Loading...
HomeMy WebLinkAbout2788 James Dr; ; CBR2018-1303; Recycle{'city of Carlsbad Owner: WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Job Address: '1..,18 is~~ (}(L._ Phone Number: _ _,b"'--{-'-)_-_q_L_l_-_C>_8_0_3 ___ _ Permit#: c,0 /] ,.._ ooo~ Estimated Cost of Project: $ __ ~ C/V~-+---------- Type Of Project: □ New Construction □ Remodel or T.I. ...'.181Residential □ Commercial D Demolition (check all that apply) D Other -------------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area, ________ X 2 lbs.= _________ lbs. of allowable waste. ;JJ I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to be taken to I bs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garba<"<e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled, _______ % I certify that th;Jform tion provi~M~the best of my knowledge, is true and correct. 7 /'3 I / g Date / / Official Use nly D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by:. ___________________ _ Page 1 of 2 REV.01-2017