Loading...
HomeMy WebLinkAbout2774 GATEWAY RD; 100; CB101742; Permit10-27-2010 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB101742 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2774 GATEWAY RD CBAD St: 100 Tl Sub Type: INDUST 2133000600 Lot#: 0 Status: $31,500.00 Construction Type: 5B Applied: Reference #: Entered By: AXIS FINANCIAL-EXPAND INTO STE Plan Approved: 101-900 SF Tl- OFFICE TO OFFICE -BUSINESS TO REMAIN AS Issued: Inspect Area: Plan Check#: Applicant: Qvynej': JOHNSON & JENNINGS O AS SPECTRUM L L C SUITE 1600 C/OSTEVEOAS 225 BROADWAY 2231 RUTHERFORD RD SAN DIEGO, CA 92101 CARLSBAD CA 92008 8586231100 ISSUED 09/21/2010 RMA 10/27/2010 10/27/2010 Building Permit Add'l Building Permit Fee Plan: Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedited Plan Review $300.30 Meter Size $0.00 Add'l Reel. Water Con. Fee $195.20 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $6,62 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees $1.00 HMP Fee $227.50 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $20.00 $24.00 $0.00 $0.00 $0.00 $0.00 $774.62 Total Fees:$774.62 Total Payments To Date:$774.62 Balance Due:$0.00 . .Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. c | T Y o F CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 760-602-2717 / 2718 / 2719 Fax 760-602-8558 www.carlsbadca.gov Plan Check No. Est. Value Plan Ck. Deposit DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) CONTACT NAME (If Different Fom Applicant) 1^1® AU&tehc.. tor* (Sec. 7u31.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires theapplicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of theBusiness and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to acivil penalty of not more than five hundred dollars ($500)). Workers' Compensation Declaration: / ftereoy affirm under penalty of perjury one of the following declarations: \ IJ have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.-' jr i£l I have and will maintain workers' compensation, as requijjd bisection 3700 pfttreLabor (jDde, for the performance, ofjie^jjprk fojjjjhjsh^tbij pe,rmjl%isj£su£di. My workers' compensa8pn|insura)ice carrier ' number are: Insurance Co Policy No Expiration Date policy This section need not be completed if the permit is for one hundred dollars ($100) or less. I I Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (8,100,000), in addition to the cost of compensation, damages asj^vjdjrtftourf Section 3706 of the Labor code, interest and attorney's fees. >£f CONTRACTOR SIGNATURE ^*XJ ^&S ^<-^ „ Q AGENT DATE /$/ I hereby affirm that I am exempt from Contractor's License Law for the following reason: | | I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractorfs) licensed pursuant to the Contractor's License Law). I | I am exempt under Section _.Business and Professions Code for this reason: 1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. QYes I Ihto 2.1 (have / have not) signed an application for a building permit for the proposed work. 3.1 have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number): 4,1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors' license number): 5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): ^PROPERTY OWNER SIGNATURE AGENT DATE Is the applicant or future building occupant required to submit a businererj|an(.Iacutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? I I Yes J^No Is the applicant or future building occupant required to obtain a permit from the air pollution controldjstrict or airouaUtv management district? I lYes Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? PHYes IF ANY OF THE ANSWERS ARE YES,/ EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPI RATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such pemit is not commenced within 180 days from the date of such permit orifttieJpujlajnc^woijreuthorize^tJy^ich permit is suspended or abandoned at any t me after the work is commenced for a penpflof 180 days^ection 106.4.4 Uniform Building Code). ^APPLICANT'S SIGNATURE / S// / / _. ** "1 DATE City of Carlsbad Bldg Inspection Request For: 12/08/2010 Permit* CB101742 Title: AXIS FINANCIAL-EXPAND INTO STE Inspector Assignment: MC Description: 101-900 SF Tl- OFFICE TO OFFICE -BUSINESS TO REMAIN AS SUITE 100 Type:TI Sub Type: INDUST Job Address: 2774 GATEWAY RD Suite: 100 Lot: 0 Location: APPLICANT JOHNSON & JENNINGS Owner: O A S SPECTRUM L L C Remarks: A m please Phone: 61929250300R20 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: GREG Entered By: CHRISTINE Act Comments Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# Inspection History Date Description 12/06/2010 89 Final Combo 11/29/2010 14 Frame/Steel/Bolting/Welding 11/29/2010 24 Rough/Topout 11/29/2010 34 Rough Electric 11/29/2010 44 Rough/Ducts/Dampers 11/15/2010 17 Interior Lath/Drywall 11/09/2010 14 Frame/Steel/Bolting/Welding 11/09/2010 34 Rough Electric Act Insp Comments CO MC AP TP AP AP AP AP PA PA TP TP TP MC MC MC COMPLETE ALL WORK, PROVIDE ACCESS TO EQUIP T-CLNG CLNG LITES DUCTS, HP UNIT FURR WALLS @ RM 127 ONLY FURR WALLS ONLY RM 127 AT FURR WALLS ONLY RM 127 City of Carlsbad Final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check #: Permit*: Project Name: Address: Contact Person: Sewer Dist: Date:12/08/2010 CB101742 AXIS FINANCIAL-EXPAND INTO STE 101-900 SF Tl- OFFICE TO OFFICE -BUSINESS TO REM 2774 GATEWAY RD #100 Lot: GREG Phone: 6192925030OR 2 CA Water Dist: CA Permit Type: Tl Sub Type: INDUST Inspected^ Date By: (A_AJin/\ ^inspected: Inspected X Date By: Inspected: Inspected Date By: Inspected: G / \D I®Approved: . Approved: .Approved: Disapproved: Disapproved: Disapproved: Comments: EsGil Corporation In (Partnership with government for (Building Safety DATE: 10/20/10 JURISDICTION: City of Carlsbad a FILE PLAN CHECK NO.: 10-1742 SET: II PROJECT ADDRESS: 2774 Gateway Rd Suite 100 PROJECT NAME: Axis Financial - TI X] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant' contact person. The applicant's copy of the check list has been sent to: XI Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person REMARKS: By: Doug Moody Enclosures: EsGil Corporation D GA D EJ D PC 10/13/10 9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 * (858)560-1468 * Fax (858) 560-1576 EsGil Corporation In Partnership with government for (Buiftfing Safety DATE: 9/30/10 O^APPtlQANT _ JURISDICTION: City of Carlsbad a PLAN REVIEWER a FILE PLAN CHECK NO.: 10-1742 SET: I PROJECT ADDRESS: 2774 Gateway Rd Suite 100 PROJECT NAME: Axis Financial - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. XI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. XI The applicant's copy of the check list has been sent to: Ware Malcomb / Tiffany English 6363 Greenwich Dr Suite 175, San Diego, CA 92122 Esgil Corporation staff did not advise the applicant that the plan check has been completed. XI' Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Tiffany English Telephone #: 858-638-7277 Date contacted: ^feo/ro (by: t^) Fax #: 949-788-4002 Mail Telephone./ Fax *^ In Person REMARKS: By: Doug Moody Enclosures: EsGil Corporation D GA D EJ D PC 9/23/10 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858)560-1468 * Fax (858) 560-1576 City of Carlsbad 9/30/10 10-1742 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 10-1742 OCCUPANCY: B TYPE OF CONSTRUCTION: VB ALLOWABLE FLOOR AREA: SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 9/21/10 DATE INITIAL PLAN REVIEW COMPLETED: 9/30/10 JURISDICTION: City of Carlsbad USE: Office ACTUAL AREA: 900sf STORIES: 2 HEIGHT: OCCUPANT LOAD: 9 DATE PLANS RECEIVED BY ESGIL CORPORATION: 9/23/10 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2007 CBC, which adopts the 2006 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2006 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad 10-1742 9/30/10 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Please clarify the section view of the new soffits 5 on A4.2. Show: a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approved". b) Method of attaching top to the structure and lateral bracing. c) Show height of the soffit from floor, soffit to roof framing or floor framing. 2. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.3 for the window adjacent to the new door d) Fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door in a closed position. And where the bottom exposed edge of the glazing is less than 60 inches above the walking surface. 3. Please note in the general wiring notes on the plans "AC Cable is not allowed in A, B, E, H, F, M, S and I occupancies. NM cable is restricted (without City approval) to one and two family dwellings. Note on plans that an equipment ground conductor is to be installed in all flexible conduits" 4. Please complete the LTG-1-C part 3 of 4 mandatory automatic controls portion of the LTG-1-C forms. 5. Please have the principle designer check the appropriate box(s) and complete the Statement of Compliance System Acceptance section of the LTG-1-C part 4 of 4 documents. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. City of Carlsbad 10-1742 9/30/10 Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes Q No Q The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 10-1742 9/30/10 [DO NOT PAY- THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 10-1742 PREPARED BY: Doug Moody DATE: 9/30/10 BUILDING ADDRESS: 2774 Gateway Rd Suite 100 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING II AREA PORTION ( Sq. Ft.) Tl Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code 900 cb Valuation Multiplier 34.37 By Ordinance Reg. Mod. VALUE ($) 30,933 30,933 Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: Repetitive FeeRepeats Complete Review D Other r-1 Hourly EsGil Fee Structural Only Hr. @* $293.73 $190.92 $164.49 Comments: Sheet 1 of 1 macvalue.doc + PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB ADDRESS DATE RESIDENTIAL TENANT IMPROVEMENT RESIDENTIAL ADDITION MINOR « $17,000.00) OTHER PLAZA CAMINO REAL CARLSBAD COMPANY STORES VILLAGE FAIRE COMPLETE OFFICE BUILDING PLANNER ENGINEER DATE DATE Docs/Misforms/Piannlng Engineering Approvals PLANNING/ENGINEERING APPROVALS PERMIT NUMBER cb101742 DATE 9/22/10 ADDRESS 2774 GATEWAY RD RESIDENTIAL ADDITION- POOL/SPA MINOR (<17,000.00) TENANT IMPROVEMENT RETAINING WALL COMPLETE OFFICE BUILDING VILLAGE FAIRE OTHER ROOF MOUNTED EQUIPMENT POLICY SHOWN ON SHEET A0.2 PLANNER GINA RUIZ DATE 9/22/10 ENGINEER DATE H:\ADMIN\COraTER/PlANMNG/ENGINEERING APPROVALS TITLE-24 AXIS FINANCIAL OFFICE AREA T.I. 2774 GATEWAY CARLSBAD, CA 92009 BTA Engineers, Inc. Mechanical Plumbing Energy Consultants 5125 Convoy Street, Suite 212 San Diego, CA 92111 858-715-6601 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST Project Name: AXIS FINANCIAL T.I. D Project Address: 2TI4 GATEWAY. CARLSBAD. CA (Page 1 of 5) ate: SEPT-&-2010 General Information MECH-1C Climate Zone: CAZONE*! Conditioned Floor Area: y\0 5QFT. Building Type: [x] Nonresidential Q High-Rise Residential Q Hotel/Motel Guest Room Q Schools (Public School) Q Relocatable Public School Bldg. RJ Conditioned Spaces ^Unconditioned Spaces Phase of Construction: Q New Construction Approach of Compliance: RJComponent Front Orientation: N, E, S, W or in Degrees: | N HVAC SYSTEM DETAILS 2Equipment item or System Tags (i.e.AC-1,RTU-1,HP-1) Equipment Type4: No of Systems Max Allowed Heating Capacity Minimum Heating Efficiency Max Allowed Cooling Capacity Cooling Efficiency Duct Location/ R-Value Duct Leakage Testing - If Yes, a MECH-4A must be submitted Economizer Thermostat Fan Control Equipment2 item or System Tags (i.e.AC-1,RTU-1,HP-1) Equipment Type : No of Systems Max Allowed Heating Capacity Minimum Heating Efficiency Max Allowed Cooling Capacity Cooling Efficiency Duct Location/ R- Value Duct Leakage Testing - If Yes, a MECH-4A must be submitted tconomizer I nermostat ran uomroi PI Addition [%| Alteration |~| Overall Envelope TDV Energy r1 Unconditioned (file •• affidavit) Inspection Criteria FC-I/CU-I UNIT HP-SPLIT 1 • 39,500 BTUH 3HSPF 38,000 BTUH. 13 SEER « — -- Y Y Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Special Feature1 D nnnnnnn n nnn Pass D P D D D D D D nn rj Fail - Describe Reasons D nnnnnn D n nnn FIELD INSPECTION ENERGY CHECKLIST Special Feature1 n nnnnnaa a an n Pass n nnnn nnn D nnn Fail - Describe Reason 3 n nnnnn Dn n nnn 1. indicate special feature DETAILS on Page 2 of the Inspection Checklist Form. 2. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsiUe party shall resubmit energy comp liance to include the new changes. 3. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. 4. Indicate Equipment Type: Gas(Pkg or, Split), VAV, HP (Pkg or split), Hy dronic, PTAC, or other » BASED ON COOLING LOAD 2008 Nonresidential Compliance Forms August 2009 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Page 2 of s) Project Name: AXIS FINANCIAL TJ. MECH-1C Date: SEFT-&-20I0 SPECIAL FEATURES INSPECTION CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted N/A Discrepancies: 2008 Nonresidential Compliance Forms August 2009 Om o 0 (0 OUJ Xo orr UJz UJ SPEa UJ •o CO UJo OOu.O UJ O tcUJo K c 55 wgillC m t *•••£ ° TO .a§> TO •« £ *"b I 8,<0 HisG '3 2 ^> s »JU £ *-5;§ 111! llil*="Jos=8:0)0)2 • - -^ 8 s"H^I j° isM^•9> co 1» £ § I 1 -H* §>••§<*>~> -Q Q. »J9j to '?: y•Q <b 9 Q) ttig§-c?-§ Q) N. O) (O g>| .O 0)ll ill»_ CO •fc- O -C 03 o 111- 4M "^ ^^M TO wC -C <l>821 5 i 11 §mm CL t *•* o a-g «« g a e| f g I S TO $=-•8 1 II isllt iiili TO » S g- ^aj O) 9 •§ 1^ .5 tj CL 55 •? S S> fe fe:i ^=6 °:§ §=§ $ Q- W "- So> 4s w i > 5 «* CO cd ^ "co "^izerlsEco§*& g-IIli•* en o o o i1 I o>_c ICC B 2.9--= UJ nan nan an I ana aaa aaaaaa aaaaa aaa aaa aaaaa aaa aa aa aaaa aa aa aaaaa a a aaa aa aa aaaaaa > i i i i i > o T"1 Cu s , — . tf)•5 •cR ~-" |- Zj 0 UJ o ooc UJ UJ 2 O 5UJ0. CO Q_J LU E •Dc(0 UJJ L D U. O *E E UJo ifj ID 1 1^E<D £ a P o 3 % •»• _4\ 1 • in ioUJS $v—\ o JU ^ni Ju J -r~ ± u 5 I 5CO enD >, ED « 1g tS. I g UJ in | § S. <5 2 a>£?TJ w yiif<l .2 PQ w iS 3 O(B 08 •= mM _* 0) ?"" C S £0 ° '-c 18•s '-S " N= S i <*5 to 9> 3•g o .2 **•^ o * -1 1 ll|g a S 5 "5 o>c•gg.0)0) O) §•a: .0-3 C3" UJ •1 | ri 1j c t I a n a a — — 3 3 {J a a n n a a a n a a a a a a n n a _ n n a a D a n a n a n a n a a ^* a n n a a a — ^* n a — n a n a a a a a a n a D a a n n a a a a a a a a a a n D a n a n a a a a a a n D a a n a a n n a a a a a a a a p p p p ! > i 3- 3 > 5j CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 5 of 5)MECH-1C Project Name: AXIS FINANCIAL TJ. Date: SEFT-I5-20I0 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name: TOMQ.LE Signati Company: BTA 3, INC. Date: SEFM&-20I0 Address: 505 CONVOY STREET, SUITE 2I2 irAppIicabie CEA# CEPE# City/State/Zip SAN PIE60, CA 92III Phone: 858-115-6601 Principal Mechanical Designer's Declaration Statement I am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. This Certificate of Compliance identifies the mechanical features and performance specifications required for complance with Title 24, Parts 1 and 6 of the California Code of Regulations. The design features represented on the Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name:Signature: CONVOY ST !/Zip SAN PIEQO. CA 32III Dale: 5EPT-I5-2010 License # 858-115-6601 Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures Mil? MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2008 Nonresidential Manual Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. MECH-1C Certificate of Compliance, Required on plans for all submittals. MECH-2C Mechanical Equipment Summary is required for all submittals. MECH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. MECH-4C Pan Power Consumption is required when for all prescriptive submittals. 2008 Nonresidential Compliance Forms August 2009 AIR SYSTEM REQUIREMENTS (Page 1 of 3) MECH-2C PROJECT NAME:AXIS FINANCIAL TJ. Item or System Tags (i.e. AC-1.RTU-1.HP-1) No. of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC or Heat Pump Thermostats Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Design Heating Load Calculated Design Cooling Load Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat and Cool Air Supply Reset Electric Resistance Heating1 Heat Rejection System Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted DATE: SEFT-I5-20I0 Indicate Air Systems Type (Central, Single Zone, Package, VAV or etc...) T-24 Sections 112(a) 112{a) 112(b), 112(c) 112(c), 115(a) 121(b) 121 (b) 121(c) 121(c) 122(e) 122(e) 122(f) 122(0) 123 124 FC-I/CU-I I Indicate Page Reference on the Plans or Schedule list or list information below 9H8FF 13 SEER Y — mm BOM/PERSON ~ . Y Y Y -• mm mm 144(a&b) 144(a&b) 144(c) 144(c) 144(c) 144(d) 144(e) 144(f) 144(fl) 144(h) 144 (i) 144(k) 25,481 BUM 38£00 BTUR — — ~ Y Y ~ — -- . •- 1. Total installed capacity (MBtu/h) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps, if electric heat is used explain which exceptions) to Sec. 114(g)apply. 2008 Nonresldential Compliance Forms August 2009 CCNi•T"JL U « n "i CM O)1 *• n u | WATER SIDE SYSTEM REQUIREMs JD fc 35 LU Q IKHUJbUI NAME:AXIS FINANCIAL Tl& o 18gl !I$ .0h- 11-CO CO855 'V ISI ^ri CO T£^IPSLo CO ,_• O QL ~ rb CC 6 0) $ to Q) /> o 6 .O 1 £ at EC C 8 P} •9J cr §> QL! (D 0 1 cn| Q> CO ^1 MANDATORY MEASURES^ ^ 1LU c Q. CTLU ^ c3 1 Pipe InsulationEC V) u LU I • » Ur0. ^ j^_x ofi <55-5 CO 21 COLL ^ ° 5ooO £ ^.5 CO 2 C§ o LL 1 O) 1 O £g £. 5 1 Variable Flow System Design^ ^335 1 Chiller and Boiler Isolation£ cs> 5 1 oO 0) cr i T3CCO § — fI <3 ?1 WLHP Isolation Valves£ -=3 ? Q. in Aa. Q. 0. § O 5Xo o Q 1 1 c: 1 11 1| §• ^a -.§ S^c § 8 •'p 1 1 k ^^ § ^^ ^ J € ell I g 8 ^ co §5 ^ 9 ^ c| 1 la ^ -r- -S |.s| CO ^ J- *i S 8 il I -II (Q & •£ S w ^ ?i"l 1 «i 1 |l •^ ui *"** S3 g s.2 ''^ -S 8~ c "i Q 0)DP Sensor Location7. The Proposed equipment need to match the building2. For each chiller, cooling tower, boiler, and hydronic 1required features are documented. If a requirement i1 o O CNI Ou 1 1 ~ 0) UJ UJ OC D UJ OC <£ Q.» Oo0. 08 OCUJ MH 1 SERVICE HOT WA1 1 1 ibn ^Q | E5 j> < 5j f oc n8 nf i •«•» :t X 1 U) i at ^-?. i* il& ^^ i aj • I Df Systems6 CM r CO COC ro o 1<n•f <5! S 1 •t « g V)UJ OC3 MANDATORY MEASOCjj 1 B 11 X.UJCO i •JJ CO :- ^•B Certified Water Heateri CO ^~Water heater Efficiencyi CO * .g m Service Water Heating InstI COCM *Pipe InsulationCO 0 a. I .2.ControlTJ (C 5- 0) 'o £ to T3 1 i ft O) 10) O) (0 (00)cc u•c8 UJ CO T3 to 8Q. I ^-Pool and Spa InstallationI ,0. ID O) "_J E 0 i 0)tod> 1a. i in JZ.g> $ a. i 8.CO I a 1 Pipe Insulationi 1 | §>! *0 "Qm C •c .9 i § C ^9 8 S. 11 "^ C^r ^ ? 5 H § •Sf g> |1 c § .<2 qj 1 J=a, -ons. If a requiluipment) fill irto * i | w" ^2^ ^ w ^ f t-tf a ^ §• jj. O Cff •S O «M the building pmestic wateruirement is noIII C C "1e 5 & III 1: The Proposed equipment n2: For each water heater, poorequired features are documeI M U. 1 cr O UJ IDi LU Q S UJ 11DC z OLU CO I LUoc CVJ &3CO COI z 1_ o LU CO CO < £"S3 .t §< O) CO E (D cQ 1 o •* d X CO >— r~ .2" o S| 2 O < x UJ i_ O « 2 § C ^ co 02. o (U <]> o 'S in 10 m m in in in m m in in O)•55 £ c 3 tsBasbe<M DeCO ftaI islumn%£ i| !i:i !5 &1 5|AitoTraor eI I1 FAN POWER CONSUMPTION MECH-4C PROJECT NAME: AXIS FINANCIAL TJ. DATE: SEPT-I&-20I0 NOTE: Provide one copy of this worksheet for each fan system with a total fan system greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach, see Power Consumption of fans Sec. 144 (c) A FAN DESCRIPTION N/A B DESIGN BRAKE HP 125 HP. C D EFFICIENCY MOTOR DRIVE E NUMBER OF FANS F PEAK WATTS B x E x 746 / (CxD) Totals and Adjustments FILTER PRESSURE ADJUSTMENT Equation 1 44-A in Sec. 1 44(c) of the Energy Standards \) If filter pressure drop (SPa) is greater than 1 inch W.C. or 245 Pascal than enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. B) Calculate Fan Adjustment and enter on line 6. C) Calculate Adjusted Fan Power Index and enter on Row 7 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUMN F) 2) SUPPLY DESIGN AIRFLOW (CFM) 3) TOTAL FAN SYSTEM POWER INDEX (Row 1/ Row 2)1 4) SPa 5) SPf 6) Fan Adjustment = 1 -(SPa -1 )/ SPf 7) ADJUSTED FAN POWEE INDEX (Line 3 x Line 6) 1 W/CFM W/CFM /. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not be exceed 0.8 w/cfm for Constant Volume systems or 1.25 w/cfm for VAV systems. 2000 Nonresidential Comollance Forms Auaust2009 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY UPFP* HV# BP DATE The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. 5. Organic Peroxides 9. 6. Oxidizers 10. 7. Pyrophorics 11. 8. Unstable Reactives 12. 1. Explosive or Blasting Agents 2. Compressed Gases 3. Flammable/Combustible Liquids 4. Flammable Solids Water Reactives Cryogenics Highly Toxic or Toxic Materials Radioactives 13. Corrosives 14. Other Health Hazards 15. None of These. PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 1255 Imperial Avenue, 3'° floor, San Diego, CA 92101. Call (619) 338-2222 prior to the issuance of a building permit. FEES ARE REQUIRED. Expected Date of Occupancy: / /_ YES D1. D ;8L Is your business listed on the reverse side of this form? (check all that apply). 2. D SC Will your business dispose of Hazardous Substances or Medical Waste in any amount? 3. D 52" Will your business store or handle Hazardous Substances in quantities equal to or greater than '^ 55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity? 4. D ]j3k Will your business use an existing or install an underground storage tank? 5. D "^ Will your business store or handle Regulated Substances (CalARP)? 6. D fJf Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? D CalARP Exempt Date Initials D CalARP Required Date Initials D CalARP Complete Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 3 or 4 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information. YES 1. D 2. D 3. D 4. D Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at http://www.sdapcd.org/info/facts/permits.pdf. and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? (Public and private schools may be found after search of the California School Directory at http://www.cde.ca.gov/re/sd/: or contact the appropriate school district). Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? Will there be demolition involving the removal of a load supporting structural member? Briefly describe business activities:Briefly describe proposed project: irjury that to the best of my knowledge and beliaftbe de herein are true and correct. Nanjleofc r Authorized Agent >f Owner or Authorized Agent Date FOR OFFICIAL USE ONLY:FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:, BY:DATE: EXEMPT OR NO FURTHER INFORMATION REQUIRED COUNTY-HMD APCD RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY COUNTY-HMD APCD RELEASED FOR OCCUPANCY COUNTY-HMD APCD HM-9171 (04/07)County of San Diego - DEH - Hazardous Materials Division JOHNSON & JENNINGS GENERAL CONTRACTING October 26, 2010 J&J Ref #: 3608-B CITY OF CARLSBAD 1635 Faraday Ave Carlsbad, CA 92008 RE: Building Permit for Axis Financial Phase II To Whom It May Concern: Please be advised that Johnson & Jennings, Inc. hereby authorizes Tiffany English with Ware Malcomb Architects to act as an agent for Johnson & Jennings, Inc. when completing permit applications requirements and obtaining permit documents on behalf of our company. The following information is listed for your use: Contractor's State License: 438867, Class Bl, Exp. 04/30/11 Worker's Comp. Policy: Zurich American Insurance Co. Ins. #WC594591701 Exp. 01/01/2011 Sincerely, JOHNSON & JENNINGS, INC. ^ VliA^oyi/^L^ rit— Naomi Lohnes Chief Financial Officer 6165 GREENWICH DRIVE • SUITE 180 • SAN DIEGO, CALIFORNIA 92122 • TEL 858.623.1 100 • FAX 858.623.1 108 • LIC. #438867 • www.johnsonandjennings.com 'ACORff CERTIFICATE OF LIABILITY INSURANCE PRODUCER OA99520 1-619-234-6848 Cavignac & Associates 450 B Street, Suite 1800 San Diego, CA 92101-8005 certif icatesgcaviqnac . com INSURED Johnson £ Jennings, Inc. 6165 Greenwich Dr. #180 San Diego, CA 92122 1 DATE (MM/DD/YYYY) 05/03/10 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE INSURER A: ZURICH AMERICAN INS CO INSURER B: AMERICAN GUAR 6 LIAB INS INSURER C: INSURER D: INSURER E: NAIC # 16535 26247 COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSLTR A A B A ADDNSR X X TYPE OF INSURANCE GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY 1 CLAIMS MADE | X | OCCUR X Separation of Insures X $5,000 Prop Damage De GEN'L AGGREGATE LIMIT APPLIES PER 1 POLICY fxl ?£& | 1 LOG AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON-OWNED AUTOS GARAGE LIABILITY ANY AUTO EXCESS / UMBRELLA LIABILITY X 1 OCCUR 1 1 CLAIMS MADE DEDUCTIBLE X 1 RETENTION $ -0- WORKERS COMPENSATION AND EMPLOYERS' LIABILITY y/N ANY PROPRIETOR/PARTNER/EXECUTIVE I 1OFFICER/MEMBER EXCLUDED? Mandatory in NH) ' ' f yes, describe underSPECIAL PROVISIONS below OTHER POLICY NUMBER GLA925947903 GLA925947903 AUC925947203 C594591701 POLICY EFFECTIVEDATE (MM/DD/YYYY 04/30/10 04/30/10 04/30/10 01/01/10 POLICYEXPIRATIODATE (MM/DD/YYYY1 04/30/11 04/30/11 04/30/11 01/01/11 LIMITS EACH OCCURRENCE DAMAGE TO RENTED PREMISES (Ea occurrence) MED EXP (Any one person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OP AGG COMBINED SINGLE LIMIT(Ea accident) BODILY INJURY (Per person) BODILY INJURY(Per accident) PROPERTY DAMAGE (Per accident) AUTO ONLY - EA ACCIDENT OTHER THAN AUTO ONLY: EAACC AGG EACH OCCURRENCE AGGREGATE v 1 WCSTATU-* 1 TORY LIMITS OTH-ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE .L. DISEASE - POLICY LIMIT $ 1,000,000 $ 300,000 S 10,000 $ 1,000,000 S 2,000,000 $ 2,000,000 S 1,000,000 $ S $ S S $ I 5,000,000 $ 5,000,000 ; i ; 1,000,000 1,000,000 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS le: All Operations at the City of San Diego Civic Center Plaza, 'he City of San Diego; JP Morgan Trust Bank, N.A., acting as ancillary executor of the Estate of Edwin S. Lowe; Civic Center Associates, LLC and CB Richard Ellis are named as additional insureds as respects general liability and auto liability per policy forms. Waiver of subrogation applies to general liability and auto liability per policy forms. CERTIFICATE HOLDER , CANCELLATION *lo days NOC for non-payment of premium. City of San Diego Attn: Purchasing & Contracting Dept. 1200 Third Ave., Suite 200 San Diego, CA 92101-4195 USA SHOULD ANY OFTHE ABOVE DESCRIBED POLICIES BE CAN DATEJHEREOF, THE ISSUING INSURER WILL ENBKKXXX NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEF W^BX»X«X»HmK«KJH«^^ KdHHeSKKWWBSXXXXXXXXXXXXXXXXXXXXXXXX CELL ww T.K KlXK XXX ED BEFORE THE EXPIRATION AIL 30* DAYS WRITTEN lOfXKyaaaK^agff^aexKX BaiJaUHS^rtKXKSHSSKKX xxxxxxxxxxxxxxxxxxx; AUTHORIZED REPRESENTATIVE j^"L ACORD 25 (2009/01) Katherine 15541025 © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD n o o 4-n n I! < 0