Loading...
HomeMy WebLinkAbout2778 CARLSBAD BLVD; 211; CB030102; Permit05-14-2003 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 05/14/2003 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB030102 Building Inspection Request Line (760) 602-2725 2778 CARLSBAD BL CBAD RESDNTL $3,013,511.00 Sub Type: Lot#; Construction Type: Reference #: 19 Structure Type: 42 Bathrooms: VILL BY SEA BLDG 1 28655 SF LIV 15389 SF GAR 1561 SF DECK CONDO 0 V1 CT010010 MF5+ 47 Applicant: ANASTASI CONSTRUCTION 1200 AVIATION BLVD REDONDO BEACH CA 902278 310-376-8077 CO Owner: Status: ISSUED Applied: 10/21/2002 Entered By: SB Plan Approved: Issued: 05/14/2003 Inspect Area: Orig PC#: PC02-50 Plan Check*: 5140 05/14/03 0002 01 COP 02 306753 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $7,132.95 Meter Size $0.00 Add'l Red. Water Con. Fee $4,636.42 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $301.35 PFF $46,265.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $45,600.00 Housing In Lieu Fee D5/8 Housing Credit Fee $0.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $2,660.00 $38,076.00 $0.00 $54,845.90 $50,626.98 $0.00 $0.00 $6,858.24 $7,733.76 $0.00 $1,687.00 $510.00 $680.00 $0.00 $0.00 $0.00 $0.00 $39,140.00 $0.00 $306,753.60 Total Fees: $306,753.60 Total Payments To Date:$0.00 Balance Due: $306,753.60 FINAL ARP Inspector:Clearance: NOTICE: Please take NOTICE tharapproval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have Dreyjouslv been given a NOTICE similar to this, or as to which the statuleof limitations has previously otherwise expired. City if Carlsbad Final Building Inspection Dept: Building Engineerin 0 StLite Fire Plan Check *: Permit #: Project Name: Address: Contact Person: Sewer Dist: Inspected^ By: \ JLA inspected By: Inspected Bv: Comments: CB030102 VILL BY SEA BLDG 1 28655 SF LIV 15389 SF GAR 1561SF DECK 2778 CARLSBAD BL Phone: CA Water Dist: CA . . j , ^Date / / Xx>-raUy*cfe>^O Inspected: /O///6V Date Inspected: Date Inspected: RP, ~^'L±<^ (*, t ^ CL Date: Permit Type: Sub Type: Lot: 0 Approved: (s Approved: Approved: ^A^a ( 4 09/22/2004 RESDNTL CONDO / Disapproved: Disapproved: Disapproved: *IL~A*JJL City if Carlsbad Final Building Inspection SEP 2 2 2004 Dept: Building E^Pf Plan Check ff: Permit*: CB030102 Project Name: VILL BY SEA LIV15389SF Wing Planning CMWD BLDG 1 28655 SF GAR 1 561 SF DECK Address: 2778 CARLSBAD BL Contact Person: Sewer Dist: CA Inspected Bv: ^tsfA £>st*r/£- Inspected By: Inspected Bv: Phone: Water Dist: CA Date 5 Inspected: X^^r" Date Inspected: Date inspected: StLite Fire : ; y ' Date-: 09/22/2004 :. Permit Type: RESDNTL Sub Type: CONDO Lot: 0 ^ Approved: £-*^ Disapproved: Approved: Disapproved: Approved: Disapproved: Comments: Inspection List Permit*: CB030102 Type: RESDNTL CONDO VILL BY SEA BLDG 1 28655 SF LIV 15389 SF GAR 1561SF DECK Date Inspection Item Inspector Act Comments 09/16/2004 39 09/16/2004 39 09/15/2004 39 09/15/2004 39 09/14/2004 39 09/14/2004 39 08/19/2004 84 08/17/2004 39 08/16/2004 39 07/21/2004 23 06/28/2004 23 06/22/2004 23 06/21/2004 23 06/18/2004 23 06/16/2004 23 06/15/2004 23 06/14/2004 23 06/02/2004 17 06/01/2004 17 06/01/2004 18 05/24/2004 17 05/20/2004 16 05/20/2004 17 05/19/2004 16 05/18/2004 16 05/18/2004 17 05/17/2004 16 05/17/2004 17 05/13/2004 14 05/13/2004 16 05/13/2004 17 05/13/2004 44 05/12/2004 14 05/12/2004 44 05/11/2004 14 05/11/2004 44 05/10/2004 14 05/10/2004 44 05/06/2004 16 05/05/2004 14 05/05/2004 16 05/05/2004 44 Final Electrical Final Electrical Final Electrical Final Electrical Final Electrical Final Electrical Rough Combo Final Electrical Final Electrical Gas/Test/Repairs Gas/TesVRepairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/TesVRepairs Gas/Test/Repairs Gas/Test/Repairs Interior Lath/Drywatl Interior Lath/Drywall Exterior Lath/Drywall interior Lath/Drywall Insulation Interior Lath/Drywall Insulation Insulation Interior Lath/Drywall Insulation Interior Lath/Drywall Frame/Steel/Bolting/Weldin Insulation Interior Lath/Drywall Roug h/Ducts/Dampers Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Insulation Frame/Steel/Bolting/Weldin Insulation Rough/Ducts/Dampers - PY PY - - PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY Rl PA 201 203205207209211 213215 PA EMR 200, 202, 204, 206, 208, 210, 300, 301,302,303,304 Rl EMR Rl NS PA HOUSE METER RELEASE CA NS NO INSPECTOR AVAILABLE - RESET TO TUES. NR NR NR NR PA top 1 -6 and 8 (need 7 & 9) - bottom 1 -8 (need 9 & 10) NR NS NR AP PA AP AP CORRIDORS & STAIRS AP PA 1ST LAYER LIDS PA NORTH HALF WEST SIDE AP AP PA PA TOP FLOOR EAST SIDE PA OK TO INSULATE PA PA PA NS NS NR NR CO CO AP we PA we Wednesday, September 22, 2004 Page 1 of 3 05/04/2004 16 05/04/2004 44 05/03/2004 84 04/27/2004 14 04/27/2004 44 04/26/2004 16 04/22/2004 13 04/22/2004 44 04/22/2004 84 04/21/2004 14 04/21/2004 44 03/17/2004 17 03/15/2004 17 03/11/2004 13 03/11/2004 18 03/10/2004 13 03/10/2004 18 03/09/2004 13 03/09/2004 18 03/08/2004 18 03/04/2004 16 03/04/2004 24 03/03/2004 14 03/03/2004 23 02/27/2004 24 02/26/2004 24 02/25/2004 24 02/24/2004 17 02/24/2004 24 02/23/2004 17 02/23/2004 24 02/20/2004 11 02/20/2004 24 02/19/2004 16 02/19/2004 24 02/18/2004 16 02/18/2004 24 02/17/2004 11 02/17/2004 24 02/17/2004 66 02/13/2004 11 02/13/2004 24 02/12/2004 24 02/11/2004 24 02/09/2004 1 1 01/28/2004 24 01/27/2004 24 01/26/2004 24 01/23/2004 15 01/22/2004 15 Insulation Rpugh/Ducls/Dampers Rough Combo Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Insulation Shear Panels/HD's Rough/Ducts/Dampers Rough Combo Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Interior Lath/DrywaH Interior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Exterior Lath/Drywall Insulation Rough/Topout Frame/Steel/Bolting/Weldin Gas/Test/Repairs Rough/Topout Rough/Topout Rough/Topout Interior Lath/Drywall Rough/Topout Interior Lath/Drywall Rough/Topout Ftg/Foundation/Piers Rough/Topout Insulation Rough/Topout Insulation Rough/Topout Ftg/Foundation/Piers Rough/Topout Grout Ftg/Foundation/Piers Rough/Topout Rough/Topout Rough/Topout Ftg/Foundation/Piers Rough/Topout Rough/Topout Rough/Topout Roof/Reroof Roof/Reroof PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY NR NR PA NR NR PA PA NR PA NR NR PA PA AP we CO we NR we CO PA AP PA we PA CA PA NR NR NR NR we we we we PA we we we AP we PA PA PA PA CA NS PA AP NR 3RD FLOOR EAST SIDE 2ND FLOOR EAST SIDE 2ND FLR EAST SIDE PRELIM LIDS TOWNHOUSE UNITS DRAFT STOP OVER SPAN AT PRELIM PRE LIM DROP MIDDLE 2 UNITS 1ST TWO UNITS NORTH WEST SIDE PRELIM EAST SIDE TOTAL EAST SIDE UNITS EXCEPT NORTH END UNIT SOUTHEAST SIDE OF ELEVATOR STAIR FOOTING AND RETAIN WALL @ SOUTH END 204,206,208,210 Wednesday, September 22, 2004 Page 2 of 3 01/22/2004 24 01/21/2004 _15 01/21/2004 24 01/20/2004 24 01/06/2004 11 01/05/2004 11 01/05/2004 12 01/05/2004 61 01/05/2004 65 12/17/2003 15 12/08/2003 15 12/05/2003 11 12/05/2003 14 12/05/2003 15 12/05/2003 16 12/04/2003 11 12/02/2003 15 11/05/2003 14 11/03/2003 14 10/22/2003 17 10/03/2003 62 10/02/2003 12 09/11/2003 62 09/03/2003 62 08/29/2003 12 08/28/2003 12 08/20/2003 66 08/18/2003 22 08/08/2003 18 08/08/2003 63 08/08/2003 66 08/08/2003 66 08/05/2003 61 08/05/2003 66 07/30/2003 62 07/30/2003 66 07/29/2003 62 07/28/2003 62 07/28/2003 66 07/25/2003 62 07/25/2003 66 07/24/2003 11 07/17/2003 11 07/16/2003 11 07/15/2003 11 Rough/Topout Roof/Reroof Rough/Topout Rough/Topout Ftg/Foundation/Piers Ftg/Foundation/Piers Steel/Bond Beam Footing Retaining Walls Roof/Reroof Roof/Reroof Ftg/Foundation/Piers Frame/Steel/Bolting/Weldin Roof/Reroof Insulation Ftg/Fou ndation/Piers Roof/Reroof Frame/Steel/Bolting/Weldin Frame/Steei/Bolting/Weldin Interior Lath/Drywall Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Grout Sewer/Water Service Exterior Lath/Drywall Walls Grout Grout Footing Grout Steel/Bond Beam Grout Steel/Bond Beam Steel/Bond Beam Grout Steel/Bond Beam Grout Ftg/Foundation/Piers Ftg/Foundation/Piers Ftg/Foundation/Piers Ftg/Foundation/Piers PY PY PY PS JM JM JM JM JM PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY TP TP PY PY PY PY PY PY PY PY PD PY PS PY PY PY PY PY PY PY PY NR NR NR CA NR NR we PA we AP NR AP NR NR we NR PA PA NR NR CA AP NR NR CO AP AP AP we we AP AP we PA AP PA CO AP AP we PA PA PA CA NR BY ARON ON SITE UTILITY ROOM FOOTINGS OK TO POUR BETWEEN BLDGS ELECT ROOM SLAB WET FLAT AREA FLOOR SHEATHING @ 3RD FLOOR STRUCTURAL DECK S.O.G @ GAR 1ST LIFT @ EAST WALL -ADD VERT BARS @ SOUTH END 1ST LIFT @ EASTERN WALL 2ND LIFT O STORAGE WALLS 1STLIFT NEED PLAN REVISED STORAGE WALLS COLUMN 7 INTERIOR 5 EXTERIOR 2 LIFT, WALL STEEL OK TO CLOSE FORMS ELEVATOR & WALLS AT SOUTH END AND ELEVATOR 1ST LIFT 12 COLUMNS NEED REVISED PLANS NEED REVISED PLAN Wednesday, September 22, 2004 Page 3 of 3 City of Carlsbad Bldg Inspection Request For: 11/05/2004 Permit* CB030102 Title: VILL BY SEA BLDG 1 28655 SF Description: LIV15389 SF GAR 1561SF DECK Inspector Assignment: PY Sub Type: CONDO 2778 CARLSBAD BL Lot 0 Type: RESDNTL Job Address: Suite: Location: APPLICANT ANASTASI CONSTRUCTION CO Owner: Remarks: Phone: 3103453621 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: ARON Entered By: CHRISTINE Act Comment Date 10/28/2004 10/20/2004 10/19/2004 10/19/2004 10/18/2004 10/13/2004 10/07/2004 09/16/2004 09/15/2004 09/14/2004 08/19/2004 08/17/2004 08/16/2004 07/21/2004 06/28/2004 39 Final Electrical 39 Final Electrical 84 Rough Combo 39 Final Electrical 39 Final Electrical 23 Gas/Test/Repairs 23 Gas/Test/Repairs Act PA CO NS NS PA NR NR PA PA NS PA CA NS NR NR Insp Comments PY need all depts. Associated PCRs/CVs PCR03140 ISSUED VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9 PCR04043 ISSUED ANASTASIA VILLAGE BY THE SEA; PLUMBING REVISIONS @ UNITS (BLDG 10) Inspection History Description 89 Final Combo 39 Final Electrical 23 Gas/Test/Repairs 39 Final Electrical 89 Final Combo 39 Final Electrical 89 Final Combo 39 Final Electrical PA PY 201 203205207209211 213215 EMR 200, 202, 204, 206, 208, 210, 300, 301, 302, 303, 304 PY PY PY PY PC PY PY PY PY PY PY PY PY PY WEST SIDE UNITS HOUSE METER RELEASE NO INSPECTOR AVAILABLE - RESET TO TUES. City of Carlsbad Bldg Inspection Request For 07/17/2003 Permit# CB030102 Title: VILLBYSEA BLDG 1 28655 SF Description: LIV15389 SF GAR 1561SF DECK Inspector Assignment: PY Subtype: CONDO 2778 CARLSBAD BL Lot 0 Type: RESDNTL Job Address: Suite: Location: APPLICANT ANASTASI CONSTRUCTION CO Owner: Remarks: Phone: 7604348312 Inspector: Total Time: CD Description 11 Ftg/Foundatlon/Plers Act Comment Requested By: AARON Entered By: CHRISTINE Associated PGRs/CVs PCR03140 PENDING VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9 Inspection History Date Description Act Insp Comments 07/15/2003 11 Ftg/Foundation/Piers NR PY NEED REVISED PLAN CITY OF CARLSBAD BUILDING DEPARTMENT DATE NOTICE LOCATION PERMIT NO. (760) 602-2700 1635 FARADAY AVENUE TIME A JL FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? FOR FURTHER INFORMATION, CONTACT YES CODE ENFORCEMENT OFFICER Jul-17-03 13:Z3 FrwrO'DAY CONSULTANTS T60-I3I-BBIO &&*?? I N i. U L_ T A S N Civil I --ginft'ring T S r.iu/vt r-Du« July 17,2003 J.N. 001029 City of Carlsbad Building Deptartmem 1635 Faraday Avenue Carlsbad, CA 92008 RE: Village by the Sea, C.T. 01-10 Grading Plan Dw& 403-4A, BUg. No. 1 Dear Sirs: Based upon our survey on July 16,2003, the location of building No. 1 foundation forms are substantially located in accordance with the building location shown on the approved Grading Plan Drawing No. 403-4A. Very truly yours, 0-DAY CONSULTANTS, INC. GO:pnr George'O'Day Project Manager W:\MSOmCE\wmWOlU7UUta2MU0717 Ci^ of CwMwdtir ,toe OTHy CoMuNuaM tae. i oo Wvt»M: Tri:7CO*lI 7700 International Conference of Building Officials JAN W BOSBOOM CERTIFIED SPECIAL INSPECTOR STRUCTURAL STEEL AND WELDING 1997 UBC AND 2000 IBC The Individual named hereon is CERTIFIED In the category shown, having been so certified pursuant to successful completion of the prescribed written examination. Expiration date: June 14, 2005} /,'' No. 5104561-85 tiffcation atrerff to coi ilfiTunless S'nedI by certificate holder. /CBO certification attest to compr... know/edge of codes and standards. Applicable experience ihoukf be veriflc d by focal /urfsdfctfons. ' ;AN w BOSBOOM CERTIFIED SPECIAL INSPECTOR REINFORCED CONCRETE The Individual named hereon Is CERTIFIED In the category shown, having been so certified pursuant to successful completion of the prescribed writtenexamination and ACI requirements. Expiration date: February 10, 2006 No. 5104561-49 _== l^/" Not valid unless signed by certificateICC certification attests to competent knowledge of codes and standards. A I % » *^v f W9 Ct**tt4t*+ ft., &•«* MCM, CM REGISTERED DEPUTY INSPECTION REPORT XMASONRY _CONCRETE _WELDING _FIREPROOFING _DIA _OTHER PROJECT \I\UASE 6Y THE Sm OWNER /\M(V5TA(?/ ADDRESS^?7fl CA^^AO fiU/0. PERMIT* ARCHITECT ENGINEER CONTRACTOR SUB-CONTRACTOR k£NK/£Q CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR _MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS TEST LAB TIME IN 1:00 INSPECTOR £. SAMPLES TIME OUT HOURS OVERTIME SIGNATURE LICENSE DATE / NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINK:CLlENT M«* 7* SW-&02 F REGISTERED DEPUTY INSPECTION REPORT V MASONRY _CONCRETE _WELDING _FIREPROOFING _DIA _OTHER PROJECT \) iLL06£ M -lite- ^k OWNER_AAMia5J ADDRESS377^ CMs^AAD fcuJQ > PERMIT* ENGINEER CONTRACTOR ANffiPh] SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS_ TEST LAB, SAMPLES /* f~ X"\TIME IN_lV5#/X\ TIME OUT pl-"^D HOURS ft OVERTIME "^ INSPECTOR £/' WWW fr^ _ SIGNATURE f4%fyPV. ^XJ. LICENSE VERIFIED MOT1: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT »V*-«e<.,*i"- *•""* ->"»*-—«r r _.- , / • J* 2L •/*!, • "• REGISTERED DEPUTY INSPECTION REPORT XMASONRYX CONCRETE _WELDING _FIREPROOFING _DIA _OTHER OWNER \ ADDRESS a? i g ARCHITECT CONTRACTOR AArt^fl-K/ ENGINEER C&X" CONCRETE MIX DESIGN APPROVED FABRICATOR/I DESIGN STRENGTH SUPPUER MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS 30 YQ qcRg>p$] /fob V^tMJ OJVTW A VERIFIED NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BOXED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY), WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT 271?•h-& ft., REGISTERED DEPUTY INSPECTION REPORT CONCRETE _WELDING _FIREPROOFING DIA OTHER AV Tte Cfft OWNER ADDRESS 3nifl PERMIT* tju i TTE/^ •»ENGINEER CONTRACTOR SUB-CONTRACTOR fa/ JU=Q Y CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS OF £00 /F-tofi UflE A 0 - TEST LAB TIME IN /.Y&4M INSPECTOR I. VERIFIED SAMPLES TH^ffiOUT OVERTIME LICENSE DATE2./P1/J)? NOtS: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CLIENT ,. E-i-JLB.,.,,.. j., . ........ .f j,,., ... ,, r -, ..1 ... - I .y- ..*' REGISTERED DEPUTY INSPECTION REPORT _MASONRY ^CONCRETE _WBLDING _FIRBPROOFING _DIA /OTHER PROJECT ^CW 4T rrtT S^ OWNER /f// ADDRESSJ?7g c4jeLStf*rf &tlf) \ PERMIT* ARCHTTECT ^/rF^.0 4^Sf3C . ENGINES SUB-CONTRACTOR CONCRETE MIX DESIGN &, ^ DESIGN STRENGTH 3W&SI SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWWG WAS INSPECTED IN ACCORDANCE WITH Tffi APPROVED PLANS TESTLAB^^/^/r^/) SAMPLES f TIME IN^'a ://*¥*> TB^QUT J*rv HOURS ^ QVEHTfflffi. kTURE ; VERIFIED CUA^>- -J&Lu*W DATE? MOT!: INSPECTIONS Aim BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN S HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY), WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT RC 1119 CUfaU* fc, Q*u We*, CA REGISTERED DEPUTY INSPECTION REPORT ^MASONRY _CONCRETE _WELDING _FIREPROOFING _DIA _OTHER PROJECT \f\U fttf. feV -T^F <^A OWNER. ADDRESS^??^ r*&hM-fi A^-U/l . PERMTT'i ARCHITECT ENGINEER CONTRACTOR fi fj/ .SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS or G-ftAft to TEST LAB SAMPLES TIME lN7'*Qft/V.r\ . TIME OUT ('-MR HOURS OVERTIME INSPECTOR C.AAJ \fAHFA SIGNATURB/^^' VERIFIED DATE 1 idFj 05 NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHAROE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINK:CUENT 1119 Ct#64U» ft., (W* Hi*, QA MW 71<f SftttMZ fc W REGISTERED DEPUTY INSPECTION REPORT X.MASONRY —CONCRETE _WELDING _FKEPROOFING _ DIA _OTHER THE SB* OWNER AMT/VS DCVJ •v\ PROJECT ' ADDRESSA77ft CAt&PAQ ARCHITECT kMTTgft *> P&i PERMIT ENGINEER CONTRACTOR SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS y Mid/. /<re~r TEST LAB ?/&*&*/ 260 SAMPLES / TIME IN 7"' WAI TIMEOUT < INSPECTOR^ > ^V /AlMfi< SIGNATURE VERIFIED HOURS {ff OVERTIME LICENSE DATE 7 NOTI: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE, INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CLffiNT 1113 & ft« W TSf-XK REGISTERED DEPUTY INSPECTION REPORT J^MASONRY _CONCRETE _WELDING _HREPROOFING _DIA _OTHER pROJEcrN/IIJj\f^ gV tm <£A OWNER ADDRESSfi PERMITS ENGINEER CONTRACTOR SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS X TEST LAB SAMPLES I TIME IN 7''^ A/A TIME OUT -P :HOURS 8 OVERTIME SIGNATURE LICENSEINSPECTOR VERIFIED NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINKrCUENT f > KG 111? O St, REGISTERED DEPUTY INSPECTION REPORT _MASONRY PROJECT CONCRETE fcV WELDING _FIREPROOFING OWNER DIA BOTHER PesJ. ADDRESS PERMIT # ARCHITECT V.V)\ HEP-ENGINEER CONTRACTOR D£\) .SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS OP TEST TIME IN 7 ' U' SAMPLES 5 OlAvi TIMEOUT //^OVERTIME LICENSEINSPECTOR VERIFIED NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT , YELLOW: INSPECTOR / PINK:CLIENT 7 % • St., REGISTERED DEPUTY INSPECTION REPORT VCMASONRY V_CONCRETE _WELDING _FIREPROOFING _DIA _OTHER PROJECT \/illA6£ Ry THE S£A OWNER A^STASI ADDRESS 2778 CARUBAD BUD. PERMIT #__CJJ_03O I O2. ARCHrrECT_XMlTTE« 8 AS5QCUT£S ENGINEER K£M CONTRACTOR SUB-CONTRACTOR ci 510^ CONCRETE MIX DESIGN DESIGN STRENGTH 2.g Do PS ( SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS A-t fiUilDlMA OklJg £ARA£E AegA ' Q bSLRuED pLAc£rtCNT AMP nP . 2^" Cu.ynS.oF AT f*aluMKi ALrnu6 D fl 3- 44- wA II AKiO CaluMU AND 4^ M/. A L U iNt£ AMO S£T5 CiL< rears TESTLAR SAMPLES TIME IN 7! 00 AM TIMEOUT 2? INSPECTOR T<N W. Bosbao^n SIGNATURE OVERTIME LICNSE DATE NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINK:CUENT