HomeMy WebLinkAbout2778 CARLSBAD BLVD; 212; CB030102; Permit05-14-2003
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
05/14/2003
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB030102
Building Inspection Request Line (760) 602-2725
2778 CARLSBAD BL CBAD
RESDNTL
$3,013,511.00
Sub Type:
Lot#:
Construction Type:
Reference #:
19 Structure Type:
42 Bathrooms:
VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561 SF DECK
CONDO
0
V1
CT010010
MF5+
47
Status:
Applied:
Entered By:
ISSUED
10/21/2002
SB
Plan Approved:
Applicant:
ANASTASI CONSTRUCTION
1200 AVI ATIONBLVD
REDONDO BEACH CA
902278
310-376-8077
CO
Owner:
Issued: 05/14/2003
Inspect Area:
Orig PC#: PC02-50
Plan Check*:
5140 05/14/03 0002 01
CGP
02
306753.60
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong .Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$7,132.95 Meter Size
$0.00 Add'l Red. Water Con. Fee
$4,636.42 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$301.35 PFF
$46,265.00 PFF (CFD Fund)
$0.00 License Tax
$0.00 License Tax (CFD Fund)
$0.00 Traffic Impact Fee
$0.00 Traffic Impact (CFD Fund)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
$0.00 Housing Impact Fee
$45,600.00 Housing InUeu Fee
D5/8 Housing Credit Fee
$0.00 Master Drainage Fee
$0.00 Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$2,660.00
$38,076.00
$0.00
$54,845.90
$50,626.98
$0.00
$0.00
$6,858.24
$7.733.76
$0.00
$1,687.00
$510.00
$680.00
$0.00
$0.00
$0.00
$0.00
$39,140.00
$0.00
$306,753.60
Total Fees: $306,753.60 Total Payments To Date:$0.00 Balance Due: $306,753.60
Insoector: w
)\ D FINAL ARPR|
rhrM. Rate- II f/
OVAL*v Clearance-
NOTICE: Please take NOTICE tharapproval of your project includes the "Imposition'' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required Information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service tees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously bean given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
dual Carlsbad
Final Building Inspection
Dept: Building Engineering^ PI
Plan Check #:
Permit*: CB030102
Project Name: VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
StLite Fire
Date: 09/22/2004
Permit Type: RESDNTL
Sub Type: CONDO
Address:
Contact Person:
Sewer Dist:
Inspected^
inspected
By:
Inspected
By:
Comments:
2778 CARLSBAD BL
Phone:
CA Water Dist: CA
. . [ , ^ Date / /
AXf-fai-iyfifcLuvO Inspected: lO/f 1C
Date
Inspected:
Date
Inspected:
oQ ^ , ^ i / /K r X1 t-™"ljJtf*9KJ3 ITU X *W\J 1.
t n!?**4/}f-*syft-s fj&r^A » Jtt-rmjo C
Lot: 0
>Y Approved: \s
Approved:
Approved:
_JcoJlJliXl£3/ / C
Ip -rtivvi*^ ( /YV\ /N )L»>
/
Disapproved:
Disapproved:
Disapproved:
1 ^iL^AaJLA
•*^VV jt-*OT£rf*/ ,
or AXt
City if Carlsbad
Final Building Inspection SEP 2 2 2004
UCHL. Duiiumg t^uMnppiip^ii) ricuuung wmvvw
Plan Check #:
Permit*: CB030102
Project Name: VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
Address: 2778 CARLSBAD BL
Contact Person: Phone:
Sewer Dist; CA Water Dist: CA
Inspected
By: 0fttsl,
Inspected
By:
Inspected
By:
Date
A j&/t-7~£^ Inspected: /+fa*r ' •
Date
Inspected:
Date
Inspected:
01 i-i its rue i
Date6 1.
Permit Type:
Sub Type:
Lot: 0
^ Approved: <^^
Approved:
Approved:
, -• • •• • • . *;Y
.09/22/2004 :- '
RESDNTL
CONDO
Disapproved:
Disapproved:
Disapproved:
Comments:
Inspection List
Permit*: CB030102 Type: RESDNTL CONDO
Dale Inspection Item Inspector Act
09/16/2004 39
09/16/2004 39
09/15/2004 39
09/15/2004 39
09/14/2004 39
09/14/2004 39
08/19/2004 84
08/17/2004 39
08/16/2004 39
07/21/2004 23
06/28/2004 23
06/22/2004 23
06/21/2004 23
06/18/2004 23
06/16/2004 23
06/15/2004 23
06/14/2004 23
06/02/2004 17
06/01/2004 17
06/01/2004 18
05/24/2004 17
05/20/2004 16
05/20/2004 17
05/19/2004 16
05/18/2004 16
05/18/2004 17
05/17/2004 16
05/17/2004 17
05/13/2004 14
05/13/2004 16
05/13/2004 17
05/13/2004 44
05/12/2004 14
05/12/2004 44
05/11/2004 14
05/11/2004 44
05/10/2004 14
05/10/2004 44
05/06/2004 16
05/05/2004 14
05/05/2004 16
05/05/2004 44
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Final Electrical
Rough Combo
Final Electrical
Final Electrical
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
GasfTest/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Interior Lath/Drywall
Interior Lath/Drywall
Exterior Lath/Drywall
Interior Lath/Drywall
Insulation
Interior Lath/Drywall
Insulation
Insulation
Interior Lath/Drywall
Insulation
Interior Lath/Drywall
Frame/Steel/Bolting/Weldin
Insulation
Interior Lath/Drywall
Rougn/Ducts/Dampers
Frame/S lee I/Bolting/We Id in
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Insulation
Frame/Steel/Bolting/Weldin
Insulation
Rough/Ducts/Dampers
-
PY
PY
-
-
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
Rl
PA
PA
Rl
Rl
NS
PA
CA
NS
NR
NR
NR
NR
PA
NR
NS
NR
AP
PA
AP
AP
AP
PA
PA
AP
AP
PA
PA
PA
PA
PA
PA
NS
NS
NR
NR
CO
CO
AP
we
PA
we
VILL BY SEA BLDG 1 28655 SF
LIV 15389 SF GAR 1561SF DECK
Comments
201203205207209211 213215
EMR 200, 202, 204, 206, 208, 210, 300,
301,302,303,304
EMR
HOUSE METER RELEASE
NO INSPECTOR AVAILABLE - RESET
TO TUES.
top 1 -6 and 8 (need 7 & 9} - bottom 1 -8
(need 9 & 10)
CORRIDORS & STAIRS
1ST LAYER LIDS
NORTH HALF WEST SIDE
TOP FLOOR EAST SIDE
OK TO INSULATE
Wednesday, September 22, 2004 Page 1 of 3
05/04/2004 16
05/04/2004 44
05/03/2004 84
04/27/2004 14
04/27/2004 44
04/26/2004 16
04/22/2004 13
04/22/2004 44
04/22/2004 84
04/21/2004 14
04/21/2004 44
03/17/2004 17
03/15/2004 17
03/11/2004 13
03/11/2004 18
03/10/2004 13
03/10/2004 18
03/09/2004 13
03/09/2004 18
03/08/2004 18
03/04/2004 16
03/04/2004 24
03/03/2004 14
03/03/2004 23
02/27/2004 24
02/26/2004 24
02/25/2004 24
02/24/2004 17
02/24/2004 24
02/23/2004 17
02/23/2004 24
02/20/2004 11
02/20/2004 24
02/19/2004 16
02/19/2004 24
02/18/2004 16
02/18/2004 24
02/17/2004 11
02/17/2004 24
02/17/2004 66
02/13/2004 11
02/13/2004 24
02/12/2004 24
02/11/2004 24
02/09/2004 11
01/28/2004 24
01/27/2004 24
01/26/2004 24
01/23/2004 15
01/22/2004 15
Insulation
Rpugh/Ducts/Dampers
Rough Combo
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Insulation
Shear Panels/HD's
Rough/Ducts/Dampers
Rough Combo
Frame/Steel/Bolting/Weldin
Rough/Ducts/Dampers
Interior Lath/Drywall
Interior Lath/Drywall
Shear Panels/HD's
Exterior Lath/Drywall
Shear Panels/HD's
Exterior Lath/Drywall
Shear Panels/HD's
Exterior Lath/Drywall
Exterior Lath/Drywall
Insulation
Rough/Topout
Frame/Steel/Bolting/Weldin
Gas/Test/Repairs
Rough/Topout
Rough/Topout
Rough/Topout
Interior Lath/Drywall
Rough/Topout
Interior Lath/Drywall
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Insulation
Rough/Topout
Insulation
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Grout
Ftg/Foundation/Piers
Rough/Topout
Rough/Topout
Rough/Topout
Ftg/Foundation/Piers
Rough/Topout
Rough/Topout
Rough/Topout
Roof/Reroof
Roof/Reroof
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
NR
NR
PA
NR
NR
PA
PA
NR
PA
NR
NR
PA
PA
AP
we
CO
we
NR
we
CO
PA
AP
PA
we
PA
CA
PA
NR
NR
NR
NR
we
we
we
we
PA
we
we
we
AP
we
PA
PA
PA
PA
CA
NS
PA
AP
NR
3RD FLOOR EAST SIDE
2ND FLOOR EAST SIDE
2ND FLR EAST SIDE
PRELIM LIDS
TOWNHOUSE UNITS
DRAFT STOP OVER SPAN
AT PRELIM
PRE LIM DROP
MIDDLE 2 UNITS
1ST TWO UNITS NORTH WEST SIDE
PRELIM
EAST SIDE TOTAL
EAST SIDE UNITS EXCEPT NORTH END
UNIT
SOUTHEAST SIDE OF ELEVATOR
STAIR FOOTING AND RETAIN WALL @
SOUTH END
204,206,208,210
Wednesday, September 22, 2004 Page 2 of 3
01/22/2004 24
01/21/2004 15
01/21/2004 24
01/20/2004 24
01/06/2004 11
01/05/2004 11
01/05/2004 12
01/05/2004 61
01/05/2004 65
12/17/2003 15
12/08/2003 15
12/05/2003 11
12/05/2003 14
12/05/2003 15
12/05/2003 16
12/04/2003 11
12/02/2003 15
11/05/2003 14
11/03/2003 14
10/22/2003 17
10/03/2003 62
10/02/2003 12
09/11/2003 62
09/03/2003 62
08/29/2003 12
08/28/2003 12
08/20/2003 66
08/18/2003 22
08/08/2003 18
08/08/2003 63
08/08/2003 66
08/08/2003 66
08/05/2003 61
08/05/2003 66
07/30/2003 62
07/30/2003 66
07/29/2003 62
07/28/2003 62
07/28/2003 66
07/25/2003 62
07/25/2003 66
07/24/2003 11
07/17/2003 11
07/16/2003 11
07/15/2003 11
Rough/Topout
Roof/Re roof
Rough/Topout
Rough/Topout
Ft g/Foundati on/Piers
Ftg/Foundatton/Piers
Steel/Bond Beam
Footing
Retaining Walls
Roof/Reroof
Roof/Reroof
Ftg/Foundation/Piers
Frame/Steel/Bolting/Weldin
Roof/Reroof
Insulation
Ftg/Foundation/Piers
Roof/Reroof
Frame/Steel/Bolting/Weldin
Frame/Steel/Bolting/Weldin
Interior Lath/Drywall
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Steel/Bond Beam
Grout
Sewer/Water Service
Exterior Lath/Drywall
Walls
Grout
Grout
Footing
Grout
Steel/Bond Beam
Grout
Steel/Bond Beam
Steel/Bond Beam
Grout
Steel/Bond Beam
Grout
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Ftg/Foundation/Piers
Ftg/Foundation/Piers
PY
PY
PY
PS
JM
JM
JM
JM
JM
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
TP
TP
PY
PY
PY
PY
PY
PY
PY
PY
PD
PY
PS
PY
PY
PY
PY
PY
PY
PY
PY
NR
NR
NR
CA
NR
NR
we
PA
we
AP
NR
AP
NR
NR
we
NR
PA
PA
NR
NR
CA
AP
NR
NR
CO
AP
AP
AP
we
we
AP
AP
we
PA
AP
PA
CO
AP
AP
we
PA
PA
PA
CA
NR
BY ARON ON SITE
UTILITY ROOM FOOTINGS
OK TO POUR BETWEEN BLDGS
ELECT ROOM SLAB
WET
FLAT AREA
FLOOR SHEATHING @ 3RD FLOOR
STRUCTURAL DECK
S.O.G @ GAR
1ST LIFT @ EAST WALL -ADD VERT
BARS @ SOUTH END
1ST LIFT @ EASTERN WALL
2ND LIFT O STORAGE WALLS
1STLIFT NEED PLAN REVISED
STORAGE WALLS
COLUMN 7 INTERIOR 5 EXTERIOR
2 LIFT, WALL STEEL OK TO CLOSE
FORMS
ELEVATOR & WALLS AT SOUTH END
AND ELEVATOR
1ST LIFT
12 COLUMNS
NEED REVISED PLANS
NEED REVISED PLAN
Wednesday, September 22, 2004 Page 3 of 3
City of Carlsbad Bldg Inspection Request
For: 11/05/2004
Permit* CB030102
Title: VILL BY SEA BLDG 1 28655 SF
Description: LIV15389 SF GAR 1561SF DECK
Inspector Assignment: PY
Sub Type: CONDO
2778 CARLSBAD BL
Lot 0
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT ANASTASI CONSTRUCTION CO
Owner:
Remarks:
Phone: 3103453621
Inspector:
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: ARON
Entered By: CHRISTINE
Act Comment
Associated PCRs/CVs
PCR03140 ISSUED VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9
PCR04043 ISSUED ANASTASIA VILLAGE BY THE SEA; PLUMBING REVISIONS @ UNITS (BLDG 10)
Inspection History
Insp Comments
PY need all depts.
Date Description
10/28/2004 89 Final Combo
10/20/2004 39 Final Electrical
10/19/2004 23 Gas/Test/Repairs
10/19/2004 39 Final Electrical
10/18/2004 89 Final Combo
10/13/2004 39 Final Electrical
10/07/2004 89 Final Combo
09/16/2004 39 Final Electrical
09/15/2004 39 Final Electrical
09/14/2004 39 Final Electrical
08/19/2004 84 Rough Combo
08/17/2004 39 Final Electrical
08/16/2004 39 Final Electrical
07/21/2004 23 Gayest/Repairs
06/28/2004 23 Gas/Test/Repairs
Act
PA
CO
NS
NS
PA
NR
NR
PA
PA
NS
PA
CA
NS
NR
NR
PY
PY
PY
PY
PC
PY
PY
PY
PY
PY
PY
PY
PY
PY
WEST SIDE UNITS
201203205207209211 213215
EMR 200, 202, 204, 206, 208, 210, 300, 301, 302, 303, 304
HOUSE METER RELEASE
NO INSPECTOR AVAILABLE - RESET TO TUES.
City of Carlsbad Bldg Inspection Request
For: 07/17/2003
Permits CB030102
Title: V1LL BY SEA BLDG 1 28655 SF
Description: LIV15389 SF GAR 1561SF DECK
Inspector Assignment: PY
Sub Type: CONDO
2778 CARLSBAD BL
Lot 0
Type: RESDNTL
Job Address:
Suite:
Location:
APPLICANT ANASTASI CONSTRUCTION CO
Owner:
Remarks:
Phone: 7604348312
Inspector:
Total Time:
CD Description
11 Ftg/Foundatlon/Plers
Act Comment
Requested By: AARON
Entered By: CHRISTINE
Associated PCRs/CVs
PCR03140 PENDING VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9
Inspection History
Date Description Act Insp Comments
07/15/2003 11 Ftg/Foundatlon/Piers NR PY NEED REVISED PLAN
CITY OF CARLSBAD
BUILDING DEPARTMENT
DATE
NOTICE (760) 602-2700
1635 FARADAY AVENUE
TIME
LOCATION J?7~?y
PERMIT NO.
f*.i^«#-&-
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE?
FOR FURTHER INFORMATION, CONTACT
YES
CODE ENFORCEMENT OFFICER
JuMT-OI 13:23 Froa-0'MY CONSULTANTS T8D-IJt-HN I-MI ruc/uc r-ou«
CON!. LJLTA/'NTS
CrVi7 /. gtrtffring " Surviyiaf
July 17,2003
J.N. 001029
City of Carlsbad
Building Department
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Vfflagt by the Sea, C.T. 01-10
GrmdinE Plan Dwg. 403-4A, BWt No. 1
Dear Sirs:
Based upon oar survey on July 16,2003, the location of building No. I foundation forms are
substantially located in accordance with the building location shown on the approved Grading
Plan Drawing No. 403-4A.
Very truly yours,
OT)AY CONSULTANTS, INC.
GO:pnr
GeorgeDay
Project Manager
W:\MSOTICE\wmwORIMOia2W1307! 7 Cicy of CMhtalto Joe
iOU
> 02008-WJ03 TO: 7CO *1 f 7TOO T^K- 7C0.631-WMIO
International
Conference of Building Officials
]AN W BOSBOOM
CERTIFIED SPECIAL INSPECTOR
STRUCTURAL STEEL AND WELDING
1 997 UBC AND 2000 1BC
examination.
Expiration date: )™« 14, 2
No. 5104561-85
dSsTvedby certificate holde
4 ¥
JAN W BOSBOOM
CERTIFIED SPECIAL INSPECTOR
REINFORCED CONCRETE
The Individual named nereon is CERTIFIED to the category shown, having
been so certified pursuant to successful completion of the prescribed writtenexamination and ACI requirements.
Exp/ratlon date: February 10, 2006 _
No. 5104561-49 1 '* -~
•cc «»)Ita 3tttsB -'C.SSS^^KK
b3-
.
MM 7ft SW-P02 ft- 7ft 7S1-70K
REGISTERED DEPUTY INSPECTION REPORT
^MASONRY _CONCRETE _WELDING _FIREPROOFING _DIA _OTHER
PROJECT \I\ULPGE61 Tl^E 50^ OWNER_
ADDRESS^?7fl CAA,S5AO &U^O, PERMIT*
ARCHITECT ENGINEER
CONTRACTOR SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR .MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
F..VA.
f
TEST LAB
TIME IN
INSPECTOR .
VERIFIED ^Z^U-O
SAMPLES
TIME OUT HOURS OVERTIME
SIGNATURE LICENSE
DATE ft / .(// ^
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CL?ENT
REGISTERED DEPUTY INSPECTION REPORT
V MASONRY _CONCRETE __WELDING
tU Jfig ftV f?<F ^^
FIREPROOFING DIA OTHER
ADDRESS377#PERMIT*
ARCHITECT la/Hti^ENGINEER
CONTRACTOR SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
TESTLAB_
TIME INT •'
INSPECTOR
VERIFIED
SAMPLES
TIME OUT HOURS ft OVERTIME "^
SIGNATURE LICENSE
MOTI: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS wx BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT
-. J
REGISTERED DEPUTY INSPECTION REPORT
X MASONRY X CONCRETE WELDING _FIREPROOFING __DIA _OTHER
__ OWNER,
PERMIT iADDRESS a*?7ft
ARCHITECT
CONTRA(^rOR
ENGINEER
SUB-CONTRACTORteu/lt^y
CONCRETE MEC DESIGN
APPROVED FABRICATOR.!'
DESIGN STRENGTH SflfiPM SUPPLIER
MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
VERIFIED
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAYX
WHITE: RCTT YELLOW: INSPECTOR PINK:CUENT
-is I
REGISTERED DEPUTY INSPECTION REPORT
_CONCRETE _WELDING
PROJECTS i^fifi AV Tte Cgft
ADDRESS 31-ltt CA&lAtyft $L\fQ -
ARCHTTECT^L
FIREPROOFING
OWNER
DIA OTHER
PERMIT*
ENGINEER
SUB-CONTRACTOR to/ jUgfl Y jAA- D
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
CONTRACTOR ft Utof AS
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
Ar A
u/CT
TEST LAB
TIME IN
INSPECTOR .
VERIFIEb
SAMPLES
TIMEOUT
SIGNATURE
HOURS >OVERTIME
LICENSE 5 '"? ^ 4 >
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCFT YELLOW: INSPECTOR PINK:CLIENT
REGISTERED DEPUTY INSPECTION REPORT
__MASONRY _CONCRETE _WBLDING _FIREPROOFING __DIA /OTHER
PROJECT WuAtf.gr r*r <$& OWNER A#
ADDRESSJ77g g4Mta^K/3 ^ftf/?. PERMIT*
ARCHITECT batir&L* 4*5 SdC:. ENGINEER
SUBCONTRACTOR
CONCRETE MIX DESIGN &6C, f* DESIGN STRENGTH Jtiffi&£t SUPPLIER
APPROVED FABRICATOR __ MATERIAL GRADE __
THE FOLLOWING WAS INSPECTS) IN ACCORDANCE WITH TOE APPROVED PLANS
ft
7/w
TEST
IHIf^OT8l'B£nONSAREBAS6j>QNA4HOW
REQUIRING MORE THAN 8 HOURS, SATURDAYS1ANI) HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IE OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CUENT
O f> -
1119 C(*>
MiMTttSftMttREGISTERED DEPUTY INSPECTION REPORT
J£MASONRY ^CONCRETE ^WELDING _FIREPROOFING _DIA _OTHER
PROJECT ytu flfrfi. fey f^ip *^A OWNER,
PERMTTi
ENGINEER
CONTRACTOR fi fj/ .SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
Of
ft u V rr
ttvi
TEST LAB
INSPECTOR
VERIFIED
SAMPLES
TIME OUT
SIGNATURE
HOURS OVERTIME
LICENSE 5 H ^ A 6 */ -
DATE 7
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: ROT YELLOW: INSPECTOR PINK-.CLIENT
REGISTERED DEPUTY INSPECTION REPORT
\ ^MASONRY _CONCRETE _WELDING _FIREPROOFING _DIA __OTHER
\ PROJECT VitLAfre 6fr TIC S5fr OWNER AMfr<,t7V<,(
*PERMTT#
ARCHITECT ENGINEER
CONTRACTOR A£\/ .SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
f>»ta A . GOWIJ&&) P/ter
F Mti AT / . fc
. A/vO v&r-
___
OA ^g^c i/6Q o p e/>? > v
'Afnr»v)g£u
TEST LAB
TIME IN
SAMPLES
TIMEOUT
INSPECTOR^ . h/ /AW6C SIGNATURE
VERIFIED
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: ROT YELLOW: INSPECTOR PINK:CUENT
A.,(M
REGISTERED DEPUTY INSPECTION REPORT
V'""
^MASONRY _CONCRETE _WELDING __FIREPROOFING _DIA __OTHER
PROJECT N/iUfig gV Tlfc<£A OWNER Wfr-*TVV5/ O&\J .
ADDRESS P77 &PERMIT #
ARCHITECTkU\TTEf^^ENGINEER
CONTRACTOR SUBCONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
fetors
p & f-?
TEST LAB
TIME
INSPECTOR
VERIFIED
SAMPLES ( 5€"T <Jf 3
TIME OUTP:^0
SIGNATURE
HOURS 9 OVERTIME
DATE? #3
NOTi: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PINK:CLIENT
, CA
REGISTERED DEPUTY INSPECTION REPORT
_MASONRY
PROJECT
CONCRETE WELDING _FIREPROOFING
OWNER
DIA OTHER
ADDRESS PERMIT #
ARCHITECT ENGINEER
CONTRACTOR SUB-CONTRACTOR
CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
6 GMU PK
OF
TEST LAB?/)£CfAWZgfl SAMPLES 5 OlAl)
TIME OUT // *QQ'TIME IN
INSPECTOR
VERIFIED
HOURS OVERTIME
SIGNATURE LICENSE
DATE
NOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT , YELLOW: INSPECTOR ' PINK:CLIENT
7 % '
04
REGISTERED DEPUTY INSPECTION REPORT
C_MASONRY ^CONCRETE _WELDING _FIREPROOFING _DIA _OTHER
PROJECT \/illA6£ Ry THE SEA OWNER AHASTASI
ADDRESS 2118 CARUBAD BIYO. PERMIT #__
ARCHITECT_J( hi t TTE« ^ AS5oCIATfcS ENGINEER
CONTRACTOR
O3OI 02.
SUB-CONTRACTOR SION
CONCRETE MIX DESIGN 301$°** DESIGN STRENGTH Z6oo ps< SUPPUER
APPROVED FABRICATOR MATERIAL GRADE
THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS
A-t UlLblMA Oki^ fiAAACfe A£gA .' QbSlRugfr LA^
nf Afpftp*. 2^ g Cu.25QO p. S.X
CQKJ.C-ftfi.Tg AT Aft£AS 1
0
A+ uuA li AND 4-
A L A i^a U I i Istt AMD t^-
A
w AJJ Liiue5
or
TESTS rog
TEST LAB.SAMPLES
TIME IN 7100 AM TIMEOUT 2??0 PM HOURS 8
INSPECTOR Ti^W:
OVERTIME
LICENSE *C&O
DATE I/ **/ ° 3— — — i
NOTEOTE: INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A
SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY).
WHITE: RCIT YELLOW: INSPECTOR PI]PINK:CL!ENT