Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2784 GATEWAY RD; 103; CB130614; Permit
04-11-2013 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No CB130614 Building Inspection Request Line (760) 602-2725 Job Address Permit Type Parcel No Valuation Occupancy Group Project Title 2784 GATEWAY RD CBADSt 103 Tl Sub Type INDUST 2133001204 Lot# 0 $40,015 00 Construction Type 5B Reference # CFM - 1,078 SF OFFICE TO OFFIC IN AN EXISTING 2,694 SF SUITE status Applied Entered By Plan Approved Issued Inspect Area Plan Check # ISSUED 03/13/2013 LSM 04/11/2013 04/11/2013 Applicant SUSANNA SAMANIEG STE C 2403 LA COSTA AV CARSLBAD CA 92009 760-696-0502 Owner KELLY CAPITAL GROUP INC 406 9TH AVE #309 SAN DIEGO CA 92101 Building Permit $386 99 Meter Size Add'l Building Permit Fee $0 00 Add'l Reel. Water Con Fee $0 00 Plan Check $270 89 Meter Fee $0 00 Add'l Building Permit Fee $0 00 SDCWA Fee $0 00 Plan Check Discount $0 00 CFD Payoff Fee $0 00 Strong Motion Fee $8 40 PFF (3105540) $728 27 Park Fee $0 00 PFF (4305540) $672 25 LFM Fee $0.00 License Tax (3104193) $0 00 Bndge Fee $0 00 License Tax (4304193) $0 00 BTD #2 Fee $0 00 Traffic Impact Fee (3105541) $0 00 BTD #3 Fee $0 00 Traffic Impact Fee (4305541) $0 00 Renewal Fee $0,00 PLUMBING TOTAL $0 00 Add'l Renewal Fee $0 00 ELECTRICAL TOTAL $83 00 Other Building Fee $0.00 MECHANICAL TOTAL $49 50 Pot Water Con Fee $0 00 Master Drainage Fee $0 00 Meter Size Sewer Fee $0 00 Add'l Pot Water Con Fee $0 00 Redev Parking Fee $0 00 Reel Water Con Fee $0 00 Additional Fees $0 00 Green Bldg Stands (SB1473) Fee $1 00 HMP Fee 9? Fire Expedidted Plan Review $0 00 Green Bldg Standards Plan Chk 9? TOTAL PERMIT FEES $2,200 30 Total Fees $2,200 30 Total Payments To Date $2,200 30 Balance Due: $0.00 Inspector INALAPPROVAL Date Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the Crty Manager for processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exaotions of which vou have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired GstfpLANNiNG [ENGINEERING ^BI THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: BUILDING • HEALTH •HAZMAT/APCD «4 CITY OF CARLSBAD Building Perinit Application 1635 Faraday Ave . Carlsbad, CA 92008 Ph. 760-602-2719 Fax- 760-602-8558 email building@carlsbadca gov www.carlsba(lca.gov Plan Check No. 66 /SO^/*^ Est. Value Plan Ck. Deposit 7^, f^Q Date •5 SWPPP JOB ADDRESS CT/PROJECT » TOTS -fpHASEK I OOF UNITS |« BEDROOMS SUrrEf/SPACE«/llNIT« 4£) # BATHROOMS 2. TENANT BUSINESS NAME CONSTR TVPE OCC GROUP J8 OESCRII^ION OF WORK. IrKluie Squan Feet of Affected Area(s) Office use. : 1^ 01^ S F. of C^t^,ryipn>u<.d .^/t* o'fiA^hc^^J f t^xf^rrrtXl^id, hJe^U/ office^, Ce.'i\ir\jS, U^A^HS, li^ktfn^^ ^.\cch<i CA,(, Hva. C e ^t^e^ pr*^-hj hlUa^C ducd^ lAJorl<~, tfVA.-e COnhrvls. fjO AJt:^ p)uuh/\b'ir\.^. EXISTING USE PROPOSED USE APPLICANT NAME (Primary Contact) GARAGE (SF) o PATIOS (SF) o DECKS (SF) o FIREPLACE YES[~> AIR CONDITIONING YESf5Z[N0| I FIRE SPRINKLERS YES;^NOQ APPLICANT NAME (Secondary Contact) ADDRESS CITY STATE ZIP CITY STATE ZIP PHONE PHONE Susanna (p A^S'^i^ ^dortners.cafr^'^'''' Jsa^jy^^u^'ie^o ^ C-fmS^j. tor^ PROPERTY OWNER NAME White Construction, Inc ADDRESS 't . / , STATE ADDRESS 2540 Gateway Road crtY CITY Carlsbad STATE CA ZIP 92009 PHONE PHONE 760-473-2401 760-931-1130 EMAIL SIGNER NA,VIE& ADDRESS \J | STATE UC » EMAIL sean@whiteconstructioninc.com ARCH/DESIGNER Pnn^ry tlon-^^-h U A?>9iaikb (Sec 7031 5 Business and Professions CSde Any City or County which requires a permit to construct 452513 B env BUS Lies 1202380 (Sec 7031 5 Business and Professions OSde Any Oty or County which requires a permit to construct alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 70315 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Workers' Compensatian Declaration / fiereby affirm underpenalty of peijury one of the following declarations m 1 have and will maintain a certificate of consent to self-insure for worters' compensation as provided by Section 3700 of the Labor Code, for the perfomiance of Ihe work for which this permit is issued • I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the perfonnance of the work fbr which this pennit is issued My woikeis' compensation insurance camer and policy numberare Insurance Co _ New York Manne & General Insurance Co Policy No . WC13BEP0001089 Expiration Date. 1/1/14 This secton need nol be completed if the permit is for oiffi hundred dollars (S100) or less I I Certificate of Exemption'. I certify that in the perfonnance of the vioik for which this pemiit is issued, I shall not employ any person in any manner so as lo becoine subject to the Workers' O>mpensalion Laws of California WARNING. Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damage^s provided for In Section 3706 of the Labor code, interest and attorney's fees. veS" CONTRACTOR SIGNATURE /y^, ^^^^^'^z' [7| AGENT DATE • "OT=;IU!I / /lere/y affimi ttmt I am exempi from Contractor's bcense Law for the fotlowing reason I [ I, as owner of the property or my employees with wages as their sole compensation, vnll do the work and the stmcture is not intended or offered for sale (Sec 7044, Business and Professions Code The Conlraclor's License Lav/ does not apply to an ovmer of property who builds cr improves thereon, and who does such work himself or Ihrough his own employees, provided that such improvements are not intended or offered for sale If however, the building or improvement is sold within one year of oomplelion, Ihe owner-builder will have the burden of proving that he did not build or improve for the purpose of sale) I, as owner of the property, am exclusively contracting with licensed contractors to constmct the project (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects vnth contractorfs) licensed pursuant to the Contractcr's License Law) j I I am exempt under Section Business and Professions Code for this reason 1 I personally plan to provide the major labor and matenals for construction of the proposed property improvement •Yes riNo 2 I (have / have not) signed an application for a building pemiit for the proposed work 3 I have contracted with the following person (fimi) to provide the proposed constmction (include name address / phone / contractors' license number) 4 I plan to provide portions of the worti, but I have hired the following person to coordinate, supervise and provide the major v/oik (include name / address / phone / contractore' license numtier) 5 I will provide some o( the wort<, but I hafficontracted (hired) the following peraelRlo provide the wort< indicated (mclude name / address / phone / type of work) Plan Check No - B-1.55 WEB-CommercialPermit App.pdf http://www.carlsbadca.gov/services/departments/building/Documents/.. (S®CDPaS!?e TFEIOS SS<S'u'0®El, P®© G3®[>3=B@SD®SraUO^a ©QOO&BOGO® PS^CSOffg ®G3.[kW Is the appllcan! or future buildmg occupant required to submit a business plaj, acutely hazadous materials registration form or nsk management and prevention program under Sectians 25505,25533 or 25534 of the Presley-Tanner Hazardous Substance Account AcP OYes "(QNo Is Ihe applicant or future building occupant required to obtain a pettnit from ihe ar pdlulion control dtstnd or air quality management distnct? D Yes /fna Is fhe facility to be constructed within I.OOOfeelof the outer boundary of a school site'' OYes JSNo IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for Ihe performance of Ihe work this perniit is issued (Sec 3097 (i) Civil Code). Lender's Name Lender's Address (api?Q>0(g^aG3tf ge©'irDi?o(gzauo©c3 I cediiy that I have itad the application and state thatthe above Infbmiatian ts conect and that the infonnatian on the plans is accurate I agree to comply wtth all Qty oidinanoes and State laivs relating to building constnidion. I hereby authorize lepresenlatiwe of the Cily of Ca^bad to enter upon the above mentioned property for inspection puiposes 1 ALSO AGREE TO SAVE, IMDEd/NIFY AND KEEP HARM_ESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CfTY IN CCN^CSUENCE OF THE GRANTING OF THIS reRMfT OSHA An CSHA pemii is nsqu«ed for excavatwns over 5'0' deep and demoliton or constmction of stnjctures over 3 stones on heght EXPIRATION. Every pemut issued by the Budding Official under Ihe provisions of the Code shall expire by linutation and become nuB and void if the building or vwik authonzed by such pemut B nol commenced vwlh'in 180 days from the date of such permit orif the buMmg or work authorized by such permi is suspended or abandoned at any time after the work is commenced for a penod of Iffi) days (Secton 106 4 4 Unifomn Building Code) ^STAPPUCANTS SIGNATURE DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the follov/ing ONLY if a Certificate of Occupancy will be requested at final inspection. CERTIFICATE OF OCCUPANCY (Commercial Projects Onlyl Fax (760) 602-8560, Eniail buildinq(@Garlsbadca ClOV or Mail the completed fomi to City of Carisbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. C0#: (Office Use Only) CONTACT NAME OCCUPANT NAIHE ADDRESS BUILDING ADDRESS CfTY STATE ZIP CfTY Carlsbad CA PHONE OCCUPANrSBUS UC No. DELIVERY OPTIONS • PICKUP: c CONTACT (Usted above) D OCCUPANT (Listed above) a CONTRACTOR (On Pg. 1) a MAIL TO: • CONTACT (Listed above) • OCCUPANT (Usted above) • CONTRACTOR (On Pg. 1) a MAIL/FAXTOOTHEB: G ASSOCIATED CB#- • NO CHANGE IN USE / NO CONSTRUCTION • CHANGE OF USE / NO CONSTRUCTION ^efAPPUCANTS SIGNATURE DATE 2 of 15 3/10/2013 6:54 PM Inspection List Permit#: CB130614 Type: Tl INDUST CFM-1,078 SF OFFICE TO OFFIC IN AN EXISTING 2,694 SF SUITE Date Inspection Item Inspector Act Comments 05/20/2013 89 Final Combo -Rl UNIT 103 COF 05/20/2013 89 Final Combo PB AP 05/08/2013 85 T-Bar -Rl AFTER 2 PM PLS 05/08/2013 85 T-Bar PB AP 04/25/2013 14 Frame/Steel/Bolting/Weldin PB AP 04/25/2013 34 Rough Electnc PB PA 04/22/2013 17 Intenor Lath/Drywall MC PA WALLS ONLY, SEE CARD 04/15/2013 34 Rough Electnc PB PA Tuesday, May 21, 2013 Page 1 of 1 INSPECTION RECORD El INSPECTION RECORD CARD WITH APPROVED PLANS IMUST BE KEPT ON TME JOB EI CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION EI FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.Carlibadca.gov/BuHdinq AND CLICK ON "Request Inspection" DATE: ^1/1/3 IF "YES" IS CHECKED BELOW THAT DIVISION S APPROVAL IS REQUIRED PRIOR TO BEOUESTING A FlNAL BUILDING INSPECTION. IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER ALL REQUIRED APPROVALS ARE SIGNED OFF- FAX TO 760-602-8560. EMAIL TO BLDGINSPECTIONS@CARLSBADCA.GOV OR BRING IN A COPY OF THIS CARD TO: 1635 FARADAY AVE.. CARLSBAD. CA 92008. BUILDING INSPECTORS CAN BE REACHED AT 760-602-2700 BETWEEN 7:30 AM - 8:00 AM THE DAY OF YOUR INSPECTION. CB130614 2784 GATEWAY RD 103 CFM -1,078 SF OFFICE TO OFFIC IN AN EXISTING 2,694 SF SUITE Tl INDUST Lot# SUSANNA SAMANIEG , RECORD COPY NO YES Required Prior to Requesting Building Final If Checlced YES Date Inspector Notes v/ Planning/Landscape 760-944-8463 Allow 48 hours CM&I (Engineering Inspections) 76&438-3891 Call before 2 pm Fire Preverrtion 760-602-4660 Allow 48 hours Type of Inspection Type of Inspection CODE # BUILDING Date Inspector CODE # ELECTRICAL Date Inspector #11 FOUNDATION #31 • ELECTRIC UNDERGROUND • UFER #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 • ELECTRIC SERVICE • TEMPORARY • GROUT • WAU DRAINS #35 PHOTOVOLTAIC #10 TILTPANELS #39 FINAL #11 POUR STRIPS CODE # MECHANICAL #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME • FLOOR ,^0^LIN6 #44 • DUCT & PLENUM • REF. PIPING #15 ROOFSHEATHINQ #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS #49 FINAL #16 INSULATION CODE # COMBO INSPECTION #18 EXTERIOR LATH #81 UNDERGROUND (11,12,21,31) #17 INTERIOR LATH &DRYWA11 #82 DRYWALLEXT UTH, GAS TES (17,18,23) #51 POOLEXCA/STEEL/BOND/FENCE #83 ROOFSHEATING,EXTSHEAR(13,15) #55 PREPLASTER #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL #89 FINAL OCCUPANCY (19,29,39,49) .CODE # IPLUMBING Date Inspector #22 • SEWER & BL/CO •Pl/CO FIRE Date Inspector #21 UNDERGROUND •WASTE •WTR n Q #24 TOPOUT •WASTE •WTR A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO #23 • GAS TEST • GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC #29 FINAL A/SFINAL CODE # STORM WATER F/A ROUGH-IN #600 PRE-CONSTRUCTION MEETING F/A HNAL #o03 FOLLOW UP INSPECTION FD(ED EXnNGUISHING SYSTEM ROUGH-IN #605 NOTICE TO CLEAN FDCED EXTING SYSTEM HYDROSTATIC TEST #607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OFVIOUTION MEDICAL GAS PRESSURETEST #610 VERBALWARNING MEDICAL GAS HNAL REV 10/2012 SEE BACK FOR SPECIAL NOTES Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b) For the purpose of this section the term construction site shall mean the location on which actual construction of a building is in progress. i (c) A violation of this section shall constitute a misdemeanor All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DATE ADDITIONAL NOTES EsGil Corporation In (Partnership witH government for (But fdtng Safety DATE: 4/5/13 • AEEDCANT •<JURIS 3 JURISDICTION: City of Carlsbad •^PtAN-REVIEWER • FILE PLAN CHECK NO.: 13-0614 SET II PROJECT ADDRESS: 278;9 Gateway Rd Suite 103 PROJECT NAME: CFM: San Diego INC, Process Control Specialist - TI XI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies Identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. I I The check list transmitted herewith Is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list Is enclosed for the jurisdiction to forward to the applicant contact person. I I The applicant's copy of the check list has been sent to: ^ EsGil Corporation staff did not advise the applicant that the plan check has been completed. I I EsGII Corporation staff did advise the applicant that the plan check has been completed. Person contacted Telephone #: Date contacted: (by: ) Email: Fax #• Mail Telephone Fax In Person • REMARKS: RECEIVED By: Doug Moody Enclosures: APR 0 8 2013 EsGil Corporation • GA • EJ • PC 4/1/13 CITY OF CARLSBAD BUILDING DIVtSION 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 EsGil Corporation Jn (Partners lii-p witH government for (BuiCding Safety DATE: 3/20/13 •AmrfQANT iaC^JURIsJ> JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLAN CHECK NO.: 13-0614 SET I PROJECT ADDRESS: 2789 Gateway Rd Suite 103 PROJECT NAME: CFM: San Diego INC. Process Control Specialist - TI r~l The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. r~] The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ^ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. 1 I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. xl The applicant's copy of the check list has been sent to: Susanna Samanieg 2403 C La Costa Ave, Carlsbad, CA 9209 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. IXI EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Susanna Samanieg (^\(. i^,"^ Telephone #: 760-696-0502 Date contacted: 3/20//3(by: U^) Email: susanna(a)desiqn4corners com Fax #: 6 MailTelephone^ Fax In Person n REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • PC 3/14/13 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 3/20/13 130614 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 13-0614 JURISDICTION: City ofCarlsbad OCCUPANCY: B USE: Office TYPE OF CONSTRUCTION: VB ACTUAL AREA: 280 Isf ALLOWABLE FLOOR AREA: STORIES: 1 HEIGHT- SPRINKLERS?: YES OCCUPANT LOAD: 28 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 3/13/13 DATE PLANS RECEIVED BY ESGIL CORPORATION: 3/14/13 DATE INITIAL PLAN REVIEW COMPLETED: 3/20/13 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained In the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the Issuance of a building permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC, The following items listed need clarification, modification or change. All Items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, piease note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. City of Carlsbad 13-0614 3/20/13 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGII Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGII Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468 Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Please provide a statement on the Title Sheet of the plans to show compliance with the current Codes. The following are the correct current Codes: a) The 2010 edition of the California Building Code (CBC) adopts the 2009 International Building Code (IBC) and the 2010 California Amendments. b) The 2010 edition of the California Electrical Code (CEC) adopts the 2008 National Electrical Code (NEC) and the 2008 California Amendments. c) The 2010 edition ofthe California Mechanical Code (CMC) adopts the 2009 Uniform Mechanical Code (UMC) and the 2009 California Amendments. d) The 2010 edition of the California Plumbing Code (CPC) adopts the 2009 Uniform Plumbing Code (UPC) and the 2009 California Amendments. e) The 2008 edition of the California Energy Efficiency Standards. 2. Provide a section view of the new soffits. Show: a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify manufacturer and approval number or indicate "to be ICBO approved". b) Method of attaching top to the structure and lateral bracing. c) Wall sheathing material and details of attachment (size and spacing of fasteners). d) Show height of the soffit from floor, soffit to roof framing or floor framing. 3. Please provide notes on the plans to show the suspended ceilings in Seismic Design Categories D, E & F complywith ASCE 7-05 Section 13.5.6.2.1 as follows: a) All ceilings shall use a Heavy Duty T-bar grid system. b) The width of the perimeter supporting closure angle shall be not less than 2 Inches. City of Carlsbad 13-0614 3/20/13 c) In each orthogonal horizontal direction, one end ofthe ceiling grid shall be attached to the closure angle. d) The other end in each horizontal direction shall have a clearance from the wall and shall rest upon and be free to slide on a closure angle or a listed assembly. e) Ceiling areas over 1,000 ft.^ must have horizontal restraint wires (typically restraint would consist of four 12 gauge wires splayed 90° to each other and sloped 45° to the horizontal, spaced 12" o.c). f) Ceilings without rigid bracing must have 2" oversize trim rings for sprinklers and other ceiling penetrations. 4. Glazing in the following locations should be of safety glazing material in accordance with Section 2406.3 for the sidelights e) Fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24-inch arc of either vertical edge of the door In a closed position. And where the bottom exposed edge ofthe glazing is less than 60 inches above the walking surface. 5. Please correct the panel schedule to be consistent with the mechanical plans show the same number of condensers and fan coils. 6. Please correct the electrical plans and the LTG forms to show the automatic controls for all the fixtures not controlled by an occupancy sensor. Show the control on the plans and in the forms. 7. Please review the requirements, revise the plans appropriately and imprint on the plans the City of Carlsbad Policies and Procedures for Roof Mounted Equipment to the plans. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please Indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review Items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 13-0614 3/20/13 [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: 13-0614 PREPARED BY: Doug Moody DATE: 3/20/13 BUILDING ADDRESS: 2789 Gateway Rd Suite 103 BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA (Sq. Ft) Valu ation Multiplier Reg. Mod. VALUE ($) Tl 1078 37 12 40,015 Air Conditioning Fire Sprinklers TOTAL VALUE 40,015 Junsdction Code cb By Ordinance Bldg. Permit Fee by Ordinance • $386.99 Plan Check Fee by Ordinance Type of Review QRepetitve Fee ~ Repeats IZ] Complete Review • Other Q Hourly EsGil Fee • Structural Only Hr. @ $251.54 $216.71 Comments: Sheet 1 of 1 macvalue doc + ^ CITY OF PLAN CHECK Community & Economic ^ CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITTAL Carlsbad CA 92008 www/.carlsbadca.gov DATE: 03/14/13 PROJECT NAIVIE: CFM SAN DIEGO PLAN CHECK NO: 1 SET#: 1 ADDRESS: 2784 GATEWAY VALUATION: $40,015 PROJECT ID: CB13-0813 APN: > I This plan check review is complete and has been APPROVED by the ENGINEERING - ~ Division. By: KATHLEEN LAWRENCE 03/14/13 A Final Inspection by the Division is required Dves BNO This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: INFOGRADCONSTRUCTIONINC.COM You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on tlie attached checklist piease contact the following reviewer as marked: PLANNING '^i^'760.602-4610 J ; ENGINEERING 760-602-2750:; ; FIRE PREVENTIOPJ 760-%02-4665 ; *' ! ' Chris Sexton i—J 760-602-4624 Chris.Sexton@carlsbadca.eov i /1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov 1 ( Greg Ryan 760-602-4663 5regorv.Rvan@carlsbadca.gov 1 1 G Gina Ruiz 760-602-4675 ina.Rulz@carlsbadca.gov r"~l Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov f "] Cindy Wong L—' 760-602-4662 Cvnthia.Wong@carlsbadca.gov i [ Dominic Fieri 760-602-4664 )ominic.Fieri@ca rlsbadca.gov Remarks: > BUILDING PLANCHECK Development Services Land Development Engineering 1635 Faraday Avenue CITY OF CHECKLIST Development Services Land Development Engineering 1635 Faraday Avenue CAR LSBAD QUICK-CHECK/APPROVAL 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for CB13-0613 Date 03/14/13 Project Address 2784 GATEWAY APN. Project Description Tl OFFICE TO OFFICE Valuation- $40,015 ENGINEERING Contact Kathleen Lawrenco Phone 760-602-2741 Email- kathleen.lawrence@carlsbadca.gov Fax 760-602-1052 RESIDENTIAL INTERIOR IZl RESIDENTIAL ADDITION MINOR INTERIOR ONLY (<$20,000.00) CARLSBAD PREMIER OUTLETS • OTHER: CELL ANTENNAS • TENANT IMPROVEMENT PLAZA CAMINO REAL • COMPLETE OFFICE BUILDING - OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: KATHLEEN LAWRENCE DATE: 03/14/13 REMARKS: NO ADDITIONAL ENG. FEES-OFFICE PAID FOR ON CB 07-2478 Notification of Engineering APPROVAL has been sent to via EMAIL . : on 03/14/13 (E-36 Page 1 of 1 REV 4/30/11 Plan Check No - B-1.55 WEB-CommercialPermit App.pdf http://www.car]sbadca.gov/services/departments/'bullding/Documents/... ^ CITY OF CARLSBAD STORM WATER Development Services ^ CITY OF CARLSBAD COMPLIANCE ajilding aviaon ^ CITY OF CARLSBAD ASSESSMENT 1635 Faraday Avenue 760-602-2719 B-24 www.carlsbadca.gov am af^ying to the Qty of Carlsbad for the fdlcwving type(s) cS construction permit: Buildrg Pemit Rght-of-V\/^ Pemit My project is categOTcally EXBJPT ftan tte reqiirKnent to prepwe a stcxm water pdlutioi prevenSion plai because it only reqiires issuEBToe cf caie a rrcre ctf the Idicwvir^ pemit types: BectricEd FireAddtional Rre Alarm Fixed S^stenns MKttanical MdaleHome Runftang RaficCteck Photo Vdtac R&ftoofing ^Da-Faday Sprinkler V\MerDschage Project Storm MMesr Threat Assessrr^t Criteria* No Threat Assessment Criteia Mtproi&i cpjdiflesasNOTH^Tandis©ffinnpttiraTitheneqiirm»sfttopn it iTB^ the "no threrf' ^sessmsrfl cnteria on the Qtys Footed tlreat Aeaessrrefi WbrHsheet for Detarrinalion dS Constaiction SVVfPP Tier Lewel M/prqed daes nrtrneetary of the Hc^ Mtxierete a Low Thnaat cnteria des^ Tierl - LowThreal Assessment Criteria ^V Pfqect does rvd me^ any of the Significant a Maderate Thn^ rrB^ one or mane of tte fdlloiMng cntena ResiJts in some sc»! dstutaioe; antfor InducteouWoorojistrucfiai activities (such as sawaffing, ecjupmentwasfirg, material stockpiling. veKctetuelina weSestockpiling). Tia'2 - Moderate Threat AssessHnaitQiteria IVV pn^ect does nci me^ any of tfie Sgnificait Tl¥eEt assessmert Qitaia described below an^ FYqedrBcpres a gracing plan pusuart to the CaisbadGradngOdnOT^ 16oftheCalst)adMrBcipalQxb),or. F^ect wll fBsuft in 2,500 squans fe^ or mxe of sals dsturtaanoe indudr^ eiy associated oonstnxtian staging, stockpiling, psNervert refTDv^. ecppnBrt storage, relueling and manlenaioe arras and prqed me^ Locked VHtt^n 200 Sset cf ai enwroimar^dV saisrtn^ aea a tte Pacific Ooea-i^ Dsiut^ed apea is locE^ed cn a slope vvith a gade at or e(oeeding 5 honaniy to 1 vertical, Dstubed sea K loca9i^ atong cr vuthin 30 fe^ cf a stomi drain intd, ^ cpm drainage ctwin^ ^ Construction v«ll be irsteiedduing the rainy season or VMll extend irto ire ranyseascr^ 1UTou^/*pnl30) Tier 3 - Sgnificait Threat Assessnrtent Criteria IVV prajed irdudes cJeanng, grading cr oUisr dfeturbanoes to the assooEAed oon^ruction sta^ng, equpmert storage, stockpiling, pavement removi^, refueling and maintenanoe areas' ancHa h/V Pfqect IS pat cf a [iBsed developmBrJ plan thrt vMll omiaiively (BsUt in sdi assodated construction staging, equpmmt storage, refueiing and maintmmce areas or. My prqed IS located inside or vyrthin 200 feet of an environnrBTTtalV seretjve area Qty ESA pdertial for oontnbtiing pdltiaits to neartjy receiving waters by way of storm wefer amcff a non-sJorm water dischage(s) I certify to the best of nfiy knowledge that the ^ove checked statements are true and correct. I understand and acknowledge that even though this project do^ not require prepa-allon of a constmction SV\PP, I must still adhere to, mi at ail titres during construction activities for the pemit type(s) check above cc»Tply with the stonn water best mai^ement practice pursuant to Title 15 of the Caisbad Municip^ Code and to Qty Standards. Tire Qly Bigir»Eer rray aultioniffi rnrw vanaioes ftoTi ttie stomi V\aer Ttreat/tesessiTErt Qitena in speaal aiuiTBtanoes vvhae (1 cari be shcw<i that a lesser a h^ier CcrsbTJclion SWFP Tia wamarted B-24 RqectAttEss. fiesesscrPameS No T?M &a.^^ lU . UrlsbaJ ^/^ • Zl,^- OmtlOmets /UhonzEd figsst N&ne Tide C>(^«t!Cyvna'5 Authorized totit Sgnati^^ Date Page 1 of 1 Rev 03/09 4 of 15 3/10/2013 6:54 PM W CITY Of CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca eov DATE: 3-14-13 PROJECT NAIVIE: PROJECT ID: PLAN CHECK NO: CB 13-0614 SET#: 1 ADDRESS: 2789 Gateway Rd APN: 213-300-12-01 This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required DYes ^ No you may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. [Jj This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: susanna@deslgn4corners.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANIMING I 760-602:4610 , , , ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 . X Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov • 1 1 Dominic Fieri 760-602-4664 Domlnic.Fieri@carlsbadca.gov Remarks: ^ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov 4^ DATE: 3/29/13 PROJECT NAME: CFM San Diego BW^ " T»ROJECTID: PLAN CHECK NO: cbl30614 SET#: II ADDRESS: 278^Gateway Road #103 APN: • This plan check review Is complete and has been APPROVED by the fire Division. By: cwong A Final Inspection by the Division is required ^ Yes • No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to : susanna@deslgn4corners.com (and via usps) Vou may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Q Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov X Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: **APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. Page 1 of 2 THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. 3/27/13 *** Bubble all Changes*** 1. Sheet AO.l Code references should reflect current code editions. 2. Sheet A0.2 Fire Protection notes #16: Add a reference to section CFC 907.4.1, that states smoke duct detectors shall be connected to a building's fire alarm system OR if no fire alarm present, smoke duct detectors shall activate a visible and audible signal in an approved location and shall be identified as air duct detector trouble. 3. Sheet A0.2 #23 Should be 20 not 100 sprinkler heads. 4. Sheet A2.3 Adjacent suites 140 and 110/120. Please provide occupancy classification although not in scope. Page 2 of 2 Carlsbad Fire Department Plan Review Requirements Category: TI, INDUST Date of Report: 03-29-2013 Reviewed by: / (yf Name: Address: SUSANNA SAMANIEG STEC 2403 LA COSTA AY CARSLBAD CA 92009 Permit #: CB130614 Job Name: CFM - 1,078 SF OFFICE TO OFFIC Job Address: 2784 GATEWAY RD CBAD St: 103 INCO]NlPl^TB=»!===Jttisj^g^^^^h submitted^forjreyieJOS-incpmplete.—At^^^ cannot adequately conduct a review to ^tg^^^^^^S^^gth the applicable codes and/or standards. Please review carefully all commegjgsaitte^flea Please resubmit the necessafy^lanSsai^/or specifications, with changes "clouded", to this offite»^!Sfrcview and approval. Conditions: Cond: CON0006181 [NOT MET] *** Bubble all Changes*** 1. Sheet AO.l Code references should reflect current code editions. 2. Sheet AO.2 Fire Protection notes #16: Add a reference to section CFC 907.4.1, that states smoke duct detectors shall be connected to a building's fire alarm system OR if no fire alarm present, smoke duct detectors shall activate a visible and audible signal in an approved location and shall be identified as air duct detector trouble. 3. Sheet A0.2 #23 Should be 20 not 100 sprinkler heads. 4. Sheet A2.3 Adjacent suites 140 and 110/120. Please provide occupancy classification although not in scope. Entry: 03/27/2013 By: cwong Action: CO Cond: CON0006201 [MET] ** APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 03/29/2013 By: cwong Action: AP . - - * ^ CITY OF PLAN CHECK Community & Economic . - - * ^ CITY OF REVIEW Development Department 1635 Faraday Avenue CARLSBAD TRANSMITT^ D Carlsbad CA 92008 www.carlsbadca.gov DATE: 3/27/13 PROJECT NAIVIE: CFM San Diego ^ PROJECT ID: PLAN CHECK NO: cbl30614 SET#: I ADDRESS: 278^ateway Road #103 o APN: • This plan check review is complete and has been^PROVED by the fire Division. By: cwong A Final Inspection by the Division Is required ^ Yes • No ^ This plan check review is NOT COMPLETE. Items missing or Incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to : susanna@design4corners.com (and via usps) You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-60244665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.eov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov 1 1 Greg Ryan 760-602-4663 Gregory.Ryan@carisbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov X Cindy Wong 760-602-4662 Cynthia.Wong@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: *** Bubble all Changes*** 1. Sheet AO.l Code references should reflect current code editions. Page 1 of 2 2. Sheet A0.2 Fire Protection notes #16: Add a reference to section CFC 907.4.1, that states smoke duct detectors shail be connected to a building's fire alarm system OR if no fire alarm present, smoke duct detectors shall activate a visible and audible signal in an approved location and shall be identified as air duct detector trouble. 3. Sheet A0.2 #23 Should be 20 not 100 sprinkler heads. 4. Sheet A2.3 Adjacent suites 140 and 110/120. Please provide occupancy classification although not in scope. Page 2 of 2 BUILDING ENERGY ANALYSIS REPORT PROJECT: CFM: San Diego, Inc. Process Control Specialist 2784 Gateway Rd. Suite 103 Carlsbad, CA 92010 Project Designer: North County Electric Co. 1432 Eastmore PI. Oceanside, CA 92056 760-532-1480 Report Prepared by: CarynRemy, VP CABEC CEPE# NR08-12-3863 North County Electric 1432 Eastmore PI. Oceanside, CA 92056 760-532-6359 Job Number: CFM2013 Date: 2/26/2013 The EnergyPro computer program has been used to perform the calculations summarized In this comphance report This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards This program developed by EnergySoft, LLC - www energysoft.com EnergyPro 5.1 by EnergySoft User Number 20571 RunCode: 2013-02-26T22:22:11 ID- CFM2013 06 \2> Ot^tH- TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form LTG-1-C Certificate of Compliance 3 Form LTG-2-C Lighting Controls Credit Worksheet 7 Form LTG-3-C Indoor Lighting Power Allowance 8 Form LTG-MM Lighting Mandatory Measures 9 EnergyPro 5 1 by EnergySoft Job Number ID CFM2013 User Number 20571 CERTIFICATE OF COMPLIANCE (Part 1 Of 4) LTG-1C Project Name CFM: San Diego, Inc. Process Control Specialist Date 2/2612013 Project Address 2784 Gateway Rd. Suite 103 Carisbad Climate Zone 7 Total Cond. Floor Area 2,052 Unconditioned Floor Area 0 GENERAL INFORMATION Building Type: ^ Nonresidential • High-Rise Residential • Hotel/Motel Guest Room n c^k^^i n Relocatable Public • School • g^^QQ, Conditioned Spaces • Unconditioned Spaces Phase of Construction: • New Construction • Addition 13 Alteration Method of Compliance: • Complete Building Area Category • Tailored Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Name Cao^n Remy, VP CABEC CEPEtt NR08-12-3863 Signature Company North County Electnc Date 212612013 Address 1432 Eastmore PI. CEA# CFPP M NR08-12-3863 t-XB. Ol_.ru. If CEPEaNR03-12 J863 City/State/Zip Phone Oceanside, CA 92056 760-532-6359 The Principal Lighting Designer's Declaration Statement • I am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building pertpt application. Name Cao'nRemy, VP CABEC CEPE#NR08-12-3863 Signature Company Phone North County Electnc Co. 760-532-1480 Address License # 1432 Eastmore PI. C-10 946430 exp 04/30/14 CIty/State/Zip Date Oceanside, CA 92056 02/26/13 Lighting Mandatory Measures o o Indicate localion on building plans of Mandatory Measures Note Block: El & E2 LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets is Included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the Nonresidential Manual published by the California Energy Commission • LTG-1C Pages 1 through 4 Certificate of Compliance All Pages required on plans for all submittals El LTG-2C Lighting Controls Credit Worksheet El LTG-3C Indoor Lighting Power Allowance • LTG-4C Pages 1 through 4 Tailored Method Worksheet • LTG-5C Pages 1 and 2 Line Voltage Track Lighting Worksheet EnergyPro 5 1 by EnergySoft User Number: 20571 RunCode: 2013-02-26722:22:11 ID. CFM2013 Page 3 of 9 CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG-1C Project Name Date CFM; San Diego, Inc. Process Control Specialist 2/26/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG-1- INST (Retain a copy and venfy form is completed and signed ) Field Inspector • Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.) Field Inspector • A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for- El CONDITIONED SPACE • UNCONDITIONED SPACE ™ The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the 0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts) installed Watts A B C D E F G H None or Item Tag Complete Luminaire Description' (i e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts) Watts per Luminaire' How wattage Was determined Number of Luminaires Installed Watts (D X F) Field Inspector^ None or Item Tag Complete Luminaire Description' (i e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts) Watts per Luminaire' CEC Default From NA8 According To §130 (d ore) Number of Luminaires Installed Watts (D X F) Pass 'ro u. A 2\4' Troffer (2) 32W T8 Fluor (1) T8 Electronic Ballast 61 0 • 28 1,708 • • B Can light (1) 26W fluor (1) electronic ballast 28.0 • El 5 140 • • C Pendant (1) 26W4pin (1) electronic ballast 26.0 • El 6 156 • • D 2'x2'Troffer (2) 17WT8 Fluor (1) T8 Electronic Ballast 34 0 • 2 68 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Installed Watts Page Total: 2,072 Building total number of pages: 1 Installed Watts Building Total (Suni of all pages) 2,072 Building total number of pages: 1 Enter into LTG-1 C Page 4 of 4 2,072 1 Wattage shall be determined according to Section 130 (d and e) Wattage shall be rating of light fixture, not rating of bulb 2. If Fail then descnbe on Page 2 of the Inspection Checklist Form and take appropriate action to correct Verify building plans if necessary EnergyPro 5.1 by EnergySoft User Number 20571 RunCode: 2013-02-26X22:22:11 ID:CFM2013 Page4of9 CERTIFICATE OF COMPLIANCE (Part 3 Of 4) LTG-1 C Project Name CFM: San Diego, inc. Process Control Specialist Date 2/26/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft^, automatic daylighting controls for daylit areas > 2,500 ft^, d) shut-off controls, e) display lighting controls, f) tailored lighting controls - general lighting controlled separately from display, omamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft^, in accordance with Section 131. MANDATORY LIGHTING CONTROLS - FIELD INSPECTION ENERGY CHECKLIST Field Inspector Type/ Description Number of Units Location in Building Special Features Pass Fail multi-level occupancy sensor 5 offices • • • multi-level occupancy sensor 3 conference, inventory, receivin g • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of LTG-1 C) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special wntten justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that othenwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector's Notes or Discrepancies: EnergyPro 51 by EnergySoft User Number 20571 RunCode: 2013-02-26722:22:11 ID CFM2013 Page5of9 CERTIFICATE OF COMPLIANCE (Part 4 of 4) LTG-1 C Project Name CFM: San Diego, Inc. Process Control Specialist Date 2/26/2013 CONDITIONED AND UNCONDITIONED SPACE UGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting (from Conditioned LTG-1 C, Page 2) 2,072 Installed Lighting (from Unconditioned LTG-1 C, Page 2) 0 Lighting Control Credit Conditioned Spaces (from LTG-2C) 281 Lighting Control Credit Unconditioned Spaces (from LTG-2C) 0 Adjusted Installed _ Lighting Power 1,791 Adjusted Installed :- Lighting Power 0 Complies if Installed ^ Allowed [) Complies if Installed ^ Allowed [ ] Aliowed Lighting Power Conditioned Spaces (from LTG-3C or PERF-1) 1,988 Allowed Lighting Power Unconditioned Spaces (from LTG-3C) 0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual descnbes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropnately. Fornris can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Pemnit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Luminaires Controlled LTG-2A and LTG-3A Equipment Requiring Testing Descnption Number of Luminaires controlled Location Controls and Sensors and Automatic Daylighting Controls Acceptance Occ Sensor - Multi-Level 2'x4- Troffer (2) 32W 78 Fluor (1) T8 £ 6 Open Office Occ Sensor - Multi-Level 2'x4- Troffer (2) 32W TB Fluor (1) T8 B 4 Office #1 El Occ Sensor - Multi-Level 2'x4- Troffer (2) 32W T8 Fluor (1) T81 1 Office #2 El Occ Sensor - Multi-Level 2'x4' Troffer (2) 32W T8 Fluor (1) T8 B 2 Office #3 El Occ Sensor - Multi-Level 2'x4' Troffer (2) 32W T8 Fluor (1) TB t 2 Office #4 El Occ Sensor - Multi-Level 2'x4' Troffer (2) 32W T8 Fluor (1)T8B 4 Conference Room El Occ Sensor - Multi-Level 2'x4' Troffer (2) 32W TB Fluor (1)T8B 2 Inventory Rm El Occ Sensor - Multi-Level 2'x4' Troffer (2) 32W T8 Fluor (1) T8 £ 2 Shipping!Receiving El • • • • • • • • EnergyPro 51 by EnergySofi User Number: 20571 RunCode: 2013-02-26722:22:11 ID CFM2013 Page 6 of 9 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG-2C Project Name Date CFM: San Diego, Inc. Process Control Specialist 2/26/2013 POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: IE CONDITIONED SPACES • UNCONDITIONED SPACES A B C D E F G Room # Zone ID Areas Lighting Control Description' Plan Reference Room Area (ft") Watts of Control Lighting Power Adjustments Factor^ Control Credit Watts (ExF) Open Office Occ Sensor - Multi-Level A 400 366 0.20 73 Office #1 Occ Sensor - Multi-Level A 245 244 0.20 49 Office #2 Occ Sensor - Multi-Level A 100 61 0.20 12 Office #3 Occ Sensor - Multi-Level A 110 122 0.20 24 Office m Occ Sensor - Multi-Level A 110 122 0.20 24 Conference Room Occ Sensor - Multi-Level A 190 244 0 20 49 Inventory Rm Occ Sensor - Multi-Level A 92 122 0.20 24 Shipping! Receiving Occ Sensor - Multi-Level A 120 122 0 20 24 PAGE TOTAL 281 Note; Conditioned and Unconditioned Space shall be separately totaled Building total of non-dayliqht control credit watts for ail pages of LTG-2C Page 1 of 2 Note; Conditioned and Unconditioned Space shall be separately totaled Enter buildinq total of all dayliqht controls credit watts from LTG-2C Page 2 of 2 0 Note; Conditioned and Unconditioned Space shall be separately totaled BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1 C; Page 4- Lighting Control Credit as appropnate for CONDITIONED or UNCONDITIONED Spaces 281 1. Descnption shall be consistent with Type of Control defined in Table 146-C 2 Power Adjustment Factor taken from Table 146-C EnergyPro 51 by EnergySoft User Number 20571 RunCode: 2013-02-26T22:22:11 ID CFM2013 Page 7 of 9 INDOOR LIGHTING POWER ALLOWANCE LTG-3C Project Name CFM: San Diego, Inc. Process Control Specialist Date 2/26/2013 ALLOWED LIGHTING POWER (Chose One Method) A Separate LTG-3G must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: Q CONDITIONED SPACES • UNCONDITIONED SPACES COMPLETE BUILDING METHOD BUILDING CATEGORY (From §146 Table 146-E) WATTS PER (ft^) X COMPLETE BLDG. AREA ALLOWED WATTS X X X X X X X X X X X X X X X TOTALS AREA WATTS AREA CATEGORY METHOD BUILDING CATEGORY (From §146 Table 146-F) WATTS PER (ft^) X Areaft^ ALLOWED WATTS Office > 250 sqft 0.90 X 400 360 Office <= 250 sqft 1.10 X 565 622 Convention!Conference!Meeting 1.40 X 790 266 Comp Bldg Com & Ind Storage 0.60 X 92 55 Corridor!Restroom! Support 0.60 X 580 346 Lobby, Main Entry 1.50 X 225 338 X X X X X X X X TOTALS 2,052 1,988 AREA WATTS TAILORED METHOD Total Allowed Watts using the Tailored Method taken from LTG-4C (Page 1 of 4) Row 3 0 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set of forms. A separate set of LTG- 4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces EnergyPro 51 by EnergySoft User Number 20571 RunCode: 2013-02-26722:22:11 ID.CFM2013 Page 8 of 9 LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG-MM Project Name CFM.- San Diego, Inc. Process Control Specialist Date 2/26/2013 Indoor Lighting Measures: §131 (d): Shut-off Controls For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. 1. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible ' override switch in sight of the lights. The area of override is not to exceed 5.000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. §131 (a): Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor-to-ceiling walls. Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts §131 (b): per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for 6131 (c)- effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; ^ ^ '' or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131 (c): Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less.6. Outdoor Lighting Measures: §130(c)1: Mandatory lighting power determination for medium base sockets without permanentiy installed ballasts 6132faV ^" peffnanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens ^ ^ '' per Watt or are controlled by a motion sensor. S132fbv ^" Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, ^ ^ canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)1: All permanentiy installed outdoor lighting meets the control requirements listed. Ri '3o/^\ Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi-Level Lighting Requirements EnergyPro 5.1 by EnergySoft User Number 20571 RunCode: 2013-02-26722:22:11 ID: CFM2013 Page 9 of 9 PERFORMANCE CERTIFICATE OF COMPLIANCE (Parti of3) PERF-1 C Project Name CFM San Diego Inc. Date 2/25/2013 Project Address 2784 Gateway Rd Ste 103 Carlsbad Climate Zone CA Climate Zone 07 Total Cond. Floor Area 1,322 Additon Floor Area 1,322 GENERAL INFORMATION Building Type: Nonresidential Relocatable - indicate High-Rise Residential specific climate zone Hotel/Motel Guest Room all climates Phase of Construction: New Construction Addition <^ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Titie 24, Parts 1 and 6 of the Califomia Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Ma&. Gallant, CEPE Signature ^3'^ 2/25/2013 Company Gallant Energy Consulting Address 508 W Mission Ave Ste 201 Phone 760-743-5408 City/State/Zip Escondido, CA 92025 The Principal Designer hereby certifies that the proposed building design represented in this set of constixiction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110,116 through 118, and 140 through 149 of Titie 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of Califbmia as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. It <5 Principal Envelope Designer Name Signature Company Address City/State/Zip Principal Mechanical Designer Name Signature Company ^^^^ Mechankal Address City/State/ZIp Phone Principal Lighting Designer Name Signature Company Lighting Compliance Not In The Scope Of This Submittal Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) ENV-1C Certificate of Compliance. Required on plans. MECH-1C LTG-1 C Certificate of Compliance. Required on plans. >' MECH-2C LTG-2C Lighting Controls Credit Worksheet. MECH-3C LTG-3C Indoor Lighting Power Allowance. MECH-5C Certificate of Compliance. Required on plans. Air/Water Side/Service Hot Water & Pool Requirements. Mechanical Ventilation and Reheat. Mechanical Equipment Details. EnerovPro 5.1 bv EnerovSoft User Number: 2875 RunCode 2013-02-25T16:47:43 ID Paae 1 of 15 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 Of 3) PERF-1 C Project Name CFM San Diego Inc. Date 2/25/2013 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Energy Component Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process Process Lighting TOTALS Percent better than Standard Standard Design 1.01 86 39 44.10 0 00 0.00 000 62.30 7647 0.00 0.00 270 27 Proposed Design 1.13 83 49 42.04 0.00 0.00 0.00 62.30 76 47 0 00 0.00 265 43 Compliance Margin -0 12 2.89 2.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4 83 Heating j Cooling Fans Heat Rfij Pumps DHW Lighting Receptacle Process Process Ltg 1 8%\ { 1.8% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (W) 270 deg Conditioned Floor Area 1,322 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 1 Conditioned Footprint Area 1,322 sqft. Number of Zones 1 Natural Gas Available On Site Yes Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (W) 240 sqft. 128 sqft. 53 3% Left Elevation (N) 0 sqft. 0 sqft. 00% Rear Elevation (E) 240 sqft. 128 sqft. 53 3% Right Elevation (S) 270 sqft. 60 sqft. 22 2% Total 750 sqft. 316 sqft. 42 1 % Roof 1,322 sqft. 0 sqft 00% Standard Prescriptive Lighting Power Density Prescnptive Envelope TDV Energy 1 100 40,615 W/sqft. Proposed 1 100 49,244 Prescriptive Values for W/sqft. Comparison only. See LTG-1 C for allowed LPD. Remarks: THE iksfALLING CONTRACTORS ARE RESPONSIBLIE FOR THE QUAt^flTYAND SIZING OF HEATING, COOLING AND DHW EQUIPMENT, DUCT SIZING AND EQUIPMENT SELECTION (§150(h),CEC Blueprint #60) EnergyPro 5 1 bv EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Paae2 of 15 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C Project Name CFM San Diego Inc. Date 2/25/2013 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sqft) Inst LPD (W/sf)' Ctil. Credits (W/sff /flowed LPD Proc. Loads (W/sf) System Name Zone Name Occupancy Type Floor Area (sqft) Inst LPD (W/sf)' Ctil. Credits (W/sff Area (W/sf)^ Tailored (W/sf)' Proc. Loads (W/sf) HP-2 OFRCE Office <= 250 sqft f,322 *l 100 Notes: 1 See LTG-1 C 2 See LTG-2C 3 See LTG-3C 4 See LTG-4C (Items marked with astensk, see LTG-1-C by others) (by others) Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require specel written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Sianature or Stamp EnergyPro 51 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 3 of 15 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 3) ENV-1C Project Name CFM San Diego Inc. Date 2/25/2013 Project Address 2784 Gateway Rd Ste 103 Carlsbad Climate Zone Total Cond. Floor Area 1,322 Addition Floor Area 1,322 GENERAL INFORMATION Building Type Nonresidential High-Rise Residential Hotel/Motel Guest Room Schools (Public School) Relocatable Public School .Bldg, Conditioned Spaces Unconditioned Spaces Skylight Area for Large Enclosed Space 8000 ft^ (If checked include the ENV-4C with submittal) Phase of Constmction: New Construction Addition AJte ration Approach of Compliance: Component «' Overall Envelope Unconditioned (file affidavit) Front Orientation- N, E, S, W or in Degrees. 270 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Tag/ID Assembly TVpe .2 5 Ul tl (0 -I o O O) » fc H 3 Ul u. o S- c o i "> c *; o S u m Slab 1,322 (N) 0.730 None 4.4.7-A1 New Roof 1,322 (N) 0 051 R-19 4 2 2-A12 New Wall 112 (E) 0 158 None 13 0 Metal 4 3 6-D5 New Wall 112 (W) 0 158 None 13.0 Metal 4.3.6-D5 New Wall 210 0 158 None 13 0 Metal 4 3.6-D5 New 1 See Instructions in the Nonresidential Compliance Manual, page 3-96 2 If Fail, then descnbe on Page 2 of the Inspection Checklist Form and take appropnate action to correct A fail does not meet compliance FENESTRATION SURFACE DETAILS Tag/10 Fenestration Type a a < I us 6z lot S 3 3 o W o o X s £ O o 2 = X O (A CO w c o T3 3 §s o to Window 128 (E) 1 190 Default 0 250 COG New Window 128 (W) 1 190 Default 0 250 COG New Window 60 (S) 1 190 Default 0 250 COG New 1 See Instructions in the Nonresidential Compliance Manual, page 3-96 2 If Fail then descnbe on Page 2 of the Inspection Checklist Form and take appropnate action to correct Verify building plans if necessary EnergyPro 51 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 4 of 15 CERTIFICATE OF COMPLIANCE AND FIELD INSPECTION ENERGY CHECKLIST (Part 2 Of 3) ENV-1C Project Name CFM San Diego Inc. Date 2/25/2013 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fair N/A Roofing compliance not required in Climate Zones 1 and 16 with a Low-Sloped 212 pitch or less. Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 \blf?. Greater than 2:12 pitch. Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0 039 or lower See Opaque Surface Details roof assembly, Column H of ENV-2C. Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0 048 or lower See Opaque Surface Details roof assembly below, Column H of ENV-2C The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www enerciv ca qov/title24/ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft^ are exempt from the Cool Roof cntena below High-nse residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9,12 and 16 are exempted from the low-sloped roofing cntena 1 If Fail then descnbe on this page of the Inspection Checklist Form and take appropnate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope 2 12 >2 12 Product Weight < 51b/ft^ 5lb/ft^ Product Type' Aged Solar ReflectancI Thermal Emmitance SRr Pass Fail" 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs oro/products/seafch pho 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc 3 If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0 2+0 7( ,MSI - 0 2) to obtain a calculated aged value Where is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory 4 Check box if the Aged Reflectance is a calculated value using the equation above 5 The SRI value needs to be calculated from a spreadsheet calculator at http //www enerav ca Qov/title24/ 6 If Fail then descnbe on this page of the Inspection Checklist Form and take appropnate action to correct Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4 Select the applicable coating- Aluminum-Pigmented Asphalt Roof Coating Cement-Based Roof Coating Other Discrepancies: EnergyPro 5.1 bv EnergySofi User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 5 of 15 CERTIFICATE OF COMPLIANCE (Part 3 Of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST (Part 3 Of 3) Project Name Date CFM San Diego Inc. 2/25/2013 Required Acceptance Tests Designer: This fonn is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the t)uilding for their records Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Requiring Testing or Verification Area of like Products Building Envelope Acceptance Test ppg sc(2) Canbia 316 \ EnergyPro 51 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 6 of 15 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Parti of4) MECH-1C Project Name CFM San Diego Inc. Date 2/25/2013 Project Address 2784 Gateway Rd Ste 103 Carlsbad Climate Zone Total Cond. Floor Area 1,322 Addition Floor Area 1,322 GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Schools (Public School) Relocatable Public School Bldg. Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: New Construction Addition Alteration Approach of Compliance. Component Overall Envelope TDV Energy Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 270 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e.AC-1, RTU-1, HP-1) HP-2 Equipment Type^-Split DX Number of Systems 1 Max Allowed Heating Capacity^ 56,000 Btu/hr Minimum Heating Efficiency^ 7.70 HSPF Max/flowed Cooling Capacity' 56,000 Btu/hr Cooling Efficiency' 13.0 SEER/11.0 EER Duct Location/ R-Value Conditioned / 4.2 When duct testing is required, submit MECH^A & MECH^-HERS No Economizer No Economizer Thermostat Setback Required Fan Control Constant Volume Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (I.e AC-1, RTU-1, HP-1) Equipment Type'': Number of Systems Max Allowed Heating Capacity' Minimum Heating Efficiency' Max Allowed Cooling Capacity' Cooling Efficiency' Duct Location/ R-Value When duct testing is required, submit MECH-4A & MECH-4-HERS Economizer Thermostat Fan Control 1. If the Actual installed equipment perfomiance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shail resubmit energy compliance to include the new changes 2 For additional detailed discrepancy use Page 2 of the Inspection Checklist Form Compliance fails if a Fail box is checked 3 Indicate Equipment Type Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other EnergyPro 5 1 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID. Page 7 of 15 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 4) MECH-1C Project Name CFM San Diego Inc. Date 2/25/2013 Discrepancies: EnergyPro 5.1 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 8 of 15 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1C Project Name Date CFM San Diego Inc 2/25/2013 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requinng Testiriq Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distnbuted Energy Storage DXAC Systems Ttiermal Energy Storage (TES) Systems Test Performed By Payne PH13PAOSO/PF4MmoeO / Installing Contractor EnerayPm 51 by EnerqySoft User Number 2875 RunCode 2013-02-25718 47 43 ID PageWoflS AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date CFM San Diego Inc. 2/25/2013 Item or System Tags (ie.AC-1, RTU-1, HP-1) indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (ie.AC-1, RTU-1, HP-1) HP-2 Number of Systems 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pa< je Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7 70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13 0 SEER/11 0 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b). 112(c) Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 198 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Reguired MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(g) n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Effiaency HVAC Heat Pump Thermostat Fumace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Mmimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4 2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a & b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a & b) 42,839 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a & b) n/a Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(a & b) 44,326 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(c) Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(d) No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(e) No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(g) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(0 Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electnc Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing If Yes, a MECH-4-A must be submitted 144(k) No 1 Total installed capacity (MBtu/hr) of all electnc heat on this project exclusive of electric auxiliary heat for heat pumps If electnc heat is used explain which exception(s) to §144(g) apply EnergyPro 51 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 11 of 15 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name CFM San Diego Inc. Date 2/25/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H 1 J K L M N Zone/System Condition Area (ft") CFM pw ft^ Mm CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D VA Max of DorG Design Ventilation Air CFM 50% of Design Zone Supply CFM BX04 CFM Iff Max of Columns H, J.K, 300 CFM Design Minimum Air Setpoint Transfer Air OFFICE f,322 015 198 198 )98 HP-2 Tota; 198 198 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section ^121. Table 121-A. E Based on fixed seat or the qreater of ttie expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating H Required Ventilation Air (REQ'D V A.) fe the larger of the ventilaSon rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G) 1 Must t>e qreater than or equal to H, or use Transfer Air (column N) to make up the difference J Design fan supply CFM (Fan CFM) x 50%, or the design zone outdoor airflow rate per §121 K Condition area (ff) x 0 4 CFM / ff, or L Maximum of Columns H. J, K. or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N N Transfer Air must be provided wtiere ttie Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M) Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Desiqn Minimum Air (Column M), Column H minus M EnergyPro 5.1 by EnergySoft User Number 2875 RunCode: 2013-02-25710-47 43 ID Page 12 of 15 MECHANICAL EQUIPMENT DETAILS (Part 1 of 2) MECH-5C Project Name Date CFM San Diego Inc 2/25/2013 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Qty Efficiency Tons Qty GPM BHP Pump Control DHW / BOILER SUMMARY System Name Type Distiilnition Qty Rated Input Vol (Gals). Energy Factor or RE Standby Loss or Pilot Tank Ext. R-Value Status MULTI-FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water Piping Length (ft) Control Qty. HP Type In Plenum Outside Buried Add %" Insulation CENTRAL SYSTEM RATINGS HEATING COOUNG System Name Type Qty. Output Aux kW Efficiency Output Efficiency status Payne PH13PA060/PF4MNA060 SpW DX 1 56,000 00 7 70 HSPF 56,000 13 0 SEER/11 0 EER New CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type CFM BHP CFM BHP Payne PH13PA060/PF4MNA060 Constant Volume No Economizer 2,000 0 75 none EnergyPro 51 by EnergySofi User Number 2875 RunCode. 2013-02-25710:47:43 ID Page 13 of 15 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name CFM San Diego Inc. Date 2/25/2013 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating matenal shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3 §118(0: All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117{a): All Extenor Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstnpped or otherwise sealed Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.^ of §116(a) 1: window area, 0 3 cfm/ft.^ of door area for residential doors, 0.3 cfm/ft.' of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.' for nonresidential double doors (swinging). §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §116(a) 3. Fenestration SHGC shall be rated m accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §116(b): Site Constmcted Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors) EnergyPro 5 1 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Paqe 14 of 15 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MMl Project Name CFM San Diego Inc. Date 2/25/2013 Equipment and System Efficiencies §111. Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a). Fan type central furnaces shall not have a pilot light §123. Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123 §124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e) Each space conditioning system shall be installed with one of the following- IA. Each space conditioning system serving building types such as offices and manufactunng facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system dunng off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1B An occupancy sensor to control the operating period of the system; or 10. A 4-hour timer that can be manually operated to control the operating penod of the system. 2. Each space conditioning system shail be installed with controls that temporanly restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint §122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones Each zone, shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cwolmg to be setback or shut off independently of other isolation areas, and shall be controlled by a time control device as descnbed above. §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel §122(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone §122(a&b): Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower For cooling, the control shall be adjustable up to 85 degrees F or higher Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F withm which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified §121(e) on these plans. §122(f)-All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings §121(f): Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or spac», or a new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories The controls shall limit the outlet Temperature to 110° F 2. Circulating sen/ice water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required EnergyPro 5 1 by EnergySoft User Number 2875 RunCode: 2013-02-25716:47:43 ID Page 15 of 15 Plan Check No - B-1.55 WEB-CommercialPennit App.pdf http://www.carlsbadca.gov/services/departments/building/Documents/... 4 CITY OF PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development ^rvices Building Ovision 1635 Faraday Avenue 760^02-2719 MWM carlsbadca.gov Project Address Permit No.: Infomiation provided below r^ersto work bang done on the above maitioned permit only. This fam rruA be completed and returned to ttie Buildinq Dvisim befaett^ f^rrit can be isstred. Building Dept. Fax: (760) 602-8558 Number of nevy or rdocated fixture^ trap^ or floor drains .Q. ^ New building sewer line? Yes No X Number of new roof drains. 0 Install/alter water line?. ^ Number of new water heater^. ^ Number of new, relocated or replaced gasoutlet^ ^ Number of new hose bibs? ^ Readential Permits; New/expandal service: Number of nav amps Minor Remodel on/y: Yes No (^mmerdal/lndustrial: Tenant Improvement: Number of existing amps invo/ved in thisproject: '^00 Af Number of new amps/j^/o/i/eity//? thisproject: New Construction: Ampsper Panel: Sngle Phase Number of new amperes Three Phase Number of new amperes Three Phase 483 Number of new amperes Number of new furnace A/C, or heat pump^ I New or relocated duct work?. Y^ No Number of new fireplace? ^ Number of new exhaust fan^. ^ Rdocate/inatall vent? ^ NumbQ- of new exhaust hood^ Number of new boilersor compressor^. Number of HP 0 B-18 Page 1 of 1 Rev 03/09 15 of 15 3/10/2013 6:54 PM CB130614 2784 GATEWAY RD 103 CFM - 1,078 SF SHELL TO OFFICE IM AM FYKTINir; 9 KQd qp c;i IITP 31,qf,^ '^U^'^ /V53 SW QlSSUED •cv Approved Date, By BUILDING PLANNING ENGINEERING ^ .3/3 JCL. FIRE Expedite? Y (N) AFS Checked by HazMat APCD Health Forms/Fees Sent Rec'd Due? By Enema Y N Fire y N HazHealthAPCD Y N PE&M .^//3//3 Y N School Y N Sewer Y N Stormwater Y N Special Inspection Y N CFD-^ N^OJ LandUse ^^C^ CFD-^ N^OJ LandUse ^^C^ Sensity ImpArea FY Annex Factor PFP f Y' J N CotnmehtS Date Date Date Date Building Planning Engineering Fire Need? • Done a Done • Dope • Done a Done • Done