HomeMy WebLinkAbout2788 LOKER AVE W; ENERGY; CB880065; Permiti
i.
TITLE 24 REPORT FOR:
Building il
El Fuente Business Park
Carlsbad, California
PROJECT DESIGNER:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
OWNER:
Davison-Jones Development
411 campus Drive, Suite 830
Irvine, CA 92715
REPORT PREPARED BY:
PROCALC
705 s. Velare St. il0
Anaheim, CA 92804
1-(800) TITLE-24
Job Number: T499A
Date: 12/31/1987
The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the
•
calculations summarized in this compliance report. The program has interim
. approval and is authorized by the California Energy Commission for use with
\,\,'.:..#' the Second Generation Nonresidential Building Energy Efficiency Standards • .,,..
Cb.iioo ~s
Table Of Contents for Title 24 Report
-------------------------------------
Cover Page ••..•••••.••••••••..•••••••••••••••••••.••••••••••••••••••
Table of Contents ....................................................
Form CF-l Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1
2
3
5
Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7
Form CF-2 Envelope summary & Worksheet •••••••••••.••••••••••••••••••• 9
Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-4 HVAC Power Indices summary
Form WS-4 HVAC System summary Sheets
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form CF-5 Lighting Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
HVAC Zone & Space Loads Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
64
70
72
76
77
{.;ertiticate of Compliance (Part 1 ot 2) CF-1
Pro(ac:& ,ue :=rt= I
fu1-+tc le /eili.,ee,., /Q14:rf
Building Pennit Number·
I
Pim, Choc:l<od By -,
Climate Zone ,ue,/e-r
O'ccumanialfcn Author Cate
Prescriptive Approach/Performance
Approach Strategy
General
1 CEO Oc:upanc:'/ Type • • • • • • • ••• of£c.4-
2 use OccupanC'J Group/Oivision • • • . • • :s---z-.
3 Padca;e Soledad • • • • • • • • •. • • • &f,
4 Gress Condilfcned Floor Area • • • • • • 1:ZrY"< ft2
Roof and FloorS/
5 ' Prcpcsed Rcof/C4ilitlg Rt (CF-2. CF-3) • • ~O. j hr-F-ftZ'BIU
6 .. Required Rccf/C4iling Rt (CF-2) • • • • • ___ hr-F-ftZ'BIU
7 Prcpcsed Exlodcr Floor Rt (CF-2, CF-3) • • --hr-F-1\2/BIU
8 Raqulrad Extatfor Ftocr Rt (CF-2) • • • • • hr-F-ftZ181U
Walfa ,
9 · Prcpcsed Opaque Wall Rt (CF-2.° CF-3) • • !'f .D hr-F-ftZ1etu
.
10 Wall ~eat C~pac:ft:, (CF-3) • • • • • • • • S . ~ BtulF-lt2
Reqult;d Opaque. Wall Rt (CF-2) • • • • • ___ hr-F-ftZ'SIU
(C , ; fn Walla
.. ,,.·,2 ExtadcrWallAnla(CF-2) •••••••• Jfl 'Z-ft2
13 TotalGiazing~a(CF-2) •••••••• ,a.towo n2
14 Proposed Total Parcant (Una 13 / Una 12) • lzS . S: %
15 Average Total SC (CF-2) • • • • • • • • • e, ,¼
18 Allowed Total Gtazfng Percont •••••• ___ %
17 Wut Extador Wall Area (CF-2) • • • • • • "1 ?,e4--ft2
18 WestSlfaz!ngAraa(CF-2) • • • • • • • • \C...z, ft2
19 PrcpcsadWestP81Cant(CF-2). • • • • • 'i· S: %
20 Avera;~ Wast SC (CF-2) • • • • • • • • c::>, :4::'2
21 ADowedWastGtazing Percent. • • • • • %
Gta:Ing In Roof (CF-6) · Proposed Allowod
22 S,kylght 1 • • • • • • • • • ------ft2 23 Skyltght 2 • • • • • • • • • __ _ ---ft2 24· Skyltght3 •. • • • • • • • • __ _ ---ft2 25 Skylight -4 • • • • • ; • • • __ _ ---ft2 2B SkyllghtS ••••••••• __ _
27 Skylight 8 • . • • • • • • • • ------ft2 ft2 ---28 Sko/light 7 • • • • • • • • • __ _
29 Stc-tl(ght a • • .. • • • • • • __ _
UghUng
---ft2 ___ ft2
30 PrcpoaadAdiustad LPC (CF-5) •••••• I .z z Wattslft2
31 Allow.d LPO (CF-5) • • • • • • • • • • .____ Wattslft2
'HVAC
•
PtdcrmanceSetSelected •••••••• __ _
~ropcsld Fan, Wattage Index (CF-4) • • • o. j S-Wausnt2
/ t ADcwedF W \· 1 . an attaga Index ••••••• ___ Watts/ft2
\ • .:::':4 Prcpcsad Cooling Power Index (CF-4) • • ,SS . ft8 StuMt2
3S Allowed Cocllng Power Index • • : • • • .____ BtuMt2
37 Prcpcsad Healing Power Index (CF-4) • • , £>. t 1 Bluhlfl2
3S Allowed Heating Power Index • • • • • • .____ ·e!Uhlrt2
~ Revised September 1986
For Enforcement Agency Use Only
µ~
-;. "Z,'2-°" ~
~-W
. Signature and
Registralfon Stamp
u~~~,
Calo
Freid Checked ay
Approved By
Performance Approach
Energy Budge&
1 CEC Oea.lpanc:y °Type • • • , • • • • • .Qffi'«.
2 USC Oea.lpanc:y Group/Oivision • • • • • 13--Z..
Oate
Cate
4 Condilfonod Floor Aroa • • • • • • • • • 1:ZZ.f.? tt2
4 Budgot Tablo • • • • • • , • • • • • • .l«\t:z-I A
5 Allowed Energy Budget (WS-1A) • • • • • ('ZS:· 0 kB!U/yr-ft2
Calculated Annual Energy Con:iumpUon
6 Approved Calculation Method •••••• t:1(, 42t1f''-'l' '%4-
7 CEC 0esignation • • • • • • • • • • • L.pt:> o-t
8 Muldpllar • • • • • • • • • • • • • • • , ) •Q'Z;:] •
EsUmated Energy Use
9 Healfng • • • • • • , • • • • • • • • • ·s. r kStu,yr-tt2
10 Coaling • • • • • • • • • • • • • • • • Z (p. 0 kBtu/yr-ft2
11 Fans • • • • • • • • • • • • • • • • • ~ 4. '-kBtutyr-ft2
12 Ughts • •• • • • • • • • • • • ••• *"' 4::1 • :*J kStu,yr-ft2·
13 Miscellaneous Equipment • • • • •• ~ lf, .'l. kB!U/yr-tt2
14 Total •. • • • . • • • • • • • • • • • • • ___ k8tulyr•ft2
15 A~. Total Energy Use (lifte 8 x li11e t4t •• , JU: :='I k8tulyr-ft2
~~j~c.c\ . .
Compliance Statement
General. The proposed building represented In this sat of compliance
documentation Is consistent with the other compliance forms and
worxsheets. with the plans and speci6calions and with any other
calculalions or ccmputor runs submitted with this J:)ermic application.
Performance Approach. (when applicable) The energy perf0rmance estimate presented on this form was calculated using the approved
calculalion method Indicated above and with the CEC established lixed
and restricted engineering inputs for the appllcable dlmate zone and OCCUpa!'CY type.
Preacrfpllvo Approach. (when applicable) The proposed building has
been designed 10 meet the requirements ot the Allamaliva Component
• Package indicated above for the appropriate occupancy l'fP• and·climate
~.5tL
Sign8d ~ TbD?1'6H -'Przg;,,p!fM r:
Namellide
k!IZ:
Company
l:Z..'.20
City/Staro/Zip
(114) ln$7----S;,to ?t-°Z-0\)5
Telephone Calif. Ucense Number
t..-2-0
flt---
l.,;Sruncate o-t Compliance· (Part 2 ot 2) CF-·
} For Enforaament Agency Use Only
-000Jmanta11on Aulhor/Finn cfieckad By Oare
... ~,, . ' Both parts cne and ~ of lhfs Certificate of Compliance must be included wilh each building pennit application for the above noted building and appe, en !he ·plans submitted for appl"0WL The building.fealtlres and requirements rei:,resentact on lhe Cenilicate of Compliance are adequate to achie\ ccmpllanca wilh the seccnd generation nonresfdentfal energy standards for the building referenced above. The bulldftig features and requlremencs a: also adequate for arr, subsequent alterations. mcclilicalions or additions to Iha building.
-.
Designer One
Name (Print)
iilla/Company Name
Address
Signatura Data Signature Data
Enforcement Agarcf Signature Oata Enlorcament AgonCJ signature Oata
Dul;nwTwo ~ . 4tJZ-:r A, ~JNTce.
Dealgner Four
ame (Print) /
' . Dr-JGrtdfl:--A-n:i-\/NI J MI nm
Name (Print)
Tide/Company Name
Address
Signature pate
Data enlcrcement AgenCJ Signatute oa1a
Owner Enforcement Agency
Name (Print) • · Name (Print)
Tille/Company Name
Addtass Address
Data
Form Revised September 1986 Paq_ft __ ... -,t
CERTIFICATE OF COMPLIANCE' (part 1 of 2) CF-1 page 3 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
-ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
~.i..-~ •. , ;
Documentation: PROCALC Date ---------------------------------------------------------------------------
PERFORMANCE APPROACH
Roofs and Floors
Roof/Ceiling Rt (CF-2,3)
Ext. Floor Rt (CF-2,3)
Walls
R-30.1
R-0.0
Energy Budget
CEC Occupancy Type
Conditioned Floor Area
Total Number of Floors
Climate Zone
Opaque Wall Rt (CF-2,3)
Heat Capacity (CF-2,3)
R-9.0
5.3 HC
Energy Budget (WS-lA)
Lighting Adjustment (CF-5)
Energy Compliance Budget
Office
7228
1
7
125.0 o.o
125.0
Glazing in Walls
Exterior Wall Area (CF-2)
Total Glazing Area (CF-2)
Total Glazing Percent
Average Total SC (CF-2)
West Exterior Wall (CF-2)
West Glazing Area (CF-2)
West Glazing Percent
Average West sc
,~azing in Roof
... :.Jskylight Area ( CF-2)
Lighting
7492
2660
35.5
0.46
2934
162 s.s
0.46
0
sf
sf
' SC
sf.
sf
' SC
sf
Calculated Annual Energy Consumption
Approved Calculation NR COMPLY 24
Program Version Num~er 1.14
Oser License Number 1329
CEC Designation CPO 07
CEC Multiplier 1.027
Estimated
Beating
Cooling
Fans
Energy Use (KBtu/sqft-yr}
3.1
26.0
34.6
Proposed Adjusted LPD {CF-5)1.23 w/sf
Adjustment
Lights
Receptacle
63.7 X 1.027 = 65.5
41 .. 3
16.8
1.4
124.9
HVAC
Fan Wattage Index (CF-4) 0.75
Cooling Power Index (CF-4) 55.98
Heating Power Index (CF-4) 50.17
COMPLIANCE STATEMENT
Hot Water
w/sf Total (SCM-3)
Btuh/sf
Btuh/sf
The proposed building represented in this set of compliance documentation
is consistent with the other compliance forms and worksheets, with the plans
and specifications and with any other calculations or computer runs submitted
with this permit application.
The energy performance estimate presented on this form was calculated using
the approved calculation method indicated above and with the CEC established
fixed and restricted engineering inputs for the applicable climate zone and
occupancy type.
_;.GNED
\\ .... ,,/ ,_, .. -
DESIGNER
Calif. License t:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
-----
CERTIFICATE OF.COMPLIANCE (part 2 of 2) CF-l page 4 of 96
---------------------------------------------------------------------------Project: Building il ·
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By {.ocation: Carlsbad Date: 12/31/1987 ·-.\·--
Documentation: PROCALC Date ---------------------------------------------------------------------------
Both Parts one and two of this Certificate of Compliance must be included
with each building permit application for the above noted building, and
appear on ~he plans submitted for approval. The building features and
requirements represented on the Certificate of Compliance are adequate to
achieve compliance with the second generation nonresidential energy
standards for the building referenced above. The building features and
requirements are also adequate for any subsequent alterations, modifi-
cations or additions to the building.
PROJECT TITLE
Building il
El Fuente Business Park
·carlsbad, California
OTHER DESIGNER
Name:
Address:
City:
Signed:
DOCUMENTATION AUTHOR
PROCALC
705 s. Velare St. il0
Anaheim, CA 92804
1-(800) TITLE-24 2 /· / ) __ ,/'
1·--/// ;y_ __ /·· .. ··· .. / ..... ' Signed\: ______ /_· ________ _
'--,-...... __ ,/
/
OTHER DESIGNER
Name : bi ~JrJto 1c. lbirz. 1/;J,.,,,,r,,;:,
I "
Address: lUa I& t:lC\&?<7
City:
Signed:
==•=================================================== ===================
OWNER
Davison-Jones Development
411 Campus Drive, Suite 830
Irvine, CA 92715
• \.:_,:;;.;1igned:
ENFORCEMENT AGENCY
Name:
Agency:
City:
Signed:
MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page-5 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<&cation: Carlsbad Date: 12/31/1987
,.\ .. -,~~·~/'-' -
Enforcement Agency
Suilding_Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
ENVELOPE MEASURES
o certified Insulation Materials per Sec. 2-53ll(a)
o Insulation Installed to meet Flame Spread and Smoke Density
Requirements of Sec. 2-53ll(b)
o Urea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c)
o Retrofit Insulation specified per Sec. 2-5313
o Air Infiltration is minimized by specification of tested
manufactured doors and windows and proper sealing and
weath~rstripping per sec. 2-5317
LIGHTING SYSTEM MEASURES
o Certified Luminaires/Ballasts per Sec. 2-5314(b)
(.Independent Control within enclosed Areas per Sec. 2-5319(a) .,,,;__;,;r,
o Manual Switching Readily Accesible per Sec. 2-5319(b)
o Reduction of Lighting Load to at least 50%. per sec. 2-5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute)
o Separate switching of 0aylit Areas per_ sec. 2-53l9(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale occupancies per sec 2-53l9(h)
o Automatic Control of Display Lighting in Retail/Wholesale
Occupancies per Sec. 2-5319(h)
o Tandem Wiring of land 3 Lamp Luminaires per Sec. 2-5319(h)
OCCUPANCY SENSING DEVICES (when applicable)
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-53l9(e).2
1
.Time Delays to Prevent Undesirable cycling per sec. 2-53l9(e) .3
'--:-:,~ ... /Limits on Emmisions per exceptions to Sec. 2-5319 ( e)
Reference
MANDATOR~ FEATURES CHECKLIST lpart 2 ot 2) MF-l page 6 o~ 90 ---------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
~ .. -/.'.)....'.>'
Documentation: PROCALC Date
---------------------------------------------------------------------------
DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable)
o Uniform Illumination reduction to 50% per Sec. 2-5319(e).l
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3
0 Step Switching Devices with Separation between On/Off settings
per Sec. 2-5319(e).4
o Photocell Sensors shall be Diffusing type and no Opaque cover
allowed per sec. 2-5319(e).5
o Manufacturer's Instructions provided for Installation and
Calibration per sec. 2-5319(e).6
o Proper Installation of Controls including Sensor Location,
•
Certification of Initial Calibration and Control of Luminaires
· only within Daylit Areas per Sec. 2-5319(e).8 . ,~.:.:,J
Reference
---+----
o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _
HVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per Sec. 2-5312
o Certified BVAC Equipment per 2-5314(a)
o Certified Plumbing Equipment per 2-5314(a)
o Beating and Cooling Equipment efficiency per Sec. 2-5314(b)
o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c)
o Automatic Controls for Off-Hours per Sec. 2-5315{a)·
o Thermostat Set Point Requirements per Sec. 2-5315(b).l
o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2
o Automatic Exhaust Fan Dampers per Sec. 2-5316(b)
/,.Thermostat Controls for Each Zone per Sec. 2-5315(b)
\ 1.._ -_, ,_,,.~--
0 Ventilation Provided per Secs. 2-5316 & 2-5343
o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318
tkl'\-\
. . ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 96
---------------------------------------------------------------------------Project: Building tl
Designer: Ban.zuelo/Rierson/Duff & Associates, Inc
(.ocation: Carlsbad Date: 12/31/1987 ' ,l~ .,. . '
Enforcement Agency
Building Permit No
Checked By
i. ·•
Documentation: PROCALC Date ---------------------------------------------------------------------------
CLIMATE ZONE 7 ENERGY BUDGETS
cross
Floor Sectional Office Retail
No Area Budget Budget --------------------------
l 7228 125 165
BUILDING ENERGY COMPLIANCE BUDGET BY SPACE
Total Budget Energy
Occupancy Floor Floor (KBtu Budget
Flr Space Name Type Area Mult Area /sqft) (MBtu) ~-----------------------------------------------------1 Space l Office 452 X l = 452 X 125 = 56.5
1 Space 2 Office 1124 X l = 1124 X 125 • 140.5
l Space 3 Office 1120 X l = 1120 X 125 = 140.,Q
l Space 4 Office 414 X 1 -414 X 125 = 51.8
l space 5 Office 414 X l -414 X 125 = 51.8
1 Space 6 Office 610 X 1 = 610 X 125 = 76.2 (. Space 7 Office 414 X l = 414 X 125 = 51.8
Space 8 Office 414 X l -414 X 125 = 51.8 \.\:~11 Space 9 Office 610 X 1 = 610 X 125 = 76.2
1 Space 10 Office 414 X 1 = 414 X 125 • 51.8
1 Space 11 Office 414 X 1 = 414 X 125 • 51.8
1 space 12 Office 414 X l -414 X 125 == 51.8
1 Space 13 Office 414 X 1 -414 X 125 = 51.8 -----------TOTALS 7228 903.5
BUILDING COMPLIANCE BUDGET 903.5 MBtu / 7228 sqft • 125.0 KBtu/sqft
••
ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 96
---------------------------------------------------------------------------Project: Building il
Designer: aanzuelo/Rierson/Duff & Associates, Inc
1 (.cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
·'-,.,~_.,.,,._.,_,
Documentation: PROCALC Date
---------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate use
Flr Space Name Area Mult Area (KBtu/sqft) (MBtu)
--------------------------------------------------l Space 1 452 X l = 452 X 142 .,a = 64.5
1 Space 2 1124 X l = 1124 X 131.0 = 147.3
1 Space 3 1120 X 1 = 1120 X 108.5 = · 121. 5
1 Space 4 414 X 1 = 414 X 128.9 = 53.4
1 Space 5 414 X 1 = 414 X 112.3 = 46.5
1 Space 6 610 X 1 = 610 X 124.6 :s 76.0
1 Space 7 414 X 1 = 414 X 112.3 =. 46.5
1 Space 8 414 X 1 = 414 X 128.9 = 53·.4
1 Space 9 610 X 1 = 610 X 143.S = 87.5
1 Space 10 414 X 1 -414 X 128.9 = 53.4
l Space 11 414 X 1 -414 X 112.3 :s 46.5
1 Space 12 414 X 1 -414 X 128.9 = 53.4
1 Space 13 414 X 1 = 414 X 128.0 = 53.0 -----------(. TOTALS 7228 902.8
902.8 I. 7228 · . .'··-._;;;;tJILDING ENERGY CONSUMPTION MBtu sqft = 124.9 KBtu/sqft
,~~-----------------! AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 96
---------------------------------------------------------------------------Project: Building tl
_.llllllllii_esigner: Banzuelo/Rierson/Duff & Associates, Inc
:;ll'c,cation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW . w NW TOTALS
---------------------------------------------------------------------------Roof-1
Roof-2
6591
637
6591
637
---------------------------------------------------------------------------TOTALS
ROOF R-VALOE
Type
Roof-1
Roof-2
Assembly Name -----------------~--------R-30 B/U with T-Bar
R-30 B.O.Roof/Gyp. Clg
Average R-Value
7228
Area
6591
637
7228
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s
7228
Area/
R-Value R-Value --------------30.21 218.16
28.51 22.34 -------I 240.50 = 30.05
SW w NW TOTALS -----------------~-------------------------------------------------~-------NONE
---------------------------------------------------------------------------TOTALS 0
-• ~'.;,,,.·
AREA AND MA'.rERlALS SUMMARi FORM \part 2. Ot J) CF-2. page ~o o~ ~o ---------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
1.cation: Carlsbad Date: 12/31/1987 Checked By
''-\.~,;j.'
Documentation: PROCALC Date
---------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------963 297 2376 446 477 198 2736 7492 ---------~-----------------------------------------------------------------
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW Int TOTALS
---------------------------------------------------------------------------Wal-1
Wal-2
Wal-3
135
808
20
54 702 81 171
90
36
2576
160
1179
3474
180 ---------------------------------------------------------------------------TOTALS 963 54 702 81 261 36 2736 4833
.,._AQUE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY
· .. 1._..~ Area/ Area
..... -ype Assembly Name Area R-Value BC R-Value X HC ----------------------------------------------Wal-1 6.5" Conc/R-11/Gyp.Brd. 1179 10.34 17.4 114 20503
Wal-2 5/8 Gyp/R-11/Gyp WF 3474 10.19 1.4 341 4808
Wal-3 Solid Wood Door 180 2.22 2.4 81 430 ------------Totals 4833 536 25741
Average R-Value 4833 I 536 = 9.01
Average BC 25741 I 4833 -5.33
AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page ll of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By · ' ' ' '<,.,,..·
Documentation: PROCALC Date ---------------------------------------------------------------------------
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Wind-1 243 1674 365 216 162 2660
---------------------------------------------------------------------------TOTALS 243 1674 365 216 162 2660
GLAZING O-VALUE AND SC
Area X Area
Type Assembly Name Area u-value SC U-Value X SC --------------------------------------------------Wind-1 Sunglass Blue Plate 2660 1.14 0.46 3022 1223 ------------Totals 2660 3022 1223
Average U-Value 3022 I 2660 -1.14
c! Average SC 1223 I 2660 -0.46
' '~ ""'t
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 12 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
r&cation: Carlsbad . Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By ·-. ---:.:._;_· y,-
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
South Glazing
Southwest Glazing
southeast Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window (. ~~~;
· ~·~,·· Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
Heat Capacity of Exterior wall
Lighting Power
, • Climate zone
~ \';_~>·'' , .... , ____ .
Space l
430.0 sqft
108.0 sqft
40.5 sqft
40.5 sqft
452.0 sqft
20.0 sqft o.o sqft
452.0 sqft
452.0 sqft
10.20
0.88
30.02
2.22 o.oo
Rheem RPNC030J
1
Heat Pump
Heat Pump
Electric Resistance
2.960
9.850
0.990
No
3471 watts
373 watts
1000 CFM
3.35
1.500 watts/sqft
7
I·
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 13 of 96
---------------------------------------------------------------------------Project: Building il
.
_,,.-i_esigner: Banzuelo/Rierson/Duff & Associates, Inc
~ ('11'.ocation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------South
southwest
Southeast
OVERHANGS & SIDEFINS
South A southwest (§:' southeast
SPECIAL FEATURES
Daylighting Strategies
••
SC Factor ------------0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
12.0
4.5
4.5
Shading Device
Winter Summer ------------
overhang
Height Depth
0.09
0.70
9.0 ft
Overall
SC
0.40
0.40
0.40
Side-Fin .
Distance Depth --------------
No Daylighting controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 96 ---------------------------------------------------------------------------Project: Building il
.,, •esigner: Banzuelo/Rierson/Duff & Associates, Inc
: ~:>cation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
· Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type: ·
SCHEDULING
Occupancy Level for Operational Period:
Space 1
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Beater (I Number of Non-Operational Sours per
\~'".,;J Number of Holidays per Year:
Week: Day
Night
Heating Season
Cooling Season
Thermostat Set Point Temperatures: Winter
Winter Setback
summer
summer Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
•
Occupant Latent Load:
Occupant Density:
\.~~:;,,··--\
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 96 ---------------------------------------------------------------------------Project: Building il
.• esigner: Banzuelo/Rier son/Duff
~ -0cation. Carlsbad
& Associates, Inc
Date: 12/31/1987
Enforcement Agency
Building Permit No
C~ecked By t
Documentation: PROCALC Date --~-------------------------~----------------------------------------------
Space Name: Space l
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
-------------------------------BPTl = 48.83 (Winter) BPTl = 66.62
BPT2 = 59.47 (Summer) BPT2 = 75.26
BPT3 = 59.47 (Economizer) BPT3 = 75.26
HDD -0 (Heating) HDD = 2821
COD = 1202 (Cooling) CDD = 1
BUILDING HEAT TRANSFER (Btu/hr-F) •=•===~===•====================== Building Envelope Heat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter -summer -~• -I/,, .,i
ANNUAL LOADS (MBtus) --=-================ \!(~~; Heating
Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
source Cooling
.source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
---
=
3.0
31.2
38.2 -----72.4 X 1.027
--
---• • -
---•
224.6
227.2
317.2
312.5
1.2
7.6
0.4
4.7
5.8
7.6
2.5
0.2
74.4
50.3
16.8
1.4
•=========================================================================
TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 142.8 KBtu/sqft
===•===•===================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 16 of 96
------------------------------------------------------------------------~--Project:· Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
1,.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By \-::" /,':../
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
south Glazing
southwest Glazing
East Glazing
Southeast Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
Wall
•Window
(t, ·J Roof ~\,~:,,:-Door
Floor
HVAC SYSTEM ________ _. __ _
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Wat·er Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power ·
Air Circulation Rate
GENERAL
Heat Capacity of Exterior Wall
• Lighting Power
,. Climate Zone ... \:;;,~·
Space 2
540.0 sqft
108.0 sqft
121.5 sqft
81.0 sqft
121.5 sqft
1124.0 sqft o.o sqft
0.0 sqft
1124.0 sqft
1124.0 sqft
10.27
0.88
30.13 o.oo o.oo
Rheem RPNC058C
1
Heat Pump
Heat Pump
Electric Resistance
2.960
7.850
0.990
No
7355 watts
777 watts
2000 CFM
· 9.92
1.500 watts/sqft
7
lscM INPUT DA~~ -~~~MARY ( part 2 of 2) SCM-l page 17 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/31/1987 • ~ .. ;-,· J ·\:·..,
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ----~----------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------South
Southwest
East
southeast
OVERHANGS & SIDEFINS
A south
(~ Southwest
' ';i-'",,, East
Southeast
SPECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
9.0
12.0
13.5
9.0
13.S
Shading Device
Winter summer ------------
Overhang
Height Depth
0.37
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 96
---------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, .Inc
:'.cati!:)n: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
Space 2
Office
SCHEDULING
occupancy Level for Operatio~al Period:_ Day 54.60 %
Night 3.80 \
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week:
·' Number of Holidays per Year:
Day
Night
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CO-Value):
INTERNAL LOADS & ,ENERGY
Receptacle Peak Load:
Water Heating En~rgy:
Occupant Sensible Load:
Occupant Latent Load:
.• Occupant Density:
\..~:>/
Heating Season
cooling Season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 96 ------------------------------------------------------~--------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
-",.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ----------~----------------------------------------------------------------
Space Name: Space 2
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==•======================================= Daytime Nighttime
------------------------------BPTl = 48.88 (Winter) BPTl
BPT2 = 57.96 (Summer) BPT2
BPT3 -57.96 (Economizer) BPT3
HOD = 0 (Heating) HDD
CDD -1501 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) ====•=====•====================== Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
summer
ANNUAL LOADS (MBtus) -----===============
= 66.61 = 75.12 = 75.12 -2816 = 1
----{.
\..~;~/ Heating
Cooling
= -
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =•====•====================•=========== Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
Source Hot Water
= --
=
2.5
26.5
32.0 -----61.0 X 1.027
-----=
= = =
=
454.9
460.6
685.3
672.9
2.6
16.8
0.9
9.9
12.0
18.8
6.3
0.5
62.6
50.3
16.8
1.4
•·==••====================================================================
: ~ '-~.':.\· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 131. 0 KBtu/sqft
=======•===================================================================
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 20 of 96
---------------------------------------------------------------------------Project: Building 11 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.ocation: Carlsbad Date: 12/31/1987 Checked By.
•._.,..;..
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof ·
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof A Door
{~ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency .
Rated Water Beating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 3
540.0 sqft
40.5 sqft
135.0 sqft
1120.0 sqft o.o sqft o.o sqft
1120.0 sqft
1120.0 sqft
10.20
0.88
30.13 o.oo o.oo
Rheem RPNC024J
4
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached HVAC zone Heating & cooling Load summary for
more details on the zoning arrangement.
GENERAL
.• -;;;~-Capacity of
···c·,.;,. Lighting Power
Climate Zone
Exterior Wall 2.98
1.250 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 21 of 96 ---------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.ocation: Carlsbad Date: 12/31/1987 '\ ·.<·~: "· .::.>·,
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --~-----------------Northeast
East
OVERHANGS & SIDEFINS
Northeast
East • \D.J,ECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.07
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 96
---------------------------------------------------------------------------Project: Building tl
41111111i,esig~er: Banzuelo/Rierson/Duff & Associates, Inc
·~cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By -:.,
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 3
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
1 Number of Non-operational Hours per Week: Day 32 hours
. -~ Number of Holidays per Year: Heating
Cooling
Thermostat Set Point Temperatures: Winter
Winter
summer
summer
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate cu-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
•
Occupant Latent Load:
Occupant Density:
~\, . -: · .. -,, .. ,. ... ·
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
---------------------------------------------------------------------------Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:···cation: Carlsbad Date: 12/31/1987 Checked By \' ',
') .... '
-bocumentation: PROCALC Date ---------~-----------------------------------------------------------------
Space Name: space 3
BALANCE POINT TEMPERATURES AND DEGREE DAYS -----===•================================= Daytime Nighttime
------------------------------BPTl = 53.90 (Winter) BPTl -BPT2 = 60.49 (Summer) BPT2 -BPT3 = 60.49 (Economizer) BPT3 =
HOD = 28 (Heating) BDD =
CDD -1026 (Cooling) COD -
BUILDING HEAT TRANSFER (Btu/hr-F) •=••==•====•==•================== Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
Summer
Winter
summer
''seating
Cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL LOADS (MBtus) ====================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •===•=•=•=•===•===••===•====•===-------
67.03
75.45
75.45
2951
1
----
--
----= -
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
source cooling
Source Fan
Total space Conditioning Energy
Source Lighting
Source Receptacle
source Hot Water
-=
= -
2.0
15.9
29.2 ------47.2 X 1.027 = --=
237.7
239.7
467.3
451.2
2.0
10.5
0.8
5.9
10.9
15.6
6.3 o.s
48.4
41.9
16.8
1.4
.• ------====••======•====•================================•====•===========
\\.,.>' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 108. 5 KBtu/sqft
===========•======•========================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
1.ocation: Carlsbad . Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof eDoor
.· Floor
, ..
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 4
268.0 sqft
40.S sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Heat Pump
Beat Pump
Electric Resistance
2.920
9. 35.0
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
.. ;;;~-Capacity of
\\,.-> Lighting Power
Climate Zone
Exterior Wall 4.45
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 25 of 96 ------------------------~--------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
'.ocation: Carlsbad Date: 12/31/1987 \ ,,
,.,. ~
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date --------------------------------------------------------------------------~
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --------------------southeast
East
OVERHANGS & SIDEFINS
Southeast
East
i~PECIAL FEATURES
Daylighting Strategies
• ,.\.
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.14
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth -------------
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
•~cation: Carlsbad · Date: 12/31/1987 \ . ' ,
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Space 4
Office
Occupancy Level for Operational Period: Day 54.60 %
Night 3.80 %
Lights/Recepta~le Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
water Heater
2915
359
3274
4518
1770
32
hours
hours
hours
hours
hours
Number of Non-Operational Hours P.er Week:
cl Number of Holidays per Year: Heating
Day
Night
season
hours
46 hours
5 days
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (a-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
•
Occupant Latent Load:
Occupant Density:
'i
~ .. '--,._ -~' / •. _,,·
Cooling Season
Winter
Winter Setback
summer
summer Setup
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE. RESULTS SCM-3 page 27 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
··,; .. ;:.~.
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Space 4
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==•=•====·=-===============================
Daytime Nighttime
------------------------------BPTl -53~81 (Winter} BPTl = 67.40
BPT2 -60.52 (Summer) BPT2 = 75.61
BPT3 = 60.52 (Economizer) BPT3 = 75.61
HDD = 27 (Heating) BDD = 3069
CDD = 1020 (Cooling) coo = 1
BUILDING HEAT TRANSFER (Btu/hr-F) ===•==•====••====================
Building Envelope Heat Transfer Rate: Winter -summer =
overall Heat Transfer Factor ("K"): Winter -summer -
ANNUAL LOADS (MBtus)
----------===•=•==== {,
' "'-~,:;; Beating
cooling --
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Beating
Site Cooling
Site Fan
Site Lighting
Site Receetacle
Site Bot water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ====•===============•=•==•======•=====-------Source Heating
source Cooling
source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
source Hot Water
----
3.4
30.2
41.7 -----75.2 X 1.027
------
----
196.3
198.7
281.2
276.9
1.3
6.0
0.5
4.2
5.8
4.6
2.3
0.2
77.3
33.S
16.8
1.4
•·===•••==•====•====•=•=======•=•=•==•===•===========-------=====•==•====•
TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.9 KBtu/sqft
-----=-=============•================•===•=====•==••=••==••==·=------------
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 28 of 96 -~-------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
·&cation: Carlsbad Date: 12/31/1987 Checked By
• ~; .; ,J
•• ¥ ~ i
1.-•. <V_:."
Documentation: PROCALC Date ----------------------~-------~---------------------------------------~----
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor ·
R-VALOES (including inside film resistance)
Wall
Window
Roof
aooor
(~ Floor
-~.;...--
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 5
268.0 sqft
40.5 sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached HVAC Zone Heating & Cooling Load Summary for
more details on the zoning arrangement.
GENERAL
.-;;;~-Capacity of Exterior Wall <·>·· ' Lighting Power
Climate Zone
4.45
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 2-9 of 96
---------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
·:Acation: Carlsbad Date: 12/31/1987 ~ .. , _,: ·,.~, . , '
Documentation: PROCALC
Enforcement Agency
Building .Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
East
OVERHANGS & SIDEFINS
Northeast
East l,. .
' <.,PECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.14
0.70
9.0 ft
· overall
SC -------
0.40
0.40
· Side-Fin
Distance Depth -------------
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 96 ----~------------------------------------------------------------------~---Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
&cation: Carlsbad Date: 12/31/1987 Checked By
.' .. ~-
1.,:.:. ··-:·:,/
Documentation: PROCALC Date -------------------------------------------------~-------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 5
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number
('Number
of Non-Operational Hours per Week: Day
Night
v of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS ~------------------
Infiltration Rate:
Slab Floor Heat Loss Rate (O-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.• Occupant Density:
I .. ,, '-.;,,. ___ _,/
Heating Season
Cooling Season
Winter
Winter Setback
Summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE .RESULTS SCM-3 page 31 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Ouff
1.ocation: Carlsbad
& Associates, Inc
Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
:Ir '.' • ~ •
Documentation: PROCALC Date
------------------~--------------------------------------------------------
Space Name: Space 5-
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================
Daytime Nighttime
------------------------------BPTl = 56.34 (Winter) BPTl -BPT2 = 62.18 (Summer>-BPT2 =
BPT3 = 62.18 (Economizer) BPT3 =
HDD = 83 (Heating) HDD =
CDD = 784 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F} ===•=============================
Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
cl Heating
Cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
Summer
ANNUAL LOADS (MBtus)
====================
ANNUAL SITE ENERGY REQUIREMENTS (Matus) =======================================
67.92
76.04
76.04
3240
0
= = -=
=
=
--= --=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =============================================
source Beating
source Cooling
source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
source Hot Water
---
=
4.1
25.8
29.2 -----59.1 X l.027 = ---
196.3
198.7
281.2
276.9
1.5
4.5
0.6
3.6
4.0
4.6
2.3
0.2
60.7
33.5
16.8
1.4
•··======================================================================•
<\,"> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112. 3 KBtu/sqft
===========================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 32 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By ' ~ ;_ ; .,
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
Aooor
(~ Floor .. " ... ....,•
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
• ·,. \ .... ,·:,. /
Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
Space 6
432.0 sqft
40.5 sqft
189.0 sqft
610.0 sqft· o.o sqft o.o sqft
610.0 sqft
610.0 sqft
10.22
0.88
30.07 o.oo o.oo
Rheem RPNC024J
1
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
2743 watts
373 watts
850 CFM
5.39
1.500 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 33 of 96 ----------~----------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
-'··cation: Carlsbad Da~e: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS -------------------------Wall Absorptivity
Roof Absorptivity
ceiling Height
.Glass Framing
SHADING COEFFICIENTS
--------------------southeast
East
OVERHANGS & SIDEFINS
southeast A East
(5~ECIAL FEATURES
Daylighting Strategies
•• '-\",~·-~~·:;;
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
21.0
Shading Device
Winter . summer ------------
Overhang
Height Depth
0.17
0.70
9.0 ft
Overall
SC --------0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 96
---------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
',.cation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ----------------------------~----------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 6
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week:
i,~ Number of Holidays per Year:
Day
Night
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
: .Occupant Density:
:, ', . ·,...::·~·---.
Heating Season
Cooling Season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-r
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
'&cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By ·
\://} Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 6
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 53.35 (Winter) BPTl =
BPT2 = 59.88 (Summer) BPT2 =
BPT3 = 59.88 (Economizer) BPT3 =
HDD = 25 (Heating) HDD =
CDD = 1129 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) =================================
Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ( "K"): Winter
~Heating
Cooling
Site Beating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
Summer
ANNUAL LOADS (MBtus)
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
67.21
75.43
75.43
3007
1
• = -=
= -
-----=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating
source Cooling
source Fan
Total Space conditioning Energy
source Lighting
Source Receptacle
source Hot Water
= • -
=
3.0
23.4
28.3 -----54.7 X 1.027 -• -=
256.1
259.2
381.2
374.4
1.7
7.6
0.6
4.8
5.8
10.2
3.4
0.3
56.2
50.3
16.8
1.4
,· •·=-=======•==========-====•===•=•=====-===========-================--===•
·,\,HJ: TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 124.6 KBtu/sqft
-------=====================================-==========-==-=•====-==-=-=•==
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 96
---------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,.cation: Carlsbad Date: 12/31/1987 Checked By
. ~· ,. f
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film·resistance) ----------------------------------~--------Wall
Window
Roof
Door
, Floor
. .....,,,,,,.
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Beating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 7
268.0 sqft
40.S sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached HVAC Zone Heating & cooling Load summary for
more details on the zoning arrangement.
GENERAL
,.;;;~-Capacity of
<\>> Lighting Power · Climate zone
Exterior Wall 4.45
1.000 watts/sqft
7
r -------
1
SCM INPUT DATA SUMMARY (part 2 of 2)
Project: Building il
.
• esig~er: Banzuelo/Rierson/Duf f & Associates, Inc
.-.-.?cation. Carlsbad Date: 12/31/1987 \-,
Documentation: PROCALC
SCM-1 page 37 of 96
E_nforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS -----------~--------Northeast
East
OVERHANGS & SIDEFINS
Northeast
East
tlECIAL FEATURES
Daylighting Strategies
• <:y--'
Glass Framing
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer -------------
overhang
Height Depth
0 .14 ·
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 96
------------------------------------------------------~--------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
_.-:.cation: Carlsbad Date: 12/31/1987 Checked By
' -··}
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDOLING
Occupancy Level for Operational Period:
Space 7
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-operational Hours per Week: Day
Night
'~ Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CO-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
. (. Occupant Density:
\ .. :~:",,/·
Heating Season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 96
---------------------------------------------------------------------------Project: Building il
,-~esigner: Banzuelo/Rierson/Duff
-~cation: Carlsbad
Documentation: PROCALC
& Associates, Inc
Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
Space Name: Space 7
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 56.34 (Winter) BPTl =
BPT2 = 62.18 (Summer) BPT2 =
BPT3 = 62.18 (Economizer) BPT3 =
HOD = 83 (Heating) HOD =
COD = 784 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter /\. .
1
·· ..... :j Heating
cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
summer
ANNUAL LOADS (MBtus) ===•================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
67.92
76.04
76.04
3240
0
= -= -
-=
= ---= -
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =================•=•====•==================== source Heating
source cooling
source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
source Hot Water
----
4.1
25.8
29.2 -----59.l X 1.027 = -= -
196.3
198.7
281.2
276.9
1.5
4.5
0.6
3.6
4.0
4.6
2.3
0.2
60.7
33.5
16.8
1.4
•·=-========•===================•===============•=====================•=•=
·t-\.'>·"' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112. 3 KBtu/sqft
------------=-==================•========================•=========•==••=•=
SCM INPUT DATA SUMMARY {part l of 2) SCM-l page 40 of 96
---~----------------------------------------------~-------------------~----Project:-Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
1
1.cation: Carlsbad Date: 12/31/1987 Checked By
' ! :~--. ,
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS . -----,·
Exterior Wall
southeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
•
Door
(( ... , , Floor
·<:.;,./
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Beating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 8
268.0 sqft
40.5 sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Heat Pump
Beat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached BVAC Zone Heating & cooling Load summary for
more details on the zoning arrangement.
GENERAL
... ;;;~-Capacity of
'~ .. :> Lighting Power
Climate Zone
Exterior Wall 4.45
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM~l page 41 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/31/1987 ., ~ ',
• ·t~ ·.
Documentation: PROCALC
Enforcement Agency
Build~ng Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS ----------~--------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --------------------southeast
East
OVERHANGS & SIDEFINS
southeast
East •• \~~i>ECIAL FEATURES
Daylighting Strategies
SC Factor -------------0.46 0.880
0.46 0.880
Window
Height Width .
9.0
9.0
4.0
15.0
Shading Device
Winter summer ------------
Overhang
Height Depth
0.14
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
'
SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 96 ------------------------------------------------------------------~--------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff"& Assoc;ates, Inc Building Permit No
r&cation: Carlsbad Date: 12/31/1987 Checked By
-:··· ;,' ...
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 8
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Beater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours ,.I
'. '...~P1 Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate!
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible· Load:
Occupant Latent Load:
.• ,Occupant Density:
\ ''< C ,-"'-.,. -'
Night
Heating Season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 96 ---------------------------------------------------------------------------Project: Building il
_..i..esigner: Banzuelo/Rierson/Duff
(~iocation: Carlsbad '' '" ""
& Associates, Inc
Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By ··~, .. ,;,--'
Documentation: PROCALC Date ------~--------------------------------------------------------------------
Space Name: Space 8
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================
Daytime Nighttime
------------------------------BPTl = 53.81 (Winter) BPTl = 67.40
BPT2 = 60.52 (Summer) BPT2 = 75.61
BPT3 = 60.52 (Economizer) BPT3 = 75.61
HDD = 27 (Heating) HDD = 3069
CDD -1020 (Cooling) CDD = 1
BUILDING HEAT TRANSFER (Btu/hr-F) =-------========================= Building Envelope Heat Transfer Rate: Winter -summer a
overall Heat Transfer Factor ("K"): Winter = Summer -
ANNUAL LOADS (MBtus) ...
\5;:.ii:Y Heating
Cooling --
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
•=-=====================-================ Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating
Source Cooling
Source Fan
Total Space conditioning Energy
source Lighting
source Receptacle
Source Hot Water
----
3.4
30.2
41.7 -----75.2 X 1.027
------
= ---
196.3
198.7
281.2
276.9
1.3
6.0
0.5
4.2
5.8
4.6
2.3
0.2
77.3
33.5
16.8
1.4
•=========================================================================
1. ..
\~_:::-• TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 9 KBtu/sqft
===============================================================•===========
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 44 of 96
---------------------------------------------------------------------------Project: Building il
Designer:.Banzuelo/Rierson/Duff & Associates, Inc
r_'.cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By .
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof ·
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
-------------------------------------------Wall
Window
Roof (-~~~~r ,>...;.,/
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
Heat Capacity of Exterior Wall
Lighting Power
,. Climate Zone
\~.>.:::·_..' '.
Space 9
432.0 sqft
40.5 sqft
189.0 sqft
610.0 sqft
0.0 sqft o.o sqft
610.0 sqft
610.0 sqft
10.22
0.88
30.07 o.oo o.oo
Rheem RPNC036C
1
Beat Pump
Beat Pump
Electric Resistance
2.920
8.000
0.990
No
4510 watts
533 watts
1250 CFM
5.39
1.500 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 45 of 96 ---------------------------------------------------------------------------Project: Building il
.• esig~er: Banzuelo/Rierson/Duff & Associates, Inc
., ocation. Carlsbad Date: 12/31/1987 ~ ._;:
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
East
OVERHANGS & SIDEFINS
Northeast
East
rlPECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
21.0
Shading Device
Winter Summer ------------
Overhang ·
Height Depth
0.17
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 96
---------------------------------------------------------------------------Project: Building 11
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By .ocation: Carlsbad Date: 12/31/1987
' ! "'<·,, ~ ..
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 9
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30,
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Beater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours ,I ·-.. ':;Y Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CU-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
occupant Sensible Load:
Occupant Latent Load:
.• occupant Density:
, ,. , ' ~
Heating
Cooling
Winter
Winter
summer
summer
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
o.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 96
---------------------------------------------------------------------------Project: Building il
•esigner: Banzuelo/Rierson/Duff & Associates, Inc
t-ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 9
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 53.65 (Winter) BPTl
BPT2 = 59.51 (Summer) BPT2
BPT3 = 59.51 (Economizer) BPT3
HOD = 26 (Heating) HOD
CDD = 1194 (Cooling) COD
BUILDING HEAT TRANSFER (Btu/hr-F) =================================
Building Envelope Heat Transfer Rate: Winter
summer
Winter
summer
Overall Heat Transfer Factor ("K"):
ANNUAL LOADS (MBtus) •======================
= = = = =
66.99
75.13
75.13
2935
1
= --=
--_ .. ·._.·.\ ,m · \-;,.,,-,· Heating -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================== Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating
Source Cooling
sour<::e Fan
Total Space conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
= -= -
3.0
29.7
40.4 -----73.1 X 1.027
-
= = --=
=
= --,.
256.1
259.2
381.2
374.4
1.6
9.1
0.6
6.0
8.2
10.2
3.4
0.3
75.1
50.3
16.8
1.4
•=================.====================================•=====•=============
( ' '<>:· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 143.5 KBtu/sqft
====•====••===============================•=====================•=========•
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 48 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By /.cation: Carlsbad Date: 12/31/1987 '·,-'. •;'
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES {including inside film resistance)
Wall
Window
Roof
.Door
-~Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Beating Efficieqcy
Rated Cooling Efficiency
Rated Water Beating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 10
268.0 sqft
40.5 sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
·1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC system. Please refer to
the attached HVAC Zone Heating & cooling Load summary for
more details on the zoning arrangement.
GENERAL
, .• ;;;~-capacity of
\., .,, Lighting Power
Climate Zone
Exterior wall 4.45
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 49 of 96 ----~----------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
t&cation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ----~----------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------southeast
East
OVERHANGS & SIDEFINS
southeast
East
,·IECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
Overhang
Height Depth
0.14
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page SO of 96
---------------------------------------------------------------------------Project: Building il
Designer: ·Banzuelo/Rierson/Duff & Associates, Inc
r.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By , J
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 10
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
..... Number
(]j) Number
of Non-operational Hours p_er Week:. Day
Night
of Holidays per Year:
Thermostat set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
• Occupant Density:
· I . \::, .. , .. • .-·
Heating Season
Cooling season
Winter
Winter Setback
Summer
summer setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 51 of 96 ---------------------------------------------------------------------------Project: Building #1
__ f/jesigner: Banzuelo/Rierson/Duff & Associates, Inc
'~ ncation: Carlsbad Date: 12/31/1987 . \
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 10
BALANCE POINT TEMPERATURES AND DEGREE DAYS -----=====================================
Daytime Nighttime
------------------------------BPTl • 53.81 (Winter) BPTl = 67.40
BPT2 = 60.52 (Summer) BPT2 = 75.61
BPT3 = 60.52 (Economizer) BPT3 = 75.61
HOD = 27 (Beating) HOD = 3069
COD = 1020 (Cooling) CDD = l
BUILDING HEAT TRANSFER (Btu/hr-F)
··-----·===•=••=•==••=========•== Building Envelope Heat Transfer Rate: Winter • summer -Overall Heat Transfer Factor ("K"): Winter = summer -
ANNUAL LOADS (MBtus) --G· { ,'·. ··, .,
\ _\;,/ Beating
Cooling
= -
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ---·----·===============·=---===-====-= Site Heating
Site Cooling
Site Fan
Site Light_ing
Site Receptacle
Site Hot Water
ANNUAL-SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ···========================••======•======••= source Heating
source cooling
source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
Source Hot Water
•
= -
•
3.4
30.2
. 41. 7 -----75.2 X 1.027
--= ---
=
• -•
196.3
198.7
281.2
276.9
1.3
6.0
0.5
4.2
5.8
4.6
2.3
0.2
77.3
33.5
16.8
1.4
•·············=···====•=========•=====•••=•==••••••=•••=••=••==••••==•=•••
1[ ~ ,
; " '· \>,:,:,ef , .... ~-TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.9 KBtu/sqft
····=·==•=•=====••=====•====•==============•===============================
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 52 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
•1.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
,\.
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window Roof ·
--~ ~~~~r _C!';}
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Beating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Beating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 11
268.0 sqft
40.5 sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
4
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & Cooling Load Summary for
more details on the zoning arrangement.
GENERAL
.;;;~-Capacity of
' Lighting Power
Cllmate Zone
Exterior Wall 4.45
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 53 of 96
------------------------------------------~--------------------------------Project: Building il
_ _.esigner: Banzuelo/Rierson/Duff & Associates, Inc
'~cation: Carlsbad Date: 12/31/1987
'\ .:
Documentation: PROCALC
Enforcement Agency
Building-Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS --~-----------------Northeast
East
OVERHANGS & SIDEFINS
--------------------Northeast
East
IBCIAL FEATURES
Daylighting Strategies
• ('. --..~:;,-;
Glass Framing
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.14
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 54 ot 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associate~, Inc
(_.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
space 11
Office
SCHEDULING
Occupancy Level for operational Period: Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
water Beater
Number
(~Number
of Non-Operational Hours per Week: Day
Night
of Holidays per Year:
Thermostat set Point T~mperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
• Occupant Density:
Heating Season
Cooling season
Winter
Winter setback
summer
summer setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 55 of 96
---------------------------------------------------------------------------Project: Building il
_...aiesigner: Banzuelo/Rierson/Duff & Associates, Inc
'-'-cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 11
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------
•
BPTl = -56. 34 (Winter) BPTl
BPT2 = 62.18 (Summer) · BPT2
BPT3 = 62.18 (Economizer) BPT3
BDD = 83 (Heating) BDD
CDD = 784 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) =================================
Building Envelope Beat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
summer
ANNUAL LOADS (MBtus)
·-@7;) Beating ====================
Cooling
= = = = =
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site Cooling
Site Fan
Site Lighting
·site Receptacle
Site Bot Water
=======================================
67.92
76.04
76.04
3240
0
-=
..
=
= -=
=
=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating
Source Cooling
Source F~n
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Bot Water
= = =
=
4.1
25.8
29.2 -----59.l X 1.027 = --=
196.3
198.7
281.2
276.9
1.5
4.5
0.6
3.6
4.0
4.6
2.3
0.2
60.7
33.5
16.8
1.4
•=========================================================================
·~' -.. . TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 112.3 KBtu/sqft
===========================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 56 of 96
---------------------------------------------------------------------------Project: Building il
. •.esigner: Banzuelo/Rierson/Duff & Associates, Inc
:~cation: Carlsbad Date: 12/31/1987 I . :•;
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
space Name:
AREAS
Exterior Wall
southeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
Door
Space 12
268.0 sqft
40.5 sqft
135.0 sqft
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
( Floor
10.22
0.88
30.00
2.22 o.oo
I --.. , ...... -,
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Beating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Rheem RPNC024J
4
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
10972 watts
1492 watts
3400 CFM
* Note: 4 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement •
• NERAL
: ~;;;;-Capacity of Exterior Wall
\-.. '.'">·Lighting Power
4.45
l.000 watts/sqft
7 Climate Zone
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 57 of 96
---------------------------------------------------------------------------Project: Building #l Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.ocation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date
-----~---------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS
--------------------Southeast
East
OVERHANGS & SIDEFINS
Southeast
East • ·. <li.:,iJPECIAL FEATURES
Daylighting Strategies
• : ' ,
Glass Framing
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter summer ------------
overhang
Height Depth
0.14
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting controls
SCM FIXED INPU'l' DA'.L'A ~UMMA1U ~~M-~ page jo o~ ~o
---------------------------------------------------------------------------Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By.
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
space 12
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours
cl Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat toss Rate cu-value):
INTERNAL LOADS & ENERGY
Receptacle Peak toad:
Water Heating Energy:
occupant sensible Load:
occupant Latent Load.:
• occupant Density:
\.'.>'"~
Heating
cooling
Winter
Winter
summer
summer
Night
Season
Season
Setback
setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 59 ot ~o
---------------------------------------------------------------------------Project: Building il
Banzuelo/Rierson/Duff & Associates, Inc
Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
,·.-· Documentation: PROCALC Date --------~------------------------------------------------------------------
Space Name: Space 12
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 53.81 (Winter) BPTl
BPT2 = 60.52 (Summer) BPT2
BPT3 = 60.52 (Economizer) BPT3
HOD = 27 (Heating) HOD
COD = 1020 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) •===•========•=================== Building Envelope Heat Transfer Rate: Winter
Summer
Winter
summer
Overall Heat Transfer Factor ("K"):
.. I Heating
Cooling
ANNUAL LOADS (MBtus) ====================
= = -= =
67.40
75.61
75.61
3069
l
= -=
=
--
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL
Source Heating
Source Cooling
Source Fan
SOURCE ENERGY USE
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot Water
---= = -
ESTIMATE (KBtu/sqft) -3.4 -30.2 = 41.7 -------75.2 X 1.027 = = = -
196.3
198.7
281.2
276.9
1.3
6.0
0.5
4.2
5.8
4.6
2.3
0.2
77.3
33.5
16.8
1.4
•============•==============•===========•====•===========•====•====••======
·.\,.> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 9 KBtu/sqft
==•====•=====•=•====•=========•=•==========================•====•======•=•=
1-
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 60 of 96·
---------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
~' ,;( .. -_;,~·
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
Roof
-
Door
( Floor .
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL -------
• ·, .
' -'-.~, , . ..-~~
Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
Space 13
403.0 sqft
40.5 sqft
135. O sqft-
414.0 sqft
20.0 sqft o.o sqft
414.0 sqft
414.0 sqft
10.26
0.88
30.00
2:22 o.oo
Rheem RPNC024J
1
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
2743 watts
373 watts
850 CFM
8.58
1.000 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) · SCM-1 page 61 of 96
-~-------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
, .. ocation: Carlsbad Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date -~-----------------------------------------------------------~-------------
OTHER PHYSICAL PARAMETERS
-~-----------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --------------------Northeast
East
OVERHANGS & SIDEFINS
Northeast
East
.el'ECIAL FEATURES
Daylighting Strategies
•
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
Overhang
Height Depth
0.33
0.10
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 62 of 96
---------------------------------------------------------------------------Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
~ :~·. . · ...
Documentation: PROCALC Date
--------------------------------------------------------~------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Space 13
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Nig~t 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night rA. --~ Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate cu-value):
INTERNAL LOADS.& ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.• Occupant Density:
',~·~-.. ,,-_,:
Heating Season
Cooling Season
Winter
Winter setback
summer
summer setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 63 of 96
---------------------------------------------------------------------------Project: -Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
···cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------~-----------------------------------------------------
Space Name: Space 13
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 55.58 (Winter) BPTl
BPT2 -61.59 (Summer) BPT2
BPT3 -61.59 (Economizer) BPT3
BDD -59 (Beating} BDO
CDD = 861 (Cooling} CDD
BUILDING BEAT TRANSFER (Btu/hr-F) -----·====================•====== Building Envelope Beat Transfer Rate: Winter
summer
overall Beat Transfer Factor ("K"): Winter
laeating
cooling
summer
ANNUAL LOADS (MBtus) •===================
= = -= =
67.63
75.75
75.75
3144
0
----
• -
ANNUAL SITE ENERGY REQUIREMENTS (MBtus}
Site Beating
Site Cooling
Site Fan
Site Lighting
Site Rec,ptacle
Site Bot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft} ===================•========================= source Heating
source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot water
• • • -
3.9
28.8
41.7 -----74.3 X l.027
------
• • • •
209.l
211.5
294.0
289.7
1.4
5.5
0.5
4.0
5.8
4.6
2.3
0.2
76.3
33.5
16 •. 8
1.4
•·========================================================================
'.,1·---.... > TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128. 0 KBtu/sqft
===========================================================================
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 64 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:'.ocation: car lsbad Date: 12/31/1987 '. t;{:~~:}" .
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
-----------------------------~--------------------------------------~------
Assembly Name: Solid wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value ·
Fr (in) Summer Winter
---------~-----------------------------------------------------------------1. Hardwood, Maple
2. Inside Air Film
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.750 1.54
0.68
1.54
0.68
(,---------------~-----------------------------:::::---------:~::-----:~::-
Framing Percentage: 0.0 I
Framing Material: NONE
OVERALL VALUES ADJUSTED FOR FRAMING
-------------------------------Sketch of Construction Assembly
•
sorptivity:
.. ughness: Clear Pine
\~\, .. aight:
Heat Capacity:
0.10
6.1 lb/sqft
2.39
R-Value
u-value
2.22
0.4505
a••••=
2.22
0.4505
==•••=
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 65 of 96 ---------------------------------------------------------------------------Project: Building tl
1 Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By t,, , ,,
Documentation: PROCALC Date ---------------------------------------------------------------------------
Assembly Name: R-30 B/U with T-Bar
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) Summer Winter . ----------~-----------------------------------------------------------------1. Roofing, Built-Up
2. Plywood
3. Air ~pace
4. Insulation, Mineral Wool, R-30
5. Acoustical Tile, Mineral Fiberboard
6. Inside Air Film
7. a.
9.
10.
11.
0.375
0.500
24.000
* 9.500
0.750
0.33 0.33
0.63 0.63
1.00 0.80
30.00 30.00
2.03 2.03
0.92 0.61
---------------------------------------------------------------------------
(Q:.) Total 34. 90 34. 39
10.0 % Framing Percentage:
Framing Material: Softwood, Douglas Fir-Larch
1 2 3 4 5
Calculation for Framing Adjustment.
summer 0-Value
0.0287 X 0.90 + 0.0699 X 0.10 = 0.0328
Winter o-value
0.0291 X 0.90 + 0.0725 X 0.10 • 0.0334
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
0-Value
30.51
0.0328
29.92
0.0334
Sketch of construction Assembly ==•===
•
sorptivity:
;. oughness: Concrete, Asph.
'\,.,veight:
Heat Capacity:
0.70
Shingles
8.1 lb/sqft
2.58
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 66 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,,.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By .
:..., ,,
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: R-30 B.U.Roof/Gyp. Clg
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Roofing, Built-Up
2. Plywood
3. Air ~pace
4. Insulation, Mineral Wool,
Gypsum or Plaster Board
Inside Air Film
5.
6.
7.
8.
9.
10.
11.
R-30 *
0.375
0.500
6.000
9.500
0.625
0.33
0.63
1.00
30.00
0.56
0.92
0.33
0.63
0.80
30.00
0.56
. 0.61
(.--------------------------------------------------------------------------
.(./ Total 33. 44 32. 93
Framing Percentage:
Framing Material:
1 2 3 4 5
10.0 %
Softwood, Douglas Fir-Larch
Calculation for Framing Adjustment
Summer U-Value
0.0299 X 0.90 + 0.0779 X 0.10 = 0.0347
Winter U-Value
0.0304 X 0.90 + 0.0811 X 0.10 = 0.0354
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
u-value
28. 82.
0.0347
28.22
0.0354
Sketch of Construction Assembly •===== =======
•
sorptivity:
, . ughness: Stucco,
\-... eight:
· Beat Capacity:
0.70
Wood Shingles
9.4 lb/sqft
3.01
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 67 of 96
Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By ,
Documentation: PROCALC Date ----------------~-----------------------------------~----------------------
Assembly Name: sunglass Blue Plate
Assembly Type: Glazing
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) Summer Winter
---~-----------------------------------------------------------------------l. CEC Single Glazing
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11 •
0.250 0.20
0.68
0.20
0.68
..• -------------------------------------------------------------------------
' ~;.;".;;/ Total O. 88 O. 88
Framing Percentage: 0.0 I
Framing Material: NONE
1
-------------------------------Sketch of Construction Assembly
•
ading Coefficient:
\ . sible Transmittance:
0.46
0.30
OVERALL VALOES ADJUSTED FOR FRAMING
R-Value
O-Value
0.88
1.1364 --=-=•
0.88
1.1364 ======
---~ -----------------
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 68 of 96
------------------------------------------------------------------~--------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By .ocation: carlsqad Date: 12/31/1987 . \. . .
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 5/8 Gyp/R-ll/Gyp WF
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Gypsum or Plaster Board
2. Insulation, R-11, 2x4 Wood Framing 16"
0.625
3.500
0.625
0.56
8.38
0.56
0.68
0.56
8.38
0.56
0.68
3. Gypsqm. or Plaster Board
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11.
·------------~---------------------------------------------------------~--~
( : .. ~,fj
<:·;.;1 . Total 10 .19 10 .19
Framing Percentage:
Framing Material:
...-t-H---1
Po<.-++---2
1-t---3
0.0 I
Softwood, Douglas Fir-Larch
Calculation for Framing Adjustment
Summer u-value
0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982
Winter U-Value
0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982
OVERALL VALUES ADJUSTED FOR FRAMING
-------------------------------
R-Value
o-value
10.19
0.0982
10.19
0.0982
Sketch of Construction Assembly
Absorptivity:
.~ughness: Smooth
\.'.:\ .... eight:
Heat Capacity:
o.oo
Plaster, Metal
5.4 lb/sqft
1.38
···=== ======•
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 69 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By .·,.:. ·.·,,
',. ,,.·
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 6.5" Conc/R-11/Gyp.Brd.
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------. 1. concrete, 140 lb, Oven Dried
2. Insulation, R-11, 2x4 wood Framing 16"
3. Gypsijm or Plaster Board
4. Inside Air Film s.
6.
7. a.
9.
10.
11.
6.500
3.500
0.625
0.11
8.38
0.56
0.68
0.71
8.38
0.56
0.68
(~-------------------------------------------------------------~-----------
._(~ Total 10. 34 10. 34
Framing Percentage: o.o I
Framing Material: NONE
• . . 1 .,
2 • . . ... 3 . .
• . ..
=-. . . . OVERALL VALUES ADJUSTED FOR FRAMING
1
-------------------------------Sketch of Construction Assembly
•
sorptivity:
.··. . ughness: concrete,
\.\-.. ~eight:
Heat capacity:
0.70
Asph. Shingles
78.6 lb/sqft
17.39
R-Value
o-Value
10.34
0.0967 ------
10.34
0.0967
=-----
HVAC POWER INDICES SUMMARY FORM (part 1 of 2) CF-4 page 70 of 96 ---------------------------------------------------------------------------Project: Building il Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Buildlng Permit No
4tocation: Carlsbad Date: 12/31/1987 Checked By
-..-·. -.. f
Documentation: PROCALC Date ---------------------------------------------------------------------------
FAN ENERGY
No. Motor Drive Conv No. Fan
HVAC System Sys BHP Eff~ Eff. Fact Fans Watts --------------------------------------Rheem RPNC030J {Fanl) l X 0.33 / [0.66 X 1.00] X 746 X 1 = 373
Rheem RPNC058C (Fanl) 1 X 0.75 / [0.72 X 1.00] X 746 X l = 777
Rheem RPNC024J (Fanl) 4 X 0.33 / [0.66 X 1.00] X 746 X l -1492
Rheem RPNC024J (Fanl) 4 X 0.33 / [0.66 X 1.00] X 746 X 1 = 1492
Rheem RPNC024J (Fanl) l X 0.33 / [0.66 X 1.00] X 746 X l = 373
Rheem RPNC036C (Fanl) l x a.so / [0.70 X 1.00] X 746 X l = 533
Rheem RPNC024J (Fanl) l X 0.33 / [0.66 X 1.00] X 746 X l = 373 ------Total 5413
FAN WATTAGE INDEX 5413 watts/ 7228 sqft·= 0.749 watts/sqft
HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 pag~ 71 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
/.cation: Carlsbad Date: 12/31/1987 -.. ,_ .. ··.. .
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date --------------------------~------------------------------------------------
HEATING EQUIPMENT
system No. Design Equip Conv. Source
Description Type Sys output Eff Factor (Btu/hr)
--------------------------------------------------------Rheem RPNC030J. Heat Pump 1 X 30600 I 2.96 X 3.000 • 31014
Rheem RPNC058C Heat Pump l X 61000 I 2.96 X 3.000 = 61824
Rheem RPNC024J Heat Pump 4 X 22600 I 2.92 X 3.000 = 92877
Rheem RPNC024J Heat Pump 4 X 22600 I 2.92 X 3.000 = 92877
Rheem RPNC024J Heat Pump 1 X 22600 / 2.92 X 3.000 = 23219
Rheem RPNC036C Heat Pump l X 3660ft / 2.92 X 3.000 = 37603
Rheem RPNC024J Heat Pump l X 22600 / 2.92 X 3.000 = 23219 --------Total 362632
HEATING POWER INDEX 362632 Btu/hr I 7228 sqft = 50.17 Btu/hr-sqft
COOLING EQUIPMENT
system No. Design Equip Conv. source
Description Type Sys output Eff Factor (Btu/hr)
rl;;;-;;;~030;------------------------------------------Heat Pump 1 X 30200 I 9.85 X 10.239 = 31393 \. :i,fleem RPNC058C Heat Pump l X 57500 I 7.85 X 10.239 • 74999
Rheem RPNC024J Heat Pump 4 X 23000 I 9.35 X 10.239 = 100747
Rheem RPNC024J Heat Pump 4 X 23000 I 9.35 X 10.239 • 100747
Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 = 25187
Rheem RPNC036C Heat Pump l X 36200 I 8.00 X 10.239 • 46331
Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 • 25187 --------Total 404592
COOLING POWER INDEX 404592 Btu/hr/ 7228 sqft = 55.98 Btu/hr-sqft
HVAC SYSTEM SUMMARY SHEET
Project: Building tl
ws-4 page 72 of 96
Enforcement Agency
Designer: ·aanzuelo/Rierson/Duff & Associates, Inc Building Permit No
.·.ocation: Carlsbad Date: 12/31/1987 ·Checked By
,;_:·: ·,;
Documentation: PROCALC Date ---------------------------------------------------------------------------
BVAC Equipment Name:
BEATING
system Type:
output capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
system Type:
Total Output Capacity:
sensible output capacity:
Latent output Capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer: A supply Air Temperature:
(~AlNS ~ • .';,.:_,4·
supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
•
supply Duct Heat Gain:
Return Duct Heat Gain:
supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC024J
Heat Pump
22600 a.tu/hr
2.920
105.0 F
Heat Pump
23000 Btu/hr
17800 Btu/hr
5200 Btu/hr
9.350
2743 watts
0.100
No
55.0 F
850 cfm
Blow-Through
l
0.33
66.0 I
100.0 I
2.0 I
2.0 I
4.0 I
4.0 I
HVAC SYSTEM SUMMARY SHEET page 73 of 96 ---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/31/1987
_Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC Equipment Name:
HEATING
system Type:
Output capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
System Type:
Total output capacity:
Sensible Output capacity:
Latent output Capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer:
:~~:pply Air Temperature:
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC030J
Heat Pump
30600 Btu/hr
2.960
105.0 F
Heat Pump
30200 Btu/hr
2-1600 Btu/hr
8600 Btu/hr
9.850
3471 watts
0.100
No
55.0 F
1000 cfm
Blow-Through
l
0.33
66.0 I
100.0 I
1.0 I
l.0 I
2.0 I
2.0 I
HVAC SYSTEM SUMMARY SHEET WS-4 page 74 of 96
---~------------~----------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
/.cation: Carlsbad Date: 12/31/1987 . ·-,· ·+·c:
Enforcement Agency
Building Permit No
Checked By
--~ Documentation: PROCALC Date -------------------------------------------~-------------------------------
HVAC Equipment Name:
HEATING
system Type:
output capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
system Type:
Total Output capacity:
sensible Output Capacity:
Latent output capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer: , I supply Air Temperature:
·-¼~·ANS
supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Suppiy Duct Air Leakage:
Return Duct Air Leakage:
••
Rheem RPNC036C
Heat Pump
36600 Btu/hr
2.920
105.0 F
Heat Pump
36200 Btu/hr
26200 Btu/hr
10000 Btu/hr
8.000
4510 watts
0.100
No
55.0 F
1250 cfm
Blow-Through
l
0.50
70.0 I
100.0 I
1.0 I
1.0 I
2.0 I
2.0 I
BVAC SYSTEM SUMMARY SHEET ws-4 page 75 of 96 ----~----------------------------------------------------------------------Project: Building fl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
-oca·tion: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
HVAC Equipment Name:
HEATING
system Type:
Output Capacity:
Rated Efficiency:
Supply Air Temperature:
COOLING
System Type:·
Total Output Capacity:
Sensible output Capacity:
Latent Output Capacity:
Rated Efficiency:.
Input Power Rating:
Coil Bypass Factor:
Economizer: , e Supply Air Temperature:
--~iNs
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC058C
Heat Pump
61000 Btu/hr
2.960
105.0 F
Heat Pump
57500 Btu/hr
43000 Btu/hr
14500 Btu/hr
7.850
7355 watts
0.100
No
55.0 F
2000 cfm
Blow-Through
l
0.75
72.0 I
100.0 I
1.0 I
1.0 I
2.0 I
2.0 I
LIGHTING SUMMARY AND WORKSHEET CF-5 page 76 of· 96 ---------------------------------~--------------------~--------------------Project: Building ·tl
4.esigner: Banzuelo/Rierson/Duff & Associates, Inc
(/ , .ocation: car lsbad . Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
INSTALLED LIGHTING POWER BY SPACE
Space Name
Space 1
Space 2
Space 3
Space 4
Space 5
Space 6
Space 7
Space 8
Space 9
Space 10
Space 11
,,ace 12
ace 13 ~c~'J ~ .......
Floor
Area -----452 X
1124 X
1120 X
414 X
.414 X
610 X
414 X
414 X
610 X
414 X
414 X
414 X
414 X
BUILDING LIGHTING WATTAGE
•
Vert Horiz
Mult Mult -----1 X 1 = 1 X 1 = 1 X 1 = l X 1 = 1 X 1 -l X l = 1 X 1 -1 X 1 = 1 X 1 = 1 X l = 1 X 1 = l X l = 1 X l -
TOTALS
8906 watts/
Total
Floor Lighting Installed
Area (watts/sqft) wattage --------------------------452 X 1.500 = 678
1124 X 1.500 = 1686
1120 X l.250 = 1400
414 X l.000 -414
414 X 1.000 = 414
610 X 1.500 = 915
414 X 1.000 -414
414 X 1.000 -414
610 X 1.500 = 915
414 X 1.000 = 414
414 X 1.000 = 414
414 X 1.000 = 414
414 X 1.000 -414 --------------7228 8906
7228 sqft = 1.232 watts/sqft
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 77 of 96 ---------------------------------------------------------------------------Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(~cation: Carlsbad . Date: 12/31/1987 Checked By
... ,,'""
Documentation: PROCALC Date
---------------------------------------------------~------------~----------
HVAC ZONE DESCRIPTION
HVAC zone Name:
BVAC system Name:
System Multiplier:
Beating Schedule:
Cooling Schedule:
Fan s·chedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 1
PEAK
(Jan 6am)
HEATING
9038
TOTAL SPACE LOAD 9038
Bypass Ventilation Air (
Apply Duct Conduction
(~pply Duct Leakage
·· '·viupply Fan Heat Gain
9 cfm) 318 (
90
181
. 0
EFFECTIVE SPACE LOAD 9628
Ventilation (
Return Duct conduction
Return Duct Leakage
Return Fan Heat Gain
81 cfm)
TOTAL SYSTEM LOAD
•
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
2864 (
96
193
-1273
11508
25084
Space l
Rheem RPNC030J
l
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 2pm) 9298 1153 --------------9298 1153
9 cfm) 50 12
93
186 23
0 --------------9626 1187
81 cfm) 447 104
96
193 24
1273 --------------11636 1315
1.0 tons O.l tons
21633 9826
1.8 tons 0.8 tons
SPACE HEATING & COOLING LOAD SUMMARY page 78 of 96 ---------------------------------------------------------------------------Project: Building il
4esigner: Banzuelo/Rierson/Duff & Associates, Inc
:;· ... ·,ocation: Carlsbad Date: 12/31/1987 \·¥: -
Enforcement Agency
Building Permit No
Checked By
,,,
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door conduction
Roof conduction
Skylight Conduction
Floor Conduction e Slab Conduction
;' Interior conduction
1. .,_:/ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1326
5760
268
484
0
0
1201
0
0
9038 Btu/hr
Space 1
COOLING
SENSIBLE LATENT --------------Aug 2pm
78 F DB SO I RH
83 F DB 67 F WB
Btu/hr Btu/hr --------------131
-598
0
219
0
0
0
0
5996
1485
1543 0
1153 1153 ------. -----9666 Btu/hr 1153
0.8 tons 0.1
Heating:
Cooling:
9038 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
9666 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
235 cfm
382 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page i':J of ':Jo
---------------------------------------------------------------------------Project: Building 11 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,-·&cation: Carlsbad Oat~: 12/31/1987 Checked By t . ' _,, i ,-.,
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC ZONE-DESCRIPTION
BVAC Zone Name:
HVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Space 2
22 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 202 cfm)
Return Duct Condu~tion
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
19005
19005
791 (
190
380
0
20367
7122 (
204
407
-2652
25447
50004
Space 2
Rheem RPNCOSSC
1
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
so'
COOLING
PEAK SENSIBLE LATENT --------------(Aug 2pm) 21953 2866 --------------21953 2866
22 cfm) 124 29
220
439 57
0 ____ ,.. ____ -----=--22735 2952
202 cfm) 1113 258
227
455 59
2652 --------------27182 3270
2.3 tons 0.3 tons
43066 16832
3.6 tons 1.4 tons
SPACE HEATING & COOLING LOAD SUMMARY page 80 of 96 --------~------------------------------------------------------------------Project: Building il
fjesigner: Banzuelo/Rierson/Duff & Associates, Inc
~. 1ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
\
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
---------------------Wall Conduction
Glass conduction
Door Conduction
Roof conduction
Skylight Conduction e Floor conduction
Slab Conduction
~ Int7rior ~onduction
Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1656
13166
0
1198
0
0
2985
0
0
19005 Btu/hr
Space 2
COOLING
SENSIBLE LATENT --------------Aug 2pm
78 F DB 50 % RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------264
988
0
855
0
0
0
0
9451
3692
3836 0
2866 2866 ------------21953 Btu/hr 2866
1.8 tons 0.2
Heating:
Cooling:
19005 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
21953 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
•
Btu/hr
tons
494 cfm
868 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 81 of 96 ---------------------------------------------------------------------------Project: Building il
•
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(1 • ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By ·
' . .__._."·,,~.J
Documentation: PROCALC Date
--------------------~------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC system Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
Space 3 (Jan 6am)
Space 5 (Jan 6am)
Space 7 (Jan 6am)
Space 11 (Jan 6am)
<lpass Ventilati:~::rs~ACE4:
0
::ml
Supply Duct Conduction
supply Duct Leakage
Supply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 425 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
/~ '--~--···
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
11184
7985
7985
7985
35139
1663
703
1406
0
38910
14966
778
1556
-5092
51118
74104
Spaces 3,5,7 & 11
Rheem RPNC024J
4
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
so'
COOLING
PEAK SENSIBLE LATENT --------------(Jul 10am) 14902 2856
(Jul 10am) 8575 1056
(Jul 10am) 8575 1056
(Jul 10am) 8575 1056 --------------40626 6023
( . 47 cfm) 57 -356
813
1625 241
0 --------------43121 5908
( 425 cfm) 514 -3204
862
1725 236
5092 --------------51315 2940
4.3 tons 0.2 tons
71127 25505
5.9 tons 2.1 tons
SPACE HEATING & COOLING LOAD SUMMARY page 82 of 96
----~----------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
-, .; /,,i'
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction A Slab Conduction
(~ Interior ~onduction ·. ..,._, Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
.
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1666
5349
0
1194
0
0
2975
0
0
11184 Btu/hr
Space 3
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr -------------8
-7
0
496
0
0
0
0
5090
2652
3823 0
2856 2856 -----------14902 Btu/hr 2856
1.2 tons 0.2
Heating:
Cooling:
11184 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
14902 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
,.
\ -~-._
Btu/hr
tons
290 cfm
589 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 83 of 96
---------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
;.cation: Carlsbad Date: 12/31/1987 ··J:,•. ::·.~
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight conduction
Floor Conduction
Slab Conduction
;' Int!rior ~onduction
. •.i;] Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES ---------------~-----
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 5
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------17
-7
42
179
0
0
0
0
5090
784
1413 0
1056 1056. -----------8575 Btu/hr 1056
0.7 tons 0.1
Heating:
Cooling:
7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
207 cfm
339 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 84 of 96
~--------------------------------------------------------------------------Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
/~ocation: Carlsbad . Date: 12/31/1987
·>/
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction A Slab Conduction .
(~ Interior ~onduction
~.,,..c;;:.1 Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 7
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------17
-7
42
179
0
0
0
0
5090
784
1413 0
1056 1056 -----------8575 Btu/hr 1056
0.7 tons O.l
Heating:
cooling:
7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
207 cfm
339 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 85 of 96
----------------------------------------------~----------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
i.t.Jcation: Carlsbad ·oate: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door conduction
Roof Conduction
Skylight conduction
Floor Conduction
Slab Conduction
) Interior conduction
--~ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 11
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 % RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------17
-7
42
179
0
0
0
0
5090
784
1413 0
1056 1056 -----------8575 Btu/hr 1056 Btu/hr
0.7 tons 0.1 tons
Heating:
Cooling:
7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 207 cfm
8575 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 339 cfm
1. \ . . :;-::.,~ _,.-.•
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 86 of 96
---------------------------------------------------------------------------Project: Building tl
,.sig~er: Banzuelo/Rierson/Duff & Associates, Inc
-r,,\:':>cat1on: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By .. ,,.,_,,. ·--
Documentation: PROCALC Date ---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC system Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 4
Space 8
Space 10
Space 12
PEAK
(Jan
(Jan
(Jan
(Jan
6am)
6am)
6am)
6am) I TOTAL SPACE LOAD
; ~ .. :~pass ventilation Air (
Supply Duct Conduction
supply Duct Leakage
Supply Fan Heat Gain
33 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 298 cfm)
Return Duct Conduction
Return Duct Leakage
Return· Fan Heat Gain
•
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
7985
7985
7985
7985
31940
1166
639
1278
0
35023
10492
700
l401
-5092
42524
74104
(
(
Spaces 4,8,10 & 12
Rheem RPNC024J
4
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT so ' COOLING
PEAK SENSIBLE LATENT --------------(Jul 10am) 8803 1056
(Jul 10am) 8803 1056
(Jul 10am) 8803 1056
(Jul 10am) 8803 1056 --------------35211 4223
33 cfm) 40 -250
704
1408 169
0 --------------37364 4142
298 cfm) 361 -2246
747
1495 166
5092 --------------45058 2062
3.8 tons 0.2 tons
71127 25505
5.9 tons 2.1 tons
SPACE HEATING & COOLING LOAD SUMMARY page 87 of 96 ---------------------------------------------------------------------------Project: Building tl Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.,...cation: Carlsbad Date: 12/31/1987 Checked By
< •• , ,::,
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight conduction
Floor Conduction
•
Slab conduction
: Interior conduction
,. ~:? Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING.
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 4
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------__ ,.. ___
11
-7
42
179
0
0
0
0
5325
784
1413 0
1056 1056 -----------8803 Btu/hr 1056
0.7 tons 0.l
Heating:
Cooling:
7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
207 cfm
348 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 88 of 96
---------------------------------------------------------------------------Project: Building il
_....i.esig~er: Banzuelo/Rierson/Duff & Associates, Inc
t~cat1on: Carlsbad Date: 12/31/1987 \-·: ..._z
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction I Slab Conduct ion
( Interior Conduction
~--Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan· 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 8
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------11
-7
42
179
0
0
0
0
5325
784
1413 0
1056 1056 -----------8803 Btu/hr 1056
0.7 tons 0.1
Heating:
Cooling:
7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] =
8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
• ; . --,
-\ ' . \. ",· ./ \ ........ '
Btu/hr
tons
207 cfm
348 cfm
SPACE HEA·rING & COOLING LOAD SUMMARY page 89 of 96 -~-------------------------------------------------------------------------·Project: Building il
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.--~•cation: Carlsbad Date: 12/31/1987
' '·\· -,. ";_
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date -~-------------------------------------------------------------------------
SUMMARY OF PEAK HOOR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
I Slab Conduction
( Interior Conduction
~ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 10
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------11
-7
42
179
0
0
0
0
5325
784
1413 0
1056 1056 -----------8803 Btu/hr 1056
0.7 tons 0.1
Heating:
Cooling: _
7985 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] =
8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
'·' 'Ill.,_ ;r~··'
Btu/hr
tons
207 cfm
348 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 90 of 96
---------------------------------------------------------------------------Project: Building il
,..i..esig~er: Banzuelo/Rierson/Duff & Associates, Inc
,.,c.at1on: Carlsbad Date: 12/31/1987 •.·. ,-J
Enforcement Agency
Building Permit No
Checked By .
Documentation: PROCALC Date --------------------------------------------------------------~------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
--------------------Peak Hour:
Indoor Conditions:
Outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction A Slab conduction
(~ Interior Conduction ·,\...;;;,/ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING.
Jan 6am
70 F DB
38 F DB
Btu/hr
826
5349
268
443
0
0
1100
0
0
7985 Btu/hr
Space 12
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------11
-7
42
179
0
0
0
0
5325
784
1413 0
1056 1056 -----------8803 Btu/hr 1056
0.7 tons 0.1
Heating:
Cooling:
7985 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8803 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
•• ,\ .. ,:. ,.,,.
Btu/hr
tons
207 cfm
348 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 91 of 96
---------------------------------------------------------------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
'~•ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By V -
Documentation: PROCALC Date ----~----------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Space 6
Bypass Ventilation Air (
ply Duct conduction
pply Duct Leakage
~upply Fan Heat Gain
12 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 110 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
• ' \ ; .... _"·--._-;,
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
10596
10596
429
212
424
0
11662
3865
233
466
-1273
14953
18526
(
(
Space 6
Rheem RPNC024J
1
Loads Office Heating
Loads Office Cooling
Loads Office. Fans
COINCIDENT
50 ' COOLING
PEAK SENSIBLE LATENT ---------------(Jul 10am) 12694 1556 ------------..:)-
12694 1556
12 cfm) 15 -92
254
508 62
0 -------------~
13471 1526
110 cfm) 133 -827
269
539 61
1273 --------------15685 759
1.3 tons O.l tons
17782 6376
1.5 tons 0.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 92 of 96
---------------------------------------------------------------------------Project: Building tl
_.J,.._e esigner: Banzuelo/Rierson/Duff & Associates, Inc
racation: Carlsbad Date: 12/31/1987 t;• ,, __ ,,.
Enforcement Agency
Building Permit No
Checked By
·-<.:,;2· ~·
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction·
Skylight Conduction
Floor Conduction
Aslab Conduction
(~Int~rior ~onduction ''-...,,..· Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1330
6994
0
652
0
0
1620
0
0
10596 Btu/hr
Space 6
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 \ RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------37
-10
0
267
0
0
0
0
7029
1733
2082 0
1556 1556 -----------12694 Btu/hr 1556
1.1 tons 0.1
Heating:
Cooling:
10596 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
12694 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
• ,_
Btu/hr
tons
275 cfm
502 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 93 of 96 --------------------------------------------------------------------·-------Project: Building #1
..&._esigner: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By · .,cation: Carlsbad Date: 12/31/1987 \. ·. '
Documentation: PROCALC Date ---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
BVAC Zone Name:
HVAC system Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Space 9
ypass ventilation Air (
pply Duct Conduction
12 cfm)
( pply Duct Leakage
'-. ..,upply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 110 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
• \ .
\ .
~ ..... '
HEATING
10596
10596
429
106
212
0
11344
3865
113
227
-1819
13730
30002
(
(
Space 9
Rheem RPNC036C
1
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
so I
COOLING
PEAK SENSIBLE LATENT --------------(Jul 10am) . 12466 1556 --------------12466 1556
12 cfm) 15 -92
125
249 31
0 --------------12855 1495
110 cfm) 133 -827
129
257 30
1819 --------------15192 . 697
1.3 tons 0.1 tons
26173 11849
2.2 tons 1.0 tons
,-1 SPACE HEATING & COOLING LOAD SUMMARY page 94 of 96
---------------------------------------------------------------------------Project: Building 11
.--~esigner: Banzuelo/Rierson/Duff & Associates, Inc
· ·· ocation: Carlsbad . Date: 12/31/1987
I
Enforcement Agency
Building Permit No
Chec_ked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak aoµr:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
( Interior Conduction
' Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1330
6994
0
652
0
0
1620
0
0
10596 Btu/hr
Space 9
COOLING
SENSIBLE LATENT --------------Jul 10am
78 F DB 50 I RH
79 F DB 63 F WB
Btu/hr Btu/hr ------------43
-10
0
267
0
0
0
0
6795
1733
2082 0
1556 1556 -----------12466 Btu/hr 1556
1.0 tons 0.1
Heating:
cooling:
10596 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
12466 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
,. .•
Btu/hr
tons
275 cfm
493 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 95 of 96
-------------------------------------------------------~-------------------Project: Building tl
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By \, '
Documentation: PROCALC Date ---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space ·13
PEAK
(Jan 6am)
HEATING
8396
TOTAL SPACE LOAD 8396
aypass Ventilation Air (
aupply Duct Conduction
::~upply Duct Leakage
·¼
0SUpply Fan Heat Gain
8 cfm) 291 (
168
336
0
EFFECTIVE SPACE LOAD 9191
Ventilation (
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
75 cfm)
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
2623 (
184
368
-1273
11093
18526
Space 13
Rheem RPNC024J
l
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Jul 10am) 8534 1056 --------------8534 1056
8 cfm) 10 -62
171
341 42
0 ------------«c,-9056 1036
75 cfm) 90 -562
181
362 41
1273 --------------10963· 515
0.9 tons o.o tons
17782 63}6
1.5 tons 0.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 96 of 96
----------~----------------------------------------------------------------Project: Building 11
Designer: Banzuelo/Rierson/Duff & Associates, Inc
··cation: Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
-~-/~
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name: Space 13
COOLING
DESIGN CONDITIONS
Peak Hour:
HEATING
Jan 6am
70 F DB
38 F DB
SENSIBLE LATENT.
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction .A Slab Conduct ion
{~Interior Conduction
'·-;'..:..;,~ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
Btu/hr
1237
5349
268
443
0
0
1100
0
0
8396 Btu/hr
--------------Jul 10am
78 F DB SO I RH
79 F DB 63 F WB
Btu/hr Btu/hr -------------24
-7
42
179
0
0
0
0
5090
784
1413 0
1056 1056 ------------8534 Btu/hr 1056
0.7 tons 0.1
Heating:
Cooling:
8396 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8534 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
,.
,,: \., ; " .,., __ ._,.. ....... ..-
Btu/hr
tons
218 cfm
337 cfm
,.,.
I .;
' '~l ,,;,,.:;:'
TITLE 24 REPORT FOR:
Building 12
El Fuente Business Park
Carlsbad, California
PROJECT DESIGNER:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
OWNER: ·
Davison-Jones Development
411 campus Drive, Suite 830
Irvine, CA 92715
REPORT PREPARED BY:
PROCALC
705 s. Velare St. il0
Anaheim, CA 92804
1-(800) TITLE-24
Job Number: T499B
Date: l/4/1988
The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the
•
calculations summarized in this compliance report. The program has interim
. ;approval and is authorized by the California Energy Commission for use with
<.:::,. .. the Second Generation Nonresidential Building Energy Efficiency Standards.
Table Of contents for Title 24 Report
Cover . Page ••••••••••.•••••••••••••.•••.•.••••••••••••••••••••.••••••• l
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Form CF-1 certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Form ws-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7
Form CF-2 Envelope Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-3 construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-4 HVAC Power Indices summary
Form WS-4 HVAC system summary Sheets
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-5 Lighting summary & worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
HVAC Zone & Space Loads summary .......•....•.................••....•.
9
12
56
62
64
67
68
liert1ticate at Compliance (Part 1 ot 2)
B, !IL.-\21"-l{;] -# ·Z. ProieciT,de
:f:!a··1Z HC lg /e,·~~'1 /f2l1~f
Building Permit Number-
I
Pl:in Chockod By -,
Climate Zane City/Town
Pr<c(Ak(~ , ,z./-a,, le-,
Cata
Prescriptive Approach/Performance Approach Strategy
General
1 CEO Occupanc'/ Type • • • • • • • • • .Qf f; c:.(..
2 UBCOccupanc'/Gtoup/Oivision •••.•• 13:::Z...
3 PackagaSelecmd •••••••••.•• -Brf,
4 Grass Condilfoned Floor Area • • • • • • $::0 ft2
Roof and Ftoors1
5 ' Propcs1d RooUC1illng Rt (CF-2. CF-3) • • :512. o hr-F-lt2Jeiu
6 .. Requfrad Rcof/Ceiling Rt (CF-2) • • • • • ___ hr-F-ftZte!U
7 Prcposed E.lc&arior Floor Rt (CF-2. CF-3) • • -hr-F-ftZ.SIU
a Requlrad Extariat Floor Rt (CF-2) • • • • .,___ hr-F-rt2JBiu
Walts .
9 · Proposed Opaque Wall Rt (CF-2:cF-3) • • & • 7 hr-F-ftZte!U
10 Wall Heat Capadt:, (CF-3) • • • • • • • • "., Btu/F-ft2
&.~Opaque.Wall Rt (CF-2) • • • • • ___ hr-F-ft2'BIU
~~alnW&Ua
. J Exterior Wall Area (CF-2) • • • • • • • • ~128 ft2
13 Tota! Gta:ing ~a (CF-2) • • • • • • • • ~570 ft2
14 Proposed Tota! Percent (Una 131 Une 12) • $et, p -,.
15 Avarage :rota! SC (CF-2) • • • • • • • • • 06 :4le
16 AlowedTotaJ G1azing Peraant •••••• ___ %
17 West Exterior Wall Area (CF-2) • • • • • • 17 '.21 ft2
18 WestGZazingArea(CF-2) •••••••• Jo4;0 ft2
19 Proposed Wast Percent (CF-2) • • • • • • S'j. e, %
20 Avarag~ West SC (CF-2) • • • • • • • • <? .+<o
21 AlcwedWestGlazlng Percent •••••• ___ %
Gla:lng In Roof (CF-8) Proposed Allowed
22 Sjcylfght 1 • • • • • • • • • ---
23 Skylight 2 • • • • • • • • • __ _
%4· Skyllght3 •.•••••••• __ _
2S ~light~ ••••• ; ••• ---
: ~ghtS •. • ••••••• __ _
Skylfght 8 • • • • • • • • • ---
28 Skylfght 7 • • • • • • • • • ---
29 Skylrght 8 • • ·• • • • • • • ---Ughtrnr,
___ ft2
---ft2
---ft2
---ft2 ___ ft2
---ft2
___ ft2
___ ft2
30 Propos1dA4ustad LPO (CF•S) •••••• I. );2 Wattslft2
31 Allowed LPO (CF-S) • • • • • • • • • • ___ Wattslft2
HVAC
•
32 Pedcrmanca Set Selected • • • • • • • •
Proposed Fan. Wattage Index (CF-4) • • • Q,17 Wattslft2
f ._ . ~ Fan Wattage Index • • • •••• ___ Wattstft2
~::.,.._.· Proposed Cooltng Power Index (CF-4) • • .Sf5 ,PW UtuMt2
38 Alowed Cooltng Power Index • • : • • • . Bluh/ft2
37 Proposad Heating Power Index (CF-4) • • &, 4:f> BWt2
38 Alowed Haadng Power Index • • • • • • ___ ·eiuh/ft2
F~ Ravlsed September 1986
CF-1
For Enforcement Agency Use-Only
~~
-;i_"Z..D\l,'5°
t:..-w
_Signature and
Dato
Field Ched<ed Sy
Registralfcn Stamp Approved By
l..\Ul-1~ ~!YYJ,e;.
Performance Approach
Energy Budget
1 CEC Oec:upanciType • • • • • • • • • .Offi'ce.
2 USC OcaJpancy Group/Division • • • • • 12,-Z-
Cate
Cate
4 Condilfonod Floor Aroa • • • • • • • • • !5$;,1 ft2
4 Budgot Table • • • • • • • • • • • • • .W:,-l A
5 Allowed Energy Budget (WS-1A) • • • • • I ZS';Q kB!Ulyr-ft2
Calculated Annual Energy Consumption
6 Approved Calculation Malhod • • • • • • ""C, ,12t1f'1.,.~ 'Z.4-
7 CEC Designation • • • • • • • • • • • .Lf'e» ej
8 Multiplier • • • • • • • • • • • • • • • • \ • pz;1 •
E.stJmated Energy Use . ... 1 2 9 Healing • • • • • • • • • • • • • • • • z. kStulyr-ft
10 Cooling • • • • • • • • • • • • • • • • -~ kS!Ulyr-ft2
11 Fans • • • • • • • • • • • • • • • • • ~ kBtulyr-ft2
12 Ughts • . • • • • • • • • • • • • • • "*r ;?>1. J kStulyr-ft2·
13 Mlscellaneous Equipment •••••• ~ l@i.-2. kS?u.yr0 ft2
14 Total •. • • • . • • • • • • • • • • • • • ___ kStu/yr•ft2
15 Adi. Total Energy Use (lifle a x li11e 14) • • • t 24;, (o kStu/yr-ft2
~ Ad j1,,1.!:>\-u\
Compliance Statement
General. lhe proposed building refll'9sentecl in this sat of ccmplianee
documentation Is consistent with the other campllance forms and
wotksheets. with the plans and specifications and with any olher
c:aJculations or computer runs submitted with this permit applic:ation.
Performance Approach. (when applicable) The energy perlonnance estimate presented on this form was calculated using the approved
calc:ulation method indicated above and with the cec established fixed
and restricted engineering inputs for the applicable dimate zone and
OCCUl)a!'C'( type. .
PresalptiV• Approach. (when appOcable) The proposed building has
been designed t0 meet Iha requirements of the Altemative Component . Pac:lcage indicated above for the ~ppropriate occupancy type and climate
~AL·
Signed
. tQt!AtkP JaDQi½M
Namatnde
AU?-utJyM, cro
CitylStato/Zlp I
f114) (p~z..-9310 3:Z-78%
Telephone Calif. License Number
Pa~e ___ of
veruncare o-r L;ompuance {Part 2 012>
Y;, I I i , r7 t f"-l C--:t tr" Z, For Enforcement Agency Use Only
Pro1ect fide
PKOCA. LC.... 1,z /71 /e.-']
.~ .... -"'" Daoo cliodiadBy 0al8
·. • < • doth parts one and two of this Certilic:ate of Compliance must be Included wilh each building pennit application for the above noted building and appe,
on !he ·plans submitted for approval. The building.features and requirements represented on lhe Certificate of Compliance are adequate to achie\ compliancewilh lhe second genaraticn nonresldendaJ energy standards forlhe building referenced above. The buildfrig features and requirements a:
alao ~ for any subsequent aJteralions. mocilic:alions or additions to lhe building.
Dar;nerOn•
Name (Print)
Tatla/Company Name
Acfdrass
Signa!W8
Enforcamant Agency Signature
c .. ran•Two . . J . . ~ k, :WJN:W!-:
Date
bate
!ame (Print)
( · J:fkrooeJE: / A1E< VNWt1"lfiID
~-tie/Company Name / __ l'_,~1fV\
Address
Cate
Owner
Name (Print) .
SJQnature Date
,··· \. .
Fonn Revised September 1986
•.
Eiilorcoment AgonCJ signature
D••l;ner Four
Name (Print)
Tide/Company Name
Address
Signature
enforcement Agency Signature
Enforcement Agency
Name (Print)
Tido/Agancy
Address
bate
pate
bate
CERTIFICATE OF COMPLIANCE (part l of 2) CF-l page 3 of 85
-----------~---------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By ~cation: Carlsbad Date: 1/4/1988
->.,:·;,
Doc~mentation: PROCALC Date ---------------------------------------------------------------------------
PERFORMANCE APPROACH
Roofs and Floors-
Roof/Ceiling Rt (CF-2,3) R-30.0
Ext. Floor Rt (CF-2,3) R-o.o
walls
Opaque Wall Rt (CF-2,3) R-8.5
Energy Budget
CEC occupancy Type
Conditioned Floor Area
Total Number of Floors
Climate Zone
Beat Capacity (CF-2,3) 5.9 HC
Energy Budget (WS-lA)
Lighting Adjustment (CF-5)
Energy compliance Budget
Office
5537
l
7
125.0 o.o
125.0
Glazing in Walls
Exterior Wall Area (CF-2)
Total Glazing Area (CF-2)
Total Glazing Percent
Average Total SC (CF-2)
West Exterior Wall (CF-2)
West Glazing Area (CF-2)
West Glazing Percent
Average West SC
(~ az ing in Roof
\--~~kylight Area ( CF-2)
6768
2570
38.0
0.46
1737
1040
59.8
0.46
0
sf
sf
' SC
sf
sf
' SC
sf
Calculated Annual Energy Consumption
Approved Calculation NR COMPLY 24
Program Version Number 1.14
Oser License Number 1329
CEC Designation CPO 07
CEC Multiplier 1.027
Estimated
Heating
Cooling
Fans
Energy Use (KBtu/sqft-yr)
3.7
27.7
35.6
Lighting
Proposed Adjusted LPD (CF-5)1.13 w/sf
Adjustment
Lights
Receptacle
67.0 X 1.027 = 68e8
37.7
16 .. 8
1.4
124.6
BVAC
Fan Wattage Index (CF-4) 0.77
Cooling Power Index (CF-4) 58.06
Beating Power Index (CF-4) 53.48
COMPLIANCE STATEMENT
Hot Water
w/sf Total (SCM-3)
Btuh/sf
Btuh/sf
The proposed building represented in this set of compliance documentation
is consistent with the other compliance forms and worksheets, with the plans
and specifications and with any other calculations or computer runs submitted
with this permit application.
The energy performance estimate presented on this form was calculated using
the approved calculation method indicated above and with the CEC established
fixed and restricted engineering inputs for the applicable climate zone and
occupancy type •
.• GNED I ... \.2;., ..
DESIGNER
Calif. License i:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
. (714) 777-0666
-----
CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-l page.4 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By ,.!ocation: Carlsbad Date: 1/4/1988
~,-'..-[:/·
Documentation: PROCALC Date -----~-------~-------------------------------------------------------------
Both Parts one and two of this Certificate of Compliance must be included
with each building permit application for the above noted building, and
appear on the plans submitted for approval. The building features and
requirements represented on the Certificate of compliance are adequate to
achieve compliance with the second generation nonresidential energy
standards for the building referenced above. The building features and
requirements are also adequate for any subsequent alterations, modifi-
cations or additions to the building.
PROJECT TITLE
Building i2
El Fuente Business Park
Carlsbad, California
OTHER DESIGNER
Name:
Address:
City:
Signed:
DOCUMENTATION AUTHOR
PROCALC
705 s. Velare St. il0
Anaheim, CA 92804
1-(800) TITLE-24 . . r--, //-;-. ·7 / ,;---
signed:,, //,. -I: ' , ,:/ , ·. /1
OTHER
Name:
Address:
City:
Signed:
====================================================== ===================
OWNER
Davison-Jones Development
411 Campus Drive, Suite 830
Irvine, CA 92715
.•. d ..:..'--,;.;,;,igne :
ENFORCEMENT AGENCY
Name:
Agency:
City:
Signed:
MANDATORY FEATURES CHECKLIST (part l of 2) MF-1 · page 5 of 85 ---~-----------------------------------------------------------------------Project: Building t2
Designer: Banzuelo/Rierson/Duff & Associates, Inc_
~-·&cation: Carlsbad Date: 1/4/1988
'.', ,·,.
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
ENVELOPE MEASURES
o Certified Insula~ion Materials per Sec. 2-531l(a}
o Insulation Installed to meet Flame Spread and Smoke Density
Requirements of sec. 2-531l(b)
o Orea Formaldehyde Foam Insulation. Installed per Sec. 2-53ll(c)
o Retrofit Insulation specified per Sec. 2-5313
o Air Infiltration is minimized by specification of tested
manufactured doors and windows and proper sealing and
weatherstripping p~r Sec. 2-5317
LIGHTING SYSTEM MEASURES
o Certified Luminaires/Ballasts per Sec. 2-5314(b) (I Independent Control within enclosed Areas per Sec. 2-5319(a)
o Manual Switching Readily Accesible per Sec. 2-5319(b)
o Reduction of Lighting Load to at least 50% per Sec. 2-5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute)
o Separate Switching of _Daylit Areas per Sec. 2-5319(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale Occupancies per Sec 2-5319(h)
o Automatic Control of Display Lighting in Retail/Wholesale
Occupancies per Sec. 2-5319(h)
o Tandem Wiring of 1 and 3 Lamp Luminaires per Sec. 2-5319(h)
OCCUPANCY SENSING DEVICES (when applicable)
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
/. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319 ( e) • 3
l/-:,4 Limits on Emmisions per exceptions to Sec. 2-5319 ( e)
Reference
MANDATORY FEATURES CHECKLIST (part 2 of 2) MF-1 page 6 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988 ~<,/.~:.··
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable)
o Uniform Illumination reduction to 50% per Sec. 2-5319(e).l
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2~5319(e).2
Reference
o Time Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 ---+---
o Step Switching Devices with Separation between On/Off Settings
per Sec. 2-5319(e).4
o Photocell Sensors shall be Diffusing type and no Opaque Cover
allowed per Sec. 2-5319(e).5
o Manufacturer's Instructions provided for Installation and
Calibration per Sec. 2-5319(e).6
o Proper Installation of Controls including Sensor Location, A certification of Initial Calibration and Control of Luminaires
(~ only within Daylit Areas per Sec. 2-5319(e).8
o Visible or Audible malfunction Alarm provided per sec. 2-5319(g) ____ _
HVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per sec. 2-5312
o Certified HVAC Equipment per 2-5314(a)
o Certified Plumbing Equipment per 2-5314(a)
o Heating and Cooling Equipment efficiency per sec. 2-5314(b}
o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c)
o Automatic Controls for Off-Hours per Sec. 2-5315(a)
o Thermostat Set Point Requirements per Sec. 2-5315(b).l
o Sequential Control of Heating and Cooling per sec. 2-5315(b).2
o Automatic Exhaust Fan Dampers per
/. Thermostat Controls for Each Zone
\~~~::r-> ,·
Sec. 2-5316(b)
per Sec. 2-5315(b)
o Ventilation Provided per Secs. 2-5316 & 2-5343
o Water Heaters for Domestic Hot water and Pools per Sec. 2-5318
ENERGY BUDGETS WORKSHEET (part 1 of 2) WS-lA page 7 of 85 -----------------------------~---------------------------------------------Project: Building i2
. Designer: Banzuelo/Rierson/Duff & Associates, Inc
/'.cation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
CLIMATE ZONE 7 ENERGY BUDGETS
cross
Floor Sectional Office Retail
No Area Budget Budget --------------------------
1 5537 125 165
BUILDING ENERGY COMPLIANCE BUDGET BY SPACE
Occupancy Floor
Flr Space Name Type Area Mult
-------------------------------------
1 Space 1 Office 859 X 1 =
1 Space 2 Office 419 X l -1 Space 3 Office 419 X 1 =
1 Space 4 Office 648 X 1 =
1 Space 5 Office 648 X 1 =
l Space 6 Office 419 X 1 -Space 7 Office 419 X 1 = ,1 Space 8 Office 419 X 1 a \.'":'1 , .. Space 9 Office 419 X l -1 Space 10 Office 419 X 1 a
1 Space 11 Office 449 X 1 =
Enforcement Agency
Building Permit No
Checked By
Date
Total Budget Energy
Floor (KBtu Budget
Area /sqft) (MBtu) -----------------859 X 125 • 107.4
419 X 125 = 52.4
419 X 125 • 52.4
648 X 125 = 81.0
648 X 125 • 81.0
419 X 125 • 52.4
419 X 125 a 52.4
419 X 125 = 52.4
419 X 125 = 52.4
419 X 125 • 52.4
449 X 125 = 56.1 -----------.5537 692.1
BUILDING COMPLIANCE BUDGET
TOTALS
692.1 MBtu / 5537 sqft = 125.0 KBtu/sqft
ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988 t··: ·,\ ·'.. .
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate Use
Flr Space Name Area Mult Area (KBtu/sqft) (MBtu)
--------------------------------------------------1 Space 1 859 X 1 = 859 X 124.0 = 106.5
1 Space 2 419 X 1 = 419 X 127.3 = 53.3
1 Space 3 419 X 1 = 419 ·x 128.0 = 53.6
1 Space 4 648 X 1 = 648 X 122.1 = 79.l
1 Space 5 648 X 1 = 648 X 122.5 = 79.4
1 Space 6 419 X 1 = 419 X 125.3 -52.5
1 Space 7 419 X 1 -419 X 125.3 = 52.5
1 Space 8 419 X 1 -419 X 125.3 -52.5
1 Space 9 419 X 1 = 419 X 125.3 = 52.5
1 Spaee 10 419 X 1 = 419 X 125.3 = 52.5
1 Space 11 449 X 1 -449 X 123.7 = 55.6 -----------TOTALS 5537 690.2
·11ILDING ENERGY CONSUMPTION 690.2 MBtu / 5537 sqft = 124.6 KBtu/sqft
\ s\' '~:
• (~~7
AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 85
---------------------------------------------------------------------------Project: Building i2
' Designer: Banzuelo/Rierson/Duff & Associates, Inc
:'.<>cation: Carlsbad . Date: 1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW· w NW TOTALS
---------------------------------------------------------------------------Roof-1
Roof-2
2849
343
2149
196
4998
539 ------------------------------------------------~--------------------------TOTALS 3192 2345
ROOF R-VALUE
Type
Roof-1
Roof-2
,.-.. --~
Assembly Name
--------------------------R-30 B/U with T-Bar
R-30 B.U.Roof/Gyp. Clg
. Average R-Value
Area
4998
539
5537
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE
5537
Area/
R-Value R-Value --------------30.21 165.43
28.51 18.90 -------I 184.33 • 30.04
s SW w NW TOTALS ~-------------------------------------------~------~-----------------------NONE
---------------------------------------------------------------------------TOTALS 0
• ~:/····
AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
1.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
.
Documentation: PROCALC Date ---------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------1755 1179 207 297 1287 1445 293 306 6768 ---------------------------------------------------------------~-----------
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW Int TOTALS
-~~------------------------------------------------------------------------Wal-1
Wal-2
Wal-3
1516
140
1099
80
106
54
20
54 342 580
63
54
18
72
2802
1157
240 ---------------------------------------------------------------------------TOTALS 1656 1179 180 54 342 580 117 90 4198
~AQOE EXTERIOR WALL/DOOR R-VALOE & BEAT CAPACITY
Area/ Area
ype Assembly Name Area R-Value HC R-Value X BC ----------------------------------------------Wal-1 5/8 Gyp/R-11/Gyp WF 2802 10.19 1.4 275 3878
Wal-2 6.5" Conc/R-11/Gyp.Brd. 1157 10.34 17.4 112 20112
Wal-3 Solid Wood Door 240 2.22 2.4 108 573 ------------Totals 4198 495 24563
Average R-Value 4198 I 495 == 8.48
Average HC . 24563 I 4198 == 5.85
(ff: .. ~~~ ....... ~
AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:.ocation: Carlsbad . Date: l/4/1988 (/:~:~::,/
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checke~ By
Date --------------------------------~------------------------------------------
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Wind-1 99 27 243 945 864 176 216 2570
---------------------------------------------------------------------------TOTALS 99 27 243 945 864
GLAZING O-VALUE AND SC
Type
Wind-1
• ' .. ... ,::-..':"-~--~,-'
Assembly Name Area O-Value
--------------------------Sunglass Blue Plate 2570 1.14
Totals 2570
Average u-value
Average SC
2920 /
1182 /
2570 a
2570 =
176 216 2570
Area X Area
SC u-Value X SC -------0.46 2920 1182 ------------2920 1182
1.14
0.46
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 12 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad · Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
( ',.'
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Northwest Glazing
North Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALOES ( including ins.ide film resistance)
Wall
Window
'
Roof
r' Door
\ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency ·
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Pan Power
Air Circulation Rate
GENERAL
Heat capacity of Exterior Wall
•
Lighting Power
Climate Zone
,. /-, .
\_~:,-:;
Space 1
619.0 sqft
216.0 sqft
81.0 sqft
99.0 sqft
859.0 sqft
20.0 sqft o.o sqft
859.0 sqft
859.0 sqft
10.23
0.88
30.11
2.22 o.oo
Rheem RPNC048C
1
Heat Pump
Heat Pump
Electric Resistance
3.040
8.500
0.990
No
5595 watts
533 watts
1750 CFM
5.92
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page l3 of 85 ---------------~-----------------------------------------------------------Project1 Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS
--------------------southwest
Northwest
North
OVERHANGS & SIDEFINS
Southwest e Northwest
( North ·,
SPECIAL FEATURES
Daylighting Strategies
•• \-.:~::: ... ----"
Glass Framing
SC Factor ------------
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
24.0
9.0
11.0
Shading Device
Winter summer ------------
Overhang
Height Depth
. --
0.20
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc.
.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
----------------------------------------~----------~-----------------------
space Name:
Occupancy Type:
SCHEDULING
Space l
Office
Occupancy Level for Operational Period: Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
water Heater
2915
359
3274
4518
1770
32
hours
hours
hours
hours
hours
hours Number of Non-operational Hours per Week:
f~ \V Number of Holidays per Year:
Day
Night 46 hours
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CU-Value):
INTERNAL LOADS & ENER~Y
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
• occupant Density:
•. \: . --
Heating Season
Cooling season
Winter
Winter Setback
summer
summer setup
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 85 -------------------------------------------------------------------~-------Project: Building 12
Designer: Banzuelo/Rierson/Duff
.ocation: Carlsbad ~ " ' ;
& Associates, Inc
Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By ..
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 1
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==••====================================== Daytime Nighttime
------------------------------BPTl = 54.79 (Winter) BPTl =
BPT2 = 61.76 (Summer) BPT2 =
BPT3 = 61.76 (Economizer) BPT3 =
HDD = 41 (Heating) HDD =
CDD = 837 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) •================================
Building Envelope Heat Transfer Rate: Winter
Summer
overall Heat Transfer Factor ("K"): Winter
(' Beating
Cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
summer
ANNUAL LOADS (MBtus) ••=•==•=============
ANNUAL SITE ENERGY REQUIREMENTS (MBtus} =======================================
67.60
75.79
75.79
3133
0
----
--
-= ----
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft} ==•========================================== source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
Source Hot Water
= --
=
3.9
24.8
28.7 ------57.4 X 1.027 = ---
431.4
436.9
661.3
648.6
3.1
11.7
1.1
7.1
8.2
13.4
4.8
0.4
59.0
46.9
16.8
1.4
•·========================================================================
\_,_,, TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 124. 0 KBtu/sqft
===========================================================================
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No-
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
South Glazing
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
I~ ~~~~r (~
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Beating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Beating Efficiency
Rated Cooling Efficiency
Rated Water Beating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
I. ' ' i ,, ,,,
' ·.\,~~-/
Beat capacity of Exterior Wall
Lighting Power
Climate Zone
Space 2
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft
0.0 sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
1
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
2743 watts
373 watts
850 CFM
4.66
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 17 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,-&cation: Carlsbad Date: 1/4/1988
t·j~_ .. ::·;·)·
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------south
southwest
OVERHANGS & SIDEFINS
south
southwest
(l,ECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.15
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
•~cation: Carlsbad Date: 1/4/1988
·,;;:.::_\.)'
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Leyel for Oper~tional Period:
Space 2
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
water Heater
Number
cl Number
of Non-Operational Hours per Week: Day
Night
of Holidays per Year:. Heating Season
cooling Season
Thermostat Set Point Temperatures: Winter
Winter setback
summer
summer setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (O-Value):
INTERNAL LOADS&_ ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
•
Occupant Latent Load:
Occupant Density:
i· ,. ~1.: :_.
\ \,.,.~·)· -·~
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
--<("'~ .. :<
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Space 2
BALANCE POINT TEMPERATURES AND DEGREE DAYS •=========================================
Daytime Nighttime
------------------------------BPTl = 51.28 (Winter) BPTl = 67.22
BPT2 = 60. 37 . (Summer) BPT2 = 75.66
BPT3 = 60.37 (Economizer) BPT3 = 75.66
HDD = 0 (Heating) HDD = 3010
COD = 1045 (Cooling) CDD = 0
BUILDING HEAT TRANSFER (Btu/hr-F)
=================================
Building Envelope Heat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter • summer -
ANNUAL LOADS (MBtus)
J~
-~ Heating
Cooling
----================ --
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ---=--=================================
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
source Beating
source cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
= -=
=
3.3
30.8
41.2 ___ ....,_
75.3 X 1.027
= -a -= =
= ---
194.8
197.2
306.9
300.5
1.3
6.4
0.5
4.3
5.8
4.4
2.3
0.2
77.3
31.8
16.8
1.4
•====•==========================================•=====================•====
\, .··. / TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 127. 3 KBtu/sqft
------======•==============•====•=====•================•=============------
I SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 20 of 85
----------------------------------------------------------~---------------~ Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
~ ,. ' ', '')
.... ,:·
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
West Glazing
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance) -------------------------------------------Wall
Window
Roof I Door
Floor
c;J
HVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of Systems
Beating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
,.
~ \ \', ,' . .-,,,__,,,
Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
Space 3
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
415.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
l
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
2743 watts
373 watts
850 CFM
4.66
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 21 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
';.cation: Carlsbad Date: 1/4/1988
, ,:b-ocumentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date -------------------------------------------------------------------~-------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS
--------------------West
Southwest
OVERHANGS & SIDEFINS
west
Southwest
r'~ t .
\ 'S,,J ECIAL FEATURES
Daylighting Strategies
Glass Framing
SC Facto.r ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter summer ------------
Overhang
Height Depth
0.15
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By '.ocation: Carlsbad . Date: 1/4/1988
... , ~:-
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
-----------
Occupancy Level for Operational Period:
Space 3
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours (I Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate co-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.Occupant Density:
t .·: ,..:,~~--...
Heating
Cooling
Winter
Winter
Summer
Summer
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff
.ocation: Carlsbad
Documentation: PROCALC
& Associates, Inc
Date: l/4/1988
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
Space Name: Space 3
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 52.48 (Winter) BPTl = 67.34
BPT2 = 59.94 (Summer) BPT2 = 75.60
BPT3 = 59.94 (Economizer) BPT3 = 75.60
HOD = 0 (Heating) HOD = 3050
COD = 1117 (Cooling) COD = 1
BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: ·winter • summer = Overall Heat Transfer Factor ("K"): Winter = summer =
ANNUAL LOADS (MBtus)
~ ' =•================== /8 I..; '.,;. Heating -= Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •======================================
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacl_e
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
source Cooling
Source Fan
Total space conditioning Energy
source Lighting
Source Receptacle
Source Hot water
= --
=
3.4
31.4
41.2 -----76.0 X l.027
=
• =
= --
=
= --
194.8
197.2
306.9
300.5
1.3
6.6
0.5
4.4
5.8
4.4
2.3
0.2
78.0
31.8
16.8
1.4
•=========================================================================
TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 128.0 KBtu/sqft
===========================================================================
SCM lNPU'.C DA'fA SUMMAR:! \ part J. Ot 2., SCM-l page 2.4 ot d~
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates,·rnc
Enforcement Agency
Building Permit No
Checked By .. -.ocation: _Carlsbad Date: 1/4/1988
Documentation: PROCALC Date --------------~-----------------------------------------------------------~
Space Name:
AREAS
Exterior Wall
south Glazing
southwest Glazing
Northwest Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
•
Roof
/ Door
"--.,,;.;,,~ Floor
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment ·Power Rating
Fan Power
Air Circulation Rate
..
Space 4
439.0 sqft
40.S sqft
189.0 sqft
135.0 sqft
648.0 sqft
20.0 sqft o.o sqft
648.0 sqft
648.0 sqft
10.24
0.88
30.08
2.22 o.oo
Rheem RPNC030J
2
Heat Pump
Heat Pump
Electric Resistance
2.960
9.850
0.990
No
6942 watts
746 watts
2000. CFM
* Note: 2 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Beating & Cooling Load Summary for
more details on the zoning arrangement.
-~~~~
1, .• \, ... ,: Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
6.76
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 85 ---------------------------------------------------------------~-----------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
,, :' .~,~
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --~-----------------South
Southwest
Northwest
OVERHANGS & SIDEFINS
South ' ,.a Southwest
(~ Northwest
......,r
SPECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
4.5
21.0
15.0
Shading Device
Winter summer ------------
overhang
Height Depth
0.24
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
Side-Fin.
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.··,.cation: Carlsbad Date: 1/4/1988
,, ~i>,ocumentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ------------------------------------------------------------------~--------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 4
Office
Day 54.60 I
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Number
Water Heater
of Non-Operational Hours per Week: Day
Night
(~ ,_(u Number of Holidays per Year: Heating Season
cooling Season
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CO-Value):
INTERNAL LO~DS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
• Occupant Density:
I '-.\· .... -"'
Winter
Winter setback
summer
summer setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 27 of 85
----------~----------------------------------------------------------------Project: Building ·12
Designer: Banzuelo/Rierson/Duff .& Associates, Inc
.,ocation: Carlsbad · Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ----------------------~----------------------------------------------------
Space Name: Space 4
BALANCE POINT TEMPERATURES AND DEGREE DAYS •=a•======================================
Daytime Nighttime
------------------------------BPTl -53.64 (Winter) BPTl =
BPT2 -60.83 (Summer) BPT2 -BPT3 = 60.83 (Economizer) BPT3 = HOD = 26 (Heating) HOD -COD -972 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) -----=-=====================•==== Building Envelope Heat Transfer Rate: Winter
Summer
Winter
summer
Overall Heat Transfer Factor ("K"):
Heating
Cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL LOADS (MBtus) -------=--===-----==
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----==•===•=======•==•=====•===========
67.57
75.76
75.76
3125
0
----
--
------
ANNUAL SOURCE ENERGY OSE ESTIMATE (KBtu/sqft) --------------------------------============= Source Heating
Source Cooling
~ource Fan
Total Space conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
----
4.2
24.7
26.6 ------55.6 X 1.027 = ---
380.5
385.6
553.9
545.3
2.5
9.2
0.9
5.3
5.8
10.l
3.6
0.3
57.l
46.9
16.8
1.4
··-=============-======-==•===================================-============
(-•• V .\ ... > TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 122. l KBtu/sqft
--===••===••=========•==============================-=======•==••=======•==
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 28 of 85
---------------------------------------------------------------------------Project: Building t2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
... ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
south Glazing
West Glazing
Roof
Door
Raised Floor Slab .
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
,. Door
'-:-..:.~ Floor
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 5
439.0 sqft
40.5 sqft
189.0 sqft
135.0 sqft
648.0 sqft
20.0 sqft o.o sqft
648.0 sqft
648.0 sqft
10.24
0.88
30.08
2.22 o.oo
Rheem RPNC030J
2
Heat Pump
Heat Pump
Electric Resistance
2.960
9.850
0.990
No
6942 watts
746 watts
2000 CFM
* Note: 2 Spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & Cooling Load summary for
more details on the zoning arrangement •
• ENERAL
l ,------. __ / Heat Capacity of Exterior Wall
·-Lighting Power
Climate Zone
6.76
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 29 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc.
-cation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --------------------southwest
south
West
OVERHANGS & SIDEFINS
SPECIAL FEATURES
Daylighting Strategies
SC Factor -------------
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
4.5
21.0
15.0
-Shading Device
Winter summer ------------
Overhang
Height Depth
0.24
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
-----------------------------------------~---------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
/.cation: Carlsbad
'''--:oocumentation: PROCALC
Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Space 5
Office
Day 54.60 %
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number
(,I Number
of Non-operational Hours per Week: Day
Night
of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CU-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.• Occupant Density:
Heating Season
Cooling season
Winter
Winter Setback
Summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
· SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer:
(.ocation:
Banzuelo/Rierson/Duff & Associates, Inc
Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
r.,_, ~ -,-
~·o,..-. _;
Documentation: PROCALC Date --------------------------------------------------------------------------~
Space Name: Space 5
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================
Daytime Nighttime
-------------------------------BPTl = 51.43 (Winter) BPTl =
BPT2 = 60.-38 (Summer) BPT2 =
BPT3 = 60.38 (Economizer) BPT3 =
HDD = 0 (Heating) HDD =
COD = 1044 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) •================================ Building Envelope Heat·Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
cA. . ~ Heating
Cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
summer
ANNUAL LOADS (MBtus) ====================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •======================================
67.33
75.71
75.71
3045
0
= = = =
-=
-----=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
source Heating
Source Cooling
source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
source Hot Water
----
3.9
25.4
26.6 -----55.9 X 1.027 --= =
380.5
385.6
553.9
545.3
2.3
9.6
0.8
5.5
5.8
10.1
3.6
0.3
57.4
46.9
16.8
1.4
(·=·========================================================================
\.t. )J TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 122. 5 KBtu/sqft
===========================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 32 of 85 ~--------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By :·-ocation: Carlsbad Date: l/4/1988
(~~·:_:·_:·);;'
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southeast Glazing
South Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALOES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
aooor (O Floor
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 6
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
3
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
8229 watts
1119 watts
2550 CFM
* Note: 3 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL -----. Heat Capacity of
<.:.-:-·· Lighting Power Climate zone
Exterior Wall 4.66
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 85
------------------------------~--------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
··ocation: Carlsbad . · Date: l/4/1988
~' . . • "!
\·
Documentation: PROCALC
Enfor9ement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------southeast
south
OVERHANGS & ·SIDEFINS
southeast
South
(~ECIAL FEATURES
Daylighting Strategies
SC F.actor ------------0.46 0.880
0.46 0.880
Window
Height Width -----------
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
Overhang
Height Depth
0.15 o. 7-0
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
&cation: Carlsbad Date: 1/4/1988
•;,::.,:· .. -/
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ------------------------------------------------~--------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 6
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night
( •.. x ·.: ·"' Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
:., Occupant Density:
\. .. ~·:i·,· /
Heating Season
Cooling season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours·
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
/.ocation: ·car lsbad Date: 1/4/1988
··~-~ -;)~·j
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 6
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 50.62 (Winter) BPTl =
BPT2 -61.79 (Summer) BPT2 -BPT3 = 61.79 (Economizer) BPT3 =
HOD -0 (Heating) HDD =
COD = 834 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) ===•===•=========================
Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
cl Heating
cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
Summer
ANNUAL LOADS (Matus) •==•=•========•=====
ANNUAL SITE ENERGY REQUIREMENTS (Matus) ••=====================•=s=============
67.14
75.82
75.82
2986
0
----
--
------
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==•===============•========================== Source Heating
Source Cooling
Sour~e Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
= ---
3.3
28.9
41.2 -----73.4 X l.027 ----
194.8
197.2
306.9
300.5
1.3
5.7
o.s
4.0
5.8
4.4
2.3
0.2
75.4
31.8
16.8
1.4
! ;:;···===•=•==•========================•======•==•==•=======••=======i========
\.':::/-;/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft
==••===•===================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 85
----------------~----------------------------------------------------------Project: ~uilding 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.ocation: Carlsbad · Date: l/4/1988
Enforcement Agency
Building Permit Bo
Checked By _._ i'
Documentation: PROCALC Date
-----------------------------------------~---------------------------------
Space Name:
AREAS
Exterior Wall
So~theast Glazing
south Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
1
• Door l,C::, Floor
BVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Beating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 7
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22
0.00
Rheem RPNC024J
2
Heat Pump
Beat Pump
Electric Resistance
2.920
9.350
0.990
No
5486 watts
746 watts
1700 CFM
* Note: 2 Spaces are served by this HVAC System. Please refer to
the attached BVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
· / ... ;;;;-capacity of
\.,\.;..' Lighting Power
Climate Zone
Exterior Wall 4.66
0.950 wat;ts/sqft
7
G -----------------------NPUT DATA SUMMARY (part 2 of 2) SCM-l page 37 of 85
--------------------------~--------------------------------------------Project: Building i2 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.• ocation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
Building Permit No
Checked By
Date
---------------------------------------------------------~-----------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS
--------------------southeast
south
OVERHANGS & SIDEFINS
Southeast
south
:AECIAL FEATORES
Daylighting Strategies
···-('\._.) , ... ~
Glass Framing
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter summer ------------
overhang
Height Depth
0.15
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
-·-
~o Daylighting controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 85
--------------------------------------------------------------------------~ Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
··ocation: Carlsbad Date: 1/4/1988
,,.
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 7
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night (.e Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U~Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
•. Occupant Density:
;\ j "·~ ~:~·...-...
Heating season
cooling Season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
·190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 8~
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
·Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 7
BALANCE POINT TEMPERATURES AND DEGREE DAYS •=========================================
Daytime Nighttime
------------------------------BPTl = 50.62 (Winter) BPTl
BPT2 = 61.79 (Summer) BPT2
BPT3 = 61.79 (Economizer) BPT3
HDD = 0 (Heating) HOD
CDD = 834 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) •==•=============================
·auilding Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
summer
ANNUAL LOADS (MBtus)
= = = = =
67.14
75.82
75.82
2986
0
= -=
= i. -~ Beating -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating
source Cooling
source Fan
Total Space conditioning Energy
source Lighting
source Receptacle
source Hot Water
= --
=
3.3
28.9
41.2 -----73.4 X 1.027
-
------
---=
194.8
197.2
306.9
300.5
1.3
5.7
0.5
4.0
5.8
4.4
2.3
0.2
75.4
31.8
16.8
1.4
···=-·===========================================•===============•======•===
\\;:, ... : TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 40 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff
• ocation: Carlsbad 'l/·.t::/',.1 ···~t'.:.---,'
Documentation: PROCALC
& Associates, Inc
Date: 1/4/1988
Enforcement Agency
Building Permit No .
Checked By
Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southeast Glazing
south Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
Roof A Door
~~ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 8
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22
0.00
Rheem RPNC024J
3
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
8229 watts
1119 watts
2550 CFM
* Note: 3 ·Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
.,.-;;;~-Capacity of
\'~,,,,./ Lighting Power
Climate zone
Exterior Wall 4.66
0.950 watts/sqft
7
SCM INPOT DATA SUMMARY (part 2 of 2) SCM-1 page 41 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,'.ocation: Carlsbad Date: l/ 4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
SHADING COEFFICIENTS
--------------------southeast
South
OVERHANGS & SIDEFINS
Southeast
South , ..
'-WPECIAL FEATURES
Daylighting Strategies
,.
Glass Fr~ming
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
Overhang
Height Depth
0.15
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.ocation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------~-----------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Ope~ational Period:
Space 8
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Thermostat Set Point Temperatures:
Water Beater
Heating
cooling
Winter
Winter
summer
summer
Day
Night
Season
season
Setback
Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate Co-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
~ater Beating Energy:
Occupant Sensible Load:
•.
Occupant Latent Load:
Occupant Density:
~\~~~~j
2915 hours
359 hours
3274 hours
4518· hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 85 -------------------------------------------------------------------------~-Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,·&cation: car ls bad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 8
BALANCE POINT TEMPERATURES AND DEGREE DAYS ===---====================================
Daytime Nighttime
------------------------------BPTl = 50.62 (Winter) BPTl =
BPT2 = 61.79 (Summer) BPT2 =
BPT3 -61.79 (Economizer) BPT3 =
BDD = 0 (Beating) HOD =
CDD = 834 (Cooling) COD =
BUILDING BEAT TRANSFER (Btu/hr-F) •=====•••====================•===
Building Envelope Heat Transfer Rate: winter
Summer
overall Heat Transfer Factor ("K"): Winter
cl Heating
cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
Summer
ANNUAL LOADS (MBtus) ==•============•====
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
67.14
75.82
75.82
2986
0
-=
= -
--
------
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot Water
= ---
3.3
28.9
41.2 -----73.4 X 1.027. = --=
194.8
197.2
306.9
300.S
l.3
5.7
o.s
4.0
5.8
4.4
2.3
0.2
75.4
31.8
16.8
1.4
,•=========================================================================
\.:::,,: ... · TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft
==============================================================•=========•==
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 44 of as·
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By /·&cation: Carlsbad Date: l/4/198.8
Documentation: PROCALC
Space Name:
AREAS
.Exterior Wall
southeast Glazing
South Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
-~-----------------------------------------Wall
Window
Roof A Door
(~ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Pan Power
Air Circulation Rate
Date
Space 9
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
2
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
5486 watts
746 watts
1700 CFM
* Note: 2 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
!.;;;~-Capacity of
~~'Lighting Power
Climate Zone
Exterior Wall 4.66
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 45 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date:·1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
ceiling Height
Gla·SS Framing
SHADING COEFFICIENTS ---~----------------southeast
south
OVERHANGS & SIDEFINS
southeast
South
<&ECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter summer ------------
Overhang
Height Depth
0.15
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth .
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
. /.ocation: Carlsbad Date:· 1/4/1988
. ·,·,,; ·I;
., <·.,-~::
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 9
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
water Heater
Number of Non-Operational Hours per Week: Day
Night <I Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate Co-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
:. Occupant Density:
<:~;'~_)
Heating season
cooling season
Winter
Winter setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 85
--------------------------------------------------------------------~------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
·&cation: Carlsbad Date: 1/4/1988
,1,:: '-_'.1
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date --------------------------------------------------------------------------
Space Name: Space 9
BALANCE POINT TEMPERATURES AND DEGREE DAYS •=•=•===================================== Daytime Nighttime
------------------------------BPTl = 50.62 (Winter) BPTl
BPT2 = 61.79 (Summer) BPT2
BPT3 = 61.79 (Economizer) BPT3
BOD = 0 (Beating) BOD
COD = 834 (Cooling) COD
BUILDING BEAT TRANSFER (Btu/hr-F) ======•=•========================
Building Envelope Heat Transfer Rate: Winter
summer
Winter
summer
Overall Heat Transfer Factor ("K"):
ANNUAL LOADS (MBtus)
-= = = =
67.14
75.82
75.82
2986
0
-= --
(~ \~ Heating •=========•====•===-
= -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •==•====•••====•===•=================== Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
source Hot Water
----
3.3
28.9
41.2 -----73.4 X 1.027
--• ---
-= --
194 .·8
197.2
306.9
300.5
1.3
5.7
0.5
4.0
5.8
4.4
2.3
0.2
75.4
31.8
16.8
1.4
,:·•·======================•=================================================
'\::.:~._j TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft
•===•======================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 48 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, ·Inc
Enforcement Agency
Building Permit No
Checked By .• ocation: Carlsbad Date: 1/4/1988
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southeast Glazing
South Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
'
Door
( 1 Floor
~ ,.,
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 10
250.0 sqft
40.5 sqft
135.0 sqft
419.0 sqft
20.0 sqft o.o sqft
419.0 sqft
419.0 sqft
10.22
0.88
30.00
2.22 o.oo
Rheem RPNC024J
3
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
8229 watts
1119 watts
2550 CFM
* Note: 3 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load Summary for
more details on the zoning arrangement.
GENERAL
,..a-;;;~-Capacity of
\:.:;::;c > Lighting Power
Climate zone
Exterior Wall 4.66
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 49 of 85
-------------------------------------------------------------------~--------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
·f,ocation: Carlsbad Date: l/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------southeast
south
OVERHANGS & SIDEFINS
southeast
south
( • .. ;,."',;SPECIAL FEATURES
----------------Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
4.5
15.0
Shading Device
Winter Summer ------------
overhang
Height Depth
0.15
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 50 of 85 ---------------------------------------------------------------------------Project: Building t2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
'&cation: Carlsbad Date: 1/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------~-----------------------------------
Space Name:
Occupancy Type:
Space 10
Office
SCHEDULING
Occupancy Level for operational Period: Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14. 40 I.
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-op~rational Hours per Week: Day
-Night
(~ Number of Holidays per Year: Heating season
Cooling Season
Thermostat set Point Tempetatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (O-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
; • Occupant Density:
'~ ·~~,-~/
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page Sl of 85
---------------------------------------------------------------------------Project: Building 12 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
/.ocation: Carlsbad Date: 1/4/1988 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 10
BALANCE POINT TEMPERATURES AND DEGREE DAYS ••======================================== Daytime Nighttime
------------------------------BPTl = 50.62 (Winter) BPTl =
BPT2 = 61.79 (summer) BPT2 = BPT3 = 61.79 (Economizer) BPT3 = BDD = 0 (Beating) BDD =
CDD = 834 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) ---======================~======= Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
(I &eating
Cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
summer
ANNUAL LOADS (MBtus) ==-=================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
67.14
75.82
75.82
2986
0
-= = -
--
----= -
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) •=============•============================== Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
----
3.3
28.9
41.2 -----73.4 X 1.027 =
= --
194.8
197.2
306.9
300.5
1.3
5.7
o.s
4.0
5.8
4.4
2.3
0.2
75.4
31.8
16.8
1.4
,.·-========================================================================
\~<,;) TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 125. 3 KBtu/sqft
---~---====================================================================
1.
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 52 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By ·&cation: car lsbad Date: 1/4/1988
\;/ii~cumentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
East Glazing
southeast Glazing
southwest Glazing
southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Beating Equipment Type
Cooling Equipment Type
water Beating Equipment Type
Rated Beating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
Beat Capacity of Exterior Wall
•
Lighting Power
Climate Zone l .. :,,:
\ \~ :~--.. -~:· r
Space 11
711.5 sqft
27.0 sqft
40.5 sqft
108.0 sqft
40.5 sqft
449.0 sqft
40.0 sqft
0.0 sqft
449.0 sqft
449.0 sqft
10.25
0.88
30.02
2.22
0.00
Rheem RPNC024J
1
Beat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
2743 watts
373 watts
850 CFM
7.67
0.950 watts/sqft
7
SCM INPUT DATA SUMMARY ( part 2. of 2) SCM-1 page 53 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc -
··ocation: Carlsbad Date: 1/4/1988
\/~: l
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------East
southeast
southwest
southwest
OVERHANGS & SIDEFINS
'
East
( Southeast
' southwest
Southwest
SPECIAL FEATURES
Daylighting Strategies
.( \
I . ,. J ·-.:-> .. ,,_•,; ..
SC Factor ------------0.46 0.880
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
9.0
3.0
4.6
12.0
4.5
s·hading Device
Winter Summer ------------
Overhang
Height Depth
0.29
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT-DATA SUMMARY SCM-2 page 54 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By •~ocation: Carlsbad Date: 1/4/1988
'<:;,,o·
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Space 11
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
·Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours • Number of Holidays per Year: Heating
Cooling
Thermostat Set Point Temperatures: Winter
Winter
summer
Summer
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate Co-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
Occupant Density:
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so
64
230
190
250
watts/sqft
Btu/hr-person
Btu/hr-person
Btu/hr-person
sqft/person
· SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 55 of 85
---------------------------------------------------------------------------Project: Building i2
Designer:
•• ocation:
(-",. }
Banzuelo/Rierson/Duff & Associates, Inc
Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
~:.:
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 11
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
-------------------------------BPTl -53.59 (Winter) BPTl =
BPT2 -61.-90 (Summer) BPT2 -BPT3 = 61.90 (Economizer) BPT3 =
BDO -26 (Heating) HDO -COD = 819 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) =================================
Building Envelope Heat Transfer Rate: Winter
summer
Overall Heat Transfer Factor ("K"): Winter
ti Beating
Cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
summer
ANNUAL LOADS (MBtus) ---=================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=•====================•===============
67.64
75.95
75.95
3148
0
----
--
--= --=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
Source Hot Water
= = -
=
4.5
28.9
38.4 -----71.8 X 1.027 = --=
282.1
285.3
402.3
396.0
1.8
6.4
0.7
4.3
5.8
4.8
2.5
0.2
73.8
31.8
16.8
1.4
···========================================================================
.:<.,,) TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 123. 7 KBtu/sqft
==•========================================================================
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 56 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:.ocation: Carlsbad-Date: 1/4/1988
\,(::;}
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: solid wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Hardwood, Maple
2. Inside Air Film
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.750 1.54
0.68
1.54
0.68
---------------------------------------------------------------------------
1 ~~ Total 2.22 2.22
,·
Framing Percentage: 0.0 I
Franting Ma·1;erial: NONE
----------------------~--------
OVERALL VALUES ADJUSTED FOR FRAMING
•,,. '
Sketch of Construction Assembly
.sorptivity:
~
1
~ughness: Clear
.. "'://eight:
Beat Capacity:
Pine
0.70
6.1 lb/sqft
2.39 ·
R-Value
O-Value
2.22
0.4505
2.22
0.4505
=•=•==
~-~-----------
CONSTRUCTION ASSEMBLY COMPLIANCE FORM cF.;.J page 57 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ocation: Carlsbad Date: 1/4/1988
\, .·. .( ·~i~:.;j
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date -----------------------------------------------------------------~---------
Assembly Name: R-30 B/0 with T-Bar
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Roofing, Built-Op
2. Plywood
3. Air space
4. Insulation, Mineral Wool, R-30
5. Acoustical Tile, Mineral Fiberboard
6. Inside Air Film
7. a.
9.
10.
11.
0.375
0.500
24.000
* 9.500
0.750
0.33 0.33
0.63 0.63
1.00 0.00
30.00 30.00
2.03 2.03
0.92 . 0.61
:, .... -------------------------------------------------------------------------~
{ .. ... 9 . , ;, . Total 34. O 34. 39
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir-Larch
1 2 3 4 5
-------------------------------Sketch of Construction Assembly
.absorptivity: 0.70
Shingles
Calculation for Framing Adjustment
summer o-value
0.0287 X 0.90 + 0.0699 X 0.10 • 0.0328
Winter o-value
0.0291 X 0.90 + 0.0725 X 0.10 • 0.0334
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
u-value
30.51
0.0328 ---===
29.92
0.0334 ====-==
~ughness: concrete, Asph.
'"-~~;eight:
Beat Capacity:
8.1 lb/sqft
2.58
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 58 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<'.ocation: Carlsbad · Date: l/4/1988
Enforcement Agency
Building Permit No
Checked By
'-,;·;,:/
oocumentat.ion: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: R-30 B.O.Roof/Gyp. Clg
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
construction components
Th R-Value
Fr (in) Summer Winter
---------------------------------------------------------------------------1. Roofing, Built-Op
2. Plywood
3. Air $pace
4. Insulation, Mineral Wool, R-30 s. Gypsum or Plaster Board
6. Inside Air Film
7.
8.
9.
10.
11.
0.375
0.500
6.000
* 9.500
0.625
0.33 0.33
0.63 0.63
1.00 0.80
30.00 30.00
0.56 0.56
0.92 . 0.61
---------------------------------------------------------------------------
,Q~I Total 33.44 32.93
Framing Percentage:
Framing Material:
1 2 3 4 5
10.0 %
Softwood, Douglas Fir-Larch
calculation for Framing Adjustment
summer o-value
0.0299 X 0.90 + 0.0779 X 0.10 • 0.0347
Winter o-value
0.0304 X 0.90 + 0.0811 X 0.10 • 0.0354
OVERALL VALUES ADJUSTED FOR FRAMING
-------------------------------
R-Value
O-Value
28.82
0.0347
28.22
0.0354 Sketch of Construction Assembly
•
bsorptivity:
l. ,oughness: Stucco,
-.,\:,.:.,eight:
Heat capacity:
0.70
wood Shingles
9.4 lb/sqft
3.01
=•====
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 59 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By 1 r.ocation: Carlsbad Date: 1/ 4/198-8
.,:.~' Documentation: PROCALC ·Date
---------------------------------------------------------------------------
Assembly Name: sunglass Blue Plate
Assembly Type: Glazing
Assembly Tilt: 90 deg (Ver.tical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. CEC Single Glazing
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11 •
0.250 0.20
0.68
' .
0.20
0.68
• ----------------------------------------------:::::---------:~::-~---:~~:-
Framing Percentage: 0.0 I
Framing ~aterial: NONE
1
---------~---------------------Sketch of .Construction Assembly
~ading Coefficient:
-sible Transmittance: ,., .•. ,..
0.46
0.30
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
o-Value
0.88
1.1364 ------
0.88
1.1364
•===••
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 60 of 85
--------------------------~---------------------~--------------------------Project: Building 12 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
··ocation: .Carlsbad Date~ 1/4/1988. Checked By
·,<.~ocumentation: PROCALC I I_D_a-te ______ _
------------~------------------------------------------------------------~-
Assembly Name: 5/8 Gyp/R-11/Gyp WF
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) Summer Winter
---------------------------------------------------------------------------1. Gypsum or Plaster Board
2. Insulation, R-11, 2x4 wood Framing 16"
0.625
3.500
0.625
0.56
8.38
0.56
0.68
0.56
8.38
0.56
0.68
3. Gyps~m or Plaster Board
4. Inside Air Film s.
6.
7.
8.
9.
10.
11 •
. ------------------.C---------------------------:::::--------::~::----::~::-
Framing Percentage:
Framing Material:
N"'ll~--1
P-<•+i---2
C..Jo+--3
0.0 I
Softwood, Douglas Fir-Larch
Calculation for Framing Adjustment
summer O-Value
0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982
Winter o-Value
0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
o-Value
10.19
0.0982
i0.19
0.0982 Sketch of Construction Assembly ====== ======
•
sorptivity:
t ,p~ghness: smooth ,._ ·,.,:rie1ght:
Heat Capacity:
0.00
Plaster, Metal
5.4 lb/sqft
1.38
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 61 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<aocation: ·carlsbad Date: 1/4/1988
'\-.· .. '
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 6.5" Conc/R-11/Gyp.Brd.
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) Summer Winter
---------------------------------------------------------------------------1. Concrete, 140 lb, oven Dried
2. Insulation, R-11, 2x4 Wood Framing 16"
3. Gypsµm or Plaster Board
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11. .
6.500
3.500
0.625
0.71
8.38
0.56
0.68
0.71
8.38
0.56
. 0.68
1--------------------------------------------------------------------------I .
\ Total 10.34 10.34
Framing Percentage: o.o I
Framing Material: NONE
---------~---...... -------------------
• • • . . 1 .,
2 • • . ... 3 • .
• . .,
• :. . • . • OVERALL VALUES ADJUSTED FOR FRAMING
'
Sketch of Construction Assembly
~sorptivity:
90~ghness: Concrete,
\s: .• e1ght:
Heat Capacity:
0.70
Asph. Shingles
78.6 lb/sqft
17.39
R-Value
O-Value
10.34
0.0967
••••••
10.34
0.0967 ------
----------··-----------
HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 62 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.cation: Carlsbad Date: 1/4/1988
\,.~<'.:,:.:~
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
FAN ENERGY
No. Motor Drive Conv No. Fan
HVAC System Sys BHP Eff. Eff. Fact Fans Watts
--------------------------------------Rheem RPNC048C (Fanl) l X o.so / (0.70 X 1.00] X 746 X 1 -533
Rheem RPNC024J (Fanl) 1 X 0.33 / [0.66 X 1.00] X 746 X l -373
Rheem RPNC024J (Fanl) l X 0.33 / (0.66 X 1.00] X 746 X l = 373
Rheem RPNC030J (Fanl) 2 X 0.33 / (0.66 X 1.00] X 746 X 1 -746
Rheem RPNC024J (Fanl) 3 X 0.33 / (0.66 X 1.00] X 746 X 1 = 1119
Rheem RPNC024J (Fanl) 2 X 0.33 / [0.66 X 1.00] X 746 X 1 -746
Rheem RPNC024J (Fanl) 1 X 0.33 / (0.66 X 1.00] X 746 X l = 373 __ ,.. ___
Total 4263
FAN WATTAGE INDEX 4263 watts/ 5537 sqft • 0.770 watts/sqft
HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page 63 of 85
---------------------------------------------------------------------------Project: Building i2 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
t.ocation: Carlsbad Date: 1/4/1988 Checked By
\.r,,.:_._i
Documentation: PROCALC Date -----~--------------~---------------------------------------~--------------
HEATING EQUIPMENT
System No. Design Equip Conv. source
Description Type Sys Output Eff Factor (Btu/hr)
--------------------------------------------------------Rheem RPNC048C Heat Pump 1 X 49000 I 3.04 X 3.000 • 48355
Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 • 23219
Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 • 23219
Rheem RPNC030J Heat Pump 2 X 30600 I 2.96 X 3.000 = 62027
Rheem RPNC024J Heat Pump 3 X 22600 I 2.92 X 3.000 = 69658
Rheem RPNC024J Heat Pump 2 X 22600 I 2.92 X 3.000 = 46438
Rheem RPNC024J Heat Pump l X 22600 I 2.92 X 3.000 = 23219 --------Total 296136
HEATING POWER INDEX 296136 Btu/hr I 5537 sqft = 53.48 Btu/hr-sqft
COOLING EQUIPMENT
system No. Design Equip Conv. source
Description Type Sys Output Eff Factor (Btu/hr)
,l:;;;-;;;~048~--------------------------------------------=-Heat Pump 1 X 47500 I a.so x 10.239 = 57218 \. __ ·-eem RPNC024J Heat Pump 1 X 23000 I 9.35 X 10.239 • 25187
Rheem RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 • 25187
Rheem RPNC030J Heat Pump 2 X 30200 I 9.85 X 10.239 = 62785
Rheem RPNC024J Heat Pump 3 X 23000 I 9.35 X 10.239 = 75561
Rheem RPNC024J Heat Pump 2 X 23000 I 9.35 X 10.239 • 50374
Rheem·RPNC024J Heat Pump l X 23000 I 9.35 X 10.239 = 25187 --------Total 321498
COOLING POWER INDEX 321498 Btu/hr/ 5537 sqft = 58.06 Btu/hr-sqft
HVAC SYSTEM SUMMARY SHEET ws-4 page 64 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
' i.ocation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building P~rmit No
Checked By
"";,~,;:~.f-
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC Equipment Name:
HEATING
System Type:
Output Capacity:
Rated Efficiency:
Supply Air Temperature:
COOLING
System Type:
Total Output capacity:
Sensible output.Capacity:
Latent output Capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer:
1 ~ supply Air Temperature:
\!!!ANS
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
•
Rheem RPNC024J
Heat Pump
22600 Btu/hr
2.920
105.0 F ·
Heat Pump
23000 Btu/hr
17800 Btu/hr
5200 Btu/hr
9.350
2743 watts
0.100
No
55.0 F
850 cfm
Blow-Through
l
0.33
66.0 I
100.0 I
2.0 I
2.0 I
4.0 I
4.0 I
HVAC SYSTEM SUMMARY SHEET WS-4 page 65 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:-&cation: Carlsbad Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
\; <. ~
Documentation: PROCALC Date ---------------------------------------------------~-----------------------
HVAC Equipment Name:
HEATING
System Type:
Output capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
System Type:
Total Output Capacity:
sensible output Capacity:
Latent Output capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer:
(~::pply Air Temperature:
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DOCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC030J
Heat Pump
30600 Btu/hr
2.960
105.0 F
Heat Pump
30200 Btu/hr
21600 Btu/hr
8600 Btu/hr
9.850
3471 watts
0.100
No
55.0 F
1000 cfm
Blow-Through
1
0.33
66.0 I
100.0 I
1.0 I
1.0 I
2.0 I
2.0 I
BVAC SYSTEM SUMMARY SHEET ws-4 page 66 of 85
---------------------------------------------------------------------------Project: Building i2 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.ocation: Carlsbad Date: 1/4/1988 Checked By
·\:<.\,~ocumentation: PROCALC I i~D-a"."""te ______ _
---------------------------------------------------------------------------
HVAC Equipment Name:
BEATING
System Type:
Output Capacity:
Rated Efficiency:
Supply Air Temperature:
COOLING
System Type:
Total output capacity:
Sensible output capacity:
Latent output capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer: A Supply Air Temperature:
t~ANS
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC048C
Heat Pump
49000 Btu/hr
3.040
105.0 F
Heat Pump
47500 Btu/hr
35000 Btu/hr
12500 Btu/hr
8.500
5595 watts
0.100
No
55.0 F
1750 cfm
Blow-Through
1 . o. so
70.0 I
100.0 I
1.0 I
1.0 I
2.0 I
2.0 I
LIGHTING SUMMARY AND WORKSHEET CF-5 page 67 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<.cation: Carlsbad Date: l/4/1988
'"·• .. ,.:>·
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
INSTALLED LIGHTING POWER BY SPACE
Total
Floor Vert Boriz Floor Lighting Installed
Space Name Area Mult Mult Area (watts/sqft) wattage
----------------------------------------------------------Space 1 859 X 1 X 1 = 859 X 1.400 = 1203
Space 2 419 X l X 1 -419 X 0.950 -398
Space 3 419 X 1 X 1 -419 X 0.950 = 398
Space 4 648 X 1 X 1 = 648 X 1.400 = 907
Space 5 648 X 1 X 1 = 648 X 1.400 -907
Space 6 419 X 1 X 1 -419 X 0.950 = 398
Space 7 419 X 1 X 1 :a 419 X 0.950 = 398
Space 8 419 X 1 X l -419 X 0.950 = 398
Space 9 419 X 1 X 1 -419 X 0.950 = 398
Space 10 419 X l X l = 419 X 0.950 = 398 Space 11 449 X 1 X l -449 X 0.950 -427 --------------
(tilILOING
TOTALS 5537 6230
LIGHTING WATTAGE 6230 watts I 5537 sqft • 1.125 watts/sqft
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 68 of 85 ---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,.ocation: Carlsbad Date: 1/4/198-8
Enforcement Agency
Building Permit No
Checked By lo.· ,;
, ...... , ;,
Documentation: PROCALC Date
---------------------------------------------------------------------------
BVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Space l
17 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 155 cfm)
Return Duct conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
17439
17439
605 (
174
349
0
18567
5443 (
186
371
-1819
22748
40167
Space 1
Rheem RPNC048C
1
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 4pm) 19053 2190 --------------19053 2190
17 cfm) 76 -19
191
381 44
0 --------.. ----c,.z,
19700 2216
155 cfm) 680 -168
197
394 44
1819 --------------22790 2092
1.9 tons 0.2 tons
35036 14562
2.9 tons 1.2 tons
SPACE HEATING & COOLING LOAD SUMMARY
Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
·page 69 of 85
Enforcement Agency
Building Permit No
Checked By .ocation: Carlsbad Date: 1/4/1988
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
space Name: Space 1
COOLING
DESIGN CONDITIONS HEATING· SENSIBLE LATENT -----------------------------------------Peak Hour: · Jan 6am Aug 4pm
Indoor Conditions: 70 F DB 78 F DB so I RH
Outdoor Conditions: 38 F DB 82 F DB 66 F WB
LOAD COMPONENT Btu/hr Btu/hr Btu/hr -~-------------------_,, ______ ------------Wall Conduction 1905 239
Glass Conduction 12069 840
Door Conduction 268 48
Roof Conduction 917 551
Skylight Conduction 0 0
Floor Conduction 0 0
• Slab Conduction 2282
~ Interior conduction 0 0 ..... ~~; Infiltration 0 0
Solar Gain 9531
Lighting 2721
Equipment 2932 0 Occupants 2190 2190 -------------------SPACE LOADS 17439 Btu/hr 19053 Btu/hr 2190
1.6 tons 0.2
SUPPLY AIR QUANTITIES
Heating:
Cooling:
17439 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
19053 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
453 cfm
753 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 70 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By {.pcation: Carlsbad Date: 1/4/1988
... --,,<
Documentation: PROCALC Date --~------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC system Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Space 2
Bypass Ventilation Air ( 8 cfm)
-
pply Duct conduction
1 pply Duct Leakage
·· pply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation (
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
75 cfm)
TOTAL SYSTEM LOAD
\~ ~-· .... -
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING -------7948 -------7948
295 (
159
318
0 -------8720
2655 (
174
349
-1273 -------10625
18526
Space 2
Rheem RPNC024J
l
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 3pm) 9318 1068
---------------9318 1068
8 cfm) 43 5
186
373 43
0 ----------------9920 1116
75 cfm) 390 42
198
397 45
1273 --------------12178 _1203
1.0 tons 0.1 tons
17825 §152
1.5 tons 0.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 71 of 85
----------------------------------------------------------------------~----Project: Building #2
1
1 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 1/4/1988 Checked By . .\;<_' ,,
Documentation: PROCALC Date ---------------------------------------------------------~-----------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
{ Interior Conduction
'· Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1113
0
0
7948 Btu/hr
space 2
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr -------------72
-551
-2
183
0
0
0
0
6601
888
1430 0
1068 1068 -----------9546 Btu/hr 1068
0.8 tons 0.1
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)) •
9546 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
206 cfm
377 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 72 of 85 ---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By :··cation: Carlsbad Date: l/4/1988
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC-zone Name:
HVAC system Name:
System Multiplier:
He~ting Schedule:
cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
Space 3 (Jan 6am)
TOTAL SPACE LOAD
Ventilation Air (
Duct Conduction
Duct Leakage
Fan Heat Gain
8 cfm)
EFFECTIVE SPACE LOAD
Ventilation (
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
75 cfm)
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING -------7937 -------7937
295 (
159
317
0 -------8709
2655 (
174
348
-1273 -------10613
18526
Space 3
Rheem RPNC024J
1
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT ---------------(Aug 4pm) 10058 1068 ----------------
10058 1068
8 cfm) 37 -9
201
402 43
0 --------------10699 1102
75 cfm) 332 -82
214
428 44
1273 --------------12945 1064
1.1 tons 0.1 tons
17818 6197
1.5 tons 0.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 73 of 85 --------------------------------~------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:&cation: Carlsbad Date: l/4/1988
-:-: .. :,:~.,.~'
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
cl Slab Conduction
,, ~Int7rior ~onduction , __ .,.,~., Infiltration
Solar Gain
Lighting
Equipment
occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1102
0
0
7937 Btu/hr
Space 3
COOLING
SENSIBLE LATENT --------------Aug 4pm
78 F DB 50 I RH
82 F DB 66 F WB
Btu/hr Btu/hr ------------90
373
48
268
0
0
0
0
5879
901
1430 0
1068 1068 -----------10058 Btu/hr 1068 a.a tons 0.1
Heating:
Cooling:
7937 Btu/hr/ [1.10 * (105 F Supply -70 F ~Stat)]=
10058 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
206 cfm
398 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 74 of 85
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By ' (.ocation: Carlsbad Date: 1/4/1988
" --,:-.. -~#··
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC system Name:
System Multiplier:
Beating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 4
Space 5
PEAK
(Jan 6am)
(Jan 6am)
TOTAL SPACE LOAD
411Ypass Ventilation Air (
(:~pply Duct Conduction ·.,_...;supply Duct Leakage
Supply Fan Beat Gain
26 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 233 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
••• t <;
' \ '..:,_;." ' ... __ ,,.
HEATING
15139
15139
30279
912 (
303
606
0
32100
8211 {
321
642
-2546
38728
50168
spaces 4 & 5
Rheem RPNC030J
2
toads Office Heating
toads Office cooling
toads Office Fans
COINCIDENT
so'
COOLING
PEAK SENSIBLE LATENT
---------------(Aug 4pm) 17056 1652
(Aug 4pm) 16445 1652 --------------33501 3305
26 cfm) 114. -28
335
670 66
0 --------------34620 3343
233 cfm) 1026 -254
346
692 67
2546 --------------39231 3156
3.3 tons 0.3 tons
43244 19823
3.6 tons 1.7 tons
SPACE HEATING & COOLING LOAD SUMMARY page 75 of 85
---------------------------------------------------------------------------Project: Building i2 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.ocation: Carlsbad Date: 1/4/1988 Checked By
Docntation: PROCALC Date ---------------------------------------------------------~-----------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor conduction
<I Slab conduction
Interior Conduction
Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1350
11109
268
692
0
0
1721
0
0
15139 Btu/hr
Space 4
COOLING
SENSIBLE LATENT --------------Aug 4pm
78 F DB 50 I RH
82 F DB 66 F WB
Btu/hr Btu/hr ------------166
774
48
415
0
0
0
0
9737
2052
2212 0
1652 1652 -----------17056 Btu/hr 1652
1.4 tons 0.1
Heating:
cooling:
15139 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] =
17056 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
393 cfm
674 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 76 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,,.cation: Carlsbad Date: l/4/1988
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date -------------------------------------------------~-------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight conduction
Floor Conduction I Slab Conduction
( Interior Conduction
· -Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1350
11109
268
692 a
0
1721
0
0
15139 Btu/hr
Space 5
COOLING
SENSIBLE LATENT --------------Aug 4pm
78 F DB 50 % RH
82 F DB 66 F WB
Btu/hr Btu/hr ------------61
-1213
-16
218 a
0
0
0
10483
2052
2212 0
1652 1652 -----------15450 Btu/hr 1652
l.3 tons 0.1
Heating:
Cooling:
15139 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] =
15450 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
393 cfm
611 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 77 of 85
---------------------------------------------------------------------------Project: Building i2
Designer: Banzuelo/Rierson/Duff & Associates, Inc.
Enforcement Agency
Building Permit No
Checked By r&cation: Carlsbad Date: 1/4/1988
.\c •
Documentation: PROCALC Date ---------------------------------------------------------------------------
BVAC ZONE DESCRIPTION
BVAC Zone Name:
BVAC System Name:
system Multiplier:
Beating Schedule:
cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 6
Space 8
Space 10
PEAK
(Jan
(Jan
(Jan
6am)
6am)
6am)
TOTAL SPACE LOAD
,A,pass Ventilation Air (
\~f.tpply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
25 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 226 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
7948
7948
7948
23844
885 (
477
954
0
26160
7964 (
523
1046
-3819
31875
55578
Spaces 6,8 & 10
Rheem RPNC024J
3
Loads Office Heating
Loads _Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 1pm) 7956 1068
(Aug 1pm) 7956 1068
(Aug 1pm) 7956 1068 --------------23869 3205
25 cfm) 130 14
477
955 128
0 -------------~ 25431 3348
226 cfm) 1170 127
509
1017 134
3819 --------------31945 3608
2.7 tons 0.3 tons
53475 18455
4.5 tons 1.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 78 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:··&cation: Carlsbad Date: 1/4/1988
\,;:·._::: "\..,_'._'..·,i-·
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ------~--------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
I Slab Conduction
(, Interior ~onduction
;:;:/ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1113
0
0
7948 Btu/hr
Space 6
COOLING
SENSIBLE LATENT --------------Aug 1pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr -------------84
-608
1
197
0
0
0
0
5749
851
1430 0
1068 1068 -----------8604 Btu/hr 1068
0.7 tons 0.1
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] •
8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
206 cfm
340 cfm
·sPACE HEATING & COOLING LOAD SUMMARY page 79 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:.ocation: Carlsbad Date: 1/4/1988
"'"•·:._:_,.:.,;.,·
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof conduction
Skylight Conduction
Floor Conduction
•
Slab Conduction
. Interior conduction
· Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR OOANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1113
0
0
7948 Btu/hr
Space 8
COOLING
SENSIBLE LATENT --------------Aug 1pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr -------------84
-608
1
197
0
0
0
0
5749
851
1430 0
1068 1068 ------------8604 Btu/hr 1068
0.7 tons 0.1
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8604 Btu/hr/ {1.10 * ( 78 F TStat -55 F supply)]=
Btu/hr
tons
206 cfm
340 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 80 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By i·&cation: Carlsbad Date: 1/4/1988
'\,..,::{}:
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name: Space 10
COOLING
DESIGN CONDITIONS HEATING SENSIBLE LATENT
-----------------------------------------Peak Hour: Jan 6am Aug 1pm
Indoor Conditions: 70 F DB 78 F DB 50 I RH
Outdoor Conditions: 38 F DB 83 F DB 67 F WB
LOAD COMPONENT Btu/hr Btu/hr Btu/hr ---------------------------------------Wall Conduction 770 -84
Glass Conduction 5349 -608
Door Conduction 268 1
Roof Conduction 449 197
Skylight Conduction 0 0
Floor Conduction 0 0
• Slab Conduction 1113 C Int7rior Conduction 0 0
-Infiltration 0 0
Solar Gain 5749
Lighting 851
Equipment 1430 0 Occupants 1068-1068 ------------------SPACE LOADS 7948 Btu/hr 8604 Btu/hr 1068
0.7 tons 0.1
SUPPLY AIR QUANTITIES
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
··: I :
\ .. ~~-_,,J
Btu/hr
tons
206 cfm
340 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 81 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By (.cation: Carlsbad Date·: l/4/1988
Documentation: PROCALC Date ---------------------~-----------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
BVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE ~----------------------Space 7
Space 9
PEAK
(Jan 6am)
(Jan 6am)
TOTAL SPACE LOAD
ypass Ventilation Air ( 17 cfm)
( pply Duct Conduction
' upply Duct Leakage
supply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 151 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
7948
7948
15896
590 (
318
636
0
17440
5310 (
349
698
-2546
21250
37052
Spaces 7 & 9
Rheem RPNC024J
2
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
so'
COOLING
PEAK SENSIBLE LATENT --------------(Aug 1pm) 7956 1068 (Aug 1pm) 7956 1068 --------------15912 2137
17 cfm) 87 9
318
636 85
0 --------. ------
16954 2232
151 cfm) . 780 84
339
678 89
2546 --------------21297 2405
1.8 tons 0.2 tons
35650 12304
3.0 tons l.0 tons
SPACE HEATING & COOLING LOAD SUMMARY page 82 of 85 ---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,,·&cation: Carlsbad Date: 1/4/1988
\: '' ,·" ..,, .... ".~
Documentation: PROCALC
~nforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
·peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT -----~---------------Wall conduction
Glass conduction
Door conduction
Roof Conduction
Skylight Conduction
Floor Conduction I Slab Conduction
( ,,,.1 Int7rior ~onduction
'· ;;,y Infiltration
Solar Gain
Lighting
Equipment
occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1113
0
0
7948 Btu/hr
Space 7
COOLING
SENSIBLE LATENT --------------Aug 1pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr -------------84
-608
1
197
0
0
0
0
5749
851
1430 0
1068 1068 -----------8604 Btu/hr 1068 Btu/hr
0.7 tons 0.1 tons
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l = 206 cfm
8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= _ 340 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 83 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
· ,:.cation: Carlsbad
Documentation: PROCALC
Date: l/4/1988
Enforcement Agency
Building Permit'No
Checked By
Date -----------------------------~---------------------------------------------
SUMMARY OF PEAK BOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Bour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight conduction
Floor conduction
Slab Conduction
(. Interior conduction
~ ;;.,,; Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
770
5349
268
449
0
0
1113
0
0
7948 Btu/hr
Space 9
COOLING
SENSIBLE LATENT --------------Aug 1pm
78 F DB 50 I RB
83 F DB 67 F WB
Btu/hr Btu/hr ------------
-84
-608
1
197
0
0
0
0
5749
851
1430 0
1068 1068 -----------8604 Btu/hr 1068
0.7 tons 0.1
Heating:
Cooling:
7948 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8604 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
206 cfm
340 cfm
ti VA~ ~ONE HEA'l' lN~ & qJULLNG LOAD ::iUMMA.tC:C: page t:S4 01: e>~
---------------------------------------------------------------------------Project: Building #2
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By .ocation: Carlsbad
Documentation: PROCALC
Date: l/4/1988
Date ---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC system Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
Space 11 (Jan 6am}
TOTAL SPACE LOAD
Bypass
· .. supply
(-~~i~
Ventilation Air (
Duct Conduction
Duct Leakage
Fan Heat Gain
9 cfm)
EFFECTIVE SPACE LOAD
Ventilation (
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
81 cfm)
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
10977
10977
316
220
439
0
11952
2845 (
239
478
-1273
14241
18526
Space 11
Rheem RPNC024J
l
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT, --------------(Aug 3pm) 10642 1145 --------------10642 1145
9 cfm) 46 s
213
426 46
0 ..., _______ ------11327 1196
81 cfm) 418 45
227
453 48
1273 --------------13697 1289
1.1 tons O.l tons
17825 6152
1.5 tons o.s tons
SPACE HEATING & COOLING LOAD SUMMARY page 85 of 85
---------------------------------------------------------------------------Project: Building 12
Designer: Banzuelo/Rierson/Duff & Associates, Inc
i.ocation: Carlsbad
Documentation: PROCALC
Date: 1/4/1988
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
--------------------Peak Hour:
Indoor Conditions:
outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conducti-on
Door Conduction
Roof Conduction
Skylight conduction
Floor conduction
Slab conduction
• Interior Conduction
Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
2186
6583
536
481
0
0
1193
0
0
10977 Btu/hr
Space 11
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 FOB 67 F WB
Btu/hr Btu/hr ------------188
499
118
325
0
0
0
0
5883
951
1532 0
1145 1145 -----------10642 Btu/hr 1145 Btu/hr
0.9 tons 0.1 tons
Heating:
Cooling:
10977 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 285 cfm
10642 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 421 cfm
,,,. ! ',\ : \.., .....
~ITLE 24 REPORT FOR:
Building 13
El Fuente Business Park
Carlsbad, California
PROJECT DESIGNER:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, suite 202
Anaheim~ CA 92807-1907
(714) 777-0666
OWNER:
Davison-Jones Development
411 Campus Drive, suite 830
Irvine, CA 92715
REPORT PREPARED BY:
PROCALC
705 s. Velare St. tlO
Anaheim, CA 92804
l-(800) TITLE-24
Job Number: T499C
Date: 12/30/1987
The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the
calculations summarized in this compliance report. The program has interim
.pproval and is authorized by the California Energy Commission for use with
(~:/the Second Generation Nonresidential Building Energy Efficiency Standards.
Table Of Contents for Title 24 Report
cover Page •.••••••..••••••.•••••••••••••••••••••••••••••••••••••••••
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-1 Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Form WS-lA Energy Budgets Worksheet
Form CF~2 Envelope Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form SCM Performance Run . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-4 HVAC Power Indices summar.y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form ws-4 HVAC system summary Sheets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
l
2
3
5
7
9
12
16
22
24
Form CF-5 Lighting Summary & Worksheet •••••••••••••••••••••••••••••• 25
HVAC zone & space Loads summary ••••••••••••••••••••••••••••••••••••• 26
Certificate of Compliance (Part 1 ot 2)
Pro(ec& I I)
-a= ,Z,
17Mz+tc Is 1e.-4=esa lQ11ff
Building Pennit Number-
:
Plan Chock.od By -,
City/Town
PF?aC-AL:4
ciima1e2cna
ld'!'lt 1~:r
O'ccumantalfcn Auther Cato
Prescriptive Approach/Performance Approach Strategy
General
1 CEO Oc:cupanc'J Type • • • • • • • • • .of£ c.Q..
2 use OccuPanc'f Gtaup/Civision • • • . • • e,--z.
3 PackagaSolectad •••••••••.•• ,Br:£,
4 Gross Ccndilianed Floor Area • • • • • • k24: ft2
Roof and Floora1
5 ' Proposed Rcof/Cailing Rt (CF-2, CF-3) • • fp .C, hr-F-ftZ,Btu
6 .. Requfrad RooUCeiling Rt (CF-2) • • • • • ___ hr-F-ftZ1slU
7 Proposed E=ricr Floer Rt (CF-2. CF-3) • • hr-F-ft2/stu
8 Raqufrad Exterior ROCilr Rt (CF-2) • • • • hr-F-ftZ1BIU
Walt..
9 · Proposed Op~a Wall Rt (CF-2,°CF-3) • • '.?,, 1 hr-F-ftZ1BIU
10 Wall HaatC4pac:il',f (CF-3) • • • • • • • • s;.o SlUIF-tt2 . .al _ Raqufrad Opaque. WaD Rt (CF-2) • • • • • ___ hr-F-rtZ,Stu
i~glnWaUa
'.;·-;2 Extarfcr Wall Ania (CF-2) • • • • • • • • \\1 O ft2
13 Total Gla:ing ~a (CF-2) • • • • • • • • 1t! , ft2
14 Proposed Total Percant{Una 13/Une 12). ?>+·) %
1S Aw,aga !otal SC (CF-2) • • • • • • ••• o.:+§,
16 Allowed Total Gtazing Percent •••••• ___ %
17 Was~ Exterior Wall Area (CF-2) • • • • • • ?(..,q ft2
18 Was&Slla%fngAtita(CF-2). • • • • • • • :z.e,,z. ft2
19 Proposed West Parcant (CF-2) • • • • • • j 8. ~ %
. 20 Awnag~ West SC (CF-2) • • • • • • • • o , 4"1
21 AllowedWestGlazlng Percent •••••• ___ %
Gia:ilng tn Roof (CF•6) Proposed Alfowod
22 8.kYII;ht 1 • • • • • • • • • __ _
23 SkylI;ht 2 • • • • • • • • • __ _
24· SkylI;ht3 •. • • • • • • • • __ _
25 SkyG;ht4 • • • • • ; • • • __ _
a SkylI;ht 5 • • ••••••• __ _
i:r stc,jltght 6 • . • • • • • • • • ---
2B Skyll;ht 7 • • • • • • • • • __ _
29 S1(yllght 8 • • .• • • • • ·• • __ _
U;htfng
__ ft2
__ ft2
---ft2
---ft2 ___ ft2
---ft2"
·---ft2
---ft2
30 Prcpo11d Ac!iustad lPO (CF-S) • • • • • • \ • S'P Watts/ta
31 Allowed LPO (CF-5) • • • • • • • • • • ___ Wansnt2
HVAC
3a Performance Set Selected • • • • • • • •
" •. ~ropoaed FIii\ Wattage Index (CF--4) ••• -o-.e-, Wausnt2
(:--. __ /. ~d Fan Wattage Index • • • • • • • ___ Waustft2
·--JS ProposedCoollng Power Index (CF-4) ••• Jc.C?:4::-f!tuMt2
38 Allowed CooUng Power Index • • : • • • ___ 8luhlft2
37 Proposed Heating Power Index (CF-4) • • • 7 7. SO Btuhlfl2
38 Allowed Heatfn; Power Index • • • • • • ___ ·eluhltt2
~ Rlvlsed September 1986
CF-1
For Enforcement Agency Use Only
~_M--
~z~oi??°
L,-7,Q . Signature and
Ragistralion Stamp
L\t-61-l~ ~e-
Dalo
Field Checked ay
Approved Sy
Performance Approach
Energy Budget
1 CEC Occupancy Type • • • • • • • • • .offi·ce
2 USC Occupancy Group/Division • • • • • e,--:Z.
date
Cate
4 Condilionod Floor Aroa • • • • • • • • • '2?4:: ft2
4 Budgot Table • • • • • • • • • • • • • .lht=z:: I A
5 Allowed Energy Budget (WS-1A) • • • • • r '1 ,.e> k8tu/yr-lt2
Calculated Annual Energy Con:sumptlon
6 Approved Calculation Malhod •••••• t:t(. "2r:1P'-''l' 'Z4
7 CEC Designation • • • • • • • • • • • L.pt!> 07
a Mullipliar ••••••••• , •••••• \ ,Q'(j
E3trmated Energy Use
9 Healing. • • • • • • • • • • • • • • • e,5' k8tulyr-ft2
10 Cooling • • • • • • • • • • • • • • • • 18 .1 k8tu/yr-ft2
11 Fans • • • • • • • • • • • • • • • • • ?tJ. 1 kBtulyr-ft2
12 Ughts • . • • • • • • • • • • • • • • '*• $· ?> k8tu,yr-ft2·
13 MlsceUaneous Equipment •••••• ~ 15,'l. k8tu/yr-lt2
14 Total •.•••.••••••••••••• ___ kStu,yr-ft2
15 Ac:tf. Total Energy Use (lifla 9 x liua t4' ••• \4'2: ?> kStu/yr-ft2
~ ~ju.s\-c..c\
Compliance Statement
General. The proposed buildlng repl'9sented In this set of c:cmpllance
documentation Is consistent wilh Iha olher c:cmpllance forms and
worksheets. wilh the plans and specifications and with any olher cafculalions or computar runs submitted with this pennit application.
Performance Approach. (when applicable) The energy performance
estimate presented on lhis fonn was calculated using the approve<!
calculation method indicated above and with the CEC established fixed
and restricted engineering inputs for the applicable dimata zone and OCCUpa!"CY type. .
Prescrfpuve Approach. (when applicable) The proposed building has
been designed ta meat the requirements of the Altamadve Component . Package Indicated above for the appropriate occupancy type and climate
~'.$;L
Name/TIiie
,¼12-u,-Ju M, J:Lrp
CitylSta!oJZip
ti14) ~7-""5"310 7?Z:5~S:
Telephone Calif. Ucense Number
ven:1ncare o-r Gompliance· (Part 2 ot 2) CF-·
Pro~ M~-rz I r:J ~ ' 3E z, For Enforcement Agency Use Only
Pgo<e,. u;... 1:z.L?z, /en
.---Dalo cliiciiidBy Oa<a
·. · < ··' Both parts one and two of !his Certificate of Compliance must be included with each building permit application for the above no'9d building and appa: on the ·prans submitted for approvaL The building.features and requirements rei:1resented on Iha Cenificate ot Compliance are adequate to achit\
c:omplfancawith the second generation nonresfdendaJ energy standards for the building referencad above. The bufldlng features and requirements a:
also adequate for arr, subsequent alterations. moc!ilicallons or additions to Iha buikfing.
Desfgner On•
Name (Print)
litla/Company Name
Address
Addteu
0wnet
Name (Print) • ·
Tida/Company Name
Farm Re'lised S.ptember t 986
Cata
Oaro
Oala
-.
Designer Three ·.
:cj !M CJ~ tJ ~
Esilotcoment AgonCJ Signature bate
Designer Four
Name (Print)
TidatCompany Name
SlgnalUta pate
e@crcement Agency Signature Oata
Enforcement Agency
Name (Print)
TidalAgency
Address
Page_of_
CERTIFICATE OF COMPLIANCE (part l of 2) CF-1 page 3 of 27 ------------------------------------------------~------------------~-------Project: Building 13 Enforcement Agency
-Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
'aation: Carlsbad Date: 12/30/1987 Checked By
,,:• -
Docum~ntation: PROCALC Date
---------------------------------------------------------------------------
PERFORMANCE APPROACH
Roofs and Floors
Roof/Ceiling Rt (CF-2,3) R-20.9
Ext. Floor Rt (CF-2,3) R-0.0
Walls
Opaque Wall Rt (CF-2,3) R-3.7
Energy Budget
CEC Occupancy Type .
Conditioned Floor Area
Total Number of Floors
Climate Zone
Heat Capacity (CF-2,3) 5.0 HC
Energy Budget (WS-lA}
Lighting Adjustment (CF-5)
Energy Compliance Budget
Office
654
l
7
157.0 o.o
157.0
Glazing in Walls
Exterior Wall Area (CF-2)
Total Glazing Area (CF-2)
Total Glazing Percent
Average Total SC (CF-2)
West Exterior Wall (CF-2)
West Glazing Area (CF-2)
West Glazing Percent
Average West SC
(.zing in Roof
-~ikylight Area (CF-2)
1170
399
34.1
0.46
360
282
78.3
0.46
0
sf
sf
' SC
sf
sf
' SC
sf
Calculated Annual Energy Consumption
Approved Calculation NR COMPLY 24
Program Version Number 1.14
User License Number 1329
CEC Designation CPO 07
CEC Multiplier 1.027
Estimat_ed
Heating
Cooling
Fans
Energy Use (KBtu/sqft-yr)
8.5
29.7
37.7
Lighting
Proposed Adjusted LPD (CF-5)1.50 w/sf
Adjustment
Lights
Receptacle
75.8 X 1.027 • 77.9
50.3
16.8
1.4
146.3
HVAC
Fan Wattage Index (CF-4) 0.81
Cooling Power Index (CF-4) 70.84
Heating Power Index (CF-4) 57.50
COMPLIANCE STATEMENT
Bot Water
w/sf Total (SCM-3)
Btuh/sf
Btuh/sf
The proposed building represented in this set of compliance documentation
is consistent with the other compliance forms and worksheets, with the plans
and specifications and with any other calculations or computer runs submitted
with this permit application.
The energy performance estimate presented on this form was calculated using
the approved calculation method indicated above and with the CEC established
fixed and restricted engineering inputs for the applicable climate zone and
occupancy type· •
• NED ________________ Calif. License t:
''\,".,;· -----
DESIGNER Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
--------------------------------
CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-l page 4 of 27
---------------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
1.cation: Carlsbad Date: 12/30/1987 Checked By
-~' ;~·
Documentation: PROCALC Date ---------------------------------------------------------------------------
Both Parts one and two of this Certificate of Compliance must be included
with each building permit application for the above noted building, and
appear on the plans submitted for approval. -The building features and
requirements represented on the certificate of Compliance are adequate to
achieve compliance with the second generation nonresidential energy
standards for the building referenced above. The building features and
requirements are also adequate for any subsequent alterations, modifi-
cations or additions to the building.
PROJECT TITLE
Building 13
El Fuente Business Park
Carlsbad, California
OTHER DESIGNER
Name:
Address:
City:
Signed:
OWNER
Davison-Jones Development
411 campus Drive, Suite 830
Irvine, CA 92715
-· ·-._:~ .gned:
DOCUMENTATION AUTHOR
PROCALC
705 s. Velare St. fl0
Anaheim, CA 92804
1-( 800) TITLE-24 ---;· /\_ /1 /v/ //-,.~I
, ( /{ /' f • r. /I, , I _, Signed:-.,_ , : -~ . -~-v· '----IL -·<.
-----I .. ~·
OTHER DESIGNER ~ /4
Name: b:t: A,-~ f-:rt lt-ITN!dt"\ltgp I
Address: I-Z.7Q l& J?P?k:z
City:
Signed:
ENFORCEMENT AGENCY
Name:
Agency:
City:
Signed:
MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page 5 of 27 ---------------------------------------------------------------------------Project: Building i3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
··cation: Carlsbad Date: 12/30/1987
': , .. .,.,-.
Enforcement Agency
Building Permit No
Checked By
~.;.~ :-•
Documentation: PROCALC Date
---------------------------------------------------------------------------
ENVELOPE MEASURES
o Certified Insulation-Materials per Sec. 2-531l(a)
o Insulation Installed to meet Flame Spread and smoke Density
Requirements of sec. 2-531l(b)
o Orea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c)
o Retrofit Insulation specified per Sec. 2-5313
o Air Infiltration is minimized by specification of tested
manufactured doors and windows and proper sealing and
weatherstripping per Sec. 2-5317
LIGHTING SYSTEM MEASURES
o certified Luminaires/Ballasts per sec. 2-5314(b)
1.ndependent Control within enclosed Areas per Sec. 2-5319(a)
'-~~~I
o Manual Switching Readily Accesible per Sec. 2-5319(b)
o Reduction of Lighting Load to at least 50% per sec. 2-5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute)
o Separate Switching of Daylit Areas per Sec. 2-5319(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale Occupancies per Sec 2-53l9(h)
o Automatic Control of Display Lighting in Retail/Wholesale
Occupancies per Sec. 2-5319(h)
o Tandem Wiring of land 3 Lamp Luminaires per sec. 2-5319(h)
OCCUPANCY SENSING DEVICES (when applicable)
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
Reference
I
__ ime Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 __ ..,_ __
-,~ _ __;;·Limits on Emmisions per exceptions to sec. 2-5319 ( e)
MANDATORY FEATURES CHECKLIST (part 2 of 2)
Project: Building #3
MF-1 page 6 of 27
.signer: Banzuelo/Rierson/Duff & Associates, Inc
~-~ation: Carlsbad Date: 12/30/1987 .. \/:,', .·./
Enforcement Agency
Building Permit No
Checked By
. "·~ ,.... ..
Documentation: PROCALC Date
---------------------------------------------------------------------------
DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable)
o Uniform Illuminatio~ reduction to 50% per Sec. 2-5319(e).l
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
Reference
o Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 ____ _
o Step Switching Devices with Separation between On/Off Settings
per Sec. 2-5319(e).4
o Photocell Sensors shall be Diffusing type and no Opaque cover
allowed per Sec. 2-53l~(e).5
o Manufacturer's Instructions provided for Installation and
Calibration per Sec. 2-5319(e).6
Proper Installation of Controls including Sensor Location,
ertification of Initial calibration and Control of Luminaires
~--~~-·· nly within Daylit Areas per sec. 2-5319(e) .8
o Visible or Audible malfunction Alarm provided per Sec. 2-53l9(g) ____ _
HVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per Sec. 2-5312
o Certified HVAC Equipment per 2-5314(a)
o Certified Plumbing Equipment per 2-5314(a)
o Heating and cooling Equipment efficiency per Sec. 2-53l4(b)
o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c)
o Automatic C9ntrols for Off-Hours per Sec. 2-5315(a)
o Thermostat Set Point Requirements per Sec. 2-5315(b).l
o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2
~Automatic Exhaust Fan Dampers per Sec. 2-5316(b)
i~hermostat Controls for Each Zone per Sec. 2-5315(b) <_>···
o Ventilation Provided per Secs. 2-5316 & 2-5343
o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318
ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 27
---------------------------------------------------------------------------Project: Building i3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
&ation: Carlsbad Date: 12/30/1987 ··• ",: ,, ;' ;!
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
CLIMATE ZONE 7 ENERGY BUDGETS
Cross
Floor sectional Office Retail
No Area Budget Budget --------------------------
1 654 157 186
BUILDING ENERGY COMPLIANCE BUDGET BY SPACE
Flr Space Name
Occupancy Floor
Type Area Mult
Total Budget Energy
Floor (KBtu Budget
Area /sqft) (MBtu) ------------------------------------------------------1 Office Office 654 X 1 = 654 X 157 -102.7 -----------654 102.7
BUILDING COMPLIANCE BUDGET
TOTALS
102.7 MBtu / 654 sqft = 157.0 KBtu/sqft
• -\.~ ' ,.::--
.
ENERGY BUDGETS WORKSHEET (part 2 of 2) WS-lA page 8 of 27 ---------------------------------------------------------------------------Project: Building i3
~signer: Banzuelo/Riersoh/Duff & Associates, Inc
'.·~cation: Carlsbad Date: 12/30/1987 , ..
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate Use
Flr Space Name Area Mult Area (KBtu/sqft) (MBtu)
--------------------------------------------------1 Office 654 X 1 = 654 X 146.3 = 95.7 -----------TOTALS 654 95.7
BUILDING ENERGY CONSUMPTION 95.7 MBtu / 654 sqft = 146.3 KBtu/sqft
•
AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 27
---------------------------------------------------------------------------Project: Building 13
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.cation: Carlsbad Date: 12/30/1987 \, , ~·,~:
,_,_Va•'~
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS ,. ---------------------------------------------------------------------------Roof-l
Roof-2
605 .
49
605
49 ------------------------------------------------------------------~--------TOTALS 654
ROOF R-VALUE
Type
Roof-1
Roof-2
Assembly Name
--------------------------R-19 B/O with T-Bar
R-19 B/O with Gyp. Clg.
Average R-Value
Area
605
49
654
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE
654
Area/
R-Value R-Value --------------21.04 28.75
19.40 2.53 -------I 31.28 -20.91
s SW w NW TOTALS ----------------------~----------------------------------------------------NONE
---------------------------------------------------------------------------TOTALS 0
• \:;~;;:
AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 27 ---------------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc. Building Permit No
Acation: Carlsbad Date: l2/30/l9S7 Checked By
-~ -!
-~ocumentation: PROCALC Date
---------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE E SE s SW w NW Int TOTAL
---------------------------------------------------------------------------360 36 198 360 216 1170
---------------------------------------------------------------------------
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW Int TOTALS ---------------------------------------------------------------------------Wal-1
Wal-2
Wal-3
340
20
36 81
216
78
556
195
20 ---------------------------------------·------------------------------~----TOTALS 360 36 81 78 216 771
1::E EXTERIOR WALL/DOOR R-VALUE & HEAT CAPACITY
Area/ Area
• Assembly Name Area R-Value HC R-Value X HC ----------------------------------------------Wal-l 5/8 Gyp/R-11/Gyp WF 556 10.19 l.4 55 769
Wal-2 6" Concrete Wall 195 1.34 15.4 146 3003
Wal-3 Solid Wood Door 20 2.22 2.4 9 48 ------------Totals 771 209 3820
Average R-Value 771 I 209_= 3.69
Average BC 3820 I 771 • 4.95
• <::>"
AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CP-2 page 11 .of 27
---------------------------------------------------------------------------Project: Building t3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.cation: Carlsbad Date: 12/30/1987 \'..~. ", -·
Enforcement Agency
Building Permit No
Checked By.
Documentation: PROCALC Date ------------------------------------------------~--------------------------
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS
-~-------------------------------------------------------------------------Wind-1 117 282 399 ' . ------------------------------------------------~--------------------------TOTALS 117 282
GLAZING O-VALOE AND SC
Type
Wind-1
Assembly Name Area o-value
--------------------------Sunglass Blue Plate 399
Totals 399
Average o-value
Average SC
453 I
184 /
1.14
399 •
399 =-
399
Area X Area
SC U-Value X SC --------0.46 453 184 ------------453 184
1.14
0.46
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-l page 12 of 27
---------------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/30/1987 Checked By
Documentation: PROCALC Date --------------------------~------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southeast Glazing
Southwest Glazing
southwest Glazing
Roof·
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
Door
~-;;,, Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
Heat Capacity of Exterior Wall
Lighting Power
._.Climate Zone
i~~::··,f'
Office
751.0 sqft
117.0 sqft
234.0 sqft
48.0 sqft
654.0 sqft
20.0 sqft o.o sqft
654.0 sqft
654.0 sqft
3.75
0.88
20.91
2.22
0.00
Rheem RPNC036C
l
Heat Pump
Heat Pump
Electric Resistance
2.920
8.000
0.990
No
4510 watts
533 watts
1250 CFM
4.95
1.500 watts/sqft
7
·scM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 13 of 27
---------------------------------------------------------------------------. Project: Building #3 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
&ation: Carlsbad Date: 12/30/1987 Checked By "'· ,: ;
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Southeast
southwest
Southwest
OVERHANGS & SIDEFINS
Southeast
-outhwest
(~outhwest
SPECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
6.0
13.0
26.0
8.0
Shading Device
Winter summer ------------
overhang
Height Depth
0.18
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 27 --------------------------------------------------------~------------------Project: Building i3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
.ation: carlsb~d · Date: 12/30/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ----------------------------------------------~----------------------------
Space Name:
Occupa.ncy Type:
SCHEDULING
Office
Office
Occupancy Level for Operational Period: Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: <I Day
. ~.,--Number of Holidays per Year:
Thermostat Set Point Temperatures:.
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate cu-value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
: .ccupant Density:
\ \ .. "'-..._ '~r,,'
. Night
Heating Season
Cooling Season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 27
---------------------------------------------------------------------------Project: Building i3
Designer: Banzuelo/Rierson/Duff
,'.cation: car lsbad
\~_;\}
& Associates, Inc
Date: 12/30/1987
Enforcement Agen·cy
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Office
BALANCE POINT TEMPERATURES AND DEGREE DAYS
Daytime Nighttime ------------------------------BPTl = 56.10 (Winter) BPTl -67.96
BPT2 = 64.51 (Summer) BPT2 = 76.17
BPT3 = 64.51 (Economizer) BPT3 = 76.17
BDD = 75 (Heating) HDD = 3253
CDD = 547 (Cooling) CDD = 0
BUILDING HEAT TRANSFER (Btu/hr-F) ••=•=a•===••=•============•======
Building Envelope Heat Transfer Rate: Winter = summer -overall Heat Transfer Factor ("K"): Winter -summer -
~ . vaeating
ANNUAL LOADS (MBtus) -Cooling -
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==============•=======·-----------====•=•==== Source Beating
Source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Hot water
----
a.s
29.7
37.7 -----75.8 X l.027
--= -= -
---=
554.4
561.1
942.0
918.2
5.0
9.8
1.8
6.5
8.2
11.0
3.7
0.3
77.9
50.3
16.8
1.4
~•··=====================================================•==========•=====
\;:,;,/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 146.3 KBtu/sqft
------=-====================•============================•••===============
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 16 of 27 ---------------------------------------------------------------------------Project: Building i3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
rtlcation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
..._.._ :
... , . '<-~' ,'
Documentation: PROCALC Date -~-------------------------------------------------------------------------
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical).
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Hardwood, Maple
2. Inside ·Air Film
3.
4. s.
6.
7.
8.
9.
10.
11.
1.750 1.54
0.68
1.54
0.68
-------------------------------------------------------------------------
/1 ~--· Total 2.22 2.22
Framing Percentage: 0.0 \
Framing Material: NONE
OVERALL VALOES ADJUSTED FOR FRAMING
R-Value
o-value
2.22
0.4505
2.22
0.4505
Sketch o~ construction Assembly ======
•
orptivity:
_ ghness: Clear Pine
r, • h \'··,. __ .. 1.g t:
--aeat capacity:
0.70
6.1 lb/sqft
2.39
I CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 17 of 27 ---------------------------------------------------------------------------Project: Building i3· Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,'.cation: Carlsbad Date: 12/30/1987 Checked By
-~ ' ' . •'
Documentation: PROCALC Date ---------------------------------------------------------------------------
Assembly Name: R-19 B/U with Gyp. Clg.
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
----------~----------------------------------------------------------------1. Roofing, Built-Up
2. Plywood
3. Air Space
4. Insulation, Mineral Wool, R-19
5. Gypsum or Plaster Board
6. Inside Air Film
7.
8.
9.
10.
11.
0.375
0.500
6.000
*· 6.000
0.625
0.33 0.33
0.63 0.63
1.00 0.80
19.00 19.00
0.56 0.56
0.92 . 0. 61
<~r--------------------------------------------:::::--------::~::----::~~:-
Framing Percentage: 10.0 I
Framing Material: · Softwood, Douglas Fir-Larch
1 2 3 4 5
Calculation for Framing Adjustment
summer O-Value
0.0446 X 0.90 + 0~1066 X 0.10 • 0.0508
Winter O-Value
0.0456 X 0.90 + 0.1128 X 0.10 • 0.0523
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
o-value
19.69
0.0508
19.11
0.0523 Sketch of construction Assembly -=--=--•==-==-
.allisorptivity:
~~ghness: stucco,
i,/_ . .:ight:
Heat Capacity:
0.70
Wood Shingles
8.2 lb/sqft
2.58
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 18 of 27
---------------------------------------------------------------------------Project: Building #3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
:.cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
' '~~·,. :: . ' "
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: R-19 B/U with T-Bar
Assembly Type: Roof
Assembly Tilt: 0 deg (Ho·rizontal Roof)
construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Roofing, Built-Up
2. Plywood
3. Air Spac~
4. Insulation, Mineral Wool, R-19
5. Acoustical Tile, Mineral Fiberboard
6. Inside Air Film
7.
8 .•
9.
10.
11 •
*
0.375 0.33 0.33
0.500 0.63 0.63
24.000 1.00 0.80
6.000 19.00 19.00
0.750 2.03 2.03
0.92 ·0.61
.-------------------------------------------------------------------------(
..
~ .. _,y Total 23. 90 23. 39
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir-Larch
1 2 3 4 5
Calculation for Framing Adjustment
summer u-Value
0.0418 X 0.90 + 0.0923 X 0.10 • 0.0469
Winter U-Value
0.0428 x o.~o + 0.0968 x 0.10 = 0.0482
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
o-value
21.33
0.0469
20.76
0.0482
Sketch of Construction Assembly ------=•••==
: .orptivity:
,-: 1ghness: Concrete, Asph.
~,>-~ight:
Beat capacity:
0.70
Shingles
6.9 lb/sqft
2.15
CONSTRUCTION ASSEMBLY COMPLIANCE FORM . CF-3 page 19 of 27
---------------------------------------------------------------------------Project: Building #3 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.ation: Carlsbad Date: 12/30/1987 Checked By
'-.. .... -.>
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: sunglass Blue Plate
Assembly Type: Glazing
Assembly Tilt: 90 deg {Vertical)
Construction Components
Th R-Value
Fr {in) summer Winter . . ---------------------------------------------------------------------------1. CEC Single Glazing
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11.
0.250 0.20
0.68
0.20
0.68
(.---------------------------------------------:::::---------:~::-----:~::-
Framing Percentage: 0.0 I
Framing Material: NONE
-------------------------------
1
-------------------------------Sketch of Construction Assembly
•
ding Coefficient: 0.46
. ible Transmittance: 0.30
' s ,'
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
O-Value
0.88
1.1364 -----=
0.88
1.1364 ===•=•
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF~3 page 20 of 27
---------------------------------------------------------------------------Project: Building 13
Designer: Banzuelo/Rierson/Duff & Associates, Inc
··cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By ~ ·. ". ,· . .,,. ·-.<~.:
Documentation: PROCALC Date --~------------------------------------------------------------------------
Assembly Name: 5/8 Gyp/R-11/Gyp WF
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Gypsum or Plaster Board
2. Insulation, R-11, 2x4 Wood Framing 16"
0.625
3.500
0.625
0.56
8.38
0.56
0.68
0.56
8.38
0.56
0.68
3. Gypsu~ or Plaster Board
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11.
/---------------------------------------------:::::--------::~::----::~::-
Framing Percentage: 0.0 %
Framing Material: Softwood, Douglas Fir-Larch
I-H:-½+--1
P-C.•-t+---2
~J<+--3
Calculation for Framing Adjustment
Summer o-Value
0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982
Winter O-Value
0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
u-value
10.19
0.0982
10.19
0.0982 Sketch of construction Assembly ------------
~orptivity:
~ghness: Smooth Plaster,
'· \, "j1' ght · ............... . .
Beat capacity:
o.oo
Metal
5.4 lb/sqft
1.38
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 21 of 27
---------------------------------------------------------------------------Project: Building #3 Enforcement Agency
-Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.ation: Carlsbad Date: 12/30/1987 Checked By
":.:.;,.:.,:-l
Documentation: PROCALC Date
------------------------------------------------.------------------------~--
· Assembly Name: 6" concrete Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Component~
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Concrete, 140 lb, oven Dried
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11.
6.000 0.66
0.68
0.66
0.68
~--------------------------------------------------------------------------\L .. :..~ Total 1. 34 l. 34
Framing Percentage: 0.0 I
Framing Material: NONE
-------------------------------
. ...
:. . OVERALL VALUES ADJUSTED FOR FRAMING .
1
-------------------------------Sketch of Construction Assembly
•
orptivity:
r, • ghness: Concrete,
\~,,: .. 1ght:
Heat Capacity:
0.70
Asph. Shingles
70.0 lb/sqft
15.40
R-Value
O-Value
1.34
0.7463
------
1.34
0.7463
==••==
BVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 22 of 27
---------------------------------------------------------------------------Project: Building 13
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/30/1987
'~: .. :~.-.'
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
FAN ENERGY
BVAC System
Rheem RPNC036C (Fanl)
FAN WATTAGE INDEX
No.
Sys BHP
1 X a.so I
533 watts/
Motor
Eff. -----[0.70
Drive Conv No. Fan
Eff. Fact Fans Watts --------------
X 1.00] X 746 X 1 = 533 ------Total 533
654 sqft = 0.815 watts/sqft
HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page 23 of 27
---------------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
;:.cation: Carlsbad Date: 12/30/1987 Checked By
Documentation: PROCALC Date ~--------------------------------------------------------------------------
BEATING EQUIPMENT
System No. Design Equip Conv. Source
Descripti~n Type Sys Output Eff Factor (Btu/hr)
---------------------------------------------------------Rheem RPNC036C Heat Pump 1 X 36600 I 2.92 X 3.000 -37603 --------Total 37603
aEATING POWER INDEX 37603 Btu/hr I 654 sqft -57.50 Btu/hr-sqft
COOLING EQUIPMENT
System No. Design Equip Conv. Source
Description Type Sys Output Eff Factor (Btu/hr)
--------------------------------------------------------Rheem RPNC036C Heat Pump 1 X 36200 I 8.00 X 10.239 -46331 --------Total 46331
COOLING POWER INDEX 46331 Btu/hr/ 654 sqft = 70.84 Btu/hr-sqft •
HVAC SYSTEM.SUMMARY SHEET
Project: Building #3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
WS-4 page 24 of 27
(.cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
' ,_. :, ·,,.,
Documentation: PROCALC Date -------------------------------------------------------------------------~-
HVAC Equipment Name:
HEATING
System Type:
output Capacity:
Rated Efficiency:
Supply Air Temperature:
COOLING
·System 'l'ype:
'l'otal output capacity:
Sensible Output Capacity:
Latent output Capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer:
--upply Air Temperature:
(~NS
Supply Air CFM:
Fan 'l'ype:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
supply Duct Beat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC036C
Beat Pump
36600 Btu/hr
2.920
105.0 F
Beat Pump
36200 Btu/hr
26200 Btu/hr
10000 Btu/hr
8.000
4510 watts
0.100
No
55.0 F
1250 cfm
Blow-Through
l
0.50
70.0 I
100.0 I
1.0 I
1.0 I
2.0 I
2.0 I
LIGHTING SUMMARY AND WORKSHEET CF-5 page 25 of 27
-----~---------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,.,cation: Carlsbad Date: 12/30/1987 Checked By
-<~ ;._":, '
Documentation: PROCALC Date ~----~---------------------------------------------------------------------
INSTALLED LIGHTING POWER BY SPAC~
Space Name
Office
Floor Vert Horiz
Area Mult Mult
654 X 1 X
TOTALS
1 -
BUILDING LIGHTING WATTAGE 981 watts/
•• ·. ·~, -..
Total
Floor
Area -----654 -----654
654
Lighting Installed
(watts/sqft) wattage
---------------------X 1.500 -981
---------981
sqft -1.500 watts/sqft
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 26 of 27
---------------------------------------------------------------------------Project: Building #3
Designer: Banzuelo/Rierson/Duff & Associates, Inc
>.cation: Carlsbad . Date: 12/30/1987
Enforcement Agency
Building Permit No
<,. ·~· Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
BVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
(Jan 6am)
TOTAL SPACE LOAD
Office
B ass Ventilation Air ( 13 cfm)
. ply Duct Conduction
' ply Duct Leakage .
· pply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 118 cfm)
Return Duct conduction
Return Duct Leakage
Return Fan Heat Gain
i .•
\ t'. ':. ~/ -... ~ ...... .
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
21022
21022
460 (
210
420
0
22113
4144 (
221
442
-1819
25101
30002
Space l
Rheem RPNC036C
1
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
so'
COOLING
PEAK SENSIBLE LATENT --------------(Aug 3pm) 20167 1668
--------------20167 1668
13 cfm) 68 7
202
403 33
0 ---------------20839 1708
118 cfm) 609 66
208
417 34
1819 --------------23892 1808
2.0 tons 0.2 tons
26237 11501
2.2 tons 1.0 tons
SPACE HEATING & COOLING LOAD SUMMARY page 27 of 27 ---~-----------------------------------------------------------------------Project: Building 13 Enforcement Agency
Designer: Banzuelo/Ri~rson/Duff & Asspciates, Inc Building Permit No
I _ (.cation: Carlsbad Date: 12/30/1987 Checked By
: ... ~ ,.' ..
Documentation: PROCALC Date ---------------------------~-----------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor conditions:
Outdoor Conditions:
LOAD COMPONENT
---------------------Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
.,aslab Conduction
{iainterior conduction
\s,v-• Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
5851
12160
268
1006
0
0
1737
0
0
21022 Btu/hr
SENSIBLE --------Aug 3pm
78 F DB
83 F DB
Btu/hr ------1390
922
58
650
0
0
0
0
11059
2188
2232
1668 ------20167
1.7
Office
COOLING
LATENT ------
50 I RH
67 F WB
Btu/hr ------
0
1668 -----Btu/hr 1668 Btu/hr
tons 0.1 tons
Heating:
Cooling:
21022 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l • 546 cfm
20167 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 797 cfm
I f.
\; :
/.
TITLE 24 REPORT FOR:
Building i4
El Fuente Business Park
Carlsbad, California
PROJECT DESIGNER:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
OWNER:
Davison-Jones Development
411 campus Drive, Suite 830
Irvine, CA 92715
REPORT PREPARED BY:
PROCALC
705 s. Velare St. il0
Anaheim, CA 92804
1-(800) TITLE-24
Job Number: T499D
Date: 12/31/1987
. The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the
calculations summarized in this compliance report. The program has interim
0•• approval and is authorized by the California Energy Commission for use with
\~-" the Second Generation Nonresidential Building Energy Efficiency Standards.
ce
Table Of Contents for Title 24 Report
Cover Page ..••••••.•••••••••••.•••••••••••••••••••••••••••••••••••••
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-1 Certificate of Compliance • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form MF-1 Mandatory Measures Checklist • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
l
2
3
5
Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7
Form CF-2 Envelope summary & Worksheet • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form SCM Performance Run • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form CF-3 Construction Assemblies • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form CF-4 BVAC Power Indices summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form ws-4 BVAC System summary Sheets • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form CF-5 Lighting summary & Worksheet • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
HVAC Zone & Space Loads summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
9
12
44
so
52
53
54
verur1cate or Gompliance (Part 1 ot 2}
P~Ji~.tf.P!t.Jta :# 4
Building Permit Number·
I
Pl:an Chockad By
7
Citylrown
E?lRaCAk4:
climaia Zone
1de1/e:1
Prescriptive Approach/Performance Approach Strategy
General
1 CEO 0:cupanC'f Type , • • • • • • • • .off{c.tZ..
2 use OccupaM'/ Group/Oivision • • • . • • -g.--z.,.
3 Pa:bgeSelactad ••• ~ •••••.••• fuf.
4 Gress Conclitfcned Floer Area • • • • • • ~ 7 ft2
Roof ind Ftoora1
s , Proposed Roof/Cai!Ing Rt (CF-2. CF-3) • • ZR-& hr-F4tZ'8IU
6 .. Raqwad Reef/Ceiling Rt (CF-2) • • • • • ___ hr-F-ftZ'SIU
7 Proposed EJcmrior Floor Rt (CF-2. CF-3) • -hr-F-rt2/SIU
8 Raqwad Extarfcr Floor Rt (CF-2) , • • , • hr-F4t2/81U
Walla.
9 · Proposed Opaque Wall Rt (CF-2.. CF-3) • • 1 , l hr-F-ft2/81U
10 Wall Heat Capacity (CF-3) • • • • • • • • 4. q 8tu/F.ft2
Raquirad Opaque. Wall Rt (CF-2) , , , • , ___ hr-F-ft2/SIU
( ;lnWaUa
' Extadcr Wal Area (CF-2) • • • • • • • • :4q 1 1 ft2
13 Total Grazing ~a (CF-2) • • • • • • • • \ 4?z l ft2
14 Proposed Total Percent (Una 13 / Una 12) • ?.5, \ %
15 AWtaga :rota1 SC (CF-2) , • • • • • • • • t:!:> • 4':z
18 Allowed Total Gtazfng Percent • • • • • • ___ %
17 Wast Extaricr Wall Area (CF--2) • • • • • • t 1 ?, ?> ft2
18 West~ Ania (CF--2) • • • • • • • • 1 'Z,'2. ft2
19 ProposadWestPvcant(CF-2). • • • • • 1 ~O %
20 Avera;~ Wast SC (CF-2) • • • • • • • • p. 4':;,
21 Allowed Wast Grazing Percent • • • • • • %
Gra:Ing In Roof (CJ4) Proposed Allowod
22 S.kyllght 1 • • • • • • • . • • __ _ ---ft2 23 SkyllghC 2 • • • • • , • • • __ _ ---ft2 24· Skyl(ghc3 •. • • • • • • • • __ _ ___ ,a
25 Skylight.& • • • • • ; • • • __ _ ___ ,a
: ~ts •.•••••••• __ _
Sk'Jltght I • • • • • • • • • __ _ ---ft2
---ft2
28 Skylrght7 • • • • • • • • • ---
29 Skylight a • • .. • • • • -. • __ _
___ ft2
---ft2 UghUn;
30 Propcsad Ac(ustac:t LPD (CF-5) • • • • • • I • 40 Waltslft2
31 Allowlad LPO (CF-5) , • • • • • • • • • ___ Wattslft2
HVAC
32 Ptdcnnance Set Selec:tad • • • • • • • • __ _
•
~ropoaed Far\ Wattage Index (CF-4) • • • \ • 0 § Watrs/ft2
. ~ Fan Wattage Index • • • • • • • -----Wallslft2
·-. ~ Proposed CocUng Power Index (CF-4) ••• h't .J~ fflUMt2
38 AllowedCooUng Pcwer Index • • : • • • ___ Bluhlft2
37 Propoaad Heatrng Power Index (CF-4) • • • w:f:. J,4eluMt2
38 Allowed Heating Power Index • • • • • • .____ ·eiuhlrt2
F~ Re'Med ~ptamber 1988
CF-1
For Enforcement Agency Use Only
Dalo
;iZZ °I. ~5" t,,.-W Field Checked ay Dace
_Signature and
Registradcn Stamp Approved By Cate
I,.\~ 4:tm(g.mt..
Performance Approach
Energy Budget
1 CEC Oc:cupanc:y °Type • • • • • • • • • .Of6·cc.
2 USC Oc:cupanc:y Group/Oivision • • • • • B,-2-
4 Condilfonod Acor Aroa • • • • • • • • • Zf:S S 1 ft2
4 Budgot Tabla • • • • • • • • • • • • • .t,.t;,-) A
S Allowed Energy Budget (WS-1A) • • • • • l i1,0 kBtl.llyr-tt2
Calculated Annual Energy Consumption
6 Approved Calculallon Mathod • • • • • • ttC, '42!:1 P'-'f ~
7 cec Designation • • • • • • • • • • • LP<? 07
8 Mullfpller • • • • • • • • • • • • • • • • 1 ,Q'l 1 .
EsUmated Energy Use
9 Healfng • • • • • • • • • • • • • • • • lp, 4-; kBtulyr-ft2
10 Cooling • • • • • • • • • • • • • • • • aP,1 k8t1.11yr-ft2
11 Fans • • • • • • • • • • • • • • • • • 41 • B k8tulyr-tt2
12 Ughts • • • • • • • • • • • • • • , • ~.. 4',. 9. kBtu/yr-ft2·
13 Mlscellaneous. Equipment • • • • • • ~ ) f> 1 ,Z kStlJlyr-h2
14 Total •.•••.••••••••••••• ___ k8tulyr-ft2
15 Aclf. Total Energy Use (liflle a le liua 1"4) • • • l'54, -~ kBtu/yr-ft2 ~ Aa j "4S\-u:\ ·
Compliance Statement
General. The proposed building reprasented In !his set of ccmpfianee documenWion Is consistent with lhe other compllanc:e fonns and
wori<sheets, wilh the plans and specillcalions and with any olher
calc:\llations or computor runs submiltad wilh this pennit application.
Performance Approach. (when applicable) The energy penonnanee
eslimata presented on this rem, was calculated using the approved c::alculalion method Indicated above and with the cec established fixed
and raslric:ted · engineering inputs for the applicable climate zone and
occupancy type. Prucrfpllve Approach. (when applicable) The proposed building has been designed to meet Iha requirements of Iha Altemadve Componenc • Package iridicated above for the appropriate oc:cupanC'f type and climate
zc~{1-
Signed IcciAU> ]ar;z,flAd _. fkrat PfNf
Nama/lllle
A1fZ:: DNLIC:l IWQ
campany
(?~W Ll1? W%
Address
At:\A:tlg;JM , M q-za:x-o
TeJephone Calif. Ucense Number
~,
Liertiticate o-f Compliance· (Part 2 of 2) CF-·
+ For enrorcement Agancy Usa Only
Ccc:wsentalfon AulhorJF'um Oaia chacl4id By Oa,a (,.,___ __________ _
·. :,·., ' Bath parts one and tNo of !his Certificate of Compliance must be included with each building pennit application for the above noted building and appe,
on Iha ·plans submitted for appr0vaL The building.features and reqµirements represented on the Certificate of Compliance ara adequaca to acnie\ c:cmpllanca with the second generation nonresldendal energy standaids for Iha building referenced above. Tha building features and requirements a:
also ad~ta for 8fff subsequent alterations. rnodifiealions or additions ta Iha buikfu,g.
Desf;ner One
Name (Print)
llda/Company Nama
Address
Signature
Enlcrcemant Agarq Signature
Daaf;ner Two
.am• (Print)
Addtass
Owner
Name (Print) • ·
Tilfa/C<lntpany Name
~ Ra'4ised September t 986
Data
Oato
Cate
Date
-.
Signature
enlorcomant AgonCJ signature
Deatgner Four
Name (Print)
Tiua1Company Name
Signature
Enlorcemant Agency Signature
Enforcement Agency
Name (Print)
Tido/Agel'IC'f
Cata
bate
pate
bate
Pace "'
CERTIFICATE OF COMPLIANCE (part l of 2) CF-l page 3 of 63
---------------------------------------------------------------------------Project: Building 14 E~forcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,·.cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
PERFORMANCE APPROACH
Roofs and Floors
Roof/Ceiling Rt (CF-2,3) R-20.8
Ext. Floor Rt (CF-2,3) R-o.o
Walls
Opaque Wall Rt (CF-2,3) R-7.1
Heat Capacity (CF-2,3) 4.9 HC
Glazing in Walls
Exterior Wall Area (CF-2)
Total Glazing Area (CF-2)
Total Glazing Percent
Average Total sc (CF-2)
West Exterior Wall (CF-2)
West Glazing Area (CF-2)
West Glazing Percent
Average West SC
{.azing in Roof · ,,,,.~'skylight Area C CF-2)
4077 sf
1431 sf
35.1 I
0.46 SC
1733 sf
122 sf
7.0 I
0.46 SC
O sf
Lighting
Proposed Adjusted LPD (CF-5)1.40 w/sf
Energy Budget
CEC Occupancy Type·
Conditioned Floor Area
Total Number of Floors
Climate Zone ·
Energy Budget (WS-lA)
Lighting Adjustment (CF-5)
Energy Compliance Budget
Office
2887
1
7
157.0 o.o
157.0
Calculated Annual Energy Consumption
Approved Calculation NR COMPLY 24
Program Version Number 1.14
User License Number 1329
CEC Designation CPO 07
CEC Multiplier l.027
Estimated
Heating
Cooling
Fans
Adjustment
Lights
Receptacle
Energy Use (KBtu/sqft-yr)
10.4
30.7
47.8
HVAC
Fan Wattage Index (CF-4) 1.03
Cooling Power Index (CF-4) 69.79
Heating Power Index (CF-4) 64.34
Hot Water
w/sf Total (SCM-3)
Btuh/sf
88.9 X 1.027 • 91.3
46.9
16.8
1.4
156.3
Btuh/sf
COMPLIANCE STATEMENT
The proposed building represented in this set of compliance documentation
is consistent with the other compliance forms and worksheets, with the plans
and specifications and with any other calculations or computer runs submitted
with this permit application.
The energy performance estimate presented on this form was calculated using
the approved calculation method indicated above and with the CEC established
fixed and restricted engineering inputs for the applicable climate zone and
occupancy type •
• GNED ----------------Calif. License I: ____ _ '-... _'~··:··;··
DESIGNER Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
CERTIFICATE OF COMPLIANCE (part 2 of"2) CF-1 page 4 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Both Parts one and two of this Certificate of Compliance must be included
with ~ach building permit application for the above noted building, and
appear on the plans submitted for approval. The building features and
requirements represented on the Certificate of Compliance are adequate to
achieve compliance with the second generation nonresidential energy
standards for the building referenced above. The building features and
requirements are also adequate for any subsequent alterations, modifi-
cations or additions to the building.
PROJECT TITLE
Building 14
El Fuente Business Park
Carlsbad, California
(. __ ·--
OTHER DESIGNER
Name:
Address:
City:
Signed:
OWNER
Davison-Jones Development
411 campus Drive, Suite 830
Irvine, CA 92715
DOCOMENTATION AUTHOR
PROCALC
705 s. Velare St. tl0
Anaheim, CA 92804
1-( 800) TITLE-24 · 1 ./ , ,/' ·-/ '/ ( -··\ I/ ;;: IL.'-/'/,
Signed: _/_·'-<~1_;_, __ ._._, _____ ,-_:_-_--_r_, ____ ~
'-I .
OTHER
Name:
City:
Signed:
,:--., /
i
ENFORCEMENT AGENCY
Name:
Agency:
City:
Signed:
MANDATORY FEATURES CHECKLIST (part l of 2) MF-1 page 5 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,.ocation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
ENVELOPE MEASURES
o Certified Insulation Materials per Sec. 2-53ll(a)
o Insulation Installed to meet Flame spread and Smoke Density
Requirements of Sec. 2-53ll(b)
o urea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c)
o Retrofit Insulation specified per Sec. 2-5313
o Air Infiltration is minimized by specification of tested
manufactured doors and windows and proper sealing and
weatherstripping per Sec. 2-5317
LIGHTING SYSTEM MEASURES
o Certified Luminaires/Ballasts per Sec. 2-53l4(b)
{. Independent control within enclosed Areas per sec. 2-53l9(a)
o Manual switching Readily Accesible per sec. 2-5319(b)
o Reduction of Lighting Load to at least 501 per sec. 2-5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute)
o Separate Switching of Daylit Areas per Sec. 2-53l9(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale Occupancies per Sec 2-53l9(h).
o Automatic Control of Display Lighting in Retail/Wholes~le
Occupancies per Sec. 2-53l9(h)
o Tandem Wiring of land 3 Lamp Luminaires per sec. 2-5319(h)
OCCUPANCY SENSING DEVICES (when applicable)
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-53l9(e).2
Reference
,. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319(e).3 ---+---
-..:<~," Limits on Emmisions per exceptions to sec. 2-5319 (e)
MANDATORY FEATURES CHECKLIST (part 2 of 2) MF-1 page 6 of 63 -------------------------------------------------~-------------------------Proje9t: Building #4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
' • 'T •
Documentation: PROCALC Date
--------------------------------------------------------------------~------
DAYLIGHTING AND LOMEN MAINTENANCE CONTROLS (when applicable)
o Uniform Illumination reduction to 50% per Sec.·2-5319(e).l
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
Reference
o Time Delays to Prevent Undesirable Cycling per sec. 2-5319(e).3 __ ,._ __
o Step switching Devices with Separation between On/Off Settings
per Sec. 2-5319(e).4
o Photocell Sensors shall be Diffusing type and no Opaque Cover
allowed per Sec. 2-5319(e).5
o Manufacturer's Instructions provided for Installation and
Calibration per sec. 2-5319(e).6
o Proper Installation of controls including Sensor Location, a certification of Initial Calibration and Control of Luminaires
(~only within Daylit Areas per Sec. 2-5319(e).8
o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _
HVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per sec. 2-5312
o Certified HVAC Equipment per 2-5314(a)
o certified Plumbing Equipment per 2-5314{a)
o Heating and Cooling Equipment efficiency per Sec. 2-5314(b)
o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c)
o Automatic controls for Off-Hours per Sec. 2-5315{a)
o Thermostat Set Point Requirements per Sec. 2-531S{b).1
o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2
o Automatic Exhaust Fan Dampers per Sec. 2-5316(b)
.Thermostat Controls for Each Zone per Sec. 2-5315(b)
. -...,.~ .. -·
o Ventilation Provided per Secs. 2-5316 & 2-5343
o Water Heaters for Domestic Hot Water and Pools per Sec. 2-5318
ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 63 ---------------------------------------------------------------------------Project: Building #4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Build~ng Permit No
-·cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
CLIMATE ZONE 7 ENERGY BUDGETS
Cross·
Floor Sectional Office Retail
No Area Budget Budget --------------------------r 2887 157 186
BUILDING ENERGY COMPLIANCE BUDGET BY SPACE
Total Budget Energy
Occupancy Floor Floor (KBtu Budget
Flr Space Name Type Area Mult Area /sqft) (MBtu)
------------------------------------------------------1 Space 1 Office 349 ·X 1 = 349 X 157 = 54.7
l Space 2 Office 365 X l = 365 X 157 = 57.3
1 Space 3 Office 365 X 1 = 365 X 157 = 57.3
l Space 4 Office 365 X l = 365 X 157 = 57 .. 3
l Space 5 Office 365 X 1 = 365 X 157 =-57 .. 3
l Space 6 Office 365 X l =-365 X 157 = 57.3 (-Space 7 Office 365 X l = 365 X 157 = 57.3 Space 8 Office 349 X l -349 X 157 • 54.7
_,_.f', -----------TOTALS 2887 453.3
BUILDING COMPLIANCE BUDGET 453.3 MBtu I 2887 sqft == 157.0 KBtu/sqft
ENERGY BODGETS WORKSHEET (part 2 of 2) WS-lA page S·of 63
---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
··ocation: Carlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date
---------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate use
Flr Space Name Area Mult Area (KBtu/sqft) (MBtu)
---------------------------------------------------l Space l 349 X l = 349 X 159.4 = 55.6
l Space 2 365 X l = 365 X 155.3 = 56.7
l Space 3 365 X l = 365 X 155.4 = 56.7
1 Space 4 365 X l = 365 X 155.3 = 56.7
l Space 5 365 X 1 = 365 X 155.4 -56 .. 7
l Space 6 365 X 1 = 365 X 155.3 = 56.7
l Space 7 365 X l = 365 X 155.4 = 56.7
l Space 8 349 X l -349 X 159.4 -55.6 -----------TOTALS 2887 451.4
BUILDING ENERGY CONSUMPTION 451.4 MBtu / 2887 sqft = 156.3 KBtu/sqft
AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
·&cation: Carlsbad Date: 12/31/1987 Checked By
\.:/;. _:.:
Documentation: PROCALC Date
---------------------------------------------------------------------------.
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS ---------------------------------------------------------------------------Roof-1
Roof-2
2495
392
---------------------------------------------------------------------------TOTALS 2887
ROOF R-VALUE
Type
Roof-l
Roof-2
cl
Assembly Name
--------------------------R-19 B/U with T-Bar
R-19 B/0 with Gyp. Clg.
Average R-Value
Area
2495
392
2887
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE
2887
Area/
R-Value R-Value --------------21.04 118.56
19.40 20.21 -------I 138.77 -20.80
s SW w NW TOTALS
---------------------------------------------------------------------------NONE
--------------------------------------~------------------------------------TOTALS 0
AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 63
----~----------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: .Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
!,.cation: Carlsbad Date: 12/31/1987 Checked By _,, .. , :'.,-;.: .. ..-
Documentation: PROCALC Date ~--------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE E SE s SW w NW Int TOTAL ---------------------------------------------------------------------------248 1278 99 360 1584 149 360 4077 ---------------------------------------------------------------------------
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW Int TOTALS
---------------------------------------------------------------------------Wal-1
Wal-2
Wal-3
45 252 18 108
172
80
1424
160
27 108
172
80
558
1768
320
------------------------~--------------------------------------------------TOTALS 45 252 18 360 1584 27 360 2646
.AQOE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY
( Area/ Area
, "-i'Type Assembly Name Area R-Value HC R-Value X BC ----------------------------------------------Wal-1 6.5" Conc/R-11/Gyp.Brd. 558 10.34 17.4 54 9704
Wal-2 5/8 Gyp/R-11/Gyp WF 1768 10.19 1.4 174 2447
Wal-3 Solid Wood Door 320 2.22 2.4 144 764 ------------Totals 2646 372 12915
Average R-Value 2646 I 372 = 7.12
Average ac 12915 I 2646 • ~.88
. AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.ocation: Carlsbad Date: 12/31/1987 Checked By
~..,: .;',"" ... ·~
Documentation: PROCALC Date
---------------------------------------------------------------------------
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS --------------------------------~------------------------------------------Wind-1 203 1026 81 122 1431 ---------------------------------------------------------------------------TOTALS 203 1026 81 122 1431
GLAZING 0-VALUE AND SC
Area X Area
Type Assembly Name Area O-Value SC O-Value X SC ---------------------------------------------------Wind-l Sunglass Blue Plate 1431 1.14 0.46 1626 658 ------------Totals 1431 1626 658
Average o-value 1626 I 1431 -1.14
Average SC 658 I 1431 = 0.46 <I ~ .. ~.:..-~-'
-·
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 12 of 63 ---------------------------------------------------------------------------Project: Building t4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:\.cation: Carlsbad Date: 12/31/1987 Checked By
--,f~ .. .; .:.?
Documentation: PROCALC Date ----~----------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
North Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
•
Roof
·· Door
(.~-Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space l
392.0 sqft
108.0 sqft
40.5 sqft
40.5 sqft
348.5 sqft
40.0 sqft o.o sqft
348.5 sqft
348.5 sqft
10.25
0.88
20.80
2.22 o.oo
Rheem RPNC024J
2
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
5486 watts
746 watts
1700 CFM
* Note: 2 Spaces are served by this. HVAC System. Please refer to
the attached HVAC Zone Heating & cooling Load Summary for
more details on the zoning arrangement • .• ~~~~
'.2::,-···Heat capacity of Exterior Wall
Lfghting Power
Climate Zone
7.81
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 13 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
··cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS --------------------Northeast
East
North
OVERHANGS & SIDEFINS
Northeast A East
(~North
SPECIAL FEATURES
Daylighting Strategies
SC Factor ------------
0.46 0.880
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
9.0
12.0
4.5
4.5
Shading Device
Winter summer ------------
overhang
Height Depth
0.31
0.70
9.0 ft
overall
SC
0.40
0.40
0.40
Side-Fin
Distance Depth -------------
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 o·f 63
---------------------------------------------------------------------------Project: Building i4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
l~·cation: Carlsbad Date: 12/31/1987 Checked By
'<·~·.,>
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 1
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-operational Hours per Week: Day 32 hours
• Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
occupant sensible Load:
Occupant Latent Load:
:. Occupant Density:
.... _. .. ,'of~::./
Heating
Cooling
Winter
Winter
summer
summer
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so
64
230
190
250
watts/sqft
Btu/hr-person
Btu/hr-person
Btu/hr-person
sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 63
---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space l
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 60.19 (Winter) BPTl
BPT2 = 66.34 (Summer) BPT2
BPT3 = 66.34 (Economizer) BPT3
BDD = 333 (Heating) HDD
CDD = 425 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F} ======•=====••=================== Building Envelope Heat Transfer Rate: Winter
summer
Winter
summer
Overall Heat Transfer Factor ("K"}:
ANNUAL LOADS (MBtus}
-68.21 = 76.20 = 76.20 = 3336 -0
---= .,.
\~>,JI,, Heating
cooling -=
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----===•=============================== Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
source cooling
source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot water
--=
=
10.7
31.7
49.5 -----91.9 X 1.027
------
---=
230.6
23.3 .1
409.5
397.9
3.3
4.7
1.2
3.7
5.8
5.5
1.9
0.2
94.4
46.9
16.8
1.4
:' ···======================•==-========================================•=======
'-._,,~,J' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 159. 4 KBtu/sqft
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 63
---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit NO
Checked By ·-·cation: Carlsbad Date: 12/31/1987
Documentation: PROCALC Date
---------------------------------------~-----------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
North Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (includi'ng inside film resistance)
----------------------~--------------------Wall
Window
Roof
ADoor
(~ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency .
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 2
257.0 sqft
135.0 sqft
40.5 sqft
365.0 sqft
40.0 sqft o.o sqft
365.0 sqft
365_.o sqft
10.21
o.88
20.81
2.22
o.oo
Rheem RPNC024J
6
Beat Pump
Beat Pump
Electric Resistance
2.920
9.350
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 Spaces are served by this BVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
,.;;;;-Capacity of
1,.:\> Lighting Power
Climate Zone
Exterior Wall 3.46
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 17 of 63
---~-----------------------------------------------------------------------Project: Building #4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
r4location: Carlsbad Date: 12/31/1987
'~~·-,: ·. /
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
North
OVERHANGS & SIDEFINS
Northeast
North
~-~ ~ .. ,,: . .:;PECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter summer ------------
Overhang
Height Depth
---
0.10
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
--.
NO Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 63
---------------------------------------------------------------------------Project: Building #4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date
---------------------------------------------------------------------------
space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Space 2
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night
• Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Beat Loss Rate (U~Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
occupant sensible Load:
Occupant Latent Load:
~ Occupant Density:
Beating Season
Cooling Season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 63 ---------------------------------------------------------------------------Project: Building #4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:.cation.: Carlsbad Date: 12/31/1987 Checked By
.. i-,'-,''. -Documentation: PROCALC Date ------------------------------------------~--------------------------------
Space Name: Space 2
BALANCE-POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 60.77 (Winter) BPTl
BPT2 = 66.83 (Summer) BPT2
BPT3 = 66.83 (Economizer) BPT3
HDD = 389 (Heating) HOD
COD = 383 (Cooling) COD
BUILDING HEAT TRANSFER (Btu/hr-F) •=====••=====•================•== Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
summer
ANNUAL LOADS (MBtus) ====================
= 68.24 = 76.23 = 76.23 = 3346 = 0
----
~
.! . ·.,. .
v.:..;;;-" Heating
Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ======================================= Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ============================================= source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
Source Hot Water
• -•
=
10.8
29.8
47.3 -----87.9 X 1.027
=
=
= -=
= -•
= = -=
207.2
209.5
394.5
382.0
3.5
4.5
1.3
3.6
5.8
5.7
2.0
0.2
90.3
46.9
16.8
1.4
i•·======•==========================================•=====•================
\::S, . TOTAL ANNUAL_ SOURCE ENERGY USE ESTIMATE 155. 3 KBtu/sgft
•===============================================•==========================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 20 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associate~, Inc Building Permit No
1.oca_tion: Carlsbad Date: 12/31/1987 Checked By
-·-~:i ... ·.·· Documentation: PROCALC Date ----------------------------------~---------------------------------------~
Space Name:
AREAS
Exterior Wall
Northeast Glazing
West Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALOES (including inside film resistance)
-------------------------------------------
•
Wall
Window
Roof
Door
Floor
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
cooling Equipment Type
water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 3
257.0 sqft
135.0 sqft
40.5 sqft
365.0 sqf't
40.0 sqft o.o sqft
365.0 sqft
365.0 sqft
10.21
0.88
20.81
2.22 o.oo
Rheem RPNC024J
6
Beat Pump
Beat Pump
Electric Resistance
2.920
9.350
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 spaces are served by this BVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
--~;;;~-Capacity of Exterior Wall
~S_;___>; Lighting Power
Climate Zone
3.46
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 21 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
~•ocation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
West
OVERHANGS & SIDEFINS
Northeast
West
~PECIAL FEATURES
Daylighting Strategies
,.
\: .
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter summer ------------
overhang
Height Depth
0.10
0.70
9.0 ft
Overall SC.
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 22 of 63
---------------------------------------------------------------------------Project: Building i4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
:.cation: Carlsbad Date: 12/31/1987 Checked By
. -~--··
Documentation: PROCALC Date --~---------------------------------------------------------------------~--
Space Name:
occupancy Type:
SCHEDULING
Occupancy Lev~l for Operational Period:
Space 3
Office
Day 54.60 %
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Beater
Number of Non-Operational Hours per Week:
(. Number of Holidays per Year: Heating
Day
Night
Season
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
wa~er Heating Energy:
occupant sensible Load:
Occupant Latent Load:
• occupant Density:
\ ~ · . .::.·. :~
Cooling Season
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 63
---------------------------------------------------------------------------Project: Building 14
Designer:
.···cation:
Banzuelo/Rierson/Duff & Associates, Inc
Carlsbad Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
. ··-:.~:.;;"
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Space 3
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 60.00 (Winter) BPTl =
BPT2 = 65.76 (Summer) BPT2 =
BPT3 -65.76 (Economizer) BPT3 =
HDD = 316 (Heating) HDD =
COD = 468 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) •======•=========================
Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
Summer
(. Heating
cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site aot Water
ANNUAL LOADS (Matus)
······==•=•==•••====
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=••••=•••=•==••=••==•=••===••=•=======
68.15
76.11
76.11
3317
0
--• -
• -
----=
=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =====•=====================•=•===============
Source Heating
source cooling
source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
source Hot Water
---
=
9.7
30.9
47.3 -----88.0 X l.027 = = -=
207.2
209.5
394.5
382.0
3.2
4.9
1.2
3.8
5.8
5.7
2.0
0.2
90.3
46.9
16.8
1.4
:'······-·==•=•=•===••••=••••====••===•=••=•==••==•=••=•==•=•===•==•=••====•=
\~> · TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 4_ KBtu/sqft
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 63 ---------------------------------------------------------------------------Project: Building t4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad Date: 12/31/19~7 Checked By
.. ._, ~ '.",.c,'
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
North Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance}
Wall
Window
Roof
Door t. Floor
\ _ .. I
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Numbe_r of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 4
257.0 sqft
.135. O sqft
40.5 sqft
365.0 sqft
40.0 sqft o.o sqft
365.0 sqft
365.0 sqft
10.21
0.88
20.81
2.22 o.oo
Rheem RPNC024J
6
Beat Pump
Beat Pump
Electric Resistance
2.920
9.350
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 Spaces are served by this HVAC System~ Please refer to
the attached HVAC zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
'~--• ~~;~tr~~a~~!!r of Exterior Wall
. Climate-Zone
3.46
l.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Itic Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
·"-;;;._','7
Documentation: PROCALC Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS -------~-----------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS ~-------------------Northeast
North
OVERHANGS & SIDEFINS
. Northeast
North
AECIAL FEATURES
Daylighting strategies
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter Summer ------------
overhang
Height Depth
0.10
0.70
9.0 ft
Overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.ocation: Carlsbad Date: 12/31/1987 Checked-By
,/.,~,..,.,.
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
occupancy :rype:
SCHEDULING
Occupancy Level for Operational Period:
Space 4
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Number of Non-Operational Hours per
(. Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value}:
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
occupant Sensible Load:
Occupant Latent Load: !. Occupant Density:
\ \_-.I , .. :::.-...,./
Water Heater
Week: Day
Night
Heating Season
Cooling season
Winter
Winter Setback
summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 27 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,.cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date
-------------------------------------------------------------~-------------
Space Name: Space 4
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime -----------------------------..-BPTl = 60.77 (Winter) BPTl = BPT2 = 66.83 (Summer) BPT2 =
BPT3 = 66.83 (Economizer) BPT3 =
HOD = 389 (Heating) HDD =
CDD = 383 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F)
=•==a=a•===a=====================
Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
• Heating
Cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
summer
ANNUAL LOADS (MBtus) •=•=•==============•
ANNUAL SITE ENERGY REQUIREMENTS (Matus) =========================•==•==========
68.24
76.23
76.23
3346
0
• = --
--
------
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
source cooling
Source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
Source Hot water
= • -
=
10.8
29.8
47.3 -----87.9 X 1.027 -= -=
207.2
209.5
394.5
382.0
3.5
4.5
1.3
3.6
5.a
5.7
2.0
0.2
90.3
46.9
16.8
1.4
; ..• -=-======================•=====================•==============•======•======
\_\.;..> TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 3 KBtu/sqft
•==========================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 28 of 63
---------------------------------------------------------------------------Project: Building #4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
.cation: Ca-rlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
West Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof·
, Door
(. Floor
BVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 5
257.0 sqft
135.0 sqft
40.5 sqft
365.0 sqft
40.0 sqft o.o sqft
365.0 sqft
365.0 sqft
10.21
0.88
20.81
2.22 o.oo
Rheem RPNC024J
6
Beat Pump
Heat Pump
Electric Resistance
2.920
9. 350 .
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 Spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
_, .-;;;~-~apaci ty of Exterior Wall
'-... Lighting Power
Climate Zone
3.46
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2} SCM-1 page 29 of 63 ---~-----------------------------------------------------------------------Project: Building #4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
,,.cation: Carlsbad
~··;.·:.>;,""
Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
west
OVERHANGS & SIDEFINS
Northeast
West
(.PECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter Summer ------------
--
Overhang
Height Depth
0.10
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth -------------
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 63 ---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
-"-.. ,.
Documentation: PROCALC Date --------~------------------------------------------------------------~-----
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 5
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Oper~tional Hours per Week: Day
(. Number
Night
of Holidays per Year: Heating season
Cooling Season
Thermostat Set Point Temperatures: Winter
Winter Setback
summer
Summer Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CU-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load: i. Occupant Density:
,~,. ..
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
.70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 63 ---------------------------------------------------------------------------Project: Building t4·
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
.cation: Carlsbad
::.,_;;,:,t
Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 5
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl = 60.00 (Winter} BPTl
BPT2 = 65.76 (Summer) BPT2
BPT3 = 65.76 (Economizer} BPT3
HOD = 316 (Heating} HOD
COD = 468 (Cooling} COD
BUILDING HEAT TRANSFER (Btu/hr-F) ••===============================
Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
Summer
(.Heating
Cooling
ANNUAL LOADS (MBtus) •===================
= = = = =
68.15
76.11
76.11
3317
0
-= --
--
ANNUAL SITE ENERGY REQUIREMENTS (MBtus}
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water ·
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) =••==•======================================= Source Heating
source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Bot Water
= = =
=
9.7
30.9
47.3 -----88.0 X 1.027
-=
= -=
=
= --=
207.2
209.5
394.5
382.0
3.2
4.9
1.2
3.8
5.8
5.7
2.0
0.2
90.3
46.9
16.8
1.4
_,,.·==-==-===========================•=========================-==•=======-===•===============-
,._:_, ..... TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE . 155. 4 KBtu/sqft
-----~============•=======•=•==•=••==•==================•================•=======
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 32 of 63 ---------------------------------------------------------------------------Project: Building i4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
'""~ ... -;." Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
North Glazing
Roof
Door
Raised Floor
Slab .
Total Conditioned Floor
R-VALUES (including inside film resistance) -------------------------------------------Wall
Window
Roof
Door
(. Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 6
257.0 sqft
135.0 sqft
40.5 sqft
365.0 sqft
40.0 sqft o.o sqft
365.0 sqft
365.0 sqft
10.21
0.88
20.81
2.22 o.oo
Rheem RPNC024J
6
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & Cooling Load Summary for
more details on the zoning arrangement.
GENERAL --------r.Heat capacity of Exterior Wall
\.:.--: j Lighting Power
Climate zone
3.46
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 63
---------------------------------------------------------------------------Project: Building 14
~signer: Banzuelo/Rierson/Duff & Associates, Inc ·
~cation: Carlsbad Date: 12/31/1987 \ \ ;: ~·: ..,.
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ----------------~----------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
North
OVERHANGS.& SIDEFINS
Northeast
~•North
n>) \.,\:\J'PECIAL FEATURES
Daylighting Strategies
.; •
• '<.. 'j \. ·._./
SC Factor ------------
0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter summer ------------
Overhang
Height Depth
0.10
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 63 ---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
'·t;~.~_,,_:~;
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 6
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Number of Non-Operational Hours per
(.Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate Co-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
/. Occupant Density:
'--.>:/
Water Heater
Week: Day
Night
Heating Season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 63
---------------------------------------------------------------------------Project: Building i4
. Designer: Banzuelo/Rierson/Duff
'!.cation: Carlsbad t , ·:'/
& Associates, Inc
Date: 12/31/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Space 6
BALANCE POINT TEMPERATURES AND DEGREE DAYS •=••===========•==========================
Daytime Nighttime
------------------------------BPTl -60.77 (Winter) BPTl = 68.24
BPT2 -66.83 (Summer) BPT2 = 76.23
BPT3 = 66.83 (Economizer) BPT3 = 76.23
HDD = 389 (Heating) BDD = 3346
CDD -383 (Cooling) CDD -0
BUILDING HEAT TRANSFER (Btu/hr-F) ======•==========================
Building Envelope Heat Transfer Rate: Winter = summer •
Overall Heat Transfer Factor ("K"): Winter -summer -
ANNUAL LOADS (MBtus) ,· i ~
\,\>'Heating
Cooling
-------===•=••====== • •
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •=•==================================== Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ===========•================================= source Heating
source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
Source Hot Water
= --
=
10.8
29.8
47.3 -----87.9 X 1.027
= = -=
= .•
= = --
207.2
209.5
394.5
382.0
3.5
4.5
1.3
3.6
5.8
5.7
2.0
0.2
90.3
46.9
16.8
1.4
.· :······=============================•==•=•===•====••===•====-=••==•==••••=-=-=
'.\ __ , TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155.3 KBtu/sqft
------====•••=-•======•=-•====•===========•======•====•••=-=•••==•====•===•=••
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 36 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
<.cation: Carlsbad Date: 12/31/1987 Checked By . . '
",.; ~
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Northeast Glazing
West Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
.• Door
(~ Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Space 7
257.0 sqft
135.0 sqft
40.5 sqft
365.0 sqft
40.0 sqft o.o sqft
365.0 sqft
365.0 sqft
10.21
0.88
20.81
2.22 o.oo
Rheem RPNC024J
6
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
16458 watts
2238 watts
5100 CFM
* Note: 6 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
1 ,'.;;;~-Capacity of Exterior Wall
\~.:.> Lighting Power
Cli.mate .zone
3.46
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 37 of 63
---------------------------------------------------------------------------Project: Building i4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad . Date: 12/31/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date -~-------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS
--------------------Northeast
West
OVERHANGS & SIDEFINS
Northeast
West
<SECIAL FEATURES
Daylighting Strategies
SC Factor ------------0.46 0.880
0.46 0.880
Window
Height Width
9.0
9.0
15.0
4.5
Shading Device
Winter summer ------------
overhang
Height Depth
0.10
0.70
9.0 ft
overall
SC
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
/&cation: Carlsbad Date: 12/31/1987 ·checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 7
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number
<I Number
of Non-Operational Hours per Week: Day
Night
of Holidays per Year: Heating Season
Cooling Season
Thermostat set Point Temperatures: Winter
Winter Setback
summer
summer Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load: f. Occupant Density:
\._'_-;:,'
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days.
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 39 of 63
---------------------------------------------------------------------------Project: Building 14 _Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
i···cation: Carlsbad Date: 12/31/1987 Checked By
\ .: •• ,·. ~-'<~
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Space 7
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================· Daytime Nighttime
------------------------------BPTl = 60.00 (Winter) BPTl =
BPT2 = 65.76 (Summer) BPT2 -BPT3 = 65.76 (Economizer) BPT3 -BDD = 316 (Heating) BDD =
CDD = 468 (Cooling) COD =
BUILDING HEAT TRANSFER (Btu/hr-F) •==••••=====•==================== Building Envelope Heat Transfer Rate: Winter
summer
Overall Heat Transfer Factor ("K"): Winter
(. Beating
Cooling
Site Beating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot water
summer
ANNUAL LOADS (MBtus)
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ----===================================
68.15
76.11
76.11
3317
0
----
--
---= -=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
= ---
9.7
30.9
47.3 -----88.0 X 1.027 =-
• -=
207.2
209.5
394.5
382.0
3.2
4.9
1.2
3.8
5.8
5.7
2.0
0.2
90.3
46.9
16.8
1.4
/·'.····=======================-========================================-===-===-=-===
"<".::-:.;.-/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 4 KBtu/sqft
===••====-==================================================================
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 40 of 63 ·
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: l2/3l/1987 Checked By
\ ' --;
Documentation: PROCALC Date ---------------------------------------------------------------------------
space Name:
AREAS
Exterior Wall
Northeast Glazing
East Glazing
North Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
•
Roof
Door
:171 Floor
BVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air _Circulation Rate
Space 8
392.0 sqft
108.0 sqft
40.5 sqft
40.5 sqft
348.5 sqft
40.0 sqft o.o sqft
348.5 sqft
348.5 sqft
10.25
0.88
20.80
2.22 o.oo
Rheem RPNC024J
2
Heat Pump
Heat Pump
Electric Resistance
2.920
9.350
0.990
No
5486 watts
746 watts
1700 CFM
* Note: 2 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & cooling Load summary for
more details on the zoning arrangement •
•
NERAL
.!". -----t; \:~,,:,./ Heat Capacity of Exterior Wall
Lighting Power
Climate Zone
7.81
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY {part 2 of 2) SCM-1 page 41 of 63
------------------------------------------------------------------------~--Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
r,4location: Carlsbad Date: 12/31/1987 Checked By
-~~--/,,/
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing
SHADING COEFFICIENTS ----~---------------Northeast
East
North
OVERHANGS & SIDEFINS
Northeast
,East
( North
~~
SPECIAL FEATURES
Daylighting Strategies
!\ • . •-.> '¥.:::-..•4
SC Factor ------------0.46 0.880
0.46 0.880
0.46 0.880
Winqow
Height Width
9.0
9.0
9.0
12.0
4.5
4.5
Shading Device
Winter summer ------------
Overhang
Height Depth -----------
0.31
0.70
9.0 ft
Overall
SC
0.40
0.40
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM ·FIXED INPUT DATA SUMMARY SCM-2 page 42 of 63 ---------------------------------------------------------------------------Project: Building·t4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:~·cation: Carlsbad Date: 12/31/1987 Checked By
'!<::·:·,(;'
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
Space 8
Office
SCHE·DOLING
Occupancy Level for Operational Period: Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day .A Night
(~ Number of Holidays per Year: Heating Season
Cooling Season
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U~Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
--~• Occupant Density:
\_:~~'t.~~#;'
Winter
Winter Setback
Summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 63
---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------~-----------------------
Space Name: space 8
BALANCE.POINT TEMPERATORES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 60.19 (Winter) BPTl -BPT2 -66.34 (Summer) BPT2 =
BPT3 = 66.34 (Economizer) BPT3 = HOD -333 (Heating) HOD =
COD = 425 (Cooling) COD -
BUILDING HEAT TRANSFER (Btu/hr-F) •=•==•=========================== Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
Summer
Winter
Summer
.Beating
cooling
Site Beating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL LOADS (MBtus) •===================
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
68.21
76.20
76.20
3336
0
-= --
-=
---• -=
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ===============•============================= Source Heating
source cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot water
• -• -
10.7
31.7
49.5 -----91.9 X 1.027 = ---
230.6
233.1
409.5
397.9
3.3
4.7
1.2
3.7
5.8
5.5
1.9
0.2
94.4
46.9
16.8
1.4
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 44 of 63
---------------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff ~ Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
~ ... ..,~'
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Hardwood, Maple
2. Inside Air Film
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.750 1.54
0.68
1.54
0.68
(.--------------------------------------------------------------------------
-Total 2.22 2.22
Framing Percentage: 0.0 I
Framing Material: NONE
-------------------------------
OVERALL VALUES ADJUSTED FOR FRAMING
-------------------------------Sketch o_f Construction Assembly
~sorptivity:
(-ughness: Clear Pine
\.::~ .... eight:
Heat capacity:
0.70
6.1 lb/sqft
2.39
R-Value
o-value
2.22
0.4505
------
2.22
0.4505
=•====
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 45 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(,.cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
Assembly Name: R-19 B/U with Gyp. Clg.
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Roofing, Built-Up
2. Plywood
3. Air ~pace
4. Insulation, Mineral Wool, R-19
5. Gypsum or Plaster Board
6. Inside Air Film
7.
8.
9.
10.
11 •
0.375
0.500
6.000
* 6.000
0.625
0.33 0.33
0.63 0.63
1.00 0.80
19.00 19.00
0.56 0.56
0.92 . 0. 61
• -------------------------------------------------------------------------
(~.>' Total 22.44 21.93
Framing Percentage:
Framing Material:
1 2 3 4 5
10.0 I
Softwood, Douglas Fir-Larch
Calculation for Framing Adjustment
Summer o-value
0.0446 X 0.90 + 0.1066 X 0.10 = 0.0508
Winter O-Value
0.0456 X 0.90 + 0.1128 X 0.10 = 0.0523
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
O-Value
19.69
0.0508
19.11
0.0523
Sketch of Construction Assembly •===== ======
,.sorptivity:
{(~':19hn7ss: Stucco,
\.,;,:,. ... eight.
Heat Capacity:
0.70
Wood Shingles
8.2 lb/sqft
2.58
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 46 of 63
---------------------------------------------------------------------------Project: Building 14
Designe+: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Checked By (1.ocation: Carlsbad Date: 12/31/1987
\ [~:'.;.~:~--~
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: R-19 B/O with T-Bar
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Roofing, Built-Op 0.375 0.33 0.33
2. Plywood 0.500 0.63 0.63
3. Air Space
4. Insuiation, Mineral Wool, R-19
24.000 1.00 0.80
* 6.000 19.00 19.00 5. Acoustical Tile, Mineral Fiberboard
6. Inside Air Film
0.750 2.03.
0.92
2.03 . 0.61
7.
8.
9.
10.
11~
--------------------------------------------------------------------------
1 Total 23.90 23.39
10.0 I Framing Percentage:
Framing Material: Softwood, Douglas Fir-Larch
1 2 3 4 5
-------------------------------Sket9h of Construction Assembly
.W,sorptivity: 0.70
Shingles
Calculation for Framing Adjustment
Summer o-value
0.0418 X 0.90 + 0.0923 X 0.10 = 0.0469
Winter 0-Value
0.0428 X 0.90 + 0.0968 X 0.10 • 0.0482
OVERALL VALOES ADJUSTED FOR FRAMING
R-Value
o-value
21.33
0.0469 ----==
20.76
0.0482 =====•
.:,Wfbughness: Concrete, Asph.
'i:...,,..Aeight:
Heat Capacity:
6.9 lb/sqft
2.15
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 47 of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
'\;.:..,,:~:,./
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: sunglass Blue Plate
Assembly Type: Glazing
Assembly Tilt: 90 deg (Vertical)
Construction components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. CBC Single Glazing
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11.
0.250 0.20
0.68
0.20
0.68
(-----------------------------------------------:::::---------:~::-----:~::-
Framing Percentage: o.o I
Framing Material: NONE
1
Sketch of Construction Assembly
.41111111t1ading Coefficient: 0.46
~--sible Transmittance: 0.30
\S:··
OVERALL VALOES ADJUSTED FOR FRAMING
R-Value
O-Value
0.88
1.1364
0.88
1.1364
===•==
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 48 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
r.cation: Carlsbad Date: 12/31/1987 Checked By
Y,;:;,.:i'*:;•
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 5/8 Gyp/R-11/Gyp WF
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Gypsum or Plaster Board
2. Insulation, R-11, 2x4 Wood Framing 16"
0.625
3.500
0.625
0.56
8.38
0.56
0.68
0.56
8.38
0.56
0.68
3. Gypsµm or Plaster Board
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11.
(,----------------------------------------------:::::--------::~::----::~::-
Framing Percentage: 0.0 I
Framing Material: Softwood, Douglas Fir-Larch
-------~-----------------------
~~--1
P-<.--H--2
J+--3
-------------------------------Sketch of Construction Assembly
Plaster,
o.oo
Metal
Calculation for Framing Adjustment
summer o-value
0.0982 X 1.00 + 0.0982 X 0.00 = 0.0982
Winter o-value
o.0982 x 1.00 + 0.0982 x o.oo·= o.o9a2
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value ·
o-value
10.19
0.0982 ------
10.19
0.0982
.w,sorptivity:
/-ughness: smooth
\..'--~,,eight:
····aeat Capacity:
5.4 lb/sqft
1.38
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 49 of 63
-------~-------------------------------------------------------------------Project: Building 14
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
.ocation: Carlsbad Date: 12/31/1987 Checked By
"··-,,~>';?
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 6.5" conc/R-11/Gyp.Brd.
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
----------------------------------------------------------------~----------1. Concrete, 140 lb, oven Dried
2. Insulation, R-11, 2x4 Wood Framing 16"
3. Gypsµm or Plaster Board
4. Inside Air Film s.
6.
7.
8.
9.
10.
11.
6.500
3.500
0.625
0.71
8.38
0.56
0.68
0.71
8.38
0.56
0.68
(-----------------------------------------------:::::--------::~::----::~::-
Framing Percentage: o.o I
Framing Material: NONE
----------~-~------------------• . • . •
~ 1 .,
2 . . . ,. 3 . .
• . .,
• :. . . . . OVERALL VALUES ADJUSTED FOR FRAMING
'
-------------------------------Sketch of Construction Assembly
~sorptivity:
{~':1ghness: Concrete,
~,.>.,eight:
Heat capacity:
0.70
Asph. Shingles
78.6 lb/sqft
17.39
R-Value
O-Value
10.34
0.0967 ------
10.34
0.0967
=•====
HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 50 of 63
---------------------------------------------------------------------------Project: Building #4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date
---------------------------------------------------------------------------
FAN ENERGY
HVAC System
Rheem RPNC024J (Fanl)
Rheem RPNC024J (Fanl)
FAN WATTAGE INDEX
No. Motor Drive Conv No. Fan
Sys BHP Eff. Eff. F-act Fans Watts ---------------2 X 0.33 I [0.66 x 1.00] X 746 X l = 746
6 X o.33 I [0.66 X 1.00] X 746 X 1 = 2238 ------Total 2984
2984 watts/ 2887 sqft = 1.034 watts/sqft
HVAC POWER INDICES SUMMARY FORM (part 2 of 2) CF-4 page Sl of 63 ---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad ·Date: 12/31/1987 · Checked By
\~:,~~\;)
Documentation: PROCALC Date
---------------------------------------------------------------------------
HEATING EQUIPMENT
system No. Design Equip Conv. Source
Description Type Sys Output Eff Factor (Btu/hr)
--------------------------------------------------------Rheem RPNC024J Heat Pump 2 X 22600 I 2.92 X 3.000 = 46438
Rheem RPNC024J Beat Pump 6 X 22600 I 2.92 X 3.000 -139315 --------Total 185753
HEATING POWER INDEX 185753 Btu/hr I 2887 sqft = 64.34 Btu/hr-sqft
COOLING EQUIPMENT
System No. Design Equip Conv. Source
Description Type Sys Output Eff Factor (Btu/hr)
--------------------------------------------------------Rheem RPNC024J Heat Pump 2 X 23000 I 9.35 X 10.239 = 50374
Rheem RPNC024J Beat Pump 6 X 23000 I 9.35 X 10.239 = 151121 --------Total 201495
(<!COOLING POWER INDEX 201495 Btu/hr/ 2887 sqft • 69.79 Btu/hr-sqft
_,.,,
HVAC SYSTEM SUMMARY SHEET WS-4 page 52 of 63
---------------------------------------------------------------------------Project: Building #4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
··~;~ .. ·(Je..,..5c·
Documentation: PROCALC Date ---------------------------------------------------------------------------
BVAC Equipment Name:
HEATING
System Type:
output Capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
system Type:
Total Output capacity:
Sensible Output capacity:
Latent Output capacity:
Rated Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer: a supply Air Temperature:
(~ANS
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
Rheem RPNC024J
Heat Pump
22600 Btu/hr
2.920
105.0 F
Heat ~ump
23000 Btu/hr
17800 Btu/hr
5200 Btu/hr
9.350
2743 watts
0.100
No
55.0 F
850 cfm ·
Blow-Through
1
0.33
66.0 I
100.0 I
2.0 I
2.0 I •. o' 4.0 I
LIGHTING SUMMARY AND WORKSHEET CF-5 page 53 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
14ltocation: Carlsbad Date: 12/31/1987 Checked By
. '-\,;.···
Documentation: PROCALC Date
---------------------------------------------------------------------------
INSTALLED LIGHTING POWER BY SPACE
Total
Floor Vert Horiz Floor Ligh-ting Installed
Space Name Area Mult . Mult Area (watts/sqft) wattage ----------------------------------------------------------Space 1 349 X 1 X l = 349 X 1.400 = 488
Space 2 365 X 1 X 1 = 365 X 1.400 = 511
Space 3 365 X 1 X 1 = 365 X 1.400 -511
Space 4 365 X 1 X 1 • 365 X 1.400 = 511
Space 5 365 X l X l = 365 X 1.400 = 511
Space 6 365 X 1 X 1 -365 X 1.400 -511
Space 7 365 X 1 X 1 -365 X 1.400 -511
Space 8 349 X 1 X l • 349 X 1.400 -488 ---------------TOTALS 2887 4042
BUILDING LIGHTING WATTAGE 4042 watts I 2887 sqft = 1.400 watts/sqft •
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 54 of 63
---------------------------------------------------------------------------Project: Building i4
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
,'..cation: Carlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date
--------------------------------------------------------------------~------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
HVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 1
Space 8
PEAK
(Jan 6am)
(Jan 6am)
TOTAL SPACE LOAD
ypass Ventilation A1r (
/4 pply Duct conduction
~. upply Duct Leakage
supply Fan Heat Gain
14 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 125 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
8964
8964
17928
491 (
359
717
0
19494
4416 (
390
780
-2546
22534
37052
Spaces 1 & 8
Rheem RPNC024J
2
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Jul 1pm) 7133 889
(Jul 1pm) 7281 889 --------------14414 1777
14 cfm) 72 8
288
577 71
0
--------------15350 1856
125 cfm) 649 70
307
614 74
2546 --------------19466 2001
1.6 tons 0.2 tons
35650 12304
3.0 tons 1.0 tons
SPACE HEATING & COOLING LOAD SUMMARY page 55 of 63
-------------~-------------------------------------------------------------Project: Building i4.
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
'·,,,.,,
Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name: Space 1
COOLING
DESIGN CONDITIONS HEATING
Jan 6am
70 F DB
38 F DB
SENSIBLE LATENT ------~-------------Peak Hour:
Indoor conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction i.'.. Interior Conduction
,.·. · Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
Btu/hr
1204
5760
536
539
0
0
926
0
0
8964 Btu/hr
--------------Jul 1pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------17
375
257
399
0
0
0
0
2963
1043
1189 0
889 889 -----------7133 Btu/hr 889
0.6 tons 0.1
Heating:
Cooling:
8964 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
7133 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
233 cfm
282 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 56 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associat~s, Inc Building Permit No
\•~ation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ----------------~----------~----~------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
(. Interior Conduction
'-Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1204
5760
536
539
0
0
926
0
0
8964 Btu/hr
Space 8
COOLING
SENSIBLE LATENT --------------Jul 1pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------187
375
236
399
0
0
0
0
2963
1043
1189 0
889 889 -----------7281 Btu/hr 889 Btu/hr
0.6 tons 0.1 tons
Heating:
cooling:
8964 Btu/hr/ [1.10 * (105 F Supply·-70 F TStat)] =
7281 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]= 233 cfm
288 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 57 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(r.cation: Carlsbad Date: 12/31/1987 Checked By
'\.~ ·:;::,..,
Documentation: PROCALC Date
---------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
BVAC Zone Name:
HVAC System Name:
system Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 2
Space 3
Space 4
Space 5
Space 6
PEAK
(Jan 6am)
(Jan 6am)
(Jan 6am)
(Jan 6am)
(Jan 6am)
~ace 7 (Jan 6am)
~ TOTAL SPACE LOAD
Bypass Ventilation Air (
Supply Duct Conduction
Supply Duct Leakage
supply Fan Heat Gain
44 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 394 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
8211
8211
8211
8211
8211
8211
49263
1542
985
1971
0
53761
13876
1075
2150
-7638
63224
111156
(
(
Spaces 2,3,4,5,6 & 7
Rheem RPNC024J
6
Loads Office Heating
Loads Office cooling
Loads Office Fans
COINCIDENT
50 ' COOLING
PEAK SENSIBLE LATENT --------------(Jul 2pm) 6794 931 {Jul 2pm) 7491 931
(Jul 2pm) 6794 931 {Jul 2pm) 7491 931
{Jul 2pm) 6794 931
(Jul 2pm) 7491 931 --------------42853 5584
44 cfm) 241 56
857
1714 223
0 --------------45666 5864
394 cfm) 2168 503
913
1827 235
7638 --------------58212 6602
4.9 tons 0.6 tons
106965 36792
8.9 tons 3.1 tons
SPACE HEATING & COOLING LOAD SUMMARY page 58 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
··cation: Carlsbad Date: 12/31/1987 Checked By
Documentation: PROCALC Date ----------------~----------------------------------------------------------
SUMMARY OF PEAK BOOR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall conduction
Glass Conduction
Door Conduction
Roof conduction
Skylight Conduction
Floor Conduction
•
Slab Conduction
~ Interior Conduction
L Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
Space 2
COOLING
SENSIBLE LATENT --------------Jul 2pm
78 F DB 50 I RB
83 F DB 67 F WB
Btu/hr Btu/hr ------------67
401
252
424
0
0
0
0
2354
1119
1246 0
931 931 -----------6794 Btu/hr 931 Btu/hr
0.6 tons 0.1 tons
Beating:
cooling:
8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm
6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 269 cfm
SPACE HEATI'NG & COOLING LOAD SUMMARY page 59 of 63
---------------------------------------------------------------------------Project: Building 14
_Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
((.cation: Carlsbad
Documentation: PROCALC
Date: 12/31/1987 Checked By
Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
·Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight conduction
Floor conduction
Slab Conduction
(tAinterior Conduction
~Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
Space 3
COOLING
SENSIBLE LATENT --------------Jul 2pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------58
401
317
424
0
0
0
0
2995
1119
1246 0
931 931 -----------7491 Btu/hr 931
0.6 tons 0.1
Heating:
Cooling:
8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)l •
7491 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)}•
Btu/hr
tons
213 cfm
296 cfm·
SPACE·HEATING & COOLING LOAD SUMMARY page 60 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
1··cation: Carlsbad Date: 12/31/1987 Checked By
... (\~,,~-
Documentation: PROCALC Date --------------------------------------------------------------------------~
SUMMARY OF PEAK HOUR LOADS FOR SPACE
space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor conduction
•
Slab Conduction
{ Interior conduction
\ __ _. Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
SENSIBLE --------Jul 2pm
78 F DB
83 F DB
Btu/hr ------67
401
252
424
0
0
0
0
2354
1119
1246
931 ------6794
0.6
Space 4
COOLING
LATENT -------
50 I RH
67 F WB
Btu/hr ------
0
931 . -----Btu/hr 931 Btu/hr
tons 0.1 tons
Heating:
Cooling:
8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm
6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]• 269 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 61 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/31/1987 Checked By
'\:./,.,.·:;,.-./
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor conduction
Slab Conduction (t• Interior conduction
.\..: Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR OUANTITlES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
Space 5
COOLING
SENSIBLE LATENT --------------Jul 2pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------58
401
317
424
0
0
0
0
2995
1119
1246 0
931 931 -----------7491 Btu/hr 931 Btu/hr
0.6 tons 0.1 tons
Heating:
Cooling:
8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] = 213 cfm
7491 ~tu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 296 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 63 of 63
---------------------------------------------------------------------------Project: Building i4 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checke.d By
Documentation: PROCALC Date --------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR-SPACE
Space Name:
DESIGN CONDITIONS
Pea-k Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor conduction
Slab Conduction
(.Interior Conduction
:~ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY A!R QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
SENSIBLE --------Jul 2pm
78 F DB
83 F DB
Btu/hr ------58
401
· 317
424
0
0
0
0
2995
1119
1246
931 ------7491
0.6
Space 7
COOLING
LATENT ------
50 I RH
67 F WB
Btu/hr ------
0
931 -----Btu/hr 931 Btu/hr
tons 0.1 tons
Heating:
Cooling:
8211 Btu/hr/ [1.10 * (105 F supply -70 F TStat)] = 213 cfm
7491 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]= 296 cfm
•• '---~-
SPACE HEATING & COOLING LOAD SUMMARY page 62 of 63
---------------------------------------------------------------------------Project: Building 14 Enforcement Age~cy
Designer: Banzuelo/Ri•rson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/31/1987 Checked By
' \-.:~.,_;-)"
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
space Name:
DESIGN CONDITIONS
Peak Bour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof conduction
Skylight Conduction
Floor conduction
•
Slab Conduction
\
1 Interior conduction
-~ Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
793
5349
536
564
0
0
969
0
0
8211 Btu/hr
Space 6
COOLING
SENSIBLE LATENT --------------Jul 2pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------67
401
252
424
0
0
0
0
2354
1119
1246 0
931 931 -----------6794 Btu/hr 931
0.6 tons 0.1
Heating:
Cooling:
8211 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
6794 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
213 cfm
269 cfm
TITLE 24 REPORT FOR:
Building 15
El Fuente Business Park
Carlsbad, California
PROJECT DESIGNER:
Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
OWNER:
Davison-Jones Development
411 campus Drive, Suite 830
I_FVine, CA 92715
. REPORT PREPARED BY:
PROCALC
705 s. Velare st. 110
Anaheim, CA 92804
1-(800) TITLE-24
Job Number: T499E
Date: _12/30/1987
The NONRESIDENTIAL COMPLY 24 computer program has been used to perform the
calculations summarized in this compliance report. The program has interim
/;.approval and is authorized by the California Energy Commission for use with
\.:~--_., the Second Generation Nonresidential Building Ener~y Efficiency Standards.
r
'{.\ , ..
••••• i' ~~
Table Of contents for Title 24 Report
cover Page ..........•.......................•..•.....•........••.....
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form CF-1 Certificate of Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Form MF-1 Mandatory Measures Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
l
2
3
5
Form WS-lA Energy Budgets Worksheet ••••••••••••••••••••••••••••••••• 7
Form CF-2 Envelope Summary & Worksheet •••••••••••••••••••••••••••••• 9
Form SCM Performance Run • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
Form CF-3 Construction Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
52
Form CF-4 HVAC Power Indices summary •••••••••••••••••••••••••••••••• 58
Form ws-4 HVAC System summary Sheets ...........................•..... 60
Form CF-5 Lighting Summary & Worksheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
HVAC Zone & Space Loads summary • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 62
Certificate of Compliance (Part 1 at 2)
Pro1ec: 1 •
# q
:6M1-t:1c le /ei4-Cso ID'<lf:£
Building Permit Number-
I
Plan Chockod By
7 cliiiiaie Zone Cily/Town
Pr:RaGAkG: 1de1/~7
O'ccumentaifcn Author Cate
Prescriptive Approach/Performance Approach Strategy
General
1 CECOccupancyType •••••••••• Off;~
2 use Occupanc'f Group/Division • • • . • • s,-:z..
3 PadcagaSefectad •••••••••.••• &f.
4 Gress Condilionad Rocr Area • • • • · • • :ZkS1c: ft2
Reef and Frocra;
5 ' Proposed RccUCeilfng Rt (CF-2. CF-3) • • 'ZR 1 'i hr-F-ftZ.BIU
6 .. Requirad Roof/Ceiling Re (CF-2) • • • • • ---hr-F-rtZ.SIU
7 Proposed EJciaricr Roar Rt (CF-2. CF-3) • hr-F-ft2/etu
8 Required Extarfcr Floor Rt (CF-2) • • • • • hr-F-rt2/a!U
Walla,
9 · Proposed Opaque Wall Rt ccr:-2.·cF-3). • W· W hr-F-rtZ.SIU
10 Wall Heat Capadt-J (CF-3) • • • • • • • • 1,, '4 BtulF-ft2 (•=:.paqua Wall Rt (CF-2) • • • • • __ hr-F-ftZ.Stu
' ·12 Exterior Wall Area (CF-2) • • • • • • • • ~p nz
13 Total ~ !na (CF-2) • • • • • • • • I WU? rt2
14 Proposed Total Ptre8nt (1Jne 13 / Une 12) • %'5'· 7 %
15 Awrage :rota1 SC (CF-2) • • • • • • ••• e ·+'='
18 AltowedTotaJ Gtazing Percent •••••• ___ %
17 Wut ~ Wal Area (CF-2) • • • • • • \'9U ft2
18 West !,31azlno Area (CF-2) • • • • • • • • ) fp zc, ft2
19 PropcsedWutParcant(CF-2). • • • • • \Oo %
20 Av.rag~ West SC (CF-2) • • • • • • • • o . 4;;'1
21 Allcwed West Glazing Parcant • • • • • • %
Gia:fng fn Roof (CJ'.6) Proposed Allowod
22 S,kyll;h&1 • • • • • • • • • __ _
23 SkyD';ht 2 • • • • • • • • • ---
24· Skyll;ht3 •.•••••••• ---
25 Skylight<& • • ••• ; ••• ---
28 Slcyll;ht5 ••••••••• __ _
tr Skyll;ht S • ·• • • • • • • • __ _
28 Skylght 7 • • • • • • • • • ---
29 St<-/l;ht a • • .. • • • • • • __ _
Ugbtrng
---ft2
---ft2 ___ ftZ
---ft2
---ft2 ___ rt2·
·---ft2
---ft2
30 Proposed Ad{usted LPO (CF-5) • • • • • • I ,4c WatWft2
:S1 Allow9d I.PO (CF-S) • • • • • • • • •• ---Wattsnt2 HVAC
32 PlrfcnnanceSetSelected •••••••• __ _
;:,.Proposed FCI'\ Wactage Index (CF-4) • • • ,e ,CJ (q Wattslft2
\:-.... . All~d Fan W~e Index • • • • • • • ___ Wattstrt2
'.~ Proposed C<,clJng Power Index (CF-4) • • • 7'2', 1 <, fftuMt2
38 AllcwedCoaang Power Index • • : • • • ___ Btuhlrt2
37 Proposed Heating Power Index (CF-4) • • .?;M •'-"? 8tuMt2
38 Allowed Heating Power Index • • • • • • .__ __ ·siuMt2
F~ Revised September 1986
CF-1
For Enforcement Agency Use Only
(µ,~
Calo
~-Z.'Z-C\-;6
Field Checked By Oata ~ .. ,Z.C,~tz,tz-')
.~IUntand
Ragfstrallcn Stamp Approved By Cale
Performance Approach
Energy Budget
1 CEC Occupancy type . . . . . . . . . .Of6·cc
2 USC Occupancy Grcup/Oivision • • • • • ?z ... :k
4 Condillonod Roor Aroa • • • • • • • • • ,i<eea, ft2
4 Bucfgot Tablo • • • • • • • • • • • • • .$-I A.
5 Allowed Energy Budgat(WS-tA) • • • • • I SJ .0 k8lulyr-lt2
Cafculated Annual Energy Consumption
6 Approved Calculation Method • • • • • • M(, "2r1P'-'"1' '%-4-
7 CEC Designation • • • • • • • . • • • • L,,Po Q:t
8 Mufllpller • • • • • • • • • • • • • • • • I , Q'Z,1
Estimated Energy Uae
9 Heating • • • • • , • , • • • • • • • • 6, c:;• k8tt.ll'Jr-ft2
10 Cooling • • • • • • • • • • • • • • • • ?t,, ;!> k8tu,yr-rt2
11 Fans • • • • • • • • • • • • • • • • • 44 .S k8tulyr-ft2
12 Ughts • . • • • • • • • , • • , • • • ~.. d;k. '-t k8tulyr-ft2·
13 MiscaDaneous Equipment • , • • • • ~ )Sa ::'t k8lulyr-ft2
14 Total •. • • • . • • • • • • • • • • • • • ___ kBtu,yr•ft2
15 AclJ. Total Energy Use (lifte 8 ,c lina N) ••• \"31 :1 kStulyr-ft2 ~Adj~~ .
Compliance Statement
General. The proposed building represented In this set of ccmplianee
documentation Is consistent wilh the other ccmpllanc:e fcnns and
wcrksheets, with the plans and specilicallons and with any other
c:alcufalicns er computor runs submitted with this permit applic:.alion.
Performance Approach. (when applicable) The energy performance
astimale presented on lhis form was calculated using the approved calculation method Indicated above and with the cec established fixed
and rastric:ted engineering Inputs for the applicable climate zone at1d occupancy type.
Prucrlpllve Approach. (when appllc:able) The proposed building has
bean designed to mHC lhe requirements of the Altamalive Component
. Package indicated above for Iha appropriate occupanC'f type and climate
~}Ulg
NamefT'ltle
AH?: urJq M mm
Telephone Calif. Uc:ense Number
ven:n1cate o-r Compliance· (Part 2 of 2) CF-·
For Enforcement Agency Use Only
_ -Oocumentalfon AulhorlF'irm Cata · cfiec:kid By c;··-t--------------Oa,e
' ~\.~,, .
· Both parts one and two of lhis Certificate of Complfanca must be lnefuded with each building pennit appfication for the above noted building and appe, on lhe ·plans submitted for approval. The building.fealUres and reqµlrements represented on the Cenificate of CompUance are adequate to ac:nie•, complfanca with Iha second generation nonresidential energy standards for the building referenced above. The buildfrig features and requiremencs a:
also ~ for arr/ subsequent alterations, modifications or additions to Iha building. -
Des1gner One
Name (Print)
Til.la/Company Name
Addtass
Signatura Cata
-Enf-. -orcem--ent_Ag_e_ncJ __ S_ig_na_lU_re ________ O,...aro ____ _
__ · Name (Print)
.-. . JZrotc\Htil?: Lhttv V~\,\M 1@
iUe/Ccmpa,lY Name' I
Addrass
Data
Cara
Owner
Name (Print) • ·
lille/C<lfflpony Name
Dara
•••
{/
\.;_.
Form Revis.:! S.ptamber 1986
-.
Enlotcoment AgonCJ slgnatwe
Deargner Four
Name (Print)
Tide1Company Name
Slgnaiure
Enlorcament AganCJ Signature
Enforcement Agency
Name (Print)
Tido/Agency
Address
Cata
Oaut
pace
Oata
Paga_ot __
CERTIFICATE OF COMPLIANCE (part l of 2) CF-1 page 3 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad
Documentation: PROCALC
Date: 12/30/1987 Checked By
Date
---------------------------------------------------------------------------
PERFORMANCE APPROACH
Roofs and Floors
Roof/Ceiling Rt (CF-2,3) R-20.5
Ext. Floor Rt (CF-2,3) R-0.0
Walls
Opaque Wall Rt (CF-2,3) R-6.6
Energy Budget
CEC Occupancy Type
Conditioned Floor Area
Total Number of Floors
Climate Zone
Heat Capacity (CF-2,3) 2.6 BC
Energy Budget (WS-lA)
Lighting Adjustment (CF-5)
Energy Compliance Budget
Office
2682
1
7
157.0 o.o
157.0
Glazing in Walls
Exterior Wall Area (CF-2)
Total Glazing Area (CF-2)
Total Glazing Percent
Average Total SC (CF-2)
West Exterior Wall (CF-2)
West Glazing Area (CF-2)
West Glazing Percent
Average West sc
tAazing in Roof \ .;,.,;-Skylight Area ( CF-2)
Lighting
6300
1620
25.7
0.46
1620
1620
100.0
0.46
0
sf
sf
I
SC
sf
sf
I
SC
sf
Calculated Annual Energy Consumption
Approved Calculation NR COMPLY 24
Program Version Number 1.14
Oser License Number 1329
CEC Designation CPO 07
CEC Multiplier 1.027
Estimated
Heating
Cooling
Fans
Energy Use (KBtu/sqft-yr)
8.5
36.3
44.5
Proposed Adjusted LPD (CF-5)1.40 w/sf
Adjustment
Lights
Receptacle
89.4 X 1.027 • 91.8
46$9
16.8
1.4
156.9
HVAC
Fan Wattage Index (CF-4) 0.96
Cooling Power Index (CF-4) 72.76
Heating Power Index (CF-4) 59.66
COMPLIANCE STATEMENT
Hot water
w/sf Total (SCM-3)
Btuh/sf
Btuh/sf
The proposed building represented in this set of compliance documentation
is consistent with the other compliance forms and worksheets, with the plans
and specifications and with any other calculations or computer runs submitted
with this permit application.
The energy performance estimate presented on this form was calculated using
the approved calculation method indicated above and with the CEC established
fixed and restricted engineering inputs for the applicable climate zone and
occupancy type.
(.GNED ----------------Calif. License I: ____ _
\.. "··:;;·" -DESIGNER Banzuelo/Rierson/Duff & Associates, Inc
4501 East La Palma Avenue, Suite 202
Anaheim, CA 92807-1907
(714) 777-0666
CERTIFICATE OF COMPLIANCE (part 2 of 2) CF-1 page 4 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer-: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
f:.cation: Carlsbad Date: 12/30/1987 Checked By :-,.. . -. ,
Documentation: PROCALC Date
---------------------------------------------------------------------------
Both Parts one and two of this Certificate of Compliance must be included
with each building permit application for the above noted building, and
appear on the plans _submitted for approval. The building features and
requirements represented on the Certificate of Compliance ·are adequate to
achieve compliance with the second generation nonresidential energy
standards for the building referenced above. The building features and
requirements are also adequate ~or any subsequent alterations, modifi-
cations or additions to the building.
PROJECT TITLE
Building iS
El Fuente Business Park
Carlsbad, California -
OTHER DESIGNER
Name:
Address:
City:
Signed:
OWNER
Davison-Jones Development
411 Campus Drive, Suite 830
Irvine, CA 92715
DOCUMENTATION AUTHOR
PROCALC
705 s. Velare St. 110
Anaheim, CA 92804
1-(800) TITLE-24 ~I )
Signed: (_---/~( · -
OTHER
Name:
Address:
City:
Signed:
=•=======••==•====
ENFORCEMENT AGENCY
Name:
Agency:
City:
Signed:
MANDATORY FEATURES CHECKLIST (part l of 2) MF-l page 5 of 74
------------------------------------------------------------------------~--Project: Building ts Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
'-.. :-_,\/
Documentation: PROCALC Date ---------------------------------------------------------------------------
ENVELOPE MEASURES
o Certified Insulation Materials per Sec. 2-53ll(a)
o Insulation Installed to meet Flame Spread and Smoke Deqsity
Requirements·of Sec. 2-53ll(b)
o Orea Formaldehyde Foam Insulation Installed per Sec. 2-53ll(c)·
o Retrofit Insulation specifi~d per Sec. 2-5313
o Air Infiltration is minimized by specification of tested
manufactured doors and windows and proper sealing and
weatherstripping per sec. 2-5317
LIGHTING SYSTEM MEASURES
o Certified Luminaires/Ballasts per Sec. 2-5314(b)
(.Independent Control within enclosed Areas per Sec. 2-5319(a)
o Manual Switching Readily Accesible per Sec. 2-5319(b)
o Reduction of Lighting Load to at least 50% per sec. 2-5319(c)
(Occupancy Sensors or Programmable Timers meeting CEC
Criteria may Substitute)
o Separate Switching of Daylit Areas per Sec. 2-5319(d)
o Separate Switching of Display and Valance Lighting in
Retail/Wholesale occupancies per Sec 2-5319(h)
o Automatic Control of Display Lighting in Retail/Wholesale
Occupancies per Sec. 2-5319(h)
o Tandem Wiring of land 3 Lamp Luminaires per Sec. 2-5319(h)
OCCUPANCY SENSING DEVICES (when applicable)
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
, ,. Time Delays to Prevent Undesirable Cycling per Sec. 2-5319 ( e). 3
\i\,i Limits on Emmisions per exceptions to Sec •. 2-5319(e)
Reference
MANDATORY FEATURES CHECKLIST (part 2 of 2)
Project: Building iS
MF-l page 6 of 74
Designer: Banzuelo/Rierson/Duff & Associates, Inc
i,:.cation: Carlsbad · Date: 12/30/1987
\·
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date -------------------------------------------------------------------~-------
DAYLIGHTING AND LUMEN MAINTENANCE CONTROLS (when applicable)
o Uniform Illumination reduction to 50% per sec. 2-5319(e).l
o Flicker Free Operation and no Premature Lamp Failure
per Sec. 2-5319(e).2
o Time Delays to Prevent Undesirable cycling per Sec. 2-5319(e).3
o Step switching Devices with Separation between On/Off Settings
per Sec. 2-5319(e).4
o Photocell Sensors shall be Diffusing type and no Opaque Cover
allowed per Sec. 2-5319(e).5
o Manufacturer's Instru~tions provided for Installation and
Calibration per Sec. 2-5319(e).6
o Proper Installation of Controls including sensor Location,
..• certification of Initial Calibration and control of Luminaires (L~j only within Daylit Areas per Sec. 2-5319(e).8
Reference
o Visible or Audible malfunction Alarm provided per Sec. 2-5319(9) ____ _
BVAC AND PLUMBING SYSTEM MEASURES
o Piping Insulated as per Sec. 2-5312
o Certified HVAC Equipment per 2-5314(a)
o Certified Plumbing Equipment per 2-5314(a)
o Heating and Cooling Equipment efficiency per Sec. 2-5314(b)
o Pilotless Ignition of Gas Appliances per Sec. 2-5314(c)
o Automatic Controls for Off-Hours per Sec. 2-5315(a)
o Thermostat Set Point Requirements per Sec. 2-5315(b).l
o Sequential Control of Heating and Cooling per Sec. 2-5315(b).2
o Automatic Exhaust Fan Dampers per Sec. 2-5316(b)
.Thermostat Controls for Each Zone per Sec. 2-5315(b)
·· ....
o Ventilation Provided per secs. 2-5316 & 2-5343
o Water Heaters for Domestic Hot Water and Pools per sec. 2-5318
ENERGY BUDGETS WORKSHEET (part l of 2) WS-lA page 7 of 74 ---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:•cation: Carlsbad Date: 12/30/1987 Checked By
\. -~\~~ ~
Documentation: PROCALC Date
---------------------------------------------------------------------------
CLIMATE ZONE 7 ENERGY BUDGETS
Cross
Floor· Sectional Office Retail
No . Area Budget Budget ,. --------------------------1 2682 157 186
BUILDING ENERGY COMPLIANCE BUDGET BY SPACE
Occupancy Floor
Flr Space Name Type Area Mult
Total Budget Energy
Floor (I<Btu Budget
Area /sqft) (MBtu) ------------------------------------------------------1 Space 1 Office 139 X 1 -139 X 157 = 21.8
1 Spaces 2 & 3 Office 318 X 1 -318 X 157 • 49.9
1 Spaces 4 & 5 Office 278 X 1 -278 X 157 = 43.6
1 Spaces 6 & 7 Office 318 X 1 -318 X 157 = 49.9
1 Spaces 8 & 9 Office 278 X 1 = 278 X 157 = 43.6
1 Spaces 10 & 11 Office 318 X 1 = 318 X 157 • 49.9
<I Spaces 12 & 13 Office 278 X 1 =
Spaces 14 & 15 Office 318 X 1 =
Spaces 16 & 17 Office 278 X 1 =
278 X 157 = 43.6
318 X 157 = 49.9 278 X 157 • 43.6 1 Space 18 Office 159 X 1 = 159 X 157 = 25.0 -----------TOTALS 2682 421.l
BUILDING COMPLIANCE BUDGET 421.1 MBtu / 2682 sqft = 157.0 KBtu/sqft
ENERGY BUDGETS WORKSHEET (part 2 of 2) ws-lA page 8 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
. :~::.:.:., ,;;_,''
Documentation: PROCALC Date ---------------------------------------------------------------------------
BUILDING ENERGY CONSUMPTION BY SPACE
Total SCM Energy Energy
Floor Floor Estimate use
Flr Space Name Area Mult Area ·c KBtu/sqft) (MBtu)
--------------------------------------------------1 Space 1 139 X 1 = 139 X 179.9 = 25.0
1 Spaces 2 & 3 318 X 1 = 318 X 153.7 -48.9
1 Spaces 4 & 5 278 X 1 = 278 X 155.9 -43.3
1 .spaces 6 & 7 318 X 1 = 318 X 153.7 = 48.9
1 Spaces 8 & 9 278 X 1 = 278 X 155.9 -43.3
1 Spaces 10 & 11 318 X 1 = 318 X 153.7 -48.9
1 Spaces 12 & 13 278 X 1 = 278 X 155.9 -43.3
1 Spaces 14 & 15 318 X 1 -318 X 153.7 -48.9
1 Spaces 16 & 17 278 X 1 = 278 X 155.9 -43.3
1 Space 18 159 X 1 = 159 X "168. 3 -26.8 -----------TOTALS 2682 420 .. 7
BUILDING ENERGY CONSUMPTION 420.7 MBtu / 2682 sqft = 156.9 KBtu/sqft
cf'
AREA AND MATERIALS SUMMARY FORM (part l of 3) CF-2 page 9 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad Date: 12/30/1987 Checked By
... ,,:...-;~,---' /
Documentation: PROCALC Date ---------------------------------------------------------------------------
ROOF AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS
---------------------------------------------------------------------------Roof-l
Roof-2
1800
882
1800
882 ---------------------------------------------------------------------------TOTALS 2682 2682
ROOF R-VALOE
Area/
Type Assembly Name Area R-Value R-Value ----------------------------------------------Roof-l R-19 B/O with T-Bar 1800 21.04 85.54
Roof-2 R-19 B/U with Gyp. Clg. 882 19.40 45.47 -------(. Average R-Value 2682 I 131.00 • 20.47
ROOF GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS
---------------------------------------------------------------------------NONE
---------------------------------------------------------------------------TOTALS 0
·.
AREA AND MATERIALS SUMMARY FORM (part 2 of 3) CF-2 page 10 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
((.cation: Carlsbad Date: 12/30/1987 Checke!l By
{
... -~::.·.·' ·'
Documentation: PROCALC Date
---------------------------------------------------------------------------
ELEVATION AREA BY ORIENTATION
N NE E SE s SW w NW Int TOTAL
---------------------------------------------------------------------------1620 1530 1620 1530 6300 -------------------------------------------~-------------------------------
OPAQUE EXTERIOR WALL/DOOR AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW Int TOTALS
---------------------------------------------------------------------------Wal-1
Wal-2
Wal-3
1260
360
1197
153
180
1197
153
180
3654
306
720 ---------------------------------------------------------------------------TOTALS 1620 1530 1530 4680
~AQOE EXTERIOR WALL/DOOR R-VALOE & HEAT CAPACITY
Area/ Area •-~"Type Assembly Name Area R-Value HC R-Value X HC ------------------------------------------------Wal-1 5/8 Gyp/R-11/Gyp WF 3654 10.19 1.4 359 5057
Wal-2 6.5" Conc/R-11/Gyp.Brd. 306 10.34 17.4 30 5321
Wal-3 solid Wood Door 720 2.22 2.4 324 1720 ------------Totals 4680 713 12098
Average R-Value 4680 I 713 • 6.57
Average HC 12098 I 4680 • 2.59
AREA AND MATERIALS SUMMARY FORM (part 3 of 3) CF-2 page 11 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
::~•ocation: Carlsbad Date: 12/30/1987
·\~};./
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
GLAZING AREA BY TYPE AND ORIENTATION
Type N NE E SE s SW w NW TOTALS ------------------~--------------------------------------------------------Wind-1 1620 1620 -----------------------------------------~---------------------------------TOTALS
GLAZING O-VALUE AND SC
Type
Wind-1
I~ 1 · .. , 'J \ ' , 1 .. ·. ,.,_,~,
••••
l. :
Assembly Name
--------------------------Sunglass Blue Plate
Totals
Average u-value
Average SC
Area
1620
1620
1841 I
745 I
1620 1620
Area x Area
U-Value SC o-value X SC --------------1.14 0.46 1841 745 ------------1841 745
1620 -1.14
1620 = 0.46
SCM INPUT DATA SUMMARY (part l of 2)
Projec~: Building IS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
tc.ocation: Carlsbad Date: 12/30/1987
SCM-1 page 12 of 74
Enforcement Agency
Building Permit No
Checked By
'-:·,.~·~~~,,,
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window ·Roof
Door c! Floor
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
Beat Capacity of Exterior Wall
Li9hting Power
Climate Zone
Space 1
347.0 sqft
81.0 sqft
139.0 sqft
40.0 sqft
o.o sqft
139.0 sqft
139.0 sqft
10.25
0.88
20.43
2.22
o.oo
carrier 52BA3093
1
Heat Pump
BP w/Economizer
Electric Resistance
2.100
0.soo
0.990
No
1060 watts
143 watts
2ao· CFM
7.82
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 13 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc. Building Permit No
i 1.ocation: ~arlsbad Date: 12/30/1987 Checked By
\:,~;~/.::
Documentation: PROCALC Date ----------------------------------------~----------------------------------
OTHER PHYSICAL PARAMETERS
·Wall Absorptivity
Roof Absorptivity
Ceiling Height
0.31
0.70
9.0 ft
Glass Framing Shading Device overall
SC SHADING COEFFICIENTS
Southwest
OVERHANGS & SIDEFINS
Southwest
•
ECIAL FEATURES
{ --------------'k~,/ Daylighting Strategies
: .•.
• '· !
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 9.0
Overhang
Height Depth
0.40
Side-Fin
Distance Depth -------------
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 14 of 74
--------------------------------------------------------------------------~ Project: Building iS
, Designer: Banzuelo/Rierson/Duff & Associates, Inc
'{.cation: Carlsbad Date: 12/30/1987
...... ·:;.~;~· '
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Space 1
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night (.
\_.;;,,~.,./ Number of Holidays per Year: Heating Season
Cooling Season
Thermostat Set Point Temperatures: Winter
Winter Setback
summer
Summer Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate CU-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.· '..Occupant Density:
\.~·--·::~ /.
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 15 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
'., .• cation: Carlsbad Date: 12/30/1987 Checked By
\:.:,_a·./ "·..:...,>--
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Space l
BALANCE POINT TEMPERATURES AND DEGREE DAYS =====•==========•=========================
Daytime Nighttime
------------------------------BPTl -56.0l (Winter) -BPTl
BPT2 -64.31 (Summer) BPT2
BPT3 = 71.59 (Economizer) BPT3
BOD = 72 (Beating) BOD
CDD -350 (Cooling) CDD
BUILDING BEAT TRANSFER (Btu/hr-F) ==•==•=•=========================
Building Envelope Beat Transfer Rate:
overall Beat Transfer Factor cnK"):
Winter
summer
Winter
summer
ANNUAL LOADS (MBtus) -----=========•=••••
= = = = =
67.89
76.09
77.10
3231
0
• • -•
(• . ...;.,,,:, Beating -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) •======•=••======•==••==•=•===•==••===• Site Beating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ----====•==========•======•=•=•=========••=== Source Beating
source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Bot Water
----
9.0
55.1
47.7 -----111.9 X 1.027
-
------
---=
124.8
126.0
201.6
196.7
1.0
1.7
·0.4
2.6
2.2
2.2 a.a
0.1
114.9
46.9
16.8
1.4
········===•===•==••=•=•==========••=•=•===•=••=••=======••••==•===•=~==•=
. · .. ,./ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 179. 9 KBtu/sqft
••=•==•=•=••=•••••=•=•••==••=••••=••===··········=························-
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 16 of 74 ---------------------------------------------------------------------------Project: Building #5
. ,, ~esigner: Banzuelo/Rierson/Duff & Associates, Inc
· (~cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
'\ ~/:,..~;,-
Documentation: PROCALC Date
-------------------~-------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance) -------------------------------------------Wall
Window
Roof
Door
(;, ... Floor
,(.~ '{_l,: ... :.'?
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Beating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Spaces 2 & 3
424.0 sqft
198.0 sqft
318.0 sqft
80.0 sqft o.o sqft
318.0 sqft
318.0 sqft
10.19 o.00
20.51
2.22 o.oo
Carrier 52BA3093
16
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load Summary for
more details on the zoning arrangement.
GENERAL
•Heat Capacity of Exterior Wall
/: , • Lighting Power
\:,~: Climate zone
1.54
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 17 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
\.ocation: Carlsbad Date: 12/30/1987 Checked By
-x..-... .,, .. )
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing Shading Device
SHADING COEFFICIENTS
southwest
OVERHANGS & SIDEFINS
southwest
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 22.0
overhang
Height Depth
o.oo
0.70
9.0 ft
overall
SC
0.40
Side-Fin
Distance Depth --------____ ...,
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 18 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<:.cation: Carlsbad Date: 12/30/1987
\' .. ·.:: .. f"
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Spaces 2 & 3
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans ·
Water Heater
Number of Non-Operational Hours per Week: Day
Night
(.Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
:.Occupant Density:
Heating Season
Cooling Season
Winter
Winter setback
Summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 19 of 74
---------------------------------------------------------------------------Project: Building iS
Designer:
,.ocation:
Banzuelo/Rierson/Duff & Associates, Inc
Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
't -,-.'} ·, ~;, .. :,., ~.
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Spaces 2 & 3
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime ------------------------------BPTl = 55.67 (Winter) BPTl
BPT2 = 63.82 (Summer) BPT2
BPT3 = 71.26 (Economizer) BPT3
BOD = 62 (Beating) BDb
CDD = 377 (Cooling) COD
BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Beat Transfer Rate: Winter
Summer
Overall Heat Transfer Factor ("K"): Winter
cl Beating
Cooling
summer
ANNUAL LOADS (MBtus) -----·========•=====
= 67.85 = 76.04 = 77.07 = 3216 = 0
• • • -
--
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Beating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Beating
Source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
----
8.4
33.3
44.5 -----86.3 X l.027
• -----
• ---
256.5
259.4
432.2
421.2
2.2
3.9
0.9
3.5
4.7
5.0
l.8
0.l
88.6
46.9
16.8
1.4
t········===•===========================================•==•=====-========·--
\:,, _ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft
SCM INPUT DATA SUMMARY (part l of 2) SCM-1 page 20 of 74 ------~--------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
·(·cation: Carlsbad Date: 12/30/1987 Checked By
Documentation: PROCALC Date -------------------------------------------------------------------~-------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
------------~------------------------------Wall
Window
Roof
Door
.. -•. Floor (~
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Spaces 4 & 5
388.0 sqft
162.0 sqft
278.0 sqft so.a sqft o.o sqft
278.0 sqft
278.0 sqft
10.19
0.88
20.43
2.22
0.00
Carrier 52BA3093
16
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
•· Note: 8 Spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & cooling Load summary for
more details on the zoning arrangement.
GENERAL
•
Heat capacity of Exterior Wall
; l Lighting Power
'-~·., Climate Zone
1.56
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-l page 21 of 74 --------------------------~------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
<,.cation: Carlsbad Date: 12/30/1987 Checked By
\' .. ,,_,,,
~' ,-,;.:<
Documentation: PROCALC Date ---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing Shading Device
SHADING COEFFICIENTS
southwest
OVERHANGS &. SIDEFINS
Southwest
sc Factor Winter summer
0.46 0.880
Window
Height Width
9.0 18.0
Overhang
Height Depth
0.00
0.70
9.0 ft
overall
SC
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPOT DATA SOMMARY SCM-2 page 22 of 74
---------------------------------------------------------------------------Project: Building 15 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
' (f..ocation: Carlsbad Date: 12/30/1987 Checked By
,;,.:::·,'/
Documentation: PROCALC Date ·---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDOLING
Occupancy Level for Operational Period:
Spaces 4 & 5
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night ~ Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAME~ERS
Infiltration Rate:
Slab Floor Heat Loss Rate co-value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
,,.occupant Density:
.\zj
Heating Season
Cooling Season
Winter
Winter Setback
summer
summer setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 23 of 74 ---------------------------------------------------------------------------Project: Building IS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: _12/30/1987 Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------·
Space Name: Spaces 4 & 5
BALANCE POINT TEMPERATURES AND DEGREE DAYS =•=••==•================================== Daytime Nighttime
------------------------------BPTl = 55.97 (Winter) BPTl
BPT2 = 64.13 (Summer) BPT2
BPT3 = 71.45 (Economizer) BPT3
HOD = 71 (Heating) HOD
COD = 361 (Cooling) COD
BUILDING HEAT TRANSFER (Btu/hr-F)
Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
.
Winter
summer
Winter
Summer
(. Heating
Cooling
ANNUAL LOADS (MBtus) •==••=====•=•===•==•
=
=
= = =
67.88
76.07
77.09
3225
0
-= --
--
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ==•••======••••=•====•===•=•==•============== Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
source Lighting
Source Receptacle
Source Hot Water
----
8.5
35.4
44.5 -----88.5 X 1.027
------
--= -
220.7
223.0
374.3
364.5
2.0
3.3
a.a
3.3
4.1
4.3
1.6
0.1
90.9
46.9
16.8
1.4
;' ,.----======•==============•=•==••••========•==============-==-==-===•===••==•
~ ' . ) ·-._··~ " TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft
=••=•=-=•====-=============•=======••========•====•================•==•=-===••
SCM INPUT DATA SUMMARY (part l of 2) SCM-l page 24 of 74
-----------------------------------------------------------------------~---Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
·-'"I.';~_;;'../
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
Door
--;A .. Floor (~
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
cooling Equipment Type
Water Heating Equipment Type
Rated Beating Efficiency
Rated-cooling Efficiency
Rated Water Heating Efficiency
Economizer
cooling Equip~ent Power Rating
Fan Power ·
Air Circulation Rate
Spaces 6 & 7
424.0 sqft
198.0 sqft
318.0 sqft
80.0 sqft o.o sqft
318.0 sqft
318.0 sqft
10.19
0.88
20.51
2.22
0.00
Carrier 52BA3093
16
Heat Pump
BP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this HVAC System. Please refer to
the attached HVAC zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
•
Heat Capacity of Exterior Wall
.\. . Li~hting Power '-,>,,,, Climate Zone
1.54
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 25 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
. \.~":.·:./
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
Wall Absorptivity
Roof Absorptivity
Ceiling Height
Glass Framing Shading Device
SHADING COEFFICIENTS --------------------southwest
OVERHANGS & SIDEFINS
southwest
SC Factor Winter summer ------------------------
0.46 0.880
Window
Height Width
9.0 22.0
overhang
Height Depth
o.oo
0.70
9.0 ft
overall
SC
0.40
Side-Fin
Distance Depth -------------
No Daylighting Controls
,.
~ ( . /
\__: ,1--~-
SCM FIXED INPUT DATA SUMMARY SCM-2 page 26 of'74
---------------------------------------------------------------------------Project: Building IS
Designer: Banzuelo/Rierson/Duff _& Associates, Inc
Enforcement Agency
Building Permit No
, ').cation: Carlsbad
. .__. _. ;-·I
~ ... ~ ......
Documentation: PROCALC
Date: 12/30/1987 Checked By
Date ----------------------~-----------~----------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Spaces 6 & 7
Office.
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours
(.Number of Holidays per Year:
Thermostat. Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (O-Value):
INT~RNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
occupant Sensible Load:
Occupant Latent Load:
i;.Occupant Density:
\..:.s.-,,
Heating
Cooling
Winter
Winter
summer
· Summer
Night
Season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page ·27 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
'1~ . , ;,:, ' ... ':.. ... ,,,"J_..,;.1
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Spaces 6 & 7
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
------------------------------BPTl -55.67 (Winter) BPTl =
BPT2 = 63.82 (Summer) BPT2 = BPT3 = 71.26 (Economizer) BPTJ =
HDD = 62 (Heating) HDD =
CDD -377 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) ------=========================== Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
Summer
Winter
summer
cl Heating
Cooling
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL LOADS (MBtus)
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) =======================================
67.85
76.04
77.07
3216
0
----
--
= -----
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
---
=
8.4
33.3
44.5 -----86.3 X 1.027 = ---
256.5
259.4
432.2
421.2
2.2
3.9
0.9
3.5
4.7
5.0
1.8
0.1
88.6
46.9
16.8
1.4
.• ----=-===============================================••========•======•=•
~::.:>" TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft
--===•====================================================================•
SCM INPUT OATA SUMMARY (part l of 2) SCM-1 page 28 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By ·~ ~ .,,..
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
Door
Spaces 8 & 9
388.0 sqft
162.0 sqft
278.0 sqft
80.0 sqft o.o sqft
278.0 sqft
278.0 sqft
•
Floor
(
,.. ... ~ ....
10.19
0.88
20.43
2.22 o.oo
BVAC SYSTEM
BVAC Equipment Name (CF-4)
Number of systems
Beating Equipment Type
Cooling Equipment Type
water Beating Equipment Type
Rated Beating Efficiency
Rated Cooling Efficiency
Rated Water Beating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Carrier 52BA3093
16
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this BVAC System. Please refer to
the attached HVAC Zone Beating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
•
Beat Capacity of Exterior wall
(r Lighting Power ,,::_ Climate Zone ·
1.56
1.400 watts/sqft
7
SCM INPUT DATA·SUMMARY (part 2 of 2) SCM-1 page 29 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
/.cation: Carlsbad Date: 12/30/1987 Checked By
\.::_._~·.,"'
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
o.oo
0.70
9.0 ft
Glass Framing Shading Device overall
SC SHADING COEFFICIENTS
southwest
OVERHANGS & SIDEFINS
Southwest
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 18.0
Overhang
Height Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 30 of 74 ---------------------------------------------------------------------------Project: Building i5
Designer: Banzuelo/Rierson/Duff & Associates, Inc
'r.cation: Carlsbad · Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By '-,.-.:.,,·
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
occupancy Level for Operational Period:
Spaces 8 & 9
Office
Day 54.60 %
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours (.
\ '·· '.;I · .,,,:,, Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
,
1
.0ccupant Density:
\,.1::-,:· .-'
Night
Heating season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 31 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
, .. _. -~,..,~
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Spaces 8 & 9
BALANCE POINT TEMPERATURES AND DEGREE DAYS =•======================================== Daytime Nighttime
------------------------------BPTl = 55.97 (Winter) BPTl
BPT2 = 64.13 (Summer) BPT2
BPT3 = 71.45 (Economizer) BPT3
HDD = 71 (Heating) HOD
COD = 361 (Cooling) COD
BUILDING HEAT TRANSFER (Btu/hr-F) ================================= Building Envelope Heat Transfer Rate: Winter
summer
· overall Heat Transfer Factor ("K"): Winter
c9 Beating
Cooling
summer
ANNUAL LOADS (MBtus) ---==============•==
= = = = =
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site cooling
Site Fan
·•====•==•==•===•=====•=================
Site Lighting
Site Receptacle
Site Hot water
67.88
76.07
77.09
3225
0
= ---
-=
------
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot Water
----
8.5
35.4
44.5 -----88.5 X l.027 = ---
220.7
223.0
374.3
364.5
2.0
3.3
0.8
3.3
4.1
4.3
1.6
0.1
90.9
46.9
16.8
1.4
{•==================================================================·------
\:~,_/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155.9 KBtu/sqft
-------===========================•=========================•==============
SCM INPUT DATA SUMMARY (part l of 2) scM-l page 32 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
,--~ocation: Carlsbad . Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
Roof
Door
, . ._. Floor
(\7:!Jf
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of Systems
Heating Equipment Type
cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Spaces 10 & 11
424.0 sqft
198.0 sqft
318.0 sqft
80.0 sqft o.o sqft
318.0 sqft
318.0 sqft
10.19
0.88
20.51
2.22 o.oo
Carrier 52BA3093
16
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
•
Heat Capacity of Exterior Wall
,r ... Lighting Power
\.::.>/ Climate zone
1.54
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 33 of 74
---------------------------------------------------------------------------Project: Building ts Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
·~ -.... ,: (.
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
o.oo
0.10
9.0 ft
Glass Framing Shading Device overall
SC SHADING COEFFICIENTS
southwest
OVERHANGS & SIDEFINS ---------~----------southwest
(,
··-
SC Factor Winter Summer
0.46 0.880
Window
Height Width -----------9.0 22.0
overhang
Height Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 34 of 74
---------------------------------------------------------------------------Project: Building ts
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<&cation: ·carlsbad Date: 12/30/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
Spaces 10 & 11
Office
SCHEDULING
Occupancy Level for Operational Period: Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: Day
Night . if.
~'¼::,· Number of Holidays per Year: Heating Season
Cooling Season
Thermostat Set Point Temperatures: Winter
Winter Setback
summer
Summer Setup
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate cu-value):
INTE~NAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant sensible Load:
Occupant Latent Load:
: .• Occupant Density:
\~,.-,,,
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 35 of 74
---------------------------------------------------------------------------Project: Building i5 ·Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
/1.cation: Carlsbad Date: 12/30/1987 Checked By
\;_,:>'
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name: Spaces 10 & 11
BALANCE POINT TEMPERATURES AND DEGREE DAYS -------=================================== Daytime Nighttime
------------------------------BPTl = 55.67 (Winter) BPTl
BPT2 = 63.82 (Summer) BPT2
BPT3 = 71.26 (Economizer) BPT3
HDD -62 (Heating) HDD
CDD = 377 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) -------======•===========•======= Building Envelope Heat Transfer Rate:
overall Heat Transfer Factor ("K"):
Winter
summer
Winter
summer
(8aeating
Cooling
ANNUAL LOADS (MBtus) -----======•========
= = = = -
67.85
76.04
77.07
3216
0
----
• •
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ================•=•====•=====================
source Heating
source cooling
source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
source Hot Water
----
8.4
33.3
44.5 -----86.3 X 1.027
-----=
= ---
256.5
259.4
432.2
421.2
2.2
3.9
0.9
3.5
4.7
5.0
1.8
0.1
88.6
46.9
16.8
. 1.4
. ;•==••=============•================================================================
'-:·: · ' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft
=======================================================•================•===
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 36 of 74
------------~--------------------------------------------------------------Project: Building iS
,.J:...esigner: Banzuelo/Rierson/Duff & Associates, Inc
1 (.cation: Carlsbad . Date: 12/30/1987
\ \ '. j,
Enforcement Agency
Building Permit No
Checked By
"·,~;.;r
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALUES (including inside film resistance) --------------~----------------------------Wall
Window
Roof
Door
AFloor
(CT,
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of syst~ms
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air Circulation Rate
Spaces 12 & 13
388.0 sqft
162.0 sqft
278.0 sqft
80.0 sqft o.o sqft
278.0 sqft
278.0 sqft
10.19
0.88
20.43
2.22 o.oo
. Carrier 52BA3093
16
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this RVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
: .Heat Capacity of Exterior Wall
(i. Lighting Power
\.>·,-· Climate Zone
1.56
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 37 of 74
--------------------------------------------------------------------------~ Project: Building ts
Designer: Banzuelo/Rierson/Duff & Associates, Inc
<&cation: Carlsbad Date: 12/30/1987
\\~.;.)/
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
·wall Absorptivity
Roof Absorptivity
Ceiling Height
o.oo
0.70
9.0 ft
Glass Framing Shading Device Overall
SC SHADING COEFFICIENTS
Southwest
OVERHANGS & SIDEFINS
Southwest
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 18.0
Overhang
Height Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 38 of 74
---------------------------------------------------------------------------Project: Building IS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(?.cation: Carlsbad . Date: 12/30/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Spaces 12 & 13
Office
Day 54.60 I
Night 3.80 I
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 I
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
ccf
Number of Non-operational Hours per Week: Day
Night
'-' Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY ~----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
_.,.occupant Density:
~-~-'
Heating Season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESOLTS SCM-3 page 39 of 74
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff
&cation: Carlsbad ' ~-<~::\~,j-(
& Associates, Inc
Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Spaces 12 & 13
BALANCE POINT TEMPERATORES AND DEGREE DAYS
Daytime Nighttime
-------------------------------BPTl -55.97 (Winter) -BPTl = 67.88
BPT2 = 64.13 (Summer) BPT2 = 76.07
BPT3 = 71.45 (Economizer) BPT3 • 77.09
HOD • 71 (Heating) HDD • 3225
CDD = 361 (Cooling) CDD = 0
BUILDING HEAT TRANSFER (Btu/hr-F) ••=•=======•===================== Building Envelope Heat Transfer Rate: Winter • summer -overall Heat Transfer Factor ("K"): Winter -summer =
ANNUAL LOADS (MBtus)
(~ g~ Heating ----======•==•====== -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ••=•======•=======•=========•=•============•= Source Heating
source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
-= --
8.5
35.4
44.5 -----88.5 X 1.027
-
• -----
= --=
220.7
223.0
374.3
364.5
2.0
3.3
· 0. 8
3.3
4.1
4.3
1.6
O.l
90.9
46.9
16.8
1.4
,·····========•====•======•=••============•••=•=••===•=•=======•=============
\.>/ TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft
==•=••==••====••=====••••==•======••=•••===•===•====•=====•================
SCM INPUT DATA SUMMARY (part 1 of 2) SCM-1 page 40 of 74
---------------------------------------------------------------------------Project: Building iS
. ~esigner: Banzuelo/Rierson/Duff & Associates, Inc
~ocation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
(
"-\~:.~-
Documentation: PROCALC Date
---------------------------------------------------------------------------
~
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total conditioned Floor
R-VALUES (including inside film resistance)
Wall
Window
Roof
Door
Floor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated Water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Fan Power
Air circulation Rate
Spaces 14 & 15
424.0 sqft
198.0 sqft
318.0 sqft
80.0 sqft o.o sqft
318.0 sqft
318.0 sqft
10.19
0.88
20.51
2.22
0.00
Carrier 52BA3093
16
Beat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
* Note: 8 Spaces are served by this HVAC System. Please refer to
the attached HVAC Zone Heating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
.Heat capacity of Exterior Wall
: :"-.. • > Li~hting Power
'-.. >~ Climate Zone
1.54
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 41 of 74
---------------------------------------------------------------------------Project: Building iS
.-~ .. esigner: Banzuelo/Rierson/Duff & Associates, Inc
:r'llcation: Carlsbad Date: 12/30/1987
Documentation: PROCAtC
Enforcement Agency
Building Permit No
Checked By
Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
o.oo
0.70
9.0 ft
Glass Framing Shading Device overall
SC SHADING COEFFICIENTS
southwest
OVERHANGS & SIDEFINS
Southwest
(/•~:=~~-:~~=~~~~
\\:..:;} Daylighting Strategies
• \~ .. -.
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 22.0
Overhang
Height .Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 42 of 74
---------------------------------------------------------------------------Project: Building iS
.. ~esigner: Banzuelo/Rierson/Duff & Associates, Inc
{(~cation: Carlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
... <.:;j, ,
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Peri9d:
Spaces 14 & 15
Office
Day 54.60 \
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 \
Night 14.40 \
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Beater
Number of Non-Operational Hours per Week: Da.y ~ Number of Holidays per Year:
Thermostat Set Point Temperatures:
I
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Beat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.Occupant Density:
\ ... ;
Night
Beating Season
Cooling Season
Winter
Winter Setback
Summer
summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 43 of 74· ---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(.ocation: G:arlsbad Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By ...
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name: Spaces 14 &'15
BALANCE POINT TEMPERATURES AND DEGREE DAYS ========================================== Daytime Nighttime
-------------------------------BPTl • 55.67 (Winter) BPTl
BPT2 = 63.82 (Summer) BPT2
BPT3 • 71.26 (Economizer) BPT3
HDD • 62 (Heating) BOD
CDD • 377 (Cooling) CDD
BUILDING HEAT TRANSFER (Btu/hr-F) •====••========================== Building Envelope Heat Transfer Rate: Winter
summer
Overall Heat Transfer Factor ("K"): Winter
~ Heating
Cooling
summer
ANNUAL LOADS (MBtus)
= 67.85 = 76.04 = 77.07
• 3216 = 0
• ---
--
ANNUAL SITE ENERGY REQUIREMENTS (MBtus)
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft) ----==========•==================••========== Source Beating
Source Cooling
Source Fan
Total Space Conditioning Energy
Source Lighting
source Receptacle
source Hot Water
----
8.4
33.3
44.5 -----86.3 X 1.027
-----•
-= --
256.5
259.4
432.2
421.2
2.2
3.9
0.9
3.5
4.7 s.o
1.8
0.1
88.6
46.9
16.8
1.4
·······================•=••===•=••=======········=·····======•==•=====•=====
\~:_:""· TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 153. 7 KBtu/sqft
==•••===••=================•===••=========•============•============•====••
SCM INPUT DATA SUMMARY (part l of 2)
Project: Building i5
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(,:.cation: Carlsbad Date: 12/30/1987
SCM-1 page 44 of 74
Enforcement Agency
Building Permit No
Checked By ·, , ~
Documentation: PROCALC Date --------~------------------------------------------------------------------
Space Name:
AREAS
Exterior Wall
southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
Wall
Window
Roof
Door
(!'loor
HVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated cooling Efficiency
Rated·water Heating Efficiency
Economizer
Cooling Equipment Power Rating
Pan Power
Air Circulation Rate
Spaces 16 & 17
388.0 sqft
162.0 sqft
278.0 sqft
80.0 sqft o.o sqft
278.0 sqft
278.0 sqft
10.19
0.88
20.43
2.22 o.oo
Carrier 52BA3093
16
Heat Pump
BP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
16960 watts
2295 watts
4480 CFM
•·Note: 8 Spaces are served by this HVAC system. Please refer to
the attached HVAC Zone Beating & Cooling Load summary for
more details on the zoning arrangement.
GENERAL
Aaeat capacity of Exterior Wall
, -~Lighting Power \_--:-Climate Zone
1.56
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 45 of 74
---------------------------------------------------------------------------Project: Building 15 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.cation: Carlsbad · Date: 12/30/1987 Checked By
'\ ... ~.:·.·:) 1
Documentation: PROCALC Date
---------------------------------------------------------------------------
OTHER PHYSICAL PARAMETERS ------------------~------Wall Absorptivity
Roof Absorptivity
Ceiling Height
o.oo
0.70
9.0 ft
Glass Framing Shading Device Overall
SC SHADING COEFFICIENTS
Southwest
OVERHANGS & SIDEFINS
Southwest
SC Factor Winter Summer
0.46 0.880
Window
Height Width
9.0 18.0
overhang
Height Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 page 46 of 74
---------------------------------------------------------------------------Project: Building 15
1
--~signer: Banzuelo/Rierson/Duff & Associates, Inc
:~cation: Carlsbad Date: 12/30/1987
Documentation: PROCALC
Enforcement Agency
Building Permit No
Chec~ed By
Date ---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Spaces 16 & 17
Office
Day 54.60 %
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 %
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day
Lighting Night
Receptacle
Fans
Water Heater
Number of Non-Operational Hours per Week: cl Number of Holidays per Year:
Day
Night
Thermostat Set Point Temperatures:
PHYSICAL· PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
/;,.Occupant Density:
' ( . < \.~'.>··'
Heating season
Cooling Season
Winter
Winter Setback
summer
Summer Setup
2915 hours
359 hours
3274 hours
4518 hours
1770 hours
32 hours
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0. 0284 cfm/sq·ft
0.0862 Btu/hr-sqft-F
0.50 watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 47 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
,,..;.cation: Carlsbad Date: 12/30/1987 Checked By
·-:._~.,:/.
Documentation: PROCALC Date
!" ---------------------------------------------------------------------------
Space Name: Spaces 16 & 17
BALANCE POINT TEMPERATURES AND DEGREE DAYS •============================.================= Daytime Nighttime -.------------------------------BPTl == 55.97 (Winter) BPTl = BPT2 = 64.13 (Summer) BPT2 ==
BPT3 = 71.45 (Economizer) BPT3 = HDD = 71 (Heating) HDD =
CDD = 361 (Cooling) CDD =
BUILDING HEAT TRANSFER (Btu/hr-F) ---==========•=================== Building Envelope Heat Transfer Rate: Winter
summer
overall Heat Transfer Factor ("K"): Winter
c8 Heating
Cooling
Site Heating
Site cooling
Site Fan
Site Lighting
Site Receptacle
Site Hot Water
summer
ANNUAL LOADS (MBtus) ----=-=====•========
ANNUAL SITE ENERGY REQUIREMENTS (Matus) •==•=======•=••========••=============•
67.88
76.07
77.09
3225
0
--= -
• -
= ---• •
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
Source Cooling
Source Fan
Total Space Conditioning Energy
source Lighting
source Receptacle
Source Hot Water
-• •
•
8.5
35.4
44.5 -----88.5 X 1.027 -• • -
220.7
223.0
374.3
364.5
2.0
3.3
0.8
3.3
4.l
4.3
l.6
0.1
90.9
46.9
16.8
1.4
i' 'i···=============================•==================•==•=======••••=========
: '·,,:./' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 155. 9 KBtu/sqft
••===•=••=======================================••=========================
. SCM INPUT DATA SUMMARY ( part 1 of 2) SCM-1 page 48 of 74
---------------------------------------------------------------------------Project: Building 15
Designer: Banzuelo/Rierson/Duff & Associates, Inc
1:.cation: Carlsbad · Date: 12/30/1987
Enforcement Agency
Building Permit No
Checked By
:;,\·:..., ·,-
Documentation: PROCALC Date ---------------------------------------------------------------------------
Space Name:
AREAS
Exterior wall
Southwest Glazing
Roof
Door
Raised Floor
Slab
Total Conditioned Floor
R-VALOES (including inside film resistance)
-------------------------------------------Wall
Window
Roof
Door
... Floor
(~
BVAC SYSTEM
HVAC Equipment Name (CF-4)
Number of systems
Heating Equipment Type
Cooling Equipment Type
Water Heating Equipment Type
Rated Heating Efficiency
Rated Cooling Efficiency
Rated Water Heating Effic"iency
Economizer
cooling Equipment Power Rating
Fan Power
Air Circulation Rate
GENERAL
,<. ~-.,-""' ·-.... __ /
Beat Capacity of Exterior Wall
Lighting Power
Climate Zone
Space 18
365.0 sqft
99.0 sqft
159.0 sqft
40.0 sqft o.o sqft
159.0 sqft
159.0 sqft
10.25
0.88
20.51
2.22 o.oo
Carrier 52BA3093
l
Heat Pump
HP w/Economizer
Electric Resistance
2.700
8.500
0.990
No
1060 watts
143 watts
280 CFM
7.53
1.400 watts/sqft
7
SCM INPUT DATA SUMMARY (part 2 of 2) SCM-1 page 49 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
!.cation:_ Carlsbad Date: 12/30/1987 Checked By ··~ .... -:' /.
Documentation: PROCALC Date -------------------------~-------------~-----------------------------------
OTHER PHYSICAL PARAMETERS
-------------------------Wall Absorptivity
Roof Absorptivity
Ceiling Height
0.29
0.70
9.0 ft
Glass Framing Shading Device overall
SC SHADING COEFFICIENTS
Southwest
OVERHANGS & SIDEFINS
southwest
f.' "• a ' .. , .~--.. '-, ... ,•
SC Factor Winter summer
0.46 0.880
Window
Height Width
9.0 11.0
Overhang
Height Depth
0.40
Side-Fin
Distance Depth
No Daylighting Controls
SCM FIXED INPUT DATA SUMMARY SCM-2 . page 50 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
: (.cation: Carlsbad Date: 12/30/1987 Checked By
-., ,..,.,.~
Documentation: PROCALC Date
---------------------------------------------------------------------------
Space Name:
Occupancy Type:
SCHEDULING
Occupancy Level for Operational Period:
Space 18
Office
Day 54.60 % -
Night 3.80 %
Lights/Receptacle Level for Operational Period: Day 70.30 I
Night 14.40 %
Equivalent Operational Hours per Year: Lighting Day 2915 hours
Lighting Night 359 hours
Receptacle 3274 hours
Fans 4518 hours
Water Heater 1770 hours
Number of Non-Operational Hours per Week: Day 32 hours
cl Number of Holidays per Year:
Thermostat Set Point Temperatures:
PHYSICAL PARAMETERS
Infiltration Rate:
Slab Floor Heat Loss Rate (U-Value):
INTERNAL LOADS & ENERGY
-----------------------
Receptacle Peak Load:
Water Heating Energy:
Occupant Sensible Load:
Occupant Latent Load:
.Occupant Density:
: ( ·.·.
\ ...... '~·-<,.,.,./
Heating
Cooling
Winter
Winter
Summer
summer
.Night
season
Season
Setback
Setup
46 hours
5 days
3 days
70 F
40 F
78 F
85 F
0.0284 cfm/sqft
0.0862 Btu/hr-sqft-F
a.so watts/sqft
64 Btu/hr-person
230 Btu/hr-person
190 Btu/hr-person
250 sqft/person
SCM ANALYSIS PERFORMANCE RESULTS SCM-3 page 51 of 74
---------------------------------------------------------------------------Project: Building #5
Designer: Banzuelo/Rierson/Duff & Associates, Inc
(i.cation: Carlsbad Date: 12/30/1987
\ . t
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date -------------------------------~-------------------------------------------
Space Name: Space 18
BALANCE POINT TEMPERATURES AND DEGREE DAYS ==========================================
Daytime Nighttime
------------------------------BPTl = 55.91 (Winter) BPTl = 67.94
BPT2 = 64.18 (Summer) BPT2 -76.13
BPT3 = 70.90 (Economizer) BPT3 = 77.04
HDD = 69 (Heating) BOD -3245
COD = 381 (Cooling) COD -0
BUILDING BEAT TRANSFER (Btu/hr-F) ------------=-=================== Building Envelope Beat Transfer Rate: Winter -summer -overall Heat Transfer Factor ("K"): Winter -Summer -
ANNUAL LOADS (MBtus)
(i~ ,\!Jaeating ------============== -Cooling
ANNUAL SITE ENERGY REQUIREMENTS (MBtus) ------------------------=-============= Site Heating
Site Cooling
Site Fan
Site Lighting
Site Receptacle
Site Bot Water
ANNUAL SOURCE ENERGY USE ESTIMATE (KBtu/sqft)
Source Heating
Source Cooling
source Fan
Total Space Conditioning Energy
Source Lighting
Source Receptacle
Source Hot Water
-• -
=
9.0
49.8
41.7 -----100.5 X 1.027
-
------
----
142.7
144.2
230.6
225.l
1.2
1.9
0.5
2.6
2.2
2.5
0.9
0.1
103.2
46.9
16.8
1.4
''!····-===•==•===================•=========•=•=••========•=============-=====-
'\ •' TOTAL ANNUAL SOURCE ENERGY USE ESTIMATE 168. 3 KBtu/sqft
=•=•===•==•===•===•==-================-=-========•==•======•=-========-====•==••
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 52 of 74
---------------------------------------------------------------------------Project: Building #5
Designer:-Banzuelo/Rierson/Duff & Associates, Inc
,...r.cation: Carlsbad Date: 12/30/1987
·. \·~-, .. ~)
Enforcement Agency
Building Permit No
Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
~onstruction Components
Th R-Value
Fr (in) Summer Winter
---------------------------------------------------------------------------1. Hardwood, Maple
2. Inside Air Film
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.750 1.54
0.68
1.54
0.68
·~--------------------------------------------------------------------------
{. >-J \.·:~ Total 2. 22 2. 22
Framing Percentage: 0.0 I
Framing Material: NONE
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
0-Value
2.22
0.4505
2.22
0.4505 Sketch of Construction Assembly ======
•
orptivity: . r ghness: Clear Pine : .,>-,.;<ct igh t :
·seat Capacity:
0.70
6.1 lb/sqft
2.39
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 53 of 74
-------------------------------------------------~-------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
·, '-.; .. .)
~. ~~·. -...-~;
Documentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: R-19 B/U with Gyp. Clg.
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction components
Th' R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Roofing, Built-op
2. Plywood
3. Air $pace
4. Insulation, Mineral Wool, R-19
5. Gypsum or Plaster Board
6. Inside Air Film ,.
8.
9.
10.
11 •
0.375
0.500
6.000
* 6.000
0.625
0.33 0.33
0.63 0.63
1.00 0.80
19.00 19.00
0.56 0.56
0.92 · 0.61
. (,----------------------------------------------:::::--------::~::----::~::-
Framing Percentage:
Framing Material:
1 2 3 4 5
10.0 I
Softwood, Douglas Fir-Larch
Calculation for Framing Adjustment
summer U-Value
0.0446 X 0.90 + 0.1066 X 0.10 = 0.0508
Winter o-value
0.0456 X 0.90 + 0.1128 X 0.10 = 0.0523
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
u-value
19.69
0.0508
19.11
0.0523
Sketch of construction Assembly •==•== ====•=
•
sorptivity:
. 1. . ughness: Stucco, Wood
i. ·., :,1eight:
'--·aeat Capacity:
0.70
Shingles
8.2 lb/sqft
2.58
i
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 54 of 74
---------------------------------------------------------------------------Project: Building ts Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(i.cation: Carlsbad . Date: 12/30/1987 Checked By
', \/ . ; .~J
Documentation: PROCALC Date ---------------------------------------------------------------------------
Assembly Name: R-19 B/O with T-Bar
Assembly Type: Roof
Assembly Tilt: O deg (Horizontal Roof)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------1. Roofing, Built-op
2. Plywood
3. Air ~pace
4. Insulation, Mineral Wool, R-19
5. Acoustical Tile, Mineral Fiberboard
6. Inside Air Film
7. a.
9.
10.
11 •
0.375
0.500
24.000
* 6.000
0.750
0.33 0.33
0.63 0.63
1.00 a.so
19.00 19.00
2.03 2.03
0.92 0.61
• -------------------------------------------------------------------------
(~;;;:;l Total 23. 90 23. 39
Framing Percentage: 10.0 I
Framing Material: Softwood, Douglas Fir-Larch
-------------------------------Calculation for Framing Adjustment
Summer o-value
1 2 3 4 5 0.0418 X 0.90 + 0.0923 X 0.10 = 0.0469
Winter O-Value
0.0428 X 0.90 + 0.0968 X 0.10 • 0.0482
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
o-value
21.33
0.0469
20.76
0.0482 Sketch of construction Assembly ----=----=-=
•
sorptivity:
. , ':1ghness: concrete, \ . .__, __ ,ught:
··-·aeat capacity:
Asph.
0.70
Shingles
6.9 lb/sgft
2.15
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 55 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff ~ Associates, Inc Building Permit No
(.Cation: Carlsbad Date: 12/30/1987 Checked By
.._~~., .:)/
~bocumentation: PROCALC Date
------------------------------------------------------------------~--------
Assembly Name: Sunglass Blue Plate
Assembly Type: Glazing
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) Summer Winter
------------~------------------------------------------------------------~-1. CEC Single Glazing
2. Inside Air Film
3.
4. s.
6.
7.
8.
9.
10.
11.
0.250 0.20
0.68
0.20
0.68
(!---------------------------------------------:::::---------:~::-----:~::-
Framing Percentage: o.o I
Framing Material: NONE
1
-------------------------------Sketch of Construction Assembly
~ading Coefficient: 0.46
~~sible Transmittance: 0.30
\:~::.,/·.:
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
O-Value
0.88
1.1364 ------
0.88
1.1364
CONSTRUCTION ASSEMBL.~ COMiJL.IANC.E: fURM CJ:'-J page :> 1:> o.t , "*
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
I
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(~·cation: Carlsbad Date: 12/30/1987 Checked By
~~~-~ .
'"·'oocumentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 5/8 Gyp/R-11/Gyp WF
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) Summer Winter ---------------------------------------------------------------------------l. Gypsum or Plaster Board
2. -Insulation, R-11, 2x4 Wood Framing 16"
3. Gyps~m or Plaster Board
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11.
0.625
3.500
0.625
0.56
8.38
0.56
0.68
0.56
8.38
0.56
0.68
,...---------------------------------------------------------------------------
( r:. '·¼9 Total 10 .19 10 .19
Framing Percentage: o.o' Framing Material: Softwood, Douglas Fir-Larch
l"t-4::-i+--1
P-<•-++---2
~-1'+--3
Sketch of Construction Assembly
~sorptivity: · 0.00
Calculation for Framing Adjustment
Summer U-Value
0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982
Winter U-Value
0.0982 X 1.00 + 0.0982 X 0.00 • 0.0982
OVERALL VALUES ADJUSTED FOR FRAMING
R-Value
U-Value
10.19
0.0982 ------
10.19
0.0982
=•••==
r-~ghness: Smooth Plaster, Metal
~ _eight: 5.4 lb/sqft
·-geat Capacity: 1.38
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF-3 page 57 of 74
---------------------------------------------------------------------------Project: Building #5 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
(.cation: Carlsbad Date: 12/30/1987 Checked By
~~Bocumentation: PROCALC Date
---------------------------------------------------------------------------
Assembly Name: 6.5" Conc/R-11/Gyp.Brd.
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Th R-Value
Fr (in) summer Winter
---------------------------------------------------------------------------l. Concrete, 140 lb,
2. Insulation, R-11,
3. Gypsum or Plaster
4. Inside Air Film
5.
6.
7.
8.
9.
10.
11.
Oven Dried
2x4 wood Framing 16"
Board
6.500
3.500
0.625
0.71
8.38
0.56
0.68
0.71
8.38
0.56
0.68
-----------------------------------------------------.---------------------
(f:.:) Total 10. 34 10. 34
Framing Percentage: 0.0 I
Framing Material: NONE
. . • . • 1 .,
2 . . . ~. 3 . .
• . .,
• ::. .
• OVERALL VALUES ADJUSTED FOR FRAMING
• .
'
Sketch of construction Assembly
•
sorptivity:
, ughness: concrete, ; ' .. ,". ~ight. '· \._-.-,;-. '··"·aeat Capacity:
0.70
Asph. Shingles
78.6 lb/sqft
17.39
R-Value
O-Value
10.34
0.0967 ------
10.34
0.0967 ====--
HVAC POWER INDICES SUMMARY FORM (part l of 2) CF-4 page 58 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff.& Associates, Inc Building Permit No
:'°,'..cation: Carlsbad Date: 12/30/1987 Checked By
Documentation: PROCALC Date ---------------------------------------------------------------------------
FAN ENERGY
HVAC System -----------------------Carrier 52BA3093 (Fanl)
carrier 52BA3093 (Fanl)
carrier 52BA3093 (Fanl)
FAN WATTAGE INDEX
No. Motor Drive
Sys BHP Eff. Eff. ----------l X 0.10 I [0.52 X 1.00]
16 X 0.10 / [0.52 X 1.00]
l X 0.10 I [0.52 X 1.00]
Conv
Fact
X 746 X
X 746 X
X 746 X
No.
Fans
l -
l -
l -
Fan
watts
143
2295
143
Total 2582
2582 watts/ 2682 sqft • 0.963 watts/sqft
HVAC ~OWER I~DICES SUMMAR~ FORM (part 2 ot 2) CF-4 page~~ ot: ''* ---------------------------------------------------------------------------Project: Building iS .Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:·:·cation: Carlsbad Date: 12/30/1987 Checked ·By
......
'·oocumentation: PROCALC Date ---------------------------------------------------------------------------
HEATING EQOIPMENT
System No. Design Equip Conv. source
Description Type Sys Output Eft Factor (Btu/hr)
--------------------------------------------------------Carrier 52BA3093 Heat Pump 1 X 8000 I 2.70 X 3.000 = 8889
carrier 52BA3093 Heat Pump 16 X 8000 I 2.70 X 3.000 = 142222
carrier 52BA3093 · Heat Pump 1 X 8000 I 2.70 X 3.000 = 8889
--------Total 160000
HEATING POWER INDEX 160000 Btu/hr I 2682 sqft = 59.66 Btu/hr-sqft
COOLING EQOIPMENT
system No. Design Equip Conv. Source
Description Type Sys Output Eff Factor (Btu/hr) --------------------------------------------------------carrier 52BA3093 HP w/Econ 1 X 9000 I a.so X 10.239 • 10841
carrier 52BA3093 HP w/Econ 16 X 9000 I a.so X 10.239 = 173461
Carrier 52BA3093 HP w/Econ 1 X 9000 I 8.50 X 10.239 = 10841 --------fl Total 195143
\ 'c.. j
'\-, ... ~~ 195143 Btu/hr/ COOLING POWER INDEX 2682 sqft = 72.76 Btu/hr-sqft
... \ ·,__ /
HVAC SYSTEM SUMMARY SHEET ws-4 page 60 of 74
---------------------------------------------------------------------------Project: Building ts
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
~•cation: Carlsbad Date: 12/30/1987 Checked By
'-.. ,_:::,:
Documentation: PROCALC Date ---------------------------------------------------~-----------------------
HVAC Equipment Name:
HEATING
System Type:
output Capacity:
Rated Efficiency:
supply Air Temperature:
COOLING
System Type:
Total output Capacity:
Sensible output Capacity:
Latent Output Capacity:
R~ted Efficiency:
Input Power Rating:
Coil Bypass Factor:
Economizer: A:~ply Air Temperature:
Supply Air CFM:
Fan Type:
Fan Multiplier:
Brake Horsepower:
Motor Efficiency:
Drive Efficiency:
DUCTS
Supply Duct Heat Gain:
Return Duct Heat Gain:
Supply Duct Air Leakage:
Return Duct Air Leakage:
carrier 52BA3093
·ap
Heat Pump
8000 Btu/hr
2.700
105.0 F
w/Economizer
9000 Btu/hr
9000 Btu/hr
0 Btu/hr
8.500
1060 watts
0.100
Yes ss.o F
280 cfm
Blow-Through
l
0.10
52.0 I
100.0 I
2.0 I
2.0 I
4.0 I
4.0 I
LIGHTING SUMMARY AND WORKSHEET CF-5 page 61 of 74
---------------------------------------------------------------------------Project: Building tS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
f.cation: Carlsbad Date: 12/30/1987 Checked By
'(.S~; 7 Documentation: PROCALC Date ---------------------------------------------------------------------------
INSTALLED LIGHTING POWER BY SPACE
Total
Floor Vert Horiz Floor Lighting Installed
Space Name Area Mult Mult Area (watts/sqft) wattage -----------------------------------------------------------Space l 139 X l X l -139 X l.400 -195
Spaces 2 & 3 318 X 1 X 1 -318 X l.400 -445
Spaces 4 &: 5 278 X l X 1 -278 X 1.400 -389
Spaces 6 &: 7 318 X 1 X 1 -318 X 1.400 -445
Spaces 8 & 9 278 X l X l -278 X 1.400 = 389 spaces 10 & 11 318 X l X l -318 X 1.400 -445
Spaces 12 & 13 278. X 1 X l -278 X 1.400 -389
Spaces 14 & 15 318 X 1 X l -318 X 1.400 -445
Spaces 16 & 17 278 X l X l -278 X 1.400 -389 Space 18 159 X l X l -159 X 1.400 -223 --------------TOTALS 2682 3755
-ILDING LIGHTING WATTAGE 3755 watts I 2682 sqft = 1.400 watts/sqft
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 62 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
/.cation: Carlsbad Date: 12/30/1987 Checked By
'·J' -)
""oocumentation: PROCALC Date
----------------------------------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC Zone Name:
BVAC System Name:
System Multiplier:
Heating Schedule:
cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 1
PEAK
(Jan 6am)
HEATING
4658
TOTAL SPACE LOAD 4658
3 cfm) 98 (
93
186
0
EFFECTIVE SPACE LOAD 5035
Ventilation· (
Return Duct Conduction
Return Duct Leakage
Return Fan Beat Gain
25 cfm) 881 (
101
201
-490
TOTAL SYSTEM LOAD 5728
SYSTEM PERFORMANCE 6558
AT DESIGN CONDITIONS
Space 1
Carrier 52BA3093
l
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 4pm) 4339 354 --------------4339 354
3 cfm) 12 -3
87
174 14
0 --------------4611 366
25 cfm) 110 -27
92
184 15
490 --------------5488 353
0.5 tons o.o tons
9009 388 a.a tons o.o tons
---------------------
SPACE HEATING & COOLING LOAD SUMMARY· page 63 of 74
-~-------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
Date: 12/30/1987 Checked By
Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor conduction
•
Slab Conduction
(. Interior Conduction
..... , Infiltration ·-Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1065
2469
536
219
0
0
369
0
0
4658 Btu/hr
space 1
COOLING
SENSIBLE LATENT --------------Aug 4pm
78 F DB SO I RH
82 F DB 66 F WB
Btu/hr Btu/hr ------------
34
172
104
115
0
0
0
0
2644
440
474 0
354 354 -----------4339 Btu/hr 354
0.4 tons o.o
Heating:
Cooling:
4658 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
4339 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
121 cfm
171 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARi. page 04 01: , -.
---------------------------------------------------------------------------Project: Building 15
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
(.cation: Carlsbad
~:i .. :· ,_;/ Documentation: PROCALC
Date: 12/30/1987 Checked By
Date ---------------------------------------------------------------------------
BVAC ZONE DESCRIPTION
BVAC Zone Name:
BVAC System Name:
system Multiplier:
Beating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Spaces 2 & 3
Spaces 4 & 5
Spaces 6 & 7
Spaces 8 & 9
Spaces 10 & 11
aces 12 & 13
1 aces 14 & 15
\ aces 16 & 17
PEAK
(Jan
(Jan
(Jan
(Jan
(Jan
(Jan
(Jan
(Jan
6am)
6am)
6am)
6am)
6am)
6am)
6am)
6am)
TOTAL SPACE LOAD
Bypass Ventilation Air (
supply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
48 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 429 cfm)
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
,.-,. \ ·'-:_. _.'
\, ___ :-·-·
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
9759
8383
9759
8383
9759
8383
9759
8383
72571
1678
1451
2903
0
78603
15105
1572
3144
-7834
90590
104926
(
(
Spaces 2 -17
carrier 52BA3093
16
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 ' COOLING
PEAK SENSIBLE LATENT --------------(Aug 3pm) 10497 811
(Aug 3pm) 8837 709
(Aug 3pm) 10497 811
(Aug 3pm) 8837 709
(Aug 3pm) 10497 811
(Aug 3pm) 8837 709
(Aug 3pm) 10497 811
(Aug 3pm) 8837 709 --------------77337 6079
48 cfm) 247 27
1547
3093 243
0 --------------82224 6349
429 cfm) 2219 240
1644
3289 254
7834 --------------97210 6843
8.1 tons 0.6 tons
144202 5913
12.0 tons 0.5 tons
SPACE HEATING & COOLING LOAD SUMMARY page 65 of 74
---------------------------------------------------------------------------Project: Building 15 Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
1·-cation: Carlsbad Date: 12/30/1987 Checked_ By
. \;_ ;_: !
"··oocumentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak-Hour:
Indoor conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
'
Slab Conduction r Interior Conduction
\ '""' Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1310
6034
1071
499
0
0
845
0
0
9759 Btu/hr
Spaces 2 & 3
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------103
457
332
309
0
0
0
0
6406
993
1085 0
811 811 -----------10497 Btu/hr 811
0.9 tons 0.1
Beating:
Cooling:
9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F·Supply)] =
:. \ -. ___ .-.
•• 4
Btu/hr
tons
253 cfm
415 cfm
page ob 01: , ,.
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
1
.cation: Carlsbad Date: 12/30/1987 Checked By
\ .·., .. ' -, -~·: "·"oocumentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
--------------------Peak Hour:
Indoor conditions:
outdoor Conditions:
LOAD COMPONENT
Wall conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
, .• Interior conduction
1-~_,;J Infiltration
""' Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
BE1'TING
Jan 6am
70 F DB
38 F DB
Btu/hr
1199
4937
1071
438
0
0
738
0
0
8383 Btu/hr
spaces 4 & 5
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------94
374
332
269
0
0
0
0
5241
868
949 0
709 709 -----------8837 Btu/hr 709
0.7 tons 0.1
Heating:
Cooling:
8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
218 cfm
349 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 67 of 74
---------------------------------------------------------------------------Project: Building iS Enforcement Agency
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
<.cation: c~rlsbad Date: 12/30/1987 · Checked By
-<.;Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass conduction
Door conduction
Roof Conduction
Skylight Conduction
Floor Conduction
•
Slab Conduction
(L:;·y i~~~~~~!ti~~duction
--.~...:".,N''" · Solar Gain
Lighting
Equipment
_occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1310
6034
1071
499
0
0
845
0
0
9759 Btu/hr
Spaces 6 & 7
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------103
457
332
309
0
0
0
0
6406
993
1085 0
811 811 -----------10497 Btu/hr 811
0.9 tons 0.1
Heating:
Cooling:
9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)}•
• {., ·, ... -. _/ -... __ · ..... -
Btu/hr
tons
253 cfm
415 cfm
SPACE HEATING & COOLING LOAD SUMMARY -page 68 of 7 4
---------------------------------------------------------------------------Project: Building iS Enforcement Agency.
Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
:j.cation: Carlsbad Date: 12/30/1987 Checked By
~~\..;,,.,.:.>-}
Documentation: PROCALC Date -------------------~-------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
. DESIGN CONDITIONS
Peak Bour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
, Interior Conduction
\ "· Infiltration
Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1199
4937
1071
438
0
0
738
0
0
8383 Btu/hr
Spaces 8 & 9
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------94
374 ·
332
269
0
0
0
0
5241
868
949 0
709 709 -----------8837 Btu/hr 709 Btu/hr
0.7 tons O.l tons
Beating:
Cooling:
8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] • 218 cfm
8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply))• 349 cfm
I
I
page o~ ot /4
---------------------------------------------------------------------------Project: Building #5
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
,·.cation: Carlsbad . Date: 12/30/1987 Checked By
. '' . ',,
·oocumentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab conduction
.-·Ainterior Conduction
~~Infiltration · ·· · Solar Gain
.Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1310
6034
1071
499
0
0
845
0
0
9759 Btu/hr
Spaces 10 & 11
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------103
457
332
309
0
0
0
0
6406
993
1085 0
811 811 -----------10497 Btu/hr 811
0.9 tons 0.1
Heating:
Cooling:
9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
••• ~ ! . -f '~ '•, .. ?: .. ,·
Btu/hr
tons
253 cfm
415 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 70 of 74
---------------------------------------------------------------------------Project: Building i5 Enforcement Agency
. Designer: Banzuelo/Rierson/Duff & Associates, Inc Building Permit No
.,.cation:-Carlsbad Date: 12/30/1987 Checked By
\'., . .P ·oocumentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Bour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
·Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
{ nterior Conduction
\ .... nfiltration ·· Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1199
4937
1071
438
0
0
738
0
0
8383 Btu/hr
Spaces 12 & 13
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RB
83 F DB 67 F WB
Btu/hr Btu/hr ------------94
374
332
269
0
0
0
0
5241
868
949 0
709 709 -----------8837 Btu/hr 709
0.7 tons 0.1
Beating:
Cooling:
8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F supply)]=
Btu/hr
tons
218 cfm
349 cfm
page I l. o:c , -. ---------------~-----------------------------------------------------------Project: Building i5
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
.-recation: Carlsbad Date: 12/30/1987 Checked By
\'", '.'
"· Documentation: PROCALC Date
---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS ---------------------Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
1A Interior conduction
-~ Infiltration .. Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
---------------------
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1310
6034
1071
499
0
0
845
0
0
9759 Btu/hr
Spaces 14 & 15
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------103
457
332
309
0
0
0
0
6406
993
1085 0
811 811 -----------10497 Btu/hr 811
0.9 tons 0.1
Beating:
Cooling:
9759 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
10497 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]=
Btu/hr
tons
253 cfm
415 cfm
SPACE HEATING & COOLING LOAD SUMMARY page 72 of 74
---------------------------------------------------------------------------Project: Building IS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
,_ ...... cation: Carlsbad
-~;:· ?
.. ·oocumentation: PROCALC
Date: 12/30/1987 Checked By
Date -------------------------------------------------------~-------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
--------------------Peak Hour:
Indoor Conditions:
outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
!Slab conduction
fi(. Interior Conduction
\ Infiltration . ._ Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1199
4937
1071
438
0
0
738
0
0
8383 Btu/hr
Spaces 16 & 17
COOLING
·SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------94
374
332
269
0
0
0
0
5241
868
949 0
709 709 -----------8837 Btu/hr 709
0.7 tons 0.1
Beating:
Cooling:
8383 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] •
8837 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
218 cfm
349 cfm
HVAC ZONE HEATING & COOLING LOAD SUMMARY page 73 of 74
---------------------------------------------------------------------------Project: Building IS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Building Permit No
,..cation: Carlsbad
· . C~.-~\-~·;,.1
Date: 12/30/1987 Checked By
Documentation: PROCALC Date
--------------------------~------------------------------------------------
HVAC ZONE DESCRIPTION
HVAC ZQne Name:
HVAC system Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Sizing Method:
Relative Humidity:
SPACES IN THIS ZONE
Space 18
PEAK
(Jan 6am)
HEATING
5346
TOTAL SPACE LOAD 5346
Bypass Ventilation Air (
pply Duct Conduction
( pply Duct Leakage
\_ :,_,,~pply Fan Heat Gain
3 cfm) 112
107
214
0
EFFECTIVE SPACE LOAD 5778
Ventilation (
Return Duct conduction
Return Duct Leakage
Return Fan Heat Gain
29 cfm) 1007
116
231
-490
TOTAL SYSTEM LOAD 6643
SYSTEM PERFORMANCE 6558
AT DESIGN CONDITIONS
(
(
Space 18
Carrier 52BA3093
l
Loads Office Heating
Loads Office Cooling
Loads Office Fans
COINCIDENT
50 I
COOLING
PEAK SENSIBLE LATENT --------------(Aug 3pm) 5481 405 --------___ ._.__
5481 405
3 cfm) 16 2
110
219 16
0 --------------5827 423
29 cfm) 148 16
117
233 17
490 ---------------6814 456
0.6 tons o.o tons
9013 370 a.a tons o.o tons
pa.ge I"* Ol: 1 '*
---------------------------------------------------------------------------Project: Building iS
Designer: Banzuelo/Rierson/Duff & Associates, Inc
Enforcement Agency
Buil~ing Permit No
' (1.cation: Carlsbad Date: 12/30/1987 Checked By
.~ .. ~~:/ Documentation: PROCALC Date ---------------------------------------------------------------------------
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
outdoor conditions:
LOAD COMPONENT
Wall Conduction
Glass Conduction
Door conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
,,,,Ainterior Conduction
'.._~Infiltration · ··· Solar Gain
Lighting
Equipment
Occupants
SPACE LOADS
SUPPLY AIR QUANTITIES
HEATING
Jan 6am
70 F DB
38 F DB
Btu/hr
1121
3017
536
249
0
0
422
0
0
5346 Btu/hr
Space 18
COOLING
SENSIBLE LATENT --------------Aug 3pm
78 F DB 50 I RH
83 F DB 67 F WB
Btu/hr Btu/hr ------------245
229
206
155
0
0
0
0
3203
496
543 0
405 405 -----------5481 Btu/hr 405
0.5 tons o.o
Heating:
Cooling:
5346 Btu/hr/ [1.10 * (105 F Supply -70 F TStat)] =
5481 Btu/hr/ [1.10 * ( 78 F TStat -55 F Supply)]•
Btu/hr
tons
139 cfm
217 cfm
EATPUMPS
Fourteen Models
Nominal Sizes 1 ½ to 5 Tons
'\~~ AIR OF QUAl.JlY
SELF-CONTAINED
HEAT PUMP
RPNC-SERIES
The Rheem• RPNC-Series Self-Contained Heat Pumps
can provide year-round heating and cooling comfort for .
residential or commercial applications. Factory or field · '
installed auxiliary electric heaters may be provided to ~
meet heat load requirements. The auxiliary electric heater
kits are integral with the air discharge compartment. No
external heaters are required.
The RPNC-Self-Contained Heat Pump System is capable
of delivering a maximum HSPF (Heating Seasonal Perfo_r-
mance Factor) of 7.80 in the heating mode or a maximum
standard SEER (Seasonal Energy Efficiency Ratio) of 9.85
in the cooling mode.
The following additional features, plus its energy-saving
characteristics, make the RPNC-Heat Pump Series self-
contained heat pump an excellent choice for new con-
struction or upgrading your present system.
• Attractive cabinet protects all compo-
nents. Top grille is steel reinforced for
extra strength. Cabinet is electrostatic-
ally painted for all-weather protection.
• Outdoor coil air is discharged upward
away from bushes and shrubs. The dis-
charge pattern of the top grille provides
minimum air restriction, resulting in quiet
fan operation.
• Isolated fan and grille assembly-Motor
is. attached to the underside of the dis-
charge grille.
• All heat pump controls are accessible by
removing control box cover. Removable
top grille provides access to the con-
denser fan motor compressor and con-
denser coil.
• Single speed fan motor is designed for quiet, energy-
saving operation.
• Non-cycling reversing valve and positive defrost.
·~tr~.
··Pat8nlad.
I
. ,' '.
Performance Data
Cooling capacity
.. · Modtl
Ntlmhf
IU'MC-ARI Sid.cl) NIL Sens. Net. Lat. Slngle Pllase ARI Approz. ca,. Cooling Tolal Sound
ITU/Ht ca,. ITU/Ht SEER WIits Rating CfM
01&1 18.200 13.200 5.000 9.10 2210 8.0 650
OZ4J 23.000 17.800 5,200 9.35 2743 8.0 850
030J 30.200 21.600 8.600 9.85 3471 8.0 1000
036J 36.200 26,200 10,000 9.00 4510 8.2 I 1250
ow '2.000 31,000 11,000 9.55 4906 8.0 1500
048J 47.500 35.000 12.500 9.50 5595 8.2 1750
058J 57.500 43.000 14.500 8.60 7355 8.4 2100 I
(DD1$ign Candilions: ARI Rating Tempemures of SO-F.0.8., 67°F.W.8. incloo,; retUm air. 95'F.D.8. outdoor.
CDollnlJ Capacity Model
Namller
RPNc-
Hating capacity (70"F lndaOr Air)
OulSide Air
,1-,:.o.B.143•F.w.B •
DOE HilJb Temperalure
Power
BTU/Ht Input COP
Witts
17.700 1840 I 2.82
22.600 2270 2.92
30.600 I 3020 2.96
36.600 I 36TT I 2.92
44,000 4178 3.10
49.000 4752 3.04
61.000 6051 2.96
Outside Air
U-F.D.B.115•F.W.B.
DOE Low Temperacure
BTU/Ht
9.600
11,600
15,700
19.800
24.000
27.600
35.200
, ,
Power
Input COP
WIiis
1740 1.62
2005 1.76
2500 1.84
2997 1.90
3346 2. 10
3TT4 2.16
4945 2.08
DOE
Region
IV
-HSPF
BTU/
Wlll·Ht
I 6.15
6.40
6.55
6.60
7.65
7.80
7.40
Hlallllg capacity (70"F Indoor Air!
Oullide Air OullldeAlr
47-F.D.8143-F.W.B. 17"f.D.B.11s-F.W.B.
ODE Hlgll Temperature ODE Low Temperalu11
ARI Sld.<J> Ntt.S-. : DreePhase ARI Pawer l'aWlr cap. . Coallng Net. Lat. Total Sound Approx. BTUIHt Input COP ITU/lk Input COP BTUIHc. . ca,. ITUJHt EER Watts llatlq CfM Walls Witts
036C 36.200 26.200 10,000 8.00 4510 8.2 1250 36.600 36T7 2.92 18.800 2997 1.80
0360 36,200 26.200 10,000 8.00 4510 8.2 1250 36.600 36n 2.92 18.800 2997 1.80
042C 42.000 31,000 11,000 8.55 4906 8.0 1500 44.000 4178 3.10 22.400 3346 1.96
0420 42.000 31.000 11,000 8.55 4906 8.0 1500 44,000 4178 3.10 22.400 3346 1.96
048C 47.500 35.000 12.500 8.50. 5595 8.2 1750 ~ 49.000 4752 3.04 25.800 am 2.00.
0480 47.500 35.000 12.500 8.50 5595 8.2 1750 49,000 4752 3.04 25.800 3TT4 2.00· •
058C 57,500 43.000 14,500 7.85 7355 8.4 2100 61.000 6051 2.96 33,000 4945 1.96
0580 57.500 43,000 1'.500 7.85 7355 8.4 2100 61,000 6051 2.96 33.000 4945 1.96
Design Conditions: ARI Rating TemperatUteS of SO"F.0.8., 67°F.W.8. incloo( return air: 95'F.0.8. outaoor.
. .I ,-,-,,
---....
. . Model Identification
Outdoor Remote Heat Pump
I BLANK WHEN AUXIUARY ELECTRIC ,..J..., HEATERS ARE NOT FACTORY INSTAU.EO
R P N C-018 J 005 L AUXILIARY ELECTRIC HEATER RATING" HEATER RATING"
BLANK • NO HEAT
005 • 4.8 1M 015 • 14.4 1M
010 • 9.6 1M 020 • 19.2 1M
-----ELECTRICAL DESIGNATION
C • ~-~ D • 4111V, ,19 J -20BIZ3(N, ,.
. COOLING CAPACITY (NOMINAL)
018 • 18,200 BTIJ/HA
02, • 23,000 BTIJ/HR
030-30.200 BTIJ/HR
036•36,200 BTIJ/HR 042 .,2;000 BTIJ/HR
048 • '7,500 BTIJ/HR
058•57,500 BTU/HR (REPRESENTATIVE)
..._ ______ C•NEW DESIGN SERies
----------sru:.coNTAINED
'----------HEAT PUMP
-----------RHEEM ·FK1Dry inslalled electric lleal8IS avalallll as follows:
RPNC-018J005 RPNC-042J01(11015
RPNC-02'1JOOS/010 RPNC-042C015
RPNC-030J0051010 RPNC-0420015 RPflC-036J010/015 RPNC-048J015/020 RPNC-036C015 RPNC-048C0151020
RPNC-04800151020 RPNC-05BJ0151020
RPNC-058C0151020
RPNC-0580015/020
. Indoor Air Flow Data(!)
Al 208/230 wit units are equipped with two-speed indoor blower motors. AD 460 volt units are
eQUipped will! Single speed motors. Each unit is sllipped factory wired for 1118 proper Sl)8ed. DO NOT CllanQe indoor lllower speed. Table beloW snows proper speed:
Unit CFM
Size Speed Vtils &terul Duct Static lnclles Ka0 (ITU/Hf) a.10 11.21 8.30 G.40 0.50
18000 Low 230 721 693 665 643 607 208 690 659 633 612 577
24000 HiQII 230 964 922 879 830 792 208 914 883 838 800 752
30000 Low 230 1062 1054 1029 994 958 208 1002 991 967 934 901
36000 HilJh 230 1293 1250 1235 1204 1152 208 1207 1180 1155 1128 1080
42000 Hi9h 230 1575 1520 1467 1403 1314 208 1465;.;,. 1426 13n 1303 1233
48000 HilJh 230 1813 1766 1696 1613 1556 208 1680 ...I 1613 1555 1503 1475
56000 HiQII 230 2242 2188 2136 2070 1986 208 2127 2067 2020 1960 1895 36000 HiQII 460 1293 1250 1235 1204 1152 42000 Hi9h 460 1604 1522 1468 1408 1340 48000 Hioll 460 1825 1749 1640 1601 1553 58000 HIQII 460 2262 2206 2130 2060 1990
.
I, Electrical and Physical Data
MODEL NO. RPNC 018J
( •. ' \_:.., ·,'' ~-"'· ..
ELECTRICAL. I
Electncat I 1-60 Cllarat:ensncs 208/230
• ComoressorRLA I 9.2
Camoressor LAA I 50.0
IIICIOOI' Blower Fl.A 2.4
Outdoor Fan FlA 0.9
Conuac10r Fuse Size I 1Fac10ry lnstalle41
PHYSICAL:
·22 Cllaroe Ounces 63
lnGOOf Blower Saeed Low
Maximum Allowal)le 08 Aux. Electric Heat KW
Recommendeo SQ.FT. of
Filter Am (Filter 2.0 nor suoolieol
Filters: Numller 1
and Size 16x20
Net Weight 312 Witllout Heaters
Shiollinn Wainllt 385
,..,,..
BOT10MVl&W
.,.
'\ •. , .Y
024.1 030J 031J 03&C
I .. , I I
1-60! 1-60 I 208/230 208/230 1-60 I 208/230 3-60 I 208/230
12.91 16.6 I 20 2 14 3 I
65.0 81.0 97.6 78.0 I
2.4 3.1 3.6 I 3.6
0.9 0.9 1.3 I 1.3
61 102 98 98 !
Hioll 'low Higll Higll
10 10 15 15
2.7 3.3 4.0 4.0
1 1 1 1
20x20 20x25 25x25 25x25
312 373 373 375
385 450 450 450
0360 042J 042C 0420 048J 048C I 0480 058J osac I 0580
I ' ' I I i ' ' :
3-60 I 1-60 1 3-60 ' 3-60 i 1-60 I 3-60 I 3-60 1-60 ' 3-?II 3-60 :
.160 208/230 ' 208/230 I J60 I 208/230 208/230 460 ' 208/230 ; 208/230 • J60 I
6.7 I 22.0 : 15. I : 7 0 ! 27 5 ; 206 ! 8.3 ' 33.0 ; 21 5 10 2 '
J1.0 I 110.0 I 82.0 ! 41.0 / 118.0 • 92.0 i 46.0 I 180.0 i 1580 82 0 :
I 6 3.6 : 3.6 1.6 34 ! 3.4 I 1 0 ; 7 1 i 7.1 ! 3.2 I
0.7 1.3 1.3 I 0.7 I 2.0 I 2.0 I 1.0 I 2.0 I 2.0 1 IO I
·-·
I I I I i i
98 I 128 128 I 128 I 146 ! 146 146 150 150 ' 150
Hian Hign I Hign ' High Hion I Hign · Hign Hign I H1gn I Hign
15 15 15 15 20 20 20 20 20 I 20
4.0 4.7 4.7 4.7 5.3 5.3 5.3 6.7 6.71 6.i
2 1 1 1
20x2~ I 2 2 2
20xJ ! 2 25x25 25x25 25x25 2Sx25 20x20 20x20 20x25 20x25
373 450 450 450 470 470 470 485 485 I 485
450 500 500 500 520 520 520 535 535 I 535
Unit Dimensions
CoDIIHat CooUHat Coollltat Olmllllionl 011 030 04Z DZ4 03& 048 . OSI
A· 291:y,.· 2913/11" 32'1/,,' · ..
8 491/,," 49'¥1," 551~· :•
C 3711/,," 43%" ss·
D 13111,,· 169/11" 2411/.a .....
E. 1711/21" 20'!,,· 2611/,,"
F 1511111' 1511/11' 11111,,·
G 16" 16" 1a·
H 1411:11" 1&1~· 25¾"
I 1a11:11· zor~· 27¾"
J 1211. 201/," 29¼"
K 101¥11" 11111,.· 141/.
L 17/,,· 111,.· 171,,·
M 3'/,,· JV,,· JV,,·
N 3• 3• 3•
"Vertical measurements are 10 the bottom of the baSe pan.
WARMING: This unit must be mounted level or ½ bubble law at condensate drain connection to
prevent water migration from the condenser section.
-CAUTION: INSTALLATION MUST NOT INTERFE!'IE WITH OPENINGS IN BOTTOM
OFUNIT
LIQUID PRESSURE SERVICE PORT
SUCTION PRESSURE SERVICE PORT
MANUAL RESET HIGH PRESSURE
CONTROL
CONTROL BOX ANO SLOWER
ACCESS PANEL
• POWER WIRE ENTRANCE ¥• 018. 02-11¾." DIA.
. 030. 036-1% • DIA.
OC2. 048. 058-t"fn" DIA.
~~· ~ ___ ,,_~-----------