HomeMy WebLinkAbout2778 CARLSBAD BLVD; 208; CB030102; Permit05-14-2003
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/14/2003
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB030102
Building Inspection Request Line (760) 602-2725
2778 CARLSBAD BL CBAD
RESDNTL
$3,013,511.00
Sub Type:
Lot#:
Construction Type:
Reference #:
19 Structure Type:
42 Bathrooms:
VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
CONDO
0
V1
CT010010
MF5+
47
Applicant:
ANASTASI CONSTRUCTION
1200 AVI ATIONBLVD
REDONDO BEACH CA
902278
310-376-8077
CO
Owner:
Status: ISSUED
Applied: 10/21/2002
Entered By: SB
Plan Approved:
Issued: 05/14/2003
Inspect Area:
Orig PC#: PC02-50
Plan Check*:
5140 05/14/03 0002 01
CGP
02
306753-60
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
8TD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$7,132.95 Meter Size
$0.00 Add'l Red. Water Con. Fee
$4,636.42 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$301.35 PFF
$46,265.00 PFF (CFD Fund)
$0.00 License Tax
$0.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$45,600.00 Housing In Lieu Fee
D5/8 Housing Credit Fee
$0.00 Master Drainage Fee
$0.00 Sewer Fee
Additional Fee*
TOTAL PERMIT FEES
$0.00
$2,660.00
$38,076.00
$0.00
$54,845.90
$50,626.98
$0.00
$0.00
$6,858.24
$7,733.76
$0.00
$1,687.00
$510.00
$680.00
$0.00
$0.00
$0.00
$0.00
$39,140.00
$0.00
$306,753.60
Total Fees: $306,753.60 Total Payments To Date;$0.00 Balance Due: $306,753.60
Inspector:
FINAL APP
Date:Clearance'
NOTICE: Please take NOTICE tharapproval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020{a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
ises/exactiona ol which voa have previously been given a NOTICE similar to this, or as to which ttie statute ol limitations has previously otherwise expired.
City if Carlsbad
Final Building Inspection
Dept: Building Engineering^ PI
Plan Check #:
Permit*: CB030102
Project Name: VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
St Lite Fire
Date: 09/22/2004
Permit Type: RESDNTL
Sub Type: CONDO
Address: 2778 CARLSBAD BL Lot: 0
Contact Person: Phone:
Sewer Dist: CA Water Dist: CA
Inspected^ . . f
By: \ JJJjVlfa
Inspected
By:
Inspected
By:
Comments: Kf /
•%
..Date / /
jL#dtcLjv>^J Inspected: lO/f j (^ Approved: I/
Date
Inspected: Approved:
Date
Inspected: Approved:
~**LJ^*** rv\, i Xo f\^A^c, 1
Disapproved:
Disapproved:
Disapproved:
4 ^tUAtUUL
City if Carlsbad
final Building Insnection
SEP 2 2 2004
Dept: Building E^jjjj*
Plan Check*:
Permit*: CB030102
Project Name: VILLBYSEA
L1V15389SF
jf^ig Planning CMWD
BLDG 1 28655 SF
GAR 1561 SF DECK
Address: 2778 CARLSBAD BL
Contact Person:
Sewer Dist: CA
Inspected
Inspected
By:
Inspected
Bv:
Phone:
Water Dist: CA
Date
» Inspected: /+fe*r*<
Date
Inspected:
Date
Inspected:
St Lite Fire
Date* "„.
Permit Type:
Sub Type:
Lot: 0
<* Approved: £^^
Approved:
Approved:
- --.-•-- ;- - -J
09/22/2004. -
RESDNTL
CONDO
Disapproved:
Disapproved:
Disapproved:
Comments:
Inspection List
Permit*: CB030102 Type: RESDNTL CONDO
Date Inspection Item Inspector Act
09/16/2004 39
09/16/2004 39
09/15/2004 39
09/15/2004 39
09/14/2004 39
09/14/2004 39
08/19/2004 84
08/17/2004 39
08/16/2004 39
07/21/2004 23
06/28/2004 23
06/22/2004 23
06/21/2004 23
06/18/2004 23
06/16/2004 23
06/15/2004 23
06/14/2004 23
06/02/2004 17
06/01/2004 17
06/01/2004 18
05/24/2004 17
05/20/2004 16
05/20/2004 17
05/19/2004 16
05/18/2004 16
05/18/2004 17
05/17/2004 16
05/17/2004 17
05/13/2004 14
05/13/2004 16
05/13/2004 17
05/13/2004 44
05/12/2004 14
05/12/2004 44
05/11/2004 14
05/11/2004 44
05/10/2004 14
05/10/2004 44
05/06/2004 16
05/05/2004 14
05/05/2004 16
05/05/2004 44
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Rough Combo
Final Electrical
Final Electrical
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
GaaTest/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Interior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Insulation
Interior Lath/Drywall
Insulation
Insulation
Interior Lath/DrywaH
Insulation
Interior Lath/Drywall
Frame/Steel/Bolting/Weldin
insulation
Interior Lath/Drywall
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Insulation
Frame/Steel/Bolting/Weldin
Insulation
Rough/Ducts/Dampers
-
PY
PY
-
-
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
Rt
PA
PA
Rl
Rl
NS
PA
CA
NS
NR
NR
NR
NR
PA
NR
NS
NR
AP
PA
AP
AP
AP
PA
PA
AP
AP
PA
PA
PA
PA
PA
PA
NS
NS
NR
NR
CO
CO
AP
we
PA
we
VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
Comments
201 203205207209211 213215
EMR 200, 202, 204, 206, 208, 210, 300,
301,302,303,304
EMR
HOUSE METER RELEASE
NO INSPECTOR AVAILABLE - RESET
TO TUES.
top 1-6 and 8 (need 7 & 9) - bottom 1-8
(need 9 & 10)
CORRIDORS & STAIRS
1ST LAYER LIDS
NORTH HALF WEST SIDE
TOP FLOOR EAST SIDE
OK TO INSULATE
Wednesday, September 22, 2004 Page 1 of 3
05/04/2004 16
05/04/2004 44
05/03/2004 84
04/27/2004 14
04/27/2004 44
04/26/2004 16
04/22/2004 13
04/22/2004 44
04/22/2004 84
04/21/2004 14
04/21/2004 44
03/17/2004 17
03/15/2004 17
03/11/2004 13
03/11/2004 18
03/10/2004 13
03/10/2004 18
03/09/2004 13
03/09/2004 18
03/08/2004 18
03/04/2004 16
03/04/2004 24
03/03/2004 14
03/03/2004 23
02/27/2004 24
02/26/2004 24
02/25/2004 24
02/24/2004 17
02/24/2004 24
02/23/2004 17
02/23/2004 24
02/20/2004 11
02/20/2004 24
02/19/2004 16
02/19/2004 24
02/18/2004 16
02/18/2004 24
02/17/2004 11
02/17/2004 24
02/17/2004 66
02/13/2004 11
02/13/2004 24
02/12/2004 24
02/11/2004 24
02/09/2004 11
01/28/2004 24
01/27/2004 24
01/26/2004 24
01/23/2004 15
01/22/2004 15
Insulation
Rough/Ducts/Dampers
Rough Combo
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Insulation
Shear Panels/HD's
Rough/Ducts/Dampers
Rough Combo
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Interior Lath/Drywall
Interior Lath/Drywall
Shear Panels/HD's
Exterior Lath/Drywall
Shear Panels/HD's
Exterior Lath/Drywal!
Shear Panels/HD's
Exterior Lath/Drywall
Exterior Lath/Drywall
Insulation
Rough/Tbpout
Frame/Steel/Bolting/Weldin
Gas/Test/Repairs
Rough/Topout
Rough/Topout
Rough/Topout
Interior Lath/Drywall
Rough/Topout
Interior Lath/Drywall
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Insulation
Rough/Topout
Insulation
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Grout
Ftg/Foundation/Piers
Rough/Topout
Rough/Topout
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Rough/Topout
Rough/Topout
Roof/Reroof
Roof/Reroof
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
NR
NR
PA
NR
NR
PA
PA
NR
PA
NR
NR
PA
PA
AP
we
CO
we
NR
we
CO
PA
AP
PA
we
PA
CA
PA
NR
NR
NR
NR
we
we
we
we
PA
we
we
we
AP
we
PA
PA
PA
PA
CA
NS
PA
AP
NR
3RD FLOOR EAST SIDE
2ND FLOOR EAST SIDE
2ND FLR EAST SIDE
PRELIM LIDS
TOWNHOUSE UNITS
DRAFT STOP OVER SPAN
AT PRELiM
PRE LIM DROP
MIDDLE 2 UNITS
1ST TWO UNITS NORTH WEST SIDE
PRELIM
EAST SIDE TOTAL
EAST SIDE UNITS EXCEPT NORTH END
UNIT
SOUTHEAST SIDE OF ELEVATOR
STAIR FOOTING AND RETAIN WALL @
SOUTH END
204,206,208,210
Wednesday, September 22, 2004 Page 2 of 3
01/22/2004 24
01/21/2004;! 5
01/21/2004 24
01/20/2004 24
01/06/2004 11
01/05/2004 11
01/05/2004 12
01/05/2004 61
01/05/2004 65
12/17/2003 15
12/08/2003 15
12/05/2003 11
12/05/2003 14
12/05/2003 15
12/05/2003 16
12/04/2003 11
12/02/2003 15
11/05/2003 14
11/03/2003 14
10/22/2003 17
10/03/2003 62
10/02/2003 12
09/11/2003 62
09/03/2003 62
08/29/2003 12
08/28/2003 12
08/20/2003 66
08/18/2003 22
08/08/2003 18
08/08/2003 63
08/08/2003 66
08/08/2003 66
08/05/2003 61
08/05/2003 66
07/30/2003 62
07/30/2003 66
07/29/2003 62
07/28/2003 62
07/28/2003 66
07/25/2003 62
07/25/2003 66
07/24/2003 11
07/17/2003 11
07/16/2003 11
07/15/2003 11
Rough/Topout
Rgof/Reroof
Rough/Topout
Rough/Topout
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Steel/Bond Beam
Footing
Retaining Wads
Roof/Reroof
Roof/Re roof
Ftg/Foundation/Piers
Frame/Steel/Bolting/Weldin
Roof/Reroof
Insulation
Ftg/Foundation/Piers
Roof/Reroof
Frame/Steel/Bolting/Weldin
Frame/Steel/Bolting/Weldin
Interior Lath/Drywall
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Grout
Sewer/Water Service
Exterior Lath/Drywall
Walls
Grout
Grout
Footing
Grout
Steel/Bond Beam
Grout
Steel/Bond Beam
Steel/Bond Beam
Grout
Steel/Bond Beam
Grout
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Ftg/Foundation/P ie rs
Ftg/Foundation/Piers
PY
PY
PY
PS
JM
JM
JM
JM
JM
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
TP
TP
PY
PY
PY
PY
PY
PY
PY
PY
PD
PY
PS
PY
PY
PY
PY
PY
PY
PY
PY
NR
NR
NR
CA
NR
NR
we
PA
we
AP
NR
AP
NR
NR
we
NR
PA
PA
NR
NR
CA
AP
NR
NR
CO
AP
AP
AP
we
we
AP
AP
we
PA
AP
PA
CO
AP
AP
we
PA
PA
PA
CA
NR
BY ARON ON SITE
UTILITY ROOM FOOTINGS
OK TO POUR BETWEEN BLDGS
ELECT ROOM SLAB
WET
FLAT AREA
FLOOR SHEATHING @ 3RD FLOOR
STRUCTURAL DECK
S.O.G @ GAR
1ST LIFT @ EAST WALL -ADD VERT
BARS @ SOUTH END
1 ST LIFT @ EASTERN WALL
2ND LIFT @ STORAGE WALLS
1STLIFT NEED PLAN REVISED
STORAGE WALLS
COLUMN 7 INTERIOR 5 EXTERIOR
2 LIFT, WALL STEEL OK TO CLOSE
FORMS
ELEVATOR & WALLS AT SOUTH END
AND ELEVATOR
1ST LIFT
12 COLUMNS
NEED REVISED PLANS
NEED REVISED PLAN
Wednesday, September 22, 2004 Page 3 of 3
City of Carlsbad Bldg Inspection Request
For: 11/05/2004
Permit# CB030102
Title: VILL BY SEA BLDG 1 28655 SF
Description: LIV15389 SF GAR 1561SF DECK
Inspector Assignment: PY
Subtype: CONDO
2778 CARLSBAD BL
Lot 0
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT ANASTASI CONSTRUCTION CO
Owner:
Remarks:
Phone: 3103453621
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: ARON
Entered By: CHRISTINE
Act Comment
Associated PCRs/CVs
PCR03140 ISSUED VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9
PCR04043 ISSUED ANASTASIA VILLAGE BY THE SEA; PLUMBING REVISIONS @ UNITS (BLDG 10)
Inspection History
Comments
need all depts.
WEST SIDE UNITS
201203205207209211213215
EMR 200, 202, 204, 206, 208, 210, 300, 301, 302, 303, 304
HOUSE METER RELEASE
NO INSPECTOR AVAILABLE - RESET TO TUES.
Date
10/28/2004
10/20/2004
10/19/2004
10/19/2004
10/18/2004
10/13/2004
10/07/2004
09/16/2004
09/15/2004
09/14/2004
08/19/2004
08/17/2004
08/16/2004
07/21/2004
06/28/2004
Description
89 Final Combo
39 Final Electrical
23 Gas/Test/Repatrs
39 Final Electrical
89 Final Combo
39 Final Electrical
89 Final Combo
39 Final Electrical
39 Final Electrical
39 Final Electrical
84 Rough Combo
39 Final Electrical
39 Final Electrical
23 Gas/Test/Repairs
23 Gas/Test/Repairs
Act
PA
CO
NS
NS
PA
NR
NR
PA
PA
NS
PA
CA
NS
NR
NR
Insp
PY
PY
PY
PY
PY
PC
PY
PY
PY
PY
PY
PY
PY
PY
PY
City of Carlsbad Bldg Inspection Request
For. 07/17/2003
Permit* CB030102
Title: VILL BY SEA BLDG 1 28655 SF
Description: LIV15389 SF GAR 1561SF DECK
Inspector Assignment: PY
Subtype: CONDO
2778 CARLSBAD BL
Lot 0
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT ANASTASI CONSTRUCTION CO
Owner:
Remarks:
Phone: 7604348312
Inspector:
Total Time:
CD Description
11 Ftg/Foundation/Piers
Act Comment
Requested By: AARON
Entered By: CHRISTINE
Associated PCRs/CVs
PCR03140 PENDING VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9
Inspection History
Date Description Act Insp Comments
07/15/2003 11 Ftg/Foundation/Piers NR PY NEED REVISED PUN
1 ' *
NOTICECITY OF CARLSBAD (760) 602-2700
BUILDING DEPARTMENT 1635 FARADAY AVENUE
DATE
$ fs So^**- JL^±^ ^f
.1
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? LJ YES
FOR FUBTHER INFORMATION, CONTACT
PHONE
CODE ENFORCEMENT OFFICER
Jul-17-03 13:23 FrwrO'DAY CONSULTANTS 760-131-8680 r-ou*
GOT/ I • ginffring * Surveying
July 17,2003
J.N. 001029
City of Carlsbad
Building Deptartmem
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Village by the Sea, C.T. 01-10
Grading Plan Dwg. 403-4A, Bid* No. 1
Dear Sirs:
Based upon our survey on July 16,2003, the location of building No. I foundation forms are
substantially located in accordance with the building location shown on the approved Grading
Plan Drawing No. 403-4A.
Very truly yours,
OT>AY CONSULTANTS. INC.
GOrpnr
*Georgc'O'Day f*
Project Manager
W:\MSWFlCE\WINWOREWH029a30717 City of CwWwtltr rfoc
i.t 10 LOKM AV.II.P. Wc«. S4i» i
Cwtaou. (XiUonKi 02006-WJO3 : 7W*1I "00 r^t: 700.631.MMft
International
Conference of Building Officials
JAN W BOSBOOM
CERTIFIED SPECIAL INSPECTOR
STRUCTURAL STEEL AND WELDING
1997 UBC AND 2000 IBC
The individual named hereon Is CERTIFIED In the category shown, having been
so certified pursuant to successful completion of the prescribed written
examination. -
Expiration date: June 14, 20G5J /,'
No. 5104561-85
T^ofvaftd unless sf -rod by certificate holder
fCSO certification attests to compr... knowledge ol codes and standards.
Applicable experience shouWbeveriffej' by toca/Jurisdictions. '
*'«ca;JAN W BOSBOOM
CERTIFIED SPECIAL INSPECTOR
REINFORCED CONCRETE
The Individual named hereon is CERTIFIED In the category shown, having
been 30 certified pursuant to successful completion of the prescribed writtenexamination and ACI requirements.
Expiration date; February 10, 2006
No. 5104561-49
*-*-f^ Not valid unless signed by certificate holder.ICC certification attests to competent knowledge of codes and standards.
COM&ti
-.1
ft. ,
REGISTERED DEPUTY INSPECTION REPORT
XMASONRY _CONCRETE _WELWNG _FIREPROOFING _ DIA _
PROJECT VIUA6C 5f THg 553 OWNER
ADDRESS^77fl GMViMti £>U}D * PERMIT #,
ARCHITECT kUml=2..>ENGINEER
CONTRACTOR SUB-CONTRACTOR
CONCRETE MIX DESIGN
APPROVED FABWCATCHl
DESIGN STRENGTH
™ . _f*. ™
SUPPLIER
MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORD ANCE WITH THE APPROVED PLANS
UJNU.frIUD
TEST LAB
TIME IN
INSPECTOR .
SAMPLES
HOURS OVERTIME
LICENSE •?!
DATE ft / *//0^
RBQUDONO MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BItLED AT TIME AND ONE HALP. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT ' YELLOW: INSPECTOR PINKrCUBNT
1119 £&*&*» ft., C*u fta*. 04120*
REGISTERED DEPUTY INSPECTION REPORT
V MASONRY _CONCRETE _WBLDING _FffiEPROOnNG _MA _OTHER
reOJECT
PERMIT #
ENGINEER
CONTRACTC^SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
TESTLA&
INSPECTOR
SAMPLES
TIME HOURS ft OVERTIME -»
LICENSE
A4HOURMMMUM<)VER4HOlJRSWfij.BEAN8HOURCHAROE. INSPfiCTIONS
REQUIWira MOM THAN « HOUHS, SATtmfiAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: ROT YELLOW: INSPECTOR ' PINK:CLIENT
REGISTERED DEPUTY INSPECTION REPORT
_WEUMNG _FffiBPROOF!NG _DIA _
tag <&fr OWNER
PERMIT ^
ARCHITECT
\
ENGINEER
SUB-CONTRACTOR
CONCRETE MIX DESIGN
APPROVEP FABRICATOR
DESIGN STRENGTH ^SUPPL
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
J^-'
psi
cftHli A-
, BE AN | HOUR CHAftOE. INSPECTIONS
REQiraUNG MOWS THAN 8 HOURS, SATinO)AY3AJ0HOUDAYS AWE Ifl^
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OPFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY},
WHITE: ROT , YELLOW: INSPECTOR HNK:CLIENT
Z71?
REGISTERED DEPUTY INSPECTION REPORT
^MASONRY ^CONCRETE _WELDING _FIREPROOFING _DIA _OTHER
A -n* c OWNER, ..
ADDRESS 3C1 10 CAtfAJj^p flLrfQ - PERMIT!
ENGINEER
SUBCONTRACTOR
CXDNCRETE MIX DESIGN _ DESIGN STRENGTH _ SUPPLIER
APPRO VED FABRIC ATOR MATERIAL GRAPE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
or
TEST LAB SAMPLES
IK>n: INSPECTION ARE BASED ON A 4 HOUR MIN!MIMX>VER 4 HOURS Wni BE AN 8 HOUR CHARGE.
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOUDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCJT YELLOW: INSPECTOR PINK:CLffiNT
REGISTERED DEPUTY INSPECTION REPORT
_MASONRY _CONCREra _WBU)ING _FIREPROOFING _DIA BOTHER
PROJECT ^ ^C4^ 8? r*T «*& OWNER A*/
ADDRESSJ77g g^^js/^fy) ^ftf^. PERMIT*
ARCHITECT titrfFA.* <$<X. . _ ENGINEHl
f / __ SUB-CONTRACTOR
CONCRETE MIX DESIGN O&C* P DESIGN STRENGTH JhODSf/ SUPPLIER
APPROVED FABRICATOR MATERIAL GRAM
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH TJIE APPROVED PLANS
<
TEST
. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IP OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT
REGISTERED DEPUTY INSPECTION REPORT
XMASONRY CONCRETE WELDING FWEPROOFING DIA OTHER^_ __ ~^_ —— -^
PROJECT \HlLftfi-e. feV TUP *^A OWNER
ADDRESS77ft PERMIT #
ARCHITECT ENGINEER
CONTRACTOR flfi/-SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WTTH THE APPROVED PLANS
r.|A A'_4r tb
TEST LAB
INSPECTOR C. *
SAMPLES
TIME OUT '-MR
SIGNATURB
HOURS OVERTIME
LICENSED
HOTI: INSPECn(»JS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAI* 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT
•"• i \
REGISTERED DEPUTY INSPECTION REPORT
^MASONRY __CONCRETE _WELDING _FIREPROOFING _DIA __OTHER
PROJECT VIllAftfe 6fr tlfeSEft OWNER_
ADDRESS<3?7#PERMITS
ARCHITECT ENGINEER
CONTRACT^ AAjA^Tft^ f SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
MU AT &2/A
AgTTi\JfeAJ £&}/VLt/0£<
/
LAB SAMPLES / ^
; INSPECTIONS ARE BASED ON A 4 HOUR MINIMUMX)VER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONSREQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE is A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: ROT YELLOW: INSPECTOR PINK:CLIENT
..air; m ~
REGISTERED DEPUTY INSPECTION REPORT
IT
CONCRETE WELDING __FIREPROOFING DIA OTHER
OWNER
ADDRESS ^77^ 6*gL-g6Afl Ai^fl - PERMIT*
ENGINEER
CONTRACTOR Alyf A^ I E^N/ . SUB-CONTRACTOR
CONCRETE NflX DESIGN DESIGN STRENGTH SUPPLIER.
APPROVED FABRICATOR MATERIAL GRAM
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
SAM^ES ( ICf
TIMBOUT^:^t) HOURS OVERTIME
' • ' " ' "*. -: •
IM5PBCTOR £• WJWaL SIGNATUl^
HOT*: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOUDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK.CLDENT
tff9au*6«b»&,
REGISTERED DEPUTY INSPECTION REPORT
^MASONRY _CONCRETE _WELDING _FKEPROOFING DIA OTHER
PROJECTM\uA&€ ftv nre^£A OWNER.
> _ . . n i l^'
PERMIT)ADDRESS £
ARCHITECT km tCEH^ENGINEER
t)£\> .SUB-CONTRACTOR
CONCRETE MIX DESIGN
APPROVED FABRICATOR
DESIGN STRENGTH SUPPLIER
MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
GMU A^^<6C fjl
TEST LAB 5/fet^Aat£^ SAMPLES S OfAii
TIME IN 7'<3<M^ TnffiQUT //*W-. HOURS
SIGNATURE
T-
7
OVERTIME
LICENSE
: INSPECTIOHS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITBtRCIT -*• YELLOW: INSPECTOR / PINK:CUBNT
3L1 7 $ '
CA
REGISTERED DEPUTY INSPECTION REPORT
YOMASONRY ^CONCRETE _WELDING _FIREPROOFING _DIA _aWJtBR
PROJECT \AllA6fr Ry THE ££A OWNER A^ASTASt
ADDRESS 2778 CftgUBAD BUo> PERWTI CB Q3Qi Ol.
ARCHTTECT KmtTfeg ^ENGINEER K£N
CONTRACTOR CpK*iT>SUBCONTRACTOR Pftg- c t S4 Q N Co
CONCRETE MIX DESIGN DESIGN STRENGTH Z6 oo pt I SUPPLIER
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED FLANS
Q b
of
Cotocp£.T£ AT Polto wi
. 2 9 ? Cu. yps. oF 25QQ p. S. X'
D
...._..........
Z* 4+ uuAJl AMD CaluMw
SAMPLES
TttlEm 7' 09 AH 13MBQUt Jjt.'
JR CHARGE. INSPECTIONS
REQUIRING MORE THAN * HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCTT YELLOW: INSPECTOR P!NK:CLJENT