HomeMy WebLinkAbout2794 GATEWAY RD; ; CB081727; Permit10-27-2008
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CB081727
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
2794 GATEWAY RD CBAD
Tl Sub Type
2133001100 Lot#
$236,880 00 Construction Type
Reference #
THE NATH LAW GROUP
SHELL TO OFFICE 6,768 SF
COMM
0
5B
Applicant
ARCH CONCEPTS/BRIAN GIGUGRE
STEB
3015 SAINT CHARLES ST
SAN DIEGO CA 92110
619-531-0110
Owner
NEGMLLC
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Plan Check#
ISSUED
09/09/2008
KG
10/27/2008
10/27/2008
12264 EL CAMINO REAL #400
SAN DIEGO CA 92130
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$1,14461 Meter Size
$0 00 Add'l Reel Water Con Fee
$744 00 Meter Fee
$0 00 SDCWA Fee
$0 00 CFD Payoff Fee
$4974 PFF (3105540)
$0 00 PFF (4305540)
$0 00 License Tax (3104193)
$0 00 License Tax (4304193)
$000 Traffic Impact Fee (3105541)
$0 00 Traffic Impact Fee (4305541)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$0 00 MECHANICAL TOTAL
$7,98800 Master Drainage Fee
D1 Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
HMP Fee
TOTAL PERMIT FEES
$000
$403 00
$7,18800
$31801
$4,311 22
$000
$000
$000
$8,080 00
$000
$13900
$2000
$11950
$000
$4,945 32
$000
$000
9?
$35,450 40
Total Fees $35,450 40 Total Payments To Date $35,450 40 Balance Due $000
ByiLDING PLANS
_¥__ IN STORAGE
ATTACHED
Inspector.
FINAL APPROVAL
Date Clearance
NOTICE Please take NOTJCE thaj app val of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required nformation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this proiect NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
City of Carlsbad
1635 Faraday 'Ave , Carlsbad, CA 92008
760-602-2717/2718/2719
Fax 760-602-8558
Building Permit Application
Plan Check I
Plan Ck Deposit
; DESCRIPTION OF WORK Include Square Feet of Affected Area(s)
: EXISTING USE PROPOSED USE GARAGE (SF)PATIOS (SF)
6
DECKS (SF)
0
FIREPLACE
YES [3* NOfS?|
AIR CONDITIONING
| |
FIRE SPRINKLERS
YES I |NO|5?1
CONTACT NAME (If Different Fom
/ff&H
ADDRESS
CITY
APPLIi
ADDRESS
6(650 ZIP CITY STATE
PHONE PHONF
1 EMAIL EMAIL
PROPERTY OWNER NAME CONTRACTOR BUS NAME
ADDRESS ADDRESS
CITY STATE ZIP CITY ZIP
PHONE FAX PHONE FAX
EMAIL EMAIL,
6
ARCH/DESIGNER NAME & ADDRESS • STATE LIC #STATE LIC #CLASS.CITY BUS LIC#
(Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure prior to its issuance, also requires the
applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor s License Law (Chapter 9 commending with Section 7000 of Division 3 of the
Business and Professions Code) or that he is exempt therefrom and the basis for the alleged exemption Any violation of Section 7031 5 by any applicant for a permit subjects the applicant to a
civil penally of not more than five hundred dollars {$500})
Workers' Compensation Declaration / hereby affirm under penalty of perjury one of the following declarations
L_J I have and will maintain a certificate of consent to self insure for workers' compensation as provided by Section 3700 of the Labor Code for the performance of the work for which this permit is issued
nCl I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code for the performance of the work for which this permijjs issued My workers' compensation insurance earner and policy
number are Insurance Co Gft njLft Ctx«**^ Policy No OOi~">2Xv> ~ £,OQ^ Expiration Date {|*"Q ' *^P
This section need not be completed if the permit is for one hundred dollars ($100) or less
| | Certificate of Exemption I certify that in tha performance of the work for which this permit is issued I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California WARNING Failure to secure workers' compensation coverage Is unlawfOtTarrd-stiall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100.000), In
addition to the cost of compensation, damages as provided for In/Section 3Ztf&ftMLabor codk interest and attorney's fees
x^ CONTRACTOR SIGN ATURE ^^""jr- ^L^.;? / c/y^'^-dl^ DATE
/ hereby affirm that I am exempt from Cpmractor's License Law for the following reason
| | I as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec 7044, Business and Professions Code The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale If, however, the building or improvement is sold within one year of completion the owner builder will have the burden of proving that he did not build or improve for the purpose of sale)
I I I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions Code The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law)
[ I I am exempt under Section Business and Professions Code for this reason
1 I personally plan to provide the major labor and matenals for construction of the proposed property improvement I JYes I JNo
2 I (have / have not) signed an application for a building permit for the proposed work
3 I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors license number)
4 I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone / contractors license number)
5 I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work)
^PROPERTY OWNER SIGNATURE DATE
Is the applicant or future building occupant required to submit a business ojan. acutely hazardous materials registration form or nsk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley Tanner Hazardous Substance Account Act? I I Yes &<.lNo
Is the applicant or future building occupant required to obtain a permit from the air pollution controldjstnct or airguality management district? QYes K3 No
Is the facility to be constructed within 1.000 feet of the outer boundary of a school site' I lYes KflNo
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code)
Lender's Name Lender's Address
f" e^03T?tteiKsAil:W5W>'-"
I hereby authonze representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes I ALSO AGREE TO SAVE. INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSHA An OSHA permit is required for excavations
EXPIRATION Every permit issued by the Buildi
180 days from the date of such permit or if the
JS$APPLICANT'S SIGNATURE
SO1 deep^nd demolition or construction of structures over 3 stones in height
of this Code shall expire by limitation and become null and void if the building or work authonzed by such permit is not commenced within
such permit is suspended or abandoned at anytime after the work is commenced fora period of 180 days (Section 106 4 4 Uniform Building Code)
DATE
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected
By X^O
Inspected
By
Inspected
By
Comments
CB081727
THE NATH LAW GROUP
SHELL TO OFFICE 6,768 SF
2794 GATEWAY RD
JAMES Phone 8584492662
CA Water Dist CA
. Date
f\)/r^4^1l^UijJlJnspected V*VTu.-0C
^-S^y^or^Inspected
Date
Inspected
Date
Permit Type
Sub Type
Lot 0
/
\ Approved \S
Approved
Approved
01/12/2009
Tl
COMM
/
Disapproved
Disapproved
Disapproved
Inspection List
Permit# CB081727 Type Tl COMM
Date Inspection Item
01/12/200989 Final Combo
01/12/2009 89 Final Combo
12/23/200839 Final Electrical
12/23/2008 84 Rough Combo
12/12/2008 14
11/20/200821
11/20/200822
11/18/2008 14
11/18/2008 17
11/18/2008 34
11/13/200824
11/13/2008 34
11/13/200844
11/12/2008 14
11/12/200824
11/12/200834
10/28/200821
10/28/2008 31
Frame/Steel/Bolting/Weldm
Underground/Under Floor
Sewer/Water Service
Frame/Steel/Bolting/Weldm
Interior Lath/Drywall
Rough Electric
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Frame/Steel/Bolting/Weldm
Rough/Topout
Rough Electric
Underground/Under Floor
Underground/Conduit-Wirm
Inspector
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
Act
AP
Rl
PA
AP
PA
AP
AP
PA
AP
PA
WC
WC
WC
AP
AP
AP
AP
AP
THE NATH LAW GROUP
SHELL TO OFFICE 6,768 SF
Comments
AM PLEASE
EMR
NEED PLATFORM FOR ROOF
EQUIPMENT
T-BAR
SOFFETS
Monday, January 12, 2009 Page 1 of 1
City of Carlsbad Bldg Inspection Request
For 01/12/2009
Permit* CB081727
Title THE NATH LAW GROUP
Description SHELL TO OFFICE 6,768 SF
Inspector Assignment PY
2794 GATEWAY RD
Lot
Type Tl
Job Address
Suite
Location
OWNER NEGMLLC
Owner NEGMLLC
Remarks AM PLEASE
Sub Type COMM
Phone 8584492662
Inspector
Total Time
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By JAMES
Entered By JANEAN
Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
PCR08131 ISSUED NATH LAW GROUP-REVISIONS TO, PLUMBING .FT.nCTRICAL, MECHANICAL
Inspection History
Comments
EMR
NEED PLATFORM FOR ROOF EQUIPMENT
T-BAR
SOFFETS
Date
12/23/2008
12/23/2008
12/12/2008
11/20/2008
11/20/2008
11/18/2008
11/18/2008
11/18/2008
11/13/2008
11/13/2008
11/13/2008
11/12/2008
11/12/2008
Description
39 Final Electrical
84 Rough Combo
14 Frame/Steel/Bolting/Welding
21 Underground/Under Floor
22 Sewer/Water Service
14 Frame/Steel/Boltmg/Welding
17 Interior Lath/Drywall
34 Rough Electric
24 Rough/Topout
34 Rough Electric
44 Rough/Ducts/Dampers
14 Frame/Steel/Bolting/Welding
24 Rough/Topout
Act
PA
AP
PA
AP
AP
PA
AP
PA
we
we
we
AP
AP
lns|
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
City of Carlsbad Bldg Inspection Request
For 12/23/2008
Permit* CB081727
Title THE NATH LAW GROUP
Description SHELL TO OFFICE 6,768 SF
Inspector Assignment PY
2794 GATEWAY RD
Lot
Type Tl
Job Address
Suite
Location
ONTRACTOR ELLIS CONTRACTING, INC
Owner N E G M L L C
Remarks
Sub Type COMM
Phone 8584492662
Inspector
Total Time Requested By JAMES
Entered By CHRISTINE
CD Description
39 Final Electrical
14 Frame/Steel/Boltmg/Weldmg
24 Rough/Topout
34 Rough Electric
44 Rough/Ducts/Dampers
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
PCR08131 ISSUED NATH LAW GROUP-RliVISlONS TO, PLUMBING J-I.I-CTR1CAL, MECHANICAL
Inspection History
Comments
T-BAR
SOFFETS
Date
12/12/2008
11/20/2008
11/20/2008
11/18/2008
11/18/2008
11/18/2008
11/13/2008
11/13/2008
11/13/2008
11/12/2008
11/12/2008
Description
14
21
22
14
17
34
24
34
44
14
24
Frame/Steel/Bolting/Welding
Underground/Under Floor
Sewer/Water Service
Frame/Steel/Bolting/Weldmg
Interior Lath/Drywall
Rough Electric
Rough/Topout
Rough Electric
Rough/Ducts/Dampers
Frame/Steel/Boltmg/Weldmg
Rough/Topout
Act
PA
AP
AP
PA
AP
PA
we
we
we
AP
AP
lns|
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
EsGil Corporation
In 'Partners Hip with government for (fiuikfing Safety
DATE 1O/7/O8 a APPLICANT
a JURIS
JURISDICTION City of Carlsbad a PLAN REVIEWER
a FILE
PLAN CHECK NO 08-1727 SET II
PROJECT ADDRESS 2794 Gateway Rd
PROJECT NAME The Nath Law Group - TI
X] The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to
Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Telephone #
Date contacted (by ) Fax #
Mail Telephone Fax In Person
REMARKS
By Doug Moody Enclosures
Esgil Corporation
D GA D MB D EJ D PC 10/1/08
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858)560-1468 * Fax (858) 560-1576
EsGil Corporation
In Partnership with government for <Bui[<fing Safety
DATE 9/16/O8
JURISDICTION City of Carlsbad
PLAN CHECK NO 08-1727
PROJECT ADDRESS 2794 Gateway Rd
PROJECT NAME The Nath Law Group - TI
J.NT
'JURIS,
3LAN REVIEWER
FILE
SET I
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
IX] The applicant's copy of the check list has been sent to
Architectural Concepts / Brian Giguere
3015 Saint Charles Streets, San Diego, CA 92110
Esgil Corporation staff did not advise the applicant that the plan check has been completed
[X] Esgil Corporation staff did advise the applicant that the plan check has been completed
- Person contacted Brian Giguere Telephone # 619-531-0110
Date contacted ?//7/W(by^;&3) Fax # 619-531-0113
Mail Telephone/ Faxy In Person
REMARKS
By Doug Moody
Esgil Corporation
D GA D MB [EJ PC
Enclosures
9/11/08
9320 Chesapeake Drive, Suite 208 4 San Diego, California 92123 4 (858)560-1468 * Fax (858) 560-1576
City of Carlsbad O8-1727
9/16/08
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO O8-1727
OCCUPANCY B
TYPE OF CONSTRUCTION VB
ALLOWABLE FLOOR AREA
SPRINKLERS'? No
REMARKS
DATE PLANS RECEIVED BY
JURISDICTION 9/9/08
DATE INITIAL PLAN REVIEW
COMPLETED 9/16/08
JURISDICTION City of Carlsbad
USE Office
ACTUAL AREA 6768sf
STORIES 1
HEIGHT
OCCUPANT LOAD 99
DATE PLANS RECEIVED BY
ESGIL CORPORATION 9/11/08
PLAN REVIEWER Doug Moody
FOREWORD (PLEASE READ)
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled This plan
review is based on regulations enforced by the Building Department You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments Clearance from those departments may be
required prior to the issuance of a building permit
-Code sections oted are based on the 2007 CBC, which adopts the 2006 IBC
The following items listed need clarification, modification or change All items must be satisfied
before the plans will be in conformance with the cited codes and regulations Per Sec 105 4 of
the 2006 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i e , plan sheet number, specification section, etc
Be sure to enclose the marked up list when you submit the revised plans.
City of Carlsbad 08-1727
9/16/O8
Please make all corrections on the original tracings, as requested in the correction
list Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects) For expeditious processing, corrected sets can be
submitted in one of two ways
1 Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave , Carlsbad, CA 92008, (760)
602-2700 The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments
2 Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments
NOTE Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete
1 Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes Business and
Professions Code
2 Provide a section view of the new Rotunda soffit Show
a) Type, size and spacing of studs Indicate gauge for metal studs Specify
manufacturer and approval number or indicate "to be ICBO approved"
b) Method of attaching top to the structure and lateral bracing
c) Show height of the soffit from floor, soffit to roof framing or floor framing
3 Please provide plans and calculations signed by the California State licensed
engineer or architect for the structural support of the 800# rooftop air handler
units Include all calculations and finding on the plans Please include the
California license number, seal, date of license expiration and date plans are
signed Business and Professions Code
4 Please review the requirements, revise the plans appropriately and imprint on
the plans the City of Carlsbad Policies and Procedures for Roof Mounted
Equipment to the plans
5 Please note in the general wiring notes on the plans "AC Cable is not allowed in
A, B, E, H, F, M, S and I occupancies NM cable is restricted (without City
approval) to one and two family dwellings Note on plans that an equipment
ground conductor is to be installed in all flexible conduits"
6 Please clarify the single line diagram and the electrical plans sheet E2 2 Sheet
E2 2 shows the 800 amp service to be replaced yet none of this information is
shown on the single line'? Please clarify the electrical single line diagram Show
new or existing distribution equipment, ampere size and AIC rating of distribution
City of Carlsbad 08-1727
9/16/O8
equipment, feeder over-current devices size and indicate AIC rating, conduit and
conductor size and length, sub-service ampere rating and AIC rating
7 Please correct the single line diagram to show the over-current device feeding
panel L1 to be a 100 amp and not 225
8 Please clarify the panel load for panel L1 and the LTG-2-C form the panel load is
546 watts greater than the allowable wattage'?
9 Please have the document author and the principle designer of the LTG-1-C
form sign the imprinted document
10 Please have the principle designer check the appropriate box(s) and complete
the Statement of Compliance System Acceptance section of the LTG-1-C part 4
of 4 documents to show occupancy sensor in addition to the lighting control
panel
11 Please have the Document Author sign the Statement of Compliance and have
the principle designer check the appropriate box in the Statement of Compliance
section of the PERF-1-C energy document and sign the appropriate portion
12 Please have the principle designer check the appropriate box(s) in the Statement
of Compliance System Acceptance section of the MECH-1 documents
13 Please indicate why the split system is not included in the energy design'? The
mechanical equipment in the server room is not considered process cooling
unless the temperature is maintained outside the range of 55°F through 90 F
and the system is designed and controlled to be incapable of operating at above
55°F and below 90°F
14 When alterations, structural repairs or modifications or additions are made to an
existing building, that building, or portion of the building affected, is required to
comply with all of the requirements for new buildings, per Section 1134B 2 These
requirements apply as follows
a) A primary entrance to the building and the primary path of travel to the
altered area, must be shown to comply with all accessibility features
15 Show that accessible parking spaces comply with Section 1129B 3 1 as follows
a) Single spaces shall be 14' wide and outlined to provide a 9' parking area
and a 5' loading and unloading area on the passenger side of the vehicle
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i e , plan sheet, note or detail number,
calculation page, etc
City of Carlsbad 08-1727
9/16/08
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list If there are other changes, please briefly
describe them and where they are located in the plans
Have changes been made to the plans not resulting from this correction list9
Please indicate
Yes Q No a
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123, telephone number of
858/560-1468, to perform the plan review for your project If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation Thank you
CITY OF CARLSBAD
POLICIES AND PROCEDURE
NUMBER 80-6 SUBJECT ROOF MOUNTED EQUIPMENT
EFFECTIVE 5/1/92 SECTION BUILDING DEPARTMENT
SUPERSEDES 80-6(9/10/80)
80-6(5/01/81)
PURPOSE-
INTENT-
PROVIDE INSTALLATION STANDARDS FOR ALL ROOF MOUNTED EQUIPMENT AND
PENETRATIONS ON COMMERCIAL AND INDUSTRIAL BUILDINGS
A Maintain roof integrity
B Prevent hazardous condition to firemen who must fight fire on the roof
C Provide an installation that is aesthetically sensitive to the building and the
adjoining properties
POLICY 1 All equipment shall be concealed from view and the design* shall meet the
approval of the Planning Department
2 All equipment shall be specifically designed and approved for exterior use and '
shall be approved by the City of Carlsbad Building Department
3 All roof mounted equipment shall be on a platform which shall be an integral
part of the roof-flashed and waterproofed When a screen is approved, it shall
have as few roof connections as possible and be structurally adequate
4 All electrical, plumbing, mechanical duct work and related piping shall be inside
the building and not on the roof All connections related to equipment shall be
made in the same roof opening on the platform or have the prior approval from
the building official
5 Sewer vents shall be brought to one mam vent below the roof and have one
penetration where restrooms or other plumbing fixtures are back to back or in
the general proximity
Air exhaust fans and other equipment shall be within the building and use the
same roof opening where restrooms and other equipment are back to back or in
general proximity.
6 Bxtstmg buildings and equipment, remodel or replacement, shall meet the above
regulations or shall have the prior approval from the building official
7. Where new equipment is installed, unused or abandoned equipment, including
all roof mounted piping, electrical, mechanical, duct, and other related
appurtenances shall be removed from roof and unused openings properly sealed
to maintain roof integrity
*The architect should, through design, conceal the heating/AC unit and other equipment whether
they are on the roof or elsewhere.
ciated By:Approved B
City of Carlsbad O8-1727
9/16/08
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION City of Carlsbad PLAN CHECK NO 08-1727
PREPARED BY Doug Moody DATE 9/16/08
BUILDING ADDRESS 2794 Gateway Rd
BUILDING OCCUPANCY B TYPE OF CONSTRUCTION VB
BUILDING
PORTION
Tl
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
Rtrtn Pormit- FPP hu nrrlina
AREA
( Sq Ft )
6768
cb
Valuation
Multiplier
3437
By Ordinance
nrp V :
Reg
Mod
VALUE ($)
232,616
232,616
$1,043 13
Plan Check Fee by Ordinance ^ j
Type of Review ED Complete Review
] Repetitive Fee
~^~! Repeats
D Other
i—I Hourly
Structural Only
Hour*
$678 03
Esgil Plan Review Fee $58415
Comments
Sheet 1 of 1
macvalue doc
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB rift (7^*7 DATE
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
(<$10,000.00)
KL
TENANT IMPROVEMENT
AMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER.,<Ln OQ
PLANNER
ENGINEER
(1
Coe* MMw AppMli
DATE
DATE
( f
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
Estimate based on unconfirmed information from applicant
Calculation based on building plancheck plan submittal
£><?
Address Bldg Permit No.
Checked by Date
EDU CALCULATIONS: List types an
JfiZX- \f^e^. &L ty-a*-2*""" c
Tyges of Use u
Types of Use
APT CALCULATIONS: List types ape
Types of Use ^
Types of Use
£( square footages for all usesstr^ccJLc^s ;
Sq Ft /Units
Sq Ft /Units
1 square footages for all uses
Sq Ft /Units
Sq Ft /Units
EDU's
EDU's
ADT's
ADT's
HI
/o!
FEES REQUIRED:.
WITHIN CFD JS'YES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee)DNO
PARK-IN-LIEU FEE
FEE/UNIT
PARK AREA & #
X NO UNITS =$_
TRAFFIC IMPACT FEE
ADT's/UNITS
f
M.FEBADT
AND THOROUGHFARE FEE (DIST #1 DIST #2 DIST #3
ADT's/UNITS
ILITIES MANAGEMENT FEE
UNIT/SO FT
5 SEWER FEE
EDU's
X FEE/ADT
ZONE
X FEE/SO FT/UNIT
BENEFIT AREA
EDU's
HITL
FEE/EDU
SEWER LATERAL ($2,500)
RAINAGE FEES PLDA_
ACRES
8 POTABLE WATER FEES
UNITS CODE CONNECTION
HIGH.
FEE/AC
/LOW
=$_
15,080
METER FEE "SDCWA FEE ^SD"CCWA FEE
F \FEE CALCULATION WORKSHEET doc
1 of 2
Rev 7/14/00
" (.35
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No CB081727 Address 2794 GATEWAY RD
Planner GlNA RUIZ Phone (760) 602- 5675
APN 213-300-11-00
Type of Project & Use JJ Net Project Density DU/AC
Zoning P-C General Plan PJ Facilities Management Zone 17
CFD (in/out) #_Date of participation Remaining net dev acres
S S!Circle One
(For non-residential development Type of land used created by this permit
D
a a
a
Legend' £<] Item Complete / CUltem Incomplete - Needs your action
Environmental Review Required YES Q NO IEI TYPE
DATE OF COMPLETION
Compliance with conditions of approval? If not, state conditions which require action
Conditions of Approval
Discretionary Action Required
APPROVAL/RESO NO DATE
PROJECT NO
OTHER RELATED CASES
YES n NO 153 TYPE
Compliance with conditions or approval? If not, state conditions which require action
Conditions of Approval
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES D NO J5J
CA Coastal Commission Authority? YES D NO El
If California Coastal Commission Authority Contact them at - 7575 Metropolitan Drive, Suite 103,
San Diego, CA 92108-4402, (619) 767-2370
Determine status (Coastal Permit Required or Exempt)
Habitat Management Plan
Data Entry Completed? YES Q NO Kl
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and
assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type
impacted/taken, UPDATE')
Inclusionary Housing Fee required YES Q NO £<]
(Effective date of Inclusionary Housing Ordinance - May 21, 1993 )
Data Entry Completed? YES D NO D
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATE))
H \ADMIN\Template\Buildmg Plancheck Review Checklist doc Rev 4/08
Provide a fully dimensional site plan drawn to scale Show North arrow, property lines, easements,
existing and proposed structures, streets, existing street improvements, right-of-way width,
dimensional setbacks and existing topographical lines (including all side and rear yard slopes)
Provide legal description of property and assessor's parcel number
Policy 44 - Neighborhood Architectural Design Guidelines
D 1 Applicability YES D NO Kl
D 2 Project complies YES
Zoning
D 1 Setbacks
Front
Interior Side
Street Side
Rear
Top of slope
D
Required.
Required
Required
Required
Required
2 Accessory structure setbacks
Front Required
Interior Side Required
Street Side Required
Rear Required.
Structure separation Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
D 3 Lot Coverage Required Shown
D 4 Height
5 Parking
Required Shown
Spaces Required 6798/250=27 Shown
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
Additional Comments #1 HOW ARE THE ROOF MOUNTED EQUIPMENT GOING TO BE
SCREENED FROM VIEW FROM STREETS WITHIN 500'? SEE HANDOUT FOR EXAMPLE #2
SHOW TOTAL REQUIRED AND PROVIDED PARKING SPACES ON THE SITE PLAN SEE
HANDOUT FOR EXAMPLE
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER
H \ADMIN\Template\Buildmg Plancheck Review Checklist doc Rev 4/08
Carlsbad Fire Department BLDG. DEPT COPY
Plan Review Requirements Category TI, COMM
Date of Report 09-10-2008
Name
Address
Reviewed by
Permit # CB081727
Job Name THE NATH LAW GROUP
Job Address 2794 GATEWAY RD CBAD
d for review is incomplete At this time, this office cannot
p ^'iii Mx**aJ*^aBftn^ ^Mn.fards Please review
and/or specifications, wilh cha
adequately conduct a review to determine
carefully all comments attached
approval
Conditions;
Cond CON0003036
[MET]
APPROVED
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A
BUILDING PERMIT
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT
NOTATIONS,
CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND
REGULATIONS
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW
Entry 09/10/2008 By MS Action AP
*XSEI
STRUCTURAL ENGINEERS
SEI Structural Engineers, Inc
1042 N El Cammo Real, Suite B-311
Encinius, CA 92024
T 760 479 0047
www sei-sd com
Calculations for
The Nath Law Group
Tenant Improvements
2794 Gateway Road, Building K
Carlsbad, CA 92009
<3
October 1, 2008
SEI #8092
for
Architectural Concepts, Inc.
3015 Saint Charles St., Suite B
San Diego, CA 92110
Phone: (619)531-0113
72-7
SE1
T 760 438 1190
F 760438 1 197
STRUCTURAL ENGINEERS
Project L/H^
Sheet
<P T- L SB No
Engr Date
Sheet
SEI
T 760 438 1190 Project
F 760 438 1197
SEI No 0
STRUCTURAL ENGINEERS Engr
f QjigJr*- -
0*
geocoder us a free US geocoder Page 1 of2
"License Suspension Law
Carlsbad, CA Attorneys Law Firm
Phone 888-430-9534
www GoldenStateLawCorp com
Geocodino Web Service
Easy to use service with parcel
geocodmg Register today
www proxix com
Reverse Gecoder NET SDK Law Enforcement Data
Easy to Use Reverse Gecoder NET Bad Data is Bad for Government &
Download Risk Free Demo Today Citizens Free Analyst Report
CIS ThinkGeo com ExpenanQAS-Government com
geocoder.us / geocoder.net
find the latitude & longitude of any US address - for free
Address 4863 Palomar Airport
Rd
San Marcos CA 92009
(33 129941, -
117 249939)
Latitude
33.129941 °
N 33 ° 7' 47 8"
33 ° 7 7965' (degree
m mmmm)
-117 249939 °
. W 117 ° 14' 59 8"
Longitude -117 °
14 9963' (degree
m mmmm)
Search for another address:
j 4863 Palomar Airport Rd, Carlsbad, CA 92009
(it can take a bit for the map to load-
wait for the red circle to turn green
Stay in your happy place )
T,
And You might try adding a comma
between the street and the city
name, as this often helps to
disambiguate complex addresses If
you'd like help, drop an e-mail to
missmg@geocoder.us, and we'll try
to help you find your location
If you want a bunch of addresses
geocoded you can send a file (text
or Excel work fine) to the same
address They will be geocoded and
sent back to you If you are happy
the cost is $50 per 20,000 records
with a minimum cost of $50, which
http //geocoder us/demo cgi9address=4863+Palomar+Airport+Rd%2C+Carlsbad%2C+CA+92009 9/30/2008
Conterminous 48 States
2005 ASCE 7 Standard
Latitude = 32 129941
Longitude = -117 249939
Spectral Response Accelerations Ss and S1
Ss and S1 = Mapped Spectral Acceleration Values
Site Class B - Fa = 1 0 ,Fv = 1 0
Data are based on a 0 01 deg grid spacing
Period Sa
(sec) (g)
02 0 926 (Ss, Site Class B)
10 0 339 (S1, Site Class B)
Conterminous 48 States
2005 ASCE 7 Standard
Latitude = 32 129941
Longitude = -117 249939
Spectral Response Accelerations SMs and SM1
SMs = FaSs and SM1 = FvS1
Site Class D - Fa = 1 13 ,Fv = 1 722
Period Sa
(sec) (g)
02 1 046 (SMs, Site Class D)
10 0 584 (SM1, Site Class D)
Conterminous 48 States
2005 ASCE 7 Standard
Latitude = 32 129941
Longitude = -117 249939
SDs = 2/3 x SMs and SD1 = 2/3 x SM1
Site Class D - Fa = 1 13 ,Fv = 1 722
Period Sa
(sec) (g)
02 0 697 (SDs, Site Class D)
10 0 389 (SD1, Site Class D)
251933-YTG-B-0806
Weights and Dimensions
ZJ/XP036-060 Unit Weights
Unit 4 Point Load Weight Unit 6 Point Load Weight
LEFT FRONT
ZJ036-060
Size
(Tons)
036
(30)
048
(40)
060
(50)
Weight (Ibs )
Shipping
580
590
595
Operating
575
585
590
Center of Gravity
X
40
40
40
Y
20
20
20
4 Point Load Location (Ibs )
A
132
134
135
~ B
125
127
128
C
155
158
159
D
164
167
168
6 Point Load Location (Ibs )
A
89
90
91
B
85
87
88
C
82
84
84
D
102
104
105
E
106
108
109
F
110
112
113
XP036-060
Size
(Tons)
036
(30)
048
(40)
060
(50)
Weight (Ibs )
Shipping
580
590 ,
595
Operating
575
585
590
Center of Gravity
X
39
39
39
Y
20
20
20
4 Point Load Location (Ibs )
A
135
137
138
B
121
124
125
C
151
154
155
D
168
171
172
6 Point Load Location (Ibs )
A
91
93
94
B
85
87
87
C
80
81
82
D
99
101
102
E
106
108
109
F
114
116
117
ZJ/XP036-060 Unit Accessory Weights
Unit Accessory
Economizer
Power Exhaust
Electnc Heat1
Gas Heat'
Weight (Ibs )
Shipping
55
55
28
70
Operating
50
50
28
70
1 Weight given is for the maximum heater size available
(30KW)
2 Weight given is for the maximum number of tube heat
exchangers available (5 tube)
52 Unitary Products Group
251933-YTG-B-0806
XP036-060 Physical Data
Models
v*omponem
Nominal Tonnage
ARI COOLING PERFORMANCE
Gross Capacity @ ARI A point (Btu)
ARI net capacity (Btu)
EER
SEER
Nominal CFM
System power (KW)
Refrigerant type
Refngerant charge (Ib-oz)
ARI HEATING PERFORMANCE
47°F capacity rating (MBH)
System power (KW) / COP
17°F capacity rating (MBH
System power (KW) / COP
HSPF (Btu/Watts-hr)
DIMENSIONS (Inches)
Length
Width
Height
OPERATING WT (Ibs )
COMPRESSORS
Type
Quantity
CONDENSER COIL DATA
Face area (Sq Ft )
Rows
Fins per inch
Tube diameter
Circuitry Type
EVAPORATOR COIL DATA
Face area (Sq Ft )
Rows
Fins per inch
Tube diameter
Circuitry Type
Refngerant control
XP036
30
36200
35000
11 0
130
1200
325
R-410A
13-0
34800
329(kW)/310
19000
260(kW)/215
770
82-1/4
44-7/8
32-5/8
575
Scroll
1
1688
2
18
3/8
Split-face
506
4
15
0375
Split-face
TXV
XP048
40
48500
46500
108
130
1600
426
R-410A
13-0
45000
4 06(kW) / 3 25
27000
3 86(kW) / 2 06
770
82-1/4
44-7/8
32-5/8
585
Scroll
1
1688
2
18
3/8
Split-face
506
4
15
0375
Split-face
TXV
XP060
50
60900
58700
109
130
2000
539
R-410A
12-0
59000
5 25(kW) / 3 34
35000
476(kW)/215
770
82-1/4
44-7/8
32-5/8
590
Scroll
1
1688
2
18
3/8
Split-face
506
4
15
0375
Split-face
TXV
Unitary Products Group 13
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUESTIONNAIRE
OFFICE USE ONLY
UPFP#
HV#
BP DATE
Business Name usiness Contact Telephone #
Project Address
2-74-
City State Zip Code APN#
Mailing Address City State Zip Code Plan File*
Telephone #
The following questions represent the facility's activities, NOT the specific project description
PART I FIRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION OCCUPANCY CLASSIFICATION Indicate by circling the item, whether your business
will use, process, or store any of the following hazardous materials If any of the items are circled, applicant must contact the Fire Protection Agency with
jurisdiction prior to plan submittal
5 Organic Peroxides 9
6 Oxidizers 10
7 Pyrophoncs 11
8 Unstable Reactives 12
1 Explosive or Blasting Agents
2 Compressed Gases
3 Flammable/Combustible Liquids
4 Flammable Solids
Water Reactives
Cryogenics
Highly Toxic or Toxic Materials
Radioactives
13
14
15
Corrosives
Other Health Hazards
None of These
PART II SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD) If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 1255 Imperial Avenue, 3>u floor, San Diego, CA 92101
Call (619) 338-2222 prior to the issuance of a building permit
FEES ARE
YES
1 D
2 D
3 D
4 n
5 D6 a
REQUIRED • Expected Date of Occupancy 0\ 1 1*5 / 0*[
NO
B
&m
m0»
Is your business listed on the reverse side of this form? (check all that apply)
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than
55 gallons, 500 pounds, 200 cubic feet, or carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank'
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
D CalARP Exempt
/
Date Initials
D CalARP Required
/
Date Initials
D CalARP Complete
/
Date Initials
PART III SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT If the answer to any of the questions below is yes, applicant must contact the Air
Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition
permit Note if the answer to questions 3 or 4 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to
commencing demolition or renovation, except demolition or renovation of residential structures of four units or less Contact the APCD for more information
1
YES
D
NO
Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD factsheet at http //www sdapcd ora/mfo/facts/permits pdf, and the list of typical equipment requiring an APCD permit on the reverse side
of this from Contact APCD if you have any questions)
D D (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)?
(Public and private schools may be found after search of the California School Directory at http //www cde ca aov/re/sd/. or contact the
appropriate school district)
D JKJ Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos?
D H Will there be demolition involving the removal of a load supporting structural member?
Briefly describe business activities Briefly describe proposed project
Office,
lade herein are true and correct
Name of owner or Authorized Agent Sig/atilre of^Owrfgf or^tuthonzed Agent Date
FOR OFFICIAL USE ONLY
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION
BY DATE
EXEMPT OR NO FURTHER INFORMATION REQUIRED
COUNTY-HMD APCD
RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY
COUNTY-HMD APCD
RELEASED FOR OCCUPANCY
COUNTY-HMD APCD
HM-9171 (04/07)County of San Diego - DEH - Hazardous Materials Division
COMMUNITY FACILITIES DISTRICT No. 1
NON-RESIDENTIAL CERTIFICATE NON-RESIDENTIAL LAND OWNER, PLEASE
READ THIS OPTION CAREFULLY AND BE SURE YOU THOROUGHLY UNDERSTAND
BEFORE SIGNING THE OPTION YOU CHOSE WILL AFFECT YOUR PAYMENT OF THE
DEVELOPED SPECIAL TAX ASSESSED ON YOUR PROPERTY THIS OPTION IS
AVAILABLE ONLY AT THE TIME OF THE FIRST BUILDING PERMIT ISSUANCE
PROPERTY OWNER SIGNATURE is REQUIRED BEFORE SIGNING YOUR SIGNATURE is
CONFIRMING THE ACCURACY OF ALL INFORMATION SHOWN
NEGM, LLC
NAME OF OWNER
2794 GATEWAY RD
ADDRESS
TELEPHONE
2794 GATEWAY RD
PROJECT ADDRESS
CARLSBAD CA 92OO9 CARLSBAD, CA 92009
CITY, STATE
213 3OO 1 1 OO
ZIP CITY, STATE ZIP
ASSESSOR PARCEL NUMBER(S) OR APN(s) AND LOT NUMBERS(S) IF NOT YET SUBDIVIDED BY COUNTY ASSESSOR
CB081727
BUILDING PERMIT NUMBER(S)
As CITED BY ORDINANCE No NS-155 AND ADOPTED BY THE CITY OF CARLSBAD, CALIFORNIA,
THE CITY IS AUTHORIZED TO LEVY A SPECIAL TAX IN COMMUNITY FACILITIES DISTRICT NO 1 ALL
NON-RESIDENTIAL PROPERTY, UPON THE ISSUANCE OF A BUILDING PERMIT, SHALL HAVE THE
OPTION TO (1) PAY THE SPECIAL DEVELOPMENT TAX ONE TIME OR (2) ASSUME THE
ANNUAL SPECIAL TAX - DEVELOPED PROPERTY FOR A PERIOD NOT TO EXCEED TWENTY-
FIVE (25) YEARS PLEASE INDICATE YOUR CHOICE BY INITIALIZING THE APPROPRIATE LINE BELOW
OPTION (1)
OPTION (2)
I ELECT TO PAY THE SPECIAL TAX • ONE TIME NOW, AS A ONE-TIME PAYMENT
AMOUNT OF ONBJJME SPECIAL TAX. $ 318.77
OWNER'S lNiTiALsCj&^__
I ELECT TO PAY THE SPECIAL DEVELOPMENT TAX ANNUALLY FOR A
PERIOD NOT TO EXCEED TWENTY-FIVE (25) YEARS
MAXIMUM ANNUAL SPECIAL TAX: $ N/A
OWNER'S INITIALS
I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS
THE PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDERSTAND
AND VWtjZ COMfOWVITH THE PROVISION AS STATED ABOVE
SIGNATE OF PRORERY OWNER TITLE
PRINT NAME DATE
THE CITY OF CARLSBAD HAS NOT INDEPENDENTLY VERIFIED THE INFORMATION SHOWN ABOVE THEREFORE,
WE ACCEPT NO RESPONSIBILITY AS TO THE ACCURACY OR COMPLETENESS OF THIS INFORMATION
LAND USE, FY, FACTORING O3/O3 O47 1 X SQUARE FT 6,768= 3 1 8.77
- • ~t
mmunity Facilities District No. 1
NON-RESIDENTIAL CERTIFICATE: Non-Residential Land Owner,
please read this option carefully and be sure you thoroughly understand the options before
signing The option you chose will affect your payment of the developed Special Tax
assessed on your property This option is available only at the time of the first building
permit issuance. Property owner signature is required before a building permit will be
issued Your signature is confirming the accuracy of all information shown
BRESSI SPECTRUM LLC
Name of Owner
4350 EXECUTIVE PR STE 301
Address
SAN DIEGO CA 92121
City, State Zip Code
Lot HO APN 213-263-0800
(858) 784-3660
Telephone
Project Address
Carlsbad, California
,
9200
City, State Zip Code
Assessor's Parcel Number or APN and Lot Number if not yet subdivided by County Assessor
Budding fermit Number(s)
As cited by Ordinance No NS-15S and adopted by the City of Carlsbad, California, the City is authorized
to levy a Special Tax in Community Facilities District No 1 All non-residential property, upon the
issuance of a building permit, shall have the option to (1) pay the SPECIAL DEVELOPMENT TAX ONE-
TIME or (2) assume the ANNUAL SPECIAL TAX - DEVELOPED PROPERTY for a period not to
exceed twenty-five (25) years. Please indicate your choice by initialing the appropriate line below
OPTION (1)
OPTION (2)
I elect to pay the SPECIAL T
One-Time Special Tax $_
now, as a one-tune payment Amount of
Owner's Initials
I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to
exceed twenty-five (25) years Maximum Amiual^y Special Tax
S 7ff>L. 13- Owner's Initials
I DO HEREBY CERTIFY UNDER PENALTY OF PERJURY THAT THE
PROPERTY OWNER OF THE SUBJECT PROPERTY AND THAT I UNDi
COMPLY WITH THE PROVISIONS AS STATED ABOVE
NED IS THE
AND WILL
Title
Print Name Date
The City of Carlsbad has not independently verified the information shown above Therefore, we accept no
responsibility as to the accuracy or completeness of this information
Land Use, FY .Factor /H0UT77? \/?/ 3/ff . jjfy75 X SW*re Ft ^ 7^/J* - ^ 7 J5.
o5"cToo o5?^>^ _-i_A°\< ,.?L_^~P^ v\^'ft ^«£r>*^r*<t^^^i O^~c\>1 /\&~c$H^~^^.-i -^^oo?^2 &€-^^a®v>$rrrsJ ^>^°s>^>li^viir )^P>. L.^ -\(S)Imr-— \do-T-l' 1TlOn7)vjJ)D0n^-ct%?6 O 10
I
9
-nj
I!U
«
3,,^
O
r^
O
^
11-18-2008
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Plan Check Revision Permit No PCR08131
Building Inspection Request Line (760) 602-2725
Job Address
Permit Type
Parcel No
Valuation
Reference #
PC#
Project Title
2794 GATEWAY RD CBAD
PCR
2133001100 Lot# 0
$0 00 Construction Type NEW
C6081727
NATH LAW GROUP-REVISIONS TO
PLUMBING .ELECTRICAL, MECHANICAL
Applicant
WHITLOCK MARGIT
STEB
3015 SAINT CHARLES
SAN DIEGO CA 92110
619-531-0110
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Owner
NEGMLLC
12264 EL CAMINO REAL #400
SAN DIEGO CA 92130
ISSUED
10/28/2008
KG
11/18/2008
11/18/2008
Plan Check Revision Fee
Additional Fees
$18000
$000
Total Fees $180 00 Total Payments To Date $18000 Balance Due $000
Inspector
FINAL APPROVAL
Date Clearance
NOTICE Please lake NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bai any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this proicct NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation:) nas previously otherwise expired
EsGil Corporation
In (Partnership with government for G)uiCd~ing Safety
DATE 11/5/08
JURISDICTION City of Carlsbad
FILE
PLAN CHECK NO 08-1727 PCR08-131 SET I
PROJECT ADDRESS 2794 Gateway Rd
PROJECT NAME The Nath Law Group - TI
XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to
i
XI Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Telephone #
Date contacted (by ) Fax #
Mail Telephone Fax In Person
REMARKS
By Doug Moody Enclosures
Esgil Corporation
D GA D MB D EJ D PC 10/30/08
9320 Chesapeake Dnvc, Suite 208 * San Diego, California 92123 + (858)560-1468 + Fax (858) 560-1576
City of Carlsbad 08-1727 PCR08-131
U/5/0&
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION City of Carlsbad
131
PLAN CHECK NO 08-1727 PCR08-
DATE 11/5/08PREPARED BY Doug Moody
BUILDING ADDRESS 2794 Gateway Rd
BUILDING OCCUPANCY B TYPE OF CONSTRUCTION VB
BUILDING
PORTION
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code
RlHn Pprmir FPP hv Drdina
AREA
( Sq Ft )
cb
Valuation
Multiplier
By Ordinance
-- -• , ..— |
nrp : ^
Reg
Mod
VALUE ($)
Plan Check Fee by Ordinance
Type of Review FJ]
] Repetitive Fee
~ Repeats
$180 00
Complete Review
D Other
r-i Hourly
D Structural Only
1 5 Hours *
Esgil Plan Review Fee $144 00
* Based on hourly rate
Comments
Sheet 1 of 1
macvalue doc
TITLE 24 REPORT
Title 24 Report for:
The Nath Law Group San Diego Office
2794 Gateway Road, Building K
Carlsbad, CA 92009
Project Designer:
Architectural Concepts
3015 Saint Charles St #B
San Diego, CA 92110
(619)531-0110
Report Prepared By:
Ryan Heather
T-Squared Professional Engineers, Inc
1340 Specialty Drive Suite E
Vista, CA 92081
(760)560-0100
Job Number:
#08077
Date:
10/22/2008
The EnergyPro computer program has been used to perform the calculations
authorized by the California Energy Commission for use with both the Residential
This program developed by EnergySoft,!
proval and is
ndards
EnergyPro 4 4 by EnergySoft Job Number #0;
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV-MM Envelope Mandatory Measures 18
Form MECH-MM Mechanical Mandatory Measures 19
EnergyPro 4 4 by EnergySoft Job Number #08077 User Number 5511
[PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-I
PROJECT NAME
The Nath Law Group San Diego Office
PROJECT ADDRESS
2794 Gateway Road Building K Carlsbad
PRINCIPAL DESIGNER - ENVELOPE
Architectural Concepts
DOCUMENTATION AUTHOR
TELEPHONE
(619)531-0110
TELEPHONE
DATE
10/22/2008
_ I
Checked by/Date
T-Squared Professional Engineers, Inc 760) 560-0100 | Enforcement Agency Use
IGENERAL INFORMATION
JDATE OF PLANS
I 9-2-2008
BUILDING CONDITIONED FLOOR AREA CLIMATE ZONE
6,613SqFt 7
Q HIGH RISE RESIDENTIAL
PHASE OF CONSTRUCTION
HOTEL/MOTEL GUEST ROOM
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
SIGNATURE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations This certificate applies only to a Building using the performance compliance approach
The documentation preparer hereby certifies that the documentation \s accurate andj^emplete
DOCUMENTATION AUTHOR
Ryan Heather
iThe Principal Designer hereby certifys that the proposed building design represented in this set of construction documei
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6
ENV LTG MECJ_
1 I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation, and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect
2 I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537 2 or 6737 3 to sign this document as the person responsible for its preparation, and that I am a licensed
contractor performing this work
in n 3 I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737 1 (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for
PRINCIPAL ENVELOPE DESIGNER - NAME
Architectural Concepts
Mandatory Measures
Required Forms ENV-1
SIGNATURE LIC NO DATE
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for
PRINCIPAL LIGHTING DESIGNER - NAME
Mandatory Measures Lighting Compliance Not In The Scope Of
This SubmittalRequired Forms :
: SIGNATURE LIC NO I DATE
MECHANICAL COMPLIANCE /?
Indicate location on plans of Note Block for
PRINCIPAL MECHANICAL DESIGNER - NAME
T-Squared Professional Engineers,
Run Initiation Time
Mandatory Measures j //
Required FormsMECH-1, MECH-2, MECH-3, MECH-5
SIGNATURE /M LIC NO DATE
//I
1 0/22/081 6. W 45 Run Code 1224717465
EnergyPro44 by EnergySoft User Number 5511 / / Job Number #08077 Page 3 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-1
PROJECT NAME DATE
The Nath Law Group San Dieqo Office ! 10/22/2008
ANNUAL TDV ENERGY USE SUMMARY (kBtu/saft-vr)
Standard Proposed
ENERGY COMPONENT Design Design
Space Heating 1036 -oso
Space Cooling 14259 9079
Indoor Fans 38 07 27 18
Heat Rejection o oo o 00
Pumps & Misc ooo ooo
Domestic Hot Water ooo ooo
Lighting j 6673 6673
Receptacle 74 99 74 99
Process o oo o oo
TOTALS 332 74 258 89
Percent better than Standard 22 2%
Compliance
Margin [ | Standard , .„ • Proposed
1 1 1 fi Space Heating J
1Q88 «^ I
0 00 HotRweton
000; : ..PU™silfac
000 ' D"w
o oo :' mmmmmi^
\ ooo """*" |
•••' 1 9 19 29 39 49 59 69:;79 89.: 99 109119129139
7384 :;:'.! kBti"sqftyr >^i
( 22 2% excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation (N)Odeg Conditioned Floor Area 6,613 sqft
; Number of Stones 1 Unconditioned Floor Area Osqft
Number of Systems ' 8 Conditioned Footprint Area Osqft
Number of Zones ; 8; Fuel Type Natural Gas ,
i
Orientation Gross Area Glazing Area Glazing Ratio
Front Elevation ! (N)
Left Elevation (E)
Rear Elevation (S)
Right Elevation (W)
Total
Roof
992 sqft 528 sqft 53 2%
795 sqft 445; sqft 560%
772 sqft 432 ! sqft 560%
740 sqft 420 sqft 56 8%
3299!sqft ' 1,825 sqft 553%
!
6613;sqft Osqft 00%
Standard
Lighting Power Density ' 1100 w/sqft
Prescriptive Env Heat Loss i,736ietu/h
Prescriptive Env Heat Gam i32,28i!Btu/h-F
Proposed
0 000: w/sqft
2,086! Btu/h
161,936:Btu/h-F
i Remarks
Run Initiation Time 10/22/08 16 17 45 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 4 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1
[PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008
IZONE INFORMATION I
System Name
FC-1/HP-1
HP-7
HP-6
HP-5
i .HFM
i I HP~3
HP-2
HP-1
Zone Name
FC-1/HP-1
HP-7
HP-6
HP-5
HP-4
Floor
Area
Occupancy Type (sqft)
Comp Bldg Office
Comp Bldg Office
Comp Bldg Office
Comp Bldg Office
Comp Bldg Office
HP-3 : Comp Bldg Office
HP-2 Comp Bldg Office
HP-1 : Comp Bldg Office
-— -
;|
76
773
721
1,935
1,421
581
406
700
Inst
LPD
(W/sf)1
0000
0000
0000
0000
0000
0000
0000
0000
•
Notes 1 See LTG-2-C 2 See LTG-4-C 3 See LTG-5-C 4 See LTG-6-C
(items marked with asterisk see LTG-2 -C by others) (by others)
Ctrl Allows
Credits < Area
(W/sf)2i (W/sf)3
.. ....... _
sd_LP_D_
Tailored
(W/sf)4
Proc
Loads
(W/sf)
'
i
Items above require special documentation
I EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration however the Roof Surface is NOT being replaced
;T_he Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
Jhe Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
I The Roof "Roof has-been designated as an alteration, however the Roof Surface jsj^OJ being repjaced
I The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
. The_Rpof "Rpof' has been designated as an alteration, however the Roof Surface is NOT being replaced _
IThe Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
IThe Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
| The Roof "Roof'has been designated as an alteration however the Roof Surface is NOT being replaced
The exceptional features listed in this performance approach application have specifically been reviewed Adequate written justification and
documentation for their use have been provided by the applicant
Authorized Signature or Stamp
I Run Initiation Time 10/22/08161745 Run Code 1224717465
' EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 5 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1
PROJECT NAME
L The Nath Law Group San Diego Office
DATE
10/22/2008
(ZONE INFORMATION
i System Name
i
j
Zone Name Occupancy Type
;
Floor
Area
(sqft)
Inst
LPD
(W/sf)1
I
j
|
r'
i
,
Notes 1 See LTG-2-C 2 See LTG-4-C 3 See LTG-5-C 4 See LTG-6-C
(items marked with asterisk see LTG-2 -C by others) (by others)
Ctrl
Credits
(W/sf)2
Al lowed LPD
Area '• Tailored
(W/sf)3. (W/sf)4
Proc
Loads
(W/sf)
! ;
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
.The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
.The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has Jpeen designated as an alteration, however the Roof Surface is NOT being replaced
JM._Rooi"Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
The exceptional features listed in this performance approach application have specifically been reviewed Adequate written justification and
documentation for their use have been provided by the applicant
Authorized Signature or Stamp
Run Initiation Time 10/22/08161745 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 6 of 20
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-1
(PROJECT NAME
JThe^Nath Law Group San Diego Office
'• DATE
10/22/2008
ZONE INFORMATION
System Name Zone Name
Floor
i Area
Occupancy Type ' (sqft )
j
!|
Inst
LPD
(W/sf)1
Notes 1 SeeLTG-2-C 2 See LTG-4-C 3 See LTG-5-C 4 See LTG-6-C
(items marked with asterisk see LTG-2 -C by others) (by others)
Ctrl
Credits
(W/sf)2
Aljpwc
Area
(W/sf)3
KJ.LPD
tailored
(W/sf)4
Proc
Loads
(W/sf)
L
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted
The Roof "Roof has_been designated as an alteration, howeyerjhe Roof Surface is NOT being replaced
The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced _
! Til.e..R.9_0CR°°f" nas been designated as an alteration, however the Roof Surface is NOT being replaced
: The Roof "Roof has been designated as an alteration, however the Roof Surface is NOT being replaced
| The Roof "Roof has been designated as an alteration however the Roof Surface is NOT being replaced
The exceptional features listed in this performance approach application have specifically been reviewed Adequate written justification and
documentation for their use have been provided by the applicant
Authorized Signature or Stamp
Run Initiation Time 10/22/08 16 17 45 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 7 of 20
CERTIFICATE OF COMPLIANCE ENV-1-C
'PROJECT NAME
l_ The Nath Law Group San Diego Office
DATE
10/22/2008
[OPAQUE SURFACES
#
•i
3
*
i 6
7
8
"9
lQ-
11
12"
,13
COTilif
16
"17
Surface
Type
Roof
Area
76
Roof : 147
Wall
Roof
Wall
Roof
49
121
50
U-Fac
0036
0036
0102
0036
0102
Insulation
Cav Cont
Act
Azm
R-30 : R-00 0
R-30 , R-0 0
R-13 R-00
R-30 ! R-0 0
0
180
0
Tilt
0
Cond* 'Joint Appendix
Status ; IV Reference
Altered
0 Altered
90 TAlTered
0 : Altered
02-A9(E=02-A1)
02-A9(E=02-A1)
09-A3(E=09-A1)
Location / Comments
FC-1/HP-1 l
HP-7
HP-7
02-A9(E=02-A1) :HP-7
R-13 R-00: 180 . 90 Altered 09-A3 (E=09-A1)
196, 0036' R-30i R-0 Oi 0
Wall 61 0102
Roof 147 0036
Wall 49 0102
Roof 163 0036
Wall
Roof
Wall
R-13
R-30
R-13
R-30
51 0102; R-13
216
71
Wall 80
Roof
Wall
Roof
18 .Wall
19 Roof
2o!wall
0036
0102
0102
119 0036
R-30
R-13
R-13
R-30
R-00
R-00
R-00
180
0
180
0
90
0
90
Altered
Altered
Altered
Altered
02-A9(E=02-A1)
09-A3(E=09-A1)
02-A9(E=02-A1)
HP-7
HP-7
HP-7
HP-7
09-A3(E=09-A1) HP-7
R-00! 0 0 Altered 02-A9 (E=02-A1) .HP-7
R-00; 180
R-00
R-00
R-00
R-00
0
90
90
0
90 : Altered .09-A3 (E=09-A1)
0
90
90(__._ ... _
40 0102 R-13 R-00 90 : 90
143, 0036 R-30; R-00 0
24
119
53
0102
0036
0102
R-13
R-30
R-13
R-OOi 90
R-00
R-00
0
90
0
90
0
90
Altered
Altered
Altered
02-A9 (h-0^-A1 )
09-A3(E=09-A1)
HP-7
HP-6
HP-6
09-A3(E=09-A1) ;HP-6
Altered '02-A9 (E=02-A1)
Altered
Altered
Altered
Altered
Altered
09-A3(E=09-A1)
02-A9(E=02-A1)
09-A3(E=09-A1)
HP-6
HP-6
HP-6
HP-6
02-A9(E=02-A1) HP-6
09-A3(E=09-A1) jHP-6
'NEAR (New Existing Altered Removed)
IFENESTRATION SURFACES
D More than or equal to 10 000 sq ft of site built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U factors from
Standards Table 116 A and B Certificate shall be filed in the contractor's project office during construction and in the building manager's office after constructor^
#
1
2
3
4
Type
Window Rear (S)
Area
66
Window Rear (S) 45
Window Rear (S)
Window Rear (S)
5 iWmdow Rear (S)
6
7^
8
9
10
"11
12
13
Window Lett (E)
Window Lett (E)
Window Left (E)
Window Left (E)
U-Fac1
0930
0930
90 0930
66
75
60
90
60
NFRC
NFRC
SHGC2
038
038
NFRC 038
0930 NFRC: 038
0930
0930
0930
'"O 930
87' 0 930
Window Left (E) 39 0930
Window Left (E) j 49. 0 930
Window Front (N)
Window Right (W)
126
126
NFRC
NFRC
NFRC
NFRC
NFRC
NFRC
038
038
NFRC
NFRC
Act
Azm
180
Cond
Stat Glazing Type
Existing
180 Existing
NFRC 180 Existing
NFRC 180
NFRC 180
NFRC
0 38 NFRC
0 38 .NFRC
038
\ 038
NFRC 038
0930 NFRC 038
NFRC
NFRC
l_ 90
90
90
Existing
Existing
Existing
Single Pane Reflected Blue
Single Pane Reflected Blue
Single Pane Reflected Blue
Location/
Comments
HP-7
HP-7
HP-7
Single Pane Reflected Blue HP-7
Single Pane Reflected Blue HP-7
Single Pane Reflected Blue
Existing ! Single Pane Reflected Blue
Existing Single Pane Reflected Blue
90 Existing
90 Existing
NFRC 90; Existing
NFRC; 0
0930, NFRC 038 NFRC| 270
Existing
Existing
Single Pane Reflected Blue
Single Pane Reflected Blue
HP-6
HP-6
HP-6
HP-6
HP-6
Single Pane Reflected Blue : HP-6
Single Pane Reflected Blue HP-4
Single Pane Reflected Blue HP-4
(1)U factor Type 116 A Default Table from Standards Table Nl 1 Default Table from the ACM Manual Appendix NFRC Labeled value
(2) SHGC Type 116 B Default Table from Standards COG Center of Glass NFRC Labeled Value
EXTERIOR SHADING I
#
1
2
3
Exterior Shade Type
None
None
None
4 I None
5
6
7
8
9
10
11
12
13
None
None
SHGC
076
076
076
076
076
Window
Hgt Wd
Overhang
Len Hgt LExt RExt
076
None : 0 76 :
None 0 76
None i 0 76
None
None
None
None
076
076
076
Left Fin Right Fin \
Dist Len Hgt Dist Len Hgt
:
!
076 !
,
IMINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
The proposed building is in climate zones 2 through 1S and contains an enclosed space with floor area greater than 25 000 ft2 a ceiling height greater than 1S feet and an LPD for general
— lighting of at least 0 5 W/ft2 See Section 143(c) If this box is checked, ENV-4 C must be filled out when submitting under the Prescriptive Compliance Approach
Run Initiation Time. 10/22/0816 1745 Run Code 1224717465 I
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 8 of 20 |
CERTIFICATE OF COMPLIANCE ENV-1-C
PROJECT NAME
I The Nath Law Group San Diec Office
DATE
10/22/2008
IQPAQUE SURFACES
#
?1
22
23
Surface
Type Area
Roof 124
Wall 46
Roof
24 ;Roof
J5
26
27
i 28
29
30
:3T
Roof
Roof "1
122
178
1,515
U-Fac
0036
0102
Insulation
Cav Cont
R-30 R-0 0
R-131 R-00
0 036 R-30
0036
0036
R-30
R-30
R-00
R-00
R-00
120| 0036 R-30 R-0 0
Roof 151 0036, R-30
Roof
Roof
31 0 036
152
Roof ! 6£
Roof
32 Roof
33
34
35
36
*L
raT
39
40
Roof
Wall
151
509
0036
R-30
R-30
Act ' Cond* I Joint Appendix
Azm ! Tilt Status IV Reference
0 : 0
90
"o
I 90
0
0 | 0
Altered
Altered
Altered
Altered
Location / Comments
02-A9(E-02-A1) HP-6
09-A3(E=09-A1)
02-A9(E=02-A1)
02-A9(E=02-A1)
HP-6
HP-5
HP-5
0 ' 0 i Altered 02-A9 (E=02-A1) HP-5
0
R-0 0: 0
R-00
R-00
0036 R-30 R-00
0 036 , R-30 R-0 0
0036
358 0 036
114
Wall ' 9£
Roof 15'
Wall
Wall
Roof
Wall
79
0102
0102
0
0
0 Altered
0
0
0
0 0
0
R-30 i R-00 0
R-30
R-13
R-13
R-0 0; 0
R-OOl
R-00
0 036 R-30 ; R-0 0
0 102 R-13 R-0 0
36 0 102
188
49
0036
0102
R-13
R-30
R-13
0
0
0
0 90
270 90
Altered
Altered
Altered
Altered
Altered
Altered
Altered ...
Altered
02-A9(E=02-A1) HP-5
02-A9(E=02-A1) HP-4
02-A9(E=02-A1)
02-A9(E=02-A1)
02-A9 (E=02-A1J
HP-4
HP-4
HP-4
02-A9(E=02-A1) HP-4
02-A9(E=02-A1)
02-A9(E=02-A1)
HP-4
HP-4
09-A3(E=09-A1) 'HP-4
09-A3(E=09-A1)
0 0 I Altered ;02-A9 (E=02-A1)
0
R-0 0 90
R-00 0
R-00 0
90
90 ~l
Altered
Altered
0 Altered
09-A3(E=09-A1)
09-A3(E=09-A1)
02-A9(E=02-A1)
HP-4
HP-3
HP-3
HP-3
HP-3
90 Altered :09-A3 (E=09-A1 ) HP-3
•NEAR (New Existing Altered Removed)
[FENESTRATION SURFACES I
1
#
14
'Is"
16
Si
19
20
21
22
More than or equal to 10 000 sq ft of site built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U factors from
Standards Table 1 16 A and B Certificate shall be fled in the contractor's project office during construction and in the building manager's office after construction
Type Area U-Fac1 I Act
SHGC2 Azm
Cond
Stat
| Location/
Glazing Type Comments
Window Front (N) : 60 0 930 NFRC 038JNFRC 0 Existing Single Pane Reflected Blue
Window Left (E) , 60 0930LNFRC' 038 NFRC 90j Existing ; Single Pane Reflected Blue
Window Front (N)
Window Front (N)
Window Front (N)
Window Front (N)
96
45
60
141
0930
0930
0 930
0930
Window Rear (S) ': 90 0930
Window Right (W)
Window Right (W)
23 Window Right (W)
24 Window Right (W)
!
120 0930
49
38
87
0930
NFRC
NFRC
NFRC
NFRC
NFRC
0 38 .NFRC
038
038
038
038
NFRC 038
NFRC; 038
0930 NFRC
0930; NFRC
NFRC
NFRC
NFRC
NFRC
NFRC
0
0
0
0
Existing j Single Pane Reflected Blue
Existing
Existing
Existing
180 Existing
270
NFRC. 270
0 38 NFRC
038 IslFRC
. . _.._
I 270
270
Existing
HP-3
HP-3
HP-3
Single Pane Reflected Blue i HP-3
Single Pane Reflected Blue :HP-3 :
Single Pane Reflected Blue
Single Pane Reflected Blue
Single Pane Reflected Blue
Existing .Single Pane Reflected Blue
Existing
Existing
Single Pane Reflected Blue
Single Pane Reflected Blue
HP-2
HP-1
HP-1
HP-1
HP-1
HP-1
(1) U factor Type 115 A Default Table from Standards Table Nl 1 Default Table from the ACM Manual Appendix NFRC Labeled value
(2) SHGC Type 116 B Default Table from Standards COG Center of Glass NFRC Labeled Value
EXTERIOR SHADING
#
14
15
J6
17
18
19
20
21
22
23
24
Exterior Shade Type SHGC
Window
Hgt Wd
Overhang Left Fin Right Fin
Len Hgt LExt RExt Dist Len Hgt Dist Len Hgt
None ! 0 76
None ! 0 76 ;
None
None
None
None
076
076
076
076
None : 0 76
None 0 76
None i 0 76
None
None
!
076
076
I MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACESnThe proposed building is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25 000 ft2, a ceiling height greater than 15 feet and an LPD for general
lighting of at least 0 5 W/ft2 See Section 143(c) If this box is checked ENV-4 C must be filled out when submitting under the Prescnptive Compliance Approach
Run Initiation Time 10/22/0816
EnergyPro 4 4 by EnergySoft User Number 5511
17 45 Run Code 1224717465
Job Number #08077 Page 9 of 20
CERTIFICATE OF COMPLIANCE ENV-1-C
PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008
[OPAQUE SURFACES
#
~41
42
43
44
45
46
47
48
Surface
Type
Roof
Wall
Roof
Wall
Roof
Wall
Roof
Wall
Area
121
50
U-Fac
0036
0102
121 0036
35
406
137
336
0102
0036
0102
0036
Insulation
Cav Cont
R-30 R-0 0
R-13 R-OO
R-30
R-13
R-OO
R-OO
R-30 R-0 0
R-13: R-OO
R-30 R-0 0
80, 0102 R-13! R-OO
49|Wall 111 0102: R-13 R-0 0
50 : Roof : 104; 0036 R-30 R-0 0
51 Wall 32 0102| R-13
52 Roof
53
54
55
Wall
Roof
Wall
118 0036
54! 0102
142 0 036
24 0 102
R-30
R-13
R-30
R-13
R-OO
R-OO
R-OO
R-OO
Act
Azm
0
0
0
0
0
0
0
180
270
0
270
0
270
'"o
R-OO! 270
j
Tilt
0
90
0
90
0
90
0
90
90
0
90
Cond*
Status
Altered
Altered
Joint Appendix
IV Reference
02-A9 <E=02-A1}
09-A3 (E=09-A1)
Altered '02-A9 (E=02-A1)
Altered I09-A3 (E=09-A1)
Altered :02-A9 (E=02-A1)
Altered :09-A3 (E=09-A1 )
Altered
Altered
02-A9(E=02-A1)
09-A3(E=09-A1)
Altered 09-A3 (E=09-A1)
Altered
Altered
Location / Comments
HP-3
HP-3
HP-3
HP-3
HP-2
HP-2
HP-1
HP-1
HP-1
02-A9(E=02-A1) :HP-1
09-A3(E=09-A1) :HP-1
0 Altered :02-A9 (E=02-A1L :HP-1
90 Altered
0 Altered
90 Altered
;
09-Ao (t-09-A1)HP-1
02-A9(E=02-A1) :HP-1
09-A3(E=09-A1) HP-1
•NEAR (New Existing Altered Removed)
IFENESTRATION SURFACES
: More than or equal to 10 000 sq ft of site built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U factors from
Standards Table 116 A and B Certificate shall be filed in the contractor's project office during construction and in the building manager's office after construction
(1)U factor Type 116 A Default Table from Standards Table NI 1 Default Table from the ACM Manual Appendix NFRC Labeled value
(2) SHGC Type 116 B Default Table from Standards COG Center of Glass NFRC Labeled Value
EXTERIOR SHADING
|
# Exterior Shade Type
j
SHGC
Window
Hgt Wd
Overhang
Len Hat LExt RExt
Left Fin
Dist Len Hgt
Right Fin
Dist Len Hgt
I
I MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
.J The proposed building is in climate zones 2 through 15 and contains an enclosed space with floor area greater than 25 000 ft2, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0 5 W/ft2 See Section 143(c) If this box is checked, ENV-4-C must be filled out when submitting under the Prescriptive Compliance Approach
Run Initiation Time 10/22/08161745 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077
I
Page 10 of 20
CERTIFICATE OF COMPLIANCE MECH-1-C
PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008
Designer
This form is to be used by the designer and attached to the plans Listed below are all the acceptance tests for mechanical systems The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test Also indicate the person responsible for performing the tests (i e the installing contractor design professional or an agent
selected by the owner) Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately
Building Departments
SYSTEM ACCEPTANCE Before an occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance
In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications installation
certificates and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6
STATEMENT OF COMPLIANCE
• MECH-2-A Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Tes( required on all New systems both New Construction and Retrofit
LJ MECH-3-A Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Ies( required on all New systems both New Construction and Retrofit
\ MECH-4-A Air-Side Economizer Acceptance Document
Equipment requiring acceptance testing _.
Tesf required on all New systems both New Construction and Retrofit Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection
MECH-5-A Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5 000 f!2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an
attic New systems that meet the above requirements Retrofit systems that meet the above requirements and either extend ducts replace ducts or
replace the packaged unit
L] MECH-6-A Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested
i MECH-7-A Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VAVfan volume controls installed on new or existing systems must be tested
J MECH-8-A -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems
-Automatic Isolation Controls Applies to new boilers and chillers and the pnmary pumps are connected to a common header
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500 000 Btu/hr
-Water-loop Heat Pump Controls
Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp
-Variable Frequency Controls Applies to all new distnbution pumps on new vanable flow chilled hydronic heat pump
or condenser water systems where the pumps motors are greater thanShp
Equipment requiring acceptance testing __
User Number 5511 Job Number #08077EnergyPro 4 4 by EnergySoft Page 11 of 20
AIR SYSTEM REQUIREMENTS Parti of2 MECH-2-C
PROJECT NAME
The Nath Law Group San Diego Office
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
DATE
10/22/2008
I
AIR SYSTEMS, Central or Single Zone
FC-1/HP-1 HP-7
1 1
HP-6 !
1
Reference on Plans or Specification 1
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a)
112(a)
112(b)
112(c), 115(a)
121(b)
121(b)
121(c)
121.(c) _
121(c), 122(e)
122(e)
122(f)
122(g)
123
124
80% AFUE
130 SEER/ 11 OEER
n/a
n/a
Yes
1 cfm
No
No
Programmable Switch
No Setback Required
Auto
n/a
R-80
0 81 HSPF
130 SEER/ 10 SEER
Yes
n/a
Yes
1 65 cfm
No
No
Programmable Switch
No Setback Required
Auto
n/a
R-80
0 81 HSPF
130 SEER/ 10 SEER
Yes
n/a
Yes
1 50 cfm
No
No
Proqrammable Switch
No Setback Required !
Auto
n/a
R-80
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1 43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1 21 2
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance3
144 (a & b)
144 (a & b)
144 (a &b)
144 (a & b)
144 (c)
144 (c)
144 (c)
144 (d)
144 (e)
144(f)
144 (f)
144 (k)
n/a
Obtuh
n/a
25,515 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
41, 998 btuh
n/a
45,840 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
40,162 btuh
n/a
44,325 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp '
No !
1 For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented If a requirement is not applicable put N/A in the column
2 Not required for hydronic heating and cooling Either enter a value here or put in reference ot plans and specifications per footnote 1
3 Enter Yes if System is Constant Volume Single Zone Serves < 5 000 sqft Has > 25% duct in unconditioned space Duct sealing is required for Prescriptive Compliance
see PERF-1 for performance method duct sealing requirements
INOTES TO FIELD - For Building Department Use Only I
!
i i
b Run Initiation Time 10/22/08161745 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 12 of 20
AIR SYSTEM REQUIREMENTS Parti of 2 MECH-2-C
PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008 I
(SYSTEM FEATURES
AIR SYSTEMS, Central or Single Zone !
ITEM OR SYSTEM TAG(S) , HP-5
N u m ber of Systems 1
T-24
MANDATORY MEASURES Section
HP-4
1
HP-3 |_. . .. ^
Reference on Plans or Specification 1
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
112(a)
112(a)
112(b)
112(c), 115(a)
121(b)
121(b)
121(c)
121(c)
12KO, 122(e)
122(e)
122(f)
122(g)
123
124
081 HSPF
130 SEER/ 10 SEER
Yes
n/a
Yes
380 cfm
No
No
Programmable Switch
No Setback Required
Auto
n/a
R-80
081 HSPF
130 SEER/ 10 SEER
Yes
n/a
Yes
254 cfm
No
No
Programmable Switch
No Setback Required
Auto
n/a
R-80
081 HSPF
160SEER/120EER
Yes
n/a
Yes
104 cfm
No
No
Programmable Switch :
No Setback Required
I
Auto :
n/a
R-80
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1 43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1 212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance3
1 For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented If a requirement is not applicable put N/A in the column
2 Not required for hydronic heating and cooling Either enter a value here or put in reference ot plans and specificatons per footnote 1
3 Enter Yes if System is Constant Volume Single Zone Serves < 5 000 sqft Has > 25% duct m unconditioned space Duct sealing is required for Prescriptive Compliance
see PERF-1 for performance method duct sealing requirements
144 (a & b)
144 (a & b)
144 (a&b)
144 (a & b)
144 (c)
144 (c)
144 (c)
144 (d)
144(e)
144 (f)
144(f)
144 (k)
n/a
32,741 btuh
n/a
26,041 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
39,703 btuh
n/a
36,421 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
20,043 btuh
n/a
15,882 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
INOTES TO FIELD - For Building Department Use Only
Run Initiation Time 10/22/08 16 17.45 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 13 of 20
AIR SYSTEM REQUIREMENTS Parti of2 MECH-2-C
PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008
TSYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
HP-2
AIR SYSTEMS, Central or Single Zone
HP-1
1 I
T-24
Section Reference on Plans or Specification 1
1
112(a) | 081HSPF
112(a) ! 160SEER/120EER
112(b) ! Yes
112(c), 115(a)i n/a
121(b) ! Yes
121(b) 180 cfm
121(c) No
121(c) No
0 81 COP
130SEER/109EER
Yes
n/a
Yes
196 cfm
No
No
121(c). 122(e)
122(e)
122JfJ
122(g)
123
124
Programmable Switch
No Setback Required
Auto
n/a
R-80
Programmable Switch
No Setback Required
Auto
n/a
R-80
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1 43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1 21^ :144 (a & b)
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
144 (a & b)
144 (a & b)
144 (a & b)
144 (a &b)
144 (c)
144 (c)
144 (c)
144 (d)
144(6)
144 (f)
144 (f)
144 (k)
n/a
14,076 btuh
n/a
9,454 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
No
n/a
50,489 btuh
n/a
57,545 btuh
Constant Volume
Yes
No
No Economizer
Constant Temp
Constant Temp
NoDuct Sealing for Prescriptive Compliance
1 For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented If a requirement is not applicable put N/A in the column
2 Not required for hydromc heating and cooling Either enter a value here or put in reference ot plans and specificatons per footnote 1
3 Enter Yes if System is Constant Volume Single Zone Serves < 5 000 sqft Has > 25% duct in unconditioned space Duct sealing is required for Prescriptive Compliance
see PERF-1 for performance method duct sealing requirements
INOTES TO FIELD - For Building Department Use Only ~
EnergyPro 4 4
Run
by EnergySoft
Initiation Time
User Number
10/22/08
5511
16 17 45 Run Code 1224717465
Job Number #08077 Page 14 of 20
MECHANICAL VENTILATION MECH-3-C
I PROJECT NAME
; The Nath Law Group San Diego Office_
JDATE
10/22/2008
MECHANICAL VENTILATION (Section 121(b)2)
A
ZONE/SYSTEM
AR
B
O
FC-1/HP-1 76
FC-1/HP-1 ;
HP-7 773
HP-7
HP-6 72'
HP-6
HP-5
HP-5
HP-4
HP-4
HP-3
HP-3
;HP-2
HP-2
HP-1
HP-1
1,93£
1,42'
58
EABASI
...C
00
.0
S-o 0
oa
S
D
x 3> *fc
g <3 -n
OCCUPANCY BASIS
E F : G
§1 I*s
015 11
oi5| nel i
015
015
015
015
J
4od 0 15
70d 015
i
c
E
H
I
, . J...
K
L
I
108
290
213
87
61
i
J
!
105
|
I
!
L ' I
Minimum ventilation rate per Section 121 Table 121 A
Based on fixed seat or the greater of the expected number of occup
Required Ventilation Air (REQ D V A ) is the larger of the ventilation
ants and 5C
rates calcul
% of the CBC occupan
ated on and AREA or C
CT
><
x ^ O
3
H I
|il |!f
-•*> =! =
i 11
Total
Total
Total
Total
Total
Total
Total
Total
11
116
116
108
108
1
1
165
165
150
PRESCRIPTIVE REHEAT
LIMITATION (Section 144(d))
VAV MINIMUM
J K
•<T<5
150
290 380 ;
L
Max of !Columns H, J, !KorSOOCFMM
QO
I5
! '
290 380 i
213 ! 254
213' 254
87^ 104
87
61
61
105
105
104
180
180!
196 i
196
-- -i z' Transfer Air10
|
I :
load for egress purposes for space
>CCUPANCY BASIS (column D or C
s without fixed seating
3)
Must be greater than or equal to H or use Transfer Air (column N) to make up the difference
Design fan supply cfm (Fan CFM) x 30% or
Condition area (ft sq ) x 04 cfm/ft sq or
Maximum of Columns H J K or 300 cfm
'This must be less than or equal to Column L and greater that or equal to the sum of Columns H •»• N
Transfer air must be provided where the Required Ventilation Air (column I) is greater than the Design Minimum Air (column M) Where required transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column I) and the Design Minimum Air (column M) column H M
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 15 of 20
MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C
PROJECT NAME
The Nath Law Group San Diego
CHILLER AND TOWER SUMMARY
Office DATE1 0/22/2008
l
Equipment Name Equipment Type
!
Qty
!
I
Efficiency : Tons
!
Tot
Qty GPM BMP
PU
Motor
Eff
IMPS
Drive Pump
Eff Control
IDHW / BOILER SUMMARY
System Name System Type Distribution Type Qty
Rated
Input
Vol Condition
(Gals ) i Status
iI
:
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL
Ext
R-Val
MULTI-FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump
Control #
.
HP Tvpe
Hot Water Piping Length (ft)
In Plenum Outside Buried Add 1/2'HInsulation
l
j ;
1 i
CENTRAL SYSTEM RATINGS 1
HEATING
System Name
FC-1/HP-1
System Type
Split DX
HP-7
Packaged DX
HP-6
'Packaged DX
HP-5
Packaged DX
HP-4 .Packaged DX
HP-3
Packaged DX
Qty Output
1j 0
1
1
1
1
1
54,900
52,500
42,800
51,900
26,200
HP 9 i; Packaged DX 1i 18,400
Aux
_kW
00
00
00
00
00
00
COOLING :
Eff Outout
80%AFUE
081 HSPF
0 81 HSPF
081 HSPF
081 HSPF
081 HSPF
00081 HSPF
29,000
47,300
Efficiency
130 SEER/ 11 OEER
130 SEER/ 10 SEER
45,000 130 SEER/ 10 SEER
38,400 130 SEER/ 10 SEER
43,700:130 SEER/ 10 SEER
20600
15,900
160 SEER/ 12 OEER
160 SEER/ 12 OEER
Condition
Status
New
IEconomizer Type
No Economizer
New No Economizer
New
New
New
No Economizer
No Economizer
No Economizer
New No Economizer
New 'No Economizer
CENTRAL SYSTEM FAN SUMMARY I
SUPPLY
i
System Name
FC-1/HP-1
HP-7
HP-6
HP-5
HP-4
I
|HP-3
l
Fan Type Motor Location : CFM
Constant Volume
Constant Volume
Constant Volume
Constant Volume
Draw-Through
Draw-Through
Draw-Through
Draw-Through
Constant Volume Draw-Through
1,000
1,600
'..FAN
BHP
Motor
Eff
Drive
Eff
017: 600%i 970%
025: 640%
1,600 025
1,600
1,760
Constant Volume jDraw-Through 960
'HP-2 ; :
jConstant Volume :Draw-Through 800
025
028
011
009
64 0%
64 0%
64 0%
49 0%
49 0%
97 0%!
RETUR
CFM
none
none
97 0% none
97 0% : none
97 0%, none
97 0%
97 0%
none
none
BHP
NFAN
Motor
Eff
_]
Drive |
Eff
!
i
!
Run Initiation Time 10/22/08161745 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 _P_age16of20 J
MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C
PROJECT NAME DATE
The Nath Law Group San Diego Office 10/22/2008
CHILLER AND TOWER SUMMARY
Equipment Name Equipment Type Qty j Efficiency ; Tons
PUMPS
Tot
Qty GPM BMP
Motor
Eff
Drive
Eff
Pump
Control
DHW / BOILER SUMMARY
System Name System Type Distribution Type Qty
Rated ! Vol
Input ' (Gals )
Condition
Status
Enerav
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL
Ext
R-Val
MULTI-FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump HotV
Control • # HP Type In Plenum
i
Vater Piping Length (ft)
Outside Buried
!
i
Add 1/2"Insulation,
CENTRAL SYSTEM RATINGS
System Name j System Type
HP-1
jPackaged DX
I
City
1
HEATING
__Qutput_
66,000
Aux i
kW ' Eff
0 0 0 81 COP
COOLING
.Output..
60800
Efficiency
130SEER/109EER
Condition
Status Economizer Type
New; No Economizer
- --
i
CENTRAL SYSTEM FAN SUMMARY I
SUPPLY FAN
System Name
HP-1
Fan Type Motor Location
Constant Volume ;Draw-Through
CFM BHPi
2,000 031
j
i
Motor
Eff
64 0%
Drive
Eff
97 0%
BEIUE
CFjyij BHP
none
i ;
! I
NFAN
Motor
Eff
Drive
Eff
Run Initiation Time 10/22/08161745 Run Code 1224717465
EnergyPro 4 4 by EnergySoft User Number 551 1 Job Number #08077 Page 17 of 20
ENVELOPE MANDATORY MEASURES ENV-MM
PROJECT NAME
The Nath Law Group San Diego Office
DATE
10/22/2008
DESCRIPTION
|X| § 118(a) Installed Insulating Material shall have been certified by the manufacturer to
comply with the California Quality Standards for insulating material, Title 20,
Chapter 4, Article 3
'Xl § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2
§ 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstnpped or otherwise sealed
| § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstnpped (except for unframed glass doors
and fire doors)
|X| § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E of the Standards Manufactured
fenestration products must be labeled for U-value according to NFRC procedures
| ; §118(e) Demising Walls in Nonresidential Buildings
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R-value of no less than R-13 between framing
members
Designer Enforcement
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 18 of 20
MECHANICAL MANDATORY MEASURES Parti of2 MECH-MM
PROJECT NAME
The Math Law Group San Diego Office
DESCRIPTION
Equipment and Systems Efficiencies
[X] §111 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard
| §115(a) Fan type central furnaces shall not have a pilot light
X §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123
[Xj §124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards
Controls
§122(e) Each space conditioning system shall be installed with one of the following
[X~- §!22(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off-hours for up to 4 hours The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted, or
: I §| 22(e)1 B An occupancy sensor to control the operating period of the system, or
[ , §122(e)1C A 4-hour timer that can be manually operated to control the operating period of
the system
X §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpomt
[X| §122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones Each zone shall not exceed 25,000 square feet, shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas, and shall be controlled by a time control device as described above
§122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower For cooling, the
control shall be adjustable up to 85 degrees F or higher Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum
:X] §122(c) Thermostats shall have numeric setpomts in degrees Fahrenheit (F) and
adjustable setpomt stops accessible only to authorized personnel
X| §!12(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone
DATE
10/22/2008
Designer Enforcement
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 19 of 20
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
JPROJECTNAME
Description
The Nath Law Group San Diego Office
DATE
10/22/2008
Ventilation
r)(] §121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans
[X~| §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems
[X1 §122(f) A" gravity ventilating systems shall be provided with automatic or readily
~ accessible manually operated dampers in all openings to the outside, except for
combustion air openings
Xl §121(f)1 Air Balancing The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989), or
jX"| §121 (f)2 Outside Air Certification The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system, or
'X j §121(f)3 Outside Air Measurement The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice, or
['X| §121(f)4 Another method approved by the Commission
Service Water Heating Systems
| | §113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required
' | §H3(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F
Designer Enforcement
EnergyPro 4 4 by EnergySoft User Number 5511 Job Number #08077 Page 20 of 20 j