod-CR Cap Sheets Traditional Cap Sheets uct and the documentation.. 'Estimate. California Energy Commission Consumer Energy Center Web site Graphic is representative of potential range/drop using reactive/emissive surface products. Tough, high IN-blocker content white acrylic coating keeps the roof surface cool, providing Surfacing of white ceramic-roofing Title 24 compliance and protecting the asphalt granules increases adhesion of the white from the long-term effects of the sun and heat.acrylic coating and provides a redundant layer of protection for the asphalt layer. STIriS7V. '''' 40 S.ISVirsaillsfigo.lh••- Fiber glass Mat provides High-quality asphalt a solid,dimensionally—-gle-coating provides stable reinforcement waterproofing above for the other roofing and below the fiber membrane components.glass mat • 12 dr johns Manville Bituminous Products APP —APPeP, BICOR', IRICOR'" andTRICOr M FR CR APP membranes are made of plastic-polymer modifiers BUR -GrasKapat, GlasBase-Plus,GlasKae. GlasPly IV,combined with asphalt to provide a tough material with good GlasIPle Premier and Ventaulation• Felt weathering properties and are ideal for hot, desert climates. A BUR system is made of multiple plies of reinforcement laminated together with bitumen (hot asphalt),a highly reliable Energy and the Environment wate rproofing method.In regions that mandate cool roofs, multiple-ply roofing products can be used.CR cap sheets are factory-coated and cool •SBS — DynaBaset DynaClar, DynaKar. DynaFlee,roof compliant. Other asphaltic systems can be used with a DynaGlaat DynaGrir. Dynalastie, JACleanBon.coating; JM's TopGard 4000 and TopGard 5000 acrylic coatings DynalFlex•CR,DynaGlaa.FR CR,DynaKap•FR CR,Dynamic•are ideal for these applications. 180 FR CR,Dynalastie 250 FR CR, DynaMeld•Cap FR CR SBS membranes are made of SBS rubber-polymer modifiers combined with a premium asphalt flux. This asphalt-blended coating produces a highly durable roof in an extreme environment. Bit'SBS APP •Multi-ply application • Durable under extremes in high • Heat-welded application for sites • Widespread and long-term use and low temperature extremes with rooftop obstacles •Reliable waterproofing through • Self-adhering, heat-welded, cold-•Can be applied with cold adhesive multiple layers applied or hot-mopped installation • Applicator-friendly burn-off films • Field-fabricated waterproofing • Heat-welded products have appli-for proper adhesion to substrate cator-friendly, burn-off films for • Waterproofed in the manufa ctur- proper adhesion to substrate ing process • Waterproofed in the manufacturing process Nce-Naiabh.Deck DraBas• DreLaseeUP S.I1PeD.,cE„.. Nola.Deck '.spiel "4'"'"dIn'd.'n :1V17/POr1=.8""''- ...1 -.--1" 1.Lap :'1 • . ... ".. Asphalrf44.1,14apar .11i .CometsPlkIlelfIltRappad)• GesSese Plus.GlasKap CR Mineral w...Ilfr3"161-1 17 -tinmrS I T....!....::..'0'.Apielt PannaP0,.200.T. DP,,Surkiced.yam-•EndUm i ;.TAPPs.or - -f -i • '"Alp'7"4""PonLsulation i CoaledCD Sh..t 'Summed ,,•IApart M)I r•• Pa:mealy 29 i•. ) A h'ir-.1 E t •••• i.% t .-•pi •.. .:t •.•••. 1 ' 1 \k -“2 Lap g —t ._._. i J :•.V TV1IA G •Pram. ili .. 1 .SBS Cap Sheet •..00pGed ".•---.Neetwoci•d ,,,.•,.ITAIMai\or GimPlyP/I Lap'P _,_I 1.11 .•A'6*k..:.Tialb .•.—- 1••. romr S likerS.OPet.SS,APP.X41 54.""' CNC-CR 2C10/2FINPID 3CBN-W/3PIIN-W rit 111 foil ...•••.--- ak41.111 Ft elli it ........„.....r.o. .........-ail III A t••PINS .1•11.•1110