Loading...
HomeMy WebLinkAbout2778 CARLSBAD BLVD; 203; CB030102; Permit05-14-2003 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 05/14/2003 # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB030102 Building Inspection Request Line (760) 602-2725 2778 CARLSBAD BL CBAD RESDNTL $3,013,511.00 Sub Type: Lot#: Construction Type: Reference #: 19 Structure Type: 42 Bathrooms: VILL BY SEA BLDG 1 28655 SF LI V 15389 SF GAR 1561 SF DECK CONDO 0 V1 CT010010 MF5+ 47 Applicant: ANASTASI CONSTRUCTION 1200 AVIATION BLVD REDONDO BEACH CA 902278 310-376-8077 CO Owner: Status: ISSUED Applied: 10/21/2002 Entered By: SB Plan Approved: Issued: 05/14/2003 Inspect Area: Orig PC#: PC02-50 Plan Check*: 5140 05/14/03 0002 Oi CGP 02 306753-60 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $7,132.95 Meter Size $0.00 Add'l Red. Water Con. Fee $4,636.42 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $301.35 PFF $46,265.00 PFF (CFD Fund) $0.00 License Tax $0.00 License Tax (CFD Fund) $0.00 Traffic Impact Fee $0.00 Traffic Impact (CFD Fund) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Housing Impact Fee $45,600.00 Housing In Lieu Fee D5/8 Housing Credit Fee $0.00 Master Drainage Fee $0.00 Sewer Fee Additional Fees TOTAL PERMIT FEES $0.00 $2,660.00 $38,076.00 $0.00 $54,845.90 $50,626.98 $0.00 $0.00 $6,858.24 $7,733.76 $0.00 $1,687.00 $510.00 $680.00 $0.00 $0.00 $0.00 $0.00 $39,140.00 $0.00 $306,753.60 Total Fees; $306,753.60 Total Payments To Date;$0.00 Balance Due: $306,753.60 Inspector: FINAL A Date: NOTICE: Please take NOTICE tharapproval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as lees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions, if you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been aiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Gliyaf Carlsbad Final Building Inspection Dept: Building Engineering^ PI Plan Check #: Permit^: CB030102 Project Name: VILL BY SEA BLDG 1 28655 SF LIV 15389 SF GAR 1561SF DECK St Lite Fire Date; 09/22/2004 Permit Type: RESDNTL Sub Type: CONDO Address: Contact Person: Sewer Dist: Inspected^ By: \ 2\ Inspected By: Inspected By: Comments: 2778 CARLSBAD BL Phone: CA Water Dist: CA J * L - -xDate / /AX/ -fauy*tfe>*O Inspected: lO/( It Date Inspected: Date Inspected: nO r.L.xsv-o Avii Jou / Lot: 0 ?y Approved: \s Disapproved: Approved: Disapproved: Approved: Disapproved: ^u^A^c, 1 4 ^iU <H«JUL City if Carlsbad final Building Inspection SEP 2 2 2004 Dept: Building E(jgj£» Plan Check #: Permit*: CB030102 Project Name: VI LL BY SEA LIV 15389 SF •jrjng Planning CMWD BLDG 1 28655 SF GAR 1 561 SF DECK Address: 2778 CARLSBAD BL Contact Person: Sewer Dist: CA Inspected Inspected By: Inspected Bv: Phone: Water Dist: CA Date 5 inspected: />/y*r'p' Date Inspected: Date Inspected: StLite Fire v V Date: _. 09/22/2004 \. , Permit Type: RESDNTL Sub Type: CONDO Lot: 0 ^ Approved: £-^ Disapproved: Approved: Disapproved: Approved: Disapproved: Comments: Inspection List Permit*: CB 030 102 Type: RESDNTL CONDO Date inspection Item Inspector Act 09/16/2004 39 09/16/2004 39 09/15/2004 39 09/15/2004 39 09/14/2004 39 09/14/2004 39 08/19/2004 84 08/17/2004 39 08/16/2004 39 07/21/2004 23 06/28/2004 23 06/22/2004 23 06/21/2004 23 06/18/2004 23 06/16/2004 23 06/15/2004 23 06/14/2004 23 06/02/2004 17 06/01/2004 17 06/01/2004 18 05/24/2004 17 05/20/2004 16 05/20/2004 17 05/19/2004 16 05/18/2004 16 05/18/2004 17 05/17/2004 16 05/17/2004 17 05/13/2004 14 05/13/2004 16 05/13/2004 17 05/13/2004 44 05/12/2004 14 05/12/2004 44 05/11/2004 14 05/11/2004 44 05/10/2004 14 05/10/2004 44 05/06/2004 16 05/05/2004 14 05/05/2004 16 05/05/2004 44 Final Electrical Final Electrical Final Electrical Final Electrical Final Electrical Final Electrical Rough Combo Final Electrical Final Electrical Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Gas/Test/Repairs Interior Lath/Drywall Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Insulation Interior Lath/Drywall Insulation Insulation Interior Lath/Drywall Insulation Interior Lath/Drywall Frame/Steel/Bolting/Weldin Insulation Interior Lath/Drywall Rough/Ducts/Dampers Frame/Steel/Bolting/Weldin Rougn/Ducts/Dampers Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Insulation Frame/Steel/Bolting/Weldin Insulation Rough/Ducts/Dampers - PY PY - - PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY Rl PA PA Rl Rl NS PA CA NS NR NR NR NR PA NR NS NR AP PA AP AP AP PA PA AP AP PA PA PA PA PA PA NS NS NR NR CO CO AP we PA we VILL BY SEA BLOG 1 28655 SF LIV 15389 SF GAR 1561SF DECK Comments 201 203 205 207 209 211213215 EMR 200, 202, 204, 206, 208, 210, 300, 301,302,303,304 EMR HOUSE METER RELEASE NO INSPECTOR AVAILABLE - RESET TO TUES. top 1-6 and 8 (need 7 & 9) - bottom 1-8 (need 9 & 10) CORRIDORS & STAIRS 1ST LAYER LIDS NORTH HALF WEST SIDE TOP FLOOR EAST SIDE OK TO INSULATE Wednesday, September 22, 2004 Page 1 of 3 05/04/2004 16 05/04/2004 44 05/03/2004 84 04/27/2004 14 04/27/2004 44 04/26/2004 16 04/22/2004 13 04/22/2004 44 04/22/2004 84 04/21/2004 14 04/21/2004 44 03/17/2004 17 03/15/2004 17 03/11/2004 13 03/11/2004 18 03/10/2004 13 03/10/2004 18 03/09/2004 13 03/09/2004 18 03/08/2004 18 03/04/2004 16 03/04/2004 24 03/03/2004 14 03/03/2004 23 02/27/2004 24 02/26/2004 24 02/25/2004 24 02/24/2004 17 02/24/2004 24 02/23/2004 17 02/23/2004 24 02/20/2004 11 02/20/2004 24 02/19/2004 16 02/19/2004 24 02/18/2004 16 02/18/2004 24 02/17/2004 11 02/17/2004 24 02/17/2004 66 02/13/2004 11 02/13/2004 24 02/12/2004 24 02/1 1/2004 24 02/09/2004 11 01/28/2004 24 01/27/2004 24 01/26/2004 24 01/23/2004 15 01/22/2004 15 Insulation RQugh/Ducts/Dampers Rough Combo Frame/Steel/Bolting/Weldin Rough/Ducts/Dampers Insulation Shear Panels/HD's Rough/Ducts/Dampers Rough Combo Frame/Steel/Boltrng/Weldin Rough/Ducts/Dampers Interior Lath/Drywall Interior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Shear Panels/HD's Exterior Lath/Drywall Exterior Lath/Drywall Insulation Rough/Topout Frame/Steel/Bolting/Weldin Gas/Test/Repairs Rough/Topout Rough/Topout Rough/Topout Interior Lath/Drywall Rough/Topout Interior Lath/Drywall Rough/Topout Ftg/Foundation/Piers Rough/Topout Insulation Rough/Topout Insulation Rough/Topout Ftg/Foundation/Piers Rough/Topout Grout Ftg/Foundation/Piers Rough/Topout Rough/Topout Rough/Topout Ftg/Foundation/Piers Rough/Topout Rough/Topout Rough/Topout Roof/Reroof Roof/Reroof PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY NR NR PA NR NR PA PA NR PA NR NR PA PA AP WC CO WC NR WC CO PA AP PA WC PA CA PA NR NR NR NR WC WC WC WC PA WC WC WC AP WC PA PA PA PA CA NS PA AP NR 3RD FLOOR EAST SIDE 2ND FLOOR EAST SIDE 2ND FLR EAST SIDE PRELIM LIDS TOWNHOUSE UNITS DRAFT STOP OVER SPAN AT PRELIM PRE LIM DROP MIDDLE 2 UNITS 1ST TWO UNITS NORTH WEST SIDE PRELIM EAST SIDE TOTAL EAST SIDE UNITS EXCEPT NORTH END UNIT SOUTHEAST SIDE OF ELEVATOR STAIR FOOTING AND RETAIN WALL ® SOUTH END 204,206,208,210 Wednesday, September 22, 2004 Page 2 of 3 01/22/2004 24 01/2 1/2004;! 5 01/21/2004 24 01/20/2004 24 01/06/2004 11 01/05/2004 11 01/05/2004 12 01/05/2004 61 01/05/2004 65 12/17/2003 15 12/08/2003 15 12/05/2003 11 12/05/2003 14 12/05/2003 15 12/05/2003 16 12/04/2003 11 12/02/2003 15 11/05/2003 14 11/03/2003 14 10/22/2003 17 10/03/2003 62 10/02/2003 12 09/11/2003 62 09/03/2003 62 08/29/2003 12 08/28/2003 12 08/20/2003 66 08/18/2003 22 08/08/2003 18 08/08/2003 63 08/08/2003 66 08/08/2003 66 08/05/2003 61 08/05/2003 66 07/30/2003 62 07/30/2003 66 07/29/2003 62 07/28/2003 62 07/28/2003 66 07/25/2003 62 07/25/2003 66 07/24/2003 11 07/17/2003 11 07/16/2003 11 07/15/2003 11 Rough/Topout Rgof/Reroof Rough/Topout Rough/Topout Ftg/Foundation/Piers Ftg/Foundation/Piers Steel/Bond Beam Footing Retaining Walls Roof/Re roof Roof/Re roof Ftg/Foundation/Piers Frame/Steel/Bolting/Weldin Roof/Reroof Insulation Ftg/Foundation/Piers Roof/Reroof Frame/Steel/Bolting/Weldin Frame/Steel/Bolting/Weldin Interior Lath/Drywall Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Steel/Bond Beam Grout Sewer/Water Service Exterior Lath/Drywall Walls Grout Grout Footing Grout Steel/Bond Beam Grout Steel/Bond Beam Steel/Bond Beam Grout Steel/Bond Beam Grout Ftg/Foundation/Piers Ftg/Foundation/Piers Ftg/Foundation/Piers Ftg/Foundation/Piers PY PY PY PS JM JM JM JM JM PY PY PY PY PY PY PY PY PY PY PY PY PY PY PY TP TP PY PY PY PY PY PY PY PY PD PY PS PY PY PY PY PY PY PY PY NR NR NR CA NR NR we PA we AP NR AP NR NR we NR PA PA NR NR CA AP NR NR CO AP AP AP we we AP AP we PA AP PA CO AP AP we PA PA PA CA NR BY ARON ON SITE UTILITY ROOM FOOTINGS OK TO POUR BETWEEN BLDGS ELECT ROOM SLAB WET FLAT AREA FLOOR SHEATHING @ 3RD FLOOR STRUCTURAL DECK S.O.G O GAR 1ST LIFT @ EAST WALL -ADD VERT BARS @ SOUTH END 1ST LIFT @ EASTERN WALL 2ND LIFT 9 STORAGE WALLS 1STLIFT NEED PLAN REVISED STORAGE WALLS COLUMN 7 INTERIOR 5 EXTERIOR 2 LIFT, WALL STEEL OK TO CLOSE FORMS ELEVATOR & WALLS AT SOUTH END AND ELEVATOR 1ST LIFT 12 COLUMNS NEED REVISED PLANS NEED REVISED PLAN Wednesday, September 22, 2004 Page 3 of 3 City of Carlsbad Bldg Inspection Request For: 11/05/2004 Permit* CB030102 Title: VILL BY SEA BLDG 1 28655 SF Description: LIV15389 SF GAR 1561SF DECK Inspector Assignment: PY Sub Type: CONDO 2778 CARLSBAD BL Lot 0 Type: RESDNTL Job Address: Suite: Location: APPLICANT ANASTASI CONSTRUCTION CO Owner: Remarks: Phone: 3103453621 Inspector: Total Time: CD Description 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Requested By: ARON Entered By: CHRISTINE Act Comment Associated PCRs/CVs PCR03140 ISSUED VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9 PCR04043 ISSUED ANASTASIA VILLAGE BY THE SEA; PLUMBING REVISIONS @ UNITS (BLDG 10) Inspection History Date Description 10/28/2004 89 Final Combo 10/20/2004 39 Final Electrical 10/19/2004 23 Gas/Test/Repairs 10/19/2004 39 Final Electrical 10/18/2004 89 Final Combo 10/13/2004 39 Final Electrical 10/07/2004 89 Final Combo 09/16/2004 39 Final Electrical 09/15/2004 39 Final Electrical 09/14/2004 39 Final Electrical 08/19/2004 84 Rough Combo 08/17/2004 39 Final Electrical 08/18/2004 39 Final Electrical 07/21/2004 23 Gas/Test/Repairs 06/28/2004 23 Gas/Test/Repairs Act Insp Comments PA PY need all depts. CO PY NS PY NS PY PA PY NR PC NR PY PA PY PA PY NS PY PA PY CA PY NS PY NR PY NR PY WEST SIDE UNITS 201 203205207209211213215 EMR 200, 202, 204, 206, 208, 210, 300, 301, 302, 303, 304 HOUSE METER RELEASE NO INSPECTOR AVAILABLE - RESET TO TUES. City of Carlsbad Bldg Inspection Request For: 07/17/2003 Permit* CB030102 Title: VILL BY SEA BLDG 1 28655 SF Description: LIV15389 SF GAR 1561SF DECK Inspector Assignment: PY Subtype: CONDO 2778 CARLSBAD BL Lot 0 Type: RESDNTL Job Address: Suite: Location: APPLICANT ANASTAS1 CONSTRUCTION CO Owner: Remarks: Phone: 7604348312 Inspector: Total Time: CD Description 11 Ftg/Foundatlon/Piers Act Comment Requested By: AARON Entered By: CHRISTINE Associated PCRs/CVs PCR03140 PENDING VILLAGE BY THE SEA REVSION/; CLARIFICATION TO PLAN BLDGS 2-9 Inspection History Date Description Act Insp Comments 07/16/2003 11 Rg/Foundation/Piers NR PY NEED REVISED PLAN CITY OF CARLSBAD BUILDING DEPARTMENT NOTICE DATE MG DEPARTMEr zl^h. LOCATION PERMIT NO. (760) 602-2700 1635 FARADAY AVENUE TIME %*o*^L FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? LJ YES FOR FURTHER INFORMATION, CONTACT PHONE CODE ENFORCEMENT OFFICER Internationa! Conference of Building Officials JAN W BOSBOOM CERTIFIED SPECIAL INSPECTOR STRUCTURAL STEEL AND WELDING 1997 UBC AND 2000 IBC The Individual named hereon Is CERTIFIED In the category shown, having been so certified pursuant to successful completion of the prescribed written examination. Expiration date: June 14, 20051 /? No. 5104561-85 ^lorvawTiintess sUted by certificate holder. ICBO certification attcJBto compe.., know/edge of codes and standards. Applicable experience jhoufcf be verifkJ by local iuitaticttora. ' JAN W BOSBOOM CERTIFIED SPECIAL INSPECTOR REINFORCED CONCRETE The Individual named hereon Is CERTIFIED In the category shown, having been so certified pursuant to successful completion of the prescribed writtenexamination and ACI requirements, Expiration date: February 10, 2006 No. 5104561-49 tICC cert/flcatlon atieiu to <j ^/-^K.- "***TXN(fi vafld unTes/iipied by ^certifkatent es and standards. older. £OM&), 4 * 11l8CMt&*ftt REGISTERED DEPUTY INSPECTION REPORT XMASONRY _CONCRBTE _WELDING _F»EPROOFING _DIA _OTHER PROJECT ViU-Afig 6t TRE 503 OWNER ADDRBSSa77«PERMIT* ARCHTTECT A-5-5CT..ENGINEER CONTRACTOR /Wflrffta/SUB-CONTRACTOR kElVlUgQy CONCRETE MIX DESIGN APPROVED FABRICATOR . DESIGN STRENGTH-f <SUPPLIER MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS Ofe-SBuED CH?vM^U.fr<UD L.\ -^ TEST LAB T»ffi IN 7; INSPECTOR . VERIFIED ^ZA^ti*-^ SAMPLES TIME OUT SIGNATURE HOURS OVERTIME LICENSE I. INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BHXED AT TBrfB AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED 04 ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CLljBNT REGISTERED DEPUTY INSPECTION REPORT ^MASONRY ^CONCRETE _WELDING _FIREPRQOFING __DIA _OTHER PROJECT lLfiE ftVlUE^ OWNER ADDRESS^-77^ ENGINEER CONTRACTOR SURCONTRACTOR CONCRETE MIX DESIGN APPROVED FABRICATOR DESIGN STRENGTH SUPPLIER MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS TESTLAX. TMB&9-T* VERIFIED SAMPLES HOURS ft' OVERTIME ~* LICENSE SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CUENT PROJECT REGISTERED DEPUTY INSPECTION REPORT _WEUHN<3 __ FIREPROOFING DIA OTHER fflg <fi4 OWNER \ENGMEER CONCRETE MIX DESIGN 0ESC»* STRENGTH UPPUTO MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS SHOW UP CHARGE WHITE: ROT HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS NOTIFIED IN ADVANCE (PREVIOUS DAYX YELLOW: INSPECTOR HNK:CLIENT 271? 05 - ., -BJCULI- XMASONRY PROJECT! 1119 g ft V REGISTERED DEPUTY INSPECTION REPORT WELMNG _FIREPROOFING DIA OTHER Cpft OWNER PERMIT* ENGINEER SUB-CONTRACTOR IflB/AJO V CONCRETE MK DESIGN DESIGN STRENGTH SUPPLIER AWROVE0 FABRICATOR.MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS lit . )ftj.Q MOrt: INSPECTIONS ARE BASED ON A 4 HOUR MH«Mm^<»VER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIR1NO MORE THAN 8 HOURS, SATURDAYS AM& HOLIDAYS AM BILLED AT TIME AND ONE HALF THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PJNK:CUENT ' V X REGISTERED DEPUTY INSPECTION REPORT _MASONRY _CONCRETE _WBLDING _FffiEPROOFING _DIA /OTHER PROJECT WUAtf #? fW *& OWNER fa ADDRE3SJ 7 7g e^fta^f/1 4fMtf . PERMTT* ARCHITECT *fl/ma.* /f^Of.. ENGINEER CONTRACTORS/4 VT#:T / SUB-CONTRACTOR CONCRETE MIX DESIGN /&, ^ DESIGN STRENGTH JhfD&l SUPKJER APPROVED FABRICATOR MATERIAL GRADE THE FOLU)WING WAS INSPECTED IN ACCORDANCE WITH TTO APPROVED PLANS rtf/3 SAMPLES f TIMEOUT 7*r-V HOURS IX OVERTIME INSPECTOR ^-rv/#W^ SKJSATURI ' VERIFIED 6Uvt^- NOffi: iNsracnoNS Aim BASED cm A 4 HOUR MOOMUM-OVER 4 HOURS WILL BB AN « HOUR CHARGE. INSPECTIONS REQUIRING MORE THAK 8 HOURS, SATURDAYS AN» HOLTOAYS ARE MIXED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCIT YELLOW: INSPECTOR PINK:CLJENT REGISTERED DEPUTY INSPECTION REPORT JJ^MASONRY _CONCRETE _WELDING _FIREPROOFING _DIA _J3THER PROJECT iu/rg. fe 1 ^A OWNER ADDRESS %77 ft fftgJSJjA/) ALUfl . PERMIT I ARCHITECT ^tlT ^ ^yf., ENGINEER CONTRACTOR AMfKTfo 1 fifi/ . SUB-CONTRACTOR jlgM>fenV CONCRETE MIX DESIGN _ DESIGN STRENGTH _ SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS I TESTLAB_ SAMPLES TIME OUT HOURS SIGNATUREflW ^U^ LICENSED I"? "^A 6 t/- VERIFIED . NOTl. WSPBCTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BOXED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: RCTT YELLOW: INSPECTOR PINK:CLIENT REGISTERED DEPUTY INSPECTION REPORT V* ^MASONRY _ CONCRETE _WELDING _F»EPROOFING _DIA _OTHER PROJECT VlllAfrfe 6V THE ^5^ OWNER AMy»Tfr«s( ADDRESSA?7% CA&l^M/) AUfo. PERMIT # ARCHITECT ENGINEER CONTRACTok A^A^Tft^f SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS AT o p V €/r> >^ ) U-SE/?.Mf</* TOST LAB TPtt-JN SAMPLES / HOn: INSPECTIONS ARE BASED ON A 4 HOCFR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS. SATURDAYS AND HOLIDAYS ARE BILUED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR P1NK:CLJENT REGISTERED DEPUTY INSPECTION REPORT ^MASONRY ^CONCRETE _WELDING _FKEPROOFING _DIA _OTHER 0V fflg 33* OWNER A^ft PERMIT f. ENGINEER SUB^CTTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH SUPPLIER APPROVED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTS) IN ACCORDANCE WITH THE APPROVED PLANS $f IfJ \v liBST LAB : INSPECTIONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN « HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS; SATURDAYS AND HOUDAYS ME BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CLIENT REGISTERED PEPUTY INSPECTION REPORT MASONRY CONCRETE F»EPROOFING DIA OWNER ADDRESS N£-PERMIT # ENGINEER CONTRACTOR t)£\) .SUB-CONTRACTOR CONCRETE MIX DESIGN DESIGN STRENGTH APPRO VED FABRICATOR MATERIAL GRADE THE FOLLOWING WAS INSPECTED IN ACCORDANCE WITH THE APPROVED PLANS OFAt TEST LAB TIME IN SAMH.ES S 0>AO „ r NOTE: mSPECTlONS ARE BASED ON A 4 HOUR MINIMUM-OVER 4 HOURS WILL BE AN 8 HOUR CHARGE. INSPECTIONS REQUIRING MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CLENT REGISTERED DEPUTY INSPECTION REPORT /o_MAS0NRY ^.CONCRETE _WELDING _FffiEPROOFING __DIA _OTIlBR PROJECT \AllA6C fjy THE SEA OWNER APMSTASI ADDRESS 2778 CAl&S BAD BUQ. PERMIT*O3OI Oft.-. ARCHITECT ASSOCIATES ENGINEER Kg* CONTRACTOR COI^fCRETB MIX DESIGN APPRO VED FABRIC ATOR SUB-CONTRACTOR PR&g|StQN DESIGN STRENGTH Zg QQ P^ * SUFPUER PAloW4Jt MATERIAL GRADE THE FOLU)WING WAS INSPECTED m ACCORDANCE A CCA '! Q THE APPROVED PLANS AMP Of . 2 g Cu.OF 25QO p. S.X AT I. rtf ikit£lHag ColuMKj ALn>j4 D Attife fl 1* 4+ u/AJl A MP i AND 4- Ala ! ALaKi/i U I ilsig AKJO I— LlURt . TESTLABu SAMPLES TIMED* 7?OQAM tiMiQut 2j'l HOURS OVERTIME, NOTi:mSPECTK>NSA*EBAS^ONA4HOUR)«NlMUM<)V^ REQUIRINa MORE THAN 8 HOURS, SATURDAYS AND HOLIDAYS ARE BILLED AT TIME AND ONE HALF. THERE IS A SHOW UP CHARGE FOR JOB CANCELLATIONS IF OFFICE IS NOT NOTIFIED IN ADVANCE (PREVIOUS DAY). WHITE: ROT YELLOW: INSPECTOR PINK:CUENT JiHMt 11:21 FrorO'MY CONtaTMTS Ctfit t. pttffrmg • . r-»in July 17,2003 J.N. 001029 92008 Dor Sin: Bated upon our survey on July 16,2003, the location «£ jubrtantiafly located to Mxonltnce wtth the PtaaDrawin«No.403^A. NO. 1 fcttiofliioo forms ira on Ac approved Oradmg OT)AY CONSULTANTS. B4C. nojict MmgMT ^r^* « W UMb A^Mb Wm 8M> : 7GOWITWO TH: TOOMl W»