HomeMy WebLinkAbout2791 LOKER AVE W; ; CB061772; Permit,,. City of Carlsbad
08-24-2006
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No: CB061772
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
Applicant:
2791 LOKER AV WEST CBAD
Tl Sub Type:
2090811500 Lot#:
$17,400.00 Construction Type:
Reference #:
LG PHILIPS: STORAGE RACKS
INDUST
0
NEW
Owner:
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Plan Check#:
ISSUED
06/20/2006
JMA
08/24/2006
08/24/2006
PRO SURPLUS INC.
1350 E. 6TH ST
LBA INDUSTRIAL FUND-HOLDING CO II INC
LAYTON BELLING & ASSOCIATES
92879
951-278-3500
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
STD #2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$161.29
$0.00
$104.84
$0.00
$0.00
$3.65
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
17901 VON KARMAN AVE #950
IRVINE CA 92614
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
HMP Fee
TOTAL PERMIT FEES
Total Fees: $269.78 Total Payments To Date: $269.78 Balance Due:
Inspector: M ~
__ IN STOR/\.C
_ATTACHE.J-
FINAL APPRO AL
Date: /o l>0 0 '=> Clearance:
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
??
$269.78
$0.00
NOTICE: Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
f I xacti of which u have r viousl been iven a NOTICE imi r this or a t hi h th statute of limi ati ns has revio sl otherwis ex ir d.
PERMIT APPLICATION
FqitilM~ic~~~i(~/2006 001 33
PLAN CHECK NO. C50,t 7'1.-:z_
CITY OF CARLSBAD BUILDING DEPARTMENT
1635 Faraday Ave., Carlsbad, CA 92008
EST. VAL. f 7, 'f:0-V
Plan Ck. Deposit _________ _
Validated By .J =="
Date '1{2.0/n..b.
;iillllllm~~-lw!&'l:;;>L ;. ; ' '~: .•... ,£, .. .. .
/ .J..-, q 1 .4,, Ire< Ave. 0-cs t c':~:,:~:qz=<" .AHiA:i%E ,' ,, ,,,,,f.:lidl'./;--·
Address (include Bldg/Suite #I
L. (r PA I I, Pr l c D A ,,_,e,.,:, c ,;.
Business Nlme (at this address)
Legal Description Lot No. Subdivision Name/Number Unit No. Phase No.
Assessor's Parcel # Existing Use Proposed Use
lhJ'f§ 11-, t-/qi.,, o4' ,C/,rr4 h rq c ,f S: '2. I D L/
Total # of units
Description of Work /
#of Stories # of Bedrooms # of Bathrooms
·-tiill li.!Efioil!(ff,.O#e'Bflt~n1Pi>!latlll!:!' ' e_, · .. ,,j)Jz!Ei:'.:' \ill\ill/iw .
,,,, :77, h~ Leen tier-as t/,J I Pto-RtJ ffi A-v-.e P/tt:1ce,,,,,·l/,,s
Name Address City
, ,;ftllii.· r0ter:. u ,,,,,, •• ·~·):~~
CA 7 2-J' :>~ 71 4 2 .. :2...H. J-¥3/
State/Zip Telephone# Fax#
~,~,:~,:1:~,:~:;:~t~~:{y~[J·p.g~nr1t<ifil~i!1ftraet:iit:~!r'fil~~-j~;.·[31!'~ftllfflvn~r1t'
Name k!J Address City State/Zip Telephone#
• Jlji:;: A;l:1111£ · · ' · · <'~1'!1 ,.
Name Address City State/Zip Telephone#
l;Jl;::•1!{/HIFM~i'.Dft'!1:1ta'lell¥NJl'-;;Y~°*;;'* •rnmt~!'' . t:#1 ,.,,.. ·I-~;; . · >'."~ii;;;:.;].~;i~::\ .. ,;: . .:~
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001).
11-o df,t,rp/tA.S /ac. 12s-r:, E. t,nJI-LJl:::r.Mca CA 92,,2 (CJ:s-,,) 2 7 i-:rr6"b
Name I Address City State/Zip Telephone#
State License # 7 S:7 "I li-8 License Class __________ City Business License # 70 A--f' .P L)-(
Designer Name Address City State/Zip Telephone
State License # _________ _
•1-.,;re1u11:mni,,<···· '\' c; .. ··. '.::' .. = .:.·· ." .. ' .. ' .. ·' .. :' .. ·"',·' · ,, .. ·:· ~ ·· . .:pz:::;;,;1llfilf:.'11'"''"'. •.. : , •· ·• ··
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
0 I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
0 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
issued. My worker's compensatio"E1~1f t,!rier and j.olicv, ~b re: .J-, ~ ~ g-3-;;;,.4-7
Insurance Company ,[~o1icy p(o., :2 71 i </I, -Expiration Date 7 / / 4 {. r, (THIS SECTION NEED NOT BE COMPLE ED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS)
0 CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not empfo~'a'?iy person in any manner so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
_ ~ • thousand dollars ($1 ,0001, in addition t e cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
~ SIGNATURE"i;;~~-i'm;~~~~~---ii~iiiiii•iiii•iiiiii•~ii~, DATE ~./ ~ b /l\ C.. ~-'B~lt)1'eil;A;RAJ'iij'f,J;:' ,3,!HIJ9i'fii!{f'l:;t;fMf)il<' ·.. . .. .. ,: ;!!'~"',;~· '''[!::~1:1:lilJ)ti•~!!:
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
0 I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
D I am exempt under Section ______ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 YES ONO
2. I (have / have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
number/ contractors license number):. _____________________________________________ _
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / typa of work): _______________________________________________________ _
PROPERTY OWNER SIGNATURE_______________________ DATE _________ _
-----~·-Pl1M~&m!'lt~d~ITS::O!liY¢iill1! ,A•.:,,,d,M·. ·:::~~"'.:f,i~t=rm.-1,a~if('.l' /1:fl/!S"~i;.,;;;1r:•'i,1Z::if'i%'*1f:?Ztik;,i;0;,;~
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D YES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D YES O NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES O NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
lri~t&---.qlllli~!NBllfflPVL,t,::t'L;;.:
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Citt of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned , y at any time after the work is commen~d_)II' ~fod of 18 da (Section 106.4.4 Uniform Building Code).
~APPLICANT'S SIGNATURE ~~ DATE vfa y~ I.
YELLOW: Applicant PINK: Finance
lns.pection List
Permit#: CB061772 Type: Tl INDUST LG PHILIPS: STORAGE RACKS
Date Inspection Item Inspector Act Comments
-~--,--------
10/27/2006 14 Frame/Steel/Bolting/Weldin RI OR 692-0926
10/27/2006 14 Frame/Steel/Bolting/Weldin MC Fl WEIGHT PLAQUES POSTED FOR
STORAGE RACKS
10/27/2006 19 Final Structural MC Fl
10/26/2006 19 Final Structural RI PLEASE INSPECT AFTER 1 0AM
10/26/2006 19 Final Structural MC co NOTICE ATTACHED
Monday, October 30, 2006 Page 1 of 1
EsGil Corporation
In a?artnersliip witli l}overnment for <Builaing Safety
DATE: 8/ 15/06
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 061772 SET:11
N REVIEWER
D FILE
PROJECT ADDRESS: 2791 Loker Ave. West
PROJECT NAME: Storage Racks for LG Phillips
D
D
D
D
D
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone#:
Fax#:
Mail Telephon Va~n Person
Date contac~ed: ~,,._ . iby: )
REMARKS: City to field verify that the path of travel from the handicapped parking space to
the rack area and bathroom serving the rack area comply with all the current disabled access
requirements. 2. Fire Department approval is required .. --··[} (/k,R_
By: David Yao Enclosures:
Esgil Corporation
0 GA O MB O EJ O PC 8/8 tmsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
EsGil Corporation
In <Partners nip wit{& qoiiernment for <Buitifin9 Safety
DATE: 6/30/06
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 061772
PROJECT ADDRESS: 2791 Loker Ave. West
PROJECT NAME: Storage racks for LG Phillips
SET:I
D APPLICANT
D JURIS.
0 PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
~ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
~ The applicant's copy of the check list has been sent to:
Tony Landeros 431 Purds Ave. Placentia, CA 92870
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
~ Esgil Corporatio·n staff did advise the applicant that the plan check has been completed.
Person contacted: Tony Landeros Telephone#: 714-223-6844
Date contacted: -:,-I 2;, / a lo (by: ~ ,Y) Fax #: 714-223-6846
Mail Telephone,.../ Fax/ In Person
D REMARKS:
By: David Yao Enclosures:
Esgil Corporation
0 GA O MB O EJ O PC 6/22 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
C~ty o( ·carlsbad 061772
6/30/06
GENERAL PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad
PROJECT ADDRESS: 2791 Loker Ave. West
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 6/22
REVIEWED BY: David Yao
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 061772
DATE REVIEW COMPLETED:
6/30/06
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
• Please make all corrections on the originals and submit two new complete sets of prints to:
ESGIL CORPORATION.
• To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
• Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
0 Yes 0 No
C~ty o~ ·carlsbad 061772
6/30/06
• 1. Plans and calculations shall be signed by the California state licensed engineer or
architect where there are structural changes to existing buildings or structural additions.
Please include the California license number, seal, date of license expiration and date
plans are signed. Business and Professions Code. (No calculation was provided)
2. Only the storage racks are included in this plan review
3. Provide a statement on the Title Sheet of the plans that this project shall comply with
Title 24.
4. USC Section 107.2 requires the Building Official to determine the total value of all
construction work proposed under this permit. Please provide a signed copy of the
designer's or contractor's construction cost estimate of all work proposed.
5. Provide a note on the plans indicating if any hazardous materials will be stored and/or
used within the building which exceed the quantities listed in USC Tables 3-D and 3-E.
6. The tenant space and new and/or existing facilities serving the remodeled area must be
accessible to and functional for the physically disabled. Show a path of travel from the
handicapped parking space to the rack area and the bathrooms serving the rack area
comply with all the current disabled requirements. Title 24, Part 2.
7. Obtain Fire Department approval for groups F, Mand S occupancy storage per USC
Sections 306.8, 309.8 and 311.8.
8. Indicate the clearance from the new racks to the existing building walls and building
columns.
9. Provide forklift protection per Section 2222.5. (or Provide calculation to show the rack
comply with the exception.)
Recheck the "pallet" racks as follows:
10. Include the 25% increase in vertical loading for impact per Section 2228.2
11. Recheck all connections on sheet SCE 1 as follows:
a) The rivet bearing capacity is only dtFu = 0.406(0.0747)65 = 2 kips.
b) Provide calculations for all beam to bracket weld capacities per Section 2330
(allowable weld stress is the member thickness times 26 ksi times 1.33, or the
weld stress, whichever is lower).
c) Check the bracket maximum weak axis moment.
12. Check the base plate anchors as follows:
a) Check the transverse seismic for overturning with only the top shelf loaded with
the force acting through the center of gravity of the top load per Section 2228.7.
13. Provide calculations for the column weak axis bending\ plus axial for transverse seismic
loading. The axial load is the maximum compression load at the base from vertical plus
City of' Carlsbad 061 772
6i30/06
seismic overturning. The column moment will probably be maximum for the lateral load
from the base plate to the first diagonal brace (not only to the first horizontal member) .
. · 14. Check the slab stress for the maximum transverse overturning axial load. Show the slab
thickness on the plans per the calculations. Check the maximum slab stress under the
base plate per Section 1915.4.2.
15. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive,
Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform
the plan review for your project. If you have any questions regarding these plan review
items, please contact David Yao at Esgil Corporation. Thank you.
1--~-City of'(;arlsbad 061772
6130/06
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: David Yao
PLAN CHECK NO.: 061772
DATE: 6/30/06
BUILDING ADDRESS: 2791 Loker Ave. West
BUILDING OCCUPANCY: TYPE OF CONSTRUCTION:
BUILDING AREA Valuation Reg. VALUE
PORTION ( Sq. Ft.) Multiplier Mod.
storage racks per city
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
Plan Check F~~ by C>rdina~~~~~~~=:yj
Type of Review: Complete Review D Structural Only
0 Repetitive Fee 3 Repeats
Comments:
D Other
D Hourly .___ ___ ___.I Hour*
Esgil Plan Review Fee
($)
17,400
17,400
$161.29!
$104.84\
$90.321
Sheet 1 of 1
macvalue.doc
PLANNING/ENGINEERING APPROVALS
PERMIT NU111ER ca Ob-· I 7 .-z 2. DATI Ge [ 2..2, { okz
ADDIDS ;;L J q I Lo~ \ .;)gp?f · ·
· WISIDINTIAL
RISIDINTIAL ADDfflON MINOR
I< $10,000.GOJ
.
Pt.A2A CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGli FAIRI
CGMPLUa OFFICI BUILDING
OTHER_..;;:q:P6~----°a--¥=g_;._~ __ e;,t....,_~-------+-----
PLANNER .~ __.-/
DATE t;t.:f¼·
<:;arlsbad Fire Department
Plan Review Requirements Category: TI, INDUST
Date of Report: 06-28-2006
Name:
Address:
Permit #: CB061772
Job Name:
Job Address:
LG PHILIPS: STORAGE RACKS
2791 LOKER AV WEST CBAD
BUILDING DEPT.
COPY
Reviewed by: ----4-~~v-
Htl!!Qfiif ZEIE Ifie it&n you have submitted for review is incomplete. At this time, this office cannot
adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review
carefully all coipments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded",
to this office for review and approval.
storage.
High piled combustible storage is storage of combustible materials of more than 500 square feet
where materials are stored over 12 feet in height from the floor to the top of the storage. For
certain high-hazard commQdities, storage height over 6 feet will require a permit from the fire
department.
,i.Nlllll-'11...-!-i-,~i~cl~e 1 of the California Fire Code requires a permit for the installation of high
piled storage racking. Please contact this office at 760-602-4665 for information on obtaining a
use permit.
Entry: 06/28/2006 By: GR Action: PA Awexed for the purpose of building permit
issuance. No storage shall be permitted until after all inspections and permits have been
issued.
"
S~rura1 ·
\., ts
ngineering
1729 S. Douglass RD, ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
Project: LG PHILLIPS
Project#: f-()6()506-2
Date: / " l; ; t u
Address: 2791 LOKER AVE.
CARLSBAD, CA. 92010
Plan Check #: 61772
Plan Review Responses
9. Please see added calculations page 7.2 where columns have been shown adequate without the use of post
protectors per section 2222.5 of the code.
10. Please see revised calculations page 8 where the 25% impact load has been taken into consideration. Note that per
the code, since there are 2 unit loads per beam level we divide the 25% by 2 and thus get the total of 25% as required.
11. Please see revised calculations page 9 where the connection analysis has been provided as required.
12. Please see revised calculations page 11 where anchors have been checked with both top loaded and fully loaded
conditions as required. /::J 13.Please see revised calculations page 7.3 where column weak axis moment plus bending has been provided as
required. t
14. Please see revised calculations page 13 where the axial plus axial from overturning is considered when considering
the critical stress on the slab. See page 12 for critical base plate analysis.
Please feel free to call with any questions you may have regarding the above matters.
~ Bob Sharifi
tructural
Concepts
Engineering
1729 S. Douglass Rd, Suite B
Anaheim, CA 92806
Tei: 774.456.0056 Fax: 774.456.0066
e-mail: sceng@engineer.com
Prqject Name : LG PHILLIPS
Prqject Number: F-060506-2
Date: 07/10/06
Street: 2791 LOKER AVE.
City/State : CARLSBAD, CA. 92010
Scope of Work: STORAGE RACKS
1 0 2006
Structur:-al
·Canc~pts
:;fii,A Engineering ·~~~ 1729 S. Douglass Rd, Ste B Anaheim, CA 92806 Tel: 714-456.0056 Fax: 714.456.0066
By: 608 Pc-aject: LG PHIL.LIPS Pc-eject #: f-060506-2
TABLE OF CONTENTS
Title Page ...... .. . .. . . .. . . . .. . . ... . . . .. ...... ... . . . . . . . . .... ... ..... .. . .. . ... ... . . .. ........ .. .. . . . ... .. . . . . . .... ... . .. . . 1
Table of Contents..................................................................................................... 2
Design Data and Definition of Components . ... . . .. .. .... ...... .. ... .. .. . .. . . . . . ... . ... . . . . . .. . . ....... 3
Critical Configuration . . ...... .. . ....... .... ..... ....... ...... .. . . . .. ............ .. ........ .. .. . . .. . .. . .. ... . . . . .... 4
Seismic Loads ........ .. . . ..... ... . . .. ..... ... . .. .. . ... ... . .. .... ... ........ .... ........ ....... .. .. .. ... ..... ....... .. .. 5 to 6
Column.................................................................................................................... 7
Beam and Connector . .. . ... .. .. ....... ... . .. . .. ... ....... .. . .. . . . . . .... ......... ... .. .. .. .. .. ... .. ...... .. . . . .. . . . . 8 to 9
Bracing.................................................................................................................... 10
Anchors................................................................................................................... 11
Base Plate ................................................................................................................ 12
Slab on Grade .......................................................................................................... 13
Other Configurations ... .... . .. ............. ....... ..... . .......... ....... ................. .... . . .. .... ..... . . ...... 14
1YPE I sR-LG P1"11LL!PS Page Q_ of I\ G/G/200G
Structural
' c~n~epts
~--4 Engineering ·---J 1729 S. Douglass l<d, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOB Project: L..G PHiLL!PS Projec+ ~: f-060506-2
Design Data
1) Toe analyses conforms to the requirements of the 2001 CBC, utilizing division X of chapter 22 and section 1630.2
2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=SS ksi
Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=SS ksi
All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi
3) Anchor bolts shall be provided by installer per ICBO reference on plans and calculations herein. Installer must
provide any special inspection as called out on plans or calculations, or as required by the ICBO report indicated herein.
4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed
in shop, with no field welding allowed other than those supervised by a licensed deputy inspector.
5) Toe slab on grade is 6" thick with minimum 2000 psi compressive strength. Soil bearing capacity is 1000 psf.
Definition of Components
~=
Frame
Height
t=
A
Beam
Spacing
Front View: Down Aisle
(Longitudinal) Frame
i
Column
Beam to Column
Connector
Base Plate and
Anchors
LFrame-1 1 Depth 7
Section A: Cross Aisle
([ransverse ) Frame
Horizontal
Brace
Diagonal
Brace
The components hei-ein 4i-e qesigned within the guidelines o(the 2001 CBC .:ind with due i-eg.:ircl to
est4b!ished industi-y st.:ind4i-ds set foi-th by the ~ck ,i\~.:inufuctmei-'s Institute. The fin;:il design o(the system
is v.:ilid only with proper .:ipprov;:i! from the furis
1YPE i 5R-LG PHJ~U~S Page J of l '-( G/G/200G
Structur.al
· Ca·nc.epts
~-;;J Engineering
···-~ 1729 S. Douglass Rd. Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOB Projec-r. LS PH1L:....!PS Project :i:t: f-060506-2
Configuration & Summary: TYPE 1 SINGLE ROW
,_
T
78"
180" + 78"
-I --
Seismic Zone #Bmlvls
4 (Na=l.0) 2
Tlong=0.24 sec/ Tshort=0.14 sec
Component
Column Fy=55 ksi
Column Backer None
Beam Fy=55 ksi
Beam Connector Fy=SS ksi
Brace-Horizontal Fy=55 ksi
Brace-Diagonal Fy=55 ksi
Base Plate Fy=36 ksi
Anchor 2 per Base
Slab
Level I Load
Per level BeamSpcg
1 2,500 lb 78.0 in
2 2,500 lb 78.0 in
Notes
TYPE I sR-LG PHILLIPS
T / 62" + "'"-' 180" 52"
"'--+ ',
/'
52" // -L / -
99" ~ 42" _,,.j
Frame Depth! Frame Height! # Diagonals Beam Length I Frame Type
42in I 180.0 in I 3 99in I Single Row
Description
INTLK LU75/3x3x13ga P=2575 lb, M=13950 in-lb
None None
Hnbl 33140/3.375" deep x 0.075" thk Lu=99in I capacity: 4049 lb/pr
Lvl 1: 3 pin OK I Mconn=12035 in-lb I Mcap=20306 in-lb
Intlk 1-1/2xl-1/2x14ga
Intlk 1-1/2xl-1/2x14ga
8 X 5 X0.375 I Fixity= 0 in-lb
0.5" x 3.5" Embed HILTI KWIK BOLT II ICBO ESR 1355 No Inspection (T=707 lb)
6" thk x 2000 psi slab. 1000 psf Soil Bearing Pressure
Brace
52.0 in
52.0 in
62.0 in
Total:
I Story Force I Story Force
Transv Long it.
3071b 1241b
6131b 2481b
9201b 3721b
Page ¼ of l l-(
Column I Axial
2,575 lb
1,288 lb
Column I Conn.
Moment Moment
13,950 "# 12,035 "#
4,836 "# 5,060 "#
STRESS
0.46-OK
N/A
0.62-OK
0.59-0K
0.12-OK
0.29-0K
0.24-OK
0.16-OK
0.26-OK
Beam
Connector
3 pin OK
3 pin OK
G/G/200G
S-tructur:ol
·Canc~pts
~/) Engineering -~~ 1729 S. Douglass Rd, Ste B Anaheim, CA 92806 Te!: 714.456.0056 Fax: 714.456.0066
By: BOB ProjecT: LG PHiLLiPS
Seismic Forces Configuration: TYPE 1 SINGLE ROW
Lateral analysis is performed with regard to sections 2228.5.2 and 1630.2 of the 2001 CBC
Base shear is highest of: 1) Cv*I*W/(R*T*l.4) (EQ 30-4) <= 2.5*Ca*I*W/(R*1.4) (Eq 30-5)
2) 0.ll*(a*I*W/1.4 (Eq 30-6)
3) 0.8*Z*Nv*I*W/(R*l.4) (Eq 30-7) 4) 1.5%*(DL+LL) (Sec 2228.3.2)
Transverse (Cross Aisle) Seismic Load
T= Ct*(H)°-75 =
VEQ30-4= 0.742
VEQ30-6= 0.035
Base Shear Coeff= 0.1786
Level
1
2
LL
2,500 lb
2,500 lb
Longitudinal (Downaisle) Seismic Load
T=(Ct)*hA0.75= 0.24 sec
VEQ 30-4= 0.340
VEQ 30-6= 0.035
Base Shear Coeff= 0.1403
Level
1
2
LL
2,500 lb
2,500 lb
0.14sec Ct-transv= 0.020
<= VEQ 30-s= 0.1786 V222B.3.2.= 0.015
VEQ 30.7= 0.033 n-transv= 1
Vtransv= Base Shear Coeff * (EDL + Ell/n-transv)
= 0.1786 * (150 lb + 5000 lb/1)
= 9201b
LL/(n-transv)
2,500 lb
2,500 lb
5,000 lb
DL
751b
751b
1501b
hi
78in
156in
W=5150 lb
Ct-long= 0.035
<= VEQ 30-s= 0.1403 V222s.3.2.= 0.015
wi*hi
200,850
401,700
602,550
Vlong= Base Shear Coeff * (I:DL + EU/n-long)
= 0.1403 * (150 lb + 5000 lb/2)
= 372 lb
LL/(n-long) DL
1,250 lb 75 lb
1,250 lb 75 lb
2 500 lb 1501b
hi
78in
156in
W=2650 lb
f'age ') of t '1
wi*hi
103,350
206,700
310 050
P:-ojec-: rl: f-060506-2
I= 1.0
Seismic Zone 4, Z= 0.4
ca= 0.44
Na= 1.0
Cv= 0.64
Nv= 1.0
(Transverse) R= 4.4
Fi R*hi
306.7 lb
613.3 lb
23,923-#
95,675-#
9201b Z:=119,597
(Longitudinal ) R= 5.6
n-long= 2
Fi
124.0 lb
248.0 lb
3721b
G/G/200G
S-tructurnl
·Canc.epts
~ ,,,-ng1neenng ~~=-?iE·.
·--~ 1729 S. Douglass Rd, Ste 13 Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: B03 Projec1: L.-G PrliU..iPS
Downaisle Seismic Loads Configuration: TYPE 1 SINGLE ROW
Determine the story moments by applying portal analysis. The base plate is assumed to provide no fixity.
Seismic Story Forces
Vlong= 372 lb
Vcol=Vlong/2= 186 lb
Fl= 124Ib
F2= 248 lb
F3= 0 lb
Typical frame macle
Ttihirtary at~ of two columns
ofrackh-.ime "-._ ... ____ _ ,
I
E] G. a--·a·-a··-'GJ· ~ -·-··.,.-.. · .. 1-.' .-. . . . .·. . I ... -~ . ' .·, ... -I : .. :, ..
1 1
BGB·-··ra··· EJ···G ---.. ·. .. -. . ·-· · __ -. . . , : . ~ I .. -_ --.· . .-. ~ I ·.--.. _. __ .
Seismic Story Moments Conceptual System
Project~: f-060506-2
Typical Frame made
of two columns ,-~--
Mbase-max= 0 in-lb <=== Default capacity
Mbase-v= (Vcol*hleff)/2
hl-eff= hl -beam clip height/2
= ?Sin
= 6,975 in-lb <=== Moment going to base
Mbase-eff= Minimum of Mbase-max and Mbase-v
= O in-lb
M 1-1= [Vcol * hleff]-Mbase-eff
= (186 lb * 75 in)-0 in-lb
= 13,950 in-lb
Mseis= (Mupper+Mlower)/2
Mseis(l-1)= (13950 in-lb+ 4836 in-lb)/2
= 9,393 in-lb
LEVEL
1
2
hi
78in
78in
TYPE ! sR-LG PHILUPS
Axial Load
2,575 lb
1,288 lb
M 2-2= [Vcol-(Fl)/2] * h2
= [186 lb -124 lb]*78 in/2
= 4,836 in-lb
Mseis(2-2)= (4836 in-lb+ O in-lb)/2
= 2,418 in-lb
Summary of Forces
Column Moment
13,950 in-lb
4,836 in-lb
Page
Mseismic
9,393 in-lb
2,418 in-lb
{eof l v(
Mend-fixity
2,642 in-lb
2,642 in-lb
Vcol
1
h 2
" ,--
·1
h 1 h1eff
' 11
Beam to Column Elevation
Mconn
12,035 in-lb
5,060 in-lb
Beam Connector
3 pin OK
3 pin OK
:;1:;1200:;
Structur-al
· Co~c~pts
~"4 Engineering
-----~ 1729 S. Douglass Rd, Ste B Anaheim, CA 92806 Te!: 714.456.0056 Fox: 714.456.0066
By: SOB Projecr: L.G ?HlL:...IPS ProJecr :l:f: f-060506-2
Column Configuration: iYPE 1 SINGLE ROW
Conforms to the requirements of Chapter CS of the 1996 AISI Cold Formed Steel Design Manual for combined bending and axial loads.
Section Properties
Loads
Section: INTLK LU75/3x3x13ga
Aeff = 0.757 inA2
Ix = 1.320 inA4
Sx = 0.879 inA3
rx = 1.320 in
Qf= 1.67
E= 29,500 ksi
Iy = 0.871 inA4
Sy = 0.574 in A 3
ry = 1.080 in
Fy= 55 ksi
Cmx= 0.85
Kx= 1.2
Lx = 78.0 in
Ky= 1.0
Ly= 52.0 in
Cb= 1.0
y-·-·-t·-·-y
I0.090 in
x
~0.75in
Axial=P= 2,575 lb Moment=Mx= 13,950 in-lb (Column stresses@ Level 1)
Axial Analysis
Kxlx/rx = 1.2*78"/1.3196"
= 70.9
Fe= nA2E/(KL/r)maxA2
= 57.9ksi
Pn= Aeff*Fn
= 31,742 lb
P/Pa= 0.16
Bending Analysis
> 0.15
Kyly/ry = 1*52"/1.08"
= 48.1
Fy/2= 27.5 ksi
Qc= 1.92
Check: P/Pa + (Cmx*Mx)/(Max*µx) :S 1.33
P/Pao + Mx/Max s 1.33
Pno= Ae*Fy Pao= Pno/Qc
Fe> Fy/2
Fn= Fy{l-Fy/4Fe)
= 55 ksi*(l-55 ksi/(4*57.9 ksi)J
= 41.9 ksi
Pa= Pn/Qc
= 31742 lb/1.92
= 16,533 lb
Myield=My= Sx*Fy
3.000 in
_J_
: 0,757 inA2 *55000 psi
= 41,635 lb
= 416351b/l.92
= 21,685 lb
= 0.879 inA3 * 55000 psi
= 48,345 in-lb
Max= My/Qf
= 48345 in-lb/1.67
= 28,949 in-lb
µx= {l/[l-(Qc*P/Pcr)JV-1
= {l/[1-(l.92*2575 lb/43868 lb)]}"-l
= 0.89
Combined Stresses
Per= nA2EI/(KL)maxA2
= nA2*29500 ksi/(l.2*78 in)A2
= 43,868 lb
(2575 lb/16533 lb)+ (0.85*13950 in-fb)/(28949 in-lb*0.89) =
(2575 lb/21685 lb)+ (13950 in-lb/28949 in-lb) =
0.62
0.60
< 1.33, OK
< 1.33, OK
TYPE ! ,c,R-LG PHILLIPS Page f:\.of ( '1
(EQ C5-1)
(EQ C5-2)
6/6/2006
Str~ural. , . · \., onEts
~ ngineering ~~ 1729 S, Douglass Rd, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOBS. Project: LG PHILLIPS Project#: F-060506-2
Column-Exposed Post Check
Conforms to the requirements of Chapter CS of the 1996 AISI Cold Formed Steel Design Manual for combined bending and axial loads.
Oledc post protector requirement of 2001 CBC Sec 2222.5
Section Properties
Loads
Section: 3x3x13 ga
Aeff = 0.757 in/\2
Ix = 1.320 in"4
Sx = 0.879 in"3
rx = 1.320 in
Qf= 1.67
E= 29,500 ksi
Axial=P= 2,575 lb
Axial Analysis
Kxlx/rx = 1.7*78"/1.32"
= 100.5
Fe= n" 2E/(KL/r)max" 2
= 28.9ksi
Pn= Aeff*Fn
= 21,793 lb
Iy = 0.871 in/\4
Sy= 0.574 in"3
ry = 1.080 in
Fy= 55 ksi
Cmx= 0.85
width= 3.000 in
depthl= 3.000 in
thickl= 0.090 in
Moment=Mx= 0 in-lb
Kyly/ry = 1 *52"/1.08"
= 48.1
Fy/2= 27.5 ksi
Qc= 1.92
P/Pa= 0.23 > 0.15
Bending Analysis
Check: P/Pa + (Cmx*Mx)/(Max*µx) $ 1.33
P/Pao + Mx/Max $ 1.33
Pno= Ae*Fy
= 0.757 in"2 *55000 psi
= 41,635 lb
Pao= Pno/Qc
= 416351b/l.92
= 21,685 lb
Kx = 1.7
Lx = 78.0 in
Ky= 1.0
Ly= 52.0 in
Cb= 1.0
Fe> Fy/2
Fn= Fy(l-Fy/4Fe)
= 55 ksi*[l-55 ksi/(4*28.9 ksi)]
= 28.8 ksi
Pa= Pn/Qc
= 21793 lb/1.92
= 11,351 lb
Myield=My= Sx*Fy
= 0.879 in"3 * 55000 psi
= 48,345 in-lb
Max= My/Qf Per= n"2EI/(Kl)max"2
= 48345 in-lb/1.67
= 28,949 in-lb
= n"2*29500 ksi/(l.7*78 in)"2
= 21,858 lb
µx= {1/[1-(Qc*P/Pcr)]}"-l
Combined Stresses
= {l/[1-(1.92*2575 lb/21858 lb)]}"-1
= 0.77
(2575 lb/11351 lb) + (0.85*0 in-lb)/(28949 in-lb*0.77) =
r"-~--...-H ,..,__,,_,...,..,_,.,.._ ....... . "'' ,,.,,..._~ ...... . ~, --'. J"-; .-• C' ';l~ 'f _F \ n;-.,-, ----~·ac ,;1;-1;;;;_.i-ri'"f""!---. 1il-~~1, = -...-----, --------·-.1
1,'J_
0.23 < 50%, OK per sec. 2222.5
t..·-~L...
Str~ural . · , ·
\,onEts ~ ngineering ~~ 1725 S. Douglass Rd, Ste D Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOBS. Project: LG PHILLIPS Project #: F-060506-2
umn
Conforms to the requirements of Chapter CS of the 1996 AISI Cold Formed Steel Design Manual for combined bending and axial loads.
Section Properties
Section: 3X3Xl3GA
Aeff = 0.757 inA2
Ix = 1.320 inA4
Sx = 0.879 in"3
IX= 1.320 in
Qf= 1.67
E= 29,500 ksi
Cb= 1.0
Iy = 0.871 inA4
Sy= 0.574 inA3
ry = 1.080 in
Fy= 55 ksi
~ ~ 0.075in
J_ My
Cmx= 0.85
width= 3.000 in
depthl= 3.000 in
thickl= 0.090 in
Lx = 78.0 in
Ly= 42.0 in Transvetse Elevation
Loads
Movt= 137,537 in-lb
Frame Depth= 42 in
Seismic Axial=Pv= Movt/d
= 3,275 lb
Axial Analysis
Kxlx/rx = 1.2*78"/1.32"
= 70.9
Fe= n"2E/(KL/r)maxA2
= 57.9ksi
Pn= Aeff*Fn
= 31,748 lb
P/Pa= 0.35
Bending Analysis
> 0.15
Oleck: P/Pa + (Cmy*My)/(May*µy) :$ 1.33
P/Pao +My/May:$ 1.33
Pno= Ae*Fy
Static Axial=Ps= 2,575 lb
Ptotal=P= 5,850 lb
Kyly/ry = 1 *42"/1.08"
= 38.9
Fy/2= 27.5 ksi
Qc= 1.92
Pao= Pno/Qc
V= 920 lb
h= 5 in
Moment=My= V*h
= 4,600 in-lb
Fe> Fy/2
Fn= Fy(l-Fy/4Fe)
= 55 ksi*[l-55 ksi/(4*57.9 ksi)]
= 41.9 ksi
Pa= Pn/Qc
= 31748 lb/1.92
= 16,536 lb
Myield=My= Sy*Fy
h
= 0.757 in" 2 *55000 psi
= 41,635 lb
= 41635fb/1.92
= 21,685 lb
= 0.574 in"3 * 55000 psi
= 31,570 in-lb
May= My/Qf
= 31570 in-lb/1.67
= 18,904 in-lb
µx= {l/[l-(Qc*P/Pcr)]}A-1
Combined Stresses
= {l/[1-(l.92*5850 lb/43868 lb)]}"-1
= 0.74
Per= nA 2EI/(KL)max" 2
= nA2*29500 ksi/(1.2*78 in)A2
= 43,868 lb
(5850 lb/16536 lb} + (0.85*4600 in-lb)/(18904 in-lb*0.74) =
(5850 lb/21685 lb)+ (4600 in-lb/18904 in-lb)=
0.63
0.51
< 1.33, OK
< 1.33, OK ·,.~
(EQ CS-1)
(EQ CS-2)
Structural
· Ca'ncep-ts
~--/) Engineering
-~ 1729 S. Douglass Rd, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
Sy: 803 Project: L.G PH!L--'....iPS P:oject :f;: f-060506-2
Beam Configuration: 1YPE 1 SINGLE ROW
Toe beam to column connection is assumed to provide partial end fixity for the beam frame. The end moment calculated herein is added
to the lateral force force portal moment when analyzing the connection capacity. Designed per section 2228 of the 2001 CBC
Toe impact load on the beam is addressed by including the Impact Factor "a" in the determination of the beam center bending stress.
Section Properties
Beam Member= Hnbl 33140/3.375" deep x 0.075" thk t-1.750in ,j-+--2.750inl
Beam at Level= 1
Beam Type= Formed
Ix= 1.337 in1'4
Sx= 0.750 in"3
Length=L= 99.0 in
Lu= 99.0 in
Beam Weight= 4.0 lb/ft
Thickness= 0.075 in
Beam Shape= Step
T ._.,.,,
3.375in == --1-
Impact Factor (a)=[l-(25%/2)]= 0.875 1 0.075in
~ Loads
Bendin
% End Rxity= 25 %
0 = 0.25
Mcenter= B*(wl"2/8)
= 0.832*(wl"2/8)
Mends= 0*Mmax(fixed ends)
= (wl"2/12)*0.25
= 0.0208*wl A 2
Fb= 0.6 * Fy
= 33,000 psi
Fb-eff= 33,000 psi
Live Load/Pair= 2,500 lb
Mcenter= 0.104 * wL"2
= 13,210 in-lb
M= 13,210 in-lb
fb= (M/Sx)/a
= 20,129 psi
Bending Capcity= 4,141 lb/pair
Deflection
Defl-allow=L/ 180
= 0.550 in
Deflection Capacity= 4,049 Jb/Pair
Coeff B= 0.104/0.125
= 0.832
Mcenter= Mcenter(sirnple ends) -0*Mcenter(fixed ends)
= wL A 2/8 -(0,25 * WL A 2/12)
= wL"2/8 -wl"2/48
= 0.104 * wL A2
Fy= 55,000 psi
Dead Load/Pair= (4 lb/ft) * 2 * 99 in/12
= 661b
Mends= 0.0208*wL" 2
= 2,642 in-lb
fb/Fb= 20129 psi/33000 psi
= 0.61 <= 1.0, OK
Defl= B * [5wL "4/(384*E*Ix)]
Dist Load=w= 13.0 lb/in
= [5*13 lb/in*(99 in)A4/(384*29.5x10"6 psi * 1.337 in"4)]*0.832
= 0.343 in <= 0.55 in, OK
< = = = Critical
Allowable load per beam pair= 4,049 lb
TYPE ! sR-LG PHILLIPS Page f of \'--f G/G/200G
~-t~~r.~I ·
Ve ts
ngineering
729 S. Daugiass Rd, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOB Project: LG PHILLIPS
3 Pin Beam to Column Connection TYPE 1 SINGLE ROW
Mconn max= 12,035 in-lb Load at level 1 ---,.-
1"
_______.P3j/ __L 1/2"
~112"
Connector Type= 3 Pin
Shear capacity of Pin
Pin Diam= 0.44 in
Ashear= (0.438 in)A2 * Pi/4
= 0.1507 in1'2
Pshear= 0.4 * Fy * Ashear
= 0.4 * 55000 psi* 0.1507inA2
= 3,315 lb
Bearing capacity of Pin
Per thei996 AISI Cold Formed Steel Manual, Sec E3.3:
tcol= 0.090 in
Omega= 2.22
Fy= 55,000 psi
Fu= 65,000 psi
a= 2.22
Pbearing= alpha * Fu "' diam * tcol/Omega
= 2.22 * 65000 psi * 0.438 in "' 0.09 in/2.22
= 2,562 lb < 3315 lb
Moment capacity of Bracket
Edge Distance=E= 1.00 in Pin Spacing= 2.0 in
C= Pl+P2+P3 tclip= 0.18 in
= Pl +Pl *(2.5"/4.5")+P1 *(0.5"/4.5")
= 1.667 * Pl
Mcap= Sclip * Fbending
= 0.127 inA3 * 0.66 * Fy
= 4,610 in-lb
Pclip= Mcap/(1.667 * d)
C*d= Mcap = 1.667
= 4610.1 in-lb/(1.667 * 0.5 in)
= 5,531 lb
Thus, Pl= 2,562 lb
Mconn-allow= [Pl *4.5"+Pl *(2.5"/4.5")*2.5"+Pl *(0.5"/4.5")*0.5"]*1.33
= 2562 LB*[ 4.5"+(2.5"/4.5")*2.5" + (0.5"/4.5")*0.5"]* 1.33
= 20,306 in-lb > Mconn max, OK
TYPE I sR-LG PI-JILLIPS Page '~ of l '-1
Fy= 55,000 psi
Sclip= 0.127 inA3
d= E/2
= 0.50 in
Project 1'!: f-060506-2
G/G/200G
Str;ucturol ·c· oncep~s
By: BOB Project: l_G Prl!i...LlPS ProJeCt tr: f-060506-2
Transverse Brace Configuration: 1YPE 1 SINGLE ROW
Section Properties
Diagonal Member= Intlk 1-1/2xl-1/2xl 4ga
Area= 0.315 inA2
r min= 0.488 in
Horizontal Member= Intlk 1-l/2xl-l/2xl4ga
1-3-1.soo in-j
Fy= 55,000 psi
K= 1.0
Qc= 1.92 R loin
J_
Area= 0.315 inA2
r min= 0.488 in
Fy= 55,000 psi
K= 1.0
Frame Dimensions
Diagonal Member
Bottom Panel Height=H= 52.0 in
Frame Depth=D= 42.0 in
Column Width=B= 3.0 in
V=Vtransv= 920 lb
Ldiag= [(D-B*2)"2 + (H-6")A2)Al/2
= 58.4 in
Pmax= V*(Ldiag/D)
= 1,2791b
Pn= AREA*Fn
= 0.315 inA2 * 20320 psi
= 6,401 lb
Pallow= Pn/Q
= 6401 lb /1.92
= 3,3341b
Clear Depth=D-B*2= 36.0 in
X Brace= NO
SINCE Fe<Fy/2,
(kl/r)= (k * Ldiag)/r min
= (1 x 58.4 in /0.488 in )
= 119.7 in
Fe= piA2*E/(kl/r)"2
= 20,320 psi
Fn= Fe
= 20,320 psi
Check End Weld
Lweld= 2.5 in
Fu= 65 ksi
tmin= 0.075 in
Typical Panel
Configuration
Weld capacity= 0.75 * tmin * L * Fu * 1.33/2.5
fa/Fa= 0.38
Horizontal brace
Pmax=V= 920 lb
(kl/r)= (k * Lhoriz)/r min
= (1 x 42 in) /0.488 in
= 86.1 in
SINCE Fe>Fy/2, Fn=Fy*(l-fy/4fe)
= 35,745 psi
fa/Fa= 0.16
TYPE l sR-LG Pt"iiLL!PS
<= 1.33 OK
<= 1.33 OK
Fe= piA2*E/(kl/r)"2
= 39,275 psi
Pn= AREA*Fn
= Q,315inA2*35745 psi
= 11,260 lb
Page lD of \ i
4,875 lb OK
Fy/2= 27,500 psi
Pallow= Pn/Qc
= 11260 lb /1.92
= 5,864 lb
G/G/200G
Structur.al
·Canc.epts
~~ Engineering
-~ 1729 S. Douglass Rd, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOB Projec~ '.-.G PHli.....L-1PS Project ~: f-060506-2
Anchors Configuration: TYPE 1 SINGLE ROW
Check overturning per section 2228.7.1 of the 2001 CBC
Loads
Vtrans=V= 920 lb
DL/Frarne= 150 lb
LL/Frame= 5,000 lb Frame Depth=D= 42.0 in
Htop-lvl= 156.0 in
# Levels= 2
n-transv= 1
Wst=(0.9*DL+LL/n)total= 5,135 lb
LL @ TOP= 2,500 lb
DL/Lvl= 75 lb
DL*0.90= 68 lb # Anchors/Base= 2
n= 1
T
Lateral Ovt Forces=E(Fl*hi)= 119,597 in-lb
Fully Loaded rack SIDE ELEVATION
Vtrans= 920 lb
Movt= ~(Fi*hi)*l.15 Mst= Wst. * D/2 T = (Movt-Mst)/D
= 119597in-lb * 1.15
= 137,537 in-lb
= 5135 lb * 42 in/2
= 107,835 in-lb
= (137537 in-lb -107835 in-lb)/42 in
= 7071b
Top Level Loaded Only
Critical Level= 2
Anchor
Vtop= 2.5*ca*I(DL +LL@top/n-transv)/(R*l.4)
= 0.1786 * (75 lb+ 2500 lb/1)
= 4601b
Mst= 0.9*(DL-total + Utop/n) *D/2
= (2500 lb/1 + 67.5 lb*2) * 42 in/2
= 55,335 in-lb
Hgt @ Lvl 2= 156.0 in
Movt= vtop*Htop*l.15
= 459.895 lb* 156 in * 1.15
= 82,505 in-lb
T= (Movt-Mst)/D
= (82505 in-lb -55335 in-lb)/42 in
= 6471b
Check (2) 0.5" x 3.5" Embed HILTI KWIK BOLT II anchor(s) per base plate.
Special inspection is not provided per ICBO ESR 1355.
Fully Loaded:
Top Level Loaded:
Pullout capacity= Tcap= 875 lb
Shear capacity=Vcap= 1,840 lb
Tcap*Phi*S= 1,164 lb
Vcap*Phi*S= 2,447 lb
L.A. City Jurisdiction? NO
Phi= 1.33
Spacing Coeff=S= 1.0
(354 lb/1164 lb)"l.66 + (230 lb/2447 lb)"l.66 =
(324 lb/1164 lb)"l.66 + (115 lb/2447 lb)"l.66 =
TYPE I sR-LG P,1-iiLUPS Page ll of l 'l
0.16
0.13
<= 1.0 OK
<= 1.0 OK
G/G/200b
Ste B Aoobeim CA 928Q6 Iel· 714 456 QQ56 fox· 714 456 QQ66
By: BOB Project: LG PHILUPS Project #: f-060506-2
Base Plate Configuration: 1YPE 1 SINGLE RCJ./1/
Section
Width=W = 8.00 in
Depth=D = 5.00 in
Column Width=b = 3.00 in
Column Depth=dc = 3.00 in
L = 2.50 in
Plate Thickness=t = 0.375 in
a= 3.00 in
Anchor c.c. =2*a=d = 6.00 in
N=# Anchor/Base= 2
Down Aisle Loads
P = 2,575 lb
Axial stress=fa = P/A = P/(D*W)
= 64psi
Moment Stress=fb = M/S = 6*Mb/[ {D*BA 2]
= 0.0 psi
Moment Stress=fbl = fb-fb2
= 0.0 psi
Fy = 36,000 psi
Mbase=Mb = 0 in-lb
Ml= wlf2/2= fa*L A2/2
= 201 in-lb
Moment Stress=fb2 = 2 * fb * L/W
= 0.0 psi
M2= fbl *L A2)/2
= 0 in-lb
M3 = (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*LA2
= O in-lb
Mtotal = M1+M2+M3
= 201 in-lb/in
5-plate = (l)(tA2)/6
= 0.023 inA3/in
fb/Fb = Mtotal/[(5-piate)(Fb)]
= 0,24 OK
Tanchor = (Mb-(P*0.9)(a))/[(d)*N/2]
= -1,159 lb No Tension
Cross Aisle Loads
Pstatic= 2,575 lb
Movt= 137,537 in-lb
Frame Depth= 42.0 in
b =Column Depth= 3.00 in
L =Base Plate Depth-Col Depth= 2.50 in
fa = P/A = P/(D*W)
= 146 psi
Sbase/in = (l)(tA2)/6
= 0.023 in"3/in
fb/Fb = M/((5-plate)(Fb)]
0.54
1YFE I sR-LG FHILUFS
OK
Fb = 0.75*Fy*L33
= 35,910 psi
Tallow= 1,164 lb
Pseismic= Movt/Frame Depth
= 3,275 lb
M= wL A2/2= fa*L A2/2
= 457 in-lb/in
Fbase = 0.75*Fy*l.33
= 36,000 psi
Paqe f 'l-of \~
Downaisle Elevation
OK
P=Pstatic+Pseismic= 5,850 lb
7/9/2006
Structural
· Co~~epts
~=.;j Engineering
·----~ 1729 S. Douglass Rd. Ste B Anaheim. CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
3y 603 Project: LG PH\LUPS Project ~: f-060506-2
Slab on Grade Configuration: TYPE 1 SINGLE ROW
The slab is designed per UBC 1922 to carry the puncture stress of the post as well as the upward soil reaction from the soil.
t X --1• _1-L~ ~-J-X :1
SLAB ELEVATION
Base Plate
B= 8.00 in
D= 5.00 in
Load Case 1: Product + Seismic
width=a= 3.00 in
depth=b= 3.00 in
,----------' [al ;
I ----·c ---_ ..
: Cross
:Aisle
· · · · ··_-_Down Aisle
Baseplate Plan Vif!!N
Concrete
f'c= 2,000 psi
tslab=t= 6.0 in
phi=0= 0.65
Soil
fsoil= 1,000 psf
Movt= 137,537 in-lb
Frame depth= 42.0 in
eff. baseplate width=c= 8.00 in
eff. baseplate depth=e= 5.00 in
Product DL= 75 lb
Product LL= 2,500 lb
P-seismic=E= (Movt/Frame depth)*l.4
= 4,585 lb
Pse=DL+LL+E/1.4= 5,850 lb
(Strength Design Loads)
Puncture !Section 1922.5, Eqtn 22-9
Pu= 1.1 *(1.2PDL + 1.0PLL + 1.0*E) (Sec 1612.2.1, EQ 12-5)
= 7,892 lb
Apunct= [(c+t)+(e+t)]*2*t
= 300.0 inA2
Slab Bending I Per UBC 1922.7.2
Asoil= (Pse*144)/(fsoil) L= (Asoil)A0.5
= 842 in"2 = 29.02 in
X= (L-y)/2 M= w*x,...2/2
= 5.3in = (fsoif*XA2)/(144*2)
Fb= 5*(phi)*(f'c)A0.S/1.4 = 99.2 in-lb
= 104.0 psi (Sec 1922.5.1)
Load Case 2: Static Loads
PDL= 75Ib PLL= 2,500 lb
Puncture !Section 1922.5, Eqtn 22-9
Pu= 1.4*PDL + 1.7*PLL (Sec 1909.2.1, EQ 9-1)
= 4,355 lb
Apunct= [(c+t)+(e+t)]*2*t
= 300 inA2
Slab Bending !Per UBC 1922.7.2
Asoil= (Ps*144)/(fsoil) L= (Asoil)A0.5
= 371 jnA2 = 19.26 in
x= (L-y)/2 M= w*x,...2/2
= 0.5 in = (fsoil*XA2)/(144*2)
Fb= 5*(phi)*(f'c),...0.5/1.7 = 0.8 in-lb
= 85.0 psi (Sec 1922.5.1)
TYPE I sR-LG PHILL!PS Page { ?J of \ '-1
Fpunct= 2.66*phi*sqrt(f'c)
= 77.3 psi
fv/Fv= Pu/(Apunct*Fpunct)
= 0.34 < 1.33 OK
y= (c*e)"'0.5 + t*2
= 18.3 in
S·Slab: 1 *tA 2/6
= 6.0 jnA3
fb/Fb= M/(S-slab*Fb)
= 0.159
Ps= DL+LL
= 2,575 lb
< 1.33, OK
Fpunct= 2.66*phi*sqrt(f'c)
= 77.3 psi
fv/Fv= Pu/(Apunct*Fpunct)
= 0.19 < 1.0OK
y= (c*e)"'0.5 + t*2
= 18.3 in
S-slab= 1 *t,... 2/6
: 6,0 inA3
fb/Fb= M/(S-slab*Fb)
= 0.001 < 1.0, OK
G!G/200G
S-tructur:al
·Co~c~p-ts
~ Engineering
---~ 1729 S. Douglass f<d, Ste B Anaheim, CA 92806 Tel: 714.456.0056 Fax: 714.456.0066
By: BOB Project: LG PHILLIPS Project ~: f-060506-2
Configuration &. Summary: TYPE 1 DOUBLE ROW
T
78"
180" t
78"
-j -
Seismic Zone # Bmlvls
4 (Na=l.0) 2
llong=0.24 sec/ Tshort=0.14 sec
Component
Column Fy=55 ksi
Column Backer None
Beam Fy=55 ksi
Beam Connector Fy=55 ksi
Brace-Horizontal Fy=55 ksi
Brace-Diagonal Fy=55 ksi
Base Plate Fy=36 ksi
Anchor 2 per Base
Slab
Level I Load Per Level BeamSpcg
1 2,500 lb 78.0 in
2 2,500 lb 78.0 in
Notes
TYPE I DR-LG PHiLUPS
-T ,// I== "--...._
62'' -............_ + ,, /' -....... ....
"'-, ,/
'
....._...,_ ___
// 180" 52'' + ~ ............ ,/
// ~ 52'' V -l-= ·-........ ,,
--
99''
Frame Depth! Frame Heightl # Diagonals Beam Length I Frame Type
42in I 180.0 in I 3 99in I Intrconnected
Description
INTLK LU75/3x3x13ga P=2575 lb, M=13950 in-lb
None None
Hnbl 33140/3.375" deep X 0.075" thk Lu=99 in I Capacity: 4049 lb/pr
Lvl 1: 3 pin OK I Mconn=12035 in-lb I Mcap=20306 in-lb
Intlk 1·1/2xl-1/2x14ga
Intlk 1-l/2xl • 1/2x14ga
8 X 5 X 0.375 I Rxity= 0 in-lb
0.5" x 3.5" Embed HILTI KWIK BOLT II ICBO ESR 1355 No Inspection (T=O lb)
6" thk x 2000 psi slab. 1000 psf Soil Bearing Pressure
Brace
52.0 in
52.0 in
62.0 in
Total:
I Story Force I Story Force
Transv Longit.
1581b 124lb
3151b 2481b
4731b 3721b
Page l 1-l._ of L\
Column I Axial
2,575 lb
1,288 lb
Column I Conn.
Moment Moment
13,950 "# 12,035 "#
4,836 "# 5,060 "#
STRESS
0.46-0K
N/A
0.62-0K
0.59-0K
0.06-0K
0.15-0K
0.24-0K
0.01-0K
0.19-0K
Beam
Connector
3 pin OK
3 pin OK