Loading...
HomeMy WebLinkAbout2788 LOKER AVE W; ENERGY; CB880065; Permiti i. TITLE 24 REPORT FOR: Building il El Fuente Business Park Carlsbad, California PROJECT DESIGNER: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 OWNER: Davison-Jones Development 411 campus Drive, Suite 830 Irvine, CA 92715 REPORT PREPARED BY: PROCALC 705 s. Velare St. il0 Anaheim, CA 92804 1-(800) TITLE-24 Job Number: T499A Date: 12/31/1987 The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the • calculations summarized in this compliance report. The program has interim . approval and is authorized by the California Energy Commission for use with \,\,'.:..#' the Second Generation Nonresidential Building Energy Efficiency Standards • .,,.. Cb.iioo ~s Table Of Contents for Title 24 Report ------------------------------------- Cover Page ••..•••••.••••••••..•••••••••••••••••••.•••••••••••••••••• Table of Contents .................................................... Form CF-l Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 3 5 Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7 Form CF-2 Envelope summary & Worksheet •••••••••••.••••••••••••••••••• 9 Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-4 HVAC Power Indices summary Form WS-4 HVAC System summary Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form CF-5 Lighting Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HVAC Zone & Space Loads Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 64 70 72 76 77 {.;ertiticate of Compliance (Part 1 ot 2) CF-1 Pro(ac:& ,ue :=rt= I fu1-+tc le /eili.,ee,., /Q14:rf Building Pennit Number· I Pim, Choc:l<od By -, Climate Zone ,ue,/e-r O'ccumanialfcn Author Cate Prescriptive Approach/Performance Approach Strategy General 1 CEO Oc:upanc:'/ Type • • • • • • • ••• of£c.4- 2 use OccupanC'J Group/Oivision • • • . • • :s---z-. 3 Padca;e Soledad • • • • • • • • •. • • • &f, 4 Gress Condilfcned Floor Area • • • • • • 1:ZrY"< ft2 Roof and FloorS/ 5 ' Prcpcsed Rcof/C4ilitlg Rt (CF-2. CF-3) • • ~O. j hr-F-ftZ'BIU 6 .. Required Rccf/C4iling Rt (CF-2) • • • • • ___ hr-F-ftZ'BIU 7 Prcpcsed Exlodcr Floor Rt (CF-2, CF-3) • • --hr-F-1\2/BIU 8 Raqulrad Extatfor Ftocr Rt (CF-2) • • • • • hr-F-ftZ181U Walfa , 9 · Prcpcsed Opaque Wall Rt (CF-2.° CF-3) • • !'f .D hr-F-ftZ1etu . 10 Wall ~eat C~pac:ft:, (CF-3) • • • • • • • • S . ~ BtulF-lt2 Reqult;d Opaque. Wall Rt (CF-2) • • • • • ___ hr-F-ftZ'SIU (C , ; fn Walla .. ,,.·,2 ExtadcrWallAnla(CF-2) •••••••• Jfl 'Z-ft2 13 TotalGiazing~a(CF-2) •••••••• ,a.towo n2 14 Proposed Total Parcant (Una 13 / Una 12) • lzS . S: % 15 Average Total SC (CF-2) • • • • • • • • • e, ,¼ 18 Allowed Total Gtazfng Percont •••••• ___ % 17 Wut Extador Wall Area (CF-2) • • • • • • "1 ?,e4--ft2 18 WestSlfaz!ngAraa(CF-2) • • • • • • • • \C...z, ft2 19 PrcpcsadWestP81Cant(CF-2). • • • • • 'i· S: % 20 Avera;~ Wast SC (CF-2) • • • • • • • • c::>, :4::'2 21 ADowedWastGtazing Percent. • • • • • % Gta:Ing In Roof (CF-6) · Proposed Allowod 22 S,kylght 1 • • • • • • • • • ------ft2 23 Skyltght 2 • • • • • • • • • __ _ ---ft2 24· Skyltght3 •. • • • • • • • • __ _ ---ft2 25 Skylight -4 • • • • • ; • • • __ _ ---ft2 2B SkyllghtS ••••••••• __ _ 27 Skylight 8 • . • • • • • • • • ------ft2 ft2 ---28 Sko/light 7 • • • • • • • • • __ _ 29 Stc-tl(ght a • • .. • • • • • • __ _ UghUng ---ft2 ___ ft2 30 PrcpoaadAdiustad LPC (CF-5) •••••• I .z z Wattslft2 31 Allow.d LPO (CF-5) • • • • • • • • • • .____ Wattslft2 'HVAC • PtdcrmanceSetSelected •••••••• __ _ ~ropcsld Fan, Wattage Index (CF-4) • • • o. j S-Wausnt2 / t ADcwedF W \· 1 . an attaga Index ••••••• ___ Watts/ft2 \ • .:::':4 Prcpcsad Cooling Power Index (CF-4) • • ,SS . ft8 StuMt2 3S Allowed Cocllng Power Index • • : • • • .____ BtuMt2 37 Prcpcsad Healing Power Index (CF-4) • • , £>. t 1 Bluhlfl2 3S Allowed Heating Power Index • • • • • • .____ ·e!Uhlrt2 ~ Revised September 1986 For Enforcement Agency Use Only µ~ -;. "Z,'2-°" ~ ~-W . Signature and Registralfon Stamp u~~~, Calo Freid Checked ay Approved By Performance Approach Energy Budge& 1 CEC Oea.lpanc:y °Type • • • , • • • • • .Qffi'«. 2 USC Oea.lpanc:y Group/Oivision • • • • • 13--Z.. Oate Cate 4 Condilfonod Floor Aroa • • • • • • • • • 1:ZZ.f.? tt2 4 Budgot Tablo • • • • • • , • • • • • • .l«\t:z-I A 5 Allowed Energy Budget (WS-1A) • • • • • ('ZS:· 0 kB!U/yr-ft2 Calculated Annual Energy Con:iumpUon 6 Approved Calculation Method •••••• t:1(, 42t1f''-'l' '%4- 7 CEC 0esignation • • • • • • • • • • • L.pt:> o-t 8 Muldpllar • • • • • • • • • • • • • • • , ) •Q'Z;:] • EsUmated Energy Use 9 Healfng • • • • • • , • • • • • • • • • ·s. r kStu,yr-tt2 10 Coaling • • • • • • • • • • • • • • • • Z (p. 0 kBtu/yr-ft2 11 Fans • • • • • • • • • • • • • • • • • ~ 4. '-kBtutyr-ft2 12 Ughts • •• • • • • • • • • • • ••• *"' 4::1 • :*J kStu,yr-ft2· 13 Miscellaneous Equipment • • • • •• ~ lf, .'l. kB!U/yr-tt2 14 Total •. • • • . • • • • • • • • • • • • • ___ k8tulyr•ft2 15 A~. Total Energy Use (lifte 8 x li11e t4t •• , JU: :='I k8tulyr-ft2 ~~j~c.c\ . . Compliance Statement General. The proposed building represented In this sat of compliance documentation Is consistent with the other compliance forms and worxsheets. with the plans and speci6calions and with any other calculalions or ccmputor runs submitted with this J:)ermic application. Performance Approach. (when applicable) The energy perf0rmance estimate presented on this form was calculated using the approved calculalion method Indicated above and with the CEC established lixed and restricted engineering inputs for the appllcable dlmate zone and OCCUpa!'CY type. Preacrfpllvo Approach. (when applicable) The proposed building has been designed 10 meet the requirements ot the Allamaliva Component • Package indicated above for the appropriate occupancy l'fP• and·climate ~.5tL Sign8d ~ TbD?1'6H -'Przg;,,p!fM r: Namellide k!IZ: Company l:Z..'.20 City/Staro/Zip (114) ln$7----S;,to ?t-°Z-0\)5 Telephone Calif. Ucense Number t..-2-0 flt--- l.,;Sruncate o-t Compliance· (Part 2 ot 2) CF-· } For Enforaament Agency Use Only -000Jmanta11on Aulhor/Finn cfieckad By Oare ... ~,, . ' Both parts cne and ~ of lhfs Certificate of Compliance must be included wilh each building pennit application for the above noted building and appe, en !he ·plans submitted for appl"0WL The building.fealtlres and requirements rei:,resentact on lhe Cenilicate of Compliance are adequate to achie\ ccmpllanca wilh the seccnd generation nonresfdentfal energy standards for the building referenced above. The bulldftig features and requlremencs a: also adequate for arr, subsequent alterations. mcclilicalions or additions to Iha building. -. Designer One Name (Print) iilla/Company Name Address Signatura Data Signature Data Enforcement Agarcf Signature Oata Enlorcament AgonCJ signature Oata Dul;nwTwo ~ . 4tJZ-:r A, ~JNTce. Dealgner Four ame (Print) / ' . Dr-JGrtdfl:--A-n:i-\/NI J MI nm Name (Print) Tide/Company Name Address Signature pate Data enlcrcement AgenCJ Signatute oa1a Owner Enforcement Agency Name (Print) • · Name (Print) Tille/Company Name Addtass Address Data Form Revised September 1986 Paq_ft __ ... -,t CERTIFICATE OF COMPLIANCE' (part 1 of 2) CF-1 page 3 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc -ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ~.i..-~ •. , ; Documentation: PROCALC Date --------------------------------------------------------------------------- PERFORMANCE APPROACH Roofs and Floors Roof/Ceiling Rt (CF-2,3) Ext. Floor Rt (CF-2,3) Walls R-30.1 R-0.0 Energy Budget CEC Occupancy Type Conditioned Floor Area Total Number of Floors Climate Zone Opaque Wall Rt (CF-2,3) Heat Capacity (CF-2,3) R-9.0 5.3 HC Energy Budget (WS-lA) Lighting Adjustment (CF-5) Energy Compliance Budget Office 7228 1 7 125.0 o.o 125.0 Glazing in Walls Exterior Wall Area (CF-2) Total Glazing Area (CF-2) Total Glazing Percent Average Total SC (CF-2) West Exterior Wall (CF-2) West Glazing Area (CF-2) West Glazing Percent Average West sc ,~azing in Roof ... :.Jskylight Area ( CF-2) Lighting 7492 2660 35.5 0.46 2934 162 s.s 0.46 0 sf sf ' SC sf. sf ' SC sf Calculated Annual Energy Consumption Approved Calculation NR COMPLY 24 Program Version Num~er 1.14 Oser License Number 1329 CEC Designation CPO 07 CEC Multiplier 1.027 Estimated Beating Cooling Fans Energy Use (KBtu/sqft-yr} 3.1 26.0 34.6 Proposed Adjusted LPD {CF-5)1.23 w/sf Adjustment Lights Receptacle 63.7 X 1.027 = 65.5 41 .. 3 16.8 1.4 124.9 HVAC Fan Wattage Index (CF-4) 0.75 Cooling Power Index (CF-4) 55.98 Heating Power Index (CF-4) 50.17 COMPLIANCE STATEMENT Hot Water w/sf Total (SCM-3) Btuh/sf Btuh/sf The proposed building represented in this set of compliance documentation is consistent with the other compliance forms and worksheets, with the plans and specifications and with any other calculations or computer runs submitted with this permit application. The energy performance estimate presented on this form was calculated using the approved calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable climate zone and occupancy type. _;.GNED \\ .... ,,/ ,_, .. - DESIGNER Calif. License t: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 ----- CERTIFICATE OF.COMPLIANCE (part 2 of 2) CF-l page 4 of 96 ---------------------------------------------------------------------------Project: Building il · Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By {.ocation: Carlsbad Date: 12/31/1987 ·-.\·-- Documentation: PROCALC Date --------------------------------------------------------------------------- Both Parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building, and appear on ~he plans submitted for approval. The building features and requirements represented on the Certificate of Compliance are adequate to achieve compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are also adequate for any subsequent alterations, modifi- cations or additions to the building. PROJECT TITLE Building il El Fuente Business Park ·carlsbad, California OTHER DESIGNER Name: Address: City: Signed: DOCUMENTATION AUTHOR PROCALC 705 s. Velare St. il0 Anaheim, CA 92804 1-(800) TITLE-24 2 /· / ) __ ,/' 1·--/// ;y_ __ /·· .. ··· .. / ..... ' Signed\: ______ /_· ________ _ '--,-...... __ ,/ / OTHER DESIGNER Name : bi ~JrJto 1c. lbirz. 1/;J,.,,,,r,,;:, I " Address: lUa I& t:lC\&?<7 City: Signed: ==•=================================================== =================== OWNER Davison-Jones Development 411 Campus Drive, Suite 830 Irvine, CA 92715 • \.:_,:;;.;1igned: ENFORCEMENT AGENCY Name: Agency: City: Signed: MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page-5 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc <&cation: Carlsbad Date: 12/31/1987 ,.\ .. -,~~·~/'-' - Enforcement Agency Suilding_Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- ENVELOPE MEASURES o certified Insulation Materials per Sec. 2-53ll(a) o Insulation Installed to meet Flame Spread and Smoke Density Requirements of Sec. 2-53ll(b) o Urea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c) o Retrofit Insulation specified per Sec. 2-5313 o Air Infiltration is minimized by specification of tested manufactured doors and windows and proper sealing and weath~rstripping per sec. 2-5317 LIGHTING SYSTEM MEASURES o Certified Luminaires/Ballasts per Sec. 2-5314(b) (.Independent Control within enclosed Areas per Sec. 2-5319(a) .,,,;__;,;r, o Manual Switching Readily Accesible per Sec. 2-5319(b) o Reduction of Lighting Load to at least 50%. per sec. 2-5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute) o Separate switching of 0aylit Areas per_ sec. 2-53l9(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale occupancies per sec 2-53l9(h) o Automatic Control of Display Lighting in Retail/Wholesale Occupancies per Sec. 2-5319(h) o Tandem Wiring of land 3 Lamp Luminaires per Sec. 2-5319(h) OCCUPANCY SENSING DEVICES (when applicable) o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-53l9(e).2 1 .Time Delays to Prevent Undesirable cycling per sec. 2-53l9(e) .3 '--:-:,~ ... /Limits on Emmisions per exceptions to Sec. 2-5319 ( e) Reference MANDATOR~ FEATURES CHECKLIST lpart 2 ot 2) MF-l page 6 o~ 90 ---------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By ~ .. -/.'.)....'.>' Documentation: PROCALC Date --------------------------------------------------------------------------- DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) o Uniform Illumination reduction to 50% per Sec. 2-5319(e).l o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 0 Step Switching Devices with Separation between On/Off settings per Sec. 2-5319(e).4 o Photocell Sensors shall be Diffusing type and no Opaque cover allowed per sec. 2-5319(e).5 o Manufacturer's Instructions provided for Installation and Calibration per sec. 2-5319(e).6 o Proper Installation of Controls including Sensor Location, • Certification of Initial Calibration and Control of Luminaires · only within Daylit Areas per Sec. 2-5319(e).8 . ,~.:.:,J Reference ---+---- o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _ HVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per Sec. 2-5312 o Certified BVAC Equipment per 2-5314(a) o Certified Plumbing Equipment per 2-5314(a) o Beating and Cooling Equipment efficiency per Sec. 2-5314(b) o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c) o Automatic Controls for Off-Hours per Sec. 2-5315{a)· o Thermostat Set Point Requirements per Sec. 2-5315(b).l o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2 o Automatic Exhaust Fan Dampers per Sec. 2-5316(b) /,.Thermostat Controls for Each Zone per Sec. 2-5315(b) \ 1.._ -_, ,_,,.~-- 0 Ventilation Provided per Secs. 2-5316 & 2-5343 o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318 tkl'\-\ . . ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Ban.zuelo/Rierson/Duff & Associates, Inc (.ocation: Carlsbad Date: 12/31/1987 ' ,l~ .,. . ' Enforcement Agency Building Permit No Checked By i. ·• Documentation: PROCALC Date --------------------------------------------------------------------------- CLIMATE ZONE 7 ENERGY BUDGETS cross Floor Sectional Office Retail No Area Budget Budget -------------------------- l 7228 125 165 BUILDING ENERGY COMPLIANCE BUDGET BY SPACE Total Budget Energy Occupancy Floor Floor (KBtu Budget Flr Space Name Type Area Mult Area /sqft) (MBtu) ~-----------------------------------------------------1 Space l Office 452 X l = 452 X 125 = 56.5 1 Space 2 Office 1124 X l = 1124 X 125 • 140.5 l Space 3 Office 1120 X l = 1120 X 125 = 140.,Q l Space 4 Office 414 X 1 -414 X 125 = 51.8 l space 5 Office 414 X l -414 X 125 = 51.8 1 Space 6 Office 610 X 1 = 610 X 125 = 76.2 (. Space 7 Office 414 X l = 414 X 125 = 51.8 Space 8 Office 414 X l -414 X 125 = 51.8 \.\:~11 Space 9 Office 610 X 1 = 610 X 125 = 76.2 1 Space 10 Office 414 X 1 = 414 X 125 • 51.8 1 Space 11 Office 414 X 1 = 414 X 125 • 51.8 1 space 12 Office 414 X l -414 X 125 == 51.8 1 Space 13 Office 414 X 1 -414 X 125 = 51.8 -----------TOTALS 7228 903.5 BUILDING COMPLIANCE BUDGET 903.5 MBtu / 7228 sqft • 125.0 KBtu/sqft •• ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 96 ---------------------------------------------------------------------------Project: Building il Designer: aanzuelo/Rierson/Duff & Associates, Inc 1 (.cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ·'-,.,~_.,.,,._.,_, Documentation: PROCALC Date --------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate use Flr Space Name Area Mult Area (KBtu/sqft) (MBtu) --------------------------------------------------l Space 1 452 X l = 452 X 142 .,a = 64.5 1 Space 2 1124 X l = 1124 X 131.0 = 147.3 1 Space 3 1120 X 1 = 1120 X 108.5 = · 121. 5 1 Space 4 414 X 1 = 414 X 128.9 = 53.4 1 Space 5 414 X 1 = 414 X 112.3 = 46.5 1 Space 6 610 X 1 = 610 X 124.6 :s 76.0 1 Space 7 414 X 1 = 414 X 112.3 =. 46.5 1 Space 8 414 X 1 = 414 X 128.9 = 53·.4 1 Space 9 610 X 1 = 610 X 143.S = 87.5 1 Space 10 414 X 1 -414 X 128.9 = 53.4 l Space 11 414 X 1 -414 X 112.3 :s 46.5 1 Space 12 414 X 1 -414 X 128.9 = 53.4 1 Space 13 414 X 1 = 414 X 128.0 = 53.0 -----------(. TOTALS 7228 902.8 902.8 I. 7228 · . .'··-._;;;;tJILDING ENERGY CONSUMPTION MBtu sqft = 124.9 KBtu/sqft ,~~-----------------! AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 96 ---------------------------------------------------------------------------Project: Building tl _.llllllllii_esigner: Banzuelo/Rierson/Duff & Associates, Inc :;ll'c,cation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE s SW . w NW TOTALS ---------------------------------------------------------------------------Roof-1 Roof-2 6591 637 6591 637 ---------------------------------------------------------------------------TOTALS ROOF R-VALOE Type Roof-1 Roof-2 Assembly Name -----------------~--------R-30 B/U with T-Bar R-30 B.O.Roof/Gyp. Clg Average R-Value 7228 Area 6591 637 7228 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s 7228 Area/ R-Value R-Value --------------30.21 218.16 28.51 22.34 -------I 240.50 = 30.05 SW w NW TOTALS -----------------~-------------------------------------------------~-------NONE ---------------------------------------------------------------------------TOTALS 0 -• ~'.;,,,.· AREA AND MA'.rERlALS SUMMARi FORM \part 2. Ot J) CF-2. page ~o o~ ~o ---------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 1.cation: Carlsbad Date: 12/31/1987 Checked By ''-\.~,;j.' Documentation: PROCALC Date --------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------963 297 2376 446 477 198 2736 7492 ---------~----------------------------------------------------------------- OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW Int TOTALS ---------------------------------------------------------------------------Wal-1 Wal-2 Wal-3 135 808 20 54 702 81 171 90 36 2576 160 1179 3474 180 ---------------------------------------------------------------------------TOTALS 963 54 702 81 261 36 2736 4833 .,._AQUE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY · .. 1._..~ Area/ Area ..... -ype Assembly Name Area R-Value BC R-Value X HC ----------------------------------------------Wal-1 6.5" Conc/R-11/Gyp.Brd. 1179 10.34 17.4 114 20503 Wal-2 5/8 Gyp/R-11/Gyp WF 3474 10.19 1.4 341 4808 Wal-3 Solid Wood Door 180 2.22 2.4 81 430 ------------Totals 4833 536 25741 Average R-Value 4833 I 536 = 9.01 Average BC 25741 I 4833 -5.33 AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page ll of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By · ' ' ' '<,.,,..· Documentation: PROCALC Date --------------------------------------------------------------------------- GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Wind-1 243 1674 365 216 162 2660 ---------------------------------------------------------------------------TOTALS 243 1674 365 216 162 2660 GLAZING O-VALUE AND SC Area X Area Type Assembly Name Area u-value SC U-Value X SC --------------------------------------------------Wind-1 Sunglass Blue Plate 2660 1.14 0.46 3022 1223 ------------Totals 2660 3022 1223 Average U-Value 3022 I 2660 -1.14 c! Average SC 1223 I 2660 -0.46 ' '~ ""'t SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 12 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc r&cation: Carlsbad . Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ·-. ---:.:._;_· y,- Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall South Glazing Southwest Glazing southeast Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window (. ~~~; · ~·~,·· Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL Heat Capacity of Exterior wall Lighting Power , • Climate zone ~ \';_~>·'' , .... , ____ . Space l 430.0 sqft 108.0 sqft 40.5 sqft 40.5 sqft 452.0 sqft 20.0 sqft o.o sqft 452.0 sqft 452.0 sqft 10.20 0.88 30.02 2.22 o.oo Rheem RPNC030J 1 Heat Pump Heat Pump Electric Resistance 2.960 9.850 0.990 No 3471 watts 373 watts 1000 CFM 3.35 1.500 watts/sqft 7 I· SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 13 of 96 ---------------------------------------------------------------------------Project: Building il . _,,.-i_esigner: Banzuelo/Rierson/Duff & Associates, Inc ~ ('11'.ocation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------South southwest Southeast OVERHANGS & SIDEFINS South A southwest (§:' southeast SPECIAL FEATURES Daylighting Strategies •• SC Factor ------------0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 12.0 4.5 4.5 Shading Device Winter Summer ------------ overhang Height Depth 0.09 0.70 9.0 ft Overall SC 0.40 0.40 0.40 Side-Fin . Distance Depth -------------- No Daylighting controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 96 ---------------------------------------------------------------------------Project: Building il .,, •esigner: Banzuelo/Rierson/Duff & Associates, Inc : ~:>cation: Carlsbad Date: 12/31/1987 Documentation: PROCALC · Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: · SCHEDULING Occupancy Level for Operational Period: Space 1 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Beater (I Number of Non-Operational Sours per \~'".,;J Number of Holidays per Year: Week: Day Night Heating Season Cooling Season Thermostat Set Point Temperatures: Winter Winter Setback summer summer Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: • Occupant Latent Load: Occupant Density: \.~~:;,,··--\ 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 96 ---------------------------------------------------------------------------Project: Building il .• esigner: Banzuelo/Rier son/Duff ~ -0cation. Carlsbad & Associates, Inc Date: 12/31/1987 Enforcement Agency Building Permit No C~ecked By t Documentation: PROCALC Date --~-------------------------~---------------------------------------------- Space Name: Space l BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -------------------------------BPTl = 48.83 (Winter) BPTl = 66.62 BPT2 = 59.47 (Summer) BPT2 = 75.26 BPT3 = 59.47 (Economizer) BPT3 = 75.26 HDD -0 (Heating) HDD = 2821 COD = 1202 (Cooling) CDD = 1 BUILDING HEAT TRANSFER (Btu/hr-F) •=•===~===•====================== Building Envelope Heat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter -summer -~• -I/,, .,i ANNUAL LOADS (MBtus) --=-================ \!(~~; Heating Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating source Cooling .source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Hot Water --- = 3.0 31.2 38.2 -----72.4 X 1.027 -- ---• • - ---• 224.6 227.2 317.2 312.5 1.2 7.6 0.4 4.7 5.8 7.6 2.5 0.2 74.4 50.3 16.8 1.4 •========================================================================= TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 142.8 KBtu/sqft ===•===•=================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 16 of 96 ------------------------------------------------------------------------~--Project:· Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc 1,.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By \-::" /,':../ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall south Glazing southwest Glazing East Glazing Southeast Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) Wall •Window (t, ·J Roof ~\,~:,,:-Door Floor HVAC SYSTEM ________ _. __ _ HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Wat·er Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power · Air Circulation Rate GENERAL Heat Capacity of Exterior Wall • Lighting Power ,. Climate Zone ... \:;;,~· Space 2 540.0 sqft 108.0 sqft 121.5 sqft 81.0 sqft 121.5 sqft 1124.0 sqft o.o sqft 0.0 sqft 1124.0 sqft 1124.0 sqft 10.27 0.88 30.13 o.oo o.oo Rheem RPNC058C 1 Heat Pump Heat Pump Electric Resistance 2.960 7.850 0.990 No 7355 watts 777 watts 2000 CFM · 9.92 1.500 watts/sqft 7 lscM INPUT DA~~ -~~~MARY ( part 2 of 2) SCM-l page 17 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/31/1987 • ~ .. ;-,· J ·\:·.., Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ----~---------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------South Southwest East southeast OVERHANGS & SIDEFINS A south (~ Southwest ' ';i-'",,, East Southeast SPECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 9.0 12.0 13.5 9.0 13.S Shading Device Winter summer ------------ Overhang Height Depth 0.37 0.70 9.0 ft overall SC 0.40 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, .Inc :'.cati!:)n: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: Space 2 Office SCHEDULING occupancy Level for Operatio~al Period:_ Day 54.60 % Night 3.80 \ Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: ·' Number of Holidays per Year: Day Night Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CO-Value): INTERNAL LOADS & ,ENERGY Receptacle Peak Load: Water Heating En~rgy: Occupant Sensible Load: Occupant Latent Load: .• Occupant Density: \..~:>/ Heating Season cooling Season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 96 ------------------------------------------------------~--------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc -",.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date ----------~---------------------------------------------------------------- Space Name: Space 2 BALANCE POINT TEMPERATURES AND DEGREE DAYS ==•======================================= Daytime Nighttime ------------------------------BPTl = 48.88 (Winter) BPTl BPT2 = 57.96 (Summer) BPT2 BPT3 -57.96 (Economizer) BPT3 HOD = 0 (Heating) HDD CDD -1501 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) ====•=====•====================== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter summer ANNUAL LOADS (MBtus) -----=============== = 66.61 = 75.12 = 75.12 -2816 = 1 ----{. \..~;~/ Heating Cooling = - ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =•====•====================•=========== Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle Source Hot Water = -- = 2.5 26.5 32.0 -----61.0 X 1.027 -----= = = = = 454.9 460.6 685.3 672.9 2.6 16.8 0.9 9.9 12.0 18.8 6.3 0.5 62.6 50.3 16.8 1.4 •·==••==================================================================== : ~ '-~.':.\· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 131. 0 KBtu/sqft =======•=================================================================== SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 20 of 96 ---------------------------------------------------------------------------Project: Building 11 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .ocation: Carlsbad Date: 12/31/1987 Checked By. •._.,..;.. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof · Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof A Door {~ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency . Rated Water Beating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 3 540.0 sqft 40.5 sqft 135.0 sqft 1120.0 sqft o.o sqft o.o sqft 1120.0 sqft 1120.0 sqft 10.20 0.88 30.13 o.oo o.oo Rheem RPNC024J 4 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached HVAC zone Heating & cooling Load summary for more details on the zoning arrangement. GENERAL .• -;;;~-Capacity of ···c·,.;,. Lighting Power Climate Zone Exterior Wall 2.98 1.250 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 21 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc (.ocation: Carlsbad Date: 12/31/1987 '\ ·.<·~: "· .::.>·, Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --~-----------------Northeast East OVERHANGS & SIDEFINS Northeast East • \D.J,ECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.07 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 96 ---------------------------------------------------------------------------Project: Building tl 41111111i,esig~er: Banzuelo/Rierson/Duff & Associates, Inc ·~cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By -:., Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 3 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours 1 Number of Non-operational Hours per Week: Day 32 hours . -~ Number of Holidays per Year: Heating Cooling Thermostat Set Point Temperatures: Winter Winter summer summer PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate cu-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: • Occupant Latent Load: Occupant Density: ~\, . -: · .. -,, .. ,. ... · Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person ---------------------------------------------------------------------------Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :···cation: Carlsbad Date: 12/31/1987 Checked By \' ', ') .... ' -bocumentation: PROCALC Date ---------~----------------------------------------------------------------- Space Name: space 3 BALANCE POINT TEMPERATURES AND DEGREE DAYS -----===•================================= Daytime Nighttime ------------------------------BPTl = 53.90 (Winter) BPTl -BPT2 = 60.49 (Summer) BPT2 -BPT3 = 60.49 (Economizer) BPT3 = HOD = 28 (Heating) BDD = CDD -1026 (Cooling) COD - BUILDING HEAT TRANSFER (Btu/hr-F) •=••==•====•==•================== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter Summer Winter summer ''seating Cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL LOADS (MBtus) ==================== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •===•=•=•=•===•===••===•====•===------- 67.03 75.45 75.45 2951 1 ---- -- ----= - ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating source cooling Source Fan Total space Conditioning Energy Source Lighting Source Receptacle source Hot Water -= = - 2.0 15.9 29.2 ------47.2 X 1.027 = --= 237.7 239.7 467.3 451.2 2.0 10.5 0.8 5.9 10.9 15.6 6.3 o.s 48.4 41.9 16.8 1.4 .• ------====••======•====•================================•====•=========== \\.,.>' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 108. 5 KBtu/sqft ===========•======•======================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc 1.ocation: Carlsbad . Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof eDoor .· Floor , .. HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 4 268.0 sqft 40.S sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Heat Pump Beat Pump Electric Resistance 2.920 9. 35.0 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL .. ;;;~-Capacity of \\,.-> Lighting Power Climate Zone Exterior Wall 4.45 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 25 of 96 ------------------------~--------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc '.ocation: Carlsbad Date: 12/31/1987 \ ,, ,.,. ~ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------~ OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southeast East OVERHANGS & SIDEFINS Southeast East i~PECIAL FEATURES Daylighting Strategies • ,.\. SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.14 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth ------------- No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc •~cation: Carlsbad · Date: 12/31/1987 \ . ' , Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Space 4 Office Occupancy Level for Operational Period: Day 54.60 % Night 3.80 % Lights/Recepta~le Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans water Heater 2915 359 3274 4518 1770 32 hours hours hours hours hours Number of Non-Operational Hours P.er Week: cl Number of Holidays per Year: Heating Day Night season hours 46 hours 5 days Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (a-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: • Occupant Latent Load: Occupant Density: 'i ~ .. '--,._ -~' / •. _,,· Cooling Season Winter Winter Setback summer summer Setup 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE. RESULTS SCM-3 page 27 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ··,; .. ;:.~. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 4 BALANCE POINT TEMPERATURES AND DEGREE DAYS ==•=•====·=-=============================== Daytime Nighttime ------------------------------BPTl -53~81 (Winter} BPTl = 67.40 BPT2 -60.52 (Summer) BPT2 = 75.61 BPT3 = 60.52 (Economizer) BPT3 = 75.61 HDD = 27 (Heating) BDD = 3069 CDD = 1020 (Cooling) coo = 1 BUILDING HEAT TRANSFER (Btu/hr-F) ===•==•====••==================== Building Envelope Heat Transfer Rate: Winter -summer = overall Heat Transfer Factor ("K"): Winter -summer - ANNUAL LOADS (MBtus) ----------===•=•==== {, ' "'-~,:;; Beating cooling -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Beating Site Cooling Site Fan Site Lighting Site Receetacle Site Bot water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ====•===============•=•==•======•=====-------Source Heating source Cooling source Fan Total Space Conditioning Energy source Lighting source Receptacle source Hot Water ---- 3.4 30.2 41.7 -----75.2 X 1.027 ------ ---- 196.3 198.7 281.2 276.9 1.3 6.0 0.5 4.2 5.8 4.6 2.3 0.2 77.3 33.S 16.8 1.4 •·===•••==•====•====•=•=======•=•=•==•===•===========-------=====•==•====• TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.9 KBtu/sqft -----=-=============•================•===•=====•==••=••==••==·=------------ SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 28 of 96 -~-------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ·&cation: Carlsbad Date: 12/31/1987 Checked By • ~; .; ,J •• ¥ ~ i 1.-•. <V_:." Documentation: PROCALC Date ----------------------~-------~---------------------------------------~---- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor · R-VALOES (including inside film resistance) Wall Window Roof aooor (~ Floor -~.;...-- HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 5 268.0 sqft 40.5 sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached HVAC Zone Heating & Cooling Load Summary for more details on the zoning arrangement. GENERAL .-;;;~-Capacity of Exterior Wall <·>·· ' Lighting Power Climate Zone 4.45 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 2-9 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc ·:Acation: Carlsbad Date: 12/31/1987 ~ .. , _,: ·,.~, . , ' Documentation: PROCALC Enforcement Agency Building .Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast East OVERHANGS & SIDEFINS Northeast East l,. . ' <.,PECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.14 0.70 9.0 ft · overall SC ------- 0.40 0.40 · Side-Fin Distance Depth ------------- No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 96 ----~------------------------------------------------------------------~---Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No &cation: Carlsbad Date: 12/31/1987 Checked By .' .. ~- 1.,:.:. ··-:·:,/ Documentation: PROCALC Date -------------------------------------------------~------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 5 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number ('Number of Non-Operational Hours per Week: Day Night v of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS ~------------------ Infiltration Rate: Slab Floor Heat Loss Rate (O-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .• Occupant Density: I .. ,, '-.;,,. ___ _,/ Heating Season Cooling Season Winter Winter Setback Summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE .RESULTS SCM-3 page 31 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Ouff 1.ocation: Carlsbad & Associates, Inc Date: 12/31/1987 Enforcement Agency Building Permit No Checked By :Ir '.' • ~ • Documentation: PROCALC Date ------------------~-------------------------------------------------------- Space Name: Space 5- BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 56.34 (Winter) BPTl -BPT2 = 62.18 (Summer>-BPT2 = BPT3 = 62.18 (Economizer) BPT3 = HDD = 83 (Heating) HDD = CDD = 784 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F} ===•============================= Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter cl Heating Cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water Summer ANNUAL LOADS (MBtus) ==================== ANNUAL SITE ENERGY REQUIREMENTS (Matus) ======================================= 67.92 76.04 76.04 3240 0 = = -= = = --= --= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Beating source Cooling source Fan Total Space Conditioning Energy source Lighting source Receptacle source Hot Water --- = 4.1 25.8 29.2 -----59.1 X l.027 = --- 196.3 198.7 281.2 276.9 1.5 4.5 0.6 3.6 4.0 4.6 2.3 0.2 60.7 33.5 16.8 1.4 •··======================================================================• <\,"> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112. 3 KBtu/sqft =========================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 32 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc ,.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ' ~ ;_ ; ., Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof Aooor (~ Floor .. " ... ....,• HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL • ·,. \ .... ,·:,. / Heat Capacity of Exterior Wall Lighting Power Climate Zone Space 6 432.0 sqft 40.5 sqft 189.0 sqft 610.0 sqft· o.o sqft o.o sqft 610.0 sqft 610.0 sqft 10.22 0.88 30.07 o.oo o.oo Rheem RPNC024J 1 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 2743 watts 373 watts 850 CFM 5.39 1.500 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 33 of 96 ----------~----------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc -'··cation: Carlsbad Da~e: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity ceiling Height .Glass Framing SHADING COEFFICIENTS --------------------southeast East OVERHANGS & SIDEFINS southeast A East (5~ECIAL FEATURES Daylighting Strategies •• '-\",~·-~~·:;; SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 21.0 Shading Device Winter . summer ------------ Overhang Height Depth 0.17 0.70 9.0 ft Overall SC --------0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc ',.cation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ----------------------------~---------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 6 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: i,~ Number of Holidays per Year: Day Night Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: : .Occupant Density: :, ', . ·,...::·~·---. Heating Season Cooling Season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-r a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc '&cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By · \://} Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 6 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 53.35 (Winter) BPTl = BPT2 = 59.88 (Summer) BPT2 = BPT3 = 59.88 (Economizer) BPT3 = HDD = 25 (Heating) HDD = CDD = 1129 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ( "K"): Winter ~Heating Cooling Site Beating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water Summer ANNUAL LOADS (MBtus) ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 67.21 75.43 75.43 3007 1 • = -= = - -----= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating source Cooling source Fan Total Space conditioning Energy source Lighting Source Receptacle source Hot Water = • - = 3.0 23.4 28.3 -----54.7 X 1.027 -• -= 256.1 259.2 381.2 374.4 1.7 7.6 0.6 4.8 5.8 10.2 3.4 0.3 56.2 50.3 16.8 1.4 ,· •·=-=======•==========-====•===•=•=====-===========-================--===• ·,\,HJ: TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 124.6 KBtu/sqft -------=====================================-==========-==-=•====-==-=-=•== SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 96 ---------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,.cation: Carlsbad Date: 12/31/1987 Checked By . ~· ,. f Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film·resistance) ----------------------------------~--------Wall Window Roof Door , Floor . .....,,,,,,. HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Beating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 7 268.0 sqft 40.S sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached HVAC Zone Heating & cooling Load summary for more details on the zoning arrangement. GENERAL ,.;;;~-Capacity of <\>> Lighting Power · Climate zone Exterior Wall 4.45 1.000 watts/sqft 7 r ------- 1 SCM INPUT DATA SUMMARY (part 2 of 2) Project: Building il . • esig~er: Banzuelo/Rierson/Duf f & Associates, Inc .-.-.?cation. Carlsbad Date: 12/31/1987 \-, Documentation: PROCALC SCM-1 page 37 of 96 E_nforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS -----------~--------Northeast East OVERHANGS & SIDEFINS Northeast East tlECIAL FEATURES Daylighting Strategies • <:y--' Glass Framing SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------- overhang Height Depth 0 .14 · 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 96 ------------------------------------------------------~--------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No _.-:.cation: Carlsbad Date: 12/31/1987 Checked By ' -··} Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDOLING Occupancy Level for Operational Period: Space 7 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-operational Hours per Week: Day Night '~ Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CO-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: . (. Occupant Density: \ .. :~:",,/· Heating Season Cooling Season Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 96 ---------------------------------------------------------------------------Project: Building il ,-~esigner: Banzuelo/Rierson/Duff -~cation: Carlsbad Documentation: PROCALC & Associates, Inc Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Space 7 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 56.34 (Winter) BPTl = BPT2 = 62.18 (Summer) BPT2 = BPT3 = 62.18 (Economizer) BPT3 = HOD = 83 (Heating) HOD = COD = 784 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter /\. . 1 ·· ..... :j Heating cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water summer ANNUAL LOADS (MBtus) ===•================ ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 67.92 76.04 76.04 3240 0 = -= - -= = ---= - ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =================•=•====•==================== source Heating source cooling source Fan Total Space Conditioning Energy source Lighting Source Receptacle source Hot Water ---- 4.1 25.8 29.2 -----59.l X 1.027 = -= - 196.3 198.7 281.2 276.9 1.5 4.5 0.6 3.6 4.0 4.6 2.3 0.2 60.7 33.5 16.8 1.4 •·=-========•===================•===============•=====================•=•= ·t-\.'>·"' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112. 3 KBtu/sqft ------------=-==================•========================•=========•==••=•= SCM INPUT DATA SUMMARY {part l of 2) SCM-l page 40 of 96 ---~----------------------------------------------~-------------------~----Project:-Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 1 1.cation: Carlsbad Date: 12/31/1987 Checked By ' ! :~--. , Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS . -----,· Exterior Wall southeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof • Door (( ... , , Floor ·<:.;,./ BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Beating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 8 268.0 sqft 40.5 sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Heat Pump Beat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached BVAC Zone Heating & cooling Load summary for more details on the zoning arrangement. GENERAL ... ;;;~-Capacity of '~ .. :> Lighting Power Climate Zone Exterior Wall 4.45 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM~l page 41 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/31/1987 ., ~ ', • ·t~ ·. Documentation: PROCALC Enforcement Agency Build~ng Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS ----------~--------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southeast East OVERHANGS & SIDEFINS southeast East •• \~~i>ECIAL FEATURES Daylighting Strategies SC Factor -------------0.46 0.880 0.46 0.880 Window Height Width . 9.0 9.0 4.0 15.0 Shading Device Winter summer ------------ Overhang Height Depth 0.14 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls ' SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 96 ------------------------------------------------------------------~--------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff"& Assoc;ates, Inc Building Permit No r&cation: Carlsbad Date: 12/31/1987 Checked By -:··· ;,' ... Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 8 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Beater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours ,.I '. '...~P1 Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate! Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible· Load: Occupant Latent Load: .• ,Occupant Density: \ ''< C ,-"'-.,. -' Night Heating Season Cooling Season Winter Winter Setback summer Summer Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 96 ---------------------------------------------------------------------------Project: Building il _..i..esigner: Banzuelo/Rierson/Duff (~iocation: Carlsbad '' '" "" & Associates, Inc Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ··~, .. ,;,--' Documentation: PROCALC Date ------~-------------------------------------------------------------------- Space Name: Space 8 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 53.81 (Winter) BPTl = 67.40 BPT2 = 60.52 (Summer) BPT2 = 75.61 BPT3 = 60.52 (Economizer) BPT3 = 75.61 HDD = 27 (Heating) HDD = 3069 CDD -1020 (Cooling) CDD = 1 BUILDING HEAT TRANSFER (Btu/hr-F) =-------========================= Building Envelope Heat Transfer Rate: Winter -summer a overall Heat Transfer Factor ("K"): Winter = Summer - ANNUAL LOADS (MBtus) ... \5;:.ii:Y Heating Cooling -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=-=====================-================ Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating Source Cooling Source Fan Total Space conditioning Energy source Lighting source Receptacle Source Hot Water ---- 3.4 30.2 41.7 -----75.2 X 1.027 ------ = --- 196.3 198.7 281.2 276.9 1.3 6.0 0.5 4.2 5.8 4.6 2.3 0.2 77.3 33.5 16.8 1.4 •========================================================================= 1. .. \~_:::-• TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 9 KBtu/sqft ===============================================================•=========== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 44 of 96 ---------------------------------------------------------------------------Project: Building il Designer:.Banzuelo/Rierson/Duff & Associates, Inc r_'.cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By . Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof · Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) -------------------------------------------Wall Window Roof (-~~~~r ,>...;.,/ HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL Heat Capacity of Exterior Wall Lighting Power ,. Climate Zone \~.>.:::·_..' '. Space 9 432.0 sqft 40.5 sqft 189.0 sqft 610.0 sqft 0.0 sqft o.o sqft 610.0 sqft 610.0 sqft 10.22 0.88 30.07 o.oo o.oo Rheem RPNC036C 1 Beat Pump Beat Pump Electric Resistance 2.920 8.000 0.990 No 4510 watts 533 watts 1250 CFM 5.39 1.500 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 45 of 96 ---------------------------------------------------------------------------Project: Building il .• esig~er: Banzuelo/Rierson/Duff & Associates, Inc ., ocation. Carlsbad Date: 12/31/1987 ~ ._;: Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast East OVERHANGS & SIDEFINS Northeast East rlPECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 21.0 Shading Device Winter Summer ------------ Overhang · Height Depth 0.17 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 96 ---------------------------------------------------------------------------Project: Building 11 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By .ocation: Carlsbad Date: 12/31/1987 ' ! "'<·,, ~ .. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 9 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30, Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Beater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours ,I ·-.. ':;Y Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CU-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: occupant Sensible Load: Occupant Latent Load: .• occupant Density: , ,. , ' ~ Heating Cooling Winter Winter summer summer Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F o.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 96 ---------------------------------------------------------------------------Project: Building il •esigner: Banzuelo/Rierson/Duff & Associates, Inc t-ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 9 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 53.65 (Winter) BPTl BPT2 = 59.51 (Summer) BPT2 BPT3 = 59.51 (Economizer) BPT3 HOD = 26 (Heating) HOD CDD = 1194 (Cooling) COD BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter summer Winter summer Overall Heat Transfer Factor ("K"): ANNUAL LOADS (MBtus) •====================== = = = = = 66.99 75.13 75.13 2935 1 = --= --_ .. ·._.·.\ ,m · \-;,.,,-,· Heating -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================== Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating Source Cooling sour<::e Fan Total Space conditioning Energy Source Lighting Source Receptacle Source Hot Water = -= - 3.0 29.7 40.4 -----73.1 X 1.027 - = = --= = = --,. 256.1 259.2 381.2 374.4 1.6 9.1 0.6 6.0 8.2 10.2 3.4 0.3 75.1 50.3 16.8 1.4 •=================.====================================•=====•============= ( ' '<>:· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 143.5 KBtu/sqft ====•====••===============================•=====================•=========• SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 48 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By /.cation: Carlsbad Date: 12/31/1987 '·,-'. •;' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES {including inside film resistance) Wall Window Roof .Door -~Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Beating Efficieqcy Rated Cooling Efficiency Rated Water Beating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 10 268.0 sqft 40.5 sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts ·1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC system. Please refer to the attached HVAC Zone Heating & cooling Load summary for more details on the zoning arrangement. GENERAL , .• ;;;~-capacity of \., .,, Lighting Power Climate Zone Exterior wall 4.45 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 49 of 96 ----~----------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc t&cation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ----~---------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southeast East OVERHANGS & SIDEFINS southeast East ,·IECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ Overhang Height Depth 0.14 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page SO of 96 ---------------------------------------------------------------------------Project: Building il Designer: ·Banzuelo/Rierson/Duff & Associates, Inc r.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By , J Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 10 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater ..... Number (]j) Number of Non-operational Hours p_er Week:. Day Night of Holidays per Year: Thermostat set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: • Occupant Density: · I . \::, .. , .. • .-· Heating Season Cooling season Winter Winter Setback Summer summer setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 51 of 96 ---------------------------------------------------------------------------Project: Building #1 __ f/jesigner: Banzuelo/Rierson/Duff & Associates, Inc '~ ncation: Carlsbad Date: 12/31/1987 . \ Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 10 BALANCE POINT TEMPERATURES AND DEGREE DAYS -----===================================== Daytime Nighttime ------------------------------BPTl • 53.81 (Winter) BPTl = 67.40 BPT2 = 60.52 (Summer) BPT2 = 75.61 BPT3 = 60.52 (Economizer) BPT3 = 75.61 HOD = 27 (Beating) HOD = 3069 COD = 1020 (Cooling) CDD = l BUILDING HEAT TRANSFER (Btu/hr-F) ··-----·===•=••=•==••=========•== Building Envelope Heat Transfer Rate: Winter • summer -Overall Heat Transfer Factor ("K"): Winter = summer - ANNUAL LOADS (MBtus) --G· { ,'·. ··, ., \ _\;,/ Beating Cooling = - ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ---·----·===============·=---===-====-= Site Heating Site Cooling Site Fan Site Light_ing Site Receptacle Site Hot Water ANNUAL-SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ···========================••======•======••= source Heating source cooling source Fan Total Space Conditioning Energy source Lighting Source Receptacle Source Hot Water • = - • 3.4 30.2 . 41. 7 -----75.2 X 1.027 --= --- = • -• 196.3 198.7 281.2 276.9 1.3 6.0 0.5 4.2 5.8 4.6 2.3 0.2 77.3 33.5 16.8 1.4 •·············=···====•=========•=====•••=•==••••••=•••=••=••==••••==•=••• 1[ ~ , ; " '· \>,:,:,ef , .... ~-TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.9 KBtu/sqft ····=·==•=•=====••=====•====•==============•=============================== SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 52 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc •1.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ,\. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window Roof · --~ ~~~~r _C!';} BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Beating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Beating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 11 268.0 sqft 40.5 sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 4 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & Cooling Load Summary for more details on the zoning arrangement. GENERAL .;;;~-Capacity of ' Lighting Power Cllmate Zone Exterior Wall 4.45 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 53 of 96 ------------------------------------------~--------------------------------Project: Building il _ _.esigner: Banzuelo/Rierson/Duff & Associates, Inc '~cation: Carlsbad Date: 12/31/1987 '\ .: Documentation: PROCALC Enforcement Agency Building-Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --~-----------------Northeast East OVERHANGS & SIDEFINS --------------------Northeast East IBCIAL FEATURES Daylighting Strategies • ('. --..~:;,-; Glass Framing SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.14 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 54 ot 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associate~, Inc (_.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: space 11 Office SCHEDULING Occupancy Level for operational Period: Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans water Beater Number (~Number of Non-Operational Hours per Week: Day Night of Holidays per Year: Thermostat set Point T~mperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: • Occupant Density: Heating Season Cooling season Winter Winter setback summer summer setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 55 of 96 ---------------------------------------------------------------------------Project: Building il _...aiesigner: Banzuelo/Rierson/Duff & Associates, Inc '-'-cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 11 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------ • BPTl = -56. 34 (Winter) BPTl BPT2 = 62.18 (Summer) · BPT2 BPT3 = 62.18 (Economizer) BPT3 BDD = 83 (Heating) BDD CDD = 784 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Beat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter summer ANNUAL LOADS (MBtus) ·-@7;) Beating ==================== Cooling = = = = = ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site Cooling Site Fan Site Lighting ·site Receptacle Site Bot Water ======================================= 67.92 76.04 76.04 3240 0 -= .. = = -= = = ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating Source Cooling Source F~n Total Space Conditioning Energy Source Lighting Source Receptacle source Bot Water = = = = 4.1 25.8 29.2 -----59.l X 1.027 = --= 196.3 198.7 281.2 276.9 1.5 4.5 0.6 3.6 4.0 4.6 2.3 0.2 60.7 33.5 16.8 1.4 •========================================================================= ·~' -.. . TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112.3 KBtu/sqft =========================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 56 of 96 ---------------------------------------------------------------------------Project: Building il . •.esigner: Banzuelo/Rierson/Duff & Associates, Inc :~cation: Carlsbad Date: 12/31/1987 I . :•; Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- space Name: AREAS Exterior Wall southeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof Door Space 12 268.0 sqft 40.5 sqft 135.0 sqft 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft ( Floor 10.22 0.88 30.00 2.22 o.oo I --.. , ...... -, HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Beating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Rheem RPNC024J 4 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 10972 watts 1492 watts 3400 CFM * Note: 4 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement • • NERAL : ~;;;;-Capacity of Exterior Wall \-.. '.'">·Lighting Power 4.45 l.000 watts/sqft 7 Climate Zone SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 57 of 96 ---------------------------------------------------------------------------Project: Building #l Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .ocation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date -----~--------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --------------------Southeast East OVERHANGS & SIDEFINS Southeast East • ·. <li.:,iJPECIAL FEATURES Daylighting Strategies • : ' , Glass Framing SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter summer ------------ overhang Height Depth 0.14 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting controls SCM FIXED INPU'l' DA'.L'A ~UMMA1U ~~M-~ page jo o~ ~o ---------------------------------------------------------------------------Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: occupancy Type: SCHEDULING occupancy Level for Operational Period: space 12 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours cl Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat toss Rate cu-value): INTERNAL LOADS & ENERGY Receptacle Peak toad: Water Heating Energy: occupant sensible Load: occupant Latent Load.: • occupant Density: \.'.>'"~ Heating cooling Winter Winter summer summer Night Season Season Setback setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 59 ot ~o ---------------------------------------------------------------------------Project: Building il Banzuelo/Rierson/Duff & Associates, Inc Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By ,·.-· Documentation: PROCALC Date --------~------------------------------------------------------------------ Space Name: Space 12 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 53.81 (Winter) BPTl BPT2 = 60.52 (Summer) BPT2 BPT3 = 60.52 (Economizer) BPT3 HOD = 27 (Heating) HOD COD = 1020 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) •===•========•=================== Building Envelope Heat Transfer Rate: Winter Summer Winter summer Overall Heat Transfer Factor ("K"): .. I Heating Cooling ANNUAL LOADS (MBtus) ==================== = = -= = 67.40 75.61 75.61 3069 l = -= = -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL Source Heating Source Cooling Source Fan SOURCE ENERGY USE Total Space Conditioning Energy Source Lighting Source Receptacle source Hot Water ---= = - ESTIMATE (KBtu/sqft) -3.4 -30.2 = 41.7 -------75.2 X 1.027 = = = - 196.3 198.7 281.2 276.9 1.3 6.0 0.5 4.2 5.8 4.6 2.3 0.2 77.3 33.5 16.8 1.4 •============•==============•===========•====•===========•====•====••====== ·.\,.> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 9 KBtu/sqft ==•====•=====•=•====•=========•=•==========================•====•======•=•= 1- SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 60 of 96· ---------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By ~' ,;( .. -_;,~· Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window Roof - Door ( Floor . BVAC SYSTEM BVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL ------- • ·, . ' -'-.~, , . ..-~~ Heat Capacity of Exterior Wall Lighting Power Climate Zone Space 13 403.0 sqft 40.5 sqft 135. O sqft- 414.0 sqft 20.0 sqft o.o sqft 414.0 sqft 414.0 sqft 10.26 0.88 30.00 2:22 o.oo Rheem RPNC024J 1 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 2743 watts 373 watts 850 CFM 8.58 1.000 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) · SCM-1 page 61 of 96 -~-------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc , .. ocation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date -~-----------------------------------------------------------~------------- OTHER PHYSICAL PARAMETERS -~-----------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast East OVERHANGS & SIDEFINS Northeast East .el'ECIAL FEATURES Daylighting Strategies • SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ Overhang Height Depth 0.33 0.10 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 62 of 96 ---------------------------------------------------------------------------Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By ~ :~·. . · ... Documentation: PROCALC Date --------------------------------------------------------~------------------ Space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Space 13 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Nig~t 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night rA. --~ Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate cu-value): INTERNAL LOADS.& ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .• Occupant Density: ',~·~-.. ,,-_,: Heating Season Cooling Season Winter Winter setback summer summer setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 63 of 96 ---------------------------------------------------------------------------Project: -Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc ···cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date ---------------------~----------------------------------------------------- Space Name: Space 13 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 55.58 (Winter) BPTl BPT2 -61.59 (Summer) BPT2 BPT3 -61.59 (Economizer) BPT3 BDD -59 (Beating} BDO CDD = 861 (Cooling} CDD BUILDING BEAT TRANSFER (Btu/hr-F) -----·====================•====== Building Envelope Beat Transfer Rate: Winter summer overall Beat Transfer Factor ("K"): Winter laeating cooling summer ANNUAL LOADS (MBtus) •=================== = = -= = 67.63 75.75 75.75 3144 0 ---- • - ANNUAL SITE ENERGY REQUIREMENTS (MBtus} Site Beating Site Cooling Site Fan Site Lighting Site Rec,ptacle Site Bot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft} ===================•========================= source Heating source Cooling source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot water • • • - 3.9 28.8 41.7 -----74.3 X l.027 ------ • • • • 209.l 211.5 294.0 289.7 1.4 5.5 0.5 4.0 5.8 4.6 2.3 0.2 76.3 33.5 16 •. 8 1.4 •·======================================================================== '.,1·---.... > TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 0 KBtu/sqft =========================================================================== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 64 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc :'.ocation: car lsbad Date: 12/31/1987 '. t;{:~~:}" . Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -----------------------------~--------------------------------------~------ Assembly Name: Solid wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value · Fr (in) Summer Winter ---------~-----------------------------------------------------------------1. Hardwood, Maple 2. Inside Air Film 3. 4. 5. 6. 7. 8. 9. 10. 11. 1.750 1.54 0.68 1.54 0.68 (,---------------~-----------------------------:::::---------:~::-----:~::- Framing Percentage: 0.0 I Framing Material: NONE OVERALL VALUES ADJUSTED FOR FRAMING -------------------------------Sketch of Construction Assembly • sorptivity: .. ughness: Clear Pine \~\, .. aight: Heat Capacity: 0.10 6.1 lb/sqft 2.39 R-Value u-value 2.22 0.4505 a••••= 2.22 0.4505 ==•••= CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 65 of 96 ---------------------------------------------------------------------------Project: Building tl 1 Designer: Banzuelo/Rierson/Duff & Associates, Inc (.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By t,, , ,, Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-30 B/U with T-Bar Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) Summer Winter . ----------~-----------------------------------------------------------------1. Roofing, Built-Up 2. Plywood 3. Air ~pace 4. Insulation, Mineral Wool, R-30 5. Acoustical Tile, Mineral Fiberboard 6. Inside Air Film 7. a. 9. 10. 11. 0.375 0.500 24.000 * 9.500 0.750 0.33 0.33 0.63 0.63 1.00 0.80 30.00 30.00 2.03 2.03 0.92 0.61 --------------------------------------------------------------------------- (Q:.) Total 34. 90 34. 39 10.0 % Framing Percentage: Framing Material: Softwood, Douglas Fir-Larch 1 2 3 4 5 Calculation for Framing Adjustment. summer 0-Value 0.0287 X 0.90 + 0.0699 X 0.10 = 0.0328 Winter o-value 0.0291 X 0.90 + 0.0725 X 0.10 • 0.0334 OVERALL VALUES ADJUSTED FOR FRAMING R-Value 0-Value 30.51 0.0328 29.92 0.0334 Sketch of construction Assembly ==•=== • sorptivity: ;. oughness: Concrete, Asph. '\,.,veight: Heat Capacity: 0.70 Shingles 8.1 lb/sqft 2.58 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 66 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc ,,.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By . :..., ,, Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-30 B.U.Roof/Gyp. Clg Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Roofing, Built-Up 2. Plywood 3. Air ~pace 4. Insulation, Mineral Wool, Gypsum or Plaster Board Inside Air Film 5. 6. 7. 8. 9. 10. 11. R-30 * 0.375 0.500 6.000 9.500 0.625 0.33 0.63 1.00 30.00 0.56 0.92 0.33 0.63 0.80 30.00 0.56 . 0.61 (.-------------------------------------------------------------------------- .(./ Total 33. 44 32. 93 Framing Percentage: Framing Material: 1 2 3 4 5 10.0 % Softwood, Douglas Fir-Larch Calculation for Framing Adjustment Summer U-Value 0.0299 X 0.90 + 0.0779 X 0.10 = 0.0347 Winter U-Value 0.0304 X 0.90 + 0.0811 X 0.10 = 0.0354 OVERALL VALUES ADJUSTED FOR FRAMING R-Value u-value 28. 82. 0.0347 28.22 0.0354 Sketch of Construction Assembly •===== ======= • sorptivity: , . ughness: Stucco, \-... eight: · Beat Capacity: 0.70 Wood Shingles 9.4 lb/sqft 3.01 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 67 of 96 Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By , Documentation: PROCALC Date ----------------~-----------------------------------~---------------------- Assembly Name: sunglass Blue Plate Assembly Type: Glazing Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) Summer Winter ---~-----------------------------------------------------------------------l. CEC Single Glazing 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11 • 0.250 0.20 0.68 0.20 0.68 ..• ------------------------------------------------------------------------- ' ~;.;".;;/ Total O. 88 O. 88 Framing Percentage: 0.0 I Framing Material: NONE 1 -------------------------------Sketch of Construction Assembly • ading Coefficient: \ . sible Transmittance: 0.46 0.30 OVERALL VALOES ADJUSTED FOR FRAMING R-Value O-Value 0.88 1.1364 --=-=• 0.88 1.1364 ====== ---~ ----------------- CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 68 of 96 ------------------------------------------------------------------~--------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By .ocation: carlsqad Date: 12/31/1987 . \. . . Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 5/8 Gyp/R-ll/Gyp WF Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Gypsum or Plaster Board 2. Insulation, R-11, 2x4 Wood Framing 16" 0.625 3.500 0.625 0.56 8.38 0.56 0.68 0.56 8.38 0.56 0.68 3. Gypsqm. or Plaster Board 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. ·------------~---------------------------------------------------------~--~ ( : .. ~,fj <:·;.;1 . Total 10 .19 10 .19 Framing Percentage: Framing Material: ...-t-H---1 Po<.-++---2 1-t---3 0.0 I Softwood, Douglas Fir-Larch Calculation for Framing Adjustment Summer u-value 0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982 Winter U-Value 0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982 OVERALL VALUES ADJUSTED FOR FRAMING ------------------------------- R-Value o-value 10.19 0.0982 10.19 0.0982 Sketch of Construction Assembly Absorptivity: .~ughness: Smooth \.'.:\ .... eight: Heat Capacity: o.oo Plaster, Metal 5.4 lb/sqft 1.38 ···=== ======• CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 69 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc ,.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By .·,.:. ·.·,, ',. ,,.· Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 6.5" Conc/R-11/Gyp.Brd. Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------. 1. concrete, 140 lb, Oven Dried 2. Insulation, R-11, 2x4 wood Framing 16" 3. Gypsijm or Plaster Board 4. Inside Air Film s. 6. 7. a. 9. 10. 11. 6.500 3.500 0.625 0.11 8.38 0.56 0.68 0.71 8.38 0.56 0.68 (~-------------------------------------------------------------~----------- ._(~ Total 10. 34 10. 34 Framing Percentage: o.o I Framing Material: NONE • . . 1 ., 2 • . . ... 3 . . • . .. =-. . . . OVERALL VALUES ADJUSTED FOR FRAMING 1 -------------------------------Sketch of Construction Assembly • sorptivity: .··. . ughness: concrete, \.\-.. ~eight: Heat capacity: 0.70 Asph. Shingles 78.6 lb/sqft 17.39 R-Value o-Value 10.34 0.0967 ------ 10.34 0.0967 =----- HVAC POWER INDICES SUMMARY FORM (part 1 of 2) CF-4 page 70 of 96 ---------------------------------------------------------------------------Project: Building il Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Buildlng Permit No 4tocation: Carlsbad Date: 12/31/1987 Checked By -..-·. -.. f Documentation: PROCALC Date --------------------------------------------------------------------------- FAN ENERGY No. Motor Drive Conv No. Fan HVAC System Sys BHP Eff~ Eff. Fact Fans Watts --------------------------------------Rheem RPNC030J {Fanl) l X 0.33 / [0.66 X 1.00] X 746 X 1 = 373 Rheem RPNC058C (Fanl) 1 X 0.75 / [0.72 X 1.00] X 746 X l = 777 Rheem RPNC024J (Fanl) 4 X 0.33 / [0.66 X 1.00] X 746 X l -1492 Rheem RPNC024J (Fanl) 4 X 0.33 / [0.66 X 1.00] X 746 X 1 = 1492 Rheem RPNC024J (Fanl) l X 0.33 / [0.66 X 1.00] X 746 X l = 373 Rheem RPNC036C (Fanl) l x a.so / [0.70 X 1.00] X 746 X l = 533 Rheem RPNC024J (Fanl) l X 0.33 / [0.66 X 1.00] X 746 X l = 373 ------Total 5413 FAN WATTAGE INDEX 5413 watts/ 7228 sqft·= 0.749 watts/sqft HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 pag~ 71 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc /.cation: Carlsbad Date: 12/31/1987 -.. ,_ .. ··.. . Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------~------------------------------------------------ HEATING EQUIPMENT system No. Design Equip Conv. Source Description Type Sys output Eff Factor (Btu/hr) --------------------------------------------------------Rheem RPNC030J. Heat Pump 1 X 30600 I 2.96 X 3.000 • 31014 Rheem RPNC058C Heat Pump l X 61000 I 2.96 X 3.000 = 61824 Rheem RPNC024J Heat Pump 4 X 22600 I 2.92 X 3.000 = 92877 Rheem RPNC024J Heat Pump 4 X 22600 I 2.92 X 3.000 = 92877 Rheem RPNC024J Heat Pump 1 X 22600 / 2.92 X 3.000 = 23219 Rheem RPNC036C Heat Pump l X 3660ft / 2.92 X 3.000 = 37603 Rheem RPNC024J Heat Pump l X 22600 / 2.92 X 3.000 = 23219 --------Total 362632 HEATING POWER INDEX 362632 Btu/hr I 7228 sqft = 50.17 Btu/hr-sqft COOLING EQUIPMENT system No. Design Equip Conv. source Description Type Sys output Eff Factor (Btu/hr) rl;;;-;;;~030;------------------------------------------Heat Pump 1 X 30200 I 9.85 X 10.239 = 31393 \. :i,fleem RPNC058C Heat Pump l X 57500 I 7.85 X 10.239 • 74999 Rheem RPNC024J Heat Pump 4 X 23000 I 9.35 X 10.239 = 100747 Rheem RPNC024J Heat Pump 4 X 23000 I 9.35 X 10.239 • 100747 Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 = 25187 Rheem RPNC036C Heat Pump l X 36200 I 8.00 X 10.239 • 46331 Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 • 25187 --------Total 404592 COOLING POWER INDEX 404592 Btu/hr/ 7228 sqft = 55.98 Btu/hr-sqft HVAC SYSTEM SUMMARY SHEET Project: Building tl ws-4 page 72 of 96 Enforcement Agency Designer: ·aanzuelo/Rierson/Duff & Associates, Inc Building Permit No .·.ocation: Carlsbad Date: 12/31/1987 ·Checked By ,;_:·: ·,; Documentation: PROCALC Date --------------------------------------------------------------------------- BVAC Equipment Name: BEATING system Type: output capacity: Rated Efficiency: supply Air Temperature: COOLING system Type: Total Output Capacity: sensible output capacity: Latent output Capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: A supply Air Temperature: (~AlNS ~ • .';,.:_,4· supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS • supply Duct Heat Gain: Return Duct Heat Gain: supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC024J Heat Pump 22600 a.tu/hr 2.920 105.0 F Heat Pump 23000 Btu/hr 17800 Btu/hr 5200 Btu/hr 9.350 2743 watts 0.100 No 55.0 F 850 cfm Blow-Through l 0.33 66.0 I 100.0 I 2.0 I 2.0 I 4.0 I 4.0 I HVAC SYSTEM SUMMARY SHEET page 73 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/31/1987 _Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC Equipment Name: HEATING system Type: Output capacity: Rated Efficiency: supply Air Temperature: COOLING System Type: Total output capacity: Sensible Output capacity: Latent output Capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: :~~:pply Air Temperature: Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC030J Heat Pump 30600 Btu/hr 2.960 105.0 F Heat Pump 30200 Btu/hr 2-1600 Btu/hr 8600 Btu/hr 9.850 3471 watts 0.100 No 55.0 F 1000 cfm Blow-Through l 0.33 66.0 I 100.0 I 1.0 I l.0 I 2.0 I 2.0 I HVAC SYSTEM SUMMARY SHEET WS-4 page 74 of 96 ---~------------~----------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc /.cation: Carlsbad Date: 12/31/1987 . ·-,· ·+·c: Enforcement Agency Building Permit No Checked By --~ Documentation: PROCALC Date -------------------------------------------~------------------------------- HVAC Equipment Name: HEATING system Type: output capacity: Rated Efficiency: supply Air Temperature: COOLING system Type: Total Output capacity: sensible Output Capacity: Latent output capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: , I supply Air Temperature: ·-¼~·ANS supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Suppiy Duct Air Leakage: Return Duct Air Leakage: •• Rheem RPNC036C Heat Pump 36600 Btu/hr 2.920 105.0 F Heat Pump 36200 Btu/hr 26200 Btu/hr 10000 Btu/hr 8.000 4510 watts 0.100 No 55.0 F 1250 cfm Blow-Through l 0.50 70.0 I 100.0 I 1.0 I 1.0 I 2.0 I 2.0 I BVAC SYSTEM SUMMARY SHEET ws-4 page 75 of 96 ----~----------------------------------------------------------------------Project: Building fl Designer: Banzuelo/Rierson/Duff & Associates, Inc -oca·tion: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC Equipment Name: HEATING system Type: Output Capacity: Rated Efficiency: Supply Air Temperature: COOLING System Type:· Total Output Capacity: Sensible output Capacity: Latent Output Capacity: Rated Efficiency:. Input Power Rating: Coil Bypass Factor: Economizer: , e Supply Air Temperature: --~iNs Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC058C Heat Pump 61000 Btu/hr 2.960 105.0 F Heat Pump 57500 Btu/hr 43000 Btu/hr 14500 Btu/hr 7.850 7355 watts 0.100 No 55.0 F 2000 cfm Blow-Through l 0.75 72.0 I 100.0 I 1.0 I 1.0 I 2.0 I 2.0 I LIGHTING SUMMARY AND WORKSHEET CF-5 page 76 of· 96 ---------------------------------~--------------------~--------------------Project: Building ·tl 4.esigner: Banzuelo/Rierson/Duff & Associates, Inc (/ , .ocation: car lsbad . Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- INSTALLED LIGHTING POWER BY SPACE Space Name Space 1 Space 2 Space 3 Space 4 Space 5 Space 6 Space 7 Space 8 Space 9 Space 10 Space 11 ,,ace 12 ace 13 ~c~'J ~ ....... Floor Area -----452 X 1124 X 1120 X 414 X .414 X 610 X 414 X 414 X 610 X 414 X 414 X 414 X 414 X BUILDING LIGHTING WATTAGE • Vert Horiz Mult Mult -----1 X 1 = 1 X 1 = 1 X 1 = l X 1 = 1 X 1 -l X l = 1 X 1 -1 X 1 = 1 X 1 = 1 X l = 1 X 1 = l X l = 1 X l - TOTALS 8906 watts/ Total Floor Lighting Installed Area (watts/sqft) wattage --------------------------452 X 1.500 = 678 1124 X 1.500 = 1686 1120 X l.250 = 1400 414 X l.000 -414 414 X 1.000 = 414 610 X 1.500 = 915 414 X 1.000 -414 414 X 1.000 -414 610 X 1.500 = 915 414 X 1.000 = 414 414 X 1.000 = 414 414 X 1.000 = 414 414 X 1.000 -414 --------------7228 8906 7228 sqft = 1.232 watts/sqft HVAC ZONE HEATING & COOLING LOAD SUMMARY page 77 of 96 ---------------------------------------------------------------------------Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (~cation: Carlsbad . Date: 12/31/1987 Checked By ... ,,'"" Documentation: PROCALC Date ---------------------------------------------------~------------~---------- HVAC ZONE DESCRIPTION HVAC zone Name: BVAC system Name: System Multiplier: Beating Schedule: Cooling Schedule: Fan s·chedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 1 PEAK (Jan 6am) HEATING 9038 TOTAL SPACE LOAD 9038 Bypass Ventilation Air ( Apply Duct Conduction (~pply Duct Leakage ·· '·viupply Fan Heat Gain 9 cfm) 318 ( 90 181 . 0 EFFECTIVE SPACE LOAD 9628 Ventilation ( Return Duct conduction Return Duct Leakage Return Fan Heat Gain 81 cfm) TOTAL SYSTEM LOAD • SYSTEM PERFORMANCE AT DESIGN CONDITIONS 2864 ( 96 193 -1273 11508 25084 Space l Rheem RPNC030J l Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 2pm) 9298 1153 --------------9298 1153 9 cfm) 50 12 93 186 23 0 --------------9626 1187 81 cfm) 447 104 96 193 24 1273 --------------11636 1315 1.0 tons O.l tons 21633 9826 1.8 tons 0.8 tons SPACE HEATING & COOLING LOAD SUMMARY page 78 of 96 ---------------------------------------------------------------------------Project: Building il 4esigner: Banzuelo/Rierson/Duff & Associates, Inc :;· ... ·,ocation: Carlsbad Date: 12/31/1987 \·¥: - Enforcement Agency Building Permit No Checked By ,,, Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door conduction Roof conduction Skylight Conduction Floor Conduction e Slab Conduction ;' Interior conduction 1. .,_:/ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1326 5760 268 484 0 0 1201 0 0 9038 Btu/hr Space 1 COOLING SENSIBLE LATENT --------------Aug 2pm 78 F DB SO I RH 83 F DB 67 F WB Btu/hr Btu/hr --------------131 -598 0 219 0 0 0 0 5996 1485 1543 0 1153 1153 ------. -----9666 Btu/hr 1153 0.8 tons 0.1 Heating: Cooling: 9038 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 9666 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 235 cfm 382 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page i':J of ':Jo ---------------------------------------------------------------------------Project: Building 11 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,-·&cation: Carlsbad Oat~: 12/31/1987 Checked By t . ' _,, i ,-., Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE-DESCRIPTION BVAC Zone Name: HVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Space 2 22 cfm) EFFECTIVE SPACE LOAD Ventilation ( 202 cfm) Return Duct Condu~tion Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 19005 19005 791 ( 190 380 0 20367 7122 ( 204 407 -2652 25447 50004 Space 2 Rheem RPNCOSSC 1 Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT so' COOLING PEAK SENSIBLE LATENT --------------(Aug 2pm) 21953 2866 --------------21953 2866 22 cfm) 124 29 220 439 57 0 ____ ,.. ____ -----=--22735 2952 202 cfm) 1113 258 227 455 59 2652 --------------27182 3270 2.3 tons 0.3 tons 43066 16832 3.6 tons 1.4 tons SPACE HEATING & COOLING LOAD SUMMARY page 80 of 96 --------~------------------------------------------------------------------Project: Building il fjesigner: Banzuelo/Rierson/Duff & Associates, Inc ~. 1ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By \ Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT ---------------------Wall Conduction Glass conduction Door Conduction Roof conduction Skylight Conduction e Floor conduction Slab Conduction ~ Int7rior ~onduction Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1656 13166 0 1198 0 0 2985 0 0 19005 Btu/hr Space 2 COOLING SENSIBLE LATENT --------------Aug 2pm 78 F DB 50 % RH 83 F DB 67 F WB Btu/hr Btu/hr ------------264 988 0 855 0 0 0 0 9451 3692 3836 0 2866 2866 ------------21953 Btu/hr 2866 1.8 tons 0.2 Heating: Cooling: 19005 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 21953 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= • Btu/hr tons 494 cfm 868 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 81 of 96 ---------------------------------------------------------------------------Project: Building il • Designer: Banzuelo/Rierson/Duff & Associates, Inc (1 • ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By · ' . .__._."·,,~.J Documentation: PROCALC Date --------------------~------------------------------------------------------ HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC system Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK Space 3 (Jan 6am) Space 5 (Jan 6am) Space 7 (Jan 6am) Space 11 (Jan 6am) <lpass Ventilati:~::rs~ACE4: 0 ::ml Supply Duct Conduction supply Duct Leakage Supply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( 425 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain /~ '--~--··· TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 11184 7985 7985 7985 35139 1663 703 1406 0 38910 14966 778 1556 -5092 51118 74104 Spaces 3,5,7 & 11 Rheem RPNC024J 4 Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT so' COOLING PEAK SENSIBLE LATENT --------------(Jul 10am) 14902 2856 (Jul 10am) 8575 1056 (Jul 10am) 8575 1056 (Jul 10am) 8575 1056 --------------40626 6023 ( . 47 cfm) 57 -356 813 1625 241 0 --------------43121 5908 ( 425 cfm) 514 -3204 862 1725 236 5092 --------------51315 2940 4.3 tons 0.2 tons 71127 25505 5.9 tons 2.1 tons SPACE HEATING & COOLING LOAD SUMMARY page 82 of 96 ----~----------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc <.ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By -, .; /,,i' Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction A Slab Conduction (~ Interior ~onduction ·. ..,._, Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS . SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1666 5349 0 1194 0 0 2975 0 0 11184 Btu/hr Space 3 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr -------------8 -7 0 496 0 0 0 0 5090 2652 3823 0 2856 2856 -----------14902 Btu/hr 2856 1.2 tons 0.2 Heating: Cooling: 11184 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 14902 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• ,. \ -~-._ Btu/hr tons 290 cfm 589 cfm SPACE HEATING & COOLING LOAD SUMMARY page 83 of 96 ---------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc ;.cation: Carlsbad Date: 12/31/1987 ··J:,•. ::·.~ Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight conduction Floor Conduction Slab Conduction ;' Int!rior ~onduction . •.i;] Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES ---------------~----- HEATING Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 5 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------17 -7 42 179 0 0 0 0 5090 784 1413 0 1056 1056. -----------8575 Btu/hr 1056 0.7 tons 0.1 Heating: Cooling: 7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 207 cfm 339 cfm SPACE HEATING & COOLING LOAD SUMMARY page 84 of 96 ~--------------------------------------------------------------------------Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc /~ocation: Carlsbad . Date: 12/31/1987 ·>/ Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction A Slab Conduction . (~ Interior ~onduction ~.,,..c;;:.1 Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 7 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------17 -7 42 179 0 0 0 0 5090 784 1413 0 1056 1056 -----------8575 Btu/hr 1056 0.7 tons O.l Heating: cooling: 7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 207 cfm 339 cfm SPACE HEATING & COOLING LOAD SUMMARY page 85 of 96 ----------------------------------------------~----------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc i.t.Jcation: Carlsbad ·oate: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door conduction Roof Conduction Skylight conduction Floor Conduction Slab Conduction ) Interior conduction --~ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 11 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 % RH 79 F DB 63 F WB Btu/hr Btu/hr ------------17 -7 42 179 0 0 0 0 5090 784 1413 0 1056 1056 -----------8575 Btu/hr 1056 Btu/hr 0.7 tons 0.1 tons Heating: Cooling: 7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 207 cfm 8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 339 cfm 1. \ . . :;-::.,~ _,.-.• HVAC ZONE HEATING & COOLING LOAD SUMMARY page 86 of 96 ---------------------------------------------------------------------------Project: Building tl ,.sig~er: Banzuelo/Rierson/Duff & Associates, Inc -r,,\:':>cat1on: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By .. ,,.,_,,. ·-- Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC system Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 4 Space 8 Space 10 Space 12 PEAK (Jan (Jan (Jan (Jan 6am) 6am) 6am) 6am) I TOTAL SPACE LOAD ; ~ .. :~pass ventilation Air ( Supply Duct Conduction supply Duct Leakage Supply Fan Heat Gain 33 cfm) EFFECTIVE SPACE LOAD Ventilation ( 298 cfm) Return Duct Conduction Return Duct Leakage Return· Fan Heat Gain • TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 7985 7985 7985 7985 31940 1166 639 1278 0 35023 10492 700 l401 -5092 42524 74104 ( ( Spaces 4,8,10 & 12 Rheem RPNC024J 4 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT so ' COOLING PEAK SENSIBLE LATENT --------------(Jul 10am) 8803 1056 (Jul 10am) 8803 1056 (Jul 10am) 8803 1056 (Jul 10am) 8803 1056 --------------35211 4223 33 cfm) 40 -250 704 1408 169 0 --------------37364 4142 298 cfm) 361 -2246 747 1495 166 5092 --------------45058 2062 3.8 tons 0.2 tons 71127 25505 5.9 tons 2.1 tons SPACE HEATING & COOLING LOAD SUMMARY page 87 of 96 ---------------------------------------------------------------------------Project: Building tl Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .,...cation: Carlsbad Date: 12/31/1987 Checked By < •• , ,::, Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight conduction Floor Conduction • Slab conduction : Interior conduction ,. ~:? Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING. Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 4 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------__ ,.. ___ 11 -7 42 179 0 0 0 0 5325 784 1413 0 1056 1056 -----------8803 Btu/hr 1056 0.7 tons 0.l Heating: Cooling: 7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 207 cfm 348 cfm SPACE HEATING & COOLING LOAD SUMMARY page 88 of 96 ---------------------------------------------------------------------------Project: Building il _....i.esig~er: Banzuelo/Rierson/Duff & Associates, Inc t~cat1on: Carlsbad Date: 12/31/1987 \-·: ..._z Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction I Slab Conduct ion ( Interior Conduction ~--Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan· 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 8 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------11 -7 42 179 0 0 0 0 5325 784 1413 0 1056 1056 -----------8803 Btu/hr 1056 0.7 tons 0.1 Heating: Cooling: 7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• • ; . --, -\ ' . \. ",· ./ \ ........ ' Btu/hr tons 207 cfm 348 cfm SPACE HEA·rING & COOLING LOAD SUMMARY page 89 of 96 -~-------------------------------------------------------------------------·Project: Building il Designer: Banzuelo/Rierson/Duff & Associates, Inc .--~•cation: Carlsbad Date: 12/31/1987 ' '·\· -,. ";_ Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -~------------------------------------------------------------------------- SUMMARY OF PEAK HOOR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction I Slab Conduction ( Interior Conduction ~ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 10 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------11 -7 42 179 0 0 0 0 5325 784 1413 0 1056 1056 -----------8803 Btu/hr 1056 0.7 tons 0.1 Heating: Cooling: _ 7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= '·' 'Ill.,_ ;r~··' Btu/hr tons 207 cfm 348 cfm SPACE HEATING & COOLING LOAD SUMMARY page 90 of 96 ---------------------------------------------------------------------------Project: Building il ,..i..esig~er: Banzuelo/Rierson/Duff & Associates, Inc ,.,c.at1on: Carlsbad Date: 12/31/1987 •.·. ,-J Enforcement Agency Building Permit No Checked By . Documentation: PROCALC Date --------------------------------------------------------------~------------ SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS --------------------Peak Hour: Indoor Conditions: Outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction A Slab conduction (~ Interior Conduction ·,\...;;;,/ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING. Jan 6am 70 F DB 38 F DB Btu/hr 826 5349 268 443 0 0 1100 0 0 7985 Btu/hr Space 12 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------11 -7 42 179 0 0 0 0 5325 784 1413 0 1056 1056 -----------8803 Btu/hr 1056 0.7 tons 0.1 Heating: Cooling: 7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= •• ,\ .. ,:. ,.,,. Btu/hr tons 207 cfm 348 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 91 of 96 ---------------------------------------------------------------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc '~•ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By V - Documentation: PROCALC Date ----~---------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Space 6 Bypass Ventilation Air ( ply Duct conduction pply Duct Leakage ~upply Fan Heat Gain 12 cfm) EFFECTIVE SPACE LOAD Ventilation ( 110 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain • ' \ ; .... _"·--._-;, TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 10596 10596 429 212 424 0 11662 3865 233 466 -1273 14953 18526 ( ( Space 6 Rheem RPNC024J 1 Loads Office Heating Loads Office Cooling Loads Office. Fans COINCIDENT 50 ' COOLING PEAK SENSIBLE LATENT ---------------(Jul 10am) 12694 1556 ------------..:)- 12694 1556 12 cfm) 15 -92 254 508 62 0 -------------~ 13471 1526 110 cfm) 133 -827 269 539 61 1273 --------------15685 759 1.3 tons O.l tons 17782 6376 1.5 tons 0.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 92 of 96 ---------------------------------------------------------------------------Project: Building tl _.J,.._e esigner: Banzuelo/Rierson/Duff & Associates, Inc racation: Carlsbad Date: 12/31/1987 t;• ,, __ ,,. Enforcement Agency Building Permit No Checked By ·-<.:,;2· ~· Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction· Skylight Conduction Floor Conduction Aslab Conduction (~Int~rior ~onduction ''-...,,..· Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1330 6994 0 652 0 0 1620 0 0 10596 Btu/hr Space 6 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 \ RH 79 F DB 63 F WB Btu/hr Btu/hr ------------37 -10 0 267 0 0 0 0 7029 1733 2082 0 1556 1556 -----------12694 Btu/hr 1556 1.1 tons 0.1 Heating: Cooling: 10596 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 12694 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= • ,_ Btu/hr tons 275 cfm 502 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 93 of 96 --------------------------------------------------------------------·-------Project: Building #1 ..&._esigner: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By · .,cation: Carlsbad Date: 12/31/1987 \. ·. ' Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION BVAC Zone Name: HVAC system Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Space 9 ypass ventilation Air ( pply Duct Conduction 12 cfm) ( pply Duct Leakage '-. ..,upply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( 110 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS • \ . \ . ~ ..... ' HEATING 10596 10596 429 106 212 0 11344 3865 113 227 -1819 13730 30002 ( ( Space 9 Rheem RPNC036C 1 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT so I COOLING PEAK SENSIBLE LATENT --------------(Jul 10am) . 12466 1556 --------------12466 1556 12 cfm) 15 -92 125 249 31 0 --------------12855 1495 110 cfm) 133 -827 129 257 30 1819 --------------15192 . 697 1.3 tons 0.1 tons 26173 11849 2.2 tons 1.0 tons ,-1 SPACE HEATING & COOLING LOAD SUMMARY page 94 of 96 ---------------------------------------------------------------------------Project: Building 11 .--~esigner: Banzuelo/Rierson/Duff & Associates, Inc · ·· ocation: Carlsbad . Date: 12/31/1987 I Enforcement Agency Building Permit No Chec_ked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak aoµr: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction ( Interior Conduction ' Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1330 6994 0 652 0 0 1620 0 0 10596 Btu/hr Space 9 COOLING SENSIBLE LATENT --------------Jul 10am 78 F DB 50 I RH 79 F DB 63 F WB Btu/hr Btu/hr ------------43 -10 0 267 0 0 0 0 6795 1733 2082 0 1556 1556 -----------12466 Btu/hr 1556 1.0 tons 0.1 Heating: cooling: 10596 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 12466 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= ,. .• Btu/hr tons 275 cfm 493 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 95 of 96 -------------------------------------------------------~-------------------Project: Building tl Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By \, ' Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC System Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space ·13 PEAK (Jan 6am) HEATING 8396 TOTAL SPACE LOAD 8396 aypass Ventilation Air ( aupply Duct Conduction ::~upply Duct Leakage ·¼ 0SUpply Fan Heat Gain 8 cfm) 291 ( 168 336 0 EFFECTIVE SPACE LOAD 9191 Ventilation ( Return Duct Conduction Return Duct Leakage Return Fan Heat Gain 75 cfm) TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS 2623 ( 184 368 -1273 11093 18526 Space 13 Rheem RPNC024J l Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Jul 10am) 8534 1056 --------------8534 1056 8 cfm) 10 -62 171 341 42 0 ------------«c,-9056 1036 75 cfm) 90 -562 181 362 41 1273 --------------10963· 515 0.9 tons o.o tons 17782 63}6 1.5 tons 0.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 96 of 96 ----------~----------------------------------------------------------------Project: Building 11 Designer: Banzuelo/Rierson/Duff & Associates, Inc ··cation: Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By -~-/~ Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: Space 13 COOLING DESIGN CONDITIONS Peak Hour: HEATING Jan 6am 70 F DB 38 F DB SENSIBLE LATENT. Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction .A Slab Conduct ion {~Interior Conduction '·-;'..:..;,~ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES Btu/hr 1237 5349 268 443 0 0 1100 0 0 8396 Btu/hr --------------Jul 10am 78 F DB SO I RH 79 F DB 63 F WB Btu/hr Btu/hr -------------24 -7 42 179 0 0 0 0 5090 784 1413 0 1056 1056 ------------8534 Btu/hr 1056 0.7 tons 0.1 Heating: Cooling: 8396 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8534 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= ,. ,,: \., ; " .,., __ ._,.. ....... ..- Btu/hr tons 218 cfm 337 cfm ,.,. I .; ' '~l ,,;,,.:;:' TITLE 24 REPORT FOR: Building 12 El Fuente Business Park Carlsbad, California PROJECT DESIGNER: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 OWNER: · Davison-Jones Development 411 campus Drive, Suite 830 Irvine, CA 92715 REPORT PREPARED BY: PROCALC 705 s. Velare St. il0 Anaheim, CA 92804 1-(800) TITLE-24 Job Number: T499B Date: l/4/1988 The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the • calculations summarized in this compliance report. The program has interim . ;approval and is authorized by the California Energy Commission for use with <.:::,. .. the Second Generation Nonresidential Building Energy Efficiency Standards. Table Of contents for Title 24 Report Cover . Page ••••••••••.•••••••••••••.•••.•.••••••••••••••••••••.••••••• l Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Form CF-1 certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Form ws-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7 Form CF-2 Envelope Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-3 construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-4 HVAC Power Indices summary Form WS-4 HVAC system summary Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-5 Lighting summary & worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HVAC Zone & Space Loads summary .......•....•.................••....•. 9 12 56 62 64 67 68 liert1ticate at Compliance (Part 1 ot 2) B, !IL.-\21"-l{;] -# ·Z. ProieciT,de :f:!a··1Z HC lg /e,·~~'1 /f2l1~f Building Permit Number- I Pl:in Chockod By -, Climate Zane City/Town Pr<c(Ak(~ , ,z./-a,, le-, Cata Prescriptive Approach/Performance Approach Strategy General 1 CEO Occupanc'/ Type • • • • • • • • • .Qf f; c:.(.. 2 UBCOccupanc'/Gtoup/Oivision •••.•• 13:::Z... 3 PackagaSelecmd •••••••••.•• -Brf, 4 Grass Condilfoned Floor Area • • • • • • $::0 ft2 Roof and Ftoors1 5 ' Propcs1d RooUC1illng Rt (CF-2. CF-3) • • :512. o hr-F-lt2Jeiu 6 .. Requfrad Rcof/Ceiling Rt (CF-2) • • • • • ___ hr-F-ftZte!U 7 Prcposed E.lc&arior Floor Rt (CF-2. CF-3) • • -hr-F-ftZ.SIU a Requlrad Extariat Floor Rt (CF-2) • • • • .,___ hr-F-rt2JBiu Walts . 9 · Proposed Opaque Wall Rt (CF-2:cF-3) • • & • 7 hr-F-ftZte!U 10 Wall Heat Capadt:, (CF-3) • • • • • • • • "., Btu/F-ft2 &.~Opaque.Wall Rt (CF-2) • • • • • ___ hr-F-ft2'BIU ~~alnW&Ua . J Exterior Wall Area (CF-2) • • • • • • • • ~128 ft2 13 Tota! Gta:ing ~a (CF-2) • • • • • • • • ~570 ft2 14 Proposed Tota! Percent (Una 131 Une 12) • $et, p -,. 15 Avarage :rota! SC (CF-2) • • • • • • • • • 06 :4le 16 AlowedTotaJ G1azing Peraant •••••• ___ % 17 West Exterior Wall Area (CF-2) • • • • • • 17 '.21 ft2 18 WestGZazingArea(CF-2) •••••••• Jo4;0 ft2 19 Proposed Wast Percent (CF-2) • • • • • • S'j. e, % 20 Avarag~ West SC (CF-2) • • • • • • • • <? .+<o 21 AlcwedWestGlazlng Percent •••••• ___ % Gla:lng In Roof (CF-8) Proposed Allowed 22 Sjcylfght 1 • • • • • • • • • --- 23 Skylight 2 • • • • • • • • • __ _ %4· Skyllght3 •.•••••••• __ _ 2S ~light~ ••••• ; ••• --- : ~ghtS •. • ••••••• __ _ Skylfght 8 • • • • • • • • • --- 28 Skylfght 7 • • • • • • • • • --- 29 Skylrght 8 • • ·• • • • • • • ---Ughtrnr, ___ ft2 ---ft2 ---ft2 ---ft2 ___ ft2 ---ft2 ___ ft2 ___ ft2 30 Propos1dA4ustad LPO (CF•S) •••••• I. );2 Wattslft2 31 Allowed LPO (CF-S) • • • • • • • • • • ___ Wattslft2 HVAC • 32 Pedcrmanca Set Selected • • • • • • • • Proposed Fan. Wattage Index (CF-4) • • • Q,17 Wattslft2 f ._ . ~ Fan Wattage Index • • • •••• ___ Wattstft2 ~::.,.._.· Proposed Cooltng Power Index (CF-4) • • .Sf5 ,PW UtuMt2 38 Alowed Cooltng Power Index • • : • • • . Bluh/ft2 37 Proposad Heating Power Index (CF-4) • • &, 4:f> BWt2 38 Alowed Haadng Power Index • • • • • • ___ ·eiuh/ft2 F~ Ravlsed September 1986 CF-1 For Enforcement Agency Use-Only ~~ -;i_"Z..D\l,'5° t:..-w _Signature and Dato Field Ched<ed Sy Registralfcn Stamp Approved By l..\Ul-1~ ~!YYJ,e;. Performance Approach Energy Budget 1 CEC Oec:upanciType • • • • • • • • • .Offi'ce. 2 USC OcaJpancy Group/Division • • • • • 12,-Z- Cate Cate 4 Condilfonod Floor Aroa • • • • • • • • • !5$;,1 ft2 4 Budgot Table • • • • • • • • • • • • • .W:,-l A 5 Allowed Energy Budget (WS-1A) • • • • • I ZS';Q kB!Ulyr-ft2 Calculated Annual Energy Consumption 6 Approved Calculation Malhod • • • • • • ""C, ,12t1f'1.,.~ 'Z.4- 7 CEC Designation • • • • • • • • • • • .Lf'e» ej 8 Multiplier • • • • • • • • • • • • • • • • \ • pz;1 • E.stJmated Energy Use . ... 1 2 9 Healing • • • • • • • • • • • • • • • • z. kStulyr-ft 10 Cooling • • • • • • • • • • • • • • • • -~ kS!Ulyr-ft2 11 Fans • • • • • • • • • • • • • • • • • ~ kBtulyr-ft2 12 Ughts • . • • • • • • • • • • • • • • "*r ;?>1. J kStulyr-ft2· 13 Mlscellaneous Equipment •••••• ~ l@i.-2. kS?u.yr0 ft2 14 Total •. • • • . • • • • • • • • • • • • • ___ kStu/yr•ft2 15 Adi. Total Energy Use (lifle a x li11e 14) • • • t 24;, (o kStu/yr-ft2 ~ Ad j1,,1.!:>\-u\ Compliance Statement General. lhe proposed building refll'9sentecl in this sat of ccmplianee documentation Is consistent with the other campllance forms and wotksheets. with the plans and specifications and with any olher c:aJculations or computer runs submitted with this permit applic:ation. Performance Approach. (when applicable) The energy perlonnance estimate presented on this form was calculated using the approved calc:ulation method indicated above and with the cec established fixed and restricted engineering inputs for the applicable dimate zone and OCCUl)a!'C'( type. . PresalptiV• Approach. (when appOcable) The proposed building has been designed t0 meet Iha requirements of the Altemative Component . Pac:lcage indicated above for the ~ppropriate occupancy type and climate ~AL· Signed . tQt!AtkP JaDQi½M Namatnde AU?-utJyM, cro CitylStato/Zlp I f114) (p~z..-9310 3:Z-78% Telephone Calif. License Number Pa~e ___ of veruncare o-r L;ompuance {Part 2 012> Y;, I I i , r7 t f"-l C--:t tr" Z, For Enforcement Agency Use Only Pro1ect fide PKOCA. LC.... 1,z /71 /e.-'] .~ .... -"'" Daoo cliodiadBy 0al8 ·. • < • doth parts one and two of this Certilic:ate of Compliance must be Included wilh each building pennit application for the above noted building and appe, on !he ·plans submitted for approval. The building.features and requirements represented on lhe Certificate of Compliance are adequate to achie\ compliancewilh lhe second genaraticn nonresldendaJ energy standards forlhe building referenced above. The buildfrig features and requirements a: alao ~ for any subsequent aJteralions. mocilic:alions or additions to lhe building. Dar;nerOn• Name (Print) Tatla/Company Name Acfdrass Signa!W8 Enforcamant Agency Signature c .. ran•Two . . J . . ~ k, :WJN:W!-: Date bate !ame (Print) ( · J:fkrooeJE: / A1E< VNWt1"lfiID ~-tie/Company Name / __ l'_,~1fV\ Address Cate Owner Name (Print) . SJQnature Date ,··· \. . Fonn Revised September 1986 •. Eiilorcoment AgonCJ signature D••l;ner Four Name (Print) Tide/Company Name Address Signature enforcement Agency Signature Enforcement Agency Name (Print) Tido/Agancy Address bate pate bate CERTIFICATE OF COMPLIANCE (part l of 2) CF-l page 3 of 85 -----------~---------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By ~cation: Carlsbad Date: 1/4/1988 ->.,:·;, Doc~mentation: PROCALC Date --------------------------------------------------------------------------- PERFORMANCE APPROACH Roofs and Floors- Roof/Ceiling Rt (CF-2,3) R-30.0 Ext. Floor Rt (CF-2,3) R-o.o walls Opaque Wall Rt (CF-2,3) R-8.5 Energy Budget CEC occupancy Type Conditioned Floor Area Total Number of Floors Climate Zone Beat Capacity (CF-2,3) 5.9 HC Energy Budget (WS-lA) Lighting Adjustment (CF-5) Energy compliance Budget Office 5537 l 7 125.0 o.o 125.0 Glazing in Walls Exterior Wall Area (CF-2) Total Glazing Area (CF-2) Total Glazing Percent Average Total SC (CF-2) West Exterior Wall (CF-2) West Glazing Area (CF-2) West Glazing Percent Average West SC (~ az ing in Roof \--~~kylight Area ( CF-2) 6768 2570 38.0 0.46 1737 1040 59.8 0.46 0 sf sf ' SC sf sf ' SC sf Calculated Annual Energy Consumption Approved Calculation NR COMPLY 24 Program Version Number 1.14 Oser License Number 1329 CEC Designation CPO 07 CEC Multiplier 1.027 Estimated Heating Cooling Fans Energy Use (KBtu/sqft-yr) 3.7 27.7 35.6 Lighting Proposed Adjusted LPD (CF-5)1.13 w/sf Adjustment Lights Receptacle 67.0 X 1.027 = 68e8 37.7 16 .. 8 1.4 124.6 BVAC Fan Wattage Index (CF-4) 0.77 Cooling Power Index (CF-4) 58.06 Beating Power Index (CF-4) 53.48 COMPLIANCE STATEMENT Hot Water w/sf Total (SCM-3) Btuh/sf Btuh/sf The proposed building represented in this set of compliance documentation is consistent with the other compliance forms and worksheets, with the plans and specifications and with any other calculations or computer runs submitted with this permit application. The energy performance estimate presented on this form was calculated using the approved calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable climate zone and occupancy type • .• GNED I ... \.2;., .. DESIGNER Calif. License i: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 . (714) 777-0666 ----- CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-l page.4 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By ,.!ocation: Carlsbad Date: 1/4/1988 ~,-'..-[:/· Documentation: PROCALC Date -----~-------~------------------------------------------------------------- Both Parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building, and appear on the plans submitted for approval. The building features and requirements represented on the Certificate of compliance are adequate to achieve compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are also adequate for any subsequent alterations, modifi- cations or additions to the building. PROJECT TITLE Building i2 El Fuente Business Park Carlsbad, California OTHER DESIGNER Name: Address: City: Signed: DOCUMENTATION AUTHOR PROCALC 705 s. Velare St. il0 Anaheim, CA 92804 1-(800) TITLE-24 . . r--, //-;-. ·7 / ,;--- signed:,, //,. -I: ' , ,:/ , ·. /1 OTHER Name: Address: City: Signed: ====================================================== =================== OWNER Davison-Jones Development 411 Campus Drive, Suite 830 Irvine, CA 92715 .•. d ..:..'--,;.;,;,igne : ENFORCEMENT AGENCY Name: Agency: City: Signed: MANDATORY FEATURES CHECKLIST (part l of 2) MF-1 · page 5 of 85 ---~-----------------------------------------------------------------------Project: Building t2 Designer: Banzuelo/Rierson/Duff & Associates, Inc_ ~-·&cation: Carlsbad Date: 1/4/1988 '.', ,·,. Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- ENVELOPE MEASURES o Certified Insula~ion Materials per Sec. 2-531l(a} o Insulation Installed to meet Flame Spread and Smoke Density Requirements of sec. 2-531l(b) o Orea Formaldehyde Foam Insulation. Installed per Sec. 2-53ll(c) o Retrofit Insulation specified per Sec. 2-5313 o Air Infiltration is minimized by specification of tested manufactured doors and windows and proper sealing and weatherstripping p~r Sec. 2-5317 LIGHTING SYSTEM MEASURES o Certified Luminaires/Ballasts per Sec. 2-5314(b) (I Independent Control within enclosed Areas per Sec. 2-5319(a) o Manual Switching Readily Accesible per Sec. 2-5319(b) o Reduction of Lighting Load to at least 50% per Sec. 2-5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute) o Separate Switching of _Daylit Areas per Sec. 2-5319(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale Occupancies per Sec 2-5319(h) o Automatic Control of Display Lighting in Retail/Wholesale Occupancies per Sec. 2-5319(h) o Tandem Wiring of 1 and 3 Lamp Luminaires per Sec. 2-5319(h) OCCUPANCY SENSING DEVICES (when applicable) o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 /. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319 ( e) • 3 l/-:,4 Limits on Emmisions per exceptions to Sec. 2-5319 ( e) Reference MANDATORY FEATURES CHECKLIST (part 2 of 2) MF-1 page 6 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 ~<,/.~:.·· Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) o Uniform Illumination reduction to 50% per Sec. 2-5319(e).l o Flicker Free Operation and no Premature Lamp Failure per Sec. 2~5319(e).2 Reference o Time Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 ---+--- o Step Switching Devices with Separation between On/Off Settings per Sec. 2-5319(e).4 o Photocell Sensors shall be Diffusing type and no Opaque Cover allowed per Sec. 2-5319(e).5 o Manufacturer's Instructions provided for Installation and Calibration per Sec. 2-5319(e).6 o Proper Installation of Controls including Sensor Location, A certification of Initial Calibration and Control of Luminaires (~ only within Daylit Areas per Sec. 2-5319(e).8 o Visible or Audible malfunction Alarm provided per sec. 2-5319(g) ____ _ HVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per sec. 2-5312 o Certified HVAC Equipment per 2-5314(a) o Certified Plumbing Equipment per 2-5314(a) o Heating and Cooling Equipment efficiency per sec. 2-5314(b} o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c) o Automatic Controls for Off-Hours per Sec. 2-5315(a) o Thermostat Set Point Requirements per Sec. 2-5315(b).l o Sequential Control of Heating and Cooling per sec. 2-5315(b).2 o Automatic Exhaust Fan Dampers per /. Thermostat Controls for Each Zone \~~~::r-> ,· Sec. 2-5316(b) per Sec. 2-5315(b) o Ventilation Provided per Secs. 2-5316 & 2-5343 o Water Heaters for Domestic Hot water and Pools per Sec. 2-5318 ENERGY BUDGETS WORKSHEET (part 1 of 2) WS-lA page 7 of 85 -----------------------------~---------------------------------------------Project: Building i2 . Designer: Banzuelo/Rierson/Duff & Associates, Inc /'.cation: Carlsbad Date: 1/4/1988 Documentation: PROCALC CLIMATE ZONE 7 ENERGY BUDGETS cross Floor Sectional Office Retail No Area Budget Budget -------------------------- 1 5537 125 165 BUILDING ENERGY COMPLIANCE BUDGET BY SPACE Occupancy Floor Flr Space Name Type Area Mult ------------------------------------- 1 Space 1 Office 859 X 1 = 1 Space 2 Office 419 X l -1 Space 3 Office 419 X 1 = 1 Space 4 Office 648 X 1 = 1 Space 5 Office 648 X 1 = l Space 6 Office 419 X 1 -Space 7 Office 419 X 1 = ,1 Space 8 Office 419 X 1 a \.'":'1 , .. Space 9 Office 419 X l -1 Space 10 Office 419 X 1 a 1 Space 11 Office 449 X 1 = Enforcement Agency Building Permit No Checked By Date Total Budget Energy Floor (KBtu Budget Area /sqft) (MBtu) -----------------859 X 125 • 107.4 419 X 125 = 52.4 419 X 125 • 52.4 648 X 125 = 81.0 648 X 125 • 81.0 419 X 125 • 52.4 419 X 125 a 52.4 419 X 125 = 52.4 419 X 125 = 52.4 419 X 125 • 52.4 449 X 125 = 56.1 -----------.5537 692.1 BUILDING COMPLIANCE BUDGET TOTALS 692.1 MBtu / 5537 sqft = 125.0 KBtu/sqft ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 t··: ·,\ ·'.. . Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate Use Flr Space Name Area Mult Area (KBtu/sqft) (MBtu) --------------------------------------------------1 Space 1 859 X 1 = 859 X 124.0 = 106.5 1 Space 2 419 X 1 = 419 X 127.3 = 53.3 1 Space 3 419 X 1 = 419 ·x 128.0 = 53.6 1 Space 4 648 X 1 = 648 X 122.1 = 79.l 1 Space 5 648 X 1 = 648 X 122.5 = 79.4 1 Space 6 419 X 1 = 419 X 125.3 -52.5 1 Space 7 419 X 1 -419 X 125.3 = 52.5 1 Space 8 419 X 1 -419 X 125.3 -52.5 1 Space 9 419 X 1 = 419 X 125.3 = 52.5 1 Spaee 10 419 X 1 = 419 X 125.3 = 52.5 1 Space 11 449 X 1 -449 X 123.7 = 55.6 -----------TOTALS 5537 690.2 ·11ILDING ENERGY CONSUMPTION 690.2 MBtu / 5537 sqft = 124.6 KBtu/sqft \ s\' '~: • (~~7 AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 85 ---------------------------------------------------------------------------Project: Building i2 ' Designer: Banzuelo/Rierson/Duff & Associates, Inc :'.<>cation: Carlsbad . Date: 1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE s SW· w NW TOTALS ---------------------------------------------------------------------------Roof-1 Roof-2 2849 343 2149 196 4998 539 ------------------------------------------------~--------------------------TOTALS 3192 2345 ROOF R-VALUE Type Roof-1 Roof-2 ,.-.. --~ Assembly Name --------------------------R-30 B/U with T-Bar R-30 B.U.Roof/Gyp. Clg . Average R-Value Area 4998 539 5537 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE 5537 Area/ R-Value R-Value --------------30.21 165.43 28.51 18.90 -------I 184.33 • 30.04 s SW w NW TOTALS ~-------------------------------------------~------~-----------------------NONE ---------------------------------------------------------------------------TOTALS 0 • ~:/···· AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc 1.ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By . Documentation: PROCALC Date --------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------1755 1179 207 297 1287 1445 293 306 6768 ---------------------------------------------------------------~----------- OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW Int TOTALS -~~------------------------------------------------------------------------Wal-1 Wal-2 Wal-3 1516 140 1099 80 106 54 20 54 342 580 63 54 18 72 2802 1157 240 ---------------------------------------------------------------------------TOTALS 1656 1179 180 54 342 580 117 90 4198 ~AQOE EXTERIOR WALL/DOOR R-VALOE & BEAT CAPACITY Area/ Area ype Assembly Name Area R-Value HC R-Value X BC ----------------------------------------------Wal-1 5/8 Gyp/R-11/Gyp WF 2802 10.19 1.4 275 3878 Wal-2 6.5" Conc/R-11/Gyp.Brd. 1157 10.34 17.4 112 20112 Wal-3 Solid Wood Door 240 2.22 2.4 108 573 ------------Totals 4198 495 24563 Average R-Value 4198 I 495 == 8.48 Average HC . 24563 I 4198 == 5.85 (ff: .. ~~~ ....... ~ AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc :.ocation: Carlsbad . Date: l/4/1988 (/:~:~::,/ Documentation: PROCALC Enforcement Agency Building Permit No Checke~ By Date --------------------------------~------------------------------------------ GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Wind-1 99 27 243 945 864 176 216 2570 ---------------------------------------------------------------------------TOTALS 99 27 243 945 864 GLAZING O-VALUE AND SC Type Wind-1 • ' .. ... ,::-..':"-~--~,-' Assembly Name Area O-Value --------------------------Sunglass Blue Plate 2570 1.14 Totals 2570 Average u-value Average SC 2920 / 1182 / 2570 a 2570 = 176 216 2570 Area X Area SC u-Value X SC -------0.46 2920 1182 ------------2920 1182 1.14 0.46 SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 12 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad · Date: 1/4/1988 Enforcement Agency Building Permit No Checked By ( ',.' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southwest Glazing Northwest Glazing North Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALOES ( including ins.ide film resistance) Wall Window ' Roof r' Door \ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency · Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Pan Power Air Circulation Rate GENERAL Heat capacity of Exterior Wall • Lighting Power Climate Zone ,. /-, . \_~:,-:; Space 1 619.0 sqft 216.0 sqft 81.0 sqft 99.0 sqft 859.0 sqft 20.0 sqft o.o sqft 859.0 sqft 859.0 sqft 10.23 0.88 30.11 2.22 o.oo Rheem RPNC048C 1 Heat Pump Heat Pump Electric Resistance 3.040 8.500 0.990 No 5595 watts 533 watts 1750 CFM 5.92 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page l3 of 85 ---------------~-----------------------------------------------------------Project1 Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --------------------southwest Northwest North OVERHANGS & SIDEFINS Southwest e Northwest ( North ·, SPECIAL FEATURES Daylighting Strategies •• \-.:~::: ... ----" Glass Framing SC Factor ------------ 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 24.0 9.0 11.0 Shading Device Winter summer ------------ Overhang Height Depth . -- 0.20 0.70 9.0 ft overall SC 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc. .ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date ----------------------------------------~----------~----------------------- space Name: Occupancy Type: SCHEDULING Space l Office Occupancy Level for Operational Period: Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans water Heater 2915 359 3274 4518 1770 32 hours hours hours hours hours hours Number of Non-operational Hours per Week: f~ \V Number of Holidays per Year: Day Night 46 hours Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CU-Value): INTERNAL LOADS & ENER~Y Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: • occupant Density: •. \: . -- Heating Season Cooling season Winter Winter Setback summer summer setup 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 85 -------------------------------------------------------------------~-------Project: Building 12 Designer: Banzuelo/Rierson/Duff .ocation: Carlsbad ~ " ' ; & Associates, Inc Date: 1/4/1988 Enforcement Agency Building Permit No Checked By .. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 1 BALANCE POINT TEMPERATURES AND DEGREE DAYS ==••====================================== Daytime Nighttime ------------------------------BPTl = 54.79 (Winter) BPTl = BPT2 = 61.76 (Summer) BPT2 = BPT3 = 61.76 (Economizer) BPT3 = HDD = 41 (Heating) HDD = CDD = 837 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) •================================ Building Envelope Heat Transfer Rate: Winter Summer overall Heat Transfer Factor ("K"): Winter (' Beating Cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot water summer ANNUAL LOADS (MBtus) ••=•==•============= ANNUAL SITE ENERGY REQUIREMENTS (MBtus} ======================================= 67.60 75.79 75.79 3133 0 ---- -- -= ---- ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft} ==•========================================== source Heating Source Cooling Source Fan Total Space Conditioning Energy source Lighting source Receptacle Source Hot Water = -- = 3.9 24.8 28.7 ------57.4 X 1.027 = --- 431.4 436.9 661.3 648.6 3.1 11.7 1.1 7.1 8.2 13.4 4.8 0.4 59.0 46.9 16.8 1.4 •·======================================================================== \_,_,, TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 124. 0 KBtu/sqft =========================================================================== SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No- Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall South Glazing Southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof I~ ~~~~r (~ HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Beating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Beating Efficiency Rated Cooling Efficiency Rated Water Beating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL I. ' ' i ,, ,,, ' ·.\,~~-/ Beat capacity of Exterior Wall Lighting Power Climate Zone Space 2 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft 0.0 sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 1 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 2743 watts 373 watts 850 CFM 4.66 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 17 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,-&cation: Carlsbad Date: 1/4/1988 t·j~_ .. ::·;·)· Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------south southwest OVERHANGS & SIDEFINS south southwest (l,ECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.15 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc •~cation: Carlsbad Date: 1/4/1988 ·,;;:.::_\.)' Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING occupancy Leyel for Oper~tional Period: Space 2 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans water Heater Number cl Number of Non-Operational Hours per Week: Day Night of Holidays per Year:. Heating Season cooling Season Thermostat Set Point Temperatures: Winter Winter setback summer summer setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (O-Value): INTERNAL LOADS&_ ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: • Occupant Latent Load: Occupant Density: i· ,. ~1.: :_. \ \,.,.~·)· -·~ 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By --<("'~ .. :< Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 2 BALANCE POINT TEMPERATURES AND DEGREE DAYS •========================================= Daytime Nighttime ------------------------------BPTl = 51.28 (Winter) BPTl = 67.22 BPT2 = 60. 37 . (Summer) BPT2 = 75.66 BPT3 = 60.37 (Economizer) BPT3 = 75.66 HDD = 0 (Heating) HDD = 3010 COD = 1045 (Cooling) CDD = 0 BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter • summer - ANNUAL LOADS (MBtus) J~ -~ Heating Cooling ----================ -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ---=--================================= Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) source Beating source cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water = -= = 3.3 30.8 41.2 ___ ....,_ 75.3 X 1.027 = -a -= = = --- 194.8 197.2 306.9 300.5 1.3 6.4 0.5 4.3 5.8 4.4 2.3 0.2 77.3 31.8 16.8 1.4 •====•==========================================•=====================•==== \, .··. / TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 127. 3 KBtu/sqft ------======•==============•====•=====•================•=============------ I SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 20 of 85 ----------------------------------------------------------~---------------~ Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By ~ ,. ' ', '') .... ,:· Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall West Glazing Southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof I Door Floor c;J HVAC SYSTEM BVAC Equipment Name (CF-4) Number of Systems Beating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL ,. ~ \ \', ,' . .-,,,__,,, Heat Capacity of Exterior Wall Lighting Power Climate Zone Space 3 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 415.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J l Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 2743 watts 373 watts 850 CFM 4.66 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 21 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ';.cation: Carlsbad Date: 1/4/1988 , ,:b-ocumentation: PROCALC Enforcement Agency Building Permit No Checked By Date -------------------------------------------------------------------~------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --------------------West Southwest OVERHANGS & SIDEFINS west Southwest r'~ t . \ 'S,,J ECIAL FEATURES Daylighting Strategies Glass Framing SC Facto.r ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter summer ------------ Overhang Height Depth 0.15 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By '.ocation: Carlsbad . Date: 1/4/1988 ... , ~:- Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING ----------- Occupancy Level for Operational Period: Space 3 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours (I Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate co-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .Occupant Density: t .·: ,..:,~~--... Heating Cooling Winter Winter Summer Summer Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff .ocation: Carlsbad Documentation: PROCALC & Associates, Inc Date: l/4/1988 Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Space 3 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 52.48 (Winter) BPTl = 67.34 BPT2 = 59.94 (Summer) BPT2 = 75.60 BPT3 = 59.94 (Economizer) BPT3 = 75.60 HOD = 0 (Heating) HOD = 3050 COD = 1117 (Cooling) COD = 1 BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: ·winter • summer = Overall Heat Transfer Factor ("K"): Winter = summer = ANNUAL LOADS (MBtus) ~ ' =•================== /8 I..; '.,;. Heating -= Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •====================================== Site Heating Site Cooling Site Fan Site Lighting Site Receptacl_e Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating source Cooling Source Fan Total space conditioning Energy source Lighting Source Receptacle Source Hot water = -- = 3.4 31.4 41.2 -----76.0 X l.027 = • = = -- = = -- 194.8 197.2 306.9 300.5 1.3 6.6 0.5 4.4 5.8 4.4 2.3 0.2 78.0 31.8 16.8 1.4 •========================================================================= TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.0 KBtu/sqft =========================================================================== SCM lNPU'.C DA'fA SUMMAR:! \ part J. Ot 2., SCM-l page 2.4 ot d~ ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates,·rnc Enforcement Agency Building Permit No Checked By .. -.ocation: _Carlsbad Date: 1/4/1988 Documentation: PROCALC Date --------------~-----------------------------------------------------------~ Space Name: AREAS Exterior Wall south Glazing southwest Glazing Northwest Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALOES (including inside film resistance) Wall Window • Roof / Door "--.,,;.;,,~ Floor BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment ·Power Rating Fan Power Air Circulation Rate .. Space 4 439.0 sqft 40.S sqft 189.0 sqft 135.0 sqft 648.0 sqft 20.0 sqft o.o sqft 648.0 sqft 648.0 sqft 10.24 0.88 30.08 2.22 o.oo Rheem RPNC030J 2 Heat Pump Heat Pump Electric Resistance 2.960 9.850 0.990 No 6942 watts 746 watts 2000. CFM * Note: 2 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Beating & Cooling Load Summary for more details on the zoning arrangement. -~~~~ 1, .• \, ... ,: Heat Capacity of Exterior Wall Lighting Power Climate Zone 6.76 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 85 ---------------------------------------------------------------~-----------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 ,, :' .~,~ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --~-----------------South Southwest Northwest OVERHANGS & SIDEFINS South ' ,.a Southwest (~ Northwest ......,r SPECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 4.5 21.0 15.0 Shading Device Winter summer ------------ overhang Height Depth 0.24 0.70 9.0 ft overall SC 0.40 0.40 0.40 Side-Fin. Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .··,.cation: Carlsbad Date: 1/4/1988 ,, ~i>,ocumentation: PROCALC Enforcement Agency Building Permit No Checked By Date ------------------------------------------------------------------~-------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 4 Office Day 54.60 I Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Number Water Heater of Non-Operational Hours per Week: Day Night (~ ,_(u Number of Holidays per Year: Heating Season cooling Season Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CO-Value): INTERNAL LO~DS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: • Occupant Density: I '-.\· .... -"' Winter Winter setback summer summer setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 27 of 85 ----------~----------------------------------------------------------------Project: Building ·12 Designer: Banzuelo/Rierson/Duff .& Associates, Inc .,ocation: Carlsbad · Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date ----------------------~---------------------------------------------------- Space Name: Space 4 BALANCE POINT TEMPERATURES AND DEGREE DAYS •=a•====================================== Daytime Nighttime ------------------------------BPTl -53.64 (Winter) BPTl = BPT2 -60.83 (Summer) BPT2 -BPT3 = 60.83 (Economizer) BPT3 = HOD = 26 (Heating) HOD -COD -972 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) -----=-=====================•==== Building Envelope Heat Transfer Rate: Winter Summer Winter summer Overall Heat Transfer Factor ("K"): Heating Cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL LOADS (MBtus) -------=--===-----== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----==•===•=======•==•=====•=========== 67.57 75.76 75.76 3125 0 ---- -- ------ ANNUAL SOURCE ENERGY OSE ESTIMATE (KBtu/sqft) --------------------------------============= Source Heating Source Cooling ~ource Fan Total Space conditioning Energy Source Lighting Source Receptacle Source Hot Water ---- 4.2 24.7 26.6 ------55.6 X 1.027 = --- 380.5 385.6 553.9 545.3 2.5 9.2 0.9 5.3 5.8 10.l 3.6 0.3 57.l 46.9 16.8 1.4 ··-=============-======-==•===================================-============ (-•• V .\ ... > TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 122. l KBtu/sqft --===••===••=========•==============================-=======•==••=======•== SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 28 of 85 ---------------------------------------------------------------------------Project: Building t2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ... ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southwest Glazing south Glazing West Glazing Roof Door Raised Floor Slab . Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof ,. Door '-:-..:.~ Floor BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Heating Equipment Type cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 5 439.0 sqft 40.5 sqft 189.0 sqft 135.0 sqft 648.0 sqft 20.0 sqft o.o sqft 648.0 sqft 648.0 sqft 10.24 0.88 30.08 2.22 o.oo Rheem RPNC030J 2 Heat Pump Heat Pump Electric Resistance 2.960 9.850 0.990 No 6942 watts 746 watts 2000 CFM * Note: 2 Spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & Cooling Load summary for more details on the zoning arrangement • • ENERAL l ,------. __ / Heat Capacity of Exterior Wall ·-Lighting Power Climate Zone 6.76 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 29 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc. -cation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southwest south West OVERHANGS & SIDEFINS SPECIAL FEATURES Daylighting Strategies SC Factor ------------- 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 4.5 21.0 15.0 -Shading Device Winter summer ------------ Overhang Height Depth 0.24 0.70 9.0 ft overall SC 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls -----------------------------------------~---------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc /.cation: Carlsbad '''--:oocumentation: PROCALC Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Space 5 Office Day 54.60 % Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number (,I Number of Non-operational Hours per Week: Day Night of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CU-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .• Occupant Density: Heating Season Cooling season Winter Winter Setback Summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person · SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: (.ocation: Banzuelo/Rierson/Duff & Associates, Inc Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By r.,_, ~ -,- ~·o,..-. _; Documentation: PROCALC Date --------------------------------------------------------------------------~ Space Name: Space 5 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -------------------------------BPTl = 51.43 (Winter) BPTl = BPT2 = 60.-38 (Summer) BPT2 = BPT3 = 60.38 (Economizer) BPT3 = HDD = 0 (Heating) HDD = COD = 1044 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) •================================ Building Envelope Heat·Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter cA. . ~ Heating Cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot water summer ANNUAL LOADS (MBtus) ==================== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •====================================== 67.33 75.71 75.71 3045 0 = = = = -= -----= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) source Heating Source Cooling source Fan Total Space Conditioning Energy source Lighting source Receptacle source Hot Water ---- 3.9 25.4 26.6 -----55.9 X 1.027 --= = 380.5 385.6 553.9 545.3 2.3 9.6 0.8 5.5 5.8 10.1 3.6 0.3 57.4 46.9 16.8 1.4 (·=·======================================================================== \.t. )J TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 122. 5 KBtu/sqft =========================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 32 of 85 ~--------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By :·-ocation: Carlsbad Date: l/4/1988 (~~·:_:·_:·);;' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southeast Glazing South Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALOES (including inside film resistance) -------------------------------------------Wall Window Roof aooor (O Floor BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 6 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 3 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 8229 watts 1119 watts 2550 CFM * Note: 3 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL -----. Heat Capacity of <.:.-:-·· Lighting Power Climate zone Exterior Wall 4.66 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 85 ------------------------------~--------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc ··ocation: Carlsbad . · Date: l/4/1988 ~' . . • "! \· Documentation: PROCALC Enfor9ement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southeast south OVERHANGS & ·SIDEFINS southeast South (~ECIAL FEATURES Daylighting Strategies SC F.actor ------------0.46 0.880 0.46 0.880 Window Height Width ----------- 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ Overhang Height Depth 0.15 o. 7-0 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc &cation: Carlsbad Date: 1/4/1988 •;,::.,:· .. -/ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ------------------------------------------------~-------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 6 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night ( •.. x ·.: ·"' Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: :., Occupant Density: \. .. ~·:i·,· / Heating Season Cooling season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours· 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc /.ocation: ·car lsbad Date: 1/4/1988 ··~-~ -;)~·j Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 6 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 50.62 (Winter) BPTl = BPT2 -61.79 (Summer) BPT2 -BPT3 = 61.79 (Economizer) BPT3 = HOD -0 (Heating) HDD = COD = 834 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) ===•===•========================= Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter cl Heating cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water Summer ANNUAL LOADS (Matus) •==•=•========•===== ANNUAL SITE ENERGY REQUIREMENTS (Matus) ••=====================•=s============= 67.14 75.82 75.82 2986 0 ---- -- ------ ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==•===============•========================== Source Heating Source Cooling Sour~e Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water = --- 3.3 28.9 41.2 -----73.4 X l.027 ---- 194.8 197.2 306.9 300.5 1.3 5.7 o.s 4.0 5.8 4.4 2.3 0.2 75.4 31.8 16.8 1.4 ! ;:;···===•=•==•========================•======•==•==•=======••=======i======== \.':::/-;/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft ==••===•=================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 85 ----------------~----------------------------------------------------------Project: ~uilding 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc (.ocation: Carlsbad · Date: l/4/1988 Enforcement Agency Building Permit Bo Checked By _._ i' Documentation: PROCALC Date -----------------------------------------~--------------------------------- Space Name: AREAS Exterior Wall So~theast Glazing south Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof 1 • Door l,C::, Floor BVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Beating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 7 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 0.00 Rheem RPNC024J 2 Heat Pump Beat Pump Electric Resistance 2.920 9.350 0.990 No 5486 watts 746 watts 1700 CFM * Note: 2 Spaces are served by this HVAC System. Please refer to the attached BVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL · / ... ;;;;-capacity of \.,\.;..' Lighting Power Climate Zone Exterior Wall 4.66 0.950 wat;ts/sqft 7 G -----------------------NPUT DATA SUMMARY (part 2 of 2) SCM-l page 37 of 85 --------------------------~--------------------------------------------Project: Building i2 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc .• ocation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Building Permit No Checked By Date ---------------------------------------------------------~----------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --------------------southeast south OVERHANGS & SIDEFINS Southeast south :AECIAL FEATORES Daylighting Strategies ···-('\._.) , ... ~ Glass Framing SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter summer ------------ overhang Height Depth 0.15 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth -·- ~o Daylighting controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 85 --------------------------------------------------------------------------~ Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ··ocation: Carlsbad Date: 1/4/1988 ,,. Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 7 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night (.e Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U~Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: •. Occupant Density: ;\ j "·~ ~:~·...-... Heating season cooling Season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person ·190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 8~ ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By ·Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 7 BALANCE POINT TEMPERATURES AND DEGREE DAYS •========================================= Daytime Nighttime ------------------------------BPTl = 50.62 (Winter) BPTl BPT2 = 61.79 (Summer) BPT2 BPT3 = 61.79 (Economizer) BPT3 HDD = 0 (Heating) HOD CDD = 834 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) •==•============================= ·auilding Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter summer ANNUAL LOADS (MBtus) = = = = = 67.14 75.82 75.82 2986 0 = -= = i. -~ Beating -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating source Cooling source Fan Total Space conditioning Energy source Lighting source Receptacle source Hot Water = -- = 3.3 28.9 41.2 -----73.4 X 1.027 - ------ ---= 194.8 197.2 306.9 300.5 1.3 5.7 0.5 4.0 5.8 4.4 2.3 0.2 75.4 31.8 16.8 1.4 ···=-·===========================================•===============•======•=== \\;:, ... : TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 40 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff • ocation: Carlsbad 'l/·.t::/',.1 ···~t'.:.---,' Documentation: PROCALC & Associates, Inc Date: 1/4/1988 Enforcement Agency Building Permit No . Checked By Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southeast Glazing south Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window Roof A Door ~~ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 8 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 0.00 Rheem RPNC024J 3 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 8229 watts 1119 watts 2550 CFM * Note: 3 ·Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL .,.-;;;~-Capacity of \'~,,,,./ Lighting Power Climate zone Exterior Wall 4.66 0.950 watts/sqft 7 SCM INPOT DATA SUMMARY (part 2 of 2) SCM-1 page 41 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,'.ocation: Carlsbad Date: l/ 4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height SHADING COEFFICIENTS --------------------southeast South OVERHANGS & SIDEFINS Southeast South , .. '-WPECIAL FEATURES Daylighting Strategies ,. Glass Fr~ming SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ Overhang Height Depth 0.15 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc (.ocation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ---------------------------------------~----------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Ope~ational Period: Space 8 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Thermostat Set Point Temperatures: Water Beater Heating cooling Winter Winter summer summer Day Night Season season Setback Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate Co-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: ~ater Beating Energy: Occupant Sensible Load: •. Occupant Latent Load: Occupant Density: ~\~~~~j 2915 hours 359 hours 3274 hours 4518· hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 85 -------------------------------------------------------------------------~-Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,·&cation: car ls bad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 8 BALANCE POINT TEMPERATURES AND DEGREE DAYS ===---==================================== Daytime Nighttime ------------------------------BPTl = 50.62 (Winter) BPTl = BPT2 = 61.79 (Summer) BPT2 = BPT3 -61.79 (Economizer) BPT3 = BDD = 0 (Beating) HOD = CDD = 834 (Cooling) COD = BUILDING BEAT TRANSFER (Btu/hr-F) •=====•••====================•=== Building Envelope Heat Transfer Rate: winter Summer overall Heat Transfer Factor ("K"): Winter cl Heating cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot water Summer ANNUAL LOADS (MBtus) ==•============•==== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 67.14 75.82 75.82 2986 0 -= = - -- ------ ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting Source Receptacle source Hot Water = --- 3.3 28.9 41.2 -----73.4 X 1.027. = --= 194.8 197.2 306.9 300.S l.3 5.7 o.s 4.0 5.8 4.4 2.3 0.2 75.4 31.8 16.8 1.4 ,•========================================================================= \.:::,,: ... · TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft ==============================================================•=========•== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 44 of as· ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By /·&cation: Carlsbad Date: l/4/198.8 Documentation: PROCALC Space Name: AREAS .Exterior Wall southeast Glazing South Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) -~-----------------------------------------Wall Window Roof A Door (~ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Pan Power Air Circulation Rate Date Space 9 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 2 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 5486 watts 746 watts 1700 CFM * Note: 2 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL !.;;;~-Capacity of ~~'Lighting Power Climate Zone Exterior Wall 4.66 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 45 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date:·1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity ceiling Height Gla·SS Framing SHADING COEFFICIENTS ---~----------------southeast south OVERHANGS & SIDEFINS southeast South <&ECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter summer ------------ Overhang Height Depth 0.15 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth . No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc . /.ocation: Carlsbad Date:· 1/4/1988 . ·,·,,; ·I; ., <·.,-~:: Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 9 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans water Heater Number of Non-Operational Hours per Week: Day Night <I Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate Co-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: :. Occupant Density: <:~;'~_) Heating season cooling season Winter Winter setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 85 --------------------------------------------------------------------~------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ·&cation: Carlsbad Date: 1/4/1988 ,1,:: '-_'.1 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -------------------------------------------------------------------------- Space Name: Space 9 BALANCE POINT TEMPERATURES AND DEGREE DAYS •=•=•===================================== Daytime Nighttime ------------------------------BPTl = 50.62 (Winter) BPTl BPT2 = 61.79 (Summer) BPT2 BPT3 = 61.79 (Economizer) BPT3 BOD = 0 (Beating) BOD COD = 834 (Cooling) COD BUILDING BEAT TRANSFER (Btu/hr-F) ======•=•======================== Building Envelope Heat Transfer Rate: Winter summer Winter summer Overall Heat Transfer Factor ("K"): ANNUAL LOADS (MBtus) -= = = = 67.14 75.82 75.82 2986 0 -= -- (~ \~ Heating •=========•====•===- = -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •==•====•••====•===•=================== Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating Source Cooling Source Fan Total Space Conditioning Energy source Lighting Source Receptacle source Hot Water ---- 3.3 28.9 41.2 -----73.4 X 1.027 --• --- -= -- 194 .·8 197.2 306.9 300.5 1.3 5.7 0.5 4.0 5.8 4.4 2.3 0.2 75.4 31.8 16.8 1.4 ,:·•·======================•================================================= '\::.:~._j TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft •===•====================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 48 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, ·Inc Enforcement Agency Building Permit No Checked By .• ocation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southeast Glazing South Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof ' Door ( 1 Floor ~ ,., HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer cooling Equipment Power Rating Fan Power Air Circulation Rate Space 10 250.0 sqft 40.5 sqft 135.0 sqft 419.0 sqft 20.0 sqft o.o sqft 419.0 sqft 419.0 sqft 10.22 0.88 30.00 2.22 o.oo Rheem RPNC024J 3 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 8229 watts 1119 watts 2550 CFM * Note: 3 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load Summary for more details on the zoning arrangement. GENERAL ,..a-;;;~-Capacity of \:.:;::;c > Lighting Power Climate zone Exterior Wall 4.66 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 49 of 85 -------------------------------------------------------------------~--------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ·f,ocation: Carlsbad Date: l/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------southeast south OVERHANGS & SIDEFINS southeast south ( • .. ;,."',;SPECIAL FEATURES ----------------Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 4.5 15.0 Shading Device Winter Summer ------------ overhang Height Depth 0.15 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 50 of 85 ---------------------------------------------------------------------------Project: Building t2 Designer: Banzuelo/Rierson/Duff & Associates, Inc '&cation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ---------------------------------------~----------------------------------- Space Name: Occupancy Type: Space 10 Office SCHEDULING Occupancy Level for operational Period: Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14. 40 I. Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-op~rational Hours per Week: Day -Night (~ Number of Holidays per Year: Heating season Cooling Season Thermostat set Point Tempetatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (O-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: ; • Occupant Density: '~ ·~~,-~/ Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page Sl of 85 ---------------------------------------------------------------------------Project: Building 12 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No /.ocation: Carlsbad Date: 1/4/1988 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 10 BALANCE POINT TEMPERATURES AND DEGREE DAYS ••======================================== Daytime Nighttime ------------------------------BPTl = 50.62 (Winter) BPTl = BPT2 = 61.79 (summer) BPT2 = BPT3 = 61.79 (Economizer) BPT3 = BDD = 0 (Beating) BDD = CDD = 834 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) ---======================~======= Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter (I &eating Cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water summer ANNUAL LOADS (MBtus) ==-================= ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 67.14 75.82 75.82 2986 0 -= = - -- ----= - ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) •=============•============================== Source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water ---- 3.3 28.9 41.2 -----73.4 X 1.027 = = -- 194.8 197.2 306.9 300.5 1.3 5.7 o.s 4.0 5.8 4.4 2.3 0.2 75.4 31.8 16.8 1.4 ,.·-======================================================================== \~<,;) TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft ---~---==================================================================== 1. SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 52 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By ·&cation: car lsbad Date: 1/4/1988 \;/ii~cumentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall East Glazing southeast Glazing southwest Glazing southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Beating Equipment Type Cooling Equipment Type water Beating Equipment Type Rated Beating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL Beat Capacity of Exterior Wall • Lighting Power Climate Zone l .. :,,: \ \~ :~--.. -~:· r Space 11 711.5 sqft 27.0 sqft 40.5 sqft 108.0 sqft 40.5 sqft 449.0 sqft 40.0 sqft 0.0 sqft 449.0 sqft 449.0 sqft 10.25 0.88 30.02 2.22 0.00 Rheem RPNC024J 1 Beat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 2743 watts 373 watts 850 CFM 7.67 0.950 watts/sqft 7 SCM INPUT DATA SUMMARY ( part 2. of 2) SCM-1 page 53 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc - ··ocation: Carlsbad Date: 1/4/1988 \/~: l Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------East southeast southwest southwest OVERHANGS & SIDEFINS ' East ( Southeast ' southwest Southwest SPECIAL FEATURES Daylighting Strategies .( \ I . ,. J ·-.:-> .. ,,_•,; .. SC Factor ------------0.46 0.880 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 9.0 3.0 4.6 12.0 4.5 s·hading Device Winter Summer ------------ Overhang Height Depth 0.29 0.70 9.0 ft overall SC 0.40 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT-DATA SUMMARY SCM-2 page 54 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By •~ocation: Carlsbad Date: 1/4/1988 '<:;,,o· Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Space 11 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours ·Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours • Number of Holidays per Year: Heating Cooling Thermostat Set Point Temperatures: Winter Winter summer Summer PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate Co-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: Occupant Density: Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so 64 230 190 250 watts/sqft Btu/hr-person Btu/hr-person Btu/hr-person sqft/person · SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 55 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: •• ocation: (-",. } Banzuelo/Rierson/Duff & Associates, Inc Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By ~:.: Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 11 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -------------------------------BPTl -53.59 (Winter) BPTl = BPT2 -61.-90 (Summer) BPT2 -BPT3 = 61.90 (Economizer) BPT3 = BDO -26 (Heating) HDO -COD = 819 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter summer Overall Heat Transfer Factor ("K"): Winter ti Beating Cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot water summer ANNUAL LOADS (MBtus) ---================= ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=•====================•=============== 67.64 75.95 75.95 3148 0 ---- -- --= --= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating Source Cooling Source Fan Total Space Conditioning Energy source Lighting Source Receptacle Source Hot Water = = - = 4.5 28.9 38.4 -----71.8 X 1.027 = --= 282.1 285.3 402.3 396.0 1.8 6.4 0.7 4.3 5.8 4.8 2.5 0.2 73.8 31.8 16.8 1.4 ···======================================================================== .:<.,,) TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 123. 7 KBtu/sqft ==•======================================================================== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 56 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc :.ocation: Carlsbad-Date: 1/4/1988 \,(::;} Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: solid wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Hardwood, Maple 2. Inside Air Film 3. 4. 5. 6. 7. 8. 9. 10. 11. 1.750 1.54 0.68 1.54 0.68 --------------------------------------------------------------------------- 1 ~~ Total 2.22 2.22 ,· Framing Percentage: 0.0 I Franting Ma·1;erial: NONE ----------------------~-------- OVERALL VALUES ADJUSTED FOR FRAMING •,,. ' Sketch of Construction Assembly .sorptivity: ~ 1 ~ughness: Clear .. "'://eight: Beat Capacity: Pine 0.70 6.1 lb/sqft 2.39 · R-Value O-Value 2.22 0.4505 2.22 0.4505 =•=•== ~-~----------- CONSTRUCTION ASSEMBLY COMPLIANCE FORM cF.;.J page 57 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ocation: Carlsbad Date: 1/4/1988 \, .·. .( ·~i~:.;j Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -----------------------------------------------------------------~--------- Assembly Name: R-30 B/0 with T-Bar Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Roofing, Built-Op 2. Plywood 3. Air space 4. Insulation, Mineral Wool, R-30 5. Acoustical Tile, Mineral Fiberboard 6. Inside Air Film 7. a. 9. 10. 11. 0.375 0.500 24.000 * 9.500 0.750 0.33 0.33 0.63 0.63 1.00 0.00 30.00 30.00 2.03 2.03 0.92 . 0.61 :, .... -------------------------------------------------------------------------~ { .. ... 9 . , ;, . Total 34. O 34. 39 Framing Percentage: 10.0 % Framing Material: Softwood, Douglas Fir-Larch 1 2 3 4 5 -------------------------------Sketch of Construction Assembly .absorptivity: 0.70 Shingles Calculation for Framing Adjustment summer o-value 0.0287 X 0.90 + 0.0699 X 0.10 • 0.0328 Winter o-value 0.0291 X 0.90 + 0.0725 X 0.10 • 0.0334 OVERALL VALUES ADJUSTED FOR FRAMING R-Value u-value 30.51 0.0328 ---=== 29.92 0.0334 ====-== ~ughness: concrete, Asph. '"-~~;eight: Beat Capacity: 8.1 lb/sqft 2.58 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 58 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc <'.ocation: Carlsbad · Date: l/4/1988 Enforcement Agency Building Permit No Checked By '-,;·;,:/ oocumentat.ion: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-30 B.O.Roof/Gyp. Clg Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) construction components Th R-Value Fr (in) Summer Winter ---------------------------------------------------------------------------1. Roofing, Built-Op 2. Plywood 3. Air $pace 4. Insulation, Mineral Wool, R-30 s. Gypsum or Plaster Board 6. Inside Air Film 7. 8. 9. 10. 11. 0.375 0.500 6.000 * 9.500 0.625 0.33 0.33 0.63 0.63 1.00 0.80 30.00 30.00 0.56 0.56 0.92 . 0.61 --------------------------------------------------------------------------- ,Q~I Total 33.44 32.93 Framing Percentage: Framing Material: 1 2 3 4 5 10.0 % Softwood, Douglas Fir-Larch calculation for Framing Adjustment summer o-value 0.0299 X 0.90 + 0.0779 X 0.10 • 0.0347 Winter o-value 0.0304 X 0.90 + 0.0811 X 0.10 • 0.0354 OVERALL VALUES ADJUSTED FOR FRAMING ------------------------------- R-Value O-Value 28.82 0.0347 28.22 0.0354 Sketch of Construction Assembly • bsorptivity: l. ,oughness: Stucco, -.,\:,.:.,eight: Heat capacity: 0.70 wood Shingles 9.4 lb/sqft 3.01 =•==== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 59 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By 1 r.ocation: Carlsbad Date: 1/ 4/198-8 .,:.~' Documentation: PROCALC ·Date --------------------------------------------------------------------------- Assembly Name: sunglass Blue Plate Assembly Type: Glazing Assembly Tilt: 90 deg (Ver.tical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. CEC Single Glazing 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11 • 0.250 0.20 0.68 ' . 0.20 0.68 • ----------------------------------------------:::::---------:~::-~---:~~:- Framing Percentage: 0.0 I Framing ~aterial: NONE 1 ---------~---------------------Sketch of .Construction Assembly ~ading Coefficient: -sible Transmittance: ,., .•. ,.. 0.46 0.30 OVERALL VALUES ADJUSTED FOR FRAMING R-Value o-Value 0.88 1.1364 ------ 0.88 1.1364 •===•• CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 60 of 85 --------------------------~---------------------~--------------------------Project: Building 12 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ··ocation: .Carlsbad Date~ 1/4/1988. Checked By ·,<.~ocumentation: PROCALC I I_D_a-te ______ _ ------------~------------------------------------------------------------~- Assembly Name: 5/8 Gyp/R-11/Gyp WF Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) Summer Winter ---------------------------------------------------------------------------1. Gypsum or Plaster Board 2. Insulation, R-11, 2x4 wood Framing 16" 0.625 3.500 0.625 0.56 8.38 0.56 0.68 0.56 8.38 0.56 0.68 3. Gyps~m or Plaster Board 4. Inside Air Film s. 6. 7. 8. 9. 10. 11 • . ------------------.C---------------------------:::::--------::~::----::~::- Framing Percentage: Framing Material: N"'ll~--1 P-<•+i---2 C..Jo+--3 0.0 I Softwood, Douglas Fir-Larch Calculation for Framing Adjustment summer O-Value 0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982 Winter o-Value 0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982 OVERALL VALUES ADJUSTED FOR FRAMING R-Value o-Value 10.19 0.0982 i0.19 0.0982 Sketch of Construction Assembly ====== ====== • sorptivity: t ,p~ghness: smooth ,._ ·,.,:rie1ght: Heat Capacity: 0.00 Plaster, Metal 5.4 lb/sqft 1.38 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 61 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc <aocation: ·carlsbad Date: 1/4/1988 '\-.· .. ' Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 6.5" Conc/R-11/Gyp.Brd. Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) Summer Winter ---------------------------------------------------------------------------1. Concrete, 140 lb, oven Dried 2. Insulation, R-11, 2x4 Wood Framing 16" 3. Gypsµm or Plaster Board 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. . 6.500 3.500 0.625 0.71 8.38 0.56 0.68 0.71 8.38 0.56 . 0.68 1--------------------------------------------------------------------------I . \ Total 10.34 10.34 Framing Percentage: o.o I Framing Material: NONE ---------~---...... ------------------- • • • . . 1 ., 2 • • . ... 3 • . • . ., • :. . • . • OVERALL VALUES ADJUSTED FOR FRAMING ' Sketch of Construction Assembly ~sorptivity: 90~ghness: Concrete, \s: .• e1ght: Heat Capacity: 0.70 Asph. Shingles 78.6 lb/sqft 17.39 R-Value O-Value 10.34 0.0967 •••••• 10.34 0.0967 ------ ----------··----------- HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 62 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc .cation: Carlsbad Date: 1/4/1988 \,.~<'.:,:.:~ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- FAN ENERGY No. Motor Drive Conv No. Fan HVAC System Sys BHP Eff. Eff. Fact Fans Watts --------------------------------------Rheem RPNC048C (Fanl) l X o.so / (0.70 X 1.00] X 746 X 1 -533 Rheem RPNC024J (Fanl) 1 X 0.33 / [0.66 X 1.00] X 746 X l -373 Rheem RPNC024J (Fanl) l X 0.33 / (0.66 X 1.00] X 746 X l = 373 Rheem RPNC030J (Fanl) 2 X 0.33 / (0.66 X 1.00] X 746 X 1 -746 Rheem RPNC024J (Fanl) 3 X 0.33 / (0.66 X 1.00] X 746 X 1 = 1119 Rheem RPNC024J (Fanl) 2 X 0.33 / [0.66 X 1.00] X 746 X 1 -746 Rheem RPNC024J (Fanl) 1 X 0.33 / (0.66 X 1.00] X 746 X l = 373 __ ,.. ___ Total 4263 FAN WATTAGE INDEX 4263 watts/ 5537 sqft • 0.770 watts/sqft HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page 63 of 85 ---------------------------------------------------------------------------Project: Building i2 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No t.ocation: Carlsbad Date: 1/4/1988 Checked By \.r,,.:_._i Documentation: PROCALC Date -----~--------------~---------------------------------------~-------------- HEATING EQUIPMENT System No. Design Equip Conv. source Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------Rheem RPNC048C Heat Pump 1 X 49000 I 3.04 X 3.000 • 48355 Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 • 23219 Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 • 23219 Rheem RPNC030J Heat Pump 2 X 30600 I 2.96 X 3.000 = 62027 Rheem RPNC024J Heat Pump 3 X 22600 I 2.92 X 3.000 = 69658 Rheem RPNC024J Heat Pump 2 X 22600 I 2.92 X 3.000 = 46438 Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 = 23219 --------Total 296136 HEATING POWER INDEX 296136 Btu/hr I 5537 sqft = 53.48 Btu/hr-sqft COOLING EQUIPMENT system No. Design Equip Conv. source Description Type Sys Output Eff Factor (Btu/hr) ,l:;;;-;;;~048~--------------------------------------------=-Heat Pump 1 X 47500 I a.so x 10.239 = 57218 \. __ ·-eem RPNC024J Heat Pump 1 X 23000 I 9.35 X 10.239 • 25187 Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 • 25187 Rheem RPNC030J Heat Pump 2 X 30200 I 9.85 X 10.239 = 62785 Rheem RPNC024J Heat Pump 3 X 23000 I 9.35 X 10.239 = 75561 Rheem RPNC024J Heat Pump 2 X 23000 I 9.35 X 10.239 • 50374 Rheem·RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 = 25187 --------Total 321498 COOLING POWER INDEX 321498 Btu/hr/ 5537 sqft = 58.06 Btu/hr-sqft HVAC SYSTEM SUMMARY SHEET ws-4 page 64 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc ' i.ocation: Carlsbad Date: 1/4/1988 Enforcement Agency Building P~rmit No Checked By "";,~,;:~.f- Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC Equipment Name: HEATING System Type: Output Capacity: Rated Efficiency: Supply Air Temperature: COOLING System Type: Total Output capacity: Sensible output.Capacity: Latent output Capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: 1 ~ supply Air Temperature: \!!!ANS Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: • Rheem RPNC024J Heat Pump 22600 Btu/hr 2.920 105.0 F · Heat Pump 23000 Btu/hr 17800 Btu/hr 5200 Btu/hr 9.350 2743 watts 0.100 No 55.0 F 850 cfm Blow-Through l 0.33 66.0 I 100.0 I 2.0 I 2.0 I 4.0 I 4.0 I HVAC SYSTEM SUMMARY SHEET WS-4 page 65 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc :-&cation: Carlsbad Date: 1/4/1988 Enforcement Agency Building Permit No Checked By \; <. ~ Documentation: PROCALC Date ---------------------------------------------------~----------------------- HVAC Equipment Name: HEATING System Type: Output capacity: Rated Efficiency: supply Air Temperature: COOLING System Type: Total Output Capacity: sensible output Capacity: Latent Output capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: (~::pply Air Temperature: Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DOCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC030J Heat Pump 30600 Btu/hr 2.960 105.0 F Heat Pump 30200 Btu/hr 21600 Btu/hr 8600 Btu/hr 9.850 3471 watts 0.100 No 55.0 F 1000 cfm Blow-Through 1 0.33 66.0 I 100.0 I 1.0 I 1.0 I 2.0 I 2.0 I BVAC SYSTEM SUMMARY SHEET ws-4 page 66 of 85 ---------------------------------------------------------------------------Project: Building i2 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.ocation: Carlsbad Date: 1/4/1988 Checked By ·\:<.\,~ocumentation: PROCALC I i~D-a"."""te ______ _ --------------------------------------------------------------------------- HVAC Equipment Name: BEATING System Type: Output Capacity: Rated Efficiency: Supply Air Temperature: COOLING System Type: Total output capacity: Sensible output capacity: Latent output capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: A Supply Air Temperature: t~ANS Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC048C Heat Pump 49000 Btu/hr 3.040 105.0 F Heat Pump 47500 Btu/hr 35000 Btu/hr 12500 Btu/hr 8.500 5595 watts 0.100 No 55.0 F 1750 cfm Blow-Through 1 . o. so 70.0 I 100.0 I 1.0 I 1.0 I 2.0 I 2.0 I LIGHTING SUMMARY AND WORKSHEET CF-5 page 67 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc <.cation: Carlsbad Date: l/4/1988 '"·• .. ,.:>· Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- INSTALLED LIGHTING POWER BY SPACE Total Floor Vert Boriz Floor Lighting Installed Space Name Area Mult Mult Area (watts/sqft) wattage ----------------------------------------------------------Space 1 859 X 1 X 1 = 859 X 1.400 = 1203 Space 2 419 X l X 1 -419 X 0.950 -398 Space 3 419 X 1 X 1 -419 X 0.950 = 398 Space 4 648 X 1 X 1 = 648 X 1.400 = 907 Space 5 648 X 1 X 1 = 648 X 1.400 -907 Space 6 419 X 1 X 1 -419 X 0.950 = 398 Space 7 419 X 1 X 1 :a 419 X 0.950 = 398 Space 8 419 X 1 X l -419 X 0.950 = 398 Space 9 419 X 1 X 1 -419 X 0.950 = 398 Space 10 419 X l X l = 419 X 0.950 = 398 Space 11 449 X 1 X l -449 X 0.950 -427 -------------- (tilILOING TOTALS 5537 6230 LIGHTING WATTAGE 6230 watts I 5537 sqft • 1.125 watts/sqft HVAC ZONE HEATING & COOLING LOAD SUMMARY page 68 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,.ocation: Carlsbad Date: 1/4/198-8 Enforcement Agency Building Permit No Checked By lo.· ,; , ...... , ;, Documentation: PROCALC Date --------------------------------------------------------------------------- BVAC ZONE DESCRIPTION HVAC Zone Name: HVAC System Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Space l 17 cfm) EFFECTIVE SPACE LOAD Ventilation ( 155 cfm) Return Duct conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 17439 17439 605 ( 174 349 0 18567 5443 ( 186 371 -1819 22748 40167 Space 1 Rheem RPNC048C 1 Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 4pm) 19053 2190 --------------19053 2190 17 cfm) 76 -19 191 381 44 0 --------.. ----c,.z, 19700 2216 155 cfm) 680 -168 197 394 44 1819 --------------22790 2092 1.9 tons 0.2 tons 35036 14562 2.9 tons 1.2 tons SPACE HEATING & COOLING LOAD SUMMARY Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc ·page 69 of 85 Enforcement Agency Building Permit No Checked By .ocation: Carlsbad Date: 1/4/1988 Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE space Name: Space 1 COOLING DESIGN CONDITIONS HEATING· SENSIBLE LATENT -----------------------------------------Peak Hour: · Jan 6am Aug 4pm Indoor Conditions: 70 F DB 78 F DB so I RH Outdoor Conditions: 38 F DB 82 F DB 66 F WB LOAD COMPONENT Btu/hr Btu/hr Btu/hr -~-------------------_,, ______ ------------Wall Conduction 1905 239 Glass Conduction 12069 840 Door Conduction 268 48 Roof Conduction 917 551 Skylight Conduction 0 0 Floor Conduction 0 0 • Slab Conduction 2282 ~ Interior conduction 0 0 ..... ~~; Infiltration 0 0 Solar Gain 9531 Lighting 2721 Equipment 2932 0 Occupants 2190 2190 -------------------SPACE LOADS 17439 Btu/hr 19053 Btu/hr 2190 1.6 tons 0.2 SUPPLY AIR QUANTITIES Heating: Cooling: 17439 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 19053 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 453 cfm 753 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 70 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By {.pcation: Carlsbad Date: 1/4/1988 ... --,,< Documentation: PROCALC Date --~------------------------------------------------------------------------ HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC system Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Space 2 Bypass Ventilation Air ( 8 cfm) - pply Duct conduction 1 pply Duct Leakage ·· pply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( Return Duct Conduction Return Duct Leakage Return Fan Heat Gain 75 cfm) TOTAL SYSTEM LOAD \~ ~-· .... - SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING -------7948 -------7948 295 ( 159 318 0 -------8720 2655 ( 174 349 -1273 -------10625 18526 Space 2 Rheem RPNC024J l Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 3pm) 9318 1068 ---------------9318 1068 8 cfm) 43 5 186 373 43 0 ----------------9920 1116 75 cfm) 390 42 198 397 45 1273 --------------12178 _1203 1.0 tons 0.1 tons 17825 §152 1.5 tons 0.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 71 of 85 ----------------------------------------------------------------------~----Project: Building #2 1 1 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 1/4/1988 Checked By . .\;<_' ,, Documentation: PROCALC Date ---------------------------------------------------------~----------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction { Interior Conduction '· Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1113 0 0 7948 Btu/hr space 2 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr -------------72 -551 -2 183 0 0 0 0 6601 888 1430 0 1068 1068 -----------9546 Btu/hr 1068 0.8 tons 0.1 Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)) • 9546 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 206 cfm 377 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 72 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By :··cation: Carlsbad Date: l/4/1988 Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC-zone Name: HVAC system Name: System Multiplier: He~ting Schedule: cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK Space 3 (Jan 6am) TOTAL SPACE LOAD Ventilation Air ( Duct Conduction Duct Leakage Fan Heat Gain 8 cfm) EFFECTIVE SPACE LOAD Ventilation ( Return Duct Conduction Return Duct Leakage Return Fan Heat Gain 75 cfm) TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING -------7937 -------7937 295 ( 159 317 0 -------8709 2655 ( 174 348 -1273 -------10613 18526 Space 3 Rheem RPNC024J 1 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT ---------------(Aug 4pm) 10058 1068 ---------------- 10058 1068 8 cfm) 37 -9 201 402 43 0 --------------10699 1102 75 cfm) 332 -82 214 428 44 1273 --------------12945 1064 1.1 tons 0.1 tons 17818 6197 1.5 tons 0.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 73 of 85 --------------------------------~------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc :&cation: Carlsbad Date: l/4/1988 -:-: .. :,:~.,.~' Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction cl Slab Conduction ,, ~Int7rior ~onduction , __ .,.,~., Infiltration Solar Gain Lighting Equipment occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1102 0 0 7937 Btu/hr Space 3 COOLING SENSIBLE LATENT --------------Aug 4pm 78 F DB 50 I RH 82 F DB 66 F WB Btu/hr Btu/hr ------------90 373 48 268 0 0 0 0 5879 901 1430 0 1068 1068 -----------10058 Btu/hr 1068 a.a tons 0.1 Heating: Cooling: 7937 Btu/hr/ [1.10 * (105 F Supply -70 F ~Stat)]= 10058 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 206 cfm 398 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 74 of 85 ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By ' (.ocation: Carlsbad Date: 1/4/1988 " --,:-.. -~#·· Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC system Name: System Multiplier: Beating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 4 Space 5 PEAK (Jan 6am) (Jan 6am) TOTAL SPACE LOAD 411Ypass Ventilation Air ( (:~pply Duct Conduction ·.,_...;supply Duct Leakage Supply Fan Beat Gain 26 cfm) EFFECTIVE SPACE LOAD Ventilation ( 233 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS ••• t <; ' \ '..:,_;." ' ... __ ,,. HEATING 15139 15139 30279 912 ( 303 606 0 32100 8211 { 321 642 -2546 38728 50168 spaces 4 & 5 Rheem RPNC030J 2 toads Office Heating toads Office cooling toads Office Fans COINCIDENT so' COOLING PEAK SENSIBLE LATENT ---------------(Aug 4pm) 17056 1652 (Aug 4pm) 16445 1652 --------------33501 3305 26 cfm) 114. -28 335 670 66 0 --------------34620 3343 233 cfm) 1026 -254 346 692 67 2546 --------------39231 3156 3.3 tons 0.3 tons 43244 19823 3.6 tons 1.7 tons SPACE HEATING & COOLING LOAD SUMMARY page 75 of 85 ---------------------------------------------------------------------------Project: Building i2 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.ocation: Carlsbad Date: 1/4/1988 Checked By Docntation: PROCALC Date ---------------------------------------------------------~----------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction Skylight Conduction Floor conduction <I Slab conduction Interior Conduction Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1350 11109 268 692 0 0 1721 0 0 15139 Btu/hr Space 4 COOLING SENSIBLE LATENT --------------Aug 4pm 78 F DB 50 I RH 82 F DB 66 F WB Btu/hr Btu/hr ------------166 774 48 415 0 0 0 0 9737 2052 2212 0 1652 1652 -----------17056 Btu/hr 1652 1.4 tons 0.1 Heating: cooling: 15139 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 17056 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 393 cfm 674 cfm SPACE HEATING & COOLING LOAD SUMMARY page 76 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,,.cation: Carlsbad Date: l/4/1988 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date -------------------------------------------------~------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight conduction Floor Conduction I Slab Conduction ( Interior Conduction · -Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1350 11109 268 692 a 0 1721 0 0 15139 Btu/hr Space 5 COOLING SENSIBLE LATENT --------------Aug 4pm 78 F DB 50 % RH 82 F DB 66 F WB Btu/hr Btu/hr ------------61 -1213 -16 218 a 0 0 0 10483 2052 2212 0 1652 1652 -----------15450 Btu/hr 1652 l.3 tons 0.1 Heating: Cooling: 15139 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 15450 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 393 cfm 611 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 77 of 85 ---------------------------------------------------------------------------Project: Building i2 Designer: Banzuelo/Rierson/Duff & Associates, Inc. Enforcement Agency Building Permit No Checked By r&cation: Carlsbad Date: 1/4/1988 .\c • Documentation: PROCALC Date --------------------------------------------------------------------------- BVAC ZONE DESCRIPTION BVAC Zone Name: BVAC System Name: system Multiplier: Beating Schedule: cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 6 Space 8 Space 10 PEAK (Jan (Jan (Jan 6am) 6am) 6am) TOTAL SPACE LOAD ,A,pass Ventilation Air ( \~f.tpply Duct Conduction Supply Duct Leakage Supply Fan Heat Gain 25 cfm) EFFECTIVE SPACE LOAD Ventilation ( 226 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 7948 7948 7948 23844 885 ( 477 954 0 26160 7964 ( 523 1046 -3819 31875 55578 Spaces 6,8 & 10 Rheem RPNC024J 3 Loads Office Heating Loads _Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 1pm) 7956 1068 (Aug 1pm) 7956 1068 (Aug 1pm) 7956 1068 --------------23869 3205 25 cfm) 130 14 477 955 128 0 -------------~ 25431 3348 226 cfm) 1170 127 509 1017 134 3819 --------------31945 3608 2.7 tons 0.3 tons 53475 18455 4.5 tons 1.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 78 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc :··&cation: Carlsbad Date: 1/4/1988 \,;:·._::: "\..,_'._'..·,i-· Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ------~-------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction I Slab Conduction (, Interior ~onduction ;:;:/ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1113 0 0 7948 Btu/hr Space 6 COOLING SENSIBLE LATENT --------------Aug 1pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr -------------84 -608 1 197 0 0 0 0 5749 851 1430 0 1068 1068 -----------8604 Btu/hr 1068 0.7 tons 0.1 Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] • 8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 206 cfm 340 cfm ·sPACE HEATING & COOLING LOAD SUMMARY page 79 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc :.ocation: Carlsbad Date: 1/4/1988 "'"•·:._:_,.:.,;.,· Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof conduction Skylight Conduction Floor Conduction • Slab Conduction . Interior conduction · Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR OOANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1113 0 0 7948 Btu/hr Space 8 COOLING SENSIBLE LATENT --------------Aug 1pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr -------------84 -608 1 197 0 0 0 0 5749 851 1430 0 1068 1068 ------------8604 Btu/hr 1068 0.7 tons 0.1 Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8604 Btu/hr/ {1.10 * ( 78 F TStat -55 F supply)]= Btu/hr tons 206 cfm 340 cfm SPACE HEATING & COOLING LOAD SUMMARY page 80 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By i·&cation: Carlsbad Date: 1/4/1988 '\,..,::{}: Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: Space 10 COOLING DESIGN CONDITIONS HEATING SENSIBLE LATENT -----------------------------------------Peak Hour: Jan 6am Aug 1pm Indoor Conditions: 70 F DB 78 F DB 50 I RH Outdoor Conditions: 38 F DB 83 F DB 67 F WB LOAD COMPONENT Btu/hr Btu/hr Btu/hr ---------------------------------------Wall Conduction 770 -84 Glass Conduction 5349 -608 Door Conduction 268 1 Roof Conduction 449 197 Skylight Conduction 0 0 Floor Conduction 0 0 • Slab Conduction 1113 C Int7rior Conduction 0 0 -Infiltration 0 0 Solar Gain 5749 Lighting 851 Equipment 1430 0 Occupants 1068-1068 ------------------SPACE LOADS 7948 Btu/hr 8604 Btu/hr 1068 0.7 tons 0.1 SUPPLY AIR QUANTITIES Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= ··: I : \ .. ~~-_,,J Btu/hr tons 206 cfm 340 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 81 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By (.cation: Carlsbad Date·: l/4/1988 Documentation: PROCALC Date ---------------------~----------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: BVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE ~----------------------Space 7 Space 9 PEAK (Jan 6am) (Jan 6am) TOTAL SPACE LOAD ypass Ventilation Air ( 17 cfm) ( pply Duct Conduction ' upply Duct Leakage supply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( 151 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 7948 7948 15896 590 ( 318 636 0 17440 5310 ( 349 698 -2546 21250 37052 Spaces 7 & 9 Rheem RPNC024J 2 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT so' COOLING PEAK SENSIBLE LATENT --------------(Aug 1pm) 7956 1068 (Aug 1pm) 7956 1068 --------------15912 2137 17 cfm) 87 9 318 636 85 0 --------. ------ 16954 2232 151 cfm) . 780 84 339 678 89 2546 --------------21297 2405 1.8 tons 0.2 tons 35650 12304 3.0 tons l.0 tons SPACE HEATING & COOLING LOAD SUMMARY page 82 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc ,,·&cation: Carlsbad Date: 1/4/1988 \: '' ,·" ..,, .... ".~ Documentation: PROCALC ~nforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS ·peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT -----~---------------Wall conduction Glass conduction Door conduction Roof Conduction Skylight Conduction Floor Conduction I Slab Conduction ( ,,,.1 Int7rior ~onduction '· ;;,y Infiltration Solar Gain Lighting Equipment occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1113 0 0 7948 Btu/hr Space 7 COOLING SENSIBLE LATENT --------------Aug 1pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr -------------84 -608 1 197 0 0 0 0 5749 851 1430 0 1068 1068 -----------8604 Btu/hr 1068 Btu/hr 0.7 tons 0.1 tons Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l = 206 cfm 8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= _ 340 cfm SPACE HEATING & COOLING LOAD SUMMARY page 83 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc · ,:.cation: Carlsbad Documentation: PROCALC Date: l/4/1988 Enforcement Agency Building Permit'No Checked By Date -----------------------------~--------------------------------------------- SUMMARY OF PEAK BOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Bour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction Skylight conduction Floor conduction Slab Conduction (. Interior conduction ~ ;;.,,; Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 770 5349 268 449 0 0 1113 0 0 7948 Btu/hr Space 9 COOLING SENSIBLE LATENT --------------Aug 1pm 78 F DB 50 I RB 83 F DB 67 F WB Btu/hr Btu/hr ------------ -84 -608 1 197 0 0 0 0 5749 851 1430 0 1068 1068 -----------8604 Btu/hr 1068 0.7 tons 0.1 Heating: Cooling: 7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 206 cfm 340 cfm ti VA~ ~ONE HEA'l' lN~ & qJULLNG LOAD ::iUMMA.tC:C: page t:S4 01: e>~ ---------------------------------------------------------------------------Project: Building #2 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By .ocation: Carlsbad Documentation: PROCALC Date: l/4/1988 Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC system Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK Space 11 (Jan 6am} TOTAL SPACE LOAD Bypass · .. supply (-~~i~ Ventilation Air ( Duct Conduction Duct Leakage Fan Heat Gain 9 cfm) EFFECTIVE SPACE LOAD Ventilation ( Return Duct Conduction Return Duct Leakage Return Fan Heat Gain 81 cfm) TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 10977 10977 316 220 439 0 11952 2845 ( 239 478 -1273 14241 18526 Space 11 Rheem RPNC024J l Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT, --------------(Aug 3pm) 10642 1145 --------------10642 1145 9 cfm) 46 s 213 426 46 0 ..., _______ ------11327 1196 81 cfm) 418 45 227 453 48 1273 --------------13697 1289 1.1 tons O.l tons 17825 6152 1.5 tons o.s tons SPACE HEATING & COOLING LOAD SUMMARY page 85 of 85 ---------------------------------------------------------------------------Project: Building 12 Designer: Banzuelo/Rierson/Duff & Associates, Inc i.ocation: Carlsbad Documentation: PROCALC Date: 1/4/1988 Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS --------------------Peak Hour: Indoor Conditions: outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conducti-on Door Conduction Roof Conduction Skylight conduction Floor conduction Slab conduction • Interior Conduction Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 2186 6583 536 481 0 0 1193 0 0 10977 Btu/hr Space 11 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 FOB 67 F WB Btu/hr Btu/hr ------------188 499 118 325 0 0 0 0 5883 951 1532 0 1145 1145 -----------10642 Btu/hr 1145 Btu/hr 0.9 tons 0.1 tons Heating: Cooling: 10977 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 285 cfm 10642 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 421 cfm ,,,. ! ',\ : \.., ..... ~ITLE 24 REPORT FOR: Building 13 El Fuente Business Park Carlsbad, California PROJECT DESIGNER: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, suite 202 Anaheim~ CA 92807-1907 (714) 777-0666 OWNER: Davison-Jones Development 411 Campus Drive, suite 830 Irvine, CA 92715 REPORT PREPARED BY: PROCALC 705 s. Velare St. tlO Anaheim, CA 92804 l-(800) TITLE-24 Job Number: T499C Date: 12/30/1987 The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. The program has interim .pproval and is authorized by the California Energy Commission for use with (~:/the Second Generation Nonresidential Building Energy Efficiency Standards. Table Of Contents for Title 24 Report cover Page •.••••••..••••••.••••••••••••••••••••••••••••••••••••••••• Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-1 Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form WS-lA Energy Budgets Worksheet Form CF~2 Envelope Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-4 HVAC Power Indices summar.y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form ws-4 HVAC system summary Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l 2 3 5 7 9 12 16 22 24 Form CF-5 Lighting Summary & Worksheet •••••••••••••••••••••••••••••• 25 HVAC zone & space Loads summary ••••••••••••••••••••••••••••••••••••• 26 Certificate of Compliance (Part 1 ot 2) Pro(ec& I I) -a= ,Z, 17Mz+tc Is 1e.-4=esa lQ11ff Building Pennit Number- : Plan Chock.od By -, City/Town PF?aC-AL:4 ciima1e2cna ld'!'lt 1~:r O'ccumantalfcn Auther Cato Prescriptive Approach/Performance Approach Strategy General 1 CEO Oc:cupanc'J Type • • • • • • • • • .of£ c.Q.. 2 use OccuPanc'f Gtaup/Civision • • • . • • e,--z. 3 PackagaSolectad •••••••••.•• ,Br:£, 4 Gross Ccndilianed Floor Area • • • • • • k24: ft2 Roof and Floora1 5 ' Proposed Rcof/Cailing Rt (CF-2, CF-3) • • fp .C, hr-F-ftZ,Btu 6 .. Requfrad RooUCeiling Rt (CF-2) • • • • • ___ hr-F-ftZ1slU 7 Proposed E=ricr Floer Rt (CF-2. CF-3) • • hr-F-ft2/stu 8 Raqufrad Exterior ROCilr Rt (CF-2) • • • • hr-F-ftZ1BIU Walt.. 9 · Proposed Op~a Wall Rt (CF-2,°CF-3) • • '.?,, 1 hr-F-ftZ1BIU 10 Wall HaatC4pac:il',f (CF-3) • • • • • • • • s;.o SlUIF-tt2 . .al _ Raqufrad Opaque. WaD Rt (CF-2) • • • • • ___ hr-F-rtZ,Stu i~glnWaUa '.;·-;2 Extarfcr Wall Ania (CF-2) • • • • • • • • \\1 O ft2 13 Total Gla:ing ~a (CF-2) • • • • • • • • 1t! , ft2 14 Proposed Total Percant{Una 13/Une 12). ?>+·) % 1S Aw,aga !otal SC (CF-2) • • • • • • ••• o.:+§, 16 Allowed Total Gtazing Percent •••••• ___ % 17 Was~ Exterior Wall Area (CF-2) • • • • • • ?(..,q ft2 18 Was&Slla%fngAtita(CF-2). • • • • • • • :z.e,,z. ft2 19 Proposed West Parcant (CF-2) • • • • • • j 8. ~ % . 20 Awnag~ West SC (CF-2) • • • • • • • • o , 4"1 21 AllowedWestGlazlng Percent •••••• ___ % Gia:ilng tn Roof (CF•6) Proposed Alfowod 22 8.kYII;ht 1 • • • • • • • • • __ _ 23 SkylI;ht 2 • • • • • • • • • __ _ 24· SkylI;ht3 •. • • • • • • • • __ _ 25 SkyG;ht4 • • • • • ; • • • __ _ a SkylI;ht 5 • • ••••••• __ _ i:r stc,jltght 6 • . • • • • • • • • --- 2B Skyll;ht 7 • • • • • • • • • __ _ 29 S1(yllght 8 • • .• • • • • ·• • __ _ U;htfng __ ft2 __ ft2 ---ft2 ---ft2 ___ ft2 ---ft2" ·---ft2 ---ft2 30 Prcpo11d Ac!iustad lPO (CF-S) • • • • • • \ • S'P Watts/ta 31 Allowed LPO (CF-5) • • • • • • • • • • ___ Wansnt2 HVAC 3a Performance Set Selected • • • • • • • • " •. ~ropoaed FIii\ Wattage Index (CF--4) ••• -o-.e-, Wausnt2 (:--. __ /. ~d Fan Wattage Index • • • • • • • ___ Waustft2 ·--JS ProposedCoollng Power Index (CF-4) ••• Jc.C?:4::-f!tuMt2 38 Allowed CooUng Power Index • • : • • • ___ 8luhlft2 37 Proposed Heating Power Index (CF-4) • • • 7 7. SO Btuhlfl2 38 Allowed Heatfn; Power Index • • • • • • ___ ·eluhltt2 ~ Rlvlsed September 1986 CF-1 For Enforcement Agency Use Only ~_M-- ~z~oi??° L,-7,Q . Signature and Ragistralion Stamp L\t-61-l~ ~e- Dalo Field Checked ay Approved Sy Performance Approach Energy Budget 1 CEC Occupancy Type • • • • • • • • • .offi·ce 2 USC Occupancy Group/Division • • • • • e,--:Z. date Cate 4 Condilionod Floor Aroa • • • • • • • • • '2?4:: ft2 4 Budgot Table • • • • • • • • • • • • • .lht=z:: I A 5 Allowed Energy Budget (WS-1A) • • • • • r '1 ,.e> k8tu/yr-lt2 Calculated Annual Energy Con:sumptlon 6 Approved Calculation Malhod •••••• t:t(. "2r:1P'-''l' 'Z4 7 CEC Designation • • • • • • • • • • • L.pt!> 07 a Mullipliar ••••••••• , •••••• \ ,Q'(j E3trmated Energy Use 9 Healing. • • • • • • • • • • • • • • • e,5' k8tulyr-ft2 10 Cooling • • • • • • • • • • • • • • • • 18 .1 k8tu/yr-ft2 11 Fans • • • • • • • • • • • • • • • • • ?tJ. 1 kBtulyr-ft2 12 Ughts • . • • • • • • • • • • • • • • '*• $· ?> k8tu,yr-ft2· 13 MlsceUaneous Equipment •••••• ~ 15,'l. k8tu/yr-lt2 14 Total •.•••.••••••••••••• ___ kStu,yr-ft2 15 Ac:tf. Total Energy Use (lifla 9 x liua t4' ••• \4'2: ?> kStu/yr-ft2 ~ ~ju.s\-c..c\ Compliance Statement General. The proposed buildlng repl'9sented In this set of c:cmpllance documentation Is consistent wilh Iha olher c:cmpllance forms and worksheets. wilh the plans and specifications and with any olher cafculalions or computar runs submitted with this pennit application. Performance Approach. (when applicable) The energy performance estimate presented on lhis fonn was calculated using the approve<! calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable dimata zone and OCCUpa!"CY type. . Prescrfpuve Approach. (when applicable) The proposed building has been designed ta meat the requirements of the Altamadve Component . Package Indicated above for the appropriate occupancy type and climate ~'.$;L Name/TIiie ,¼12-u,-Ju M, J:Lrp CitylSta!oJZip ti14) ~7-""5"310 7?Z:5~S: Telephone Calif. Ucense Number ven:1ncare o-r Gompliance· (Part 2 ot 2) CF-· Pro~ M~-rz I r:J ~ ' 3E z, For Enforcement Agency Use Only Pgo<e,. u;... 1:z.L?z, /en .---Dalo cliiciiidBy Oa<a ·. · < ··' Both parts one and two of !his Certificate of Compliance must be included with each building permit application for the above no'9d building and appa: on the ·prans submitted for approvaL The building.features and requirements rei:1resented on Iha Cenificate ot Compliance are adequate to achit\ c:omplfancawith the second generation nonresfdendaJ energy standards for the building referencad above. The bufldlng features and requirements a: also adequate for arr, subsequent alterations. moc!ilicallons or additions to Iha buikfing. Desfgner On• Name (Print) litla/Company Name Address Addteu 0wnet Name (Print) • · Tida/Company Name Farm Re'lised S.ptember t 986 Cata Oaro Oala -. Designer Three ·. :cj !M CJ~ tJ ~ Esilotcoment AgonCJ Signature bate Designer Four Name (Print) TidatCompany Name SlgnalUta pate e@crcement Agency Signature Oata Enforcement Agency Name (Print) TidalAgency Address Page_of_ CERTIFICATE OF COMPLIANCE (part l of 2) CF-1 page 3 of 27 ------------------------------------------------~------------------~-------Project: Building 13 Enforcement Agency -Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 'aation: Carlsbad Date: 12/30/1987 Checked By ,,:• - Docum~ntation: PROCALC Date --------------------------------------------------------------------------- PERFORMANCE APPROACH Roofs and Floors Roof/Ceiling Rt (CF-2,3) R-20.9 Ext. Floor Rt (CF-2,3) R-0.0 Walls Opaque Wall Rt (CF-2,3) R-3.7 Energy Budget CEC Occupancy Type . Conditioned Floor Area Total Number of Floors Climate Zone Heat Capacity (CF-2,3) 5.0 HC Energy Budget (WS-lA} Lighting Adjustment (CF-5) Energy Compliance Budget Office 654 l 7 157.0 o.o 157.0 Glazing in Walls Exterior Wall Area (CF-2) Total Glazing Area (CF-2) Total Glazing Percent Average Total SC (CF-2) West Exterior Wall (CF-2) West Glazing Area (CF-2) West Glazing Percent Average West SC (.zing in Roof -~ikylight Area (CF-2) 1170 399 34.1 0.46 360 282 78.3 0.46 0 sf sf ' SC sf sf ' SC sf Calculated Annual Energy Consumption Approved Calculation NR COMPLY 24 Program Version Number 1.14 User License Number 1329 CEC Designation CPO 07 CEC Multiplier 1.027 Estimat_ed Heating Cooling Fans Energy Use (KBtu/sqft-yr) 8.5 29.7 37.7 Lighting Proposed Adjusted LPD (CF-5)1.50 w/sf Adjustment Lights Receptacle 75.8 X 1.027 • 77.9 50.3 16.8 1.4 146.3 HVAC Fan Wattage Index (CF-4) 0.81 Cooling Power Index (CF-4) 70.84 Heating Power Index (CF-4) 57.50 COMPLIANCE STATEMENT Bot Water w/sf Total (SCM-3) Btuh/sf Btuh/sf The proposed building represented in this set of compliance documentation is consistent with the other compliance forms and worksheets, with the plans and specifications and with any other calculations or computer runs submitted with this permit application. The energy performance estimate presented on this form was calculated using the approved calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable climate zone and occupancy type· • • NED ________________ Calif. License t: ''\,".,;· ----- DESIGNER Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 -------------------------------- CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-l page 4 of 27 ---------------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 1.cation: Carlsbad Date: 12/30/1987 Checked By -~' ;~· Documentation: PROCALC Date --------------------------------------------------------------------------- Both Parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building, and appear on the plans submitted for approval. -The building features and requirements represented on the certificate of Compliance are adequate to achieve compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are also adequate for any subsequent alterations, modifi- cations or additions to the building. PROJECT TITLE Building 13 El Fuente Business Park Carlsbad, California OTHER DESIGNER Name: Address: City: Signed: OWNER Davison-Jones Development 411 campus Drive, Suite 830 Irvine, CA 92715 -· ·-._:~ .gned: DOCUMENTATION AUTHOR PROCALC 705 s. Velare St. fl0 Anaheim, CA 92804 1-( 800) TITLE-24 ---;· /\_ /1 /v/ //-,.~I , ( /{ /' f • r. /I, , I _, Signed:-.,_ , : -~ . -~-v· '----IL -·<. -----I .. ~· OTHER DESIGNER ~ /4 Name: b:t: A,-~ f-:rt lt-ITN!dt"\ltgp I Address: I-Z.7Q l& J?P?k:z City: Signed: ENFORCEMENT AGENCY Name: Agency: City: Signed: MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page 5 of 27 ---------------------------------------------------------------------------Project: Building i3 Designer: Banzuelo/Rierson/Duff & Associates, Inc ··cation: Carlsbad Date: 12/30/1987 ': , .. .,.,-. Enforcement Agency Building Permit No Checked By ~.;.~ :-• Documentation: PROCALC Date --------------------------------------------------------------------------- ENVELOPE MEASURES o Certified Insulation-Materials per Sec. 2-531l(a) o Insulation Installed to meet Flame Spread and smoke Density Requirements of sec. 2-531l(b) o Orea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c) o Retrofit Insulation specified per Sec. 2-5313 o Air Infiltration is minimized by specification of tested manufactured doors and windows and proper sealing and weatherstripping per Sec. 2-5317 LIGHTING SYSTEM MEASURES o certified Luminaires/Ballasts per sec. 2-5314(b) 1.ndependent Control within enclosed Areas per Sec. 2-5319(a) '-~~~I o Manual Switching Readily Accesible per Sec. 2-5319(b) o Reduction of Lighting Load to at least 50% per sec. 2-5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute) o Separate Switching of Daylit Areas per Sec. 2-5319(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale Occupancies per Sec 2-53l9(h) o Automatic Control of Display Lighting in Retail/Wholesale Occupancies per Sec. 2-5319(h) o Tandem Wiring of land 3 Lamp Luminaires per sec. 2-5319(h) OCCUPANCY SENSING DEVICES (when applicable) o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 Reference I __ ime Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 __ ..,_ __ -,~ _ __;;·Limits on Emmisions per exceptions to sec. 2-5319 ( e) MANDATORY FEATURES CHECKLIST (part 2 of 2) Project: Building #3 MF-1 page 6 of 27 .signer: Banzuelo/Rierson/Duff & Associates, Inc ~-~ation: Carlsbad Date: 12/30/1987 .. \/:,', .·./ Enforcement Agency Building Permit No Checked By . "·~ ,.... .. Documentation: PROCALC Date --------------------------------------------------------------------------- DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) o Uniform Illuminatio~ reduction to 50% per Sec. 2-5319(e).l o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 Reference o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 ____ _ o Step Switching Devices with Separation between On/Off Settings per Sec. 2-5319(e).4 o Photocell Sensors shall be Diffusing type and no Opaque cover allowed per Sec. 2-53l~(e).5 o Manufacturer's Instructions provided for Installation and Calibration per Sec. 2-5319(e).6 Proper Installation of Controls including Sensor Location, ertification of Initial calibration and Control of Luminaires ~--~~-·· nly within Daylit Areas per sec. 2-5319(e) .8 o Visible or Audible malfunction Alarm provided per Sec. 2-53l9(g) ____ _ HVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per Sec. 2-5312 o Certified HVAC Equipment per 2-5314(a) o Certified Plumbing Equipment per 2-5314(a) o Heating and cooling Equipment efficiency per Sec. 2-53l4(b) o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c) o Automatic C9ntrols for Off-Hours per Sec. 2-5315(a) o Thermostat Set Point Requirements per Sec. 2-5315(b).l o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2 ~Automatic Exhaust Fan Dampers per Sec. 2-5316(b) i~hermostat Controls for Each Zone per Sec. 2-5315(b) <_>··· o Ventilation Provided per Secs. 2-5316 & 2-5343 o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318 ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 27 ---------------------------------------------------------------------------Project: Building i3 Designer: Banzuelo/Rierson/Duff & Associates, Inc &ation: Carlsbad Date: 12/30/1987 ··• ",: ,, ;' ;! Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- CLIMATE ZONE 7 ENERGY BUDGETS Cross Floor sectional Office Retail No Area Budget Budget -------------------------- 1 654 157 186 BUILDING ENERGY COMPLIANCE BUDGET BY SPACE Flr Space Name Occupancy Floor Type Area Mult Total Budget Energy Floor (KBtu Budget Area /sqft) (MBtu) ------------------------------------------------------1 Office Office 654 X 1 = 654 X 157 -102.7 -----------654 102.7 BUILDING COMPLIANCE BUDGET TOTALS 102.7 MBtu / 654 sqft = 157.0 KBtu/sqft • -\.~ ' ,.::-- . ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 27 ---------------------------------------------------------------------------Project: Building i3 ~signer: Banzuelo/Riersoh/Duff & Associates, Inc '.·~cation: Carlsbad Date: 12/30/1987 , .. Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate Use Flr Space Name Area Mult Area (KBtu/sqft) (MBtu) --------------------------------------------------1 Office 654 X 1 = 654 X 146.3 = 95.7 -----------TOTALS 654 95.7 BUILDING ENERGY CONSUMPTION 95.7 MBtu / 654 sqft = 146.3 KBtu/sqft • AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 27 ---------------------------------------------------------------------------Project: Building 13 Designer: Banzuelo/Rierson/Duff & Associates, Inc .cation: Carlsbad Date: 12/30/1987 \, , ~·,~: ,_,_Va•'~ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ,. ---------------------------------------------------------------------------Roof-l Roof-2 605 . 49 605 49 ------------------------------------------------------------------~--------TOTALS 654 ROOF R-VALUE Type Roof-1 Roof-2 Assembly Name --------------------------R-19 B/O with T-Bar R-19 B/O with Gyp. Clg. Average R-Value Area 605 49 654 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE 654 Area/ R-Value R-Value --------------21.04 28.75 19.40 2.53 -------I 31.28 -20.91 s SW w NW TOTALS ----------------------~----------------------------------------------------NONE ---------------------------------------------------------------------------TOTALS 0 • \:;~;;: AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 27 ---------------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc. Building Permit No Acation: Carlsbad Date: l2/30/l9S7 Checked By -~ -! -~ocumentation: PROCALC Date --------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------360 36 198 360 216 1170 --------------------------------------------------------------------------- OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW Int TOTALS ---------------------------------------------------------------------------Wal-1 Wal-2 Wal-3 340 20 36 81 216 78 556 195 20 ---------------------------------------·------------------------------~----TOTALS 360 36 81 78 216 771 1::E EXTERIOR WALL/DOOR R-VALUE & HEAT CAPACITY Area/ Area • Assembly Name Area R-Value HC R-Value X HC ----------------------------------------------Wal-l 5/8 Gyp/R-11/Gyp WF 556 10.19 l.4 55 769 Wal-2 6" Concrete Wall 195 1.34 15.4 146 3003 Wal-3 Solid Wood Door 20 2.22 2.4 9 48 ------------Totals 771 209 3820 Average R-Value 771 I 209_= 3.69 Average BC 3820 I 771 • 4.95 • <::>" AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CP-2 page 11 .of 27 ---------------------------------------------------------------------------Project: Building t3 Designer: Banzuelo/Rierson/Duff & Associates, Inc .cation: Carlsbad Date: 12/30/1987 \'..~. ", -· Enforcement Agency Building Permit No Checked By. Documentation: PROCALC Date ------------------------------------------------~-------------------------- GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS -~-------------------------------------------------------------------------Wind-1 117 282 399 ' . ------------------------------------------------~--------------------------TOTALS 117 282 GLAZING O-VALOE AND SC Type Wind-1 Assembly Name Area o-value --------------------------Sunglass Blue Plate 399 Totals 399 Average o-value Average SC 453 I 184 / 1.14 399 • 399 =- 399 Area X Area SC U-Value X SC --------0.46 453 184 ------------453 184 1.14 0.46 SCM INPUT DATA SUMMARY (part 1 of 2) SCM-l page 12 of 27 ---------------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/30/1987 Checked By Documentation: PROCALC Date --------------------------~------------------------------------------------ Space Name: AREAS Exterior Wall Southeast Glazing Southwest Glazing southwest Glazing Roof· Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof Door ~-;;,, Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL Heat Capacity of Exterior Wall Lighting Power ._.Climate Zone i~~::··,f' Office 751.0 sqft 117.0 sqft 234.0 sqft 48.0 sqft 654.0 sqft 20.0 sqft o.o sqft 654.0 sqft 654.0 sqft 3.75 0.88 20.91 2.22 0.00 Rheem RPNC036C l Heat Pump Heat Pump Electric Resistance 2.920 8.000 0.990 No 4510 watts 533 watts 1250 CFM 4.95 1.500 watts/sqft 7 ·scM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 13 of 27 ---------------------------------------------------------------------------. Project: Building #3 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No &ation: Carlsbad Date: 12/30/1987 Checked By "'· ,: ; Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Southeast southwest Southwest OVERHANGS & SIDEFINS Southeast -outhwest (~outhwest SPECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 6.0 13.0 26.0 8.0 Shading Device Winter summer ------------ overhang Height Depth 0.18 0.70 9.0 ft overall SC 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 27 --------------------------------------------------------~------------------Project: Building i3 Designer: Banzuelo/Rierson/Duff & Associates, Inc .ation: carlsb~d · Date: 12/30/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ----------------------------------------------~---------------------------- Space Name: Occupa.ncy Type: SCHEDULING Office Office Occupancy Level for Operational Period: Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: <I Day . ~.,--Number of Holidays per Year: Thermostat Set Point Temperatures:. PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate cu-value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: : .ccupant Density: \ \ .. "'-..._ '~r,,' . Night Heating Season Cooling Season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 27 ---------------------------------------------------------------------------Project: Building i3 Designer: Banzuelo/Rierson/Duff ,'.cation: car lsbad \~_;\} & Associates, Inc Date: 12/30/1987 Enforcement Agen·cy Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Office BALANCE POINT TEMPERATURES AND DEGREE DAYS Daytime Nighttime ------------------------------BPTl = 56.10 (Winter) BPTl -67.96 BPT2 = 64.51 (Summer) BPT2 = 76.17 BPT3 = 64.51 (Economizer) BPT3 = 76.17 BDD = 75 (Heating) HDD = 3253 CDD = 547 (Cooling) CDD = 0 BUILDING HEAT TRANSFER (Btu/hr-F) ••=•=a•===••=•============•====== Building Envelope Heat Transfer Rate: Winter = summer -overall Heat Transfer Factor ("K"): Winter -summer - ~ . vaeating ANNUAL LOADS (MBtus) -Cooling - ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==============•=======·-----------====•=•==== Source Beating Source Cooling source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Hot water ---- a.s 29.7 37.7 -----75.8 X l.027 --= -= - ---= 554.4 561.1 942.0 918.2 5.0 9.8 1.8 6.5 8.2 11.0 3.7 0.3 77.9 50.3 16.8 1.4 ~•··=====================================================•==========•===== \;:,;,/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 146.3 KBtu/sqft ------=-====================•============================•••=============== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 16 of 27 ---------------------------------------------------------------------------Project: Building i3 Designer: Banzuelo/Rierson/Duff & Associates, Inc rtlcation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ..._.._ : ... , . '<-~' ,' Documentation: PROCALC Date -~------------------------------------------------------------------------- Assembly Name: Solid Wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical). Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Hardwood, Maple 2. Inside ·Air Film 3. 4. s. 6. 7. 8. 9. 10. 11. 1.750 1.54 0.68 1.54 0.68 ------------------------------------------------------------------------- /1 ~--· Total 2.22 2.22 Framing Percentage: 0.0 \ Framing Material: NONE OVERALL VALOES ADJUSTED FOR FRAMING R-Value o-value 2.22 0.4505 2.22 0.4505 Sketch o~ construction Assembly ====== • orptivity: _ ghness: Clear Pine r, • h \'··,. __ .. 1.g t: --aeat capacity: 0.70 6.1 lb/sqft 2.39 I CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 17 of 27 ---------------------------------------------------------------------------Project: Building i3· Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,'.cation: Carlsbad Date: 12/30/1987 Checked By -~ ' ' . •' Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/U with Gyp. Clg. Assembly Type: Roof Assembly Tilt: 0 deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ----------~----------------------------------------------------------------1. Roofing, Built-Up 2. Plywood 3. Air Space 4. Insulation, Mineral Wool, R-19 5. Gypsum or Plaster Board 6. Inside Air Film 7. 8. 9. 10. 11. 0.375 0.500 6.000 *· 6.000 0.625 0.33 0.33 0.63 0.63 1.00 0.80 19.00 19.00 0.56 0.56 0.92 . 0. 61 <~r--------------------------------------------:::::--------::~::----::~~:- Framing Percentage: 10.0 I Framing Material: · Softwood, Douglas Fir-Larch 1 2 3 4 5 Calculation for Framing Adjustment summer O-Value 0.0446 X 0.90 + 0~1066 X 0.10 • 0.0508 Winter O-Value 0.0456 X 0.90 + 0.1128 X 0.10 • 0.0523 OVERALL VALUES ADJUSTED FOR FRAMING R-Value o-value 19.69 0.0508 19.11 0.0523 Sketch of construction Assembly -=--=--•==-==- .allisorptivity: ~~ghness: stucco, i,/_ . .:ight: Heat Capacity: 0.70 Wood Shingles 8.2 lb/sqft 2.58 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 18 of 27 ---------------------------------------------------------------------------Project: Building #3 Designer: Banzuelo/Rierson/Duff & Associates, Inc :.cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ' '~~·,. :: . ' " Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/U with T-Bar Assembly Type: Roof Assembly Tilt: 0 deg (Ho·rizontal Roof) construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Roofing, Built-Up 2. Plywood 3. Air Spac~ 4. Insulation, Mineral Wool, R-19 5. Acoustical Tile, Mineral Fiberboard 6. Inside Air Film 7. 8 .• 9. 10. 11 • * 0.375 0.33 0.33 0.500 0.63 0.63 24.000 1.00 0.80 6.000 19.00 19.00 0.750 2.03 2.03 0.92 ·0.61 .-------------------------------------------------------------------------( .. ~ .. _,y Total 23. 90 23. 39 Framing Percentage: 10.0 % Framing Material: Softwood, Douglas Fir-Larch 1 2 3 4 5 Calculation for Framing Adjustment summer u-Value 0.0418 X 0.90 + 0.0923 X 0.10 • 0.0469 Winter U-Value 0.0428 x o.~o + 0.0968 x 0.10 = 0.0482 OVERALL VALUES ADJUSTED FOR FRAMING R-Value o-value 21.33 0.0469 20.76 0.0482 Sketch of Construction Assembly ------=•••== : .orptivity: ,-: 1ghness: Concrete, Asph. ~,>-~ight: Beat capacity: 0.70 Shingles 6.9 lb/sqft 2.15 CONSTRUCTION ASSEMBLY COMPLIANCE FORM . CF-3 page 19 of 27 ---------------------------------------------------------------------------Project: Building #3 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.ation: Carlsbad Date: 12/30/1987 Checked By '-.. .... -.> Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: sunglass Blue Plate Assembly Type: Glazing Assembly Tilt: 90 deg {Vertical) Construction Components Th R-Value Fr {in) summer Winter . . ---------------------------------------------------------------------------1. CEC Single Glazing 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11. 0.250 0.20 0.68 0.20 0.68 (.---------------------------------------------:::::---------:~::-----:~::- Framing Percentage: 0.0 I Framing Material: NONE ------------------------------- 1 -------------------------------Sketch of Construction Assembly • ding Coefficient: 0.46 . ible Transmittance: 0.30 ' s ,' OVERALL VALUES ADJUSTED FOR FRAMING R-Value O-Value 0.88 1.1364 -----= 0.88 1.1364 ===•=• CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF~3 page 20 of 27 ---------------------------------------------------------------------------Project: Building 13 Designer: Banzuelo/Rierson/Duff & Associates, Inc ··cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ~ ·. ". ,· . .,,. ·-.<~.: Documentation: PROCALC Date --~------------------------------------------------------------------------ Assembly Name: 5/8 Gyp/R-11/Gyp WF Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Gypsum or Plaster Board 2. Insulation, R-11, 2x4 Wood Framing 16" 0.625 3.500 0.625 0.56 8.38 0.56 0.68 0.56 8.38 0.56 0.68 3. Gypsu~ or Plaster Board 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. /---------------------------------------------:::::--------::~::----::~::- Framing Percentage: 0.0 % Framing Material: Softwood, Douglas Fir-Larch I-H:-½+--1 P-C.•-t+---2 ~J<+--3 Calculation for Framing Adjustment Summer o-Value 0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982 Winter O-Value 0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982 OVERALL VALUES ADJUSTED FOR FRAMING R-Value u-value 10.19 0.0982 10.19 0.0982 Sketch of construction Assembly ------------ ~orptivity: ~ghness: Smooth Plaster, '· \, "j1' ght · ............... . . Beat capacity: o.oo Metal 5.4 lb/sqft 1.38 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 21 of 27 ---------------------------------------------------------------------------Project: Building #3 Enforcement Agency -Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .ation: Carlsbad Date: 12/30/1987 Checked By ":.:.;,.:.,:-l Documentation: PROCALC Date ------------------------------------------------.------------------------~-- · Assembly Name: 6" concrete Wall Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Component~ Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Concrete, 140 lb, oven Dried 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11. 6.000 0.66 0.68 0.66 0.68 ~--------------------------------------------------------------------------\L .. :..~ Total 1. 34 l. 34 Framing Percentage: 0.0 I Framing Material: NONE ------------------------------- . ... :. . OVERALL VALUES ADJUSTED FOR FRAMING . 1 -------------------------------Sketch of Construction Assembly • orptivity: r, • ghness: Concrete, \~,,: .. 1ght: Heat Capacity: 0.70 Asph. Shingles 70.0 lb/sqft 15.40 R-Value O-Value 1.34 0.7463 ------ 1.34 0.7463 ==••== BVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 22 of 27 ---------------------------------------------------------------------------Project: Building 13 Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/30/1987 '~: .. :~.-.' Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- FAN ENERGY BVAC System Rheem RPNC036C (Fanl) FAN WATTAGE INDEX No. Sys BHP 1 X a.so I 533 watts/ Motor Eff. -----[0.70 Drive Conv No. Fan Eff. Fact Fans Watts -------------- X 1.00] X 746 X 1 = 533 ------Total 533 654 sqft = 0.815 watts/sqft HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page 23 of 27 ---------------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ;:.cation: Carlsbad Date: 12/30/1987 Checked By Documentation: PROCALC Date ~-------------------------------------------------------------------------- BEATING EQUIPMENT System No. Design Equip Conv. Source Descripti~n Type Sys Output Eff Factor (Btu/hr) ---------------------------------------------------------Rheem RPNC036C Heat Pump 1 X 36600 I 2.92 X 3.000 -37603 --------Total 37603 aEATING POWER INDEX 37603 Btu/hr I 654 sqft -57.50 Btu/hr-sqft COOLING EQUIPMENT System No. Design Equip Conv. Source Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------Rheem RPNC036C Heat Pump 1 X 36200 I 8.00 X 10.239 -46331 --------Total 46331 COOLING POWER INDEX 46331 Btu/hr/ 654 sqft = 70.84 Btu/hr-sqft • HVAC SYSTEM.SUMMARY SHEET Project: Building #3 Designer: Banzuelo/Rierson/Duff & Associates, Inc WS-4 page 24 of 27 (.cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ' ,_. :, ·,,., Documentation: PROCALC Date -------------------------------------------------------------------------~- HVAC Equipment Name: HEATING System Type: output Capacity: Rated Efficiency: Supply Air Temperature: COOLING ·System 'l'ype: 'l'otal output capacity: Sensible Output Capacity: Latent output Capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: --upply Air Temperature: (~NS Supply Air CFM: Fan 'l'ype: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS supply Duct Beat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC036C Beat Pump 36600 Btu/hr 2.920 105.0 F Beat Pump 36200 Btu/hr 26200 Btu/hr 10000 Btu/hr 8.000 4510 watts 0.100 No 55.0 F 1250 cfm Blow-Through l 0.50 70.0 I 100.0 I 1.0 I 1.0 I 2.0 I 2.0 I LIGHTING SUMMARY AND WORKSHEET CF-5 page 25 of 27 -----~---------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,.,cation: Carlsbad Date: 12/30/1987 Checked By -<~ ;._":, ' Documentation: PROCALC Date ~----~--------------------------------------------------------------------- INSTALLED LIGHTING POWER BY SPAC~ Space Name Office Floor Vert Horiz Area Mult Mult 654 X 1 X TOTALS 1 - BUILDING LIGHTING WATTAGE 981 watts/ •• ·. ·~, -.. Total Floor Area -----654 -----654 654 Lighting Installed (watts/sqft) wattage ---------------------X 1.500 -981 ---------981 sqft -1.500 watts/sqft HVAC ZONE HEATING & COOLING LOAD SUMMARY page 26 of 27 ---------------------------------------------------------------------------Project: Building #3 Designer: Banzuelo/Rierson/Duff & Associates, Inc >.cation: Carlsbad . Date: 12/30/1987 Enforcement Agency Building Permit No <,. ·~· Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: BVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE PEAK (Jan 6am) TOTAL SPACE LOAD Office B ass Ventilation Air ( 13 cfm) . ply Duct Conduction ' ply Duct Leakage . · pply Fan Heat Gain EFFECTIVE SPACE LOAD Ventilation ( 118 cfm) Return Duct conduction Return Duct Leakage Return Fan Heat Gain i .• \ t'. ':. ~/ -... ~ ...... . TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 21022 21022 460 ( 210 420 0 22113 4144 ( 221 442 -1819 25101 30002 Space l Rheem RPNC036C 1 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT so' COOLING PEAK SENSIBLE LATENT --------------(Aug 3pm) 20167 1668 --------------20167 1668 13 cfm) 68 7 202 403 33 0 ---------------20839 1708 118 cfm) 609 66 208 417 34 1819 --------------23892 1808 2.0 tons 0.2 tons 26237 11501 2.2 tons 1.0 tons SPACE HEATING & COOLING LOAD SUMMARY page 27 of 27 ---~-----------------------------------------------------------------------Project: Building 13 Enforcement Agency Designer: Banzuelo/Ri~rson/Duff & Asspciates, Inc Building Permit No I _ (.cation: Carlsbad Date: 12/30/1987 Checked By : ... ~ ,.' .. Documentation: PROCALC Date ---------------------------~----------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor conditions: Outdoor Conditions: LOAD COMPONENT ---------------------Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction .,aslab Conduction {iainterior conduction \s,v-• Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 5851 12160 268 1006 0 0 1737 0 0 21022 Btu/hr SENSIBLE --------Aug 3pm 78 F DB 83 F DB Btu/hr ------1390 922 58 650 0 0 0 0 11059 2188 2232 1668 ------20167 1.7 Office COOLING LATENT ------ 50 I RH 67 F WB Btu/hr ------ 0 1668 -----Btu/hr 1668 Btu/hr tons 0.1 tons Heating: Cooling: 21022 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l • 546 cfm 20167 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 797 cfm I f. \; : /. TITLE 24 REPORT FOR: Building i4 El Fuente Business Park Carlsbad, California PROJECT DESIGNER: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 OWNER: Davison-Jones Development 411 campus Drive, Suite 830 Irvine, CA 92715 REPORT PREPARED BY: PROCALC 705 s. Velare St. il0 Anaheim, CA 92804 1-(800) TITLE-24 Job Number: T499D Date: 12/31/1987 . The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. The program has interim 0•• approval and is authorized by the California Energy Commission for use with \~-" the Second Generation Nonresidential Building Energy Efficiency Standards. ce Table Of Contents for Title 24 Report Cover Page ..••••••.•••••••••••.••••••••••••••••••••••••••••••••••••• Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-1 Certificate of Compliance • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form MF-1 Mandatory Measures Checklist • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • l 2 3 5 Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7 Form CF-2 Envelope summary & Worksheet • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form SCM Performance Run • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form CF-3 Construction Assemblies • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form CF-4 BVAC Power Indices summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form ws-4 BVAC System summary Sheets • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form CF-5 Lighting summary & Worksheet • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • HVAC Zone & Space Loads summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 9 12 44 so 52 53 54 verur1cate or Gompliance (Part 1 ot 2} P~Ji~.tf.P!t.Jta :# 4 Building Permit Number· I Pl:an Chockad By 7 Citylrown E?lRaCAk4: climaia Zone 1de1/e:1 Prescriptive Approach/Performance Approach Strategy General 1 CEO 0:cupanC'f Type , • • • • • • • • .off{c.tZ.. 2 use OccupaM'/ Group/Oivision • • • . • • -g.--z.,. 3 Pa:bgeSelactad ••• ~ •••••.••• fuf. 4 Gress Conclitfcned Floer Area • • • • • • ~ 7 ft2 Roof ind Ftoora1 s , Proposed Roof/Cai!Ing Rt (CF-2. CF-3) • • ZR-& hr-F4tZ'8IU 6 .. Raqwad Reef/Ceiling Rt (CF-2) • • • • • ___ hr-F-ftZ'SIU 7 Proposed EJcmrior Floor Rt (CF-2. CF-3) • -hr-F-rt2/SIU 8 Raqwad Extarfcr Floor Rt (CF-2) , • • , • hr-F4t2/81U Walla. 9 · Proposed Opaque Wall Rt (CF-2.. CF-3) • • 1 , l hr-F-ft2/81U 10 Wall Heat Capacity (CF-3) • • • • • • • • 4. q 8tu/F.ft2 Raquirad Opaque. Wall Rt (CF-2) , , , • , ___ hr-F-ft2/SIU ( ;lnWaUa ' Extadcr Wal Area (CF-2) • • • • • • • • :4q 1 1 ft2 13 Total Grazing ~a (CF-2) • • • • • • • • \ 4?z l ft2 14 Proposed Total Percent (Una 13 / Una 12) • ?.5, \ % 15 AWtaga :rota1 SC (CF-2) , • • • • • • • • t:!:> • 4':z 18 Allowed Total Gtazfng Percent • • • • • • ___ % 17 Wast Extaricr Wall Area (CF--2) • • • • • • t 1 ?, ?> ft2 18 West~ Ania (CF--2) • • • • • • • • 1 'Z,'2. ft2 19 ProposadWestPvcant(CF-2). • • • • • 1 ~O % 20 Avera;~ Wast SC (CF-2) • • • • • • • • p. 4':;, 21 Allowed Wast Grazing Percent • • • • • • % Gra:Ing In Roof (CJ4) Proposed Allowod 22 S.kyllght 1 • • • • • • • . • • __ _ ---ft2 23 SkyllghC 2 • • • • • , • • • __ _ ---ft2 24· Skyl(ghc3 •. • • • • • • • • __ _ ___ ,a 25 Skylight.& • • • • • ; • • • __ _ ___ ,a : ~ts •.•••••••• __ _ Sk'Jltght I • • • • • • • • • __ _ ---ft2 ---ft2 28 Skylrght7 • • • • • • • • • --- 29 Skylight a • • .. • • • • -. • __ _ ___ ft2 ---ft2 UghUn; 30 Propcsad Ac(ustac:t LPD (CF-5) • • • • • • I • 40 Waltslft2 31 Allowlad LPO (CF-5) , • • • • • • • • • ___ Wattslft2 HVAC 32 Ptdcnnance Set Selec:tad • • • • • • • • __ _ • ~ropoaed Far\ Wattage Index (CF-4) • • • \ • 0 § Watrs/ft2 . ~ Fan Wattage Index • • • • • • • -----Wallslft2 ·-. ~ Proposed CocUng Power Index (CF-4) ••• h't .J~ fflUMt2 38 AllowedCooUng Pcwer Index • • : • • • ___ Bluhlft2 37 Propoaad Heatrng Power Index (CF-4) • • • w:f:. J,4eluMt2 38 Allowed Heating Power Index • • • • • • .____ ·eiuhlrt2 F~ Re'Med ~ptamber 1988 CF-1 For Enforcement Agency Use Only Dalo ;iZZ °I. ~5" t,,.-W Field Checked ay Dace _Signature and Registradcn Stamp Approved By Cate I,.\~ 4:tm(g.mt.. Performance Approach Energy Budget 1 CEC Oc:cupanc:y °Type • • • • • • • • • .Of6·cc. 2 USC Oc:cupanc:y Group/Oivision • • • • • B,-2- 4 Condilfonod Acor Aroa • • • • • • • • • Zf:S S 1 ft2 4 Budgot Tabla • • • • • • • • • • • • • .t,.t;,-) A S Allowed Energy Budget (WS-1A) • • • • • l i1,0 kBtl.llyr-tt2 Calculated Annual Energy Consumption 6 Approved Calculallon Mathod • • • • • • ttC, '42!:1 P'-'f ~ 7 cec Designation • • • • • • • • • • • LP<? 07 8 Mullfpller • • • • • • • • • • • • • • • • 1 ,Q'l 1 . EsUmated Energy Use 9 Healfng • • • • • • • • • • • • • • • • lp, 4-; kBtulyr-ft2 10 Cooling • • • • • • • • • • • • • • • • aP,1 k8t1.11yr-ft2 11 Fans • • • • • • • • • • • • • • • • • 41 • B k8tulyr-tt2 12 Ughts • • • • • • • • • • • • • • , • ~.. 4',. 9. kBtu/yr-ft2· 13 Mlscellaneous. Equipment • • • • • • ~ ) f> 1 ,Z kStlJlyr-h2 14 Total •.•••.••••••••••••• ___ k8tulyr-ft2 15 Aclf. Total Energy Use (liflle a le liua 1"4) • • • l'54, -~ kBtu/yr-ft2 ~ Aa j "4S\-u:\ · Compliance Statement General. The proposed building reprasented In !his set of ccmpfianee documenWion Is consistent with lhe other compllanc:e fonns and wori<sheets, wilh the plans and specillcalions and with any olher calc:\llations or computor runs submiltad wilh this pennit application. Performance Approach. (when applicable) The energy penonnanee eslimata presented on this rem, was calculated using the approved c::alculalion method Indicated above and with the cec established fixed and raslric:ted · engineering inputs for the applicable climate zone and occupancy type. Prucrfpllve Approach. (when applicable) The proposed building has been designed to meet Iha requirements of Iha Altemadve Componenc • Package iridicated above for the appropriate oc:cupanC'f type and climate zc~{1- Signed IcciAU> ]ar;z,flAd _. fkrat PfNf Nama/lllle A1fZ:: DNLIC:l IWQ campany (?~W Ll1? W% Address At:\A:tlg;JM , M q-za:x-o TeJephone Calif. Ucense Number ~, Liertiticate o-f Compliance· (Part 2 of 2) CF-· + For enrorcement Agancy Usa Only Ccc:wsentalfon AulhorJF'um Oaia chacl4id By Oa,a (,.,___ __________ _ ·. :,·., ' Bath parts one and tNo of !his Certificate of Compliance must be included with each building pennit application for the above noted building and appe, on Iha ·plans submitted for appr0vaL The building.features and reqµirements represented on the Certificate of Compliance ara adequaca to acnie\ c:cmpllanca with the second generation nonresldendal energy standaids for Iha building referenced above. Tha building features and requirements a: also ad~ta for 8fff subsequent alterations. rnodifiealions or additions ta Iha buikfu,g. Desf;ner One Name (Print) llda/Company Nama Address Signature Enlcrcemant Agarq Signature Daaf;ner Two .am• (Print) Addtass Owner Name (Print) • · Tilfa/C<lntpany Name ~ Ra'4ised September t 986 Data Oato Cate Date -. Signature enlorcomant AgonCJ signature Deatgner Four Name (Print) Tiua1Company Name Signature Enlorcemant Agency Signature Enforcement Agency Name (Print) Tido/Agel'IC'f Cata bate pate bate Pace "' CERTIFICATE OF COMPLIANCE (part l of 2) CF-l page 3 of 63 ---------------------------------------------------------------------------Project: Building 14 E~forcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,·.cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- PERFORMANCE APPROACH Roofs and Floors Roof/Ceiling Rt (CF-2,3) R-20.8 Ext. Floor Rt (CF-2,3) R-o.o Walls Opaque Wall Rt (CF-2,3) R-7.1 Heat Capacity (CF-2,3) 4.9 HC Glazing in Walls Exterior Wall Area (CF-2) Total Glazing Area (CF-2) Total Glazing Percent Average Total sc (CF-2) West Exterior Wall (CF-2) West Glazing Area (CF-2) West Glazing Percent Average West SC {.azing in Roof · ,,,,.~'skylight Area C CF-2) 4077 sf 1431 sf 35.1 I 0.46 SC 1733 sf 122 sf 7.0 I 0.46 SC O sf Lighting Proposed Adjusted LPD (CF-5)1.40 w/sf Energy Budget CEC Occupancy Type· Conditioned Floor Area Total Number of Floors Climate Zone · Energy Budget (WS-lA) Lighting Adjustment (CF-5) Energy Compliance Budget Office 2887 1 7 157.0 o.o 157.0 Calculated Annual Energy Consumption Approved Calculation NR COMPLY 24 Program Version Number 1.14 User License Number 1329 CEC Designation CPO 07 CEC Multiplier l.027 Estimated Heating Cooling Fans Adjustment Lights Receptacle Energy Use (KBtu/sqft-yr) 10.4 30.7 47.8 HVAC Fan Wattage Index (CF-4) 1.03 Cooling Power Index (CF-4) 69.79 Heating Power Index (CF-4) 64.34 Hot Water w/sf Total (SCM-3) Btuh/sf 88.9 X 1.027 • 91.3 46.9 16.8 1.4 156.3 Btuh/sf COMPLIANCE STATEMENT The proposed building represented in this set of compliance documentation is consistent with the other compliance forms and worksheets, with the plans and specifications and with any other calculations or computer runs submitted with this permit application. The energy performance estimate presented on this form was calculated using the approved calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable climate zone and occupancy type • • GNED ----------------Calif. License I: ____ _ '-... _'~··:··;·· DESIGNER Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 CERTIFICATE OF COMPLIANCE (part 2 of"2) CF-1 page 4 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Both Parts one and two of this Certificate of Compliance must be included with ~ach building permit application for the above noted building, and appear on the plans submitted for approval. The building features and requirements represented on the Certificate of Compliance are adequate to achieve compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are also adequate for any subsequent alterations, modifi- cations or additions to the building. PROJECT TITLE Building 14 El Fuente Business Park Carlsbad, California (. __ ·-- OTHER DESIGNER Name: Address: City: Signed: OWNER Davison-Jones Development 411 campus Drive, Suite 830 Irvine, CA 92715 DOCOMENTATION AUTHOR PROCALC 705 s. Velare St. tl0 Anaheim, CA 92804 1-( 800) TITLE-24 · 1 ./ , ,/' ·-/ '/ ( -··\ I/ ;;: IL.'-/'/, Signed: _/_·'-<~1_;_, __ ._._, _____ ,-_:_-_--_r_, ____ ~ '-I . OTHER Name: City: Signed: ,:--., / i ENFORCEMENT AGENCY Name: Agency: City: Signed: MANDATORY FEATURES CHECKLIST (part l of 2) MF-1 page 5 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,.ocation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- ENVELOPE MEASURES o Certified Insulation Materials per Sec. 2-53ll(a) o Insulation Installed to meet Flame spread and Smoke Density Requirements of Sec. 2-53ll(b) o urea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c) o Retrofit Insulation specified per Sec. 2-5313 o Air Infiltration is minimized by specification of tested manufactured doors and windows and proper sealing and weatherstripping per Sec. 2-5317 LIGHTING SYSTEM MEASURES o Certified Luminaires/Ballasts per Sec. 2-53l4(b) {. Independent control within enclosed Areas per sec. 2-53l9(a) o Manual switching Readily Accesible per sec. 2-5319(b) o Reduction of Lighting Load to at least 501 per sec. 2-5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute) o Separate Switching of Daylit Areas per Sec. 2-53l9(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale Occupancies per Sec 2-53l9(h). o Automatic Control of Display Lighting in Retail/Wholes~le Occupancies per Sec. 2-53l9(h) o Tandem Wiring of land 3 Lamp Luminaires per sec. 2-5319(h) OCCUPANCY SENSING DEVICES (when applicable) o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-53l9(e).2 Reference ,. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 ---+--- -..:<~," Limits on Emmisions per exceptions to sec. 2-5319 (e) MANDATORY FEATURES CHECKLIST (part 2 of 2) MF-1 page 6 of 63 -------------------------------------------------~-------------------------Proje9t: Building #4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By ' • 'T • Documentation: PROCALC Date --------------------------------------------------------------------~------ DAYLIGHTING AND LOMEN MAINTENANCE CONTROLS (when applicable) o Uniform Illumination reduction to 50% per Sec.·2-5319(e).l o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 Reference o Time Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 __ ,._ __ o Step switching Devices with Separation between On/Off Settings per Sec. 2-5319(e).4 o Photocell Sensors shall be Diffusing type and no Opaque Cover allowed per Sec. 2-5319(e).5 o Manufacturer's Instructions provided for Installation and Calibration per sec. 2-5319(e).6 o Proper Installation of controls including Sensor Location, a certification of Initial Calibration and Control of Luminaires (~only within Daylit Areas per Sec. 2-5319(e).8 o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _ HVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per sec. 2-5312 o Certified HVAC Equipment per 2-5314(a) o certified Plumbing Equipment per 2-5314{a) o Heating and Cooling Equipment efficiency per Sec. 2-5314(b) o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c) o Automatic controls for Off-Hours per Sec. 2-5315{a) o Thermostat Set Point Requirements per Sec. 2-531S{b).1 o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2 o Automatic Exhaust Fan Dampers per Sec. 2-5316(b) .Thermostat Controls for Each Zone per Sec. 2-5315(b) . -...,.~ .. -· o Ventilation Provided per Secs. 2-5316 & 2-5343 o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318 ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 63 ---------------------------------------------------------------------------Project: Building #4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Build~ng Permit No -·cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- CLIMATE ZONE 7 ENERGY BUDGETS Cross· Floor Sectional Office Retail No Area Budget Budget --------------------------r 2887 157 186 BUILDING ENERGY COMPLIANCE BUDGET BY SPACE Total Budget Energy Occupancy Floor Floor (KBtu Budget Flr Space Name Type Area Mult Area /sqft) (MBtu) ------------------------------------------------------1 Space 1 Office 349 ·X 1 = 349 X 157 = 54.7 l Space 2 Office 365 X l = 365 X 157 = 57.3 1 Space 3 Office 365 X 1 = 365 X 157 = 57.3 l Space 4 Office 365 X l = 365 X 157 = 57 .. 3 l Space 5 Office 365 X 1 = 365 X 157 =-57 .. 3 l Space 6 Office 365 X l =-365 X 157 = 57.3 (-Space 7 Office 365 X l = 365 X 157 = 57.3 Space 8 Office 349 X l -349 X 157 • 54.7 _,_.f', -----------TOTALS 2887 453.3 BUILDING COMPLIANCE BUDGET 453.3 MBtu I 2887 sqft == 157.0 KBtu/sqft ENERGY BODGETS WORKSHEET (part 2 of 2) WS-lA page S·of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ··ocation: Carlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate use Flr Space Name Area Mult Area (KBtu/sqft) (MBtu) ---------------------------------------------------l Space l 349 X l = 349 X 159.4 = 55.6 l Space 2 365 X l = 365 X 155.3 = 56.7 l Space 3 365 X l = 365 X 155.4 = 56.7 1 Space 4 365 X l = 365 X 155.3 = 56.7 l Space 5 365 X 1 = 365 X 155.4 -56 .. 7 l Space 6 365 X 1 = 365 X 155.3 = 56.7 l Space 7 365 X l = 365 X 155.4 = 56.7 l Space 8 349 X l -349 X 159.4 -55.6 -----------TOTALS 2887 451.4 BUILDING ENERGY CONSUMPTION 451.4 MBtu / 2887 sqft = 156.3 KBtu/sqft AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ·&cation: Carlsbad Date: 12/31/1987 Checked By \.:/;. _:.: Documentation: PROCALC Date ---------------------------------------------------------------------------. ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Roof-1 Roof-2 2495 392 ---------------------------------------------------------------------------TOTALS 2887 ROOF R-VALUE Type Roof-l Roof-2 cl Assembly Name --------------------------R-19 B/U with T-Bar R-19 B/0 with Gyp. Clg. Average R-Value Area 2495 392 2887 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE 2887 Area/ R-Value R-Value --------------21.04 118.56 19.40 20.21 -------I 138.77 -20.80 s SW w NW TOTALS ---------------------------------------------------------------------------NONE --------------------------------------~------------------------------------TOTALS 0 AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 63 ----~----------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: .Banzuelo/Rierson/Duff & Associates, Inc Building Permit No !,.cation: Carlsbad Date: 12/31/1987 Checked By _,, .. , :'.,-;.: .. ..- Documentation: PROCALC Date ~-------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------248 1278 99 360 1584 149 360 4077 --------------------------------------------------------------------------- OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW Int TOTALS ---------------------------------------------------------------------------Wal-1 Wal-2 Wal-3 45 252 18 108 172 80 1424 160 27 108 172 80 558 1768 320 ------------------------~--------------------------------------------------TOTALS 45 252 18 360 1584 27 360 2646 .AQOE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY ( Area/ Area , "-i'Type Assembly Name Area R-Value HC R-Value X BC ----------------------------------------------Wal-1 6.5" Conc/R-11/Gyp.Brd. 558 10.34 17.4 54 9704 Wal-2 5/8 Gyp/R-11/Gyp WF 1768 10.19 1.4 174 2447 Wal-3 Solid Wood Door 320 2.22 2.4 144 764 ------------Totals 2646 372 12915 Average R-Value 2646 I 372 = 7.12 Average ac 12915 I 2646 • ~.88 . AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .ocation: Carlsbad Date: 12/31/1987 Checked By ~..,: .;',"" ... ·~ Documentation: PROCALC Date --------------------------------------------------------------------------- GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS --------------------------------~------------------------------------------Wind-1 203 1026 81 122 1431 ---------------------------------------------------------------------------TOTALS 203 1026 81 122 1431 GLAZING 0-VALUE AND SC Area X Area Type Assembly Name Area O-Value SC O-Value X SC ---------------------------------------------------Wind-l Sunglass Blue Plate 1431 1.14 0.46 1626 658 ------------Totals 1431 1626 658 Average o-value 1626 I 1431 -1.14 Average SC 658 I 1431 = 0.46 <I ~ .. ~.:..-~-' -· SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 12 of 63 ---------------------------------------------------------------------------Project: Building t4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :\.cation: Carlsbad Date: 12/31/1987 Checked By --,f~ .. .; .:.? Documentation: PROCALC Date ----~---------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing East Glazing North Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window • Roof ·· Door (.~-Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space l 392.0 sqft 108.0 sqft 40.5 sqft 40.5 sqft 348.5 sqft 40.0 sqft o.o sqft 348.5 sqft 348.5 sqft 10.25 0.88 20.80 2.22 o.oo Rheem RPNC024J 2 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 5486 watts 746 watts 1700 CFM * Note: 2 Spaces are served by this. HVAC System. Please refer to the attached HVAC Zone Heating & cooling Load Summary for more details on the zoning arrangement • .• ~~~~ '.2::,-···Heat capacity of Exterior Wall Lfghting Power Climate Zone 7.81 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 13 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ··cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast East North OVERHANGS & SIDEFINS Northeast A East (~North SPECIAL FEATURES Daylighting Strategies SC Factor ------------ 0.46 0.880 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 9.0 12.0 4.5 4.5 Shading Device Winter summer ------------ overhang Height Depth 0.31 0.70 9.0 ft overall SC 0.40 0.40 0.40 Side-Fin Distance Depth ------------- No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 o·f 63 ---------------------------------------------------------------------------Project: Building i4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No l~·cation: Carlsbad Date: 12/31/1987 Checked By '<·~·.,> Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 1 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-operational Hours per Week: Day 32 hours • Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: occupant sensible Load: Occupant Latent Load: :. Occupant Density: .... _. .. ,'of~::./ Heating Cooling Winter Winter summer summer Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so 64 230 190 250 watts/sqft Btu/hr-person Btu/hr-person Btu/hr-person sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space l BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.19 (Winter) BPTl BPT2 = 66.34 (Summer) BPT2 BPT3 = 66.34 (Economizer) BPT3 BDD = 333 (Heating) HDD CDD = 425 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F} ======•=====••=================== Building Envelope Heat Transfer Rate: Winter summer Winter summer Overall Heat Transfer Factor ("K"}: ANNUAL LOADS (MBtus} -68.21 = 76.20 = 76.20 = 3336 -0 ---= .,. \~>,JI,, Heating cooling -= ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----===•=============================== Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating source cooling source Fan Total Space Conditioning Energy Source Lighting Source Receptacle source Hot water --= = 10.7 31.7 49.5 -----91.9 X 1.027 ------ ---= 230.6 23.3 .1 409.5 397.9 3.3 4.7 1.2 3.7 5.8 5.5 1.9 0.2 94.4 46.9 16.8 1.4 :' ···======================•==-========================================•======= '-._,,~,J' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 159. 4 KBtu/sqft SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit NO Checked By ·-·cation: Carlsbad Date: 12/31/1987 Documentation: PROCALC Date ---------------------------------------~----------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing North Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (includi'ng inside film resistance) ----------------------~--------------------Wall Window Roof ADoor (~ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency . Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 2 257.0 sqft 135.0 sqft 40.5 sqft 365.0 sqft 40.0 sqft o.o sqft 365.0 sqft 365_.o sqft 10.21 o.88 20.81 2.22 o.oo Rheem RPNC024J 6 Beat Pump Beat Pump Electric Resistance 2.920 9.350 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 Spaces are served by this BVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL ,.;;;;-Capacity of 1,.:\> Lighting Power Climate Zone Exterior Wall 3.46 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 17 of 63 ---~-----------------------------------------------------------------------Project: Building #4 Designer: Banzuelo/Rierson/Duff & Associates, Inc r4location: Carlsbad Date: 12/31/1987 '~~·-,: ·. / Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast North OVERHANGS & SIDEFINS Northeast North ~-~ ~ .. ,,: . .:;PECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter summer ------------ Overhang Height Depth --- 0.10 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth --. NO Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 63 ---------------------------------------------------------------------------Project: Building #4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------------- space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Space 2 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night • Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Beat Loss Rate (U~Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: occupant sensible Load: Occupant Latent Load: ~ Occupant Density: Beating Season Cooling Season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 63 ---------------------------------------------------------------------------Project: Building #4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :.cation.: Carlsbad Date: 12/31/1987 Checked By .. i-,'-,''. -Documentation: PROCALC Date ------------------------------------------~-------------------------------- Space Name: Space 2 BALANCE-POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.77 (Winter) BPTl BPT2 = 66.83 (Summer) BPT2 BPT3 = 66.83 (Economizer) BPT3 HDD = 389 (Heating) HOD COD = 383 (Cooling) COD BUILDING HEAT TRANSFER (Btu/hr-F) •=====••=====•================•== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter summer ANNUAL LOADS (MBtus) ==================== = 68.24 = 76.23 = 76.23 = 3346 = 0 ---- ~ .! . ·.,. . v.:..;;;-" Heating Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle Source Hot Water • -• = 10.8 29.8 47.3 -----87.9 X 1.027 = = = -= = -• = = -= 207.2 209.5 394.5 382.0 3.5 4.5 1.3 3.6 5.8 5.7 2.0 0.2 90.3 46.9 16.8 1.4 i•·======•==========================================•=====•================ \::S, . TOTAL ANNUAL_ SOURCE ENERGY USE ESTIMATE 155. 3 KBtu/sgft •===============================================•========================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 20 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associate~, Inc Building Permit No 1.oca_tion: Carlsbad Date: 12/31/1987 Checked By -·-~:i ... ·.·· Documentation: PROCALC Date ----------------------------------~---------------------------------------~ Space Name: AREAS Exterior Wall Northeast Glazing West Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALOES (including inside film resistance) ------------------------------------------- • Wall Window Roof Door Floor BVAC SYSTEM BVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type cooling Equipment Type water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer cooling Equipment Power Rating Fan Power Air Circulation Rate Space 3 257.0 sqft 135.0 sqft 40.5 sqft 365.0 sqf't 40.0 sqft o.o sqft 365.0 sqft 365.0 sqft 10.21 0.88 20.81 2.22 o.oo Rheem RPNC024J 6 Beat Pump Beat Pump Electric Resistance 2.920 9.350 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 spaces are served by this BVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL --~;;;~-Capacity of Exterior Wall ~S_;___>; Lighting Power Climate Zone 3.46 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 21 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ~•ocation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast West OVERHANGS & SIDEFINS Northeast West ~PECIAL FEATURES Daylighting Strategies ,. \: . SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter summer ------------ overhang Height Depth 0.10 0.70 9.0 ft Overall SC. 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 63 ---------------------------------------------------------------------------Project: Building i4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No :.cation: Carlsbad Date: 12/31/1987 Checked By . -~--·· Documentation: PROCALC Date --~---------------------------------------------------------------------~-- Space Name: occupancy Type: SCHEDULING Occupancy Lev~l for Operational Period: Space 3 Office Day 54.60 % Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Beater Number of Non-Operational Hours per Week: (. Number of Holidays per Year: Heating Day Night Season Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: wa~er Heating Energy: occupant sensible Load: Occupant Latent Load: • occupant Density: \ ~ · . .::.·. :~ Cooling Season Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: .···cation: Banzuelo/Rierson/Duff & Associates, Inc Carlsbad Date: 12/31/1987 Enforcement Agency Building Permit No Checked By . ··-:.~:.;;" Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 3 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.00 (Winter) BPTl = BPT2 = 65.76 (Summer) BPT2 = BPT3 -65.76 (Economizer) BPT3 = HDD = 316 (Heating) HDD = COD = 468 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) •======•========================= Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter Summer (. Heating cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site aot Water ANNUAL LOADS (Matus) ······==•=•==•••==== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=••••=•••=•==••=••==•=••===••=•======= 68.15 76.11 76.11 3317 0 --• - • - ----= = ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =====•=====================•=•=============== Source Heating source cooling source Fan Total Space Conditioning Energy source Lighting source Receptacle source Hot Water --- = 9.7 30.9 47.3 -----88.0 X l.027 = = -= 207.2 209.5 394.5 382.0 3.2 4.9 1.2 3.8 5.8 5.7 2.0 0.2 90.3 46.9 16.8 1.4 :'······-·==•=•=•===••••=••••====••===•=••=•==••==•=••=•==•=•===•==•=••====•= \~> · TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 4_ KBtu/sqft SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 63 ---------------------------------------------------------------------------Project: Building t4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Date: 12/31/19~7 Checked By .. ._, ~ '.",.c,' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing North Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance} Wall Window Roof Door t. Floor \ _ .. I HVAC SYSTEM HVAC Equipment Name (CF-4) Numbe_r of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 4 257.0 sqft .135. O sqft 40.5 sqft 365.0 sqft 40.0 sqft o.o sqft 365.0 sqft 365.0 sqft 10.21 0.88 20.81 2.22 o.oo Rheem RPNC024J 6 Beat Pump Beat Pump Electric Resistance 2.920 9.350 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 Spaces are served by this HVAC System~ Please refer to the attached HVAC zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL '~--• ~~;~tr~~a~~!!r of Exterior Wall . Climate-Zone 3.46 l.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Itic Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By ·"-;;;._','7 Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------~-----------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS ~-------------------Northeast North OVERHANGS & SIDEFINS . Northeast North AECIAL FEATURES Daylighting strategies SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter Summer ------------ overhang Height Depth 0.10 0.70 9.0 ft Overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .ocation: Carlsbad Date: 12/31/1987 Checked-By ,/.,~,..,.,. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: occupancy :rype: SCHEDULING Occupancy Level for Operational Period: Space 4 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Number of Non-Operational Hours per (. Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value}: INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: occupant Sensible Load: Occupant Latent Load: !. Occupant Density: \ \_-.I , .. :::.-...,./ Water Heater Week: Day Night Heating Season Cooling season Winter Winter Setback summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 27 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,.cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date -------------------------------------------------------------~------------- Space Name: Space 4 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -----------------------------..-BPTl = 60.77 (Winter) BPTl = BPT2 = 66.83 (Summer) BPT2 = BPT3 = 66.83 (Economizer) BPT3 = HOD = 389 (Heating) HDD = CDD = 383 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) =•==a=a•===a===================== Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter • Heating Cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water summer ANNUAL LOADS (MBtus) •=•=•==============• ANNUAL SITE ENERGY REQUIREMENTS (Matus) =========================•==•========== 68.24 76.23 76.23 3346 0 • = -- -- ------ ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating source cooling Source Fan Total Space Conditioning Energy source Lighting Source Receptacle Source Hot water = • - = 10.8 29.8 47.3 -----87.9 X 1.027 -= -= 207.2 209.5 394.5 382.0 3.5 4.5 1.3 3.6 5.a 5.7 2.0 0.2 90.3 46.9 16.8 1.4 ; ..• -=-======================•=====================•==============•======•====== \_\.;..> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 3 KBtu/sqft •========================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 28 of 63 ---------------------------------------------------------------------------Project: Building #4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No .cation: Ca-rlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing West Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof· , Door (. Floor BVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 5 257.0 sqft 135.0 sqft 40.5 sqft 365.0 sqft 40.0 sqft o.o sqft 365.0 sqft 365.0 sqft 10.21 0.88 20.81 2.22 o.oo Rheem RPNC024J 6 Beat Pump Heat Pump Electric Resistance 2.920 9. 350 . 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 Spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL _, .-;;;~-~apaci ty of Exterior Wall '-... Lighting Power Climate Zone 3.46 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2} SCM-1 page 29 of 63 ---~-----------------------------------------------------------------------Project: Building #4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ,,.cation: Carlsbad ~··;.·:.>;,"" Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast west OVERHANGS & SIDEFINS Northeast West (.PECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter Summer ------------ -- Overhang Height Depth 0.10 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth ------------- No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By -"-.. ,. Documentation: PROCALC Date --------~------------------------------------------------------------~----- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 5 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Oper~tional Hours per Week: Day (. Number Night of Holidays per Year: Heating season Cooling Season Thermostat Set Point Temperatures: Winter Winter Setback summer Summer Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CU-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: i. Occupant Density: ,~,. .. 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days .70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 63 ---------------------------------------------------------------------------Project: Building t4· Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No .cation: Carlsbad ::.,_;;,:,t Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 5 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.00 (Winter} BPTl BPT2 = 65.76 (Summer) BPT2 BPT3 = 65.76 (Economizer} BPT3 HOD = 316 (Heating} HOD COD = 468 (Cooling} COD BUILDING HEAT TRANSFER (Btu/hr-F) ••=============================== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter Summer (.Heating Cooling ANNUAL LOADS (MBtus) •=================== = = = = = 68.15 76.11 76.11 3317 0 -= -- -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus} Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water · ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =••==•======================================= Source Heating source Cooling Source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Bot Water = = = = 9.7 30.9 47.3 -----88.0 X 1.027 -= = -= = = --= 207.2 209.5 394.5 382.0 3.2 4.9 1.2 3.8 5.8 5.7 2.0 0.2 90.3 46.9 16.8 1.4 _,,.·==-==-===========================•=========================-==•=======-===•===============- ,._:_, ..... TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE . 155. 4 KBtu/sqft -----~============•=======•=•==•=••==•==================•================•======= SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 32 of 63 ---------------------------------------------------------------------------Project: Building i4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By '""~ ... -;." Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing North Glazing Roof Door Raised Floor Slab . Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof Door (. Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 6 257.0 sqft 135.0 sqft 40.5 sqft 365.0 sqft 40.0 sqft o.o sqft 365.0 sqft 365.0 sqft 10.21 0.88 20.81 2.22 o.oo Rheem RPNC024J 6 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & Cooling Load Summary for more details on the zoning arrangement. GENERAL --------r.Heat capacity of Exterior Wall \.:.--: j Lighting Power Climate zone 3.46 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 63 ---------------------------------------------------------------------------Project: Building 14 ~signer: Banzuelo/Rierson/Duff & Associates, Inc · ~cation: Carlsbad Date: 12/31/1987 \ \ ;: ~·: ..,. Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date ----------------~---------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast North OVERHANGS.& SIDEFINS Northeast ~•North n>) \.,\:\J'PECIAL FEATURES Daylighting Strategies .; • • '<.. 'j \. ·._./ SC Factor ------------ 0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter summer ------------ Overhang Height Depth 0.10 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By '·t;~.~_,,_:~; Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 6 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Number of Non-Operational Hours per (.Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate Co-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: /. Occupant Density: '--.>:/ Water Heater Week: Day Night Heating Season Cooling Season Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 63 ---------------------------------------------------------------------------Project: Building i4 . Designer: Banzuelo/Rierson/Duff '!.cation: Carlsbad t , ·:'/ & Associates, Inc Date: 12/31/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 6 BALANCE POINT TEMPERATURES AND DEGREE DAYS •=••===========•========================== Daytime Nighttime ------------------------------BPTl -60.77 (Winter) BPTl = 68.24 BPT2 -66.83 (Summer) BPT2 = 76.23 BPT3 = 66.83 (Economizer) BPT3 = 76.23 HDD = 389 (Heating) BDD = 3346 CDD -383 (Cooling) CDD -0 BUILDING HEAT TRANSFER (Btu/hr-F) ======•========================== Building Envelope Heat Transfer Rate: Winter = summer • Overall Heat Transfer Factor ("K"): Winter -summer - ANNUAL LOADS (MBtus) ,· i ~ \,\>'Heating Cooling -------===•=••====== • • ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=•==================================== Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ===========•================================= source Heating source Cooling source Fan Total Space Conditioning Energy Source Lighting source Receptacle Source Hot Water = -- = 10.8 29.8 47.3 -----87.9 X 1.027 = = -= = .• = = -- 207.2 209.5 394.5 382.0 3.5 4.5 1.3 3.6 5.8 5.7 2.0 0.2 90.3 46.9 16.8 1.4 .· :······=============================•==•=•===•====••===•====-=••==•==••••=-=-= '.\ __ , TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155.3 KBtu/sqft ------====•••=-•======•=-•====•===========•======•====•••=-=•••==•====•===•=•• SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No <.cation: Carlsbad Date: 12/31/1987 Checked By . . ' ",.; ~ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Northeast Glazing West Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof .• Door (~ Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Space 7 257.0 sqft 135.0 sqft 40.5 sqft 365.0 sqft 40.0 sqft o.o sqft 365.0 sqft 365.0 sqft 10.21 0.88 20.81 2.22 o.oo Rheem RPNC024J 6 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 16458 watts 2238 watts 5100 CFM * Note: 6 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL 1 ,'.;;;~-Capacity of Exterior Wall \~.:.> Lighting Power Cli.mate .zone 3.46 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 37 of 63 ---------------------------------------------------------------------------Project: Building i4 Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad . Date: 12/31/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date -~------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS --------------------Northeast West OVERHANGS & SIDEFINS Northeast West <SECIAL FEATURES Daylighting Strategies SC Factor ------------0.46 0.880 0.46 0.880 Window Height Width 9.0 9.0 15.0 4.5 Shading Device Winter summer ------------ overhang Height Depth 0.10 0.70 9.0 ft overall SC 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No /&cation: Carlsbad Date: 12/31/1987 ·checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 7 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number <I Number of Non-Operational Hours per Week: Day Night of Holidays per Year: Heating Season Cooling Season Thermostat set Point Temperatures: Winter Winter Setback summer summer Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: f. Occupant Density: \._'_-;:,' 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days. 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 63 ---------------------------------------------------------------------------Project: Building 14 _Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No i···cation: Carlsbad Date: 12/31/1987 Checked By \ .: •• ,·. ~-'<~ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space 7 BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================· Daytime Nighttime ------------------------------BPTl = 60.00 (Winter) BPTl = BPT2 = 65.76 (Summer) BPT2 -BPT3 = 65.76 (Economizer) BPT3 -BDD = 316 (Heating) BDD = CDD = 468 (Cooling) COD = BUILDING HEAT TRANSFER (Btu/hr-F) •==••••=====•==================== Building Envelope Heat Transfer Rate: Winter summer Overall Heat Transfer Factor ("K"): Winter (. Beating Cooling Site Beating Site cooling Site Fan Site Lighting Site Receptacle Site Hot water summer ANNUAL LOADS (MBtus) ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----=================================== 68.15 76.11 76.11 3317 0 ---- -- ---= -= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water = --- 9.7 30.9 47.3 -----88.0 X 1.027 =- • -= 207.2 209.5 394.5 382.0 3.2 4.9 1.2 3.8 5.8 5.7 2.0 0.2 90.3 46.9 16.8 1.4 /·'.····=======================-========================================-===-===-=-=== "<".::-:.;.-/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 4 KBtu/sqft ===••====-================================================================== SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 40 of 63 · ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: l2/3l/1987 Checked By \ ' --; Documentation: PROCALC Date --------------------------------------------------------------------------- space Name: AREAS Exterior Wall Northeast Glazing East Glazing North Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window • Roof Door :171 Floor BVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air _Circulation Rate Space 8 392.0 sqft 108.0 sqft 40.5 sqft 40.5 sqft 348.5 sqft 40.0 sqft o.o sqft 348.5 sqft 348.5 sqft 10.25 0.88 20.80 2.22 o.oo Rheem RPNC024J 2 Heat Pump Heat Pump Electric Resistance 2.920 9.350 0.990 No 5486 watts 746 watts 1700 CFM * Note: 2 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & cooling Load summary for more details on the zoning arrangement • • NERAL .!". -----t; \:~,,:,./ Heat Capacity of Exterior Wall Lighting Power Climate Zone 7.81 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY {part 2 of 2) SCM-1 page 41 of 63 ------------------------------------------------------------------------~--Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No r,4location: Carlsbad Date: 12/31/1987 Checked By -~~--/,,/ Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing SHADING COEFFICIENTS ----~---------------Northeast East North OVERHANGS & SIDEFINS Northeast ,East ( North ~~ SPECIAL FEATURES Daylighting Strategies !\ • . •-.> '¥.:::-..•4 SC Factor ------------0.46 0.880 0.46 0.880 0.46 0.880 Winqow Height Width 9.0 9.0 9.0 12.0 4.5 4.5 Shading Device Winter summer ------------ Overhang Height Depth ----------- 0.31 0.70 9.0 ft Overall SC 0.40 0.40 0.40 Side-Fin Distance Depth No Daylighting Controls SCM ·FIXED INPUT DATA SUMMARY SCM-2 page 42 of 63 ---------------------------------------------------------------------------Project: Building·t4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :~·cation: Carlsbad Date: 12/31/1987 Checked By '!<::·:·,(;' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: Space 8 Office SCHE·DOLING Occupancy Level for Operational Period: Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day .A Night (~ Number of Holidays per Year: Heating Season Cooling Season Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U~Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: --~• Occupant Density: \_:~~'t.~~#;' Winter Winter Setback Summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Date: 12/31/1987 Checked By Documentation: PROCALC Date ---------------------------------------------------~----------------------- Space Name: space 8 BALANCE.POINT TEMPERATORES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.19 (Winter) BPTl -BPT2 -66.34 (Summer) BPT2 = BPT3 = 66.34 (Economizer) BPT3 = HOD -333 (Heating) HOD = COD = 425 (Cooling) COD - BUILDING HEAT TRANSFER (Btu/hr-F) •=•==•=========================== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter Summer Winter Summer .Beating cooling Site Beating Site Cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL LOADS (MBtus) •=================== ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 68.21 76.20 76.20 3336 0 -= -- -= ---• -= ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ===============•============================= Source Heating source cooling Source Fan Total Space Conditioning Energy Source Lighting Source Receptacle source Hot water • -• - 10.7 31.7 49.5 -----91.9 X 1.027 = --- 230.6 233.1 409.5 397.9 3.3 4.7 1.2 3.7 5.8 5.5 1.9 0.2 94.4 46.9 16.8 1.4 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 44 of 63 ---------------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff ~ Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By ~ ... ..,~' Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: Solid Wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Hardwood, Maple 2. Inside Air Film 3. 4. 5. 6. 7. 8. 9. 10. 11. 1.750 1.54 0.68 1.54 0.68 (.-------------------------------------------------------------------------- -Total 2.22 2.22 Framing Percentage: 0.0 I Framing Material: NONE ------------------------------- OVERALL VALUES ADJUSTED FOR FRAMING -------------------------------Sketch o_f Construction Assembly ~sorptivity: (-ughness: Clear Pine \.::~ .... eight: Heat capacity: 0.70 6.1 lb/sqft 2.39 R-Value o-value 2.22 0.4505 ------ 2.22 0.4505 =•==== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 45 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (,.cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/U with Gyp. Clg. Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Roofing, Built-Up 2. Plywood 3. Air ~pace 4. Insulation, Mineral Wool, R-19 5. Gypsum or Plaster Board 6. Inside Air Film 7. 8. 9. 10. 11 • 0.375 0.500 6.000 * 6.000 0.625 0.33 0.33 0.63 0.63 1.00 0.80 19.00 19.00 0.56 0.56 0.92 . 0. 61 • ------------------------------------------------------------------------- (~.>' Total 22.44 21.93 Framing Percentage: Framing Material: 1 2 3 4 5 10.0 I Softwood, Douglas Fir-Larch Calculation for Framing Adjustment Summer o-value 0.0446 X 0.90 + 0.1066 X 0.10 = 0.0508 Winter O-Value 0.0456 X 0.90 + 0.1128 X 0.10 = 0.0523 OVERALL VALUES ADJUSTED FOR FRAMING R-Value O-Value 19.69 0.0508 19.11 0.0523 Sketch of Construction Assembly •===== ====== ,.sorptivity: {(~':19hn7ss: Stucco, \.,;,:,. ... eight. Heat Capacity: 0.70 Wood Shingles 8.2 lb/sqft 2.58 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 46 of 63 ---------------------------------------------------------------------------Project: Building 14 Designe+: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Checked By (1.ocation: Carlsbad Date: 12/31/1987 \ [~:'.;.~:~--~ Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/O with T-Bar Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Roofing, Built-Op 0.375 0.33 0.33 2. Plywood 0.500 0.63 0.63 3. Air Space 4. Insuiation, Mineral Wool, R-19 24.000 1.00 0.80 * 6.000 19.00 19.00 5. Acoustical Tile, Mineral Fiberboard 6. Inside Air Film 0.750 2.03. 0.92 2.03 . 0.61 7. 8. 9. 10. 11~ -------------------------------------------------------------------------- 1 Total 23.90 23.39 10.0 I Framing Percentage: Framing Material: Softwood, Douglas Fir-Larch 1 2 3 4 5 -------------------------------Sket9h of Construction Assembly .W,sorptivity: 0.70 Shingles Calculation for Framing Adjustment Summer o-value 0.0418 X 0.90 + 0.0923 X 0.10 = 0.0469 Winter 0-Value 0.0428 X 0.90 + 0.0968 X 0.10 • 0.0482 OVERALL VALOES ADJUSTED FOR FRAMING R-Value o-value 21.33 0.0469 ----== 20.76 0.0482 =====• .:,Wfbughness: Concrete, Asph. 'i:...,,..Aeight: Heat Capacity: 6.9 lb/sqft 2.15 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 47 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By '\;.:..,,:~:,./ Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: sunglass Blue Plate Assembly Type: Glazing Assembly Tilt: 90 deg (Vertical) Construction components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. CBC Single Glazing 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11. 0.250 0.20 0.68 0.20 0.68 (-----------------------------------------------:::::---------:~::-----:~::- Framing Percentage: o.o I Framing Material: NONE 1 Sketch of Construction Assembly .41111111t1ading Coefficient: 0.46 ~--sible Transmittance: 0.30 \S:·· OVERALL VALOES ADJUSTED FOR FRAMING R-Value O-Value 0.88 1.1364 0.88 1.1364 ===•== CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 48 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No r.cation: Carlsbad Date: 12/31/1987 Checked By Y,;:;,.:i'*:;• Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 5/8 Gyp/R-11/Gyp WF Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Gypsum or Plaster Board 2. Insulation, R-11, 2x4 Wood Framing 16" 0.625 3.500 0.625 0.56 8.38 0.56 0.68 0.56 8.38 0.56 0.68 3. Gypsµm or Plaster Board 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. (,----------------------------------------------:::::--------::~::----::~::- Framing Percentage: 0.0 I Framing Material: Softwood, Douglas Fir-Larch -------~----------------------- ~~--1 P-<.--H--2 J+--3 -------------------------------Sketch of Construction Assembly Plaster, o.oo Metal Calculation for Framing Adjustment summer o-value 0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982 Winter o-value o.0982 x 1.00 + 0.0982 x o.oo·= o.o9a2 OVERALL VALUES ADJUSTED FOR FRAMING R-Value · o-value 10.19 0.0982 ------ 10.19 0.0982 .w,sorptivity: /-ughness: smooth \..'--~,,eight: ····aeat Capacity: 5.4 lb/sqft 1.38 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 49 of 63 -------~-------------------------------------------------------------------Project: Building 14 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No .ocation: Carlsbad Date: 12/31/1987 Checked By "··-,,~>';? Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 6.5" conc/R-11/Gyp.Brd. Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ----------------------------------------------------------------~----------1. Concrete, 140 lb, oven Dried 2. Insulation, R-11, 2x4 Wood Framing 16" 3. Gypsµm or Plaster Board 4. Inside Air Film s. 6. 7. 8. 9. 10. 11. 6.500 3.500 0.625 0.71 8.38 0.56 0.68 0.71 8.38 0.56 0.68 (-----------------------------------------------:::::--------::~::----::~::- Framing Percentage: o.o I Framing Material: NONE ----------~-~------------------• . • . • ~ 1 ., 2 . . . ,. 3 . . • . ., • :. . . . . OVERALL VALUES ADJUSTED FOR FRAMING ' -------------------------------Sketch of Construction Assembly ~sorptivity: {~':1ghness: Concrete, ~,.>.,eight: Heat capacity: 0.70 Asph. Shingles 78.6 lb/sqft 17.39 R-Value O-Value 10.34 0.0967 ------ 10.34 0.0967 =•==== HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 50 of 63 ---------------------------------------------------------------------------Project: Building #4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------------- FAN ENERGY HVAC System Rheem RPNC024J (Fanl) Rheem RPNC024J (Fanl) FAN WATTAGE INDEX No. Motor Drive Conv No. Fan Sys BHP Eff. Eff. F-act Fans Watts ---------------2 X 0.33 I [0.66 x 1.00] X 746 X l = 746 6 X o.33 I [0.66 X 1.00] X 746 X 1 = 2238 ------Total 2984 2984 watts/ 2887 sqft = 1.034 watts/sqft HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page Sl of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad ·Date: 12/31/1987 · Checked By \~:,~~\;) Documentation: PROCALC Date --------------------------------------------------------------------------- HEATING EQUIPMENT system No. Design Equip Conv. Source Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------Rheem RPNC024J Heat Pump 2 X 22600 I 2.92 X 3.000 = 46438 Rheem RPNC024J Beat Pump 6 X 22600 I 2.92 X 3.000 -139315 --------Total 185753 HEATING POWER INDEX 185753 Btu/hr I 2887 sqft = 64.34 Btu/hr-sqft COOLING EQUIPMENT System No. Design Equip Conv. Source Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------Rheem RPNC024J Heat Pump 2 X 23000 I 9.35 X 10.239 = 50374 Rheem RPNC024J Beat Pump 6 X 23000 I 9.35 X 10.239 = 151121 --------Total 201495 (<!COOLING POWER INDEX 201495 Btu/hr/ 2887 sqft • 69.79 Btu/hr-sqft _,.,, HVAC SYSTEM SUMMARY SHEET WS-4 page 52 of 63 ---------------------------------------------------------------------------Project: Building #4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By ··~;~ .. ·(Je..,..5c· Documentation: PROCALC Date --------------------------------------------------------------------------- BVAC Equipment Name: HEATING System Type: output Capacity: Rated Efficiency: supply Air Temperature: COOLING system Type: Total Output capacity: Sensible Output capacity: Latent Output capacity: Rated Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: a supply Air Temperature: (~ANS Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: Rheem RPNC024J Heat Pump 22600 Btu/hr 2.920 105.0 F Heat ~ump 23000 Btu/hr 17800 Btu/hr 5200 Btu/hr 9.350 2743 watts 0.100 No 55.0 F 850 cfm · Blow-Through 1 0.33 66.0 I 100.0 I 2.0 I 2.0 I •. o' 4.0 I LIGHTING SUMMARY AND WORKSHEET CF-5 page 53 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 14ltocation: Carlsbad Date: 12/31/1987 Checked By . '-\,;.··· Documentation: PROCALC Date --------------------------------------------------------------------------- INSTALLED LIGHTING POWER BY SPACE Total Floor Vert Horiz Floor Ligh-ting Installed Space Name Area Mult . Mult Area (watts/sqft) wattage ----------------------------------------------------------Space 1 349 X 1 X l = 349 X 1.400 = 488 Space 2 365 X 1 X 1 = 365 X 1.400 = 511 Space 3 365 X 1 X 1 = 365 X 1.400 -511 Space 4 365 X 1 X 1 • 365 X 1.400 = 511 Space 5 365 X l X l = 365 X 1.400 = 511 Space 6 365 X 1 X 1 -365 X 1.400 -511 Space 7 365 X 1 X 1 -365 X 1.400 -511 Space 8 349 X 1 X l • 349 X 1.400 -488 ---------------TOTALS 2887 4042 BUILDING LIGHTING WATTAGE 4042 watts I 2887 sqft = 1.400 watts/sqft • HVAC ZONE HEATING & COOLING LOAD SUMMARY page 54 of 63 ---------------------------------------------------------------------------Project: Building i4 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ,'..cation: Carlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------~------ HVAC ZONE DESCRIPTION HVAC Zone Name: HVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 1 Space 8 PEAK (Jan 6am) (Jan 6am) TOTAL SPACE LOAD ypass Ventilation A1r ( /4 pply Duct conduction ~. upply Duct Leakage supply Fan Heat Gain 14 cfm) EFFECTIVE SPACE LOAD Ventilation ( 125 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 8964 8964 17928 491 ( 359 717 0 19494 4416 ( 390 780 -2546 22534 37052 Spaces 1 & 8 Rheem RPNC024J 2 Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Jul 1pm) 7133 889 (Jul 1pm) 7281 889 --------------14414 1777 14 cfm) 72 8 288 577 71 0 --------------15350 1856 125 cfm) 649 70 307 614 74 2546 --------------19466 2001 1.6 tons 0.2 tons 35650 12304 3.0 tons 1.0 tons SPACE HEATING & COOLING LOAD SUMMARY page 55 of 63 -------------~-------------------------------------------------------------Project: Building i4. Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By '·,,,.,, Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: Space 1 COOLING DESIGN CONDITIONS HEATING Jan 6am 70 F DB 38 F DB SENSIBLE LATENT ------~-------------Peak Hour: Indoor conditions: Outdoor Conditions: LOAD COMPONENT Wall conduction Glass conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction i.'.. Interior Conduction ,.·. · Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES Btu/hr 1204 5760 536 539 0 0 926 0 0 8964 Btu/hr --------------Jul 1pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------17 375 257 399 0 0 0 0 2963 1043 1189 0 889 889 -----------7133 Btu/hr 889 0.6 tons 0.1 Heating: Cooling: 8964 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 7133 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 233 cfm 282 cfm SPACE HEATING & COOLING LOAD SUMMARY page 56 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associat~s, Inc Building Permit No \•~ation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date ----------------~----------~----~------------------------------------------ SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction (. Interior Conduction '-Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1204 5760 536 539 0 0 926 0 0 8964 Btu/hr Space 8 COOLING SENSIBLE LATENT --------------Jul 1pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------187 375 236 399 0 0 0 0 2963 1043 1189 0 889 889 -----------7281 Btu/hr 889 Btu/hr 0.6 tons 0.1 tons Heating: cooling: 8964 Btu/hr/ [1.10 * (105 F Supply·-70 F TStat)] = 7281 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= 233 cfm 288 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 57 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (r.cation: Carlsbad Date: 12/31/1987 Checked By '\.~ ·:;::,.., Documentation: PROCALC Date --------------------------------------------------------------------------- HVAC ZONE DESCRIPTION BVAC Zone Name: HVAC System Name: system Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 2 Space 3 Space 4 Space 5 Space 6 PEAK (Jan 6am) (Jan 6am) (Jan 6am) (Jan 6am) (Jan 6am) ~ace 7 (Jan 6am) ~ TOTAL SPACE LOAD Bypass Ventilation Air ( Supply Duct Conduction Supply Duct Leakage supply Fan Heat Gain 44 cfm) EFFECTIVE SPACE LOAD Ventilation ( 394 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 8211 8211 8211 8211 8211 8211 49263 1542 985 1971 0 53761 13876 1075 2150 -7638 63224 111156 ( ( Spaces 2,3,4,5,6 & 7 Rheem RPNC024J 6 Loads Office Heating Loads Office cooling Loads Office Fans COINCIDENT 50 ' COOLING PEAK SENSIBLE LATENT --------------(Jul 2pm) 6794 931 {Jul 2pm) 7491 931 (Jul 2pm) 6794 931 {Jul 2pm) 7491 931 {Jul 2pm) 6794 931 (Jul 2pm) 7491 931 --------------42853 5584 44 cfm) 241 56 857 1714 223 0 --------------45666 5864 394 cfm) 2168 503 913 1827 235 7638 --------------58212 6602 4.9 tons 0.6 tons 106965 36792 8.9 tons 3.1 tons SPACE HEATING & COOLING LOAD SUMMARY page 58 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ··cation: Carlsbad Date: 12/31/1987 Checked By Documentation: PROCALC Date ----------------~---------------------------------------------------------- SUMMARY OF PEAK BOOR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall conduction Glass Conduction Door Conduction Roof conduction Skylight Conduction Floor Conduction • Slab Conduction ~ Interior Conduction L Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr Space 2 COOLING SENSIBLE LATENT --------------Jul 2pm 78 F DB 50 I RB 83 F DB 67 F WB Btu/hr Btu/hr ------------67 401 252 424 0 0 0 0 2354 1119 1246 0 931 931 -----------6794 Btu/hr 931 Btu/hr 0.6 tons 0.1 tons Beating: cooling: 8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm 6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 269 cfm SPACE HEATI'NG & COOLING LOAD SUMMARY page 59 of 63 ---------------------------------------------------------------------------Project: Building 14 _Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ((.cation: Carlsbad Documentation: PROCALC Date: 12/31/1987 Checked By Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS ·Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight conduction Floor conduction Slab Conduction (tAinterior Conduction ~Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr Space 3 COOLING SENSIBLE LATENT --------------Jul 2pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------58 401 317 424 0 0 0 0 2995 1119 1246 0 931 931 -----------7491 Btu/hr 931 0.6 tons 0.1 Heating: Cooling: 8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l • 7491 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)}• Btu/hr tons 213 cfm 296 cfm· SPACE·HEATING & COOLING LOAD SUMMARY page 60 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 1··cation: Carlsbad Date: 12/31/1987 Checked By ... (\~,,~- Documentation: PROCALC Date --------------------------------------------------------------------------~ SUMMARY OF PEAK HOUR LOADS FOR SPACE space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor conduction • Slab Conduction { Interior conduction \ __ _. Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr SENSIBLE --------Jul 2pm 78 F DB 83 F DB Btu/hr ------67 401 252 424 0 0 0 0 2354 1119 1246 931 ------6794 0.6 Space 4 COOLING LATENT ------- 50 I RH 67 F WB Btu/hr ------ 0 931 . -----Btu/hr 931 Btu/hr tons 0.1 tons Heating: Cooling: 8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm 6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 269 cfm SPACE HEATING & COOLING LOAD SUMMARY page 61 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/31/1987 Checked By '\:./,.,.·:;,.-./ Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor conduction Slab Conduction (t• Interior conduction .\..: Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR OUANTITlES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr Space 5 COOLING SENSIBLE LATENT --------------Jul 2pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------58 401 317 424 0 0 0 0 2995 1119 1246 0 931 931 -----------7491 Btu/hr 931 Btu/hr 0.6 tons 0.1 tons Heating: Cooling: 8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm 7491 ~tu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 296 cfm SPACE HEATING & COOLING LOAD SUMMARY page 63 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checke.d By Documentation: PROCALC Date -------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR-SPACE Space Name: DESIGN CONDITIONS Pea-k Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor conduction Slab Conduction (.Interior Conduction :~ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY A!R QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr SENSIBLE --------Jul 2pm 78 F DB 83 F DB Btu/hr ------58 401 · 317 424 0 0 0 0 2995 1119 1246 931 ------7491 0.6 Space 7 COOLING LATENT ------ 50 I RH 67 F WB Btu/hr ------ 0 931 -----Btu/hr 931 Btu/hr tons 0.1 tons Heating: Cooling: 8211 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 213 cfm 7491 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 296 cfm •• '---~- SPACE HEATING & COOLING LOAD SUMMARY page 62 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Age~cy Designer: Banzuelo/Ri•rson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/31/1987 Checked By ' \-.:~.,_;-)" Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE space Name: DESIGN CONDITIONS Peak Bour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof conduction Skylight Conduction Floor conduction • Slab Conduction \ 1 Interior conduction -~ Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 793 5349 536 564 0 0 969 0 0 8211 Btu/hr Space 6 COOLING SENSIBLE LATENT --------------Jul 2pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------67 401 252 424 0 0 0 0 2354 1119 1246 0 931 931 -----------6794 Btu/hr 931 0.6 tons 0.1 Heating: Cooling: 8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 213 cfm 269 cfm TITLE 24 REPORT FOR: Building 15 El Fuente Business Park Carlsbad, California PROJECT DESIGNER: Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 OWNER: Davison-Jones Development 411 campus Drive, Suite 830 I_FVine, CA 92715 . REPORT PREPARED BY: PROCALC 705 s. Velare st. 110 Anaheim, CA 92804 1-(800) TITLE-24 Job Number: T499E Date: _12/30/1987 The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. The program has interim /;.approval and is authorized by the California Energy Commission for use with \.:~--_., the Second Generation Nonresidential Building Ener~y Efficiency Standards. r '{.\ , .. ••••• i' ~~ Table Of contents for Title 24 Report cover Page ..........•.......................•..•.....•........••..... Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form CF-1 Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . l 2 3 5 Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7 Form CF-2 Envelope Summary & Worksheet •••••••••••••••••••••••••••••• 9 Form SCM Performance Run • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 52 Form CF-4 HVAC Power Indices summary •••••••••••••••••••••••••••••••• 58 Form ws-4 HVAC System summary Sheets ...........................•..... 60 Form CF-5 Lighting Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 HVAC Zone & Space Loads summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 62 Certificate of Compliance (Part 1 at 2) Pro1ec: 1 • # q :6M1-t:1c le /ei4-Cso ID'<lf:£ Building Permit Number- I Plan Chockod By 7 cliiiiaie Zone Cily/Town Pr:RaGAkG: 1de1/~7 O'ccumentaifcn Author Cate Prescriptive Approach/Performance Approach Strategy General 1 CECOccupancyType •••••••••• Off;~ 2 use Occupanc'f Group/Division • • • . • • s,-:z.. 3 PadcagaSefectad •••••••••.••• &f. 4 Gress Condilionad Rocr Area • • • • · • • :ZkS1c: ft2 Reef and Frocra; 5 ' Proposed RccUCeilfng Rt (CF-2. CF-3) • • 'ZR 1 'i hr-F-ftZ.BIU 6 .. Requirad Roof/Ceiling Re (CF-2) • • • • • ---hr-F-rtZ.SIU 7 Proposed EJciaricr Roar Rt (CF-2. CF-3) • hr-F-ft2/etu 8 Required Extarfcr Floor Rt (CF-2) • • • • • hr-F-rt2/a!U Walla, 9 · Proposed Opaque Wall Rt ccr:-2.·cF-3). • W· W hr-F-rtZ.SIU 10 Wall Heat Capadt-J (CF-3) • • • • • • • • 1,, '4 BtulF-ft2 (•=:.paqua Wall Rt (CF-2) • • • • • __ hr-F-ftZ.Stu ' ·12 Exterior Wall Area (CF-2) • • • • • • • • ~p nz 13 Total ~ !na (CF-2) • • • • • • • • I WU? rt2 14 Proposed Total Ptre8nt (1Jne 13 / Une 12) • %'5'· 7 % 15 Awrage :rota1 SC (CF-2) • • • • • • ••• e ·+'=' 18 AltowedTotaJ Gtazing Percent •••••• ___ % 17 Wut ~ Wal Area (CF-2) • • • • • • \'9U ft2 18 West !,31azlno Area (CF-2) • • • • • • • • ) fp zc, ft2 19 PropcsedWutParcant(CF-2). • • • • • \Oo % 20 Av.rag~ West SC (CF-2) • • • • • • • • o . 4;;'1 21 Allcwed West Glazing Parcant • • • • • • % Gia:fng fn Roof (CJ'.6) Proposed Allowod 22 S,kyll;h&1 • • • • • • • • • __ _ 23 SkyD';ht 2 • • • • • • • • • --- 24· Skyll;ht3 •.•••••••• --- 25 Skylight<& • • ••• ; ••• --- 28 Slcyll;ht5 ••••••••• __ _ tr Skyll;ht S • ·• • • • • • • • __ _ 28 Skylght 7 • • • • • • • • • --- 29 St<-/l;ht a • • .. • • • • • • __ _ Ugbtrng ---ft2 ---ft2 ___ ftZ ---ft2 ---ft2 ___ rt2· ·---ft2 ---ft2 30 Proposed Ad{usted LPO (CF-5) • • • • • • I ,4c WatWft2 :S1 Allow9d I.PO (CF-S) • • • • • • • • •• ---Wattsnt2 HVAC 32 PlrfcnnanceSetSelected •••••••• __ _ ;:,.Proposed FCI'\ Wactage Index (CF-4) • • • ,e ,CJ (q Wattslft2 \:-.... . All~d Fan W~e Index • • • • • • • ___ Wattstrt2 '.~ Proposed C<,clJng Power Index (CF-4) • • • 7'2', 1 <, fftuMt2 38 AllcwedCoaang Power Index • • : • • • ___ Btuhlrt2 37 Proposed Heating Power Index (CF-4) • • .?;M •'-"? 8tuMt2 38 Allowed Heating Power Index • • • • • • .__ __ ·siuMt2 F~ Revised September 1986 CF-1 For Enforcement Agency Use Only (µ,~ Calo ~-Z.'Z-C\-;6 Field Checked By Oata ~ .. ,Z.C,~tz,tz-') .~IUntand Ragfstrallcn Stamp Approved By Cale Performance Approach Energy Budget 1 CEC Occupancy type . . . . . . . . . .Of6·cc 2 USC Occupancy Grcup/Oivision • • • • • ?z ... :k 4 Condillonod Roor Aroa • • • • • • • • • ,i<eea, ft2 4 Bucfgot Tablo • • • • • • • • • • • • • .$-I A. 5 Allowed Energy Budgat(WS-tA) • • • • • I SJ .0 k8lulyr-lt2 Cafculated Annual Energy Consumption 6 Approved Calculation Method • • • • • • M(, "2r1P'-'"1' '%-4- 7 CEC Designation • • • • • • • . • • • • L,,Po Q:t 8 Mufllpller • • • • • • • • • • • • • • • • I , Q'Z,1 Estimated Energy Uae 9 Heating • • • • • , • , • • • • • • • • 6, c:;• k8tt.ll'Jr-ft2 10 Cooling • • • • • • • • • • • • • • • • ?t,, ;!> k8tu,yr-rt2 11 Fans • • • • • • • • • • • • • • • • • 44 .S k8tulyr-ft2 12 Ughts • . • • • • • • • , • • , • • • ~.. d;k. '-t k8tulyr-ft2· 13 MiscaDaneous Equipment • , • • • • ~ )Sa ::'t k8lulyr-ft2 14 Total •. • • • . • • • • • • • • • • • • • ___ kBtu,yr•ft2 15 AclJ. Total Energy Use (lifte 8 ,c lina N) ••• \"31 :1 kStulyr-ft2 ~Adj~~ . Compliance Statement General. The proposed building represented In this set of ccmplianee documentation Is consistent wilh the other ccmpllanc:e fcnns and wcrksheets, with the plans and specilicallons and with any other c:alcufalicns er computor runs submitted with this permit applic:.alion. Performance Approach. (when applicable) The energy performance astimale presented on lhis form was calculated using the approved calculation method Indicated above and with the cec established fixed and rastric:ted engineering Inputs for the applicable climate zone at1d occupancy type. Prucrlpllve Approach. (when appllc:able) The proposed building has bean designed to mHC lhe requirements of the Altamalive Component . Package indicated above for Iha appropriate occupanC'f type and climate ~}Ulg NamefT'ltle AH?: urJq M mm Telephone Calif. Uc:ense Number ven:n1cate o-r Compliance· (Part 2 of 2) CF-· For Enforcement Agency Use Only _ -Oocumentalfon AulhorlF'irm Cata · cfiec:kid By c;··-t--------------Oa,e ' ~\.~,, . · Both parts one and two of lhis Certificate of Complfanca must be lnefuded with each building pennit appfication for the above noted building and appe, on lhe ·plans submitted for approval. The building.fealUres and reqµlrements represented on the Cenificate of CompUance are adequate to ac:nie•, complfanca with Iha second generation nonresidential energy standards for the building referenced above. The buildfrig features and requiremencs a: also ~ for arr/ subsequent alterations, modifications or additions to Iha building. - Des1gner One Name (Print) Til.la/Company Name Addtass Signatura Cata -Enf-. -orcem--ent_Ag_e_ncJ __ S_ig_na_lU_re ________ O,...aro ____ _ __ · Name (Print) .-. . JZrotc\Htil?: Lhttv V~\,\M 1@ iUe/Ccmpa,lY Name' I Addrass Data Cara Owner Name (Print) • · lille/C<lfflpony Name Dara ••• {/ \.;_. Form Revis.:! S.ptamber 1986 -. Enlotcoment AgonCJ slgnatwe Deargner Four Name (Print) Tide1Company Name Slgnaiure Enlorcament AganCJ Signature Enforcement Agency Name (Print) Tido/Agency Address Cata Oaut pace Oata Paga_ot __ CERTIFICATE OF COMPLIANCE (part l of 2) CF-1 page 3 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad Documentation: PROCALC Date: 12/30/1987 Checked By Date --------------------------------------------------------------------------- PERFORMANCE APPROACH Roofs and Floors Roof/Ceiling Rt (CF-2,3) R-20.5 Ext. Floor Rt (CF-2,3) R-0.0 Walls Opaque Wall Rt (CF-2,3) R-6.6 Energy Budget CEC Occupancy Type Conditioned Floor Area Total Number of Floors Climate Zone Heat Capacity (CF-2,3) 2.6 BC Energy Budget (WS-lA) Lighting Adjustment (CF-5) Energy Compliance Budget Office 2682 1 7 157.0 o.o 157.0 Glazing in Walls Exterior Wall Area (CF-2) Total Glazing Area (CF-2) Total Glazing Percent Average Total SC (CF-2) West Exterior Wall (CF-2) West Glazing Area (CF-2) West Glazing Percent Average West sc tAazing in Roof \ .;,.,;-Skylight Area ( CF-2) Lighting 6300 1620 25.7 0.46 1620 1620 100.0 0.46 0 sf sf I SC sf sf I SC sf Calculated Annual Energy Consumption Approved Calculation NR COMPLY 24 Program Version Number 1.14 Oser License Number 1329 CEC Designation CPO 07 CEC Multiplier 1.027 Estimated Heating Cooling Fans Energy Use (KBtu/sqft-yr) 8.5 36.3 44.5 Proposed Adjusted LPD (CF-5)1.40 w/sf Adjustment Lights Receptacle 89.4 X 1.027 • 91.8 46$9 16.8 1.4 156.9 HVAC Fan Wattage Index (CF-4) 0.96 Cooling Power Index (CF-4) 72.76 Heating Power Index (CF-4) 59.66 COMPLIANCE STATEMENT Hot water w/sf Total (SCM-3) Btuh/sf Btuh/sf The proposed building represented in this set of compliance documentation is consistent with the other compliance forms and worksheets, with the plans and specifications and with any other calculations or computer runs submitted with this permit application. The energy performance estimate presented on this form was calculated using the approved calculation method indicated above and with the CEC established fixed and restricted engineering inputs for the applicable climate zone and occupancy type. (.GNED ----------------Calif. License I: ____ _ \.. "··:;;·" -DESIGNER Banzuelo/Rierson/Duff & Associates, Inc 4501 East La Palma Avenue, Suite 202 Anaheim, CA 92807-1907 (714) 777-0666 CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-1 page 4 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer-: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No f:.cation: Carlsbad Date: 12/30/1987 Checked By :-,.. . -. , Documentation: PROCALC Date --------------------------------------------------------------------------- Both Parts one and two of this Certificate of Compliance must be included with each building permit application for the above noted building, and appear on the plans _submitted for approval. The building features and requirements represented on the Certificate of Compliance ·are adequate to achieve compliance with the second generation nonresidential energy standards for the building referenced above. The building features and requirements are also adequate ~or any subsequent alterations, modifi- cations or additions to the building. PROJECT TITLE Building iS El Fuente Business Park Carlsbad, California - OTHER DESIGNER Name: Address: City: Signed: OWNER Davison-Jones Development 411 Campus Drive, Suite 830 Irvine, CA 92715 DOCUMENTATION AUTHOR PROCALC 705 s. Velare St. 110 Anaheim, CA 92804 1-(800) TITLE-24 ~I ) Signed: (_---/~( · - OTHER Name: Address: City: Signed: =•=======••==•==== ENFORCEMENT AGENCY Name: Agency: City: Signed: MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page 5 of 74 ------------------------------------------------------------------------~--Project: Building ts Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By '-.. :-_,\/ Documentation: PROCALC Date --------------------------------------------------------------------------- ENVELOPE MEASURES o Certified Insulation Materials per Sec. 2-53ll(a) o Insulation Installed to meet Flame Spread and Smoke Deqsity Requirements·of Sec. 2-53ll(b) o Orea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c)· o Retrofit Insulation specifi~d per Sec. 2-5313 o Air Infiltration is minimized by specification of tested manufactured doors and windows and proper sealing and weatherstripping per sec. 2-5317 LIGHTING SYSTEM MEASURES o Certified Luminaires/Ballasts per Sec. 2-5314(b) (.Independent Control within enclosed Areas per Sec. 2-5319(a) o Manual Switching Readily Accesible per Sec. 2-5319(b) o Reduction of Lighting Load to at least 50% per sec. 2-5319(c) (Occupancy Sensors or Programmable Timers meeting CEC Criteria may Substitute) o Separate Switching of Daylit Areas per Sec. 2-5319(d) o Separate Switching of Display and Valance Lighting in Retail/Wholesale occupancies per Sec 2-5319(h) o Automatic Control of Display Lighting in Retail/Wholesale Occupancies per Sec. 2-5319(h) o Tandem Wiring of land 3 Lamp Luminaires per Sec. 2-5319(h) OCCUPANCY SENSING DEVICES (when applicable) o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 , ,. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319 ( e). 3 \i\,i Limits on Emmisions per exceptions to Sec •. 2-5319(e) Reference MANDATORY FEATURES CHECKLIST (part 2 of 2) Project: Building iS MF-l page 6 of 74 Designer: Banzuelo/Rierson/Duff & Associates, Inc i,:.cation: Carlsbad · Date: 12/30/1987 \· Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -------------------------------------------------------------------~------- DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable) o Uniform Illumination reduction to 50% per sec. 2-5319(e).l o Flicker Free Operation and no Premature Lamp Failure per Sec. 2-5319(e).2 o Time Delays to Prevent Undesirable cycling per Sec. 2-5319(e).3 o Step switching Devices with Separation between On/Off Settings per Sec. 2-5319(e).4 o Photocell Sensors shall be Diffusing type and no Opaque Cover allowed per Sec. 2-5319(e).5 o Manufacturer's Instru~tions provided for Installation and Calibration per Sec. 2-5319(e).6 o Proper Installation of Controls including sensor Location, ..• certification of Initial Calibration and control of Luminaires (L~j only within Daylit Areas per Sec. 2-5319(e).8 Reference o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _ BVAC AND PLUMBING SYSTEM MEASURES o Piping Insulated as per Sec. 2-5312 o Certified HVAC Equipment per 2-5314(a) o Certified Plumbing Equipment per 2-5314(a) o Heating and Cooling Equipment efficiency per Sec. 2-5314(b) o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c) o Automatic Controls for Off-Hours per Sec. 2-5315(a) o Thermostat Set Point Requirements per Sec. 2-5315(b).l o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2 o Automatic Exhaust Fan Dampers per Sec. 2-5316(b) .Thermostat Controls for Each Zone per Sec. 2-5315(b) ·· .... o Ventilation Provided per secs. 2-5316 & 2-5343 o Water Heaters for Domestic Hot Water and Pools per sec. 2-5318 ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :•cation: Carlsbad Date: 12/30/1987 Checked By \. -~\~~ ~ Documentation: PROCALC Date --------------------------------------------------------------------------- CLIMATE ZONE 7 ENERGY BUDGETS Cross Floor· Sectional Office Retail No . Area Budget Budget ,. --------------------------1 2682 157 186 BUILDING ENERGY COMPLIANCE BUDGET BY SPACE Occupancy Floor Flr Space Name Type Area Mult Total Budget Energy Floor (I<Btu Budget Area /sqft) (MBtu) ------------------------------------------------------1 Space 1 Office 139 X 1 -139 X 157 = 21.8 1 Spaces 2 & 3 Office 318 X 1 -318 X 157 • 49.9 1 Spaces 4 & 5 Office 278 X 1 -278 X 157 = 43.6 1 Spaces 6 & 7 Office 318 X 1 -318 X 157 = 49.9 1 Spaces 8 & 9 Office 278 X 1 = 278 X 157 = 43.6 1 Spaces 10 & 11 Office 318 X 1 = 318 X 157 • 49.9 <I Spaces 12 & 13 Office 278 X 1 = Spaces 14 & 15 Office 318 X 1 = Spaces 16 & 17 Office 278 X 1 = 278 X 157 = 43.6 318 X 157 = 49.9 278 X 157 • 43.6 1 Space 18 Office 159 X 1 = 159 X 157 = 25.0 -----------TOTALS 2682 421.l BUILDING COMPLIANCE BUDGET 421.1 MBtu / 2682 sqft = 157.0 KBtu/sqft ENERGY BUDGETS WORKSHEET (part 2 of 2) ws-lA page 8 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc (.cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By . :~::.:.:., ,;;_,'' Documentation: PROCALC Date --------------------------------------------------------------------------- BUILDING ENERGY CONSUMPTION BY SPACE Total SCM Energy Energy Floor Floor Estimate use Flr Space Name Area Mult Area ·c KBtu/sqft) (MBtu) --------------------------------------------------1 Space 1 139 X 1 = 139 X 179.9 = 25.0 1 Spaces 2 & 3 318 X 1 = 318 X 153.7 -48.9 1 Spaces 4 & 5 278 X 1 = 278 X 155.9 -43.3 1 .spaces 6 & 7 318 X 1 = 318 X 153.7 = 48.9 1 Spaces 8 & 9 278 X 1 = 278 X 155.9 -43.3 1 Spaces 10 & 11 318 X 1 = 318 X 153.7 -48.9 1 Spaces 12 & 13 278 X 1 = 278 X 155.9 -43.3 1 Spaces 14 & 15 318 X 1 -318 X 153.7 -48.9 1 Spaces 16 & 17 278 X 1 = 278 X 155.9 -43.3 1 Space 18 159 X 1 = 159 X "168. 3 -26.8 -----------TOTALS 2682 420 .. 7 BUILDING ENERGY CONSUMPTION 420.7 MBtu / 2682 sqft = 156.9 KBtu/sqft cf' AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad Date: 12/30/1987 Checked By ... ,,:...-;~,---' / Documentation: PROCALC Date --------------------------------------------------------------------------- ROOF AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Roof-l Roof-2 1800 882 1800 882 ---------------------------------------------------------------------------TOTALS 2682 2682 ROOF R-VALOE Area/ Type Assembly Name Area R-Value R-Value ----------------------------------------------Roof-l R-19 B/O with T-Bar 1800 21.04 85.54 Roof-2 R-19 B/U with Gyp. Clg. 882 19.40 45.47 -------(. Average R-Value 2682 I 131.00 • 20.47 ROOF GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------NONE ---------------------------------------------------------------------------TOTALS 0 ·. AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ((.cation: Carlsbad Date: 12/30/1987 Checke!l By { ... -~::.·.·' ·' Documentation: PROCALC Date --------------------------------------------------------------------------- ELEVATION AREA BY ORIENTATION N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------1620 1530 1620 1530 6300 -------------------------------------------~------------------------------- OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW Int TOTALS ---------------------------------------------------------------------------Wal-1 Wal-2 Wal-3 1260 360 1197 153 180 1197 153 180 3654 306 720 ---------------------------------------------------------------------------TOTALS 1620 1530 1530 4680 ~AQOE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY Area/ Area •-~"Type Assembly Name Area R-Value HC R-Value X HC ------------------------------------------------Wal-1 5/8 Gyp/R-11/Gyp WF 3654 10.19 1.4 359 5057 Wal-2 6.5" Conc/R-11/Gyp.Brd. 306 10.34 17.4 30 5321 Wal-3 solid Wood Door 720 2.22 2.4 324 1720 ------------Totals 4680 713 12098 Average R-Value 4680 I 713 • 6.57 Average HC 12098 I 4680 • 2.59 AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc ::~•ocation: Carlsbad Date: 12/30/1987 ·\~};./ Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- GLAZING AREA BY TYPE AND ORIENTATION Type N NE E SE s SW w NW TOTALS ------------------~--------------------------------------------------------Wind-1 1620 1620 -----------------------------------------~---------------------------------TOTALS GLAZING O-VALUE AND SC Type Wind-1 I~ 1 · .. , 'J \ ' , 1 .. ·. ,.,_,~, •••• l. : Assembly Name --------------------------Sunglass Blue Plate Totals Average u-value Average SC Area 1620 1620 1841 I 745 I 1620 1620 Area x Area U-Value SC o-value X SC --------------1.14 0.46 1841 745 ------------1841 745 1620 -1.14 1620 = 0.46 SCM INPUT DATA SUMMARY (part l of 2) Projec~: Building IS Designer: Banzuelo/Rierson/Duff & Associates, Inc tc.ocation: Carlsbad Date: 12/30/1987 SCM-1 page 12 of 74 Enforcement Agency Building Permit No Checked By '-:·,.~·~~~,,, Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southwest Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALOES (including inside film resistance) Wall Window ·Roof Door c! Floor BVAC SYSTEM BVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL Beat Capacity of Exterior Wall Li9hting Power Climate Zone Space 1 347.0 sqft 81.0 sqft 139.0 sqft 40.0 sqft o.o sqft 139.0 sqft 139.0 sqft 10.25 0.88 20.43 2.22 o.oo carrier 52BA3093 1 Heat Pump BP w/Economizer Electric Resistance 2.100 0.soo 0.990 No 1060 watts 143 watts 2ao· CFM 7.82 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 13 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc. Building Permit No i 1.ocation: ~arlsbad Date: 12/30/1987 Checked By \:,~;~/.:: Documentation: PROCALC Date ----------------------------------------~---------------------------------- OTHER PHYSICAL PARAMETERS ·Wall Absorptivity Roof Absorptivity Ceiling Height 0.31 0.70 9.0 ft Glass Framing Shading Device overall SC SHADING COEFFICIENTS Southwest OVERHANGS & SIDEFINS Southwest • ECIAL FEATURES { --------------'k~,/ Daylighting Strategies : .•. • '· ! SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 9.0 Overhang Height Depth 0.40 Side-Fin Distance Depth ------------- No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 74 --------------------------------------------------------------------------~ Project: Building iS , Designer: Banzuelo/Rierson/Duff & Associates, Inc '{.cation: Carlsbad Date: 12/30/1987 ...... ·:;.~;~· ' Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Space 1 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night (. \_.;;,,~.,./ Number of Holidays per Year: Heating Season Cooling Season Thermostat Set Point Temperatures: Winter Winter Setback summer Summer Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate CU-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .· '..Occupant Density: \.~·--·::~ /. 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No '., .• cation: Carlsbad Date: 12/30/1987 Checked By \:.:,_a·./ "·..:...,>-- Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Space l BALANCE POINT TEMPERATURES AND DEGREE DAYS =====•==========•========================= Daytime Nighttime ------------------------------BPTl -56.0l (Winter) -BPTl BPT2 -64.31 (Summer) BPT2 BPT3 = 71.59 (Economizer) BPT3 BOD = 72 (Beating) BOD CDD -350 (Cooling) CDD BUILDING BEAT TRANSFER (Btu/hr-F) ==•==•=•========================= Building Envelope Beat Transfer Rate: overall Beat Transfer Factor cnK"): Winter summer Winter summer ANNUAL LOADS (MBtus) -----=========•=•••• = = = = = 67.89 76.09 77.10 3231 0 • • -• (• . ...;.,,,:, Beating -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •======•=••======•==••==•=•===•==••===• Site Beating Site Cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ----====•==========•======•=•=•=========••=== Source Beating source Cooling source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Bot Water ---- 9.0 55.1 47.7 -----111.9 X 1.027 - ------ ---= 124.8 126.0 201.6 196.7 1.0 1.7 ·0.4 2.6 2.2 2.2 a.a 0.1 114.9 46.9 16.8 1.4 ········===•===•==••=•=•==========••=•=•===•=••=••=======••••==•===•=~==•= . · .. ,./ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 179. 9 KBtu/sqft ••=•==•=•=••=•••••=•=•••==••=••••=••===··········=························- SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 74 ---------------------------------------------------------------------------Project: Building #5 . ,, ~esigner: Banzuelo/Rierson/Duff & Associates, Inc · (~cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By '\ ~/:,..~;,- Documentation: PROCALC Date -------------------~------------------------------------------------------- Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof Door (;, ... Floor ,(.~ '{_l,: ... :.'? HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Beating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Spaces 2 & 3 424.0 sqft 198.0 sqft 318.0 sqft 80.0 sqft o.o sqft 318.0 sqft 318.0 sqft 10.19 o.00 20.51 2.22 o.oo Carrier 52BA3093 16 Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load Summary for more details on the zoning arrangement. GENERAL •Heat Capacity of Exterior Wall /: , • Lighting Power \:,~: Climate zone 1.54 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 17 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No \.ocation: Carlsbad Date: 12/30/1987 Checked By -x..-... .,, .. ) Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing Shading Device SHADING COEFFICIENTS southwest OVERHANGS & SIDEFINS southwest SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 22.0 overhang Height Depth o.oo 0.70 9.0 ft overall SC 0.40 Side-Fin Distance Depth --------____ ..., No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc <:.cation: Carlsbad Date: 12/30/1987 \' .. ·.:: .. f" Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Spaces 2 & 3 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans · Water Heater Number of Non-Operational Hours per Week: Day Night (.Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: :.Occupant Density: Heating Season Cooling Season Winter Winter setback Summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: ,.ocation: Banzuelo/Rierson/Duff & Associates, Inc Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By 't -,-.'} ·, ~;, .. :,., ~. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 2 & 3 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 55.67 (Winter) BPTl BPT2 = 63.82 (Summer) BPT2 BPT3 = 71.26 (Economizer) BPT3 BOD = 62 (Beating) BDb CDD = 377 (Cooling) COD BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Beat Transfer Rate: Winter Summer Overall Heat Transfer Factor ("K"): Winter cl Beating Cooling summer ANNUAL LOADS (MBtus) -----·========•===== = 67.85 = 76.04 = 77.07 = 3216 = 0 • • • - -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Beating Site Cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Beating Source Cooling source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Hot Water ---- 8.4 33.3 44.5 -----86.3 X l.027 • ----- • --- 256.5 259.4 432.2 421.2 2.2 3.9 0.9 3.5 4.7 5.0 l.8 0.l 88.6 46.9 16.8 1.4 t········===•===========================================•==•=====-========·-- \:,, _ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 20 of 74 ------~--------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ·(·cation: Carlsbad Date: 12/30/1987 Checked By Documentation: PROCALC Date -------------------------------------------------------------------~------- Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) ------------~------------------------------Wall Window Roof Door .. -•. Floor (~ HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Spaces 4 & 5 388.0 sqft 162.0 sqft 278.0 sqft so.a sqft o.o sqft 278.0 sqft 278.0 sqft 10.19 0.88 20.43 2.22 0.00 Carrier 52BA3093 16 Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM •· Note: 8 Spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & cooling Load summary for more details on the zoning arrangement. GENERAL • Heat capacity of Exterior Wall ; l Lighting Power '-~·., Climate Zone 1.56 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 21 of 74 --------------------------~------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No <,.cation: Carlsbad Date: 12/30/1987 Checked By \' .. ,,_,,, ~' ,-,;.:< Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing Shading Device SHADING COEFFICIENTS southwest OVERHANGS &. SIDEFINS Southwest sc Factor Winter summer 0.46 0.880 Window Height Width 9.0 18.0 Overhang Height Depth 0.00 0.70 9.0 ft overall SC 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPOT DATA SOMMARY SCM-2 page 22 of 74 ---------------------------------------------------------------------------Project: Building 15 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ' (f..ocation: Carlsbad Date: 12/30/1987 Checked By ,;,.:::·,'/ Documentation: PROCALC Date ·--------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDOLING Occupancy Level for Operational Period: Spaces 4 & 5 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night ~ Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAME~ERS Infiltration Rate: Slab Floor Heat Loss Rate co-value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: ,,.occupant Density: .\zj Heating Season Cooling Season Winter Winter Setback summer summer setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 74 ---------------------------------------------------------------------------Project: Building IS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: _12/30/1987 Checked By Documentation: PROCALC Date ---------------------------------------------------------------------------· Space Name: Spaces 4 & 5 BALANCE POINT TEMPERATURES AND DEGREE DAYS =•=••==•================================== Daytime Nighttime ------------------------------BPTl = 55.97 (Winter) BPTl BPT2 = 64.13 (Summer) BPT2 BPT3 = 71.45 (Economizer) BPT3 HOD = 71 (Heating) HOD COD = 361 (Cooling) COD BUILDING HEAT TRANSFER (Btu/hr-F) Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): . Winter summer Winter Summer (. Heating Cooling ANNUAL LOADS (MBtus) •==••=====•=•===•==• = = = = = 67.88 76.07 77.09 3225 0 -= -- -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==•••======••••=•====•===•=•==•============== Source Heating Source Cooling Source Fan Total Space Conditioning Energy source Lighting Source Receptacle Source Hot Water ---- 8.5 35.4 44.5 -----88.5 X 1.027 ------ --= - 220.7 223.0 374.3 364.5 2.0 3.3 a.a 3.3 4.1 4.3 1.6 0.1 90.9 46.9 16.8 1.4 ;' ,.----======•==============•=•==••••========•==============-==-==-===•===••==• ~ ' . ) ·-._··~ " TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft =••=•=-=•====-=============•=======••========•====•================•==•=-===•• SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 74 -----------------------------------------------------------------------~---Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By ·-'"I.';~_;;'../ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof Door --;A .. Floor (~ HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type cooling Equipment Type Water Heating Equipment Type Rated Beating Efficiency Rated-cooling Efficiency Rated Water Heating Efficiency Economizer cooling Equip~ent Power Rating Fan Power · Air Circulation Rate Spaces 6 & 7 424.0 sqft 198.0 sqft 318.0 sqft 80.0 sqft o.o sqft 318.0 sqft 318.0 sqft 10.19 0.88 20.51 2.22 0.00 Carrier 52BA3093 16 Heat Pump BP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this HVAC System. Please refer to the attached HVAC zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL • Heat Capacity of Exterior Wall .\. . Li~hting Power '-,>,,,, Climate Zone 1.54 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By . \.~":.·:./ Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS Wall Absorptivity Roof Absorptivity Ceiling Height Glass Framing Shading Device SHADING COEFFICIENTS --------------------southwest OVERHANGS & SIDEFINS southwest SC Factor Winter summer ------------------------ 0.46 0.880 Window Height Width 9.0 22.0 overhang Height Depth o.oo 0.70 9.0 ft overall SC 0.40 Side-Fin Distance Depth ------------- No Daylighting Controls ,. ~ ( . / \__: ,1--~- SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of'74 ---------------------------------------------------------------------------Project: Building IS Designer: Banzuelo/Rierson/Duff _& Associates, Inc Enforcement Agency Building Permit No , ').cation: Carlsbad . .__. _. ;-·I ~ ... ~ ...... Documentation: PROCALC Date: 12/30/1987 Checked By Date ----------------------~-----------~---------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Spaces 6 & 7 Office. Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours (.Number of Holidays per Year: Thermostat. Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (O-Value): INT~RNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: occupant Sensible Load: Occupant Latent Load: i;.Occupant Density: \..:.s.-,, Heating Cooling Winter Winter summer · Summer Night Season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page ·27 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By '1~ . , ;,:, ' ... ':.. ... ,,,"J_..,;.1 Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 6 & 7 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl -55.67 (Winter) BPTl = BPT2 = 63.82 (Summer) BPT2 = BPT3 = 71.26 (Economizer) BPTJ = HDD = 62 (Heating) HDD = CDD -377 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) ------=========================== Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter Summer Winter summer cl Heating Cooling Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL LOADS (MBtus) ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= 67.85 76.04 77.07 3216 0 ---- -- = ----- ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Hot Water --- = 8.4 33.3 44.5 -----86.3 X 1.027 = --- 256.5 259.4 432.2 421.2 2.2 3.9 0.9 3.5 4.7 5.0 1.8 0.1 88.6 46.9 16.8 1.4 .• ----=-===============================================••========•======•=• ~::.:>" TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft --===•====================================================================• SCM INPUT OATA SUMMARY (part l of 2) SCM-1 page 28 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By ·~ ~ .,,.. Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) -------------------------------------------Wall Window Roof Door Spaces 8 & 9 388.0 sqft 162.0 sqft 278.0 sqft 80.0 sqft o.o sqft 278.0 sqft 278.0 sqft • Floor ( ,.. ... ~ .... 10.19 0.88 20.43 2.22 o.oo BVAC SYSTEM BVAC Equipment Name (CF-4) Number of systems Beating Equipment Type Cooling Equipment Type water Beating Equipment Type Rated Beating Efficiency Rated Cooling Efficiency Rated Water Beating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Carrier 52BA3093 16 Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this BVAC System. Please refer to the attached HVAC Zone Beating & Cooling Load summary for more details on the zoning arrangement. GENERAL • Beat Capacity of Exterior wall (r Lighting Power ,,::_ Climate Zone · 1.56 1.400 watts/sqft 7 SCM INPUT DATA·SUMMARY (part 2 of 2) SCM-1 page 29 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No /.cation: Carlsbad Date: 12/30/1987 Checked By \.::_._~·.,"' Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height o.oo 0.70 9.0 ft Glass Framing Shading Device overall SC SHADING COEFFICIENTS southwest OVERHANGS & SIDEFINS Southwest SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 18.0 Overhang Height Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 74 ---------------------------------------------------------------------------Project: Building i5 Designer: Banzuelo/Rierson/Duff & Associates, Inc 'r.cation: Carlsbad · Date: 12/30/1987 Enforcement Agency Building Permit No Checked By '-,.-.:.,,· Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING occupancy Level for Operational Period: Spaces 8 & 9 Office Day 54.60 % Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours (. \ '·· '.;I · .,,,:,, Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: , 1 .0ccupant Density: \,.1::-,:· .-' Night Heating season Cooling Season Winter Winter Setback summer Summer Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By , .. _. -~,..,~ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 8 & 9 BALANCE POINT TEMPERATURES AND DEGREE DAYS =•======================================== Daytime Nighttime ------------------------------BPTl = 55.97 (Winter) BPTl BPT2 = 64.13 (Summer) BPT2 BPT3 = 71.45 (Economizer) BPT3 HDD = 71 (Heating) HOD COD = 361 (Cooling) COD BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter summer · overall Heat Transfer Factor ("K"): Winter c9 Beating Cooling summer ANNUAL LOADS (MBtus) ---==============•== = = = = = ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site cooling Site Fan ·•====•==•==•===•=====•================= Site Lighting Site Receptacle Site Hot water 67.88 76.07 77.09 3225 0 = --- -= ------ ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting Source Receptacle source Hot Water ---- 8.5 35.4 44.5 -----88.5 X l.027 = --- 220.7 223.0 374.3 364.5 2.0 3.3 0.8 3.3 4.1 4.3 1.6 0.1 90.9 46.9 16.8 1.4 {•==================================================================·------ \:~,_/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155.9 KBtu/sqft -------===========================•=========================•============== SCM INPUT DATA SUMMARY (part l of 2) scM-l page 32 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc ,--~ocation: Carlsbad . Date: 12/30/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window Roof Door , . ._. Floor (\7:!Jf HVAC SYSTEM HVAC Equipment Name (CF-4) Number of Systems Heating Equipment Type cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Spaces 10 & 11 424.0 sqft 198.0 sqft 318.0 sqft 80.0 sqft o.o sqft 318.0 sqft 318.0 sqft 10.19 0.88 20.51 2.22 o.oo Carrier 52BA3093 16 Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL • Heat Capacity of Exterior Wall ,r ... Lighting Power \.::.>/ Climate zone 1.54 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 74 ---------------------------------------------------------------------------Project: Building ts Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By ·~ -.... ,: (. Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height o.oo 0.10 9.0 ft Glass Framing Shading Device overall SC SHADING COEFFICIENTS southwest OVERHANGS & SIDEFINS ---------~----------southwest (, ··- SC Factor Winter Summer 0.46 0.880 Window Height Width -----------9.0 22.0 overhang Height Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 74 ---------------------------------------------------------------------------Project: Building ts Designer: Banzuelo/Rierson/Duff & Associates, Inc <&cation: ·carlsbad Date: 12/30/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: Spaces 10 & 11 Office SCHEDULING Occupancy Level for Operational Period: Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: Day Night . if. ~'¼::,· Number of Holidays per Year: Heating Season Cooling Season Thermostat Set Point Temperatures: Winter Winter Setback summer Summer Setup PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate cu-value): INTE~NAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant sensible Load: Occupant Latent Load: : .• Occupant Density: \~,.-,,, 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 74 ---------------------------------------------------------------------------Project: Building i5 ·Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No /1.cation: Carlsbad Date: 12/30/1987 Checked By \;_,:>' Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 10 & 11 BALANCE POINT TEMPERATURES AND DEGREE DAYS -------=================================== Daytime Nighttime ------------------------------BPTl = 55.67 (Winter) BPTl BPT2 = 63.82 (Summer) BPT2 BPT3 = 71.26 (Economizer) BPT3 HDD -62 (Heating) HDD CDD = 377 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) -------======•===========•======= Building Envelope Heat Transfer Rate: overall Heat Transfer Factor ("K"): Winter summer Winter summer (8aeating Cooling ANNUAL LOADS (MBtus) -----======•======== = = = = - 67.85 76.04 77.07 3216 0 ---- • • ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ================•=•====•===================== source Heating source cooling source Fan Total Space Conditioning Energy Source Lighting Source Receptacle source Hot Water ---- 8.4 33.3 44.5 -----86.3 X 1.027 -----= = --- 256.5 259.4 432.2 421.2 2.2 3.9 0.9 3.5 4.7 5.0 1.8 0.1 88.6 46.9 16.8 . 1.4 . ;•==••=============•================================================================ '-:·: · ' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft =======================================================•================•=== SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 36 of 74 ------------~--------------------------------------------------------------Project: Building iS ,.J:...esigner: Banzuelo/Rierson/Duff & Associates, Inc 1 (.cation: Carlsbad . Date: 12/30/1987 \ \ '. j, Enforcement Agency Building Permit No Checked By "·,~;.;r Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior Wall Southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALUES (including inside film resistance) --------------~----------------------------Wall Window Roof Door AFloor (CT, HVAC SYSTEM HVAC Equipment Name (CF-4) Number of syst~ms Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air Circulation Rate Spaces 12 & 13 388.0 sqft 162.0 sqft 278.0 sqft 80.0 sqft o.o sqft 278.0 sqft 278.0 sqft 10.19 0.88 20.43 2.22 o.oo . Carrier 52BA3093 16 Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this RVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL : .Heat Capacity of Exterior Wall (i. Lighting Power \.>·,-· Climate Zone 1.56 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 37 of 74 --------------------------------------------------------------------------~ Project: Building ts Designer: Banzuelo/Rierson/Duff & Associates, Inc <&cation: Carlsbad Date: 12/30/1987 \\~.;.)/ Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS ·wall Absorptivity Roof Absorptivity Ceiling Height o.oo 0.70 9.0 ft Glass Framing Shading Device Overall SC SHADING COEFFICIENTS Southwest OVERHANGS & SIDEFINS Southwest SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 18.0 Overhang Height Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 74 ---------------------------------------------------------------------------Project: Building IS Designer: Banzuelo/Rierson/Duff & Associates, Inc (?.cation: Carlsbad . Date: 12/30/1987 Documentation: PROCALC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Spaces 12 & 13 Office Day 54.60 I Night 3.80 I Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 I Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater ccf Number of Non-operational Hours per Week: Day Night '-' Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY ~---------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: _.,.occupant Density: ~-~-' Heating Season Cooling Season Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESOLTS SCM-3 page 39 of 74 ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff &cation: Carlsbad ' ~-<~::\~,j-( & Associates, Inc Date: 12/30/1987 Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 12 & 13 BALANCE POINT TEMPERATORES AND DEGREE DAYS Daytime Nighttime -------------------------------BPTl -55.97 (Winter) -BPTl = 67.88 BPT2 = 64.13 (Summer) BPT2 = 76.07 BPT3 = 71.45 (Economizer) BPT3 • 77.09 HOD • 71 (Heating) HDD • 3225 CDD = 361 (Cooling) CDD = 0 BUILDING HEAT TRANSFER (Btu/hr-F) ••=•=======•===================== Building Envelope Heat Transfer Rate: Winter • summer -overall Heat Transfer Factor ("K"): Winter -summer = ANNUAL LOADS (MBtus) (~ g~ Heating ----======•==•====== -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ••=•======•=======•=========•=•============•= Source Heating source Cooling source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water -= -- 8.5 35.4 44.5 -----88.5 X 1.027 - • ----- = --= 220.7 223.0 374.3 364.5 2.0 3.3 · 0. 8 3.3 4.1 4.3 1.6 O.l 90.9 46.9 16.8 1.4 ,·····========•====•======•=••============•••=•=••===•=•=======•============= \.>/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft ==•=••==••====••=====••••==•======••=•••===•===•====•=====•================ SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 40 of 74 ---------------------------------------------------------------------------Project: Building iS . ~esigner: Banzuelo/Rierson/Duff & Associates, Inc ~ocation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ( "-\~:.~- Documentation: PROCALC Date --------------------------------------------------------------------------- ~ Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total conditioned Floor R-VALUES (including inside film resistance) Wall Window Roof Door Floor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated Water Heating Efficiency Economizer Cooling Equipment Power Rating Fan Power Air circulation Rate Spaces 14 & 15 424.0 sqft 198.0 sqft 318.0 sqft 80.0 sqft o.o sqft 318.0 sqft 318.0 sqft 10.19 0.88 20.51 2.22 0.00 Carrier 52BA3093 16 Beat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM * Note: 8 Spaces are served by this HVAC System. Please refer to the attached HVAC Zone Heating & Cooling Load summary for more details on the zoning arrangement. GENERAL .Heat capacity of Exterior Wall : :"-.. • > Li~hting Power '-.. >~ Climate Zone 1.54 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 41 of 74 ---------------------------------------------------------------------------Project: Building iS .-~ .. esigner: Banzuelo/Rierson/Duff & Associates, Inc :r'llcation: Carlsbad Date: 12/30/1987 Documentation: PROCAtC Enforcement Agency Building Permit No Checked By Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height o.oo 0.70 9.0 ft Glass Framing Shading Device overall SC SHADING COEFFICIENTS southwest OVERHANGS & SIDEFINS Southwest (/•~:=~~-:~~=~~~~ \\:..:;} Daylighting Strategies • \~ .. -. SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 22.0 Overhang Height .Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 74 ---------------------------------------------------------------------------Project: Building iS .. ~esigner: Banzuelo/Rierson/Duff & Associates, Inc {(~cation: Carlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ... <.:;j, , Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Peri9d: Spaces 14 & 15 Office Day 54.60 \ Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 \ Night 14.40 \ Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Beater Number of Non-Operational Hours per Week: Da.y ~ Number of Holidays per Year: Thermostat Set Point Temperatures: I PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Beat Loss Rate (U-Value): INTERNAL LOADS & ENERGY Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .Occupant Density: \ ... ; Night Beating Season Cooling Season Winter Winter Setback Summer summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 74· ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc (.ocation: G:arlsbad Date: 12/30/1987 Enforcement Agency Building Permit No Checked By ... Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Spaces 14 &'15 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -------------------------------BPTl • 55.67 (Winter) BPTl BPT2 = 63.82 (Summer) BPT2 BPT3 • 71.26 (Economizer) BPT3 HDD • 62 (Heating) BOD CDD • 377 (Cooling) CDD BUILDING HEAT TRANSFER (Btu/hr-F) •====••========================== Building Envelope Heat Transfer Rate: Winter summer Overall Heat Transfer Factor ("K"): Winter ~ Heating Cooling summer ANNUAL LOADS (MBtus) = 67.85 = 76.04 = 77.07 • 3216 = 0 • --- -- ANNUAL SITE ENERGY REQUIREMENTS (MBtus) Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ----==========•==================••========== Source Beating Source Cooling Source Fan Total Space Conditioning Energy Source Lighting source Receptacle source Hot Water ---- 8.4 33.3 44.5 -----86.3 X 1.027 -----• -= -- 256.5 259.4 432.2 421.2 2.2 3.9 0.9 3.5 4.7 s.o 1.8 0.1 88.6 46.9 16.8 1.4 ·······================•=••===•=••=======········=·····======•==•=====•===== \~:_:""· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft ==•••===••=================•===••=========•============•============•====•• SCM INPUT DATA SUMMARY (part l of 2) Project: Building i5 Designer: Banzuelo/Rierson/Duff & Associates, Inc (,:.cation: Carlsbad Date: 12/30/1987 SCM-1 page 44 of 74 Enforcement Agency Building Permit No Checked By ·, , ~ Documentation: PROCALC Date --------~------------------------------------------------------------------ Space Name: AREAS Exterior Wall southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) Wall Window Roof Door (!'loor HVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated cooling Efficiency Rated·water Heating Efficiency Economizer Cooling Equipment Power Rating Pan Power Air Circulation Rate Spaces 16 & 17 388.0 sqft 162.0 sqft 278.0 sqft 80.0 sqft o.o sqft 278.0 sqft 278.0 sqft 10.19 0.88 20.43 2.22 o.oo Carrier 52BA3093 16 Heat Pump BP w/Economizer Electric Resistance 2.700 8.500 0.990 No 16960 watts 2295 watts 4480 CFM •·Note: 8 Spaces are served by this HVAC system. Please refer to the attached HVAC Zone Beating & Cooling Load summary for more details on the zoning arrangement. GENERAL Aaeat capacity of Exterior Wall , -~Lighting Power \_--:-Climate Zone 1.56 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 45 of 74 ---------------------------------------------------------------------------Project: Building 15 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .cation: Carlsbad · Date: 12/30/1987 Checked By '\ ... ~.:·.·:) 1 Documentation: PROCALC Date --------------------------------------------------------------------------- OTHER PHYSICAL PARAMETERS ------------------~------Wall Absorptivity Roof Absorptivity Ceiling Height o.oo 0.70 9.0 ft Glass Framing Shading Device Overall SC SHADING COEFFICIENTS Southwest OVERHANGS & SIDEFINS Southwest SC Factor Winter Summer 0.46 0.880 Window Height Width 9.0 18.0 overhang Height Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 74 ---------------------------------------------------------------------------Project: Building 15 1 --~signer: Banzuelo/Rierson/Duff & Associates, Inc :~cation: Carlsbad Date: 12/30/1987 Documentation: PROCALC Enforcement Agency Building Permit No Chec~ed By Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Spaces 16 & 17 Office Day 54.60 % Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 % Night 14.40 % Equivalent Operational Hours per Year: Lighting Day Lighting Night Receptacle Fans Water Heater Number of Non-Operational Hours per Week: cl Number of Holidays per Year: Day Night Thermostat Set Point Temperatures: PHYSICAL· PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: /;,.Occupant Density: ' ( . < \.~'.>··' Heating season Cooling Season Winter Winter Setback summer Summer Setup 2915 hours 359 hours 3274 hours 4518 hours 1770 hours 32 hours 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0. 0284 cfm/sq·ft 0.0862 Btu/hr-sqft-F 0.50 watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No ,,..;.cation: Carlsbad Date: 12/30/1987 Checked By ·-:._~.,:/. Documentation: PROCALC Date !" --------------------------------------------------------------------------- Space Name: Spaces 16 & 17 BALANCE POINT TEMPERATURES AND DEGREE DAYS •============================.================= Daytime Nighttime -.------------------------------BPTl == 55.97 (Winter) BPTl = BPT2 = 64.13 (Summer) BPT2 == BPT3 = 71.45 (Economizer) BPT3 = HDD = 71 (Heating) HDD = CDD = 361 (Cooling) CDD = BUILDING HEAT TRANSFER (Btu/hr-F) ---==========•=================== Building Envelope Heat Transfer Rate: Winter summer overall Heat Transfer Factor ("K"): Winter c8 Heating Cooling Site Heating Site cooling Site Fan Site Lighting Site Receptacle Site Hot Water summer ANNUAL LOADS (MBtus) ----=-=====•======== ANNUAL SITE ENERGY REQUIREMENTS (Matus) •==•=======•=••========••=============• 67.88 76.07 77.09 3225 0 --= - • - = ---• • ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating Source Cooling Source Fan Total Space Conditioning Energy source Lighting source Receptacle Source Hot Water -• • • 8.5 35.4 44.5 -----88.5 X 1.027 -• • - 220.7 223.0 374.3 364.5 2.0 3.3 0.8 3.3 4.l 4.3 l.6 0.1 90.9 46.9 16.8 1.4 i' 'i···=============================•==================•==•=======••••========= : '·,,:./' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft ••===•=••=======================================••========================= . SCM INPUT DATA SUMMARY ( part 1 of 2) SCM-1 page 48 of 74 ---------------------------------------------------------------------------Project: Building 15 Designer: Banzuelo/Rierson/Duff & Associates, Inc 1:.cation: Carlsbad · Date: 12/30/1987 Enforcement Agency Building Permit No Checked By :;,\·:..., ·,- Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: AREAS Exterior wall Southwest Glazing Roof Door Raised Floor Slab Total Conditioned Floor R-VALOES (including inside film resistance) -------------------------------------------Wall Window Roof Door ... Floor (~ BVAC SYSTEM HVAC Equipment Name (CF-4) Number of systems Heating Equipment Type Cooling Equipment Type Water Heating Equipment Type Rated Heating Efficiency Rated Cooling Efficiency Rated Water Heating Effic"iency Economizer cooling Equipment Power Rating Fan Power Air Circulation Rate GENERAL ,<. ~-.,-""' ·-.... __ / Beat Capacity of Exterior Wall Lighting Power Climate Zone Space 18 365.0 sqft 99.0 sqft 159.0 sqft 40.0 sqft o.o sqft 159.0 sqft 159.0 sqft 10.25 0.88 20.51 2.22 o.oo Carrier 52BA3093 l Heat Pump HP w/Economizer Electric Resistance 2.700 8.500 0.990 No 1060 watts 143 watts 280 CFM 7.53 1.400 watts/sqft 7 SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 49 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No !.cation:_ Carlsbad Date: 12/30/1987 Checked By ··~ .... -:' /. Documentation: PROCALC Date -------------------------~-------------~----------------------------------- OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity Roof Absorptivity Ceiling Height 0.29 0.70 9.0 ft Glass Framing Shading Device overall SC SHADING COEFFICIENTS Southwest OVERHANGS & SIDEFINS southwest f.' "• a ' .. , .~--.. '-, ... ,• SC Factor Winter summer 0.46 0.880 Window Height Width 9.0 11.0 Overhang Height Depth 0.40 Side-Fin Distance Depth No Daylighting Controls SCM FIXED INPUT DATA SUMMARY SCM-2 . page 50 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No : (.cation: Carlsbad Date: 12/30/1987 Checked By -., ,..,.,.~ Documentation: PROCALC Date --------------------------------------------------------------------------- Space Name: Occupancy Type: SCHEDULING Occupancy Level for Operational Period: Space 18 Office Day 54.60 % - Night 3.80 % Lights/Receptacle Level for Operational Period: Day 70.30 I Night 14.40 % Equivalent Operational Hours per Year: Lighting Day 2915 hours Lighting Night 359 hours Receptacle 3274 hours Fans 4518 hours Water Heater 1770 hours Number of Non-Operational Hours per Week: Day 32 hours cl Number of Holidays per Year: Thermostat Set Point Temperatures: PHYSICAL PARAMETERS Infiltration Rate: Slab Floor Heat Loss Rate (U-Value): INTERNAL LOADS & ENERGY ----------------------- Receptacle Peak Load: Water Heating Energy: Occupant Sensible Load: Occupant Latent Load: .Occupant Density: : ( ·.·. \ ...... '~·-<,.,.,./ Heating Cooling Winter Winter Summer summer .Night season Season Setback Setup 46 hours 5 days 3 days 70 F 40 F 78 F 85 F 0.0284 cfm/sqft 0.0862 Btu/hr-sqft-F a.so watts/sqft 64 Btu/hr-person 230 Btu/hr-person 190 Btu/hr-person 250 sqft/person SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 51 of 74 ---------------------------------------------------------------------------Project: Building #5 Designer: Banzuelo/Rierson/Duff & Associates, Inc (i.cation: Carlsbad Date: 12/30/1987 \ . t Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date -------------------------------~------------------------------------------- Space Name: Space 18 BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 55.91 (Winter) BPTl = 67.94 BPT2 = 64.18 (Summer) BPT2 -76.13 BPT3 = 70.90 (Economizer) BPT3 = 77.04 HDD = 69 (Heating) BOD -3245 COD = 381 (Cooling) COD -0 BUILDING BEAT TRANSFER (Btu/hr-F) ------------=-=================== Building Envelope Beat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter -Summer - ANNUAL LOADS (MBtus) (i~ ,\!Jaeating ------============== -Cooling ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ------------------------=-============= Site Heating Site Cooling Site Fan Site Lighting Site Receptacle Site Bot Water ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) Source Heating Source Cooling source Fan Total Space Conditioning Energy Source Lighting Source Receptacle Source Hot Water -• - = 9.0 49.8 41.7 -----100.5 X 1.027 - ------ ---- 142.7 144.2 230.6 225.l 1.2 1.9 0.5 2.6 2.2 2.5 0.9 0.1 103.2 46.9 16.8 1.4 ''!····-===•==•===================•=========•=•=••========•=============-=====- '\ •' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 168. 3 KBtu/sqft =•=•===•==•===•===•==-================-=-========•==•======•=-========-====•==•• CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 52 of 74 ---------------------------------------------------------------------------Project: Building #5 Designer:-Banzuelo/Rierson/Duff & Associates, Inc ,...r.cation: Carlsbad Date: 12/30/1987 ·. \·~-, .. ~) Enforcement Agency Building Permit No Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: Solid Wood Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) ~onstruction Components Th R-Value Fr (in) Summer Winter ---------------------------------------------------------------------------1. Hardwood, Maple 2. Inside Air Film 3. 4. 5. 6. 7. 8. 9. 10. 11. 1.750 1.54 0.68 1.54 0.68 ·~-------------------------------------------------------------------------- {. >-J \.·:~ Total 2. 22 2. 22 Framing Percentage: 0.0 I Framing Material: NONE OVERALL VALUES ADJUSTED FOR FRAMING R-Value 0-Value 2.22 0.4505 2.22 0.4505 Sketch of Construction Assembly ====== • orptivity: . r ghness: Clear Pine : .,>-,.;<ct igh t : ·seat Capacity: 0.70 6.1 lb/sqft 2.39 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 53 of 74 -------------------------------------------------~-------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By ·, '-.; .. .) ~. ~~·. -...-~; Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/U with Gyp. Clg. Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction components Th' R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Roofing, Built-op 2. Plywood 3. Air $pace 4. Insulation, Mineral Wool, R-19 5. Gypsum or Plaster Board 6. Inside Air Film ,. 8. 9. 10. 11 • 0.375 0.500 6.000 * 6.000 0.625 0.33 0.33 0.63 0.63 1.00 0.80 19.00 19.00 0.56 0.56 0.92 · 0.61 . (,----------------------------------------------:::::--------::~::----::~::- Framing Percentage: Framing Material: 1 2 3 4 5 10.0 I Softwood, Douglas Fir-Larch Calculation for Framing Adjustment summer U-Value 0.0446 X 0.90 + 0.1066 X 0.10 = 0.0508 Winter o-value 0.0456 X 0.90 + 0.1128 X 0.10 = 0.0523 OVERALL VALUES ADJUSTED FOR FRAMING R-Value u-value 19.69 0.0508 19.11 0.0523 Sketch of construction Assembly •==•== ====•= • sorptivity: . 1. . ughness: Stucco, Wood i. ·., :,1eight: '--·aeat Capacity: 0.70 Shingles 8.2 lb/sqft 2.58 i CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 54 of 74 ---------------------------------------------------------------------------Project: Building ts Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (i.cation: Carlsbad . Date: 12/30/1987 Checked By ', \/ . ; .~J Documentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: R-19 B/O with T-Bar Assembly Type: Roof Assembly Tilt: O deg (Horizontal Roof) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------1. Roofing, Built-op 2. Plywood 3. Air ~pace 4. Insulation, Mineral Wool, R-19 5. Acoustical Tile, Mineral Fiberboard 6. Inside Air Film 7. a. 9. 10. 11 • 0.375 0.500 24.000 * 6.000 0.750 0.33 0.33 0.63 0.63 1.00 a.so 19.00 19.00 2.03 2.03 0.92 0.61 • ------------------------------------------------------------------------- (~;;;:;l Total 23. 90 23. 39 Framing Percentage: 10.0 I Framing Material: Softwood, Douglas Fir-Larch -------------------------------Calculation for Framing Adjustment Summer o-value 1 2 3 4 5 0.0418 X 0.90 + 0.0923 X 0.10 = 0.0469 Winter O-Value 0.0428 X 0.90 + 0.0968 X 0.10 • 0.0482 OVERALL VALUES ADJUSTED FOR FRAMING R-Value o-value 21.33 0.0469 20.76 0.0482 Sketch of construction Assembly ----=----=-= • sorptivity: . , ':1ghness: concrete, \ . .__, __ ,ught: ··-·aeat capacity: Asph. 0.70 Shingles 6.9 lb/sgft 2.15 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 55 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency Designer: Banzuelo/Rierson/Duff ~ Associates, Inc Building Permit No (.Cation: Carlsbad Date: 12/30/1987 Checked By .._~~., .:)/ ~bocumentation: PROCALC Date ------------------------------------------------------------------~-------- Assembly Name: Sunglass Blue Plate Assembly Type: Glazing Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) Summer Winter ------------~------------------------------------------------------------~-1. CEC Single Glazing 2. Inside Air Film 3. 4. s. 6. 7. 8. 9. 10. 11. 0.250 0.20 0.68 0.20 0.68 (!---------------------------------------------:::::---------:~::-----:~::- Framing Percentage: o.o I Framing Material: NONE 1 -------------------------------Sketch of Construction Assembly ~ading Coefficient: 0.46 ~~sible Transmittance: 0.30 \:~::.,/·.: OVERALL VALUES ADJUSTED FOR FRAMING R-Value O-Value 0.88 1.1364 ------ 0.88 1.1364 CONSTRUCTION ASSEMBL.~ COMiJL.IANC.E: fURM CJ:'-J page :> 1:> o.t , "* ---------------------------------------------------------------------------Project: Building iS Enforcement Agency I Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (~·cation: Carlsbad Date: 12/30/1987 Checked By ~~~-~ . '"·'oocumentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 5/8 Gyp/R-11/Gyp WF Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) Summer Winter ---------------------------------------------------------------------------l. Gypsum or Plaster Board 2. -Insulation, R-11, 2x4 Wood Framing 16" 3. Gyps~m or Plaster Board 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. 0.625 3.500 0.625 0.56 8.38 0.56 0.68 0.56 8.38 0.56 0.68 ,...--------------------------------------------------------------------------- ( r:. '·¼9 Total 10 .19 10 .19 Framing Percentage: o.o' Framing Material: Softwood, Douglas Fir-Larch l"t-4::-i+--1 P-<•-++---2 ~-1'+--3 Sketch of Construction Assembly ~sorptivity: · 0.00 Calculation for Framing Adjustment Summer U-Value 0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982 Winter U-Value 0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982 OVERALL VALUES ADJUSTED FOR FRAMING R-Value U-Value 10.19 0.0982 ------ 10.19 0.0982 =•••== r-~ghness: Smooth Plaster, Metal ~ _eight: 5.4 lb/sqft ·-geat Capacity: 1.38 CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 57 of 74 ---------------------------------------------------------------------------Project: Building #5 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No (.cation: Carlsbad Date: 12/30/1987 Checked By ~~Bocumentation: PROCALC Date --------------------------------------------------------------------------- Assembly Name: 6.5" Conc/R-11/Gyp.Brd. Assembly Type: Wall Assembly Tilt: 90 deg (Vertical) Construction Components Th R-Value Fr (in) summer Winter ---------------------------------------------------------------------------l. Concrete, 140 lb, 2. Insulation, R-11, 3. Gypsum or Plaster 4. Inside Air Film 5. 6. 7. 8. 9. 10. 11. Oven Dried 2x4 wood Framing 16" Board 6.500 3.500 0.625 0.71 8.38 0.56 0.68 0.71 8.38 0.56 0.68 -----------------------------------------------------.--------------------- (f:.:) Total 10. 34 10. 34 Framing Percentage: 0.0 I Framing Material: NONE . . • . • 1 ., 2 . . . ~. 3 . . • . ., • ::. . • OVERALL VALUES ADJUSTED FOR FRAMING • . ' Sketch of construction Assembly • sorptivity: , ughness: concrete, ; ' .. ,". ~ight. '· \._-.-,;-. '··"·aeat Capacity: 0.70 Asph. Shingles 78.6 lb/sqft 17.39 R-Value O-Value 10.34 0.0967 ------ 10.34 0.0967 ====-- HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 58 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff.& Associates, Inc Building Permit No :'°,'..cation: Carlsbad Date: 12/30/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- FAN ENERGY HVAC System -----------------------Carrier 52BA3093 (Fanl) carrier 52BA3093 (Fanl) carrier 52BA3093 (Fanl) FAN WATTAGE INDEX No. Motor Drive Sys BHP Eff. Eff. ----------l X 0.10 I [0.52 X 1.00] 16 X 0.10 / [0.52 X 1.00] l X 0.10 I [0.52 X 1.00] Conv Fact X 746 X X 746 X X 746 X No. Fans l - l - l - Fan watts 143 2295 143 Total 2582 2582 watts/ 2682 sqft • 0.963 watts/sqft HVAC ~OWER I~DICES SUMMAR~ FORM (part 2 ot 2) CF-4 page~~ ot: ''* ---------------------------------------------------------------------------Project: Building iS .Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :·:·cation: Carlsbad Date: 12/30/1987 Checked ·By ...... '·oocumentation: PROCALC Date --------------------------------------------------------------------------- HEATING EQOIPMENT System No. Design Equip Conv. source Description Type Sys Output Eft Factor (Btu/hr) --------------------------------------------------------Carrier 52BA3093 Heat Pump 1 X 8000 I 2.70 X 3.000 = 8889 carrier 52BA3093 Heat Pump 16 X 8000 I 2.70 X 3.000 = 142222 carrier 52BA3093 · Heat Pump 1 X 8000 I 2.70 X 3.000 = 8889 --------Total 160000 HEATING POWER INDEX 160000 Btu/hr I 2682 sqft = 59.66 Btu/hr-sqft COOLING EQOIPMENT system No. Design Equip Conv. Source Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------carrier 52BA3093 HP w/Econ 1 X 9000 I a.so X 10.239 • 10841 carrier 52BA3093 HP w/Econ 16 X 9000 I a.so X 10.239 = 173461 Carrier 52BA3093 HP w/Econ 1 X 9000 I 8.50 X 10.239 = 10841 --------fl Total 195143 \ 'c.. j '\-, ... ~~ 195143 Btu/hr/ COOLING POWER INDEX 2682 sqft = 72.76 Btu/hr-sqft ... \ ·,__ / HVAC SYSTEM SUMMARY SHEET ws-4 page 60 of 74 ---------------------------------------------------------------------------Project: Building ts Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ~•cation: Carlsbad Date: 12/30/1987 Checked By '-.. ,_:::,: Documentation: PROCALC Date ---------------------------------------------------~----------------------- HVAC Equipment Name: HEATING System Type: output Capacity: Rated Efficiency: supply Air Temperature: COOLING System Type: Total output Capacity: Sensible output Capacity: Latent Output Capacity: R~ted Efficiency: Input Power Rating: Coil Bypass Factor: Economizer: A:~ply Air Temperature: Supply Air CFM: Fan Type: Fan Multiplier: Brake Horsepower: Motor Efficiency: Drive Efficiency: DUCTS Supply Duct Heat Gain: Return Duct Heat Gain: Supply Duct Air Leakage: Return Duct Air Leakage: carrier 52BA3093 ·ap Heat Pump 8000 Btu/hr 2.700 105.0 F w/Economizer 9000 Btu/hr 9000 Btu/hr 0 Btu/hr 8.500 1060 watts 0.100 Yes ss.o F 280 cfm Blow-Through l 0.10 52.0 I 100.0 I 2.0 I 2.0 I 4.0 I 4.0 I LIGHTING SUMMARY AND WORKSHEET CF-5 page 61 of 74 ---------------------------------------------------------------------------Project: Building tS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No f.cation: Carlsbad Date: 12/30/1987 Checked By '(.S~; 7 Documentation: PROCALC Date --------------------------------------------------------------------------- INSTALLED LIGHTING POWER BY SPACE Total Floor Vert Horiz Floor Lighting Installed Space Name Area Mult Mult Area (watts/sqft) wattage -----------------------------------------------------------Space l 139 X l X l -139 X l.400 -195 Spaces 2 & 3 318 X 1 X 1 -318 X l.400 -445 Spaces 4 &: 5 278 X l X 1 -278 X 1.400 -389 Spaces 6 &: 7 318 X 1 X 1 -318 X 1.400 -445 Spaces 8 & 9 278 X l X l -278 X 1.400 = 389 spaces 10 & 11 318 X l X l -318 X 1.400 -445 Spaces 12 & 13 278. X 1 X l -278 X 1.400 -389 Spaces 14 & 15 318 X 1 X l -318 X 1.400 -445 Spaces 16 & 17 278 X l X l -278 X 1.400 -389 Space 18 159 X l X l -159 X 1.400 -223 --------------TOTALS 2682 3755 -ILDING LIGHTING WATTAGE 3755 watts I 2682 sqft = 1.400 watts/sqft HVAC ZONE HEATING & COOLING LOAD SUMMARY page 62 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No /.cation: Carlsbad Date: 12/30/1987 Checked By '·J' -) ""oocumentation: PROCALC Date ---------------------------------------------------------------------------- HVAC ZONE DESCRIPTION HVAC Zone Name: BVAC System Name: System Multiplier: Heating Schedule: cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 1 PEAK (Jan 6am) HEATING 4658 TOTAL SPACE LOAD 4658 3 cfm) 98 ( 93 186 0 EFFECTIVE SPACE LOAD 5035 Ventilation· ( Return Duct Conduction Return Duct Leakage Return Fan Beat Gain 25 cfm) 881 ( 101 201 -490 TOTAL SYSTEM LOAD 5728 SYSTEM PERFORMANCE 6558 AT DESIGN CONDITIONS Space 1 Carrier 52BA3093 l Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 4pm) 4339 354 --------------4339 354 3 cfm) 12 -3 87 174 14 0 --------------4611 366 25 cfm) 110 -27 92 184 15 490 --------------5488 353 0.5 tons o.o tons 9009 388 a.a tons o.o tons --------------------- SPACE HEATING & COOLING LOAD SUMMARY· page 63 of 74 -~-------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No Date: 12/30/1987 Checked By Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door Conduction Roof Conduction Skylight Conduction Floor conduction • Slab Conduction (. Interior Conduction ..... , Infiltration ·-Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1065 2469 536 219 0 0 369 0 0 4658 Btu/hr space 1 COOLING SENSIBLE LATENT --------------Aug 4pm 78 F DB SO I RH 82 F DB 66 F WB Btu/hr Btu/hr ------------ 34 172 104 115 0 0 0 0 2644 440 474 0 354 354 -----------4339 Btu/hr 354 0.4 tons o.o Heating: Cooling: 4658 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 4339 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 121 cfm 171 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARi. page 04 01: , -. ---------------------------------------------------------------------------Project: Building 15 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No (.cation: Carlsbad ~:i .. :· ,_;/ Documentation: PROCALC Date: 12/30/1987 Checked By Date --------------------------------------------------------------------------- BVAC ZONE DESCRIPTION BVAC Zone Name: BVAC System Name: system Multiplier: Beating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Spaces 2 & 3 Spaces 4 & 5 Spaces 6 & 7 Spaces 8 & 9 Spaces 10 & 11 aces 12 & 13 1 aces 14 & 15 \ aces 16 & 17 PEAK (Jan (Jan (Jan (Jan (Jan (Jan (Jan (Jan 6am) 6am) 6am) 6am) 6am) 6am) 6am) 6am) TOTAL SPACE LOAD Bypass Ventilation Air ( supply Duct Conduction Supply Duct Leakage Supply Fan Heat Gain 48 cfm) EFFECTIVE SPACE LOAD Ventilation ( 429 cfm) Return Duct Conduction Return Duct Leakage Return Fan Heat Gain ,.-,. \ ·'-:_. _.' \, ___ :-·-· TOTAL SYSTEM LOAD SYSTEM PERFORMANCE AT DESIGN CONDITIONS HEATING 9759 8383 9759 8383 9759 8383 9759 8383 72571 1678 1451 2903 0 78603 15105 1572 3144 -7834 90590 104926 ( ( Spaces 2 -17 carrier 52BA3093 16 Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 ' COOLING PEAK SENSIBLE LATENT --------------(Aug 3pm) 10497 811 (Aug 3pm) 8837 709 (Aug 3pm) 10497 811 (Aug 3pm) 8837 709 (Aug 3pm) 10497 811 (Aug 3pm) 8837 709 (Aug 3pm) 10497 811 (Aug 3pm) 8837 709 --------------77337 6079 48 cfm) 247 27 1547 3093 243 0 --------------82224 6349 429 cfm) 2219 240 1644 3289 254 7834 --------------97210 6843 8.1 tons 0.6 tons 144202 5913 12.0 tons 0.5 tons SPACE HEATING & COOLING LOAD SUMMARY page 65 of 74 ---------------------------------------------------------------------------Project: Building 15 Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No 1·-cation: Carlsbad Date: 12/30/1987 Checked_ By . \;_ ;_: ! "··oocumentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak-Hour: Indoor conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction ' Slab Conduction r Interior Conduction \ '""' Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1310 6034 1071 499 0 0 845 0 0 9759 Btu/hr Spaces 2 & 3 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------103 457 332 309 0 0 0 0 6406 993 1085 0 811 811 -----------10497 Btu/hr 811 0.9 tons 0.1 Beating: Cooling: 9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F·Supply)] = :. \ -. ___ .-. •• 4 Btu/hr tons 253 cfm 415 cfm page ob 01: , ,. ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No 1 .cation: Carlsbad Date: 12/30/1987 Checked By \ .·., .. ' -, -~·: "·"oocumentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS --------------------Peak Hour: Indoor conditions: outdoor Conditions: LOAD COMPONENT Wall conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction , .• Interior conduction 1-~_,;J Infiltration ""' Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES BE1'TING Jan 6am 70 F DB 38 F DB Btu/hr 1199 4937 1071 438 0 0 738 0 0 8383 Btu/hr spaces 4 & 5 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------94 374 332 269 0 0 0 0 5241 868 949 0 709 709 -----------8837 Btu/hr 709 0.7 tons 0.1 Heating: Cooling: 8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 218 cfm 349 cfm SPACE HEATING & COOLING LOAD SUMMARY page 67 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No <.cation: c~rlsbad Date: 12/30/1987 · Checked By -<.;Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass conduction Door conduction Roof Conduction Skylight Conduction Floor Conduction • Slab Conduction (L:;·y i~~~~~~!ti~~duction --.~...:".,N''" · Solar Gain Lighting Equipment _occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1310 6034 1071 499 0 0 845 0 0 9759 Btu/hr Spaces 6 & 7 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------103 457 332 309 0 0 0 0 6406 993 1085 0 811 811 -----------10497 Btu/hr 811 0.9 tons 0.1 Heating: Cooling: 9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)}• • {., ·, ... -. _/ -... __ · ..... - Btu/hr tons 253 cfm 415 cfm SPACE HEATING & COOLING LOAD SUMMARY -page 68 of 7 4 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency. Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No :j.cation: Carlsbad Date: 12/30/1987 Checked By ~~\..;,,.,.:.>-} Documentation: PROCALC Date -------------------~------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: . DESIGN CONDITIONS Peak Bour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction , Interior Conduction \ "· Infiltration Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1199 4937 1071 438 0 0 738 0 0 8383 Btu/hr Spaces 8 & 9 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------94 374 · 332 269 0 0 0 0 5241 868 949 0 709 709 -----------8837 Btu/hr 709 Btu/hr 0.7 tons O.l tons Beating: Cooling: 8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 218 cfm 8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply))• 349 cfm I I page o~ ot /4 ---------------------------------------------------------------------------Project: Building #5 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ,·.cation: Carlsbad . Date: 12/30/1987 Checked By . '' . ',, ·oocumentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab conduction .-·Ainterior Conduction ~~Infiltration · ·· · Solar Gain .Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1310 6034 1071 499 0 0 845 0 0 9759 Btu/hr Spaces 10 & 11 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------103 457 332 309 0 0 0 0 6406 993 1085 0 811 811 -----------10497 Btu/hr 811 0.9 tons 0.1 Heating: Cooling: 9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= ••• ~ ! . -f '~ '•, .. ?: .. ,· Btu/hr tons 253 cfm 415 cfm SPACE HEATING & COOLING LOAD SUMMARY page 70 of 74 ---------------------------------------------------------------------------Project: Building i5 Enforcement Agency . Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No .,.cation:-Carlsbad Date: 12/30/1987 Checked By \'., . .P ·oocumentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Bour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction ·Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction { nterior Conduction \ .... nfiltration ·· Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1199 4937 1071 438 0 0 738 0 0 8383 Btu/hr Spaces 12 & 13 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RB 83 F DB 67 F WB Btu/hr Btu/hr ------------94 374 332 269 0 0 0 0 5241 868 949 0 709 709 -----------8837 Btu/hr 709 0.7 tons 0.1 Beating: Cooling: 8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= Btu/hr tons 218 cfm 349 cfm page I l. o:c , -. ---------------~-----------------------------------------------------------Project: Building i5 Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No .-recation: Carlsbad Date: 12/30/1987 Checked By \'", '.' "· Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS ---------------------Peak Hour: Indoor Conditions: Outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction 1A Interior conduction -~ Infiltration .. Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES --------------------- HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1310 6034 1071 499 0 0 845 0 0 9759 Btu/hr Spaces 14 & 15 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------103 457 332 309 0 0 0 0 6406 993 1085 0 811 811 -----------10497 Btu/hr 811 0.9 tons 0.1 Beating: Cooling: 9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= Btu/hr tons 253 cfm 415 cfm SPACE HEATING & COOLING LOAD SUMMARY page 72 of 74 ---------------------------------------------------------------------------Project: Building IS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ,_ ...... cation: Carlsbad -~;:· ? .. ·oocumentation: PROCALC Date: 12/30/1987 Checked By Date -------------------------------------------------------~------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS --------------------Peak Hour: Indoor Conditions: outdoor Conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door Conduction Roof Conduction Skylight Conduction Floor Conduction !Slab conduction fi(. Interior Conduction \ Infiltration . ._ Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1199 4937 1071 438 0 0 738 0 0 8383 Btu/hr Spaces 16 & 17 COOLING ·SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------94 374 332 269 0 0 0 0 5241 868 949 0 709 709 -----------8837 Btu/hr 709 0.7 tons 0.1 Beating: Cooling: 8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 218 cfm 349 cfm HVAC ZONE HEATING & COOLING LOAD SUMMARY page 73 of 74 ---------------------------------------------------------------------------Project: Building IS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Building Permit No ,..cation: Carlsbad · . C~.-~\-~·;,.1 Date: 12/30/1987 Checked By Documentation: PROCALC Date --------------------------~------------------------------------------------ HVAC ZONE DESCRIPTION HVAC ZQne Name: HVAC system Name: System Multiplier: Heating Schedule: Cooling Schedule: Fan Schedule: Sizing Method: Relative Humidity: SPACES IN THIS ZONE Space 18 PEAK (Jan 6am) HEATING 5346 TOTAL SPACE LOAD 5346 Bypass Ventilation Air ( pply Duct Conduction ( pply Duct Leakage \_ :,_,,~pply Fan Heat Gain 3 cfm) 112 107 214 0 EFFECTIVE SPACE LOAD 5778 Ventilation ( Return Duct conduction Return Duct Leakage Return Fan Heat Gain 29 cfm) 1007 116 231 -490 TOTAL SYSTEM LOAD 6643 SYSTEM PERFORMANCE 6558 AT DESIGN CONDITIONS ( ( Space 18 Carrier 52BA3093 l Loads Office Heating Loads Office Cooling Loads Office Fans COINCIDENT 50 I COOLING PEAK SENSIBLE LATENT --------------(Aug 3pm) 5481 405 --------___ ._.__ 5481 405 3 cfm) 16 2 110 219 16 0 --------------5827 423 29 cfm) 148 16 117 233 17 490 ---------------6814 456 0.6 tons o.o tons 9013 370 a.a tons o.o tons pa.ge I"* Ol: 1 '* ---------------------------------------------------------------------------Project: Building iS Designer: Banzuelo/Rierson/Duff & Associates, Inc Enforcement Agency Buil~ing Permit No ' (1.cation: Carlsbad Date: 12/30/1987 Checked By .~ .. ~~:/ Documentation: PROCALC Date --------------------------------------------------------------------------- SUMMARY OF PEAK HOUR LOADS FOR SPACE Space Name: DESIGN CONDITIONS Peak Hour: Indoor Conditions: outdoor conditions: LOAD COMPONENT Wall Conduction Glass Conduction Door conduction Roof Conduction Skylight Conduction Floor Conduction Slab Conduction ,,,,Ainterior Conduction '.._~Infiltration · ··· Solar Gain Lighting Equipment Occupants SPACE LOADS SUPPLY AIR QUANTITIES HEATING Jan 6am 70 F DB 38 F DB Btu/hr 1121 3017 536 249 0 0 422 0 0 5346 Btu/hr Space 18 COOLING SENSIBLE LATENT --------------Aug 3pm 78 F DB 50 I RH 83 F DB 67 F WB Btu/hr Btu/hr ------------245 229 206 155 0 0 0 0 3203 496 543 0 405 405 -----------5481 Btu/hr 405 0.5 tons o.o Heating: Cooling: 5346 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 5481 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]• Btu/hr tons 139 cfm 217 cfm EATPUMPS Fourteen Models Nominal Sizes 1 ½ to 5 Tons '\~~ AIR OF QUAl.JlY SELF-CONTAINED HEAT PUMP RPNC-SERIES The Rheem• RPNC-Series Self-Contained Heat Pumps can provide year-round heating and cooling comfort for . residential or commercial applications. Factory or field · ' installed auxiliary electric heaters may be provided to ~ meet heat load requirements. The auxiliary electric heater kits are integral with the air discharge compartment. No external heaters are required. The RPNC-Self-Contained Heat Pump System is capable of delivering a maximum HSPF (Heating Seasonal Perfo_r- mance Factor) of 7.80 in the heating mode or a maximum standard SEER (Seasonal Energy Efficiency Ratio) of 9.85 in the cooling mode. The following additional features, plus its energy-saving characteristics, make the RPNC-Heat Pump Series self- contained heat pump an excellent choice for new con- struction or upgrading your present system. • Attractive cabinet protects all compo- nents. Top grille is steel reinforced for extra strength. Cabinet is electrostatic- ally painted for all-weather protection. • Outdoor coil air is discharged upward away from bushes and shrubs. The dis- charge pattern of the top grille provides minimum air restriction, resulting in quiet fan operation. • Isolated fan and grille assembly-Motor is. attached to the underside of the dis- charge grille. • All heat pump controls are accessible by removing control box cover. Removable top grille provides access to the con- denser fan motor compressor and con- denser coil. • Single speed fan motor is designed for quiet, energy- saving operation. • Non-cycling reversing valve and positive defrost. ·~tr~. ··Pat8nlad. I . ,' '. Performance Data Cooling capacity .. · Modtl Ntlmhf IU'MC-ARI Sid.cl) NIL Sens. Net. Lat. Slngle Pllase ARI Approz. ca,. Cooling Tolal Sound ITU/Ht ca,. ITU/Ht SEER WIits Rating CfM 01&1 18.200 13.200 5.000 9.10 2210 8.0 650 OZ4J 23.000 17.800 5,200 9.35 2743 8.0 850 030J 30.200 21.600 8.600 9.85 3471 8.0 1000 036J 36.200 26,200 10,000 9.00 4510 8.2 I 1250 ow '2.000 31,000 11,000 9.55 4906 8.0 1500 048J 47.500 35.000 12.500 9.50 5595 8.2 1750 058J 57.500 43.000 14.500 8.60 7355 8.4 2100 I (DD1$ign Candilions: ARI Rating Tempemures of SO-F.0.8., 67°F.W.8. incloo,; retUm air. 95'F.D.8. outdoor. CDollnlJ Capacity Model Namller RPNc- Hating capacity (70"F lndaOr Air) OulSide Air ,1-,:.o.B.143•F.w.B • DOE HilJb Temperalure Power BTU/Ht Input COP Witts 17.700 1840 I 2.82 22.600 2270 2.92 30.600 I 3020 2.96 36.600 I 36TT I 2.92 44,000 4178 3.10 49.000 4752 3.04 61.000 6051 2.96 Outside Air U-F.D.B.115•F.W.B. DOE Low Temperacure BTU/Ht 9.600 11,600 15,700 19.800 24.000 27.600 35.200 , , Power Input COP WIiis 1740 1.62 2005 1.76 2500 1.84 2997 1.90 3346 2. 10 3TT4 2.16 4945 2.08 DOE Region IV -HSPF BTU/ Wlll·Ht I 6.15 6.40 6.55 6.60 7.65 7.80 7.40 Hlallllg capacity (70"F Indoor Air! Oullide Air OullldeAlr 47-F.D.8143-F.W.B. 17"f.D.B.11s-F.W.B. ODE Hlgll Temperature ODE Low Temperalu11 ARI Sld.<J> Ntt.S-. : DreePhase ARI Pawer l'aWlr cap. . Coallng Net. Lat. Total Sound Approx. BTUIHt Input COP ITU/lk Input COP BTUIHc. . ca,. ITUJHt EER Watts llatlq CfM Walls Witts 036C 36.200 26.200 10,000 8.00 4510 8.2 1250 36.600 36T7 2.92 18.800 2997 1.80 0360 36,200 26.200 10,000 8.00 4510 8.2 1250 36.600 36n 2.92 18.800 2997 1.80 042C 42.000 31,000 11,000 8.55 4906 8.0 1500 44.000 4178 3.10 22.400 3346 1.96 0420 42.000 31.000 11,000 8.55 4906 8.0 1500 44,000 4178 3.10 22.400 3346 1.96 048C 47.500 35.000 12.500 8.50. 5595 8.2 1750 ~ 49.000 4752 3.04 25.800 am 2.00. 0480 47.500 35.000 12.500 8.50 5595 8.2 1750 49,000 4752 3.04 25.800 3TT4 2.00· • 058C 57,500 43.000 14,500 7.85 7355 8.4 2100 61.000 6051 2.96 33,000 4945 1.96 0580 57.500 43,000 1'.500 7.85 7355 8.4 2100 61,000 6051 2.96 33.000 4945 1.96 Design Conditions: ARI Rating TemperatUteS of SO"F.0.8., 67°F.W.8. incloo( return air: 95'F.0.8. outaoor. . .I ,-,-,, ---.... . . Model Identification Outdoor Remote Heat Pump I BLANK WHEN AUXIUARY ELECTRIC ,..J..., HEATERS ARE NOT FACTORY INSTAU.EO R P N C-018 J 005 L AUXILIARY ELECTRIC HEATER RATING" HEATER RATING" BLANK • NO HEAT 005 • 4.8 1M 015 • 14.4 1M 010 • 9.6 1M 020 • 19.2 1M -----ELECTRICAL DESIGNATION C • ~-~ D • 4111V, ,19 J -20BIZ3(N, ,. . COOLING CAPACITY (NOMINAL) 018 • 18,200 BTIJ/HA 02, • 23,000 BTIJ/HR 030-30.200 BTIJ/HR 036•36,200 BTIJ/HR 042 .,2;000 BTIJ/HR 048 • '7,500 BTIJ/HR 058•57,500 BTU/HR (REPRESENTATIVE) ..._ ______ C•NEW DESIGN SERies ----------sru:.coNTAINED '----------HEAT PUMP -----------RHEEM ·FK1Dry inslalled electric lleal8IS avalallll as follows: RPNC-018J005 RPNC-042J01(11015 RPNC-02'1JOOS/010 RPNC-042C015 RPNC-030J0051010 RPNC-0420015 RPflC-036J010/015 RPNC-048J015/020 RPNC-036C015 RPNC-048C0151020 RPNC-04800151020 RPNC-05BJ0151020 RPNC-058C0151020 RPNC-0580015/020 . Indoor Air Flow Data(!) Al 208/230 wit units are equipped with two-speed indoor blower motors. AD 460 volt units are eQUipped will! Single speed motors. Each unit is sllipped factory wired for 1118 proper Sl)8ed. DO NOT CllanQe indoor lllower speed. Table beloW snows proper speed: Unit CFM Size Speed Vtils &terul Duct Static lnclles Ka0 (ITU/Hf) a.10 11.21 8.30 G.40 0.50 18000 Low 230 721 693 665 643 607 208 690 659 633 612 577 24000 HiQII 230 964 922 879 830 792 208 914 883 838 800 752 30000 Low 230 1062 1054 1029 994 958 208 1002 991 967 934 901 36000 HilJh 230 1293 1250 1235 1204 1152 208 1207 1180 1155 1128 1080 42000 Hi9h 230 1575 1520 1467 1403 1314 208 1465;.;,. 1426 13n 1303 1233 48000 HilJh 230 1813 1766 1696 1613 1556 208 1680 ...I 1613 1555 1503 1475 56000 HiQII 230 2242 2188 2136 2070 1986 208 2127 2067 2020 1960 1895 36000 HiQII 460 1293 1250 1235 1204 1152 42000 Hi9h 460 1604 1522 1468 1408 1340 48000 Hioll 460 1825 1749 1640 1601 1553 58000 HIQII 460 2262 2206 2130 2060 1990 . I, Electrical and Physical Data MODEL NO. RPNC 018J ( •. ' \_:.., ·,'' ~-"'· .. ELECTRICAL. I Electncat I 1-60 Cllarat:ensncs 208/230 • ComoressorRLA I 9.2 Camoressor LAA I 50.0 IIICIOOI' Blower Fl.A 2.4 Outdoor Fan FlA 0.9 Conuac10r Fuse Size I 1Fac10ry lnstalle41 PHYSICAL: ·22 Cllaroe Ounces 63 lnGOOf Blower Saeed Low Maximum Allowal)le 08 Aux. Electric Heat KW Recommendeo SQ.FT. of Filter Am (Filter 2.0 nor suoolieol Filters: Numller 1 and Size 16x20 Net Weight 312 Witllout Heaters Shiollinn Wainllt 385 ,..,,.. BOT10MVl&W .,. '\ •. , .Y 024.1 030J 031J 03&C I .. , I I 1-60! 1-60 I 208/230 208/230 1-60 I 208/230 3-60 I 208/230 12.91 16.6 I 20 2 14 3 I 65.0 81.0 97.6 78.0 I 2.4 3.1 3.6 I 3.6 0.9 0.9 1.3 I 1.3 61 102 98 98 ! Hioll 'low Higll Higll 10 10 15 15 2.7 3.3 4.0 4.0 1 1 1 1 20x20 20x25 25x25 25x25 312 373 373 375 385 450 450 450 0360 042J 042C 0420 048J 048C I 0480 058J osac I 0580 I ' ' I I i ' ' : 3-60 I 1-60 1 3-60 ' 3-60 i 1-60 I 3-60 I 3-60 1-60 ' 3-?II 3-60 : .160 208/230 ' 208/230 I J60 I 208/230 208/230 460 ' 208/230 ; 208/230 • J60 I 6.7 I 22.0 : 15. I : 7 0 ! 27 5 ; 206 ! 8.3 ' 33.0 ; 21 5 10 2 ' J1.0 I 110.0 I 82.0 ! 41.0 / 118.0 • 92.0 i 46.0 I 180.0 i 1580 82 0 : I 6 3.6 : 3.6 1.6 34 ! 3.4 I 1 0 ; 7 1 i 7.1 ! 3.2 I 0.7 1.3 1.3 I 0.7 I 2.0 I 2.0 I 1.0 I 2.0 I 2.0 1 IO I ·-· I I I I i i 98 I 128 128 I 128 I 146 ! 146 146 150 150 ' 150 Hian Hign I Hign ' High Hion I Hign · Hign Hign I H1gn I Hign 15 15 15 15 20 20 20 20 20 I 20 4.0 4.7 4.7 4.7 5.3 5.3 5.3 6.7 6.71 6.i 2 1 1 1 20x2~ I 2 2 2 20xJ ! 2 25x25 25x25 25x25 2Sx25 20x20 20x20 20x25 20x25 373 450 450 450 470 470 470 485 485 I 485 450 500 500 500 520 520 520 535 535 I 535 Unit Dimensions CoDIIHat CooUHat Coollltat Olmllllionl 011 030 04Z DZ4 03& 048 . OSI A· 291:y,.· 2913/11" 32'1/,,' · .. 8 491/,," 49'¥1," 551~· :• C 3711/,," 43%" ss· D 13111,,· 169/11" 2411/.a ..... E. 1711/21" 20'!,,· 2611/,," F 1511111' 1511/11' 11111,,· G 16" 16" 1a· H 1411:11" 1&1~· 25¾" I 1a11:11· zor~· 27¾" J 1211. 201/," 29¼" K 101¥11" 11111,.· 141/. L 17/,,· 111,.· 171,,· M 3'/,,· JV,,· JV,,· N 3• 3• 3• "Vertical measurements are 10 the bottom of the baSe pan. WARMING: This unit must be mounted level or ½ bubble law at condensate drain connection to prevent water migration from the condenser section. -CAUTION: INSTALLATION MUST NOT INTERFE!'IE WITH OPENINGS IN BOTTOM OFUNIT LIQUID PRESSURE SERVICE PORT SUCTION PRESSURE SERVICE PORT MANUAL RESET HIGH PRESSURE CONTROL CONTROL BOX ANO SLOWER ACCESS PANEL • POWER WIRE ENTRANCE ¥• 018. 02-11¾." DIA. . 030. 036-1% • DIA. OC2. 048. 058-t"fn" DIA. ~~· ~ ___ ,,_~-----------