HomeMy WebLinkAbout2794 LOKER AVE W; 100; CB881688; Permit~
~1
./
I
~:tw ~)
;
0 ~ ;
~ 0
&
I[
8
C :!: = :::)
I Ill z ~
z 0 j::
~ z Ill 0. :Ii
8
Cl) a: Ill :,0: C
i
![
0 I hMeby affirm that I am llcansed under
provisions of Ch111>ter 9 (commencing with
Section 7000) of Division 3 of the Business
and Profeealons Code, and my license is in
full force and effect.
t hereby affirm that l am exempt from the Contrac-
tor's License Law tor the lotlowing reason !Set. 7031.5 Business and Professions Code: Any ~ity or county w~1ch re· quires a permit to construct, alter. rmprove. demolish, or
repair any structure. prior to its issuance also requires !heap-
pltcant lor such permit to tile a signed statement that he 1s hcensed pursuant to the provisions of the Contractor's
License Law (Chapter 9 commencing with Section 7000 of Oiv1s1on 3 ot the Business and Pro1essions Code) or th.31 ,sex-
empt therefrom and the basis tor the allegect exemption Any violation of Sectron 7031.5 by an applicant for a permit sub-
jects the apphcant to a civil penalty of not more than five hun-dred dollars 1$500).
I I t. as owner of the property, or my employees with-wages
as their sole compensation. will do the work, and the struc-
ture Is no! rntended or offered for sale (Sec. 7044, Business
and Professions Code: The Contractor's License Law does not apply to an owner ot property who builds or improves
thereon and who does such work himself or through his own employees, provided that such improvements are not intend·
ed or offered for sale. If, however, the building or improve·
ment is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or im-prove for the purpose of sale).
f l I, as owner -of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044,
Business and Professions Code· The Contractor's license Law does not apply to an owner of property who builds or im-
proves thereon. and who contracts for each projects with a contractor(s) license pursuant to the Contractor's License Law}.
11 Asa.homeowner I am improving my home, and the follow· ing conditions exist:
1. The work is being performed pnor to sale
2. I have lived in my home for twelve months prior to completion of this work.
l have not claimed this exemption during the last three years.
D I am exempt under Sec. _______ , 8 & P.C. for this reason ____________ _
D I hereby affirm that I have a certificate of consent to
self-insure. or a certificate of Workers· Compensation In-
surance. or a certified copy thereof (Sec. 3800. Labor Code)
POLICY NO
COMPANY
~ Copy is filed with the city
O. Certified copy 1s hereby furnished
CERTIFICATE OF EXEMPTION FROM
WORKERS· COMPENSATION INSURANCE
(This section need not be completed if the permit
is for one hundred dollars ($100) or less)
D t certify that in the performance of the work tor which
thrs permit is issued, I shall not employ any person in any
manner so as to became subject to the W01'kers· Compen-
sation Laws of California.
NQTICE TO APPLICANT: If. after making this Certificate
at Exemption. you should become subject to the Workers'
Compensation provisions of the Labor Code. you must
forthwith comply with such provisions or this permit shall
be deemed ,evoked.
D I hereby affirm that there is a construction lending
agency for the performance of the work far which this per-
mit is issued (Se·c. 3097. Civil Ca.de)
Lender's Name ____________ _
Lender's Address ____________ _
! US£ BALL POINT PEN ONLY & PRESS KARO
.,I
I
l
I
I
I
I.
i. ' ' I
f I
I
I
I
I
I
' \'
I
I
' 1-IOTY.
I ,:
' I
' I
I
I
I ~ : t= 'r; i QTY.
I
I
I
~ I
1
I
' I
_l_
CARLSBAD BUILDING DEPARTMENT
2075 Las Pal.mas Dr., Carlsbad, CA 92009-1915 (619) 438-1161
PLUMBING PERMIT -ISSUE
EACH FIXTURE TRAP
EACH BUILOING SEWER
EACH WATER HEATER AN010R VENT
EACH GAS SYSTEM 1 TO 4 OUTLETS
EACH GAS SYSTEM 5 OR MORE
EACH INSTAL .. ALTER, REPAIR WATER PIPE
EACH VACUUM BREAKER
WATER SOFTNER
EACH ROOF DRAIN (INSIDE!
TOTAL PLUMBING
ELECTRICAL PERMIT -ISSUE
I PH
EXIST BLOG EA AMPISWT'BKR
1 PH 3 PH
REMODEL ALTtR PER CIRCUIT
TEMJ>l'OLE ZOO AMPS
OVER ZOO AMPS
TEMP OCCUPANCY 130 DAYSI
TOTAL HECTRICAL
7-stJ ll QTY.I
s.o, 1( QTY.I
YO ND
YO NO
REDEVELOPMENT
AREA
YO NO
MECHANICAL PERMIT -ISSUE
INSTALL FURN. DUCTS iJP TO 100,000 BTU
OVER 100,000 BTU
BOILER/COMPRESSOR UP TO 3 HP
BOILER/COMPRESSOR 3.15 HP
METAL FIREPLACE
VENT FAN SINGLE DUCT
MECH EXHAUST HOOOtOUCTS
RELOCATION OF EA FURNACE/HEATER
DRYER VENT
TOT.i.L MECHANICAL
MOBILE HOME SETUP
CAR PORT ---·· I AWNING --GARAGE
APPLICANT TO FILL IN INFORMATION WITHIN SHADED AREA AND DECLARATIONS.
y NO
PLAN CHECK
TOTAL PLUMBING
ELECTRICAL
MECHANICAL
MOBILEHOME
SOLAR
STRONG MOTION
-uk-1 FIRE SPRINKLERS
PUBLIC FACILITIES FEE
BRIDGE FEE
PARK-IN-LIEU (AREA
TIF
LA COSTA TIF
FMF
LICEN_SE TAX'L, .(
MFF
CREDIT DEPOSIT
VALUATION PERMIT NUMBER
l.o0£J~ 0 1 _ ,,,
NE ti I fP
BUILDING SO. FOOTAGE
4601 02/03/89 0001 01
BldPmt
Not Valid Unless Machine Certified
00i -810-00-00-8222
001-810-00-00-8223
001 ·810-00-00-8224
001-810-00-00-8225
001-810-00-00-8226
880-519-92-33
001-810-00-00-8227
320-810-00-00-87 40
360-810-00-00-87 40
312·810-00-00-8835
311·810-00-00-8835
001-810-00-00-8162
880-519-92-57
02
1518-
~
u.
>-.;
0 C. E Q) I-
'O
0 (!)
c
<1l
()
a. C. <(
I
:,,:_
C: a:
0 rJl rJl
Q)
rJl rJl <(
I
3: .2 a:; >-
Q)
(,J C: <1l C:
u.
C: Q) Q)
"
0 t,
Q) C. rJl C:
.! "E. 3:
~
r (1hB15 I~~~ .
TYPE ' I DATE INSPECTOR ' ~
' BUILDING I
FOUNDATION ' I FIELD INSPECTION RECORD
.. -_ ;:·
REINFORCED STEEL I
' MASONRY i
GUNITE OR GROUT ' I
_ Rl;OUIRED SPECIAL INSPECTIONS INSPECTOR'S NOTES . , ...
' . REO. IF INSPECTOR'S / -· INSPECTION CHECKED APPROVAL DATE ,·" ..... , ·. -SUB FRAMED FLOOR D CEl~ING SOILS COMPLIANCE
SHEATHING D ROOF D SHEAR -PRIOR TO
FRAME I -::zJ, I Pt Ir I
EXTERIOR LA TH I I . ,,...,_
FOUNDATION INSP
-
STRUCTURAL CONCRETE
OVER 2000 PSI r
INSULATION I 2./t/f--1 rt:;:::;
INTERIOR LATH & DRYWALL I l.:J//5/J,1 r I '
I f { I
PRESTRESSED
CONCRETE
, POST TENSlONED
CONCRETE·
PLUMBING I FIELD WELDING
D SEWER AND BUCO D P~/CO
UNDERGROUND 0 WASTE O'WATER -
HIGH STRENGTH
BOLTS
TOP OUT D WASTE 0 WATER :i.lt/J,-'1 tr-' SPECIAL MASONRY ..
TUB AND SHOWER PAN I I / I
, .. , .. .
GAS TEST ' . PILES CAISSONS
D WATER HEATER D SOLAR WATER
: .
.. ' ELECTRICAL I
'
D ELECTRIC UNDERGROUND D1UFFER /)
ROUGH ELECTRIC ! z.l ~I"' ,__
!
\
0 ELECTRIC SERVICE D TEMPC)RARY I f \ '
D BONDING D POOL I .
' I ·'
MECHANICAL r
D DUCT & PLEM., D REF. PIPING . . ... ··' .. ~-~---.. .;.
HEAT -AIR COND. SYSTEMS : . ' -.,, ..
VENTILATING SYSTEMS I ·. . ' ·-
I '
' l :(. "'. -./ ·r ,,,. ·, ,. . ' . -.
CALL FOR FINAL INSPEC~~N WHEN ALL APPROPRIATE
ITEMS ABOVE HA E BEEN APPROVED. .
FINAL' I
PLUMBING '\. I
I
ELECTRICAL '\. I -/J I
MECHANICAL '\. I . . rr-
GAS 1' )/11t.l Y"' . I :
,. i "·
' ( ' ... ' ,· .
BUILDING : '\. '1r t ) .
SPECIAL CONDITIONS I '\__
j
DEVELOPMENT PROCESSING SERVICES DIVISION
2075 LAS PALMA$ DRIVE
CARLSBAD, CA 92009-4859
(619) 438-1161
MISCELLANEOUS FEE RECEIPT
Applicant Please Print And Fill In Shaded Area Only
PLAN ID NO.
3703 121~ ... ~<("os ~ '1l~ 360-00
VALIDATION AREA
ESTMATED VALUATION __ i_tJ_,_.y:<......;;.~--"'-z __
PLAN CHECK FEE _0_01_-8_1_o-0_o_-o_o-_~_a_~----~_f:,;:.......O __ _
IF THE APPLICANT TAKES NO ACTION
WITHIN 180 DAYS, PLAN CHECK FEES
WILL BE FORFEITED.
CHECK IF SUBMITTED:
D 2 ENERGY CALCS
D 2 1987 ENERGY CALCS
FOR NON RESIDENTIAL BLDGS
D 2 STRUCTURAL CALCS
D 2 SOILS REPORTS
D 2 SELF ADDRESSED ENVELOPES
DATE GIVEN/
SENT TO APPLICANT DATE
LA COSTA LETTER
SCHOOL FEE FORM
P & E CORRECTIONS LIST
CERTIFICATE OF OCCUPANCY
APPLICANT'S SIGNATURE DATE
White -File Yellow -Applicant Pink -Finance Gold -Assessor
!
.., ~ ~". • •p '
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER: 88-1688-DATE: 3-27-89
PROJECT NAME:------------------------,..,-------
ADDRESS: -=-27"--'9 __ 11'---Lo--'--k-'-er'---W_e...,cs'--"t ___ /~v_')_()_'f-_l_C_~ -'--'--------------
PROJECT NO.: _______ UNIT NUMBER: _______ PHASE NO.: ______ _
TYPE OF UNIT: _ C-=--T_I _________ NUMBER OF UNITS:
CONTACT PERSON~· ___ S=t=e~v~e~S~h~e~lt~o~"~--------------------
CONTACT TELEPHONE: _ __,11=3~1-_0~1~8~7 ______________________ _
INSPECTEo··
BY:
INSPECTED
&· ·,/~A;:ecTED: MAR. 281989
DATE BY: _________ _ INSPECTED: ..._,...__._ __ _
INSPECTED DATE , ,. ,, , BY: _________ _ INSPECTED: -~---
Costa Real Municipal Water District
COMMENTS: Engineering Department ·
(619) 438-3367
-~ ....... ·~------
'
APPROVED DISAPPROVED __
APPROVED __ DISAPPROVED __
APPROVED __ _ DISAPPROVED __
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FtNAL BUtlDINQJN8PEC1'.ION .··
88-1888-
/O()\l-/o/
• · pft()J~CT .. 0.: _______ UNIT NUMBER: _______ PHA~E NO.: _________ _,
. TYPE OF UNIT:· CTI NUMBER OF UNITS:
CONTACT P!RSON-= ---=S=t•::::..;v:c_.::e:;.,..=S=h==•='ton=----------'--------_..;..,...--
OONrACT TELEPHONE:. __ J.....,3,,,_,1,_-..,,.0-"-'18=7'--_________ ..,...,..._...__ _______ _..,;..__,,_
IW>P, EHG, PW'J. WATER, FIRE
-v/4-DATE
INSPECTED: APPROVED DISAPPROVEO ... I
•• JNSPEOTED1 DATE
8V: INSPECTED: APPROVED DJSAPPftOVED
Jfll&~TED DATE .. "~ ' -~: INSPECTED: APPROVED DISAPPROVED
COMM£~: ---'--------,--------------------------.;..;.__
,. i' .
, ' r I
' ! ' .. ]' ... ,... i.: $USf191\S8 BLUE: Water Di$lrlct . GFIJ=Ef!C:: Englneerino CANARY, utUit~ P.,,.K: Planniq ~ ~ . . .· . . .. I\
I.
;;,.; I
"" ,.· FINAL BUii.DiNG INSPECTION
PLAN CHECK NUMBER: 81-118.. DATE: __ J•_2_7_•1..;...;t ..... · ---'--
PROJECT NAME:---------------------'°'-------,--.:,-----
·ADDRESS: __:2=7=''-=--=Lok=•=--.;•:..:....:•=•c..::..t ___ /_O_O_"f_._l_O--=-/ __________ _
PROJECT NO.: _______ UNIT NUMBER: _______ PHASE NO.: _________ _
TYPE OF UNIT: _ C-=..,;;T....::.1 _________ NUMBER OF UNITS:
CONTACT PERSON~· ----'S'-'tev'-"--"-e~She=='-=ton~-------------------
. CONTACT TELEPHONE:,_---=•=•.:..1---'o::;..:1:..;::ac=.7 ________________ ..,....;.. .......... ----
,1..DG. ING, PLN, WATER, Flft&
INSPEOTl;D /J / ev: _______ ur..p...__.._...,,...... ____ .,.., __ _
l;NSPEOTfD BY: _________ _
INSPECT'D BY: .....
,_.,..l'
DATE INSPECTED: ___ __._
DATE ' I INSPECTED: ____ ,_
APPROVED __ _ DISAPPROVED __ _
APPROVED __ _ Dl$APPAOVED __ _
'''1;
COMMENT,$: --------------------------------'------
.r
)Rev. 1/8& WHITE: Suspense BLUE: Water District GREEN: Engi~eerlng CANARY: Utilities PINK: Planning GOLD: Fire
..
··m,, ·. '".·.··-.. :.· -t,
\·)
~ ·, ·,
FINAL BUILDING INSPECTION: ' ·
·pROJECTNQ.: _______ UNITWMSER: _______ PH.:NQ.: -------
...,._CT __ , _________ NUMBER OF UNITS: !
CONTAO't llWHONE: ..... · .........;;Uut.,ll.M ..... • ur.1.z.llJL.-__ ___.. ________ .,....,... __ -+-1-·...... ---~
~ Mi, M, -:: l!=-/7-ff AP-m ~. ~~:ij~;;
~~PEO'f ~~ED: '-/_/::l1/J-:'.z APPROVED ~ DISA~ _....,..,,..
I
I °'~--INSPECTED JV: ______ ................ ___ _ DATE lNSPEOTED: ____ _ APPROVED __
ii
COMM~ -4at.JU.....;.._c..,~~t:......::il.A~L./,,..--..M.1l::Z.J~""'-_L;.~:,uii..........:_t:;.~a::J-_.;.i~~~~
... liJ&,p·. UJVQL-.
,!·', ,,
·I
~-A1ft5; '4'~~-·
---------------------------'-------...f\---~-f ~,
I.
\ . I
I
! '
< l; ,· ', '
l!lev. tlll6 ·,~·,i;~,lil{remse BUIE:--,Ql$ll'idt , GR&IN:.~ . ~t,ARY: Utllltles PINK: Pl~
DATE:
ESGIL CORPORATION-
9a20 CHESAPBAKB DR., SUITB 208 ~b. ~I c... l 2.l \ 1 ,88,
SAN DIBGO, CA 92123
(619) 560-1468
JURISDICTION:
I
PLAN CHECK NO: SET:
PROJECT ADDRESS: 219 4 lo~ER A\JE, UJts'S r
PROJECT NAME: ___ *_-_2.-_o_o;:a_.._5_Z._o__;I ____ _
D
D
0
D
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's bui_lding codes when minor deficien-
cies identified Bca..a~ are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
O The applicant's copy of the check list has been sent to:
~ Esgil staff did not advise the applicant contact person that
plan check has been completed.
-:z O Esgil staff did advise applicant that the plan check has
o been completed. Person contacted: ~g Date contacted: _________ T_e_l_e_p_h_o_n_e_ft ______ _
~ cl REMARKS :Q UYtt(Z,Adt)Q.. SM0t...0 §1u-P CF--\ e B::S 8 8 '.Bz-1 NC. tP ftl. D<:5,)G,. IVL~
By:(]\wl G,\t..J;\+'\ fu)
ESGIL CORPORATION
Enclosures:(u~l,.L..;.~-=-=-ftl1.J~~i_:s;;;.._ _____ _
,.
Date1EE1~ Jurisdiction Cl4TZli>B f10
Prepared by1
Jiw'\ VALUATION AND PLAN CHECK FEE
c Bldg. Dept.
0 Esgil
PLAN CHECK NO. ~-}fu~ -:i-~
BUILDING ADDRESS ~q~ 4-Lolf,G'l2 A.-u6 , I.Ub~T" "'.1co et ZOf
APPLICANT/CONTACT CA-LU: \-tOS. I l::.'JC..-PHONE NO. 4"2>802.0°3,
BUILDING OCCUPANCY 8 -2 C1i I,) DESIGNER PHONE "
TYPE OF CONSTRUCTION \J-oJ CONTRACTOR PHO-NE ____ _
BUILDING PORTION BUILDING AREA VALUATION VALUE
MULTIPLIER
()~, ~ l 1 I 2.--0 o
W1 Hov~e-T.1, ~.149
..
_...._ __ ----
-----------4-~4~ ev. .. lR,st) :. ~~'{
J -I '
,~ ~x,::,-r1:U~ OFF=--P w rd"$ I!:.. -,....,, ),n1 '~~ W -~ .. -,
C, 1T ~ 't:)Q.n (2_. El 7" -
Air Conditionin~ '
Commercial @ -
Residential (a
Res. or Comm.
Fire Snrinklers @
Total Value eo~-
--
Building Permit ree $ s
Plan Check Fee S 3 Cao ' \ 0 $ _.;:; ___________________ ..;_____.;:.._ ____ _
CO H HEN TS_•-------------------------
SHEET OP
12/87
:·-.
..
co co
"O "O
Cl) Cl)
:l:: :l::
Cl) Cl)
> > Cl) Cl)
d 0:::
D
~D
~D :w D
·.~ D
ci D
Ef D
Gf D
ci D
~D
[i D
cio
Bo
co
"O Cl)
:l:: Cl)
> Cl)
0:::
D
D
D
D
D
D
D
D
D
D
D
D
D
(g)oo
----------------------
ENGINEERING CHECKLIST
LEGEND
Date: /2-28-88 ~
@
I tern Complete
Plan Check No. 88/(pf/8
Project Address: Z19f W<:E/2. /)vJE uJ.. I tern Incomplete -Ne~ds
Your Action
Project Name :...,Tc....,. _________ _
Field Check Date: 1,2,3 Number in circle
indicates plancheck -----------By: number that deficiency
was identified
LEGAL REQUIREMENTS
Site Plan
1. Provide a fully dimensioned site plan drawn to scale. Show: North
arrow, property lines, easements, existing and proposed
structures, streets, existing street improvements, right-of-way
width and dimensioned setbacks.
2. Show on Site Plan: Finish floor elevations, elevations of finish
grade adjacent to building, existing topographical lines, existing
and proposed slopes, driveway and percent (%) grade and drainage
patterns.
3. Provide legal description of property.
4. Provide assessor's parcel number.
PERMITS REQUIRED
Grading
s.
6.
7.
8.
Grading permit required. ( Separate submittal to Engineering
Department required for Grading Permit).
Grading plans in plan check PE ------
Need the following completed prior to building permit issuance:
A. Grading plans signed.
B. Grading permit issued.
C. Grading completed.
D. Certification letter and compaction reports submitted.
E. Grading inspected and permit signed off by City Inspector.
Right-of-Way Permit required for work in public
(e.g., driveway approach, sidewalk, connection to
etc).
right-of-way
water main,
9. Industrial Waste Permit application required. To be filled out
completely and returned to Development Processing.
600
~DD
~OD
~OD
cef D D
~D D
cefo·o
FEES REQUIRED
10. Park-in-Lieu fees required.
Quadrant: --, Fee Per Unit: , Total Fee: -----
11. Traffic impact fee required. ~ r
Fee Per Unit:_......a::=====-· Total Fee: /)'le)oJJff.l~
12. Bridge and Thoroughfare fee required. ~ 1 Fee Per Unit: ________, , Tota I Fee: 11.b~IIBf'~
13. Public facilities fee required.
14.
15.
I Facilities management fee required. Fee:~~ .
. -11/J'I! f Additional EDU's required: M ~ ~Q
Sewer connection fee=---=======---SeweiOpermit no.
16. Sewer lateral required: --'~~ . ....:.c.:~.w:;..;.-=,;;+'--------
REMARKS: ____________________________ _
0. K. to issue: Date:
If you have any questions about any of the above items identified on this plan
check, please call the Development Processing Department at 438-1161.
,,
(I) (I) (I) ..... ..... .....
n:J n:J n:J 0 Cl 0
m m co
"O "O "C
(I) (I) (I)
== == == (I) (I) <])
> > > (I) (I) (I)
~ ~ ~
... N M
=ti= * * u u u
0.. 0.. a.
~DD
~DD
~DD
~DD
ODD
PLANNING CHECKLIST
Plan Check No. 88tfs>Bca Address 27?9 /41<:Ed Ave W£S7
Type of Project and Use _7-J....;__.L_-____________ _
Zone -~P_-~t1~------Use Allowed? YES K. NO
Setback: Front~ Side~ Rear !!/4-
Facilities Management Zone 5
School District: San Dieguito Encinitas ----
Carlsbad D(_
Discretionary Action Required
Environmental Required
Landscape Plan Required
Comments
YES
YES
YES
--
--
San Marcos
NO ~
NOL
NO o(
--
Type --
-----------------------------
Coastal Permit Required YES --NO r/,
Additional Comments ------------------------
OKTOISS~ DATE /2--2 '8 -f::J'f:3
2560 ORION WAY
CARLSBAD, CA 92008
Citp of Carlu&ab
FIRE DEPARTMENT
PAGE 1 OFL
TELEPHONE
(619) 931-2121 APPROVED
DISAPPROVED
PLAN CHECK REPORT PLAN CHECK#
(_l -/ /·, /q:1f?
~:,
PROJECT "-o ,~;oc:,·-ri t L/\ ,,,; ADDRESS .179 11 I ol<c7c !'; >:t:: Ir I<T "/.i / r· (/ ;;:Cl I
ARCHITECT {/cl El /__.L -C~t k · 11\'(t. ·: ) t e' ADDRESS /:·>h't_,;.1~,-'1v PHONE 1 t ~y · •'12(,?:,
OWNER {A4t/ 1 y · I --)';,-.1c_S. r .i 0 · ADDRESS . .lie ( ,11 , ,it~---· PHONE (:,-,1 .· YSLt · /II c.,·J
STORIES -·""·-··,_·-'""'1-r:=·----OCCUPANCY -;~ J CONST. -_«:;Z,-// TOTALSQ FT d7(' Q' _ l:') . . -· d,; · t ...
'W SPRINKLERED 'r;i.rENANT IMP. ~l~2 _L_/_r __ -,_,_~ _____________________ _
__ 1.
__ 2.
__ 3.
::i:-4.
__ 5.
' :J_ 6.
\ r' _:____ 1.
i
APPROVAL OF PLANS IS PREDICATED ON CONFORMING
TO THE FOLLOWING CONDITIONS AND/OR MAKING
THE FOLLOWING CORRECTIONS:
PLANS, SPECIFICATIONS, AND PERMITS
Provide one copy of: floor plan(s); site plan; sheets ____________________ _
Provide two. site plans showing the location of all existing fire hydrants within 200 feet of the project.
Provide specifications for the following:
Permits are required for the installation of all fire protection systems ~prinklers, stand pipes, dry chemical, halon,
CO2, alarms, hydrants). Plan must be approved by the fire department prior to installation.
The business owner shall complete a building information letter and return it to the fire department.
FIRE PROTECTION SYSTEMS AND EQUIPMENT
,"!}le following fire protection systems are requirep: P..:.'L' _1,,.
1
,
1
".1~,,, 1 ·i,
1:1:1 Automatic fire sprinklers (Design Criteria: --,f-'-1 ·---"-. __,_=,_=-_ ·-=--'----'-'--'--'''-·-'.c.,,-.:.·------------0 Dry Chemical, Halon, CO2 (Location: ________________________ _
D Stand Pipes (Type: ___ __,__--+.--,----,-,--.,..,-----------------------
0 Fire Alarm (Type/Location: -----------------------------
,g,~!;~~gr~it~~r~~~~~~~~;~~r for each /, c )(JU sq. ft. or portion thereof with a travet distance to1he nearest
extinguisher not to exceed 75 feet of travel.
D An extinguisher with a minimum rating of ___ to be located:
'-ti Other: /,;:..,, ILll'i 1/ ;3C /;:;j ... .,•u 11'<,;;::µ J~11 JL·.~c/1)>1 ,-
--8. Additional fire hydrant(s) ihall be provided _______ 1 _________________ _
¥9.
$10.
__ 11.
__ 13.
__ 14.
--15.
EXITS
Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.
A sign stating,/' This doo_r to, remain_ unlocked during business hours·;~shall _be, pla.?~~ abo~e_the m~i~ exi!_~~d
dOOrS tV//f-'; ,,J It/' i I J /,,/<-·.·, //. /)/ '· .-1 '2·1 /( •· J•,1,/r.. (.,t..Jj, J r'),·/_ / ... ''-· ,' / 7
EXIT signs (6" x ¾" letters) shall be placed over all required exits and directional signs located as necessary to
clearly indicate the location of exit doors.
GENERAL
Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and
hazardous chemicals shall comply with Uniform Fire Code.
Building(s) not approved for high piled combustible stock. Storage in closely packed piles shall not exceed 15 feet
in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil·
Ing is to be done, comply with Uniform Fire Code, Article 81.
Additional Requirements. ------------------------------
I {-S i I
., 7 f •• \
) ; .. (.>
/ ,_/ · . .(_ ' ' )
Comply with regulations on attached sheet(s).
,,4 ''
Plan Examiner , ·~ __ /~ ~,/:-:~-:._ -· · ·---~ ,-~ /'} /)., 1·" Date·_.-_'-"_·,1,.,.-/~·--,,...,---,,/~· ~-~-----
Report mailed to architect ___ Met with -----------"----__ Attach to Plans
r-a.FROM MRRTIN JONES 12,16.1988 11:01 p. 1
I -oEc ,~ ·se 131~, ONEILL ~Nur~oco~P
! '· ---~t,I t.11 IVtlU;;t U I \..IVI 111,Jllc:U IUtl (1"8tl 1 or.!) P,e,. ••CF l"enormarn~• Mequn•m•n--, -.
----····-·------
, .........
IIIMlnl ____ ,...,,. _____ ..... o.:r.:,.~-------
lliml1'n11'..--------~-----------· -~.-.. .. ™"""~, .... ,----. .... a----1-P'l.'lllt_• _ _. _____ ~-\14'1, ____ _,
:q • .., ., w
a;;;. .,... 1 dMEtzzCC ,,
·w,··
...
r•Rll R¾I-
. ..... =• om
I II -
~-------~~------
Performance Requirements C F-1 B .. Certificate of Compliance (Part 1 of 2) _.::.,:.,;_ ____ ..;_ ________ ~~~------
nta on u i '""
Uuilang P1n1111 Num6ir
Plan chickid Sy
Fiild Cliiekicl dr
)pprov.aa.,
Diii
Oiii
Oiii
-------------------, ... n-et_g_y_A_n-•l-ya-1.~The----en-arg-.,-_..-rfo~nn-lUIOe--~-:--:.,:-.-IUfflfMlla'!"'. --:-.-d:-:11:"'ltlt':'"N-
Prlnolpal D••lgnar. Th• propoMd bulldlng wll be In tubetandal wa1 pe,formed ullna an apprq"'d C&C oalculailon meflOd. wld\ C&C compli~ wllh Ille Cellfomla Bulldng Enerv, &llldenay S&and4ud• approved Axed and" 111ilrlcied qlne~ lnpula for ,. appllcallle
pro,iided It le built accordng IO lh• plan• and •pecill•don• and provided Clirnale zone and occu~ IVPI, and uelng a reuonallle ..-Mftldon llture lmp,ovemenl• •• completed according 10 Ille ,wquwemenia of bulklnp zoning Ind phyalcal oonlltuniilon. Al 1lgrikanl "*11'1 lndic:aled on lhit Certillca&e of Compliance. The plane •nd epecilicallon• CIOnMrvaaon fHture• .,. Maild below, or on M a&lachld au-mem. have been pre~ed 10 lnd6de el aianfflc:anl .,.ff __ can11rvalion ,._
feaau,11 ••~Ired for compllanc:. wl., lhe S1andard1. Bulldlng ., .. , that l'2. Q S &
.,. uncondilioned and/or nol 1ubj1c1 IO lh• 1landard1 •• indicaltd on -, -
lhtplan1. . ..
Pfini dated
Conipanr
specs aa1id
o.,.
Teli • a ..... , · Re....,._, ..
1 Unoondldoned or Mulll-tenMI .,...7 •• ; N (YIN)
2 CEC 0ocupMq Tn,e •• " ·i· -· t F::eJ,e,.f L-
C1ij1Sla1e1Zlp
Telephone Cal Ucen11 No. 3 UBO Ooo. GlovplDlvlllon • • . ·. t:>-Z.
, Clma11 Zon• " 7 Owner. Th• •nervy oon11mllon feaaur.1 and pectormance • • • • • • -~ · • . -1ptclficallon1 lndlcaled on 1h11 documenl : and on 111 ,-.. and I Concldonld Floor Al,a • ;· • · • I~ l b -II
1pecillcalion1 ahaa appl'f IO luaure a111,1~. un1t11 compllence II e Unoondldonid FJoor"Aiea · · -· If dlmonI1ra11d antW and a MW Cenilcar.. ol Com~ la autinihd. A , • • = of 1111 Clnillca1e will be reralnecl and nnamiatd lo l,ue ....,..., . -7 Budge& Table (fr. $1andards) • I j 2' 1 _-t.-,;; ~t:>o.. or...::Cc .:=~:'~==•,:~~c:) .' I ' AIL Entrgr 8udg1&(WS.1A). ~-. I 6v ~tf•yr
may be ra~ed belort a ""111111 l11u1d for llllladonL Uflcondldoned :. ,t Calo. Mtlhod CEC Codi • ;_ .~ ,: ~ -~
••u.,. lndca11d on lhl plana and, If 1h11, nu.,. ooncldontd In lhe ···. 10 Mul,.pltr +" · · I o 1u,.,,., lh1y mu11 be made 10 compf'f wllh 1111 appbllle ••'111 'i, • • • • • • " • • • • ·~-· --
1landald1 lh1n In eff1c:1. • 11 Annual En11ar UN E1dma11. · I =i/.o ........ ,,
Signaaure ·-·-. . Date
Nami7fade
Aodia11.
Envelope Requlremenl• •
12 Av111g1 Roof/C1lllng R1 • • • Ol>J PuJ -Zt • 0?:,
13 Av•au• E.1111dor Floor Ra • , --i--NA
1• Average Opaque Wal Ra ••• ,_ .... _ 'Z. &o
·,15 OlulngAntalnWal, , •• •--f--S4-Z.
11 Av.rage SC (Wal glaalng) •• --f--q, 04
17 Glaalng Alea In Roof • • • • -..... -O"
11 Average SC (Roof glulng) • • • i. • tJ A
. , Ughdng Requlrem•nl• .
h-F-111811 ... ,..,, ..
h-F-1118111 .,
.,
• lntoroemonl Aaen~. The eropoaod bulldlna, and futunt a1teralion1 will 18 IJlowod Whole Bulldlng LPO • OlTT ft.11 "2.. ()
CIOfflDl'I Wllh lhe Calllomla Buildng &nlfQ'/1 lllfc:iMoy Slllndafda, pnaVtdod 20 Allow___. 11'-----•·eaa LPD ~ "'1 .._
waaataf .. .., .. lu1ure a1,.,.aon1 mNI lhl ,.qulrtm1n1a indlcaled on ltlla Cerafica11 and -._.'"'""'"' • .,,.. al applicable mandatory mNaUCH, u long u lhe building OGGUf*'C1 21 AllowodTenantSpacel.PD. · · NA
-P• f9ffla111: :.n:t-ang1c1 • • · 22 Package Ughdng Rtduotion • ~
Oa1e
Ramittidi
Addiiaa
Fonn At~atd June 7, 1981
23 Ughllng Conrola Requlntd? • _t!,__
Meohanfoal Requlremanl•
2• s1a11m TrP• ••••••• fAC~e.1) lfe:AJ PJl1F
25 Uni& Fan Powtr • • • • • • • OUTftJT O • ~ 8 wa&llldm
21 Aai.d Coollng Ellcienc, • • • ± 8 ·" E.e!';l lunill.
27 Aalltd Healing Ellcitnc:, • • • . :3-O ~:
21 EGOnOmiaer cioolng? ·• • • • N (YINJ
Nol& Anach adclllonal. detailed ...,.,.....,. .. of ,.....,,.. ,.._,..,,
to, compliance. Allaellmenl IMcOffl•t panol Cenlfloelt ol ConlpllanGe.
29 Supplemen1 Anac:hed? • • • • • • • • • N (YIN)
Pege_of_
Oertificate of Compliance (Part 2 of 2>' Per1ormance Compliance C F-1 B
.,•
CO.flr.NH
'Joc:umen1a11on Auifior/Firm ~~IL er .type . Plin cWid BY
Nole, More 1han one Part 2 may be submitted. but all muI1 reference lhe same Pan 1. Tu. person re1pon11ble for preparing lh• compliance
ctoc:umenuilion for each major building IyI1em acknowledge• lhe foDowing compliance 11alemenl by signing lhe appropriate space below. ·
Compliance Slalamanl. Th• pro~Md buiktlng lmprovementa Iub1tanllally comply wllh lhe re~lremenll lndcated on lh• C."llcate of Compliance for 1h11 builclin9, dated l~~ . The plans and 1peClillcallon1 Include the 1lgnlftcanl energy cionIeM11ion fea1Ure1 and Ille
compliance documentation 11 con1i1teniwilh • plans and ,peat1calion1.
Envelope Allowed
1 Average RoollCetling Rt, , :Z..) ,c,2
2 Average Exterior.Floor R1, • . Nf:
3 Average Opaque waa R1 , • 't.t; ()
" Glazing Area In Wall , • , • i:,+2
5 Awrage SC (Wall) • • • • O • ~1
I Glazing Area In Roor • • • o
7 Average SC (Roof) , • • • NA
Olher requlrernenta:
Propoaed
~\.o~
t;l,o.
,2.1,0
ptz.
O, ?;ft
-0
h-F-11/Btu
h-F-sf/Btu
h-F-sf/Btu .,
.,
Lighting
8 Basis of Allowed LPO , , , ftP:fOF::f1f':,-lC, oAL-C..
Allowed · .Propoaed
9 LPD ••••••••••• 1.,fl
10 Package l.lghtlng Reclucrlon._.,_N..,6_
11 A(4usted LPD • • , • , , '2-. ~ I . 4 4-
12 Lighting Conll'OI Credits? •••• , •• ,__,1,cl.a.--
Olher requirements:
Mechanical Allow.ct
13 Unit Fan Power , • • , , , • '3 8
u Ra1ad Cooling Erriciency • • g · D
15 Ralad Hearing Efflciency • • o. o
11 Economizer cooling? • , • c:!
Other Nquirementa:
Form ReviNd June 7, 1988 .
t
Propoaed
·2' "'1,0
'3.0
walll/af
wall/sf
wallllaf
(YIN)
walll/cfm
~(unill)
~(unill)
(YIN)
Extant oi improvements
Plan1diiid
Signature
Namemde
Company
w ...
C,ly7SliiiJZ1p
Telephone
Eiilorcement Agency
Eiiteni ol Improvements
Plans diiid
Signature
Nami/nt1
Company
Xddri11
C,ayJSiiii'Zip
Teliphona
Eniorcemeni Agency
Eitenl ol lmprovemenii
Plinadiiid
Nimirnd•
Company
CiiyJSliiiiJZip
Tiliphcine
.
Specadited
Cii. Cicin1e No.
Dali
Spicidi11d
Dai
Cal. ™•• No.
Daii
Spicidiiid
Oita
Ci. Cicin1e Ro.
Oita
Page_ot_
c:Mar)datory Measures Gl1ecl<l1St
P,o,ec:1 na.
llf-Yr-lAL I~-
Oocum•nlAIOR Aulhot/Fiml o ...
Aef.,•noa In
Conawctlon
Ooaum•nl•
Envelope Measures
11 Cenlllad lnauladon malellala ,., 2·5311(•) ••••••• A-f-
l I lnaulatlon ln1talad lo m-1 llam• •p,•ad and ,moi. .,i
«a.n111t ,.q11il•m•nta of a-s:11 !(b) • • • • • • • • • • • A::r
I I Utwa lormaldehvde loam lnauladon 11 ln1ldad ·
pe, 2·4l I l(c) • • • • • • • • • • • • • • • • • • • •
11 Relroftt ln1ula1lon 1pecllled aa pe, 2·1313 • • • • • ; •
I I All lnlln1lon 11 minimized bV 1pacllcadon ot
1a11ed manulae1Ufed dGo,a and wlndowa and p,oper
a•ellng and WHth .. 1\lipplng al p_, a-1:11 J • • • • • •
Lighting System Measures
A-4
11 Ca,llftad lumln.,,ea/ballaala per :t-113U(b) • • • • • • • A-~
I I lndapendanl control WI encloMd .,.., per 2·53 ll(a) • • --i--
1 I Manual awltc:hlng , .. dly acoeaalble par 2·5:I lt(b) • • • '---'--
I I ~aducdOR ol lghllng load lo al lea11 one half per
2-llll(o). Occupancy Mnao11 or p,ogrammabl1 llm111
m111lna CEO ciriteda mav aub1da,1a • • • • • • • • • .,_....,_
: J S.parale 1wl1chlna of davit.,.., per 2·5311(d) • • • • ___ _
I I S.para,. awllchlno of dlaplay and valanoe lghllng In ,-1aJ and wholaaal• 110ra1 per 2·1310(h) • • • • • • ._,___
I I AUlomatlo control of dlaplay llohd!?Q In ,. ... ,
and wholHale 11e1nt1 pet 2•1:h8(h) • • • • • • • • • • --'--
1 l Tandem wtrtng ol OM• and ~-lemp hll'Rln••
,., 2·13 IICI), • • • • • • • • • •.. • • • • • • • • • • -1.,.
, CDayllghtlng and Lumen Malnlenance ontrols (when applicable)
I I Unllotmlt Wumlnadon reducdon ID an•hall
.,., 2-5319(•) I • • • • • • • • • • • • • • • • • • • t-lA
I I Fllcic., ha OQe,adon and no pnamalUN lamp faUure
.,., 2·13 ll(•JZ • • • • • • • • • • • • • • • • • • • _
I I ........ IO pNWIRl undatlrabla CVdlng per 2·1311(aJ3 ••••••••••••••••••• __
I I Slao 1wildllng deldoea wilh ,-,.,.dan a,.ew .. n
on10H •••lino• ,., a-s:U:11(•)• • • • • • • • • • • • • ,.-.;·."-
foffll Aev11..t Juno I, 1111
MF-1
For Enlohien,IAIApncy u .. Ona,
-u ...
I I Photooel .. nao,a wld1 a clltualng oow, Md
-opaque oov-, ,., a-u1t(a)1. • • • • • • • • • • ~16
I I Manuleo1U1al'1 ln11A~lon• plOll!ded lor inalellallon
and Clllibnadon ,-, 2-l311C•,. • • • • .• • • • • • • • _ _.__
l I P1ope1 ln11.U.don ., oonlrole lncldclng aanao, looallon,
oe,af~llon ot lnillal Cllllbnidon and con-a ol lumlnal,.a
oniv w1lhln d•v•• .,.. par Z·S:lltea)I • • • • • • • • • _ _.__
I I Vlalbla o, auclble malfunctlOR Illume par 2-1311{g) • • • . ,,
Occupancy Sensing Devices (when applicable)
I I Vl1lble o, audbla malt,modon alanna par 2·1311(g) • • • t\-"
I I Um11a an •ml11lon1 par ••cepdon1 lo 2-1311(•) • • • • , J.
HVAC and Plumbing System Mea~ures
I I Piping lnaulaled • .,..,,.., a., 2·5312 • • • • • • • • , M-1
I I Ceflllled HVAO ecppment per 2·5314(•) • • • • ; • •
11 Cldllld plumbing_ equlpm1111 per 2·131-t(a) • • • • • •
11 t111llng andcoo11ng_equ1pm11111fflci1RC1per2-131.t(b).
I ) Plode11 lgnldon of OH eppllanoea pe, 2·131-t(o) • • • •
I I AUlamedo connla for off-hCNn par 2·53 ll(a) I • • • • •
I I lhem1~11a1 HI point requlN111an11 pat 2-1315(•) • • • •
( I Sequenllal control of headng and ooollng per 2·13 tl(a)3 •
I I Automado •llheu11 Ian d•mpan per 2•5:ttl(bt • • • • •
I I '1t1•rmoa1a1 conwola lo, •act• aene per 2•11:tll(bJ • • ••
I I v .. ,111.11on p1011li'-d ,., a-11:tt• end a,11:t•:t ••••• ·•
I I V•llladon and recl,Q,l•llon •It qu•ndtl•• pe, t4Q.1fb)3 •
I I I l•••ra to, domeado hol Walat end/or poola par 2·131a •
.
"
' I
Poa•_ol_
E~ergy Budgets Worksheet WS-1A
Pro,ec1 fii•
~'1".J,a.L \<;4'.
Oocum•n&aion Aulhor/Flrm
Summary Data
Seoor,d Generallon Standard• OocupanoJ TVP••
™Ii
I Concllioned Floor Nea • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
2 TOlal Allowed Energy Uae •••••••••••••• • • • • • • • • • • • • ••••• , •• , • • • -
a Energy Budge& (Un• 21 Line 1) ~ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • / t!i b Fir•• Generallon Slandard• Oooupanoy Trpe•
.a Concllloned Floor Ania • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ....... N ... A; ...... _ ft2
5 Total Mowed Energy Uae •• • •••••••.••••••••••••••••••••••••••• , • ± kSW,,
I Energy Budge& (Un• 5 / Lin• 4 • • • • • • • • • • • · • • • • • • • • • • • • • • • • • • • • • • • • • k81111yt0 ft2
Second Generation Nonresidential Standards
A a Q 0 I p Q H J
Condidoned Tollll Uah"'8 AdlU•iment ~ualld Alalnd Area-to-ConddoMd S, iAPowed~O P~• A Col fl• Col G &nec,w ~5r:iLo ~anq 0.aorlpllonf Perim•1er Float,.,_ eoa'.r!'&H ,.,. Floor Number Aalio . lor CalatOIY (fronl ) LPD Aiqm. • 11.0
~E:1.A-IL-~ET,6,,t1..,. /0JO.Ol..f.."( A,O~ l'ol 8 ,a C --I&~ -I -,
. . .
• ~
·,
.
'
.
TOIII , a,s Tolal A11aNc1 &Mro, -
. First Generation Nonresidential Standards
A .. 8 C D I
IM_IW .MMN
~ ~ Floor =~ Col~D Jpe, -·
Tolll Tolll .
' Envelope Summary Form and Worksheet (Part 1 of 2)
PIOJecl 11H ..
tte:f~ I-f Ct;)
Doc:umentadon Aulhor/Firm
Roof ,.
Roqt Type
IL-I
Total
B
Area
1>?>18
,~,s
C D
PropoNd Area/
R•value R•value ~,.,-< -
Tolal -·
Average A-value I :;.J ~o 3
Col 8/ Col D
Glazing in Roof
A B C D
Surface AN&
Type Nof1h Eal Soulh
Exterior Wall Area
A 8 C D
I I
SurfaceAnta
Nonh I Eul Soulh -po ~
Fonn Rev.Nd September 1111
12.-4-98
Dall
E
w •••
E
Welt
2-,,::,,e,
Checked By
Exposed Floor Area/Soffits
A
Floor/Sollll Type
Total
F
Horizontal
Total
F
I T ...
l"'~
B C D
Area PropoHd A,.vak,e Area/ A-val ..
-Total
Average A-value I cJA I
ColBIColD
G H
Total(Ad ':e::' ''°'8*
r,,
CF-2
Dall
Page_a,_
_. cr1vt::1upt1 vu11 unary run II cu au vv urK.sneer (Part 2 of 2) CF-2
Pro,eca fill•
tJ6't,JAk ~qe. .>ocumenlalion AudlOr/Flrm o ...
Opaque Exterior Walls and Doors
A D C D E
SurlaceAI••
Wal Nol1h Eul Soulh Well
Type (An) (Ae) (Aa) (Aw)
co,-.1&.. --?_c::t'2.. g~
Frz+.r-tl roi?> --
1?4'-'PP 42 ---
Tolala 7U, --z..q-z_ •. f;>6,
Glazing in Walls
A 8 C 0 E
SurfacllArea .
Gluing Nonh Eut. SoUlh Wat Type (An) (AeJ (AaJ (Aw)
JIJU/t -~ 114-
'
.
'
· Talala --4Z..B ,,~
SC AdJustment Notes:
Fann AeVllld June a. 1981
p
Total
(Al)
3"7.8
c.1s
42.
ltYf8
F
Chiclceclly
0 H
Pl'QII01eclWall
He .. Fl-Value Capaat, (Rd Atll\
,~. t; 1,3=3 U~iJ~
/. b~ pt,. r;!l ....,_,_" .s-o I. 5i:, ?.A.()
.
Tolll ~,.z .,,.,.ec1
... WllghlldAwrageR-VM lcZ.cB" I F'ieoi1
Q H
Date
J K
Aequlremtlfll
Fl-Value (Ar)
Toral .
J
AtlR,
'
I NA .. I
CdF/CalK
K
-Chllacteltada W1lghlldAvng11
Tolll · TolllArta W.11ANa TolllArea (At) U.Value' IC . 1U.VIIU1 •80 180
S4-2-I. It> o.~ -
,;4z. TOlala ---u-v.au. w.,, ac Tow sc
Awnigee ,z,-o I -~ I . M I
IIColF ColJIColli CdK/ColP
,._.,_
v-~--(~onstn.iction Assembly Complianc~ Form CF-3
Project Tide
HAXNAk ~. CQt-1C'AtJY
For Enforcement Agency Uae Onl)t
Documentadon Aulhor/Flnn Date Checked By Date
General Information
1 A11embly Type and Number : • • • • • • • • • • • • • • • • , • • • • • • • • • • • , • •. • • • • • 12.e>O I=='
. z . Frainlng Tvpa • • • • • • • • • · • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Woe> D
3 Fr1111lng Size • • • • • • • • • • • • • • • • , • • • • • • • • • • • • • • • • • • • • • • • • • • , 2-)(. 0
4 F18111lng Spacing • • • • • • • • • • • • • , • • • • • , , • , , • , , • , , • , , , , , , , , • , , 2411 lnche1
5 lnaulatlon In Cavity • • • • • • • • • • • • • • • • • • • • • • • • • • ••• , , , • • • • • • • ; • ____ F-it2-hr/BILI
8 Effeclive R-value or Cavity/Framing • • • • • • • • • • • • • • • • , • • • • • • . , • • • • • • • • • • -F-rt2-hr/Btu
Sketch of Construction Assembly
List of Construction .components
A B C D e Wal sr;:11c HC We~t eat ColCxColO Deac:rlpllon R-value (lblfl (BlulF-lb) (BlUIF-11)
1
2
3
4 '2-lj 11:J~rl'=: AIi t2tJ l'l-00
5 1/2." ,At.e,u~,-It-Tll--e_ f,2-S
.8 ..
7
8 Total R-Value w/o film• • • • • • • • • • • • • • • 2.0,1-5 Total HO -
9 ln11de surface air film • • • •• • • • • • • • , • • • -~I
10 Outalde surface air Ille • , • • • • • • • • • • • • • • l:Z
tt Total lhennal ,.11,tance (At) , • • • • ·• • • • • • • ~L:. c,3
12 U..,,.lue (t / Una 11) •• · •••••••••••••• • ~17
Fonn Revised September 1986 ·· Page of --
Construction Assembly Comp\ianc~ Form CF-3
For Enforcement Agency Uae Only
Pro1ect Tide
1-\.Ai't-l,...L t-c:,e:,,
Oocumentalion Author/Firm
General Information
Dale Checked By
A11embly Type and Number~ •••••••••••••• • • • • • • • • • • • • • • • • • • • • • • WALL.
Frwnlf\Q Typie • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Co ,..JC,.
Fnunlng Size • • • • • • • , , • , , • , • • • , • • • • • • , • , • • • , • • • • ·• • • • , • , , G '
fl'anllng Spacing •.......................... • • • • • • • , • •• • • •••• ____ Inches
Date
2
3
4
5
6
lnsulallon In Cavil)' • • • • • • • • • , • • , • , • , , • , , , , , • • , • • • • , • • • • • • • • · • F,lt2-hr/8tu
Effective R-value ol Caviiy/Framing • • • • • • • • • • • • • , , , , • • • • • • • , • • • • • , • • , F-lt2..hr/81U
Sketch of Construction Assembly
List of Construction Components
A
2
3
4
5
8
7
,. Oe1crip1lon
Co"1C. :n k T -u F
B
R-value
t1.4b
,'4b 8 TolalA-Valuew/offlm1, •••• , •••••••• ____ _
9 Inside surface air lilm • , • ·• • • • • • • • • • • • ____ • -~-8,-,--_
10 Outside surface air file •••••••••• , ••• •---,,...•-1_7 __
11 Total lhennal reslatance (Ad ••• , • • • • • • • • ( • ,~ ---------12 U-value (1 / Une 11) , ••••• , ••••••••• .__. ___ 7_5 __
Form Revised Seplembet 1986
C Wall
Weiaht-
(lblli2)
1/b
0 Spedllc
Heat (Btu/F-lb)
t?-?-1-
Total HC
E
HC ColCxColD
(Btu/F·•.!)
IG,-b
Page of --
·l~onstruction Assemb•y Compliance Form CF-3
For Enfon:lement Agency UN Only
PfO)ectTrile
r\AYtJ~L-!: c..o. · · .... , 1
Oocumentadon Author/Firm Date Checked By· bate
General Information
1 A11embly Type and Number ~ • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • WA L-L.-
2 Framing Type • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • He.1Ak
3 Framing Size , , , , , , , , , ·, • , • , • , • • • • • , • • • • • • • • • , • • • • • • , • • • , • 2.~ ~/.& • ... 4 Framing Spacing • • • • • • • • • • • • • • • • • , • • • • , , • • • • • , • • • • • • • • • • • • · Inches
5 Insulation ln Cavity , • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • · • 1 I F·ft2-hr/Btu
6 Effective A-value of Cavity/Framing , • • • • • , • • , • • • • • • • • • • • • • • • • • • • • • • • , G-,4;-I F-ft2-hr/Btu
Sketch of Construction Assembly
List of Construction Components
1
2
3
4
5
6
7
,A
Deaalptlon t;/e'· ~, ~A!:[2
a
R-value
• 5(-.
a Total A-Value w/o fllma • • • • • • •. • • • • • • • _7 __ ._7_!7_. _
9 Inside turface air film • • • ·• • , • , • • • , • • .• __ • '-_8 __
10 Outalde aurface air file • • • • • • • • • • • • • • •. __ ...... \7,____
11 Total lhermal realatance (Rt) • • • • • • • • • • • • __ $ ___ . ';:,_!_
12 U-value (1 / Une 11) , • • • , • • • • , • • • • • ._. __ c>_ • ...,.'/ '-'If, __
Fonn Reviaed S.ptember 1988
C Wd
Welaf,t
(lb/112) -z."'
2..(6 l
D E S=fto HC eat ColCxColD (BlulF-lb) (Btu/F-11)
·2-~ • (pe -
''2-(p ,"8
Total HO \. 3G,
Page___.:.ot_
Gnole Building I-iv AC Worksheet (Power Indices) WS-4A
For Enron:emenc Agency UH Only
Plan Chickid Sy o.,.
Summary Data
' 2
3
' 5 • 7
Condlioned Floor Alea • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1 ~J 8
Total Far, Wans During Peak Cooling Condillon1 (kom Workall"II below). • • • • • • • • • • • • • • • • &"2.
Fan Wanag• Index (Un• 2 JC 1000 I Une 1) ••••• , • , , •••••••••••• , ••••••• , ""-·;..::3;.i:8::;..._
Total HVAC Sys .. m Ene,vr During Peak Cooling Condilion1 (from Workall"II below). , , ••• , •• , • ___ _
Cooling Pow•r Ind•• (Un• 4 IC 1000 I Un• 1) • , • • • • • • • • • • • • • • , • • • • • • • • • , • • ·----
Tola.I HVAC System Ene,vr During Peak HHling Condldon1 (kom Wor1(sh"II below) • • ••• , , • • • • ___ _
H•aling Power Index (Un• 6 JC ·1000 I Lin• 1) • , , , , , , , , • • • • • • • • • • • • • • • • • • • • .__ __ _
Fan Energy
A B' C 0 E F 0 H
ft2
kllowa11a
Walblft2
kBtUlhr
BIUlhr-ft2
kS\Uflv
BIUlhr-ft2
J
Brake Horaepower Mo10, • Drive &ffldency Peak lcllowalla Equlpmenl
Maik Oescripdon Cooling HHdng CooUng H•allng Conversion Number FacllOr Fant Coollng HHling
HP-I Gt? t!l r;u> 4& -~""'I .'lo 0.7 ... ' •41~
E,,::-f ~~ -4~W -0.1 ... 2-.~2:,6
0.1 ...
0.7 ...
0.748
0.7 ..
. 0.7 ..
0.7 ..
0.7 ...
Total ldlowans .so2
Heating and Cooling Equipment
A B C D E F 0 H J
Cooing Headng
C
Equlom•nl Design Conversion Sour~ Oelign Conversion Source Mark De1c:ripdon Ou~ Ellldenc'f Facw kBb.1/hr Output Ellldency Fector kBIAlhr
na .. All Fans na 10.239 na 10,239 From WorkahNI Abow
HP-I 50~~04h -4'1.o {f.t) "''·" ~-0
I .
Total Total
' Installed Lighting Summary
n1a1 Auihor/Firm 12.-~-M Plan Chicliid Ir
· Proposed Adjusted LPD
1 Tolal lnaaled Ughllng Walla (from below) •••••••••••••••••••••••••••••• /2>tf G,
z Control Clltdl Wan• (WS-15B) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • -
3 A4ua1ed Wans (Une 1 • Line 2) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • I 81' 6
41 CondlloMd F1oor Area (from CF•1) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • /:? /1
5 Actua&ed LPO (Line 3 / UM <4) ,• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ) • #
Installed Lighting Schedule
A a C 0 &
-• w .... ,..,
Lumlnalre Reference In Lumlnalre
Reftnnce Conatruclton . Nu,nber'of (lnol. blllaal)
Documen&a Lumlnaha
Wa•
Wall
Walla
CF-5
D111
ft2
Wllll/fl2
F
TOIIII Waaa Code Lumlnalre Oaacrlpllon . Non-alllndard ~?.,
A A-3 '2.x4 P1-Jop-~rJ~e 1?) II& . /4iG
~ ,A.-3 l,-IG-A,../l:> l..lS.H-i l"'-'W .-if It=>" . ,4oe, .
.
.
' .
. .
C I
.
.
' .
•:
Robert Al 1 ar, DATE: 12-09-1988
AVERAGE R OF Wall
=================
Aw1 + Aw2 + Aw3 + Aw4 -------------------------------------------
Aw1/Rw1 + Aw2/Rw2 + Aw3/Rw3 + Aw4/Rw4
AVERAGE HC OF Wall ==================
Aw1HCw1 + Aw2HCw2 + Aw3HCw3 + Aw4HCw4
Awl + Aw2 + Aw3 + Aw4
===============================================================================
378.00 + 678.00 +
378.00 / 0.48 + 678.00 / 7.73 +
AVERAGE R-VALUE = 1.21
378.00 X 16.50 + 678. 0,ZI X 1. 36 +
378. 1210 + 678.00 +
6.78 AVERAGE HC =
Copyright 1987 Mark Gallant-Haynal and Company
0.00 + 0.00
0.00 / 0.00 + 0.00 / 0.00
0.00 X 0.00 + 0.00 X 0.00
0.00 + 0.00
HOURLY
BUILDING HEAT LOSS RATE
FORM 2
DATE: 12-09-1988
PROJECT: Robert Allan T. I.
SYSTEM TYPE: Packaged Heat Purop
CEILING HEIGHT= 10.0
LOCATION: Carlsbad
GROSS FLOOR AREA=
HAYNAL & CO., 350 E. Grand Ave.,Ste. 204, Escondido, CA 92025
DESIGN HEAT LOSS
DESIGN TEMPERATURE DIFFERENCE
Fc,r All Assemblies Other Thar, The Three Below •••• 70F -37 F
For Ir,sulated Fl,::ior Over Ver,ted Unheated Space •• Lir,e 1/Line 2
For Ur,insulated Floc,r Over Ver,ted Ur,heated Space •••• Lir,e 2-5F
For Slab-c,r, Ground F 1 c,c,rs .....•......•..........•
CONDUCTIVE HEAT LOSS
Descri pt ic,r,
Assembly
Glazil'",g SINGLE
Wall R-11
Cc,r,c
Ceiling/
Rc,c,f R-19
Flc,or SLAB
INFILTRATION
OUTDOOR AIR
110
20
c,f Area ft2
Ler,gth,
542.0
678.0
378.0
1318.0
164.0
CFM X
CFM X i3
Average u
of Assembly
or of F .... C. from
ft Graph 4-1
X 1. 100 X
X 0.098 X
X 0.710 X
X 0.051 X
X -----X
1. 08
people X 1. 08
70F -49 F
Frame
Factor DT
1. 00 X 33.0
1. 12 X 33.0
1. 12 X 33.0
1. 13 X 33.0
1. 00 X 21. 0
Sl.1btc,tal
X 33.0
X 33.0
Subtotal
= = = =
=
=
=
=
=
=
=
=
=
DUCT HEAT LOSS (enter 0 if there are no ducts) 0.10 x Subtotal =
1318.0
DT 1 33 .. 0 F
DT i 2 16.5 F
DT l.l 3 11. 5 F
DT s 4 21.0 F
Hourly
Heat Loss
19675 Btu/hr
2456 Btu/hr
9919 Btu/hr
2507 Btu/hr
3444 Btu/hr
38000 Bt l.1/hr
3914 Btu/hr
9266 Btu/hr
51181 Bt 1.1/hr
5118 Btu/hr
DESIGN HEAT LOSS= 56299 Btu/hr
Robert Allan T. I.
COOLING LOAD CALCULATION
A1.1g1.1st 5 p. m.
Cooling DT = 12
Outdoor Temp= 90
1 Pec,ple
13 (Number)
13 (Number)
>< 225
X 275
SeY,sible Factor
LateY1t Fact,:,r
2 Glass
SOUTH
WEST
428 sf x 28.5 Factor
114 sf x 64.6 Factor
3 Walls ~nd Partitions
Wall<s>
1056 Net Sq. Ft. x 3.0 Factor -CLTD x U
4 CeiliY,g
1318 Sq. Ft. x 2.4 Factor -CLTD x U
5 Lights
IYicandesceY,t
=
=
=
=
=
SENSIBLE
LOAD
BTU/HR
2925.0
12204.3
7360.1
3168.0
3163.2
LATENT
LOAD
BTU/HR
3575.0
0 (Tc,tal Watts iY1 Use) X 3.4 = 0.0
F 1 uc,rescent
2800 (Total Watts iY1 Use) X 3.4
6 Appliances and Other Heat Sources ()
Frc,r11 Table 4
7 IY1filtraticin
a
110 CFM x 12.96 Sensible Factor
110 CFM x 2. 10 Latent Factor
Outdoc,r Air
20 CFM X 13 pec,ple X 1.08 X 12.0
20 CFM X 13 people X 0.70 X 3.0
Total
Total
Cc:,ol DT
Grains
Ser-,si ble
Later-,t
= 9520.0
= 0.0
= 1425.6
= 231.0
= 3369.6
= 546.0
= 43135.a
·= 4352.0
Total Sensible 43135.8 + Total Latent 4352.0 = Total Load 47487.8 BTU/HR
Total Load 47487.8 / 12,000 = 4. 0 TC•YIS
****** SCM ENERGY ANALYSIS MODEL VERSION 2.0H ******
*** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARD***
*****************************************************
: ROBER1;·
: RETAIL
PRIMARY DATA
************
FILE NAME
BUILDING TYPE
BUILDING TITLE : ROBERT ALLAN T. I.
AREA (SQ.FT.)
*************
I EXTERIOR
WINDOW
WALL ••••••••••••••••••••••••••••••••••••••••
NORTH/NORTHEAST
EAST /SOUTHEAST
SOUTH/SOUTHWEST
: WEST /NORTHWEST
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..............................
DATE: 12-09-1988
TIME: 11:53:37
PAGE: 1
1056
0
0
428
114
ROOF" • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 131 B
GROUND FLOOR • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1318
CONDITIONED PERIMETER <LENGTH) •••••••••••••••••••.•••• 164
ZONE CONDITIONED FLOOR •••••••••••••.•••••••••.•••..•• 1318
'R'-VALUE <EXCLUDING FILM RESISTANCES>
**************************************
WALLS . . • • • • . • • • • . • • • • • . • • • • . • • • • • • • . • • • • • • • • • • • • . • • • . 1 • 21
WINDOW <INCLUDING INSIDE FILM RESISTANCE> ••••••••••••• 74
ROOF • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 20. 25
FLOOR . • • . • • • • • . • • • . • . • . • • • • • • • • • • • • • • • • • • • • • • • . • • • • • • 0
HVAC SYSTEM
*-!€·*********
HEATING EQUIPMENT TYPE ••••••••••••••••••••••••••••••• HEAT PUMP
COOLING EQUIPMENT TYPE ••••••••••••••••••••••••••••••• AIR CONDITIONER
HVAC COOLING CAPACITY <IN BTUS/HOUR> ••••••••••.•••••• 48000
ECONOMIZER • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • NO
FAN POWER <WATTS/SQ.FT.> ••••••.••••••••••••••••••••••• 38
AIR CIRCULATION RATE CCFM/SQ.FT.> ••••••••••••..••••.• 1.21
OTHER
*****
AZIMUTH OF NORTHERN BUILDING ORIENTATION••••••••••••• 0
SHADING COEFFICIENT•••••••••••••••••••••••••••••••••• .39
HEAT CAPACITY OF EXT. WALL (BTU/F-SQ.FT.) •••••••••••• 6.78
LIGHTING LEVEL <WATTS/SQ.FT.> ••••••••••••••••••••••.• 2
FLOOR TYPE • • • • • • . . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • . • • • • SLAB
CLIMATE ZONE • • • • • • • • • • • •.• • • • • • • • • • • • • • • • • • • • • • • • • • • • • 7
ASHRAE 0.5~ OUTDOOR SUMMER DESIGN TEMPERATURE ••••.••• 80
****** SCM ENERGY ANALYSIS MODEL VERSION 2.0H ******
*** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARD***
*****************************************************
PHYSICAL PARAMETERS
*******************
SECONDARY DATA
************·IHE·
DATE: 12-09-1988
TIME: 11:53:38
PAGE: 2
DOOR AREA (SQ.FT.> •••••••..••.••••••••••••••.••••••••••••••• 42
DOOR 'R'-VALUE <EXCLUDING FILM RESISTANCES) •••••••••.••••••• 1.5
WALL ABSORJ:•T IV I TY • • • • • • • • • • • • • • • • • • • • • • • • • • • • • .. • • • • • • • • • • • • • • 7
ROOF ABSO RJ:1T IV I TY • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 7
CEILING HEIGHT <FT.) •••••••••••••••••••••••••••••••••••••••• 10
SHADING
*******
SHADING COEFFICIENT NORTH/NORTHEAST••••••••••••••••••••••• .39
: EAST /SOUTHEAST • • • • • • • • • • • • • • • • • • • • • • • • 39
: SOUTH/SOUTHWEST••••••••••••••••••••••• .39
: WEST /NORTHWEST •••••••••••••••••••••••• 39
DOES THIS BUILDING HAVE WINDOW OVERHANGS •••••••••••••••••••• NO
DOES THIS BUILDING HAVE WINDOW SIDE-FINS•••••••••••••••••••• NO
MECHANICAL AND ELECTRICAL
*************************
RA-rED HEAT I NG EFFICIENCY • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 3
RATED COOL I NG EER • • • • • • • • • . • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 8
WATER HEATER TYPE .•••.•••.••••••••••.•••••••••••••.••••••••• ELECTRIC
SPECIAL FEATURES
****************
DAYLIGHTING STRATEGIES •••••••••••••••••••••••••••••••••••••• NO
SOLAR WATER HEATING SYSTEM•••••••••••••••••••••••••••••••••• NO
I~-,.
******* SCM ENERGY ANALYSIS MODEL VERSION 2.0H*******
*** 2ND GENERATION NONRESIDENTIAL ENERGY STANDARDS***
******************************************************
DATE: 12-09-1988
T I ME : 11 : 53 : 4 7
PAGE: 3
CLIMATE ZONE
BUILDING FILE
BUILDING TYPE
BUILDING TITLE
7
ROBERT
: RETAIL
ROBERT ALLAN T. I.
BALANCE-POINT TEMPERATURES AND DEGREE-DAYS INPUT
================================================
DAY NIGHT ------------------------------
BPTl = 51.78 BPTl = 68.23
BPT2 = 62.26 BPT2 = 76.75
BPT3 = 62.26 BPT3 = 76.75
HOD = 0.00 HDD = 3341. 93
CDD -772.59 CDD =
ENVELOPE HEAT TRANSFER FACTORS <BTU/HR-F> =========================================
OVERALL BUILDING ENVELOPE HEAT TRANSFER RATE <WINTER>
OVERALL HEAT TRANSFER FACTOR 'K' (WINTER)
OVERALL BUILDING ENVELOPE HEAT TRANSFER RATE (SUMMER>
OVERALL HEAT TRANSFER FACTOR 'K' <SUMMER>
0.00
PEAK COOLING EST. = 62030 BTUH -HVAC COOLING CAPACITY=
HEATING
COOLING
ANNUAL LOADS <MBTU'S) =====================
ANNUAL SITE ENERGY REQUIREMENTS CMBTU'S>
======================================~=
SITE HEATING
SITE COOLING
SITE LIGHTING
SITE RECEPTACLE
SITE FAN
SITE HOT WATER
ANNUAL SOURCE ENERGY USE ESTIMATE <KBTU/SQ.FT.) ===============================================
SOURCE HEATING
SOURCE COOLING
SOURCE LIGHTING
SOURCE RECEPTACLE
SOURCE FAN
SOURCE HOT WATER
1096.3
1321.7
1111. 4
1319.0
48000 BTUH
0.0
17. 1
0.0
11. 0
28.9
7.3
7.7
2. 1
0.0
25.0
65.9
16.7
17.5
4.9
----------===-----------------------------------------=====,==========
ANNUAL SOURCE ENERGY USE ESTIMATE IS 131. 0KBTU/SQ. FT.
======================================================================
( NOTE: 1 KWH= 10.239 KBTUS OF SOURCE ENERGY)
HEATING & COOLING
Single-
Package
Heat Pumps
50QQ
Heating Capacities: 19,800 -57,000 Btuh
Cooling Capacities: 18,000 -57,000 Btuh
Product
Data
8-86 Form 50OO-4PD
Features
• Large capacity coils for higher efficiency
• Rugged hermetic compressor for years of dependable
service
• Five-year limited warranty on compressor -see
Carrier dealer for complete details
• Powdered paint finish -for increased durability
• Quiet operation -outdoor fan sweeps sound up
and away
• High static multispeed blower motor -for greater
efficiency and flexibility, suitable for manufactured
homes, residential and commercial applications
• Temperature and overcurrent protection -helps
prolong compressor life
• Internal pressure relief valve -equalizes pressure
in compressor
• Defrost system -automatically defrosts outdoor
coil, reduces wear
... 'Field-installed accessories
• Louvered coil grille
• Time Guard II
• Electric heaters
• Supplemental heat relay
• Thermostat with subbase
• Night setback thermostat
Performance data
• AccuRater™ refrigerant metering device provides
precise control for maximum efficiency
• Accessible compressor compartment for easier
service
• Low duct conn~ctions -for easy ducting under crawl
spaces or for rooftop downshot ducting
• Crankcase heater -protects compressor during
off cycles
• Low-pressure switch -protects against loss of
refrigerant charge
• Quick-start components -for easy cold-weather
starts (single phase only)
• Refrigerant service ports -for checking and diag-
nosing system
• Accumulator -safeguards compressor against
severe stress
• Reversing valve -for heat-saving heat pump duty
• Motormaster® head pressure control
• Reversible filter drier
• Duct flange kit
• Outdoor thermostat
• Service Sentry
-+ ARI STANDARD RATINGS
SINGLE-PHASE MODELS
MODEL Coollng HI-Temp Lo-Temp
S0QQ Cfm Bels Heal Heat HSPF
TC SEER TH C.O.P. TH C.O.P.
018 675 7.8 18.0 19.8 11,0 6.60
024 900 8.0 23.4 24,0 13.4 6.40
030 1100 8,0 28.4 9,0 29.0 3,0 15.8 6.20
036 1300 8.0 34.8 35.0 19.0 1.9 6.00
042 1575 8.2 41.5 42.0 22.0 6.20
048 1650 8.2 47.0 .___ 47.0 24.0 5.54
060 2250 8.6 57.0 8,6 57.0 2.9 30.0 6.00
THREE-PHASE MODELS
MODEL Cooling HI-Temp Lo-Temp
Heat S0QQ Cfm Bela Heat Clnlearatedl
TC EER TH C.O.P. TH C.O.P.
030 1100 8,0 28,4 8,2 29.0 14,5
036 1300 8,0 34.8 8.2 35,0 3.0 17,0
042 1575 8.2 41.5 8,0 42,0 20,0 1.8
048 1650 8.2 47.0 8.4 47.0 22,0
060 2250 8.6 "57,0 7.5 57,0 2.9 27.0
C.O.P. -Coefficient of Performance
EER -Energy Efficiency Ratio (3-phase units only)
HSPF -Heating Seasonal Performance Factor (single-phase units only)
SEER -Seasonal Energy Efficiency Ratio (single-phase units only)
TC -Total Cooling Capacity (1000 Btuh)
TH -Total Heating Capacity (1000 Btuh). Does not include supple-mental heat.
SCP 1186 2
All 50OO units are rated in accordance with DOE tesl procedures and meel
DOE Residential Conservation Services Program Standards.
Rated in accordance with ARI Standards 240-81 and 270-84.
®
Ratings are net values, reflecting the effects of circulating fan heat. Supple·
mental electric heat Is not included. Ratings are based on:
Cooling Slandard: 80 F db, 67 F wb indoor entering air temperature and
95 F db air entering outdoor unit.
HI-Temp Heallng Standard: 70 F db indoor entering air temperature and
47 F db, 43 F wb air entering outdoor unit.
Lo-Temp Heallng Slandard: 70 F db Indoor entering air lemperature and 17 F db, 15 F wb air entering Indoor unit.
Pliysical data
MODELS0OO
SHIP.WT
REFRIGERANT (R-22)
Oper Charge* (lb)
Relrlg Control
COMPRESSOR
OUTDOOR FAN
Air Discharge
Clm
INDOOR FAN
Air Dl1charge
Range(Clm)
DIMENSIONS (in.)
A
B
Ct
DuctD
INDOOR COIL AND BLOWER
Face Area (sq lt)-No. Ckts
HxW(ln.)
Rows-Fins/In.
Blower Wheel Diameter and
Wldth(ln.)
Ext Static Pressure (In. we)
Drain Conn (hose)
OUTDOOR COIL AND FAN
Face Area (aq lt)-No. Ckt1
HxWlln.l
Fan Diameter (In.)
FILTER SIZE (ln.)t
Dlsposable
Permanent
•Factory refrigerant charge.
018 024
323 329
7.4 7.7
2200 I 2200
525-750 I 100-1000
3.4-3
25 X 20
10 x 6 I
.10
8.8-3
20 X 25
15 X 20
22'/o
20 X 63
20 X 25
15 X 20
tDimension C includes 1/,-in. base support channels.
:j:Recommended field-supplied fillers are one in. thick.
Dimensions
rcoNNECTOR
(CONTROL WIRING)
If DIAM K.O. ELECTRIC HEAT
r-1'\. INDOOR COIL L....y AIRFLOW
..,,,I!.,. OUTDOOR COIL . ~ AIRFLOW .
•includes ¾-in. base support channels.
NOTE: Model 5000018-048 shown.
I
I
I
I
I
030 036 042
346 I 357 402
8.0 8.3 I 9.0 AccuRater••
Hermetically Sealed
Propeller -Direct Drive -PSC
2200 I
Vertical
2100 I 3200
Centrifugal -Direct Drive -PSC
I Horizontal
875-1250 1020-1450 I 1110-1610
4.3-4
31 X 20
8.8-4
48
42'/, I 24½
14 (round)
I
.15
5.0-4 I 31 X 23
3-14
1/,
10.3-5
23 X 63
I
12 X 6
048
445
9.6
I 3200
I 1340-1020
291/,
7.3-7
37 X 28
.20
12.0-5
27 X 63
(2) 15 X 20 15 X 20
20 X 20 (2) 20 X 20 20 X 25 20 X 20
20 X 20 20 X 25 20 X 25 (2) 15 X 20
C
Model 5000060 has rectangular ducts; see Physical Data table.
4
I
I
I
060
484
10.5
3400
1690-2420
321/,
14 x 28 (rect)
8.3-7
37 X 31
.25
14.1-6
31 X 63
25 X 25
20 X 25
(2) 20 X 20
1186
. -
(
'-.......
-~-+ Electrical data (60 Hz)
MAX FUSEt OPER MODEL V-PH VOLTAGE* COMPR IFM OFM OR HACR MCA 5000
Max Min LRA
018 50.0
024 53.0
030 65.0
036 208/230-1 253 187 82.0
042 95.4
048 110.0
060 178.0
030 53.0
036 67.5
042 208/230-3 253 187 82.0
048 92.0
n,,m 124.0
036 33.8
042 460-3 506 414 41.0
048 46.0
060 62.0
FLA -Full Load Amps
HACR -Heating, Air Conditioning and Refrigeration
IFM -Indoor Fan Motor
LRA -Locked Rotor Amps
MCA -Minimum Circuit Amps
OFM -Outdoor Fan Motor
RLA -Rated Load Amps
1186
CKT BKR
RLA FLA Hp-Spnd FLA Hp-Speed AMPS
9.3 3.6 .33-2 1.0 .20-1 25 16.3
11.6 3.6 .33-2 1.0 .20-1 30 19.1 13.9 3.5 .33-2 1.0 .20-1 35 21.9 17.2 4.2 .50-2 1.5 .25-1 40 27.2 22.1 4.5 .50·3 2.1 .25·1 50 33.7
23.9 4.5 .50·3 2.4 .25-1 60 36.8 30.2 6.7 .75-2 2.8 .50·1 60 47.3
8.1 3.5 .33-2 1.0 .20-2 20 14.6 10.8 4.0 .50-2 1.5 .25-2 25 19.0 13.7 4.0 .50·3 2.1 .25-2 30 23.2 16.0 4.5 .50·3 2.4 .25-2 40 26.9 20.5 6.7 .75-2 2.8 .50-2 45 35.1
5.0 2.0 .50-3 0.75 .25-2 15 9.0 6.9 2.0 .50-3 1.2 .50-2 15 11.8 8.0 2.0 .50·3 1.2 .50-2 20 13.0 10.3 3.4 .75-2 1.4 .50-2 25 17.7
•Permissible limits of the voltage range at which units will operate satisfactorily.
tMaximum dual element fuse.
NOTE: Use copper wire only.
5
!1.0JECT NAME: ....i.~~:::-T.:....c;;;t,;L..~i.;,,..:...;.:.;J ...... ___________________ _
LOCATIOH : ~Se:it::D CLIMATE ZONE : 1 --------
· Horth !&st South Vest
,... F) 72)( 10 ~ ~ Zone: / --:)72..x. /0 ~ 7z,e ~D )<. }O: :;u>~ Gros,
Vall
Area: 1~18,
fE4:'r': \='/& 3°1' (1s) • ,128 I> ~ (; "3 '1 4-)~ //4
Skylight: -Glass .
c1, lle1sht: /o .
J.aised Flr: -t> ~117°6:J 4-t
let .
1'eriaeter: \G-4 wall p:-t,7e, C,. ~2. ?) 8~
Zo11e: Gross .
i'all
Area:
F-""r:
Sk1li1ht: Glass . . .. ....
-
Clg Height: .
l.aised Flr:
Net
Periaeter: iall •.
Zone: Gross
Vall
Area: .
?a'l'9: s kylighc: Glass .
c1, !eighc:
laised Flr:
!et
Per1meter: i&ll
SC= <31
Total . Li&hting
l,CA-t, lixtures
~
D 42 Vates
e: '?78.
F '1-1 $ W/SF
~
Fixtures
\
Watts
W/SF
Fixtures
..
Watts
W/SF
· .
. 1
IVAC
TAG
Ill.
!FF
crx
\t,t'O
C?M/ rzi FW
•'?8
TAG
EEi.
Eff•
CF'!!
CiM1
FW!
TAG
Ell
rff
CFM
CFM
FW!
L.
1.-:·.:. --
Lighting Summaiy and Worksheet (Pan1 ot2) CF-5
Proposed Adjusted LPD
1 Tota Su,lclir,o Watts (CF-5'1 • • • • • • • / '( q g w-.
3
% Ca1SdCradtWaas~...... -'Nara
><1clSMdWCS(t..u.1-Llne2) •••••• I K1R Wazzs
c".udb *1 Fb::r ..,_ • , . . . . . ·. . J.i1..!i.!i :t2
,L:1,n:wct LPO (t..irw 3 / Un. ..q • • • • • • -1.,d_ 'Nstr:s/ff).
Whole Building LPD Luminaire Schedule
A 8 C
Luniuiro ~i,
f1,elcc.:,,c,a ~
Code Coc:um«tts Ltsnirunr ~
q 3 !l"ll. L/. 3L Mo. ster
I~ -:. :i 1
11 LI 3L.. S/<>..'ie
a ...
Tailored LPO Approach (when applicable)
I 'Natta lol"IC: A-Ole (WS-6Cl , •• , , • ___ Watts
2 i~Wcza la'IC: E .r. F(WS-50). • • • W.rm
l Nort-ia:sk Wat::s fer IC: E 6 F (WS-50) • • Watts
, _iask W-.r:a tor IC: G. H & I (WS,,&:). • • Wu:s
5 N0t-iasJ1, Wat::s fer IC: G. H 6 I r,vs..&:) _-. Wcru
i ~ Sl0tw llQnanq ('WS,,5r} • Wc:s
7 iota ~ W.rz:s (I"" 1-; • , , • • , Wcu
a Cood lioi .-d Floer ...,._ • • • • • • , . , • :t2
g Maximum lPO (UM 71 l.z>e 8l • • • • • • WIC:Uft2
0 F
W.mpeo-
Num~ol u.n,onu-e · Tobi l.J.ominu,.,. (nc:l..bd.al) Watts
,,r I :J.. q (,.L/ s
,i;-,~ CJ I 1,1./.~
I 1 -' 'v LI' .'? L '"en ,J. e,l)e,nden-+ ~ /,~ b I .'IO'x. J
1 ...-;. Recessed F"r,\,n Li a'n-t ~ I I') (J
'J I
I
I
I
?ao-raca
-
FGl'IS~$eole;"'91t!JW
I :J...00
I
I
I
I·
I
I
I
u~qx
_,, •
I
i
I
I
I
I
.. . '
®
w-.,, er-
e:, 0 :t,
-,.,
0
~
0
00
..
w p
C A H T p
I T A R 0
R T s I L
C s E p E
1 4200 3 50 3
3 4200 3 50 3
5 4200 3 50 3
7 1488 1 20 1
'3 1698 1 20 1
11 1600 1 20 1
13
15
17
19
.,/;/,··.
~-
PNL B
VOLTS = 120/208
PHASE= 3,4W
AMPS= 100
MLO
w
C A
I T
R T
DESCRIPTION C s
AC 2
AC 4
AC 6
WAREHOUSE LTS 8
OFFICE LTS 10
HOT WATER 12
14
16
18
20
PHASE A= 7088W,59.06A
PHASE B = 6898W,57.48A
PHASE C = 6800W,56.66A
TOTAL WATTS
20786
p
H T p
A R 0 s I L
E p E DESCRIPTION
1200 1 20 1
1000 1 20 1
1000 1 20 1 PLUGS
200 1 20 1 PHONE PLUG