HomeMy WebLinkAbout2772 GALICIA WAY; MULTI-PERMIT FILE; CB142881; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
10-24-2014 Demolition Permit Permit No: CB142881
Building Inspection Request Line (760) 602-2725
Job Address: 2772 GALICIA WY CBAD
Permit Type: DEMO Full Demo: N Status: ISSUED
Parcel No: 2162200100 Lot #: 0 Applied: 10/24/2014
Entered By: RMA
Occupancy Group: Reference #: Plan Approved: 10/24/2014
PC #:
# Dwelling Units: 0 Structure Type: Issued: 10/24/2014
Bedrooms: 0 Bathrooms: 0 Inspect Area:
Project Title: CUNZIO RES- DEMOLISH POOL/SPA
PUNCH HOLES IN BOTTOM & FILL IN WITH SAND & DIRT-
Applicant:
CUNZIO ANTHONY&PRICHARD
2772 GALICIA WAY
CARLSBAD CA 92009
760 275-6196
Owner:
CUNZIO ANTHONY&PRICHARD
2772 GALICIA WAY
CARLSBAD CA 92009
Building Permit
Plumbing Fee
Other Fee
Additional Fees
TOTAL PERMIT FEES
$20.00
$0.00
$45.00
$0.00
$65.00
Total Fees: $65.00 Total Payments To Date: $65.00 Balance Due: $0.00
FINAL APPR
I
P/
Y
VAL
Inspector: Date: _______ Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
10-24-2014 Permit No:SW 140368
Job Address: 2772 GALICIA WY CBAD
Permit Type: SWPPP
Parcel No: 2162200100 Lot
Reference #:
CB#: CB142881
Project Title: CUNZIO RES- DEMOLISH POOL/SPA
Applicant:
CUNZIO ANTHONY&PRICHARD
2772 GALICIA WAY
CARLSBAD CA 92009
Emergency Contact:
ANTHONY CUNZIO
760 275-6196
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Status: ISSUED
0 Applied: 10/24/2014
Entered By: RMA
Issued: 10/24/2014
Inspect Area:
Tier: 1
Priority: L
Owner:
CUNZIO ANTHONY&PRICHARD
2772 GALICIA WAY
CARLSBAD CA 92009
$0.00
$58.00
$0.00
$58.00
Total Fees: $58.00 Total Payments To Date $58.00 Balance Due: $0.00
ITHE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: [:]PLANNING 0 ENGINEERING 0 BUILDING FIRE 0 HEALTH D HAZMAT!APCD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
CITY OF Ph: 760-602-2719 Fax: 760-602-8558
B A
email: buildingcarlsbadca.gov
www.carlsbadca.gov CARLS D Ak
Plan Check No.
Est. Value
Plan Ck. Deposit
Date fp [(L\ISWPPP I
JOB ADDRESS
SWTE#/SPACE#/UNIT#
BUSINESS NAME
I APN
- CT/PROJECT # LOT # PHASE C OF UNffS C BEDROOMS C BAThROOMS ]TENANT - CONSTR. TYPE 0CC. GROUP
DESCRIPTION OF WORK: Include Square Feet of Affected A,ea(s)
iflo £ t _oo 0 fDO-0 'P
hJ/J 4uL
EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS(SF) FIREPLACE
YESD#. NOD
AIRCONDITIONING I YES DNOE
IFIRESPRINKLERS
YESD NOD
APPLICANT NAME (u)3l.to __________________________________ Pitnare Contact
PROPERTY O)N1SER NAME
(.-(.i ADDRESS
d)-7'7- chis ADDRESS
7'7 4 CITY WAI CITY TATE
(:C1-(/S )J c
PHONE FAX PHON _1>4,FAX
EMAIL
an (W5Ll c -
DESIGN PROF )
EMAIL
-< I'
CONTRACTOR BUS. RAME L/
ADDRESS ADDRESS
CITY STATE ZIP CITY - , STATE ZIP
PHONE FAX PHONE FAX
EMAIL EMAIL
STATE LIC. C STATE UC.# CLASS CITY BUS. LIC.#
(Sec. 701. Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repaIr any structure, prior to Its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractors License Law jChapter 9, commending with SectIon 7000 of Division 3 of the Business and Professions Code) or that he Is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001).
i®u ° IF
Workers' Compensation Declaration: I hereby affirm under penalty f perjury one of the following declarations: -.
R I have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation Insurance carter and policy
number are: insurance Co.' Policy No. Expiration Date
I section need not be completed if the permit is for one hundred dollars ($100) or less.
Certificate of Exemption: I certify that In the performance of the work for which this permit is issued, I shall not employ any person In any manner so as to become subject to the Workers' Compensation Laws of
Califomia. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In
addition to the coat of compensation, damages as provided for In Section 3706 of the Labor code, Interest and attorney's tees.
CONTRACTOR SIGNATURE 0 AGENT DATE
I hereby affirm that lam exempt from Contractor's License Law for the following mason:
El I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or Improves thereon, and who does such work himself or through his own employees, provided that such improvements era not Intended or offered for
sale. If, however, the building or Improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or Improve for the purpose of sale).
[J I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
[] I am exempt under Section _____________Business and Professions Code for this mason: - -
I personally plan to provide the major labor and materials for construction of the proposed property Improvement. DYes [JNo
I (have! have not) signed an application fore building permit for the proposed work.
3.1 have contracted with the following person (firm) to provide the proposed construction(include name address I phone! contractor-a' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name! address! phone contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name! address! phone! type of work):
.PROPERTY OWNER SIGNATURE AGENT DATE
Inspection List
Permit#: CB142881 Type: DEMO CUNZIO RES- DEMOLISH POOL/SPA
PUNCH HOLES IN BOTTOM & FILL IN WIT
Date Inspection Item InspectorAct Comments
11/19/2014 19 Final Structural - RI POOL DEMO
11/14/2014 51 Excav/Steel/Bonding/Fence - RI AM PLEASE
11/14/2014 51 Excav/Steel/Bonding/Fence MC AP DEMO COMPLETE
11/11/2014 51 Excav/Steel/Bonding/Fence MC PA HOLES PLACED IN POOL FLOOR
Wednesday, November 26, 2014 Page 1 of 1
b - '.
- r
-: -, .-,•, + ......
,-
'! .•
. - . • • .-
E-34 ' • , • . . ' Page 1 äf :
STORM WATER
. '• '.•' . Development Services
A OW
STANDARDS Land Development Engineering
QUESTIONNAIRE" 1635 Faraday Avenue C I T V 0 F
, 760-602-2750 CARLSBAD .-
34, .• vcarlsbadca.gov
L INSTRUCTIONS
To address post-development pollutants that maybe generated from development projects, the City requires that new development and
significant redevelopment priority projects incorporate Permanent -Storm ,.Water Best Management Practices (BMPs) into the project
design per the City's Standard'Urban Stormwater Management Plan.(SUSMP). To view the SUSMP, refer to the Engineering Standards
(Volume 4, Chapter 2) at www.carlsbadcä.qov/standards.
-
Initially this questionnaire !must be completed by the applicant in advance of submitting for a development application (subdivision,
discretionary permits and/or construction permits). The results of the questionnaire determine the level of stormwater standards that
must be applied to a proposed development or redevelopment project. Depending on the outcome,,your project will either be subject to
Standard Stormwater Requirements' or be subject to additi6nal criteria called 'Priority Development Project Requirements'. Many
aspects of project site design are dependentupon the storm water standards applied to a project..
Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has
respohsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire
was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return
of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City.
If you' are unsure about the meaning of a question or need .help in determining how to resp6nd t6oné or more of the questions; please
'seek assistance from Land Development Engineering staff.
.•-' '• ,••
A separate completed and signed questionnaire must be: submitted for each new development application submission:, Only one
completed and signed questionnaire is required when multiple deeIàpment applications for the same project are submitted concurrently.
In,addition to this questionnaire, you must also complete, sign and s'übmit a Project Threat Asseèsment Form with construction permits
for the project. .. . •.•. -
Please start by completing Step I and, follow the instructions. When completed, sign the form at the end and submit this with your
application to the city. . ., .
STEP 1
JO BE C.OMPLETED FOR LL PROJECTS
To determine if your project is a priority development project, please answer the following questions:
.YES 'NO
1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet -
the following 'criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or -
-other non-erodible permeable areas; OR(2) designed and constructed to be hydraulically disconnected from
paved streets or roads; OR (3) designed and constructed with permeable pavenents or surfaces in
accordance with USEPA Green Streets guidance? ' •' ' . ; - ______ 2. , Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are '
designed and constructed in accordance with the USEPA Green Streets guidance? '
If you answered "yes" to one or more of the above questions, theh your project is NOT a priority development project and therefore is
NOT subject to the storm water criteria required for priority development projects Go to step 4 mark the last box stating my
,project does not meet PDP requirements" and èompléte applicant information. . . • •
,, t.',• ;• J •.'••.•.•. . If you answered "no" to both questions; then go tö'Step 2. •• ,, . - • •• • • .
STORM WATER
151 STANDARDS Development Services <~. mo>
I OF
Land Development Engineering
T QUESTIONNAIRE
CAR E-34 760-602-2750 LSB www.èarlsbadca.gov
S1F2
TOBE COMPLETED FOR 4LL NEW OR REDEVELOPMENT PROJECTS L
To determine if your project is a priority development project please answer the following questions:YES NO
1 Is your project a new development that creates 10 000 square feet or more of impervious surfaces collectively
over the entire project site? This includes commercial industrial residential mixed use and public
development projects on public or private land.
2 Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire
project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial
industrial,_residential, public development projects_on public private land. _mixed-use,_and _or
3 Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared
foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared
foods and drinks for immediate consumption. ' , •.: -p..
4 Is your project a new or redevelopment project that creates 5 000 square feet or more of impervious surface
collectively over the entire project site and supports a hillside development project'? A hillside development
project includes development on any natural slope that is twenty-five percent or greater. .
5. Is your projecta new orredevelopment project that creates 5,000 square feet or more of impervious surface
collectively over the entire project site and supports a parking lot. A parking lot is a land areaor facility for the
temporary parking or storage of motor vehicles personallyfor business or for commerce. _used
6 Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface
- collectively over the entire project site and supports a street road highway freeway or driveway'? A street
- road, highway, freeway or driveway 'is any paved impervious* surface used for the transportation of
automobiles, trucks, motorcycles, and other vehicles. -
7 Is your, project a new or redevelopment project that creates or replaces 2,500 square feet or more of -
impervious surface collectively over the entire site and discharges directly to an Environmentally Sensitive
Area (ESA)?.'Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or lO'ss.
from the project to the ESA; or conveyed in a pipe or open channel any distance as an isolated flow frOm the
project to_ the commingles lands).! _ESA _(i.e._not _with _flows _from_adjacent
8 Is your project a new development that supports an automotive repair shop'? An automotive repair shop is a
facility 'that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013,
5014, 5541, 7532-7534, o r 7536-7539.
Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGOs
that meet the follOwing'criteria: (a) 5;000 square feet or more or (b)'a project Average Daily Traffic (ADT) of
100 or more vehicles per day. -
Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and.
are expected to generate pollutants post construction'?
ills your project located within 200 feeLof the Pacific Ocean and (1) creates 2,500 square feet or more of
impervious surface or (2) increases impervious surface on the property by more than 10%?
If you answered yes to one or more of the above questions you ARE 'a priority development project and are therefore subject to
implementing str6ctiurall.Besti-I Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such
as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your
application(s) for development. Go to step 3 for redevelopment projects. F or. new projects, go to step 4 at the end of this
questionnaire check the "my project meets PDP requirements" box and complete applicant information
If you answered "no" to all of the above questions, ,you ARE NOT a priority development project and are therefore subjectto
implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all
development projects.. AStorrn Water Management Plan (SWMP) is not required with your application(s) for development. Go to step
4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant
information. -
Effective 6/27113
STORM WATER
STANDARDS Development Services
0 F QUESTIONNAIRE
Land Development Engineering
163.5 Faraday Avenue
760-602-2750
CAKLSBAU E-34
STEP 3
L TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELQREMENT PROJECTS ONLY
Complete the questions below regarding your redevelopment project: , YES NO
Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than
50% of the surface area of the previously existing development?
If you answered yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of
impervious surface and not the entire development. Go to step 4, check the "my project meets POP requirements" box and.
complete applicant information. . .. •
If you answered no, the structural BMP's required for Priority Development Projects apply to theéntire development. Go to step 4,
check the "my project meets PDP requirements" box and complete applicant information.
- - _ - STEP
CHECK THE APPROPRIATE BOX AND COMPLETE AIPLIC4NT INFORMATION
I My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and.must complywith additional stormwater
,criteria per the SUSMP and I understand I must prepare Storm Water Management Plan for submittal at time of application.
I understand flow control(hydromodification) requirementsniay apply to my project. Refer to SUSMP for details.
My project does not meet PDP requirements and must only 'comply.with STANDARD STORMWATER REQUIREMENTS per,
the SUSMP. As part of these requirements I will incorporate loi.h impact development strategies throughout my project.
Applicant Information and Signature Box
Address1. : Accessor's Parcel Number(s),. rrvt in nAA . . .
Aicafit- a Applicant Title: •-
.,
.
Applicant Sig Date
This Box for City Use Only
City Concurrence: YES .NO
By:.
Date:
Project ID:
.. . .
* Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas
designated as Areas of Special Biological.Significance by the State Water Resources Control Board (Water Quality Control Plan for the
San Diego Basin (1994) and amendments); water liodies designated with the RARE beneficial use by the State Water Resources
Control Board (Water Quality Control Plan for the. San Diego Basin (1994) and amendments); areas designated as preserves or their
quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent
environmentally sensitive areas which have been identified by the Copermittees.
.
.
4 •.. - '• . - - .
E-34 . - .. - ••• Page 3of3 - . - . . -• Effective 6/27/13
STORM WATER POLLUTION PREVENTION NOTES
ALL NECESSARY EQUIPMENT AND MATERIALS
SHALL BE AVAILABLE ON SITE TO FACILITATE
RAPID INSTALLATION OF EROSION AND
SEDIMENT CONTROL BMPS WHEN RAIN IS
EMINENT.
THE OWNER/CONTRACTOR SHALL RESTORE
ALL EROSION CONTROL DEVICES TO
WORKING ORDER TO THE SATISFACTION OF
THE CITY ENGINEER AFTER EACH RUN-OFF
PRODUCING RAINFALL.
THE OWNER/CONTRACTOR SHALL INSTALL
ADDITIONAL EROSION CONTROL MEASURES
AS MAY BE REQUIRED BY THE CITY
ENGINEERING OR BUILDING INSPECTOR DUE
TO UNCOMPLETED GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY
ARISE.
ALL REMOVABLE PROTECTIVE DEVICES SHALL
BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN
PROBABILITY FORECAST EXCEEDS FORTY
PERCENT (40%). SILT AND OTHER DEBRIS
SHALL BE REMOVED AFTER EACH RAINFALL.
ALL GRAVEL BAGS SHALL BE BURLAP TYPE
WITH 3/4 INCH MINIMUM AGGREGATE.
PROJECT INFORMATION
Site Address: 2_ Gt Pct i
Assessor's Parcel Number:
Project ID: L) I -'
Construction Permit No.: C12,( L1' 2_&'(
Estimated Construction Start Date
Project Duration Months
rPhone: 7(%c-(Qi9
Perceived Threat to Storm Water Quality
U Medium
Low
6. ADEQUATE EROSION AND SEDIMENT If medium box is checked, must attach a site plan
CONTROL AND PERIMETER PROTECTION BEST sheet showing proposed work area and location
MANAGEMENT PRACTICE MEASURES MUST BE of proposed structural BMPs
INSTALLED AND MAINTAINED.
SPECIAL NOTES
V CITY .
A P :
STORM WATER COMPLIANCE FORM
TIER I CONSTRUCTION SWPPP
E-29
Development Services
Land Development Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
STORM WATER COMPLIANCE CERTIFICATE
' My project is not in a category of permit types exempt from the Construction
SWPPP requirements
" My project is not located inside or within 200 feet of an environmentally
sensitive area with a significant potential for contributing pollutants to nearby
receiving waters by way of storm water runoff or non-storm water
discharge(s).
' My project does not require a grading plan pursuant to the Carlsbad
Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code)
" My project will not result in 2,500 square feet or more of soils disturbance
including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas that meets
one or more of the additional following criteria:
located within 200 feet of an environmentally sensitive area or the
Pacific Ocean; and/or,
disturbed area is located on a slope with a grade at or exceeding 5
horizontal to 1 vertical; and/or
disturbed area is located along or within 30 feet of a storm drain inlet, an
open drainage channel or watercourse; and/or
construction will be initiated during the rainy season or will extend into
the rainy season (Oct. 1 through April 30).
I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE
CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING
FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN
ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS.
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST
MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES
TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE
MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE
THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED
POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH
THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE
DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE
CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF
CARLSBAD.
DATE
For City Use Only
CITY OF CARLSBAD
STANDARD TIER 1 SWPPP
Approved By:
Date:
REV 4/30/10 E-29 Page 1 of 3
Erosion Control Tracking Non-Storm Water Waste Management and Materials
BMPs Sediment Control BMPs Control Management BMPs Pollution Control BMPs BMPs
C 2 C .2 15 -o cu c o o 2 .2 E C C a,
D
a'
Best Management Practice ID 0' i E5
CO C . 5 0' C a'
(BMP) Description 4 . j . I— E , 0) 0'
, 0)
o 0 0 c C a t o U)E 0) co 0 0 a' W a, > U) O CO a,c - (0< - (0 co o
- N
cc
N LJ
a'.!- (D (0 2 ac t co 0<
O wa .2 U) U) a Cl)
.c 0 2 u 0 co cc'> co cn 22 U)o U). 0)2o cc'o ci < a( o > (l) U). cn I o:
CASQADesignation -* 09 9) CO "T '' (9 0 '7 '
c,4 cn7 'f cc) 19
o o o ' w w w w w w w 7 o of U) U) U) U) w w w 0 U) U) (n U) U) U) C/) W I— I— Z Z Z Z Construction Activity LU (/)
Grading/Soil Disturbance
'trenching/Excavation
Ci Stockpiling
Drilling/Boring
Concrete/Asphalt Saw
cutting
Concrete flatwork
- Paving
- Conduit/Pipe Installation
Stucco/Mortar Work
Waste Disposal
- Staging/Lay Down Area
Equipment Maintenance
and Fueling
Hazardous Substance
Use/Storage
Dewatenng
- Site Access Across Dirt
- Other (list):
Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the
blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best
management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was
checked off and for each of the selected BMPs selected from the list. For Example - If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review
the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction
Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on
the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with
Plastic" column.
To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice
measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.
E-29 Page 2 of 3 REV 4/30/10
. INSPECTION RECORD-- 1 -'
-
- - DATE - REMARKS INSPECTOR
FOUND.flGNS:.
SEI
REQUESL$OR INSPECTION TIME:________
H 'TR
INSPECTOR 'VI PERMIT NO. - DATE:
Rd I•,s -. .- - FO OWNER
1 &-GL-c_-, ADDRESS c wp
p sjI
F RAM I N
tNT.LAI
EXT.LP
MASON Ii
FINAL
USE SPAC
BUILDING
El FOUNDATION
El REINFORCING STEEL
El MASONRY •- L.
El GROUT - GUNITE
El FLOOR AND CEILING FRAME
El SHEATHING
-
El FRAME
El EXTERIOR LATH
El INSULATION
J1NTER1OLATH OR DRYWALL
,-& FINAL
PLUMBING
- El UNDERGROUND PLUMBING -
El UNDERGROUND WATER
El ROUGH PLUMBING
- El TOP OUT- PLUMBING - - - -- -
El SEWER AND PL/CO
EI TUB ORSHOWERPAN
EI GAS TEST
E:l TER
* ELECTRICAL
-
- El TEMPORARY SERVICE
El ELECTRIC UNDERGROUND
El ROUGH ELECTRIC
El POOL BONDING
El ELECTRIC SERVICE
El CEILING HEAT
-
MO_K`E-VE,T,ECTOR
N JAB AL A
MISCELLANEOUS
El PLENUM AND DUCTS
El COMBUSTION AIR -
El PATIO
- El SIGN
El GRADING -.
- El DRIVEWAY
- El CONDITIONED AIR SYSTEMS
FINAL-
READY FOR INSPECTION: OMONDAY DT.UESDAY DWEDNESDAY DTHURSDAY FRIDAY
0 A.M. -
-
-
-
D
SPECIAL INSTRUCTIONS
—REQUESTED BY GT. X.
- I - - -- - I .- - --4L/0'7
.
PERSON TAKING REPORT________________
-4
MODEL NO._________
BUILD NG PERMIT APPLICATION
City of CARLSBAD, CALIFORNIA 92008 f
Applicant to complete numbered søaces on/v. Phone 729-1181 Permit No 1
JOB ADOR ESS
772 PARCEL NUMBER
LEGAL
LOT
i
NO. BLA TRACT
(ESEE ATTACHED SHEETI
BOOK PAGE PAR.
OWNER MAIL ADDRESS ZIP
2 y,4Ck '772 2
PHONE
-
CONTRACTOR I'/ MAIL ADDRESS PHONE STATE LIC. NO. CITY LIC. NO. -
/7,*'c.::r /3
ARCHITECT OR DESIGNER MAIL ADDRESS
4 —
PHONE LICENSE NO.
ENGINEER MAIL ADDRESS
5
PHONE LICENSE NO.
COMP NSATION INS. CARRIER MAIL ADDRESS
6
BRANCH
USE OF BUILO1NG
NO. BOR MS NO. BATHS_________
8 Class of work: NEW LI ADDITION El ALTERATION 0 REPAIR 0 MOVE 0 REMOVE
9 Describe work: /,,,f,/47
10 Change of use from
Change of use to
11 Valuation of work: $ 7 / / PLAN CHECK FEE $ -. PERMIT FEE $ -
SPECIAL CONDITIONS: Type of
Const.
Occupancy
Group
MICRO FILM FEE
Size of Bldg.
(Total) Sq. Ft.
No. of
Stories
Max.
0cc. Load
Fire
Zone
Use
Zone
Fire Sprinklers
Required Elves ONO APPLICATION ACCEPTED BY
DATE
PLANS CHECKED BY APPROVED FOR ISSUANCE BY
DATE
No. of -
Dwelling Units
-
OFFSTREET PARKING SPACES:
No N Covered [SQ._Ft. Open
NOTICE
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB.
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK ISSUSPENDEDOR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISrONs OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
Special Approvals Required Received Not Required
PLANNING DEPT.
HEALTH DEPT.
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
ENGINEERING DEPT.
WATER DEPT.
SIGNATURE 0FCONTRACTOR OR AUTHORIZED AGENT (DATIE)
SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
TOTAL FEES $
INSPECTOR
1 A-H
?3k
PLUMBING PERMIT APPLICATION
City of CARLSBAD, CALIFORNIA 92008
Applicant to complete numbered spaces only. Phone 729-1181 Permit Nn 31
JOB *0DB ENS
J22 (,ei4
LEGAL 1DESCR.
LOT NO.
I I I
IOLK
I I
TRACT
OWNER MAIL ADDRESS
2
. 772 9i&'4
ZIP PHONE
5<3'
PT
'
RACTOR MAIL ADDRESS
PA', 4~ PHONE STATE LIC NO CITY LIC. NO.
72c/-/1o7
ARCHITECT OR DESIGNER MAIL ADDRESS
4
PHONE LICENSE NO.
ENGINEER MAIL ADDRESS
5 _____
PHONE LICENSE NO.
COMPENSATION (NS. CARRIER MAIL ADDRESS
6
/,v'S. 4
BRANC
USE OF BUILDING
,
'
8 Class of work: 0 NEW Li ADDITION 0 ALTERATION Li REPAIR
9 Describe work: y 4'
PERMIT FEES
of Fixture or Item Fee
SPECIAL CONDITIONS:
F
No.Type
WATER CLOSET (TOILET) S
BATHTUB
LAVATORY (WASH BASIN)
- -
SHOWER
KITCHEN SINK & DISP.
DISHWASHER
APPLICATION ACCEPTED BY PLANS CHECKED BY I APPROVED FOR ISSUANCE SN'
I DATE
LAUNDRY TRAY
CLOTHES WASHER - -
WATER HEATER
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC.
TION AUTHORIZED (SNOT COMMENCED WITHIN 120 DAVS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM.
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
SIGNATURE OFONTRACTOR R ,
URINAL
DRINKING FOUNTAIN
FLOOR—SINK OR DRAIN -
SLOP SINK
/ GAS SYSTEMS: NO. OUTLETS J J_ WATER PIPING & TREATING EQUIP.
WASTE INTERCEPTOR
_L_ VACUUM BREAKERS 1)
LAWN SPRINKLER SYSTEM
SEWER NUMBER CLEANOUTS -
CESSPOOL
SEPTIC TANK & PIT
R OOF DRAINS
AUTHORIZED AGENT (OTE1 - -
ISSUANCE FEE $
SIGNATURE OF OWNER (I F OWNER BUILDER) (DATE) TOTAL FEES ,y) .$ Y 1
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. • CASH
INSPECTOR
.- TOTAL-FEES.- -. - -i. ..•,,. - •.-. .. . . t . - .:JI .. SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE) . k. - •-- . . - - '-- .-: - L_L.
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION . CK. M.O. CASH
- .
----.... -.-,.. - .__._._.•____4._.._......- ... •. - ,.-,--,, .-----..
-. . ._...._.....r. .-............ . - .
.
_-.,.-..
. . .
- - ..-.. ._. -.. *..'.--
JON ADDRESS
LEGAL 1 DESCR.
LOT NO.
.
BLK.
.
TRACT
. . . ]SEE ATTACHED SHEET) .
.
.
OWNER MAIL ADDRESS ZIP PHONE
2 /7 .
CONTRACTOR M IL ADDRESS . PHONE STATE LIC. NO.
/7
CITY LIC. NO.
ARCHITECT OR DESIGNER . MAIL ADDRESS PHONE - LICENSE No.'
4 . . -.- ..
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
COMPENSATION INS. CARRIER MAIL ADDRESS . - BR NCH -
USE OF BUILDING 1
8 Class'ofwork: (44EW 0 ADDITION 0 ALTERATION 0 REPAIR
41 .
. .:1te
- PERMIT. FEES' ... .
SWIMMING POOL WIRING;
NO INCREASE IN SERVICE
No.. Each . Fee
SPECIAL CONDITIONS:
.,
NEW CONSTRUCTION, FOR EACH
AMPERES OF MAIN SERVICE, SWITCH
FUSE OR BREAKER ,
•
: APPLICATION ACCEPTED BY: PLANS CHECKED NV: APPROVED FOR-ISSUANCE NV:
DATE NEW SERVICE ON EXISTING BLDG.
FOR EA. AMPERE OF INCREASE
IN MAIN SERVICE, SWITCH, FUSE
.
.•
.,.
. NOTICE
THIS PERMIT BECOMES NULL AND VOID IFWORK OR CONSTRUC- OR BREAKER
.
'TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A •
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM- REMODEL, ALTERATION, NO CHANGE • . . MENCED. IN SERVICE, FOR EA. AMPERE OF
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS INCREASE
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
. . TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE TEMP. SERVICE UP TO AND INCLUD-
PROVISIONS OF ANY OTHER STATE OR LOCAL.LAW REGULATING ING 200 AMP. - CONSTRUCTION OR THE PERFORMANCE. OF CONSTRUCTION. .
, •: /7 TEMP. SERVICE OVER 200 AMP.
PER 100 .
•
SIGNATURE OF C.NTRACTOR OR AUTHORIZED AGENT / IDA I . R7 ISSUANCE FEE
.
S
:ELEC1R1CA1 PERMIT; APRLICATIQN,..,.
.CitofCARLSBAb:CAüFÔRNIA92OO8 .'
.Applicantto complete numbered spaces only.l, Phone 7291181 Pørmit Nn
INSPECTOR'
FO INSPECTION
PERMIT NO
;i:11;1 c 0
BUILDING
TIME:
DATE:_________
I ELECTRICAL I
REQUEST
INSPECTOR____
OWNER
ADDR
El FOUNDATION
El REINFORCING STEEL
El MASONRY
El GROUT - GUNITE
El FLOOR AND CEILING FRAME
El SHEATHING
El FRAME
El EXTERIOR LATH
El INSULATION
El INTERIOR LATH OR DRYWALL
El FINAL
El TEMPORARY SERVICE
El ELECTRIC UNDERGROUND
El ROUGH ELECTRIC
El POOL BONDING K
El ELECTRIC SERVICE1 )\
El CEILING HEAT 11 /ic ElG.FI
El SMOJ(DTECTOR
1'FINALI
I PLUMBING I
El UNDERGROUND PLUMBING/ j
El UNDERGROUND WATER 4,,)
El ROUGH PLUMBING
El TOP OUT PLUMBING
El SEWER AND /J/CO
El TUB OR SHOJE I PAN
ElGAS TEST 4/
El WATER HEAt
El FINAL
READY FOR INSPECTION: 0 MONDAY 0 TUESDA
SPECIAL INSTRUCTION / I
LAN EOUS
JUM AND DUCTS
BUSTION AIR
El PATIO
El SIGN
El GRADING
El DRIVEWAY
El CONDITIONED AIR SYSTEMS
El REFER PIPING
El FINAL
WEDNESDAY DTHURSDAY 0 FRIDAY
REQUESTED BY CQ2AJ, -11k PHONE NO.
PERSON TAKING REPORT_(L
REQUEST FOR INSPECTION TIME:_________
INSPEcTO - \ VY PERMIT NO._______________ DATE:
OWNER
ADD
BUILDING
El FOUNDATION
El REINFORCING STEEL
El MASONRY
ElGROUT - GUNITE
El FLOOR AND CEILING FRAME
El SHEATHING
El FRAME
El EXTERIOR LATH
El INSULATION
El INTERIOR LATH OR DRYWALL
El FINAL
I PLUMBING I
El UNDERGROUND PLUMBING
El UNDERGROUND WATER
El ROUGH PLUMBING
El TOP OUT PLUMBING
El SEWER AND PL/CO
El TUB OR SHOWER PAN
El GAS TEST
Cl WATER HEATER
El FINAL
I \ELECTRICAL I
El TEMPORARY SERVICE
El ELECTRIC UNDERGROUND
ROUG HETfI
El POOL BONDING
ELECTRIC SERVICE
El CEILING HEAT
0/(El
El G.F.I.
El SMOKE DETECTOR
El FINAL
I MISCELLANEOUS I
El PLENUM AND DUCTS
El COMBUSTION AIR
El PATIO
El SIGN
El GRADING
El DRIVEWAY
El CONDITIONED AIR SYSTEMS
El REFER PIPING
El FINAL
READY FOR INSPECTION: 0 MONDAY
A.M.
P.M.
SPECIAL INSTRUCTIONS
REQUESTED BY________
0 TUESDAY 0 WEDNESDAY
PHONE NO.________________
PERSON TAKING REPORT________________
REQUEST FOR INSPECTION TIME:_________
INSPECTOR___________________ PERMIT NO._____________ DATE:____________
OWNER
I ELECTRICAL 1
El TEMPORARY SERVICE
El ELECTRIC UNDERGROUND
El ROUGH ELECTRIC
POOL BONDING
El ELECTRIC SERVICE
El CEILING HEAT
El G.F.I.
El SMOKE DETECTOR
El FINAL
ADDR
BUILDING
El FOUNDATION
REINFORCING STEEL
El MASONRY
El GROUT - GUNITE
El FLOOR AND CEILING FRAME
El SHEATHING
El FRAME
El EXTERIOR LATH
El INSULATION
El INTERIOR LATH OR DRYWALL
El FINAL
PLUMBING
El UNDERGROUND PLUMBING
El UNDERGROUND WATER
El ROUGH PLUMBING
El TOP OUT PLUMBING
El SEWER AND PL/CO
El TUB OR SHOWER PAN
El GAS TEST
El WATER HEATER
El FINAL
MISCELLANEOUS
El PLENUM AND DUCTS
El COMBUSTION AIR
El PATIO
El SIGN
El GRADING
El DRIVEWAY
El CONDITIONED AIR SYSTEMS
El REFER PIPING
El FINAL
READY FOR INSPECTION o MONDAY OTUESDAY OWEDNESDAY THURSDAY 0 FRIDAY
A.M.
P.M.
SPECIAL INSTRUCTIONS
REQUESTED BY PHONE NO._4
PERSON TAKING REPORT__________________
REQUEST FOR/4NSPE ION TIME:
INSPECTOF____________________ PERMIT NO DATE:
OWNER
BUILDING
El FOUNDATION
El REINFORCING STEEL
El MASONRY
El GROUT - GUNITE
El FLOOR AND CEILING FRAME
El SHEATHING
El FRAME
El EXTERIOR LATH
El INSULATION
El INTERIOR LATH OR DRYWALL
El FINAL
PLUMBING - -
El UNDERGROUND PLUMBING
El UNDERGROUND WATER
El ROUGH PLUMBING
El TOP OUT PLUMBING
El SEWER AND PL/CO
El TUB OR SHOWER PAN
GAS TEST
El WATER HEATER
El FINAL
I ELECTRICAL I
El TEMPORARY SERVICE
El ELECTRIC UNDERGROUND
El ROUGH ELECTRIC
El POOL BONDING
El ELECTRIC SERVICE 7l
El CEILING HEAT
,f 7 El G.F.I.
El SMOKE DETECTOR
El FINAL
MISCELLANEOUS
El PLENUM AND DUCTS
El COMBUSTION AIR
El PATIO
El SIGN
El GRADING
El DRIVEWAY
El CONDITIONED AIR SYSTEMS
El REFER PIPING
El FINAL
READY FOR INSPECTION: 0 MONDAY DTUESDAY )WEDNESDAY 0 THURSDAY 0 FRIDAY
0 A.M.
SPECIAL INSTRUCTIONSi ¶
REQUESTED BY PHONE NO.
PERSON TAKING REPORT
9- PW INTERDEPARTMENTAL INFORMATION SHEET RECEIVED
BUILDING DEPARTMENT DATE: i17B
V -
BUILDING ADDRESS: 2'77
ilding Department
PLANNING DEPARTMENT
ZONE LOT SIZE LOT WIDTH____________________
UNITS ALLOWED UNITS PROVIDED___________________________
PARKING SPACES REQUIRED PROVIDED________________________
% COVERAGE ALLOWED PROVIDED
BUILDING HEIGHT ALLOWED PROVIDED
FRONT SETBACK: SIDE SETBACK: REAR SETBACK:
ALLOWED
PROVIDED_______________
INTRUSIONS
LANDSCAPE & IRRIGATION PLAN COMMENTS:
ENVIRONMENTAL PROTECTION REQ:
ADDITIONAL COMMENTS:
OK TO ISSUE: DATE OK TO FINAL DATE__________
ENGINEERING DEPARTMENT
R.O.W. - INDUSTRIAL WASTE IMPROVEMENTS_______________
SEWER CONNECTION DRIVEWAY LOCATIONS .-_--
GRADING PERMIT ' EASEMENTS DRAINAGE_________
LEGAL DESCRIPTION
ADDITIONAL COMMENTS_________________________________________________________
OK TO ISSUE: ______ DATE /--/--7 PWI OK TO FINAL DATE_______
FIRE DEPARTMENT
SPRINKLING SYSTEM -
KIRE ALARMS
FIRE HYDRANTS______
ADDITIONAL COMMENTS
__FIRE PROTECTION EQUIP.
EXITS___________________
LOCATION
OK TO ISSUE: DATE OK TO FINAL DATE
"WATER DEPARTMENT
REQUIREMENTS OF APPROPRIATE DISTRICTS MET DATE