Loading...
HomeMy WebLinkAbout2801 JACARANDA AVE; ; CB153766; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-03-2015 Cogeneration Permit Permit No:CB153766 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2801 JACARANDA AV CBAD COGEN Sub Type: PHOTO Lot#: 0 Constuction Type: NEW Reference #: Parcel No: 2551033100 Valuation: $6,400.00 Occupancy Group: Project Title: ATEMPA: ROOF MOUNT PV, 4.16KW, 16 MODULES, 125 AMP PANEL UPGRADE Applicant: SOLARCITY 3055 CLEARVIEW WY SAN MATEO CA 94402 650-759-4658 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Green Bldg Stands (SB1473) Fee $87.98 $0.00 $61.59 $0.00 $0.00 $1.00 $1.00 Owner: ATEMPA FELIX&MINERVA 7782 PALENQUE ST CARLSBAD CA 92009 PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Additional Fees TOTAL PERMIT FEES Status: ISSUED Applied: 11/02/2015 Entered By: SLE Plan Approved: 11/02/2015 Issued: 11/02/2015 Inspect Area: Plan Check #: $0.00 $0.00 $0.00 $0.00 $151 .57 Total Fees: $151.57 Total Payments To Date: $151.57 Balance Due: $0.00 Inspector: ~ Clearance: I\OTICE Reose ta<e l\OTICE Iha~ cl ,o.r Fftject irdl.des the "lrrpositiorl' cl foos, decicaions, -cm, cr ctrer ~a,s -cdledively referral to as 'lees'~crs." Yoo rave 9J day., franthe date ttis flE'TTit v.as iss.m to pretest irrµ,sition cl these fees'~a,s. If )OJ pretest ttem )OJ nu;t fdlo.vthe pretest ~ set fCJtti in Go.errrert Qxl, Sedion oo:J:20(a), a-d file the pretest a-d ITT{ ctrer reqjred irformiion wth the Oty Mr<gerfcr rrocessi"!J ;,, axnda oewth Qrlslm Mrid!" Qxl, Sedion 3.32Cl30. Fallretotirmyfdlo.vtha JrCXID,reWII t« ITTf s,.mecµrl lega ediontoattack re.Aew, set asiOO, vcid, a nu tt-ar irrµEtirn. Yoo ae harEtrj R.R1l-ffi I\OTIFlEOtt-at ,o.r ng,t to pretest the specified fees'~ons CXES I\Of APA. Y to wa,,; a-d ,,,_ oonnecton fees ard ~ crav,s, ncr palirg, zmrg, g,drg cr ctter srrila-,wicaion rrocesslrg er senioe fees in oonnecton wth ttis l)tject. I'm OCES IT APA. Y to ITTf fees'~onsclw-ich ·vena ·m1 tti w-i lirritaionsras ·ru;1 othf':wse THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0 PLANNING 0 ENGINEERING □BUii.DiNG □FIRE □HEALTH OHAZMAT/APCD ( City of Carlsbad Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov PlanCheckNo. ('@...tc=.,~71,_1 n Est. Value t n . ,.;. -~ , Plan Ck. Deposit I Date I \ 2. / \S lswPPP JOB ADDRESS z '8' O I SUITEf/SPACEf/UNITJ IAPN CT/PROJECT# I LOT# I PHASE# I# OF UNITS I# BEDROOMS # BATHROOMS I TENANT BUSINESS NAME I CONSTR. TYPE I occ. GROUP DESCRIPTION OF WORK: lnc/11de Square Feet of Affected Atea(s) K.W 4. / Y, PV Array Roof Mount ; Modules / If : lnverter(s) I ; String(s) ~ : Main Panel upgrade?~; Flush Mounted?JffL; RMA? Ne EXISTING USE I PROPOSED USE I GARAGE (SF) PATIOS (SF) IDECKS (SF) FIREPLACE YES(]# . IAIR CONDITIONING IFIRE SPRINKLERS Ne(] I YES0No0 vesONoD APPLICANT NAME P-"-·-·n ~ Amaya Salce PROPERTY OWNER NAME _ 1 I i ,t A km O .?I ADDRESS 2370 Oak Ridge Way ADDRESS ZQ' ·1 -. 1 , , ,_. 011 -,AIIAY-,"hA&f h/1' CITY STATE ZIP Vista CA 92081 PHONE 760-877-4038 IFAX PHONE rJ / A-IFA\, /LI EMAIL EMAIL asalc~solarcity.com DESIGN PROFESSIONAL Same as Contractor CONTRACTOR BIJS. NAME Solar Citv Coro. ADDRESS ADDRESS 3055 Clearview Way CITY STATE ZIP CITY STATE ZIP San Mateo CA 94402 PHONE IFAX PHONE (650) 638-1028 IFAX EMAIL EMAIL asalc~solarcity .com I STATE LIC. # STATE LIC.# 888104 le.is. c111ICl1YBUSLIC1227803 (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair an)' structure, prior to Its issuance, also requires the applicant for such permit to file a signed statement tliat he ls licensed pursuant to the provisions of the Contractor's License Law fChapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he Is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 1031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). WORKERS' COMPENSATION Workers' Compensation Declaration; I hereby affirm under penaJty,_,,.,_,__,,one of the following declarations: D I have and will maintain a certificate of consent to sel sure for 1MJ1ke compensation as provided by Section 3700 of the Labor Code, for the performance of Iha work for which this pennit Is issued. [Z1 I have and will maintain workers' compensation, Quired by Section 00 of the Labor Code, for the perfonnance of the work for which this pennit is lssoed. My workers' compensation insurance carrier and policy □ □ Zuri rican Insurance ompany Polley No. WC0182014-00 (AOS) 911116 I, as owner of the property or my employees with wages as their sole compensaUon, will do the work and the structure Is not Intended or offered for sale {Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such Improvements are not Intended or offered for sale. If, however, the bulldlng or improvement is sold within one year of completion, the owner-bullclerwlll have the burden of proving that he did not bulld or Improve for the purpose of sale). l, as owner of the property, am exclusively contracUng with licensed contrcC!ors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property WOO builds or improves thereon, and contracts for such projects with contractot{s) licensed pursuant to the Contractor's License Law). I IITl exempt under Section ____ ,Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. OYes 0No 2. I (have/ have noQ signed an application for a building pennit for the proJXJsed work. 3. I have contramed with the following person (flnn) to pll)'lide the proposed construction (include name address/ phooe / contractors' license numbe~: 4. I plan to provide JX]rtions of the 'l,()rk, but I have hired the following person to coordinate, supervise and provide the major work Qnclude name I address/ phone I contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (ll'K:lude name / address f phone / type of 'l,()rk): /IS PROPERTY OWNER SIGNATURE @AGENT DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration fonn or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner HazardJus substance Account Act.? □ Yes □ t-,o Is the applicant or future building occupant required to obtain a pennit from the air pollution control district or air quaUly management district? □ Yes □ No Is the facility to be constructed within 1,000 feet of lhe outer boundary of a school site? □ Yes □ No IF Atf'( OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. AS APPLICANT'S SIGNATURE 'JIIR'""'•"'l'ls correct and that the lnfom1atlon on the plans is accura18. I agree to comply\\tth all City oldlnanc:esand State laws iutklg to bulldlng construcdon. -, mentioned properfyfor inspecoon purposes. I ALSO AGREE TO SAVE, INDEMND'Y AND KEEP HARMLESS THE CfTY a' CARLSBAD ICH MAY IN ANY WAY ACCRUEAGftJNST SAID CITY IN C~SEQUENCE a' THE GRANTING Of THIS PERMIT. and'!emolllo,n or construcoon of structures ""8f 3 stones ill he(lht. · ions of this Ccxie shall expre by imitation and become nul and void if the bulk:ling or v.rnk aulhoriZed by sudl perm~ is not oommencecl 'Mttiin bysudl i:mr,lt is suspended or abandoned at anytime after Iha w::irk is oommenced fora ~riod of 180 days (SeciOO 100.4.4 Unibrm Buikling Code). DATE Inspection List Penni!#: CB153766 Type: COGEN PHOTO Date ~~ lnspecti~on Item Inspector Act 12/04/2015 35 Photo Voltaic (PV) RI 12/04/2015 35 Photo Voltaic (PV) AEK AP 12/04/2015 39 Final Electrical RI 12/04/2015 39 Final Electrical AEK Fl Monday, December 07, 2015 ATEMPA: ROOF MOUNT PV, 4.16KW, 16 MODULES, 125 AMP PANEL UPGRADE Comments AM PLEASE AM PLEASE Page 1 of 1 SDfi('"Mt<ttd A~ St_ .. mprd Lnergy u11111y· ELECTRIC UNDERGROUND METER & SERVICE LOCATION Customer Copy Notification #: 300000037841 Job#: jTB: 1147-G4 Wanted Date: ON INSPECTION Date Prepared: 03/19/2015 Customer Type: Residentia1(1-2 Units) Service Type: UG REWIRE (NO TRENCHING) Project Tille: ATEMPA, FELIX (SOT) SOLAR Project Address: 2801 JACARANDA AVE I Project City: CARLSBAD Additional Address Info: Customer POC: DAVE SMITH Customer Phone#: 760 756 9829 SDGE Contact: Service Coordinator Contact Info: DANNY SADICK,760-476-5614 D Traffic Control Permit Required D SDG&E Application Required-Call: 1-800-411-7343 Excavation/Encroachment Permits Required By· Municipal Inspection required By: ClTY OF CARLSBAD I Temp Service Charge due on First Bill$ 0.00 SERVICE ATTACHMENT POINT AND/OR METER LOCATION: Install 125 -amp meter panel with 100 amp main disconnect at existing location over existing conduit and service conductors. Customer to install the new panel to meet the location of the existing landing lugs. If, for any reason, the conductors cannot be reconnected due to substandard or damaged conduit, it is customer responsibility to trench and replace the conduit from the panel to the source. To avoid delays with reconnection, your permit should read "Customer Outage Involved". Station ID #: 1117-69 Structure #: SH427170 I Joint Trench With: Handhole Installed By: Handhole Lid Shall Read: Standards Page: Ladder Arms: I Stop Trench: from Pole Riser Quad: Bend Installed By: I Bend Type: Bend Info: Conduit Installed By: Conduit Slze: Service Panel Rating: 125 Number/Size of Main Switch· 1/100 I Voltage: 120/240 # of Wires: 3 Phase: 1 Utilities Maximum Contribution to Fault Current: 10000 Metering: Self-Contained Meter Clips: 4 Meter height --4'0" min. (3'0" min. for multiple installation) --6'3" max. From finish grade to centerline of meter base. Meters are required to be readily accessible 24 hours per day. Meters must be located in a safe area free of any potentially hazardous or dangerous condition. Provide 3-ft x 3-ft. clear and level working space in front of meter. VV'here meter room is proposed, contact the planner at the nearest SDG&E office. Meter bases and meter service disconnects must be located at or immediately adjacent to each other and be identified with address and unit number. PROCEDURE FOR INSTALLATION 1. PHONE DIG ALERT "811" AT LEAST TWO DAYS PRIOR TO TRENCHING FOR LOCATION OF UNDERGROUND UTILITIES. 2 Phone Service Coordinator at 760-476-5614 for the following: -3 Working days prior to trenching to arrange pre-meet with inspector and initiate trenching process. -After excavation of trench, installation of conduit and service entrance equipment at meter location, CALL FOR INSPECTION. Do not cover conduit without inspector's written approval to backfill. -VV'hen trench is backfilled and compacted, CALL FOR INSPECTION -If service entrance equipment is installed after backfill, CALL FOR INSPECTION OF THE EQUIPMENT. 3. Meter cannot be set until inspector has approved installation, including service equipment, and receipt of city/county/state inspection Additional Information: 0 Right of Way Required Assessor's Parcel Number: To minimize the electrical outage, you are advised to schedule a morning disconnect with an afternoon reconnect. There is no charge for this service. Before you change out your meter consider (1) SDG&E needs 14 working days advance notice to schedule a crew and (2) SDG&E will not reconnect the service without municipal approval on the new panel. Please contact the City/County regarding permits and inspections. City/County inspection should be received prior to 2:00 p.m. on the same day as the disconnection of service to allow the SDG&E crew enough time for reconnection of the service on the same day. If SDG&E encounters hazardous or toxic material while pertorming construction of your project, SDG&E will halt work immediately and it will be your responsibility to remove and or clean up all hazardous or toxic material prior to SDG&E continuing construction. SDG&E shall have no liability or obligation whatsoever to cleanup, remove or remediate any hazardous or toxic materials discovered during the course of construction unless it is through negligence of SDG&E. Customer-owned facilities to receive gas service are subject to all applicable local and state of California inspection authority requirements. Building address and/or houseline must be permanently identified prior to meter set. Information on this sheet is void after six (6) months. Keep this notice with building permit. Planned By: Jennifer Mageo Phone#: 7604765609