HomeMy WebLinkAbout2803 CORTE DE LA VISTA; ; CB911255; Permit10/08/91 15 37 B U I L D I N
Page 1 of i
Job Address 2803 CORTE DE LA VISTA
Permit Type RETAINING WALL
Parcel No
Valuation 52,650
Construction Type- VN
Occupancy Group Cla«
Description 4050 SF CT 90-23 FAIRWAYS
CRIB WALLS
Appl/Ownr • THE VILLAGES OF LA COSTA
P O BOX 9000-266
CARLSBAD, CA 92009.- """"
G P E R M I T
Code
***
Fees
Adjustments
Total Fees
Fees Required **
'986"'''0.0
• ;A * * ;
7* — — — ,
9.86 . 00
Permit No CB911255
Pro3ect No A9101575
Development No
str' F1 ste (\<L v
4740 10/08/91 mi 01
C-PRMT 742-00
Status- ISSUED
Applied. OS/05/91
Apr/Issue 10/08/91
Validated By DC
619 931-8747
***es., Collected & Credits
Fee description
Building Permit I
Plan Check j
Strong Motion Fee \
Other \
* BUILDING TOTAL
, 00
Payments-: \ 244 00
\ 74200i Ext fee
428 00
278 00
5 00
275 00 COMM
986 00
t APPROVAL
DATE
CLEARANCE
CITY OF CARLSBAD
2075 Las Palmas Dr , Carlsbad, CA 92009 (619) 438-1161
r PERMTT APPLICATION
City of Carlsbad Building Department
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
1 PlillMl 1 TYPh
A - l-lCommercial DNew Bunding QTenant Improvement
B - D Industnal D New Building D Tenant Improvement
C - D Residential D Apartment D Condo D Single Family Dwelling D Addition/Alteration
D Duplex D Demolition D Relocation D Mobile Home D Electrical D Plumbing
D Mechanical D Pool D Spa D Retaining Wall D Solar D Other
2 PHOJKCTINFORMATION
PLAN CHECK NO.
PLAN CK DEPOSIT ^f V**/1
VALID BY_
DATE
C-PRMT 244-00
FOR OFFICE USE ONLY
Address
Nearest Cross Street
Building or suite No
EGAL DESCRIPTION
?a,rce\ 2.
BELOW IT
D 2 Energy Calcs {^2 Structural Calcs D 2 Soils Report D 1 Addressed Envelope
ASSESSOR'S PARCEL EXISTING USE PROPOSED USE
DESCRIPTION OF WORK
SQFT 3.3 VO # OF STORIES
UUNTAUI
NAME
CITY
iii.dillereni trom applicant.)
,4«^
STATE
ADDRESS
ZIP CODE ^ > g(£ 9
UK DOW
DAY TELEPHONE C
NAME
CITY S<tK
ft COJMTRAC I OR U AOLN I 1-OR CON 1HACIUK UUWNhR U AGENI FOR OWNER
\Aj«ttlS Co ADDRESS \$3\ ^ft.,,/ ftv./
STATE £4 ZIP CODE f2.O67 DAY TELEPHONE
i
«b
5 PROPER IT UWNKK
NAME ADDRESS
CITY
6 CON1J
NAME
CITY
DESIG1
CITY ;
<CorlS'bad
[{ACJ1UU
STATE UC
5#n /H.flX'co-r
STATE <-*
STATE
#/u*Uf c,
STATE £
1 ZIP CODE <<f'Lx>0cl
ADDRESS
ZIP CODE
LICENSE CLASS
,g> AUUKtbS |$-g|
If ZIP CODE <9l*)(t>
T WORKERS' COMPENSATION
DAY TELEPHONED k/73™3j- 51 4 7
DAY TELEPHONE
CITY BUSINESS UC #
f DAYTELEPHONE$>tf)t|"1|-2.S'OTSTATEUC # A ^72-o*3
workers txjmpensation Declaration I hereby atlirm that l nave a certilicate or consent to selt-msure issued by the Director of Industnal
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab C)
INSURANCE COMPANY POLICY NO /I <? 7:EXPIRATION DATE 5"-
certificate of txemption J certify tnfit in tne performance or tne worx lor wmcn this permit is issued, I shall not employ any person in any manner
so as to become subject tg the/Workers' Compensation Laws of California
DATE
Owner-Builder Declaration I hereby affirm that I am exempt from the Contractor'sTJcense Law for the Tbllowing reason
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec 7044, Business and Professions Code The Contractor's lacense Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale )
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec 7044, Business and Professions
Code The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's Ijcense Law)
D I am exempt under Section Business and Professions Code for this reason
(Sec 7031 5 Business and Professions Code Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption Any violation of Section 703] 5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500])
SIGNATURE DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
D YES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
Q YES D NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
D YES D NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT
HAS MET OR IS MEETING HIE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
9 uuNSi'umrnuN UJNDING AGLHHJY
I hereby affirm that there is a construction lending agency lor the performance ot the work tor which this permit is issued Ibec 309710 Civil Code)
LENDER'S NAME LENDER'S ADDRESS
10 APPLJC.ANI
l cenily inai l nave read tne application and state that tne above information is correct I agree to comply witn all City ordinances and State laws
relating to building construction I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes I ALSO AGREE TO SAVE 1NDF.MN1FY AND KILF.P HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS
AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT
OSIIA. An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stones in height
Expiration Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by
such permit is suspended or abandoned at any time aftpr'the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code)
APPLICANTS SIGNATURE DATE
WHITE- File YELLOW Applicant PINK. Finance
GEOCON
INCORPORATED
FOUNDATION OBSERVATION REPORT
JOB NAME fAlftWAV.5
LOCATION
FILE NO
WAJI
. UT.5 /DATE 7'*<1 "
FOUNDATION LOCATION (if not entire building).
PERMIT NO PLAN FILE NO
D ADDITIONAL OBSERVATION REQUIRED
)5lf SUBSTANTIAL CONFORMANCE
PURPOSE OF OBSERVATION
$ Verify soil conditions exposed are similar to those anticipated
*Iiy Verify footing excavations extend to minimum depth recommended in soil report
D Verify foundation reinforcement complies with minimum recommended in soil report
D Verify slab reinforcement, sand bedding and moisture barrier comply with minimum
recommended in soil report
D Other
APPLICABLE SOIL REPORT TITLE CAJ
DATE
SOIL REPORT RECOMMENDATIONS BASED ON
D Expansion Condition, D VERY LOW D LOW D MEDIUM D HIGH D VERY HIGH
D Fill Geometry
s( Other
MINIMUM FOUNDATION RECOMMENDATION / .
Footing Depth jit 12 INCHES D 18 INCHES D 24 INCHES OTHER "7 TZ> .PL.
Footing Reinforcement D NO 4 T&B D 2-NO 4 T&B D NO 5 T&B OTHER
Interior Slab Reinforcement / D 6x6-10/10 D 6x6-6/6 D NO 3 @ 24 INCHES D NO 3 @ 18 INCHES
Slab Bedding Material and Thickness _ Vapor Barrier _
Foundation Width _
FOUNDATION PLAN REVIEWED
If yes, identify and describe
YES D
OBSERVATIONS
!*£. Substantial conformance with Soil Report (see "Purpose of Observation")
D Substantial conformance with Foundation Plans
D Other
COMMENTS V /f 7J4*/ 5
/ (L
NOTE IT IS ASSUMED THAT ALL FOOTING EXCAVATIONS WILL BE CLEANED OF LOOSE MATERIAL PRIOR TO
PLACING CONCRETE AND THAT THE SOIL MOISTURE CONTENT WILL BE MAINTAINED
FIELD COPIES TO
n \wpjob\draft\fdnobrpt frm (2/27/91)
GEOCON REPRESENTATIVE
Ws<7HT;PuTJFn INSPECTION
DATE INSPECTOR
PERMIT f ?/- /l&* PLANCK #.
JOB ADDRESS
TIME ARRIVE: TIME LEAVE:
CD LVL DESCRIPTION ACT COMMENTS
PERMITS
6/15/89
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619) 56O-1468
DATE:
^JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS:
PROJECT NAME:
SET:
APPT.TPaKIT
CHECKER
r]FILE COPY
QUPS
r~ DESIGNER
D
D
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
*
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified k&-(e>uu- are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
|] The applicant's copy of the check list has been sent to:
ijpl Esgil staff did not advise the applicant contact person that
plan check has been completed.
jj Esgil staff did advise applicant that the plan check has
— been completed. Person contacted:
Date contacted:
REMARKS : 'fcfJm\r\\r\c< in/all's
i Pi egifion 4o "Hie B Ida •
Telephone #
r
__
cw«pl
By:Enclosures:
ESGIL CORPORATION
DGA DAA DRN QDM
Datei q/i3 hi Jurisdiction Carl<
Prepared by:
l^juH- C~ Un- VALUATION AND PLAN CHECK FEE
PLAN CHECK NO. qi- 135*5
BUILDING ADDRESS £<frp 5 £*r-l-£ J<L I*.
n Bldg. Dept.
p Esgil
APPLICANT/CONTACT /5^6 l-<*(/i<in<L PHONE NO. H~JI-35&&
BUILDING OCCUPANCY LO K 6CJc< //<
TYPE OF CONSTRUCTION ^^^c.,
BtiTTnTMP TTiPTTnN
Cr,b uJ*ll bc'.'is^!**
^
V\ "
>k 1,
MA7 "
K( C7 "
Air Conditioning:
Commercial
Residential
Res. or Comm.
Fire Snrinklers
Total Value
BUILDING AREA
/ 5&t?
l£~2&
^^l?
-Z&&
^/)<To
OT-
DESIGNER PHONE " ''
CONTRACTOR
VALUATION
•1ULTIPLIER
/^
/ ^
l "*,
13
x,(su(2-.
e
§
e
PHONE
VALUE e-1^3- Rc-Permif- p^^
1 , *>£>£? 3O~7.0O 1 ^V- 55
IS-ii^'^ (-1\.OO III* IS
)5ig72J ,^.^ ?3.^0
V^S^ 7^ =0 ^ go
,1 . « -
P7^J2> £44— ^ tfo
^ M-^S^/^-^^S
//<9^ N/^^J ,
Building Permit Fee $ $
Plan Check Fee $ $
C 0 H MENTS:
SHE ET I OF /12/87
fr/v i
O
o
-i
aLUt>
123
S N R
TDD
C C C
H H H
E E E
K K K
ann
nan
K/Anan
ana
BUILDING PLANCHECK
ENGINEERING CHECKLIST
DATE :i <D ~ 1 -
PLANCHECK NO. C& C\\-
ITEM COMPLETE
ITEM INCOMPLETE
NEEDS YOUR ACTION
ITEM SELECTED
PROJECT ID: APlO 2 1 U - 1 "?>£) - U \
LEGAL REQUIREMENTS
Site Plan
1. Provide a fully dimensioned site plan drawn to scale.
Show: north arrow, property lines, easements, existing and
proposed structures, streets, existing street improvements,
right-of-way width and dimension setbacks.
2. Show on site plan: Finish floor elevations, pad
elevations, elevations of finish grade adjacent to
building, existing topographical lines, existing and
proposed slopes, driveway with percent (%) grade and
drainage patterns.
3. Provide legal description and Assessors Parcel Number.
Discretionary Approval Compliance
4. No Discretionary approvals were required.
5. Project complies with all Engineering Conditions of
Approval for Project No. .
6. Project does not comply with the following Engineering
Conditions of Approval for Project No.
Conditions complied with by:
Field Review
'—' '—' '—' 7. Field review completed. No issues raised.
nan
Date:
8.
nn
nnn
Field review completed. The following issues or
discrepancies with the site plan were found:
A. Site lacks adequate public improvements
B. Existing drainage improvements not shown or in
conflict with site plan.
C. Site is served by overhead power lines.
P \DOCS\MISFORMS\FRM0010.DH REV 02/27/91
'—' '—' '—' D. Grading is required to access site, create pad or
provide for ultimate street improvement.
'—' '—' '—' E. Site access visibility problems exist. Provide onsite
turnaround or engineered solution to problem.
'—' '—' '—' F. Other:
Dedication Requirements
9. No dedication required.
10. Dedication required. Please have a registered Civil
Engineer or Land Surveyor prepare the appropriate legal
description together with an 8V x 11" plat map and submit
with a title report and the required processing fee. All
easement documents must be approved and signed by owner(s)
prior to issuance of Building Permit. The description of
the dedication is as follows:
Dedication completed, Date By:.
Improvement Requirements
'—' 11. No public improvements required. SPECIAL NOTE; Damaged or
defective improvements found adjacent to building site must
be repaired to the satisfaction of the City inspector prior
to occupancy.
'—''—'12. Public improvements required. This project requires
construction of public improvements pursuant to Section
18.40 of the City Code. Please have a registered Civil
Engineer prepare appropriate improvement plans and submit
for separate plancheck process through the Engineering
Department. Improvement plans must be approved,
appropriate securities posted and fees paid prior to
issuance of permit. The required improvements are:
Improvement plans signed, Date: by:.
P \DOCS\MISFORMS\FRM0010.DH REV. 02/27/91
'—' '—' 13. Improvements are required. Construction of the public
improvements may be deferred in accordance with Section
18.40 of the City Code. Please submit a letter requesting
deferral of the required improvements together with a
recent title report on the property and the appropriate
processing fee so we may prepare the necessary Future
Improvement Agreement. The Future Improvement Agreement
must be signed, notarized and approved by the City prior to
issuance of a Building Permit.
Future Improvement Agreement completed, Date:
By:
DC 13a. Inadequate information available on site plan to make a
determination on grading requirements. Please provide more
detailed proposed and existing elevations and contours.
Include accurate estimates of the grading quantities (cut,
fill, import, export).
'—' '—' 14. No grading required as determined by the information
provided on the site plan.
15. Grading Permit required. A separate grading plan prepared
by a registered Civil Engineer must be submitted for
separate plan check and approval through the Engineering
Department. NOTE: The Grading Permit must be issued and
grading substantially complete and found acceptable to the
City Inspector prior to issuance of Building Permits.
Grading Inspector sign off. Date: by:
Miscellaneous Permits
16. Right-of-Way Permit not required.
'—' '—' '—' 17. Right-of-Way Permit required. A separate Right-of-Way
Permit issued by the Engineering Department is required for
the following:
^ '—' '—' 18. Sewer Permit is not required.
'—' '—' '—' 19. Sewer Permit is required. A sewer Permit is required
concurrent with Building Permit issuance. The fee required
is noted below in the fees section.
20. Industrial Waste Permit is not required.
P \DOCS\MISFORMS\FRM0010 DH REV. 02/27/91
21. Industrial Waste Permit is required. Applicant must
complete Industrial Waste Permit Application Form and
submit for City approval prior to issuance of a Building
Permits. Permits must be issued prior to occupancy.
Industrial Waster Permit accepted -
Date: By:
Fees Required
D I 27. Park-in-Lieu Fee
%
D
D
D
D
D
D
Quadrant:._Fee per Unit:.
Total Fees:
23.
24.
25,
26,
27.
Traffic Impact Fee
Fee Per Unit:Total Fee:
Bridge and Thorough fare Fee
Fee Per Unit:Total Fee:
Public Facilities Fee required.
Facilities Management Fee Zone:.
Sewer Fees Permit No.
Fee:
EDU's
Benefit Area:Fee:
28. Sewer Lateral Required:.
Fee: _
29. REMARKS: _
ENGINEERING AUTHORIZATION TO ISSUE PERMIT
BY:DATE :- /-
P \DOCS\MISFORMS\FRM0010 DH REV. 02/27/91
OJ <U <D
^ *-» w
31 tO (Q
PLANNING CHECKLIST
Plan Check No <^-/2-^"j Address 2 Q>o3 COV-T&- £B-
Planner \)h^ Uv^cL^ Phone 438-1161 ext
(Name)
APN
<- rg KI« « «
Type of Project and Use
Zone f&t>fl/\ Facilities Management Zone
Legend
LiJ Item Complete^ £ £ M<j u o i i
c c ca a a
a. o. a. j j
I I Item Incomplete - Needs your action
1,2,3 Number in circle indicates plancheck number where deficiency was
identified
Us D D Environmental Review Required YES _ NO P^ TYPE
DATE OF COMPLETION _
cr6
Compliance with conditions of approval7 If not, state conditions which require action
Conditions of Approval
D Discretionary Action Required: YES £±_ NO TYPE CT
APPROVAL/RESO. NO. _ DATE
PROJECT NO
OTHER RELATED CASES:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
California Coastal Commission Permit Required: YES NO
DATE OF APPROVAL:
San Diego Coast District, 3111 Camino Del Rio South, Suite 200, San Diego, CA. 92108-1725
(619) 521-8036
Compliance with conditions of approval? If not, state conditions which require action
Conditions of Approval
IE'LJ Q
Landscape Plan Required YES VC NO
See attached subrruttal requirements for landscape plans
Site Plan.
1 Provide a fully dimensioned site plan drawn to scale Show \cr-
arrow, property lines, easements, existing and proposed str_c:ures
streets, existing street improvements, ngnt of-wav .%ic:h ar:
dimensioned setbacks
2 Show on Site Plan Finish floor elevations, elevations or -"rusn r-a^e
adjacent to building, existing topographical Lines, existing ana zrcrcse:
slopes and dnveway
3 Provide legal description of property
4 Provide assessor's parcel number
Zoning
Setbacks
/ Front-
\ ^ s <{® «fl Street Side:
/ ,n <s , j-^ Rear-( 0^ yjr
Lr G G \ ^ 2 Lot coverage
)3^ G Q y 3 Height.
[S^G Q AJ& 4 Parking:
G Q O Additional Comments
Required
Required
Required
Required
Required
Required
Spaces Required
Guest Spaces Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
OK TO [SSUE AND ENTERED APPROVAL INTO COMPUTER \J . O/DATE ~ f/
PLNCK.FRM
CRIBWALL STABILITY CALCULATIONS
PREPARED BY:
PREPARED FOR:
SITE:
SOILS DATA FROM:
LETTER DATED:
PROJECT NO.:
SHEET 01 OP 11
SEPTEMBER 04, 1991
RETAINING WALLS COMPANY
1531 GRAND AVENUE
SAN MARCOS, CALIFORNIA 92069
(619) 471-2500
PROJECT CONTACT: BOB LAVIGNE
THE VILLAGE OF LA COSTA
PO BOX 9000-266
CARLSBAD, CALIF. 92009
(619) 931-8747
BOUNDED N'LY BY CORTE DE LA VISTA,
NW'LY BY ALICANTE RD. & LA COSTA
RESORT ON THE SOUTH
GEOCON, INC.
6960 FLANDERS DRIVE
SAN DIEGO, CALIF. 92121-2974
(619) 558-6900
JULY 07,1991
D-4345-H01
**********************************
IT IS REQUIRED, AS A CONDITION OF THESE STRUCTURAL
CALCULATIONS, THAT A MEMBER OF THE RETAINING WALLS
COMPANY STAFF FIELD INSPECT AND APPROVE THE
CONSTRUCTION OF THIS CRIBWALL PROJECT. RETAINING
WALLS COMPANY WILL NOT ACCEPT RESPONSIBILITY FOR
ANY CRIBWALL PROJECT RELEASED WITHOUT WRITTEN FINAL
APPROVAL FROM A RETAINING WALLS COMPANY INSPECTOR.
THIS NOTE SHALL APPLY ONLY TO WALLS CONSTRUCTED
BY RETAINING WALLS COMPANY.
JOB NO. 86-11-38
Sheet 2. of II
Date
WALL "A"
tv; p C L__»we/ j » -*^2r
$ I ,;* |pV^ 4463 "?&*
CRIBLOCK
CRIBWALL STABILITY CALCULATIONS Sheet
Date
of >|"
4 T=>
CRffiLQCK No Scale
|JN
CRIBWALL STABILITY CALCULATION
JOB NUMBER: 86-11-38
Sheet 4 of
Date g-4
PI =
Wl =
W2 =
W3 =
P2 =
(1) OVERTURNING
%(13.24)2(43) = 3767; Mo = PI( 3.22) = 12145
%( 2.75)( 1.38)(115) = 218; Ml
%( 4.75)( 1.19)(115) = 325; M2
( 4.90)(11.00)(120) = 6468; M3
Pl/3 = 0; M4
SFV = 7011;
Wl(
W2(
W3(
P2(
6
5
3
7
.50)
.84)
.71)
.42)
SMr
=
=
=
=
=
1418
1896
24001
0
27315
Overturning Safety Factor = SMr/Mo = 27315/ 12145 = 2.25
(2) SLIDING
a = 14.0362° sina = 0.2425 cosa = 0.9701
RESISTING FORCE=[Plsina+SFvcosa]( n ) + SFvsina+ PASSIVE+ COHESION
=[ 914+ 6802](0.40)+ 1700+ 0+ 980=
INDUCING FORCE = Plcosa = 3655
Sliding Safety Factor = 5766/ 3655 =1.58
(3) LOCATION OF FORCE RESULTANT
1.63 < H < 3.27
H = ( 27315 - 12145) / 7011 = 2.16 FT.
(4) FOUNDATION PRESSURES
TOE PRESSURE = [4( 4.75)-6( 2.16)]* 7011/( 4.75)2= 1871 PSF
HEEL PRESSURE = [6( 2.16)-2( 4.75)]* 7011/( 4.75)2= 1078 PSF
5766
CRIBWALL STABILITY CALCULATIONS sheet 5
Date
CRfBLQCK
CA&tC/TV =
54'
No Scale
IJN
CRIBWALL STABILITY CALCULATION
JOB NUMBER: 86-11-38!
Sheet
Date
of II
PI =
(1) OVERTURNING
%(17.12)2(43) = 6303; Mo=Pl( 3.46) = 21849
Wl
W2
W3
W4
W5
W6
P2
= %( 4.54)(
= %( 6.54)(
2.27) (115) =
1.63) (115) =
= %( 2.50) (10.00) (115) =
= ( 1.84)
= ( 4.90)
= ( 9.24)
= Pl/3
(10
(10
( 3
.00)
.00)
.00)
(115) =
(120) =
(120) =
=
ZFv =
592;
615;
1438;
2116;
5880;
3326;
0;
13967;
Ml
M2
M3
M4
M5
M6
M7
= Wl(
= W2(
= W3(
= W4(
= W5(
= W6(
= P2(
8
7
7
8
4
4
9
.18)
.51)
.10)
.80)
.32)
.85)
.69)
ZMr
=
=
=
=
=
=
S5
4844
4617
10204
18619
25385
16119
0
79788
Overturning Safety Factor = SMr/Mo = 797S8/ 21849 = 3.65
(2) SLIDING
a = 14.0363° sina = 0.2425 cosa = 0.9701
RESISTING FORCE=[Plsina+2Fvcosa]( p )+ SFvsina+ PASSIVE+ COHESION
=[ 1529+ 13550](0.40)+ 3387+ 0+ 1848= 11267
INDUCING FORCE = Plcosa = 6115
Sliding Safety Factor = 11267/ 6115 =1.84
(3) LOCATION OF FORCE RESULTANT
3.08 < H < 6.16
H = ( 79788 - 21849) / 13967 = 4.15 FT.
(4) FOUNDATION PRESSURES
TOE PRESSURE = [4( 8.96)-6( 4.15)]*13967/( 8.96)2= 1906 PSF
HEEL PRESSURE = [6( 4.15)-2( 8.96)]*13967/( 8.96)2= 121Q PSF
7»f
FRO
BAC
HEA
FAL
EN
NT STRETCHER
140" 50'
ft 60"
— j — 0 375"
^rLi 2LBAS rio-
1 5" CLR (TYP ) —| |—
K STRETCHER
4 0" 3' -9 0"
•6 0"
DER
40"
•100"
— | — 0 375"
S— # 4 REBAR
1 5" CLR (TYP ) —| |—
TOP VIEWS
50'
4' -80"
1 75"-^
S— # 4 REBAR „ „ H — 1 5" CLR
.£- I 60 80 — • (TYP )
3 ,, IT 2 5" RAD (TYP ) — ^ M -, — f-
-725"JL noK- .... II III • - n - « «.-. | u _^j |^- _i j«_ | ^
0 75"-'
SE HEADER
40" _ 1 0 0"
100"
1 0"U r1 25"
T". NOTES
8 ° 1 STRENGTH OF MATERIALS
. 1 . A COMPRESSIVE STRENGTH OF CONCRETE
1 70" 1 T'C J^DU Kb'/I -1C" II _' U _ll_ 0 1C"u <.-> n -n- w^o y Y|LLD siKLNGIH Of- STEEL
fy = 60,000 PSI
D VIEWS SIDE VIEWS
MEMBER DIMENSIONS
(5.0' HEADERS)
NO SCALE
SOUTHERN OFFIC
1531 GRAND AVE
SAN MARCOS, CA
(619) 471-251
(800) FOR-WA
< RETAINING WALLS CO. ™
MUK &^ 800 E GRANT LINE RD
?n
2069 r»ISL CRIB RETAINING WALL STANDARD DETAIL TRACY, CA. 9537630 CRfBLOCK (209) 832-2600
LL ^ DETAIL NO M5-1 (800) 540-CRIB
FALSE HEADER
(TYPICAL) —i
ALTERNATING
JOINTS —
BACK STRETCHER
(TYPICAL) —i
CM
CT>
00
1 25'
(TYP)
HEADER
(TYPICAL)
2 50'
(TYP)
FRONT STRETCHER
(TYPICAL)
TYPICAL DOUBLE DEPTH
PLAN VIEW BASE COURSE
5.0' HEADER
NO SCALE
SOUTHERN OFFICE
1531 GRAND AVENUE
SAN MARCOS, CA. 92069
(619) 471-2500
(800) FOR-VALL
RETAINING WALLS CO.
CRIBLOCK CRIB RETAINING WALL STANDARD DETAIL
DETAIL NO. B5-2
NORTHERN OFFICE
800 E. GRANT LINE RD.
TRACY, CA. 95376
(209) 832-2600
(800) 540-CRIB
RECOMMENDED
BROW DITCH
BY OTHERS
GROUND
LINE •
BURIAL
PER SOILS
ENGINEER
•TOE OF WALL
DRAINAGE TO BE SPECIFIED BY SOILS ENGINEER
MANUFACTURER ADVISES AS A MINIMUM A 4 INCH
PERFORATED PVC SUBDRAIN ENCASED IN 3 CU FT/FT
OF 3/4" CRUSHED ROCK WRAPPED IN FILTER FABRIC
TYPICAL DOUBLE DEPTH X-SECTION
SLOPING BACKFILL
NO SCALE
SOUTHERN OFFICE
1531 GRAND AVENUE
SAN MARCOS, CA 92069
(619) 471-2500
(800) FOR-WALL
RETAINING WALLS CO.
CRIB LOCK CRIB RETAINING WALL STANDARD DETAIL
DETAIL NO. XS-2
NORTHERN OFFICE
800 E GRANT LINE RD
TRACY, CA 95376
(209) 832-2600
(800) 540-CRIB
\0 u
00
LO
CM
o
IT)
CN
in
CN Ld
0
CO
a,>H
E-
o
Ld
O
o
2
Qcc:
-<
Q
o
UJa:
ca
az.
o
O
Ld
Ld
_l I—
< _ H
Q^T
LJ UJ °°
CD ? L_
LJ
00
00
-x
LUI—o
00
i£
: Q
Q Ld |
X 55
GEOCON
INCORPORATED
Geotechmcal Engineers and
Engineering Geologists
Project No 04345-34-05
November 13, 1992
Fieldstone/La Costa Associates
Post Office Box 9000-266
Carlsbad, California 92009
Attention Mr Ivan Simovich
Subject FAIRWAYS
CARLSBAD, CALIFORNIA
FINAL REPORT OF TESTING AND OBSERVATION
SERVICES DURING CRIBWALL CONSTRUCTION
Gentlemen
In accordance with your request, and our proposal dated August 12, 1991, we have piovided
testing and observation services during the construction of the cnbwall located at the rear
of Lot Nos 2 and 3 within the subject development Our services were performed during
the period of December 12 through 20, 1991 The scope of our services included the
following
• Observing the cribwall backfill operation, including the installation of a
backdram
• Performing m-place density tests in fill placed and compacted in the
cnbwall cells
• Performing laboratory tests on samples of the prevailing soils conditions
used for fill
• Preparation of this final report
General
The designer and contractor retained for construction of the wall was Retaining Walls
Company and O'Day Consultants, respectively, and are entitled Grading Plans for Fairways
CT 89-16, dated June 14, 1991 Geotechmcal design parameters were provided in our
6960 Flanders Drive
San Diego, CA 92121-2974
619 558-6900
FAX 619 558-6159
Project No 04345-34-05
November 13, 1992
Page 2
letter entitled Fairways, Carlsbad, California, Ceotechmcal Design Recommendations -
Proposed Cnbwalls, dated September 4, 1991
References to elevations and locations herein were based on surveyor's stakes in the field
and/or interpolation from the referenced plans Geocon Incorporated did not provide
surveying services and, therefore, has no opinion regarding the accuracy of the "as-built"
elevations, or surface geometry with respect to the approved plans, or surface drainage
Wall Construction
During construction of the cnbwall, compaction procedures were observed and in-place
density tests (ASTM D1556-82 and D2922-81) were performed to evaluate the relative
compaction of the placed fill Due to the structure of the cnbwall, there are limitations
which restrict locations where in-place density tests may be taken Such locations are near
the face of the wall and beneath the stretchers Field observations and the results of the
m-place density tests indicate that the fill has generally been compacted to at least 90
percent relative compaction at the locations tested The results of the in-place density tests
are summarized in Table I All density tests were performed by the nuclear method (ASTM
D2922-81), except for Test Nos CW-1B and CW-27, which were performed by the sand
cone method (ASTM D1556-82) and Test Nos CW1 and CW2 through CW6A, which were
performed by the ring sampling method
Laboratory tests were performed on samples of material used for fill to evaluate the
maximum dry density and optimum moisture (ASTM D-1557-78, Method C) The results
of the laboratory tests are summarized in Table II
As recommended in our letter dated September 4,1991, a backdram was constructed behind
the rear cells of the wall. This drain, extending the entire length of the wall, consists of a
four-inch-diameter perforated PVC pipe surrounded by at least three cubic feet per linear
foot of 3/4-mch aggregate and encased in approved geotextde filter fabric
To prevent damages to the cnbwall, it is recommended that landscape irrigation near the
cnbwall top and face be monitored and controlled to prevent soil erosion within the cells
due to overwatermg
LIMITATIONS
The conclusions and recommendations contained herein apply only to our work with respect
to backfill operations of the cnbwall cells, and represent conditions at the date this report.
Any subsequent grading should be done in conjunction with our observation and testing
services As used herein, the term "observation" implies only that we observed the progress
Project No 04345-34-05
November 13, 1992
Page 3
of the work with which we agreed to be involved Our conclusions and opinions as to
whether the work essentially complies with the job specification are based on our
observations, experience, and testing Soil conditions within the cribwall cells, and the
accuracy of tests used to measure such conditions, can vary greatly at any time We make
no warranty, expressed or implied, except that our services were performed in accordance
with engineering principles generally accepted at this time and location We will accept no
responsibility for any subsequent changes made to the site by others, by the uncontrolled
action of water, or by the failure of others to properly repair damages caused by the
uncontrolled action of water
If you have any questions regarding this report, or if we may be of further service, please
contact the undersigned at your convenience
Very truly yours,
GEO
Project Geologist
AS DFL dmc
(3) Addiessee
(2/del) Jobsite
Attention- Mr Rocky Anderson
00
H
t)
CO
Cd
OS
H
C/J
M Cd
W
rH ?•*
M H
<J rH
H C/3
2W
Q
3
CdHH
b
>
O
bai -[
in
Ot
xt
CO
1
in•^
ro<fo
0
2
4J
O
0
1— )
0
PH
•O
P.cr I-H B x-x
CO CO O dPos at o xv
•o
rH ft
CO rH S x-x
•iH CO O dP
b OS O xv
T) 4J •
rH 01 4-1
CO i-l C ^-
•rl O O dp
b a U xx
rH 01 <4H
CO ^*t C O
iH >H 0) PHb Q Q xv
4J •
01 4J
11 , J ("* —^
4^ *T"^ Wl i*~^
PL, O O dP
0 a 0 xv
X-N
Ul 4-1
X >•, C 0cd s-j co p*
S Q Q xv
Ul = ,M
3 xt 0 xxrH \ O dp
f* I CO £*\ xv
co
3 O
U 2
_r^
> 4J s^.
CO Pu 4-1i— i J-i co MH
Cd O Q xv
C
O
•rl
cdo
! "]
4-1
Ul
H
co
4-1caa
4J
U)
CO O
H 2
O O O O
O^ ^1^ ON ON
IX. 00 rH O
OO OO ON ON
PX CO xt PX
rH CM CM rH
rH rH rH rH
00 m CM rH
VO FX rH O
0 O rH rH
OO 00 03 00
ON ON ON ON
00 OO 00 03
•
CM CM CM CM
CM CM CM CM
rH rH rH r-H
O O O O
CM CM CM CM
vo ^o vo in
CM CM CM CM
in m in o
CM CM CM in
rH t-H rH t-l
,-J _] I-J 1— J
^3 ^3 ^ ^3
^ & & £3
ff , fr( fj^ frj
O O O O
a a a a
Cd Cd Cd a
CO 00 00 00
ON ON ON ON
^x ^x ~*x "^x
CM CM CM CM
t-H r-H rH rH
**X ^X ^X. ^x
CM CM CM CM
rH rH rH rH
<j ca
rH t— 1 rH CM
Dt S S S
O U CJ U
0 O 0 O
ON ON ON ON
o o PX \o
ON ON OO ON
-J xt Px o
CM CM t-H CO
t-H r-l rH t-H
rH t-H Px r-H
rH rH VO 00
rH rH O rH
03 OO 00 OO
ON ON ON ON
00 00 00 OO
CM CM CM CM
CM CM CM CM
0 O O O
CM CM CM CM
CM PX ON ON
CM CM CM CM
m
+ o m mi-H O rx p-
+ + +
t-J rH O O
^ hJ rJ rJ
^ rJ f—3 rJ
^ ^5 ^b ^ D£ StO
b b b
Q 0 O 0
a a Q a
1— ( h— < (—(w a a a
ON ON ON ON
*\ *^x ^x. "-x^
CM CO CO CO
rH rH rH rH
"Xx X^ x^ x^
CM CM CM CM
t-H i-H r-H t-H
^co xt m m
S 5 S S
O U U U
O O 0 O^^ o^ cr* cy*
OO rH O CM
OO ON ON ON
xt <t P*^ CO
CM CM t— CM
rH rH r-H r-H
VO ON O- -d1
fx rH O CM
O rH rH r-H
OO CO 00 O3
ON ON ON ON
OO OO OO QO
CM CM CM CM
CM CM CM CM
O 0 O 0
CM CM CM CM
o o m <f
CO CO CM CM
0 0m m+ + m oo o ^o p*^
H" -H
nJ i 1 T— t <— ^
j »— 4
<tj *3j r-J r-J
^5 ^ r-J t-4
<J ^C*H r*i ^ ^
O 0
Q Qa Q 2 2
a a a s
Cd Cd
2 2 (O cQ
C7\ CT\ O\ O\
"****> "***** >s"fc ^X.
c^i cO ro rO
r— t i— 1 r-t r-i
"""s. >ss. "^X. ^^v
CM CM CM CM
f-H t-J rH r- 1
<vo vo r*** oo
S S 5 Su u u u
o o o o
ON ON ON ON
in t-H CM CM
ON ON ON ON
ON O O r-H
t-H xt *^" xt
rH rH t— 1 rH
r-H VO t-H CO
•
vo t— i m m
rH rH O O
oo oo px rx
ON ON CO CO
rH t-H
oo oo PX r~
CM CM xt -*
CM CM i-H i-H
- J i J 1
O O O O
CM CM OO OO
Px oo ON O
CM CM CM CO
in om co+ + o o
i-H i-H O PX
+ +
J J rH 0
"^3 ^1 I-J r-J
& ^ r— 3 r-4
^J ^J
ffj fc S ^
0 O
Q O O O
a a Q Q
rH t-Hco co a a
t-H i i i
ON ON ON ONXx x^ x^ x^
CO CO VO VO
rH t-H t-H rH
"*x ^x^ >x^ *x^
CM CM CM CM
i— 1 t-H t-H rH
ON O rH CM
t-H rH rH
^ t3E ^ ^
CJ U U U
o o o o
ON ON ON ON
CM CO CM CM
ON ON ON ON
O m O rH
xt m m m
rH rH rH rH
O m px m
in vo m in
O O 0 O
p-» r**» r**- P**
co ro ro co
r-| rH ^ T-l
r^ r^ p^ r-^ ^^ ^ ^
rH rH rH t-H
O 0 O 0
CO OO OO O3
t-H CO ON O
CO CO CM CO
m o m m
-J- CM v£) ~d"
O O rH rH
r-3 i 1 | 1 , 1
t-4 rJ t-4 t— 3
^ ^ ^ *^^ & Cs ^
b b b b
O 0 O 0
Q Q Q Q
Cd Cd Cd Cd
2 2 00 CO
t i i ir-^ r^ rH r-l
ON ON ON ON
^x ~sx *^x "^x.
v,O vo **O vO
,H rH rH rH
X^_ "X^ -x^ X^
CM CM CM CM
rH rH rH rH
co <t m vo
t-H rH i-H i-H
£5 ^ ^ S
U U O U
o o o o
ON ON ON ON
rH CM CM CM
ON ON ON ON
rH ON in CM
xt co co <t
t-H i-H r-l rH
px co O -3;•
<t m vo m
O o O o
p^. rx px p^
ro co co co
t-H rH t-H rH
rxrxpxrx
xt xt xt xt
rH rH rH rH
0 O O O
oo oo oo oo
CO O rH CM
CM CO CO CO
m o
vO <Oo m + +
CM ON O O
+ +
rH O i 1 | 1
r-J t—4
I ^ )_} ^^ ^^
1 ^ | ^ ^^ ^^
^ ^^ S b b
O 0
b b
O O Q Q
121 £5a a cd cd
M Ma a 2 2
i ^j i if~n r^ r*i r~l
ON CT* ON CT*\^ v^ v^ v^
vO ^O VO \O
rH r-t rH t— (
*S^ ^s^. "\ <SVV
CM CM CM CM
i-H T-H tH rH
r^ co o\ o
rH rH rH CM
^3 ^3 ^ ^u o u o
01e
CO
4-1
73
CO•o
0
U
MH
O
C
0
•tH
4J
cfl
Cca
t-HP.xco
o
4-1
CO
rH
CO
4-1
<4H
0
co
toQcdp.
4-1
CO
rH
COco
CO
0)
4-1o
2
CO
H
rJ
["*N
COwoi
H
CO
M W
H
W
J ^
3 5
H coa
W
Q
S
M
b
>
§
C-ia
M
mo
I
x^"
CO
1
m
CO
o
oa
4Jo
1—1
0
)-l
O-i
T)
O,
0*1—1 £ xx
0) (]) O dp
OS Bi O "^
"O
rH {X
0} rH g xx
•H <U O dpb as u -x^
•O 4->
i-4 U 4J
4) *r4 C XX
•H O O dpb a u ^
rH 01 <4H
<U t>1 C 0
H J.J <U £1|
b Q Q ^
4J
• OJ 4J
•W -H C xxa< o o dpo a u ^
05 <4H
X >N C 0
(fl rJ 0) O.
^
0j E ,*^
3 xt O xx
i-H "X. O dP
CXi CO BJ x-'
0)>
)H
3 0u a
" f^
r* 4-> xx
0) Oi W
r-H J-l <1> <4H
W O Q •*-*
C
0
H
4Jrto
3
JJ
05
H
<u
ft**wa
05
0) OH a
0 O O O
ON ON ON ON
xt CO CM rH
^\ Q^ &\ Q\
iH i— 1 CO CO
i~H rH i—i rH
vO CO O CM
[*••* vo in «^o o o o
rH rH rH rH
p*** p*« r^* r^*»
co co co ro
rH rH rH rH
r*** r*^* r*** r*^*
*«J *sf "^ "^
rH 1 i— 1 , H
T-l ^ ,_( ^
O O O O
OO 00 OO OO
m o o o
CO CO CO CO
m in
VO CO
O 0 + +
rH CO rH rH
-4j» +
O rH t-J 1-3
hJ ^ < <
< < "* &
!S CS b b
0 0Q aa a Q aHH tii >^r. *y,
ffi 33 W W
W M
pQ cQ W C/3
^ ^ ,_) ^
Q\ o\ o^ <3\
*^*s. "^V. ^S. >NS.
\Q V.O \^ VO
CM CM CM CM
rH CM CO <t
CM CM CM CM
C5 3 CS 3
CJ U U O
o o o o
ON ON ON ON
CO xt VO CM
ON ON ON ON
rH r-. CO ON. ,
xt CO xt CO
CM CM xt xt
vo oo o m
O O rH O
rx rx. px px
CO CO CO CO
l-t rH rH rH
rx. ix. rx, rx.
•
rH rH rH rH
O O O 0
oo oo oo oo
ro in i— i o
CO CO CO CO
O m
\o C5
+ + m
C3 ^5 vO+
< < rJ J
3 r3 I-H r-H
^J ^J
o o
Q Q a o
W W 33 Q
W Ma a PP a
rH rH rH rH
ON ON ON ONx^ x^ x^ x^
vo vo vo rx
\ \ \ \
CM CM CM CM
m vo rx oo
CM CM CM CM
3 3 S ^
O O U U
o o o o
ON ON ON ON
in co m vo
ON ON ON ON
oo in ON o
CO xt CO CM
CO ON xt xt
ON vo oo rx.
O O O rH
r*""« r*^* P"** oo
CO CO CO ON
rH rH rH
P"** P*** P"** 00
xt xt xt CM
rH rH rH rH
O O O O
OO OO OO CM
px rx, in vo
CO CO CO CO
r4 h-J »-4
< < < rJs 5 rs .j
b b b S
000
a a Q aa a a M
W U td 3C
Ua a a «
rH rH rH rH
ON ON ON ONx^ v^ x^ x^
rx rx. px rx
CM CM CM CM
ON O i-H CM
CM CO CO CO
^353^
0 U 0 U
o o o o
ON ON ON ON
rH CO xt CM
ON ON ON ON
ON oo rx CM
xt xt m m
CO OO O xt
>d- vo oo ino o o o
rx px rx rx
CO CO CO CO
rH rH rH rH
px px r- rx
>sf *^ *sf ""^
rH rH rH rH
O O O O
OO OO OO OO
CM co vo rx
CO CO CO CO
o o o m
xt CM OO xt
rH rH 0 O
t-J t— 3 »-3 rJ
< < ^ <
S S 3 S
b b b b
O 0 O O
Q Q Q QM M I-H aa a a w
co co a a
rH i-H rH rH
ON ON ON ONx^ x^ x^ x^
OO 00 00 OO
CM CM CM CM
co xt m vo
CO CO CO CO
S S S S
U U O U
O O O 0
ON ON ON ON
CO rH in CM
ON ON ON ON
CO in rH O
m in m co
rH ON CM xt
VO xt ON CM
0 0 O rH
i — rx. PX oo
CO CO CO ON
rH i-l i-l
P*** P*** P*1* OO
xt xt xt CM
rH rH rH rH
O O O O
OO 00 OO CM
00 ON PX r-l
CO CO CO «^-
00 O
0 0
+ 00 +
O co rx o^. ^.
r-J 0 O rJ
< rJ J ^
13 < < "*
b 13 S b
°00°Q a a Q2 M M a
Cd 33 3d U
U Ua CQ CQ a
rH rH rH rH
ON ON ON o\x^ x^ x^ x^
00 00 OO 00
CM CM CM CM
rx OO ON Oco co co xt
^ 3 13 S
U O O U
O O O O
ON ON ON ON
rH rH rH CM
ON O\ ON ON
O CO <t ON
CO rH CM in
rH rH rH rH
OO CO px CO
rH rH rH in
rH rH rH O
00 00 OO rx
ON ON ON CO
rH
oo oo oo rx
CM CM CM xt
CM CM CM rH
rH rH rH rH
O O 0 O
CM CM CM 00
rH ON rx m
xt CO CO CO
m m o
rH in CM
+ + m +
O 0 00 rH
*— J t— •) O t— 5
< < p-J <13 !3 iJ !3<;
b b G: b
00 0
b
Q Q O Q
W g Q W
Ma a a to
rH rH rH rH
ON ON ON ON
00 OO 00 00
CM CM CM CM
rH CM CO xt
E£ 3 is ^u u o u
0)
j-i
U)
U
•o
0)
T)
O
U
4H
Q
rJ
o
^H
iJ
c
CD
rH
O.
X
o
a)
rH
•8
U
t|H
O
(U
bO
a-
4J
01
rH
03
CD
CO
(U
•Poa
,.
COH
p
CO
W05
H
CO
M Cd
H
W
r-5 >H
cQ EH
^! I-HH co
Wa
Sw
rHfa
>os5
M
moi
«\i
in
^ro*Hf
O
0a
4J
CJ
<U
r*l
O
r-J
0!
•o exty I-H g --N
(U <U O dp
« BJ 0 ~
rH O.
0) rH S /-s
H 0) O dp
fa BJ U ^
"O 4->
rH M 4J
<U >H C <"»
•H O O <*>
fa S U -^
"O '— '
rH W tH
0) >-, C O
*rH r>J (U Qrifa Q Q v^
• CO 4J
4J -rl C ^-N
CX, O O dpo 2 u ^
01 "4H
X >i C Oca >H o> D.
S Q Q *-
01 : ^3 -a- o x-v
rH >^ O OP
OH CO 0^ **^
Q>
}_l
3 0
U Z
> 4J ^^
<U (X 4J
rH IH 0) 4-1
W O Q
fj
O
•iH
4J
U
rH
J \
01
0)
H
0)
4Jcd
Q
4J
CO3) o
H Z
O O O O
OS OS OS OS
CO -* i-H CM
Os OS Os OS
ro \o ~3 m
m co m ^
CM o O- o
VO OO *J if\o o o o
[**•* r*** r*** r***
ro co co ro
fH i— 1 i— » t-^
r^r-^r.
^ *^ >d" <^r-l rH rH rH
rH rH rH rH
O O 0 O
OO 00 OO 00
<f CN rH O\
n *3" *sf f*^
O O m
IO rH CO
+ + + 0
rH CO CD ^O
,J rJ J CD
< < < rJ
*^ |*^ f^ . 1
^fa fa fa J2
O O O
Q 0 Q O
Z Z Z
M M M Q
M
to Z Z S
rH rH i-H rH
OS OS OS OS
^•^ "x^ X^ >v>
00 O O O
i-H CM CM CM
CM CM CM CM
m vo r*. oo
^ *^ ^ "^
CJ U O U
o o o o
OS OS OS OS
CM CO CM rH
OS OS OS OS
m m rH co
-d1 -^ in m
CO CM rH 1— •
•
in ^o m <fo o o o
r-*» px. p*, r^.
rH rH rH rH
r-, i— r~ i--
^ >H^ ^ ^rH rH rH rH
rH rH rH rH
0 O 0 0
CO OO CO CO
oo vo >d" osco ro ^ co
o ^n
f— S p^.
in in + +
OS CM O O
O rH iJ hJ
rJ rJ < <
-J -J ^£ ^J
rfj -4llS S fc rri
00fa fa
O O Q Q
O O W Cx3
M Z
2 W Z Z
Os Os Os OS
O O O O
CM CM CM CM
\\ \ V.
CM CM CM CM
OS O rH CM<t m in m
U U U 0
o o o
OS CT> Os
CM CO CM
Os Os Os
VO O >*
m in co
<f CM O
m vo vo
0 O 0
r-. r- r-
ro co co
rH rH rH
r** p^ r^
"^ *sf "^rH rH rH
i-H rH rH
O O O
OO OO OO
03 <t r-t
CO "^ »J
o m oI-H O m
rH O O
J j j
-J . ^ t ^
^J ^J ^JS S S
fa a ao z z
M M
Q K KM W td
S «3 03
Os Os Os
*^V ^N. "\
O O O
CM CM CM
V^ \^ 'ssv
CM CM CM
ro ^ mm m m
0 U 0
01s
)H
0)
4J
T-j
0^
13
O
CJ
'Wo
co
•H
4J
C8
Q
rHa
X
(U
o
<u
rH
qj
4.)
4-1
O
<U
bO
C8a
jj
01
nj
rH
(U
0)
CO
(U
4J
O
Z
IP-la
ino
in<fm-*O
O<u
1->o
Vi
CM
X
fa
CO
Hto
Cd
H est failure, following moisture conditioning4->
t^
4->
•i-t
01
Ccu
T)Cen O
3 TH
0 4->
•r-l O> cd
0) CXvi eex ou(4-1 cu
0 Vl
4J Vlw ocu \4J TJ
cu Coi cd
fc
o
*,
CQ
«.
^J failure was removed and replaced with4J rH
W -i-l
CU O
4J 01
>,rH
4J i-l
•H r-l
Ul M-l
C
CU T)
T3 CU
4->
(4-1 U
O Cd
Cd §•cu o
Vl Ucd>•,
C r-l
••-1 Vl
CU
r-l CX
r-l O
•i-l Vl
fa (X
erf
co
&
Cd
CQJg£
*~~1
2
EHto
Cd
EH
04
O
fa
Z
O
rH
H
<£o
rHto
Cd
Q
Cd
O
O
CJ
X
M
fa
Cd
Cri
DM - Joint Trench ST - Slope Test- Moisture Test SW - SidewalkH EH
•-> 2
C
•.-I 4Jcd 01Vi cu
Q EH
cd cu
CU 01Vi cd
< CQ
1 1
Q
<C 03 - Retaining Wall SZ - Slope Zone- Storm Drain UT - Utility Trench- Subgrade WB - Wall Backfill- Sewer Lateral WL - Water Lateral3 Qa! to
Vlcu
4J
4J
3 rH
C3 i-l
«
>3 &
ft J3
VI r-l
3 Vi
CJ CJ
1 1
O 13
CJ CJ
0 rJto co
cu
T3cd
Vl>>ocdS -C
CU Ul
> -H
•r< C
Vl -H
Q fa
1 1
& o
(^ Ct4
c
•r-4cda
ucu
4->1
1
c•H
cda
VlIcuto
1
ato
rS0ccu
V4
H
C
O
•H
4Jcd
bO
•T-l
1-4
Vl
M
i
OH Z
Cd
§
P
CJ Table II, representing the laboratoryntent data for selected fill soil samplesionC•I-l
•ocu
4J
Ul
•H
r-l
01
Vl
CU
,0
c
cu>
VI3
O
o
4-1
01
T3
C
0
(X
01cu
Vl
VIo
CJ
O 4Jcj cdcue;vi cu
3 ui
4J ,0
U] O
•r-lo *os ccd
1 w>a c
i-l >H
4J 4J
(X uio cu
\ 4J>-,4-> bO
•<-! C
Ul -HC viCU 3•a -a
^•avi cu
•O Vicu
E 4J3 cE 3
•r< 0
X Ucd C
E cu
Z
O(— 1
H
CJ
-^2o
CJ
^yjCJqoi greater than zero, laboratory maximum dry density and optimumcontent For tests with rock content equal to zero, laboratoe content values listed are then unadjusted values.^ Vlcu u 3
bO O 4Jcd vi 01
•U -H
C Vl 0o> o Ecj 4-1
Vi Ecu -O 3CX cu E
4J -H
X 01 4J
O 3 ft
O "-> O
Vl T)
cd T3ja c4J cu cd
•H VlS cu >,
S 4J
Ul 1-4
4-) U 01
0? C Ccu cu cu
4J 4J T3
C
>i O >-,
U 0 Vl
•i-( 13
0} CU
C Vi Ecu 3 3
T) 4J E
01 -i-l
Vl >H Xo o cd
fa E E
H
CO
Cd
H
ft)
O
Cd
DM^-i
EH
4J
Oo
4-J
CU
r-l
O•§
4-)
0)
0>
Vlcdcu
C
cu
5
o
4J
Project No 04345-34-05
November 13, 1992
TABLE II
SUMMARY OF LABORATORY MAXIMUM DRY DENSITY
AND OPTIMUM MOISTURE CONTENT TEST RESULTS
ASTM D1557-78, METHOD C
Sample
No Description
Maximum Optimum
Dry Moisture
Density Content
(pcf) (% Dry Weight)
Dark brown, Clayey fine SAND with little
silt 1228
8 Olive-brown, Clayey fine SAND with trace
of gravel 1147
98
137
II of
GRIDLOCK™ RETAINING WALL
GENERAL NOTES
DESIGN
1. DESIGN IS BASED UPON PLANS, TOPOGRAPHY AND SOILS DATA SUPPLIED BY OTHERS
ASSUMED AS CORRECT RETAINING WALLS COMPANY SHALL NOT BE HELD RESPONSIBLE
FOR COSTS INCURRED DUE TO VARIATION IN ACTUAL FIELD CONDITIONS.
2 STABILITY CALCULATIONS ARE VALID ONLY FOR LOAD CONDITION SHOWN.
3 FIELD TESTING OF SOILS FOR VERIFICATION OF SOILS PARAMETERS IS NOT THE
RESPONSIBILITY OF RETAINING WALLS COMPANY RETAINING WALLS COMPANY DOES
NOT EMPLOY PERSONNEL TRAINED TO PERFORM SUCH TESTING
4. ALL STRUCTURAL LOADS BEHIND THE WALL MUST REMAIN BEYOND A 45 DEGREE
INFLUENCE LINE EXTENDED FROM THE HEEL OF THE WALL TO THE GROUND SURFACE,
UNLESS SPECIFICALLY DESIGNED FOR BY RETAINING WALLS COMPANY
5. RETAINING WALLS COMPANY DOES NOT ANALYZE GLOBAL STABILITY RETAINING WALLS
COMPANY SHALL NOT BE-RESPONSIBLE FOR GLOBAL STABILITY OF THE WALL
AS PROPOSED.
DRAINAGE AND EROSION CONTROL
1. UNLESS SPECIFICALLY COVERED IN CONSTRUCTION CONTRACT, ALL DRAINAGE AND
EROSION CONTROL IS TO BE INSTALLED BY OTHERS
2. DRAINAGE BEHIND WALLS SHALL BE SPECIFIED BY SOILS ENGINEER.
MANUFACTURER ADVISES AS A MINIMUM A 4 INCH PERFORATED PVC SUBDRAIN
ENCASED IN 3 CU FT/FT OF 3/4" CRUSHED ROCK WRAPPED IN FILTER FABRIC
3 A CONCRETE DITCH IS RECOMMENDED AT THE TOP OF CRIBWALLS SUPPORTING SLOPED
EARTH TO PREVENT POSSIBLE EROSION FROM IRRIGATION OR STORM RUNOFF
SPILLING OVER THE FACE
4. EROSION CONTROL AND MAINTENANCE OF DRAINS SHALL BE THE RESPONSIBILITY OF
THE OWNER
MISCELLANEOUS
1. BACKFILL WITHIN AND BEHIND THE WALL SHALL BE PLACED AT MINIMUM RELATIVE
COMPACTION OF 90%.
2. PLANTING AND IRRIGATION OF WALLS TO BE DONE BY OTHERS
3 MAINTENANCE OF WALL SHALL BE THE RESPONSIBILITY OF THE OWNER
4 AS-BUILT WALL SAFETY, SUCH AS INSTALLATION OF FENCING OR GUARDRAILS IN AREAS
ACCESSIBILITY TO PEDESTRIAN OR VEHICLE TRAFFIC, IS THE RESPONSIBILITY
OF THE OWNER.
5 RETAINING WALLS COMPANY STANDARD PLANS AND STANDARD SPECIFICATIONS ARE
A PART OF THIS DESIGN.
6 AGENCY REQUIREMENTS WHICH EXCEED THE REQUIREMENTS OF THIS DESIGN SHALL
GOVERN.
7. UNLESS SPECIFICALLY ADDRESSED IN THE DESIGN, WALLS SHALL NOT BE CONSTRUCTED
IN WATERWAYS OR IN AREAS SUBJECT TO FLOODING
DETAIL NO GN-1
SOIL AND GEOLOGIC INVESTIGATION
FOR
FAIRWAYS
CARLSBAD, CALIFORNIA
FOR
THE FIELDSTONE COMPANY
SAN DIEGO, CALIFORNIA
BY
GEOCON INCORPORATED
SAN DIEGO, CALIFORNIA
JULY, 1989
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
The Fieldstone Company
5465 Morehouse Drive, Suite 250
San Diego, California 92121
Mr Brian Milich
FAIRWAYS
CARLSBAD, CALIFORNIA
SOIL AND GEOLOGIC INVESTIGATION
Attention
Subject
Gentlemen
In accordance with your request and our proposal of March 27, 1989, we
have performed a soil and geologic investigation of the subject project
The accompanying report presents the findings of our study and our
recommendations relative to the geotechnical engineering aspects of
developing the project as presently proposed
Should you have any questions concerning our report or if we may be of
further service, please contact the undersigned at your convenience
Very truly yours ,
GEOCON INCORPORATED
GCC DFL HTK Imp
(4) addressee
(2) O'Day Consultants
Attention Mr Patrick N O'Day
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
SOIL AND GEOLOGIC INVESTIGATION Page
Purpose and Scope 1
Site and Project Description 2
Soil and Geologic Conditions 4
Stratigraphy 4
Fill (Qaf) . 5
Topsoil (Not Mapped) 6
Alluvium (Qal) 6
Slopewash (Qsw) 7
Terrace Deposits (Qt) 8
Delmar Formation (Td) 8
Santiago Peak Volcanics (Jsp) 9
Geologic Structure 10
Groundwater 10
Geologic Hazards 11
Faulting and Seismicity 11
Liquefaction Potential 12
Remedial Grading Considerations 12
CONCLUSIONS AND RECOMMENDATIONS
General 15
Remedial Grading 16
Grading 18
Soil and Excavation Characteristics 21
Bulking and Shrinkage Factors 21
Slope Stability 23
Subdrains 25
Foundations 26
Category I Shallow Fill and Cut Pads 26
Category II Medium Deep Fill Pads 27
Category III Deep Fill Pads 27
Category IV Pads Underlain by Alluvium left in place 28
Retaining Walls and Lateral Loads 29
Drainage and Maintenance 31
LIMITATIONS AND UNIFORMITY OF CONDITIONS
Figure 1, Vicinity Map
Figure 2, Geologic Map
Figures 3-4, Geologic Cross Sections
Figures 5-8, Remedial Grading
Figures 9-10, Slope Design Charts
Figure 11, Surficial Slope Stability Analysis
Figure 12, Recommended Canyon Subdrain Detail
Figure 13, Retaining Wall Drain Detail
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS (continued)
APPENDIX A
FIELD INVESTIGATION
Figures A-l - A-10, Logs of Test Borings
Figures A-11 - A-33, Logs of Test Trenches
APPENDIX B
LABORATORY TESTING
Table I, Summary of Laboratory Compaction Test Results
Table II, Summary of In-Place Moisture-Density and Direct Shear Test
Results
Table III, Summary of Laboratory Expansion Index Test Results
Figures B-l - B-4, Consolidation Curves
Figure B-5, Time Rate Consolidation
APPENDIX C
RECOMMENDED GRADING SPECIFICATIONS
Figure C-l, Specifications for Site Grading
Figure C-2, Typical Benching Detail
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
SOIL AND GEOLOGIC INVESTIGATION
Purpose and Scope
The purpose of this soil and geologic investigation was to provide
geotechnical information for development of the property to receive
approximately 131 building pads for one and/or two-story residential
structures In addition, private streets will be graded and 12 lots will
be maintained as open-space Specifically, this report is intended to
provide design information with respect to grading of the site, slope
stability analysis, approximate depth and lateral extent of existing fill
materials, excavation characteristics, foundation design criteria and
other geotechnical information pertinent to the proposed site development
The scope of our services consisted of field mapping by our engineering
geologist and a review of geotechnical reports and information relative
to the site, including the following
"Preliminary Geotechnical Investigation, Alicante
Hills/Fairway Villas, Carlsbad, California," prepared by
Ninyo and Moore, dated April 21, 1988
Tentative Map of Fairways, No C T 89-, prepared by O'Day
Consultants, dated May 18, 1989
"Encinitas Quadrangle California - San Diego County, 7 5
Minute Series (Topographic)," U S Geological Survey,
1968
- 1 -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
o "Rancho Santa Fe Quadrangle California - San Diego County,
7 5 Minute Series (Topographic)," U S Geological Survey,
1968
o "Eocene and Related Geology of a Portion of the San Luis
Rey and Encinitas Quadrangles, San Diego County,
California," dated December, 1972, unpublished M A thesis
in Geology by K L Wilson, University of California
Riverside
o Unpublished reports, aerial photographs and maps on file
with our firm
The field work consisted of a site reconnaissance by the project
engineering geologist, the excavation of eight small-diameter rotary wash-
borings and 25 exploration trenches Laboratory tests were performed on
samples from the excavations to determine pertinent physical
characteristics of the soil conditions encountered Details of the field
exploration and laboratory testing programs are presented in Appendices
A and B, respectively
Site and Project Description
The site comprises approximately 39 acres of previously graded, but
presently undeveloped land in Carlsbad, California (see Vicinity Map,
Figure 1) The property is elongate and irregular in outline, being
bounded by Corte de la Vista on the north, Alicante Road on the northwest
and the La Costa Resort Hotel and Spa golf course on the south (Figure 2)
- 2 -
File No D-4345-H01
July 7, 1989
The natural topography, as determined from 1953 aerial photographs and
1968 topographic maps, consisted of a southward-facing valley slope cut
by southward-draining canyon tributaries to San Marcos Creek (see Vicinity
Map, Figure 1) Subsequent grading modified natural slopes, creating
151 (horizontal to vertical) to 2 1 cut and fill slopes, with at least
two tributary canyons having been filled within the southwestern and
eastern portions of the property
Elevations within the site range from a high of approximately 124 feet
Mean Sea Level (MSL) along the northeast adjacent to Corte de la Vista
to a low of Approximately 20 feet MSL in the southwest corner Vegetation
consists of weeds and grass, and a thick covering of iceplant and
landscaping shrubs along the southward-facing slope near the golf course
Surface water in the form of seeps or springs occurs near the base of the
slope facing the golf course, and the toe of a cut slope in the
northeastern corner
Existing improvements include eight-inch and ten-inch diameter sewer
lignments along the southern boundary, a 12-inch water main and a 15-inch
sewer main near the western boundary and a 30-inch diameter storm drain
and a eight-inch diameter sewer line near the west-central portion of the
site Old broken PVC water sprinkler lines and unmaintained concrete brow
- 3 -
File No D-4345-H01
July 7, 1989
ditches are also present along cut and fill slopes Additionally, an area
of unsuitable oversize rock fill, trash and debris exists along the
northwestern edge of the site
It is our understanding that the proposed grading will develop the site
to receive approximately 131 one- and/or two-story residential structures
We anticipate that the residential construction will be of wood-frame and
stucco supported on spread and/or continuous footing with slab-on-grade
floors The referenced Tentative Plan indicates maximum cut and fill
slopes will be on the order of 35 and 60 feet high, respectively, at a
maximum slope inclination of 2 1 (horizontal to vertical)
The descriptions of the site and proposed development are based on a site
reconnaissance and a review of the available tentative map (see Figures
and 2) If project details vary significantly from those presently
planned, Geocon Incorporated should be advised of the changes so that the
need for additional analyses and/or revision to this report can be
determined
Soil and Geologic Conditions
Stratigraphy Four surficial soil types and three geologic
formations were encountered during our investigation The surfical
- 4 -
File No D-4345-H01
July 7, 1989
deposits include fill, topsoil, alluvium and slopewash Geologic
formations include Quaternary-aged Terrace Deposits, Eocene-aged Delmar
Formation and the Jurassic-aged Santiago Peak Volcanics Figure 2 depicts
the estimated limits of mapped surficial soils and geologic formations,
while Figures 3 and 4 show geologic cross sections through the site
Each of the surficial and geologic units is discussed below, in order of
increasing age
Fill (Qaf) A majority of the property is underlain by fill of
variable thickness and quality Most of the fill generally consists of
loose to medium dense, damp to moist reddish-brown, sandy or clayey cobble
to boulder gravel The fill soils appear to have been derived from
Terrace Deposit gravels and/or from the Jurassic Santiago Peak Volcanics
Some areas of fill appears to be moderately well compacted, but other
areas were encountered which exhibited 6-inch to 12-inch thick, loose, dry
to damp (see Trench No T-8) Furthermore, some trenches encountered
loose, dry topsoil between fill and formation, as well as deleterious
materials such as wood or brush contained within the fill soils (see
Trench No T-23)
Maximum thicknesses of fill are estimated to range between 40 and 50 feet
in the old filled-in north-south tributary canyons This depth is based
- 5 -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
0:1 exploratory work for this study (Boring No SB-8) and data provided in
the referenced previous geotechnical report by Ninyo and Moore (see also
Cross-Sections AA' through DD')
Since the fill soils exhibited variability in apparent density, moisture
and quality (due to the presence of deleterious debris), remedial grading
measures will be required as outlined within the "Conclusions and
Recommendations" section of this report
Topsoil (Not Mapped) A thin layer of topsoil, typically less than
three feet thick, occurs sporadically between fill and geologic formations
or as a surficial deposit along natural slopes in the southeast portion
of the site The topsoils generally consist of loose or soft, dark brown,
silty sand or sandy clay, respectively These soils are potentially
moderately to highly compressible and expansive and, therefore, will also
require remedial grading measures as outlined in the concluding sections
of this report
Alluvium (Oal) Soils of alluvial origin were encountered within the
natural drainage bottoms, which Includes San Marcos Creek valley bottom
and tributary canyons The alluvial soils typically consist of soft, dark
brown to black, sandy clays with interbedded sand and gravel The maximum
- 6 -
File No D-4345-H01
July 7, 1989
thickness of alluvial deposits encountered in rotary wash borings was 22
feet in Boring No SB-1 along the west-southwest margin of the site
(Figure 2) The southwest portion of the site contains fills which have
I
been placed upon the above-described soft alluvial deposits (see Cross-
Sections EE' and DD') An unknown extent and thickness of alluvium also
extends beneath fill materials along old canyon tributaries in the central
and eastern portions of the site Boring Nos SB-7 and SB-8 penetrated
i
soils up to 20 feet thick which are described as fill, but appear to be
partially reworked, or recompacted alluvium Due to the relatively
compressible characteristics of the upper alluvial deposits, remedial
grading measures will be necessary as recommended in the concluding report
sections
Slopewash (Qsw) Slopewash debris, although potentially thicker than
the above-described topsoils, also occur sporadically over the site
These soils are often indistinguishable from thick topsoil deposits and
alluvium, occurring along canyon side slopes and near the base of natural
slopes In general, these deposits consist of poorly consolidated, silty
to clayey sands which are potentially compressible The maximum observed
thickness of these materials is on the order of four feet as exposed in
Trench No 1-22 Development within areas underlain by slopewash will
require remedial grading as recommended hereinafter
- 7 -
File No D-4345-H01
July 7, 1989
Terrace Deposits (Qt) Terrace deposits were found to underlie the
eastern to southeastern approximate two-thirds of the site These
deposits are typically wedge or concave shaped with the maximum thickness
occurring in ancient canyons or at lower elevations on the site They are
believed to be ancient river deposits of San Marcos Creek which were
associated with an older, higher elevation, base level for streams and
rivers of this area The majority of the terrace deposits are derived
fi:om the Santiago Peak Volcanics bedrock and consist of dense medium to
dark reddish-brown clayey sand with scattered gravel, to very dense sandy
boulder gravel with one to four foot-diameter boulders (see Trench Nos
6 and T-17) The maximum observed thickness of these materials was in
excess of twenty feet (Trench No T-4), but may be much thicker (see also
Cjoss-Sections AA'-DD') The Terrace Deposit soils are generally very
dense and may be cemented in local areas Excavation of the rocky or
cemented, portions may require a heavy ripping effort Some oversize
bculders and chunks may be generated
Delmar Formation (Td) The Eocene-aged Delmar Formation, as
ercountered within the western and northwestern part of this site
topically consists of a dense to very dense, nearly horizontally-bedded,
tan to light bluish-gray, silty fine- to medium-grained sandstone with
- 8 -
File No D-4345-H01
July 7, 1989
interbedded cobble conglomerate layers The vast majority of this unit
is granular, with traces of clay, suggesting a stratigraphic transition
into depositional facies described a few miles northward by Wilson (1972,
|
referenced) as "Member C" of the Santiago Formation The more granular
portions of the Delmar Formation, within the site, are characterized by
1jw to moderate expansive, dense, gravelly sandstones Proposed
etcavations should encounter little difficulty utilizing conventional
h;avy-duty grading equipment, the granular portions excavating to provide
sitisfactory capping materials
Santiago Peak Volcanics (Jsp). Fractured metavolcanic bedrock of the
Jarassic-aged Santiago Peak Volcanics is exposed along the central-
nartheastern margins of the site (Figure 2) Subsurface exploration with
trenching indicated this unit forms buried hills or ridges beneath
partions of the site (see Cross-Sections AA' and BB') The Santiago Peak
Valcanics consists of very dense, dark brownish-gray to dark gray slightly
mstamorphosed andesite to dacite Fracture systems measured on the site
g2nerally strike northward with steep to vertical dip inclinations One
or two fracture sets, however, exhibited low to moderate dip inclinations
oat-of-slope to the southwest (Figure 2) Based on our experience with
tiis formation in other areas, it is estimated that this materials will
gsnerally be rippable to marginally rippable to depths on the order of
- 9 -
File No D-4345-H01
July 7, 1989
five to ten feet Recommendations with respect to the treatment of these
materials exposed near finish grade have been included within the
"Conclusions and Recommendations" sections of this report In addition,
proper procedures for placement of oversize materials generated from this,
or other units containing oversize material are included in Appendix C
Geologic Structure
Bedding planes within the Eocene-aged Delmar sediments are nearly
horizontal, but are known to have regional dip inclinations in southward
directions on the order of from one to ten degrees High-angle contacts
between the Terrace Deposits, Delmar Formation and/or Santiago Peak
Volcanics are not uncommon where the sedimentary units have been deposited
in ancient canyons, embayments and river channels (see also Cross-
Sections, Figures 3 and 4)
Groundwater
A permanent groundwater table was observed within alluvium at
approximately 5h feet below present grade in Boring No SB-1 Perched
(trapped) groundwater was also observed within permeable sandstone and/or
conglomerate members of the Quaternary Terrace Deposits (see Boring No
SB-3 and notated spring seeps on Figure 2) and within the Delmar
Formation
- 10 -
I
I
_
™
I
I
I
I
I
I
•
File No D-4345-H01
July 7, 1989
Perched water conditions are likely to develop during wet seasons within
lower drainage areas which may necessitate special consideration in order
to reduce construction difficulties during grading Areas of shallow
slope failure and sloughing were noted along the base of natural and fill
slopes along the southwestern and southern portions of the site, near
areas of perched and/or seasonally high water tables
Geologic Hazards
Faulting and Seismicitv It is our opinion, based on the site
reconnaissance, evidence obtained in the exploratory excavations and a
review of published geologic maps and reports, that the site is not
located on any known active fault trace
Recent offshore seismic activity has demonstrated that small magnitude
earthquakes can be generated by the offshore faults though to be an
extension of the potentially active Rose Canyon Fault zone The offshore
faults and the Elsinore Fault are the closest potentially active to active
faults to the site, being located approximately 5 and 26 miles the west
and northeast, respectively The probability of the Carlsbad area
experiencing a locally generated Magnitude 6 8 or greater earthquake would
appear to be low based on present knowledge Earthquakes less than
Magnitude 4 have been common to the western San Diego County Area It
- 11 -
I
H File No D-4345-H01
July 7, 1989
I
is our opinion that proposed structures to be designed in accordance with
I
I
I
I
I
I
I
I
applicable building codes,the current Uniform Building Code and the
Recommended Lateral Force Requirements of the Structural Engineer's
Association of California
I
I
Liquefaction Potential The formational units onsite, with the
II exception of the alluvial soils, are dense to very dense and there is no
permanent groundwater level Therefore, in our opinion, the potential for
liquefaction within the formational soils is very low The main drainage
area, however, is underlain by over 20 feet of alluvial soils
Recommendations are presented later in this report concerning remedial
measures on the upper zones of alluvial material in this area In our
H opinion, remediation of the upper alluvial soils combined with the
I
™ increased relative density of the deeper alluvial soils yields a low
M potential for liquefaction within the areas proposed for development
I Remedial Grading Considerations
As discussed earlier in the soil and geology section of this report,
significant quantities of existing fill soils are present at the site from
previous grading which infilled two main drainage features. Exploratory
I
excavations for this study indicated the presence of topsoil/alluvium
between this old fill and the underlying formational material Also zones
- 12 -
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
of this fill were found to be at a moisture content significantly less
than optimum, indicating the material was probably placed in a drier than
suitable condition More importantly, it is suspected that a subdrain
I
does not exist within this fill as would be required by today's standard
of care in construction of deep fills placed in natural drainage features
It is our opinion that this fill, due to the above considerations, is
unsuitable in its present condition for support of the vertical loads
imposed by additional fill or structural improvements Excessive
settlements may occur, particularly as a result of increased soil moisture
content due to irrigation of the lots after development
« Remedial grading of the fill in the form of removal and recompaction will,
therefore, be required Significant volumes of material will be involved
H In addition, oversized boulders are present within the fill Special
considerations in planning the remedial grading will be necessary as
H discussed later herein
• Alluvial soils are present in the southwestern portion of the site and
fl| will require remedial grading prior for placement and compaction of fill
soils A small area of the alluvium is exposed at existing grade,
however, the majority of this material appears to be covered by
- 13 -
File No D-4345-H01
July 7, 1989
undocumented fill The estimated extent of the soft compressible alluvium
is shown on Figure 2 Further delineation of the alluvium was restricted
by the presence of oversized material and debris in this area However,
preliminary settlement analysis for these alluvial soils indicates that,
depending upon thickness of alluvium and the height of the proposed fill,
settlements will range in order of 10 to 15 inches
It is anticipated that shallow groundwater will limit the depth of
remedial grading, in alluvial soil In these areas, compacted fill should
be instrumented with settlement monuments to monitor consolidation of the
alluvium left inplace and to evaluate when building improvements may be
constructed This is anticipated to be on the order of 4 to 6 months
Where time for development is critical, this area should be surcharged at
the earliest date and monitored until all significant settlement has
ceased
Property boundaries will limit the horizontal extent of remedial grading
of both the alluvial and fill soils Along Corta de la Vista Street,
removal of the undocumented fill will need to consider maintaining
stability of the backcut slope adjacent to the street The same
consideration will be required along the south property line when
excavating adjacent to the golf course Recommendations for grading in
these areas are presented hereinafter
- 14 -
File No D-4345-H01
July 7, 1989
CONCLUSIONS AND RECOMMENDATIONS
I
I
I
I
• General
1 It is our opinion that no significantly adverse soil or geologic
• conditions were encountered during the course of the investigation which
would preclude the development of the property as presently planned
• provided the recommendations of this report are carefully followed
2 The majority of the site is underlain by alluvium and fill soil It
• is our opinion that these materials are not considered suitable in their
present condition to receive compacted fill and/or settlement sensitive
I structures and will require remedial grading
3 The depth of remedial grading to remove and recompact the
undocumented fill will vary with anticipated maximum depths of up to 45
to 50 feet Furthermore, remedial grading of the undocumented fill will
be limited by property boundaries Special grading considerations will
be required as recommended hereinafter
File No D-4345-H01
July 7, 1989
4 Remedial grading of the alluvial soil in the southwest corner of the
property will be limited by the property boundary and relatively shallow
groundwater Proposed fill can be placed over the alluvium left in place,
however, special considerations will be required for grading,
instrumentation of the fill and foundation design as later discussed
herein
5 Where existing sewer and waterlines are proposed for abandonment and
are located in areas to receive improvements, the lines should be removed
and the resulting depression properly backfilled If the abandoned lines
are located in non-structural areas, it is recommended they be filled
using a sand/cement grout mixture
Remedial Grading
6 Extensive remedial grading will be required to develop the site in
the form of removal and recompaction of alluvium, topsoil, slopewash and
existing fill soils The majority of these soils within the interior of
the site can be regraded without restriction except or as limited in depth
of removal by shallow groundwater Remedial grading will be restricted
at the property boundaries by existing roadways and adjacent properties
All remedial grading should be observed by a representative of Geocon
Incorporated
- 16 -
File No D-4345-H01
July 7, 1989
7 Site work adjacent to Alicante Road and Corte Del La Vista will
require removal of the existing fill soils to the formational soils
Remedial grading should be performed in sections to limit the extent of
cut along a given portion of roadway and to reduce potential distress to
existing streets and associated utilities It is recommended that a
temporary cut slope should be cut no steeper than 1 1 (horizontal to
vertical) The controlled compacted fill should then be placed and
benched into the temporary cut slope (see Figure 5)
8 Along the southern edge of the property, where remedial grading is
limited by the property boundary, a temporary cut slope no steeper than
1 1 (horizontal to vertical) will limit the extent of the remedial grading
(see Figure 6) In the southwestern corner, remedial grading will be
further limited by shallow groundwater (see Figure 7) Excavation within
the alluvium should be limited to approximately 3 feet above groundwater
level
9 It is recommended that fill placed over alluvial soils left in place
be instrumented with monument plates and monitored until all significant
settlement has ceased The information gained from such monitoring
program should provide greater certainty regarding the consolidation/
compression characteristics of the alluvial materials and should be
- 17 -
File No D-4345-H01
July 7, 1989
considered as the primary factor in determining the appropriate time to
commence structural improvements
10 The proposed fill slope at the south central portion of the project
site is planned for a height of approximately 60 feet Signs of seepage
and springs have been observed in the existing natural slope It is
recommended that fill soils be keyed and benched into the natural steep
slope Details relating to construction of fill slopes over formational
soils are presented on Figure 8 Installation of horizontal drains is
also recommended along the benches where there is potential for seepage
out of the formational soils
Grading
11 All grading should be performed in accordance with the attached
"Recommended Grading Specifications" (Appendix C) once the grading plans
have been finalized and reviewed by Geocon Incorporated Where the
recommendations of this section conflict with Appendix C, the
recommendations of this section take precedence All earthwork should
be observed and all fills tested for proper compaction by Geocon
Incorporated
- 18 -
File No D-4345-H01
July 7, 1989
12 Prior to commencing grading, a preconstruction conference should be
held at the site with the owner or developer, grading contractor, civil
engineer, and geotechnical engineer in attendance Special soil handling
and/or the grading plans can be discussed at that time
13 Site preparation should begin with the removal of all deleterious
matter and vegetation The depth of removal should be such that material
to be used in fills is free of organic matter Material generated during
stripping operations and/or site demolition should be exported from the
site
14 The site should then be brought to final subgrade elevations with
structural fill compacted in layers In general, soils native to the site
are suitable for reuse as fill if free from vegetation, debris and other
deleterious matter Layers of fill should be no thicker than will allow
for adequate bonding and compaction All fill, (including backfill and
scarified ground surfaces), should be compacted to at least 90 percent of
maximum dry density at approximately 2 percent over optimum moisture
content, as determined in accordance with ASTM Test Procedure D1557-78,
Method C Based on observations and the recommendation of the
geotechnical engineer, the minimum specified percent compaction may be
modified for the initial zone of fill placed over alluvium left in place
- 19 -
File No D-4345-H01
July 7, 1989
(due to groundwater) to aid in establishing a stable layer on which to
construct the remaining fill
15 Grading operations on the site should be scheduled so as to place
oversize rock and expansive soils in the deeper fills and to "cap" the
building pads and fill slopes with granular materials having a low expan-
sion potential
16 All potentially compressible surficial deposits including existing
fill soils, topsoils, slopewash, and alluvium not removed by planned
grading operations should be removed to firm natural ground (where not
limited by groundwater) and properly compacted prior to placing additional
fill and/or structures Deeper than normal benching and/or stripping
operations for sloping ground surfaces will be required where thicknesses
of potentially compressible surficial deposits are greater than 3 feet
Alluvial removals within the southwestern area should extend a minimum of
2 to 3 feet above existing groundwater elevations depending on the
prevailing conditions The actual extent of removals will be determined
in the field by the geotechnical engineer
- 20 -
File No D-4345-H01
July 7, 1989
17 It is recommended that the cut lots and the cut portion of the
transitional lots to be undercut to 3 feet below the proposed finish
grade
18 The upper 3 feet of all building pads (cut or fill) and 12 inches in
pavement areas should be composed of properly compacted or undisturbed
formational "very low" to "low" expansive soils The more highly
expansive soils should be placed in the deeper fill areas and properly
compacted "Very low" to "low" expansive soils are defined as those soils
that have an Expansion Index of 50 or less when tested in accordance with
UBC Standard Table 29-2 Oversize rock greater than 12 inches in maximum
dimension should not be placed within 5 feet of finish grade
Soil and Excavation Characteristics
19 In general, the soil conditions encountered are generally low to
moderately expansive
20 In our opinion, the surficial deposits can be excavated with light
to moderate effort with conventional heavy-duty grading equipment
Excavation of the fill and the formational soils will require moderate to
heavy effort Cemented chunks and boulders requiring special placement
procedures may be generated during the excavation of formation materials
(see Appendix C for detail of placement of oversize materials)
- 21 -
File No D-4345-H01
July 7, 1989
Bulking and Shrinkage Factors
21 Estimates of embankment bulking and shrinkage factors are based on
comparing laboratory compaction tests with the density of the material in
its natural state as encountered in the test borings It should be
emphasized that variations in natural soil density, as well as in
compacted fill densities, render shrinkage value estimates very
approximate As an example, the contractor can compact the fill soils to
relative compaction of 90 percent or higher of the maximum laboratory
density Thus, the contractor has approximately a 10 percent range of
control over the fill volume Based on the limited work performed to
date, in our opinion, the following shrinkage factors can be used as a
basis for estimating how much the on-site soils may shrink or swell (bulk)
when excavated from their natural state and placed as compacted fills
Soil Unit Shrink/Bulk Factor
Fill, Topsoil, Slopewash, Alluvium
Terrace Deposits, Del Mar
Formation
Santiago Peak Volcanics
5 to 10 percent shrink
4 to 8 percent bulk
20 to 30 percent bulk
- 22 -
I
I File No D-4345-H01
July 7, 1989
I
Slope Stability
™ 22 The proposed cut slopes will expose primarily very dense soils of the
• Del Mar Formation and/or Terrace Deposits which should provide excellent
stability
I
23 The stability of proposed cut and fill slopes with respect to deep-
I
seated failure and surficial shrinkage was analyzed using Taylor's Chart
and the following effective shear strength parameters
• A Cut - Terrace Deposits and Del Mar Formation
Angle of Internal Friction = 25°
| Apparent Cohesion = 400 psf
B Compacted Fill
Angle of Internal Friction = 26°
Apparent Cohesion = 330 psf
24 The above shear strength parameters are based on the findings of this
study, previous studies on the site and our experience with similar soil
and geologic conditions in the area The results of the analysis indicate
that 2 1 cut slopes possess an indicated factor of safety in excess of 1 5
for a height of approximately 70 feet Fill slopes having a ratio of 2 1
- 23 -
File No D-4345-H01
July 7, 1989
also possess an Indicated factor-of-safety of at least 1 5 for a maximum
height of 60 feet The attached "Slope Design Charts" (Figures 9 and 10)
present the allowable slope height for various slope conditions and
assumes a minimum factor of safety of 1 5 Surficial slope stability
analysis of fill slopes also indicates a factor of safety in excess of
1 5, calculations are presented on Figure 11
25 Cut slopes excavated in the metavolcanic rock do not lend themselves
to conventional stability analyses However, the results of our field
investigation, our experience in the general area and the examination of
the existing slopes within and adjacent to the property indicate that the
proposed 2 1 (horizontal to vertical) cut slopes should be stable with
respect to deep-seated failure and surficial sloughage up to the proposed
maximum height of 20 feet Tops of cut slopes should be cleared of loose
boulders and should be "rounded within the exposed topsoil horizon
26 Where cuts exceed the maximum depth of the weathered portion of
metavolcanic rocks, heavy blasting may be required to break the fresh,
very hard rock Overblasting of cut slopes should not be permitted
Loose rock and blasting debris should be removed from the faces of finish
graded cut slopes No loose rock fragments greater than six inches in
maximum dimension should be left on the slope surface
- 24 -
File No D-4345-H01
July 7, 1989
27 We recommend that cut slopes be examined by an engineering geologist
from our firm during grading If adverse conditions are encountered,
additional analyses and recommendations may be necessary Fill slopes
should be constructed of granular materials with minimum shear strength
parameters of 0' = 26° and C'=330 psf or equivalent All fill slopes
inclined at 2 0 to 1 0 and flatter should be back-rolled in at least 4-
foot intervals and be track-walked upon completion
28 The outer zones of fill slopes to at least 15 feet horizontally
should be composed of properly compacted granular material free of
expansive soils Oversize rocks should not be placed at the center 15
feet of the slope
29 All slopes should be planted, drained and properly maintained upon
completion to reduce erosion Vegetation should be of relatively deep-
rooted and drought resistant varieties
Subdrains
30 A system of subdrains will be required to reduce the potential for
groundwater buildup within the canyon fills The actual location of the
subdrains will be dependant upon a review of the final grading and
improvement plans All subdrains and approved outlets should be as-built
- 25 -
File No D-4345-H01
July 7, 1989
by the project civil engineer for location and elevation (for detail see
Figure 12)
Foundations
31 The following preliminary foundation recommendations for the
proposed one- and/or two-story single-family residential structures are
separated into categories dependent on the depth and geometry of
underlying fill soils for a particular lot Determination of final
foundation design for specific lots will be made at the completion of
grading and will be presented at that time within interim and/or final
reports of mass grading operations It should be noted that the following
foundation recommendations pertain to lots excavated in or capped with a
minimum of 3 feet of "very low" to "low" expansive soils (Expansion Index
of 50 or less) For lots possessing an Expansion Index greater than 50
within 3 feet of finish grade, additional recommendations will be
provided
Category I Shallow Fill and Cut Pads In general, the lots within
this category include cut lots, undercut and/or transition cut lots
with less than 10 feet of fill thickness differential or fill lots
underlain by less than approximately 20 feet of fill
A It is recommended that foundations within this category have a
minimum depth of 12 inches and a minimum width of 12 inches
Foundations so proportioned may be designed for an allowable
soil bearing pressure of 2,000 psf (dead plus live load) This
bearing pressure may be increased by up to one-third for
transient loads such as wind or seismic forces
- 26 -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
B Continuous footings should be reinforced with two No 4
reinforcing bars, one placed near the top of the footing and one
near the bottom
C Concrete slabs-on-grade should have a thickness of 4 inches and
should be reinforced with 6x6-10/10 welded wire mesh
throughout It has been our experience that the mesh must be
physically pulled up into the slab after the placement of
concrete The mesh should be positioned within the upper
one-third of the slab Proper mesh positioning is critical to
future performance of the slabs The slab should be underlain
by at least 4 inches of clean sand and, where moisture sensitive
floor coverings are planned, a visqueen moisture barrier should
also be provided and placed at midpoint within the 4-inch sand
cushion
Category II Medium Deep Fill Pads In general, the lots within
this category are underlain by 20 to 50 feet of fill and have a
differential thickness of less than 10 feet
A It is recommended that foundations within this zone have a
minimum depth of 18 inches and a minimum width of 12 inches
Foundations so proportioned may be designed for an allowable
soil bearing pressure of 2,000 psf (dead plus live load) This
bearing pressure may be increased by up to one-third for
transient loads such as wind or seismic forces
B Continuous footings should be reinforced with four No 4
reinforcing bars, two placed near the top of the footing and two
near the bottom
C Concrete slabs-on-grade should have a thickness of 4 inches and
should be reinforced with No 3 reinforcing bars spaced at 24
inches in both directions The slab should be underlain by at
least 4 inches of clean sand and, where moisture sensitive floor
coverings are planned, a visqueen moisture barrier should also
be provided and placed at midpoint with the 4-inch sand cushion
Category III Deep Fill Pads In general, the lots within this
category are underlain by deep fills in excess of approximately 50
feet in depth or are underlain by differential fill thicknesses which
vary more than 10 feet
A It is recommended that foundations within this category have a
minimum depth of 24 inches and a minimum width of 12 inches
- 27 -
File No D-4345-H01
July 7, 1989
Foundations so proportioned may be designed for an allowable
soil bearing pressure of 2,000 psf (dead plus live load) This
bearing pressure may be increased by up to one-third for
transient loads such as wind or seismic forces
B Continuous footings should be reinforced with four No 4
reinforcing bars, two placed near the top of the footing and two
near the bottom
C Concrete slabs-on-grade should have a thickness of 4 inches and
should be reinforced with No 3 reinforcing bars spaced at 18
inches in both directions The slab should be underlain by at
least 4 inches of clean sand and, where moisture sensitive floor
coverings are planned, a visqueen moisture barrier should also
be provided and placed at midpoint with the 4-inch sand cushion
Category IV Pads Underlain by Alluvium left in place In general,
the lots within this category are underlain and/or influenced by
alluvial soils left in place
A It is recommended that the proposed structures within this
category be supported by a post-tensioned slab and foundation
system The post-tensioned systems should be designed by a
structural engineer experienced with such foundation systems
32 As an alternative to the foundation recommendations for Categories
I, II and III, consideration should be given to the use of post-tensioned
concrete slabs and foundation systems for support of the proposed
structures If used, the post-tensioned systems should be designed by
a structural engineer experienced with such foundation systems
30 Footings located on or near the top of slope are not recommended
However, where such a condition cannot be avoided, the footing depth
should be such that the bottom outside edge of the footing is at least 7
feet from the face of the slope
- 28 -
File No D-4345-H01
July 7, 1989
31 The foundation reinforcing recommendations presented above are based
on geotechnical considerations and are not meant to be in lieu of
structural design requirements
32 The recommendations presented herein are intended to reduce the
potential for cracking of slabs and foundations as a result of
differential settlement of deep fills or fills of varying thicknesses
and/or alluvial soils left in place However, even with the incorporation
of the recommendations presented herein, foundations and slabs-on-grade
placed on such conditions may still exhibit some cracking The occurrence
of concrete shrinkage cracks are independent of the supporting soil
characteristics Their occurrence may be reduced and/or controlled by
limiting the slump of the concrete, proper concrete placement and curing
and by the placement of crack control joints at periodic intervals and in
particular where re-entry slab corners occur
Retaining Walls and Lateral Loads
33 Retaining walls not restrained from movement at the top and having
a level backfill surface should be designed for an active soil pressure
equivalent to the pressure exerted by a fluid weight of 30 pcf Where the
backfill will be inclined at no steeper than 2 1, an active soil pressure
of 43 pcf is recommended
- 29 -
File No D-4345-H01
July 7, 1989
34 Unrestrained walls are defined as those walls that are allowed to
rotate more then 0 001H at the top of the wall Where walls are
restrained from movement at the top, an additional uniform horizontal
pressure of 7H psf (where H equals the height of the retaining portion of
the wall in feet) should be added to the above active soil pressure
35 All retaining walls should be provided with a drainage system
adequate to prevent the buildup of hydrostatic forces and should be
waterproofed as required by the project architect The use of weep holes
or other drainage openings along the base of the wall are not recommended
if the presence of seepage emanating along the base of the wall could be
a nuisance or otherwise adversely impact the property adjacent to the
wall The above recommendations assume a properly compacted granular
backfill material with no hydrostatic forces or imposed surcharge loads
A typical retaining wall detail is presented on Figure 13 If conditions
different than those described are anticipated or if alternate drainage
details are desired, Geocon Incorporated should be contacted for
additional recommendations
36 For resistance to lateral loads, we recommend a passive earth
pressure equivalent to a fluid weight of 300 pcf for footings or shear
keys poured neat against undisturbed natural soils or properly compacted
- 30 -
File No D-4345-H01
July 7, 1989
granular fill soils This lateral pressure assumes a horizontal distance
for the soil mass extending at least 10 feet or three times the surface
generating passive pressure, whichever is greater The upper 12 inches
of material not protected by floor slabs or pavement should not be
included in the design for lateral resistance If friction is to be used
for lateral resistance, we recommend using a coefficient of 0 4 between
the soil and concrete
Drainage and Maintenance
37 Good drainage is imperative to reduce the potential for differential
soil movement, erosion and subsurface seepage Positive measures should
be taken to properly finish grade the building pads after the structures
and other improvements are in place, so that drainage from the lots and
adjacent properties is directed off the lots and to the streets away from
foundations and the top of slopes Experience has shown that even with
these provisions, a shallow groundwater or subsurface water condition can
and may develop in areas where no such water conditions existed prior to
site development, this is particularly true where a substantial increase
in surface water infiltration results from an increase in landscape
irrigation
- 31 -
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
LIMITATIONS AND UNIFORMITY OF CONDITIONS
1 The recommendations of this report pertain only to the site
investigated and are based upon the assumption that the soil conditions
do not deviate from those disclosed in the investigation If any
variations or undesirable conditions are encountered during construction,
or if the proposed construction will differ from that anticipated herein,
Geocon, Incorporated should be notified so that supplemental recommenda-
tions can be given
2 This report is issued with the understanding that it is the
responsibility of the owner, or of his representative, to ensure that the
information and recommendations contained herein are brought to the
attention of the architect and engineer for the project and incorporated
into the plans, and the necessary steps are taken to see that the
contractor and subcontractors carry out such recommendations in the field
• 3 The findings of this report are valid as of the present date
However, changes in the conditions of a property can occur with the
fj passage of time, whether they be due to natural processes or the works of
man on this or adjacent properties In addition, changes in applicable
or appropriate standards may occur, whether they result from legislation
or the broadening of knowledge Accordingly, the findings of this report
may be invalidated wholly or partially by changes outside our control
Therefore, this report is subject to review and should not be relied upon
after a period of three years
File No D-4345-H01
July 7, 1989
REF MAP U S G 3 ENCINITAS QU40RANOLE, CALIF 1968
U.S 6 S RANCHO SANTA FE QUADRANGLE, 1968
VICINITY MAP
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 1
File No D-4345-H01
July 7, 1989
EXISTING STREET
UNDOCUMENTED
FILL
RET WALL
PROPOSED FINISH GRADE
FORMATIONAL MATERIAL
NO SCALE
REMEDIAL GRADING
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 5
File No D-4345 -HOI
July 7, 1989
PROPOSED FINISH GRADE
EXISTING
1 - GRADE
LIMITS OF REMOVAL
NO SCALE
REMEDIAL GRADING
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 6
File No D-4345-H01
July 7, 1989
PROPOSED FINISH GRADE
EXISTING GRADE
ALLUVIUM AND/OR
UNDOCUMENTED FILL
NO SCALE
REMEDIAL GRADING
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 7
File No. D-4345-H01
July 7, 1339
PROPOSED FINISH GRADE \
NOTE 4
EXISTING GRADE
NOTE 5
DETAIL "A"
NO SCALE
FORMATIONAL
MATERIAL
NOTE 3
SEE DETAIL A
NOTE 5 NO SCALE
RECOMMENDED REMEDIAL GRADING/PREPARATION - FILL SLOPE OVER FORMATIONAL
MATERIAL
Notes
1
2
3
Bench to be 2' wider than equipment with minimum of 10' wide,
backcut to be at stable angle, bench cut into dense formational
material
Topsoil, slopewash and other loose materials removed
Drain to be installed where water seeps encountered in formational
materials
Filter material to be Class II permeable material in accordance
with CALTRANS Standard Specification 68-1 025 or 1-inch open graded
crushed rock enclosed in an approved filter material fabric
Collector pipe to be 4-inch minimum diameter, perforated thick
walled PVC SDR 21 or equivalent sloped to drain at 1 percent
minimum to approved outlet
REMEDIAL GRADING
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 8
File No. D-4345-H01
July 7, 1989
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
o
ui
HI
Q
LU
Q.
O
uO
CTi UH T3
O O Cro•H >,jj in
4-1,0) •
O »M rHro>i in «w
4J O
Q; »w
"-I O >lro 4Jin u a;
O ^
«W JJ m
O u inro^ iw «w
O o
4J ro
U W
ro «w n
HH o O
_E <D
4J O Wro !-i ro
v-^\K^
T\ -CV-i-^N
V • -\\. \\.'N.~ ro
4J in U , a
E a B ^-> o o —*
Oar CJ > JJ E
O 0) -H U O ^
rH 4J E D W 4Jin ro in u xj jj
\ \ \ \ \ \ \v X i \>H C S-4 QJ U
fD a;
0 QJ
U -o -y ro(U CLU-i 0) .,c (u ro o «H — .— >
JJ £. T) -P ^J U U
-P 0) Q) TO
4: -u 3 E E
v—N7^^H
XJx.X X
-H -H
CHO'U-Hr-ICJCl)
' xx- ——-> ^>. i ——-~^-vr ;^N^l ^^
Figure 10
I
I
File No. D-4345-H01
July 7, 1989
o
_
Q
LU
Q_g
H H
10 •
in oin
CM o
C O •
U-l -p
o w T: .. -ro row o ,c E•H in H u oin ,_
u u inro 1-1 -ro .C E >-i JJc U in o
ro 1-1 H roin cu >i,c
- w ra uro
u O ro ai
.\V\\V\Ov \ \ .
\ \ ' \ \ \ •. \\ \a=
O Q) -H
H 4J £
ro w
-\vX ^-i*' V
(U (0
X T>
CU d)
CT» «W TJ
CO O C
ro
H >ijj in
<JJ.,Q) .
o <w H
ro
>i U3 <W
JJ O
Q) U-l
«W O >iro JJw Vj G)
O m<J-i Jj roO u in
ro
(-1 4-1 IW
O o
jj rou inro <w n
>w o o
4Jro co u
in ro<« a m
o
CJ<u x
(0 JJ
3 T3
E 0)jj o inro ti ro
,C»w ,Qjj
jj
in c
r-{ -d) ,
ro M 5
QJ CJ O> y-j H
CJ *W Q)
^•H ,Q'Oin jj
CJ >i M
H H roU JJ ,C
n c CJ•H ro
rj o CU
H
— ^ ro in
Figure 9
File No D-43'. 3-HOI
July 7, 1989
ASSUMED PARAMETERS - Fill Slopes
Z
I
0
C
DEPTH OF SATURATION = 3 feet
SLOPE ANGLE =26.5°
UNIT WEIGHT OF WATER =624 pcf
SATURATED UNIT WEIGHT OF SOIL = 135 pcf
APPARENT ANGLE OF INTERNAL FRICTION =26
APPARENT COHESION = 330 psf
FS C + T TAN 0 = C+
T
^T -JTw ) Z COS2i TAN g)
ST Z SINi COSi
FS = 2.08
SURFICIAL SLOPE STABILITY FILL ANALYSIS
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 11
File No D-4345-H01
July 7, 1989
APPROVED FILTER FABRIC
J..'*.°« « <
b . ° «0
__ 7
-, Q o »o O - />A<> ^o ° s~\
70n 0 °^ ^ /I ° O JU v Q t ^j C/ ° '_ — •*
BEDROCK
( FORMATIONAL SOIL)
OPEN-GRADED I MAX AGGREGATE
8" PERFORATED ABS PIPE SLOPED TO
DRAIN AT 1% OR GREATER
USE S D R 35 FOR UP TO 30' FILL COVER
USE SDR 2350RPVC SCHEDULE 40FOR
UP TO 100'FILL COVER
I" TO 2" CLEAR FROM BOTTOM OF TRENCH
NO SCALE
NOTES:
1. If Class II permeable material (per Sec. 68-1.025 CalTrans Standard
Specifications) is used, the filter fabric may be deleted.
2. Where the subdrain does not connect directly to a storm drain pipe,
the subdrain should be nonperforated and should be provided with a
12-inch-thick concrete cut-off wall extending at least 6 inches
beyond the subdrain trench sidewalls, bottom and the top of the pipe.
The cut-off wall should be located at the connection of the perforated
and nonperforated pipes.
3. Where subdrain length is less than 500 feet, the pipe diameter may be
reduced to 6 inches.
4. Canyon subdrains outletting into open space areas should be properly
protected (le. concrete, headwalls, rip-rap) to provide free drainage
RECOMMENDED CANYON SUBDRAIN DETAIL
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 12
,'ile No D-4345-H01
July 7, 1089
PROPERLY
COMPACTED
BACKFILL
PROPOSED
RETAINING WALL
APPROVED FILTER FABRIC
OPEN GRADED l" MAX AGGREGATE
4" OIA PERFORATED ABS PIPE
WIN l/2% FALL TO APPROVED OUTLET
PROPOSED FOOTING
NO SCALE
RETAINING WALL DRAINAGE DETAIL
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure 13
APPENDIX A
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
APPENDIX A
FIELD INVESTIGATION
The field investigation was performed from March 29, 1989 through April
16, 1989 and consisted of a site reconnaissance by an engineering
I geologist from our firm, the excavation of 8 exploratory borings and 24
exploratory trenches to depths ranging from 6 to 50 feet below existing
• ground elevation The approximate locations of our exploratory borings,
trenches are shown on Figure 2 (pocket map) As drilling and trenching
• proceeded, the soils encountered were continuously observed, visually
• classified and logged Logs of the test borings and trenches are included
herein The logs depict the various soil types encountered and indicate
the depths at which samples were obtained
The exploratory borings were excavated by a Mayhew 1000 Rotary Wash
truck-mounted drill rig equipped with 5-inch-diameter bit As drilling
proceeded, relatively undisturbed drive samples were obtained at various
depths in the borings and returned to our laboratory for testing The
relatively undisturbed samples were obtained by driving a 3-inch 0 D
split-tube sampler into the undisturbed soil mass with blows from a
400-pound hammer falling 18 inches
The exploratory trenches were performed by means of a Komatsu 220 track
backhoe equipped with a 24-inch bucket Disturbed bulk samples were also
obtained from the test trenches
Fii-. No D ,345 -HOI
Jul. 7, 198-
T-
h-
Q ^
0
. 2 .
. 4 .
™ ™
. 6 .
. 8 .
. 10 .
_ M
. 12 .
. 14 .
. 16 .
_ 18 .
. 20 .
~
- 22 -
-
. 24 .
-
. 26 .
. 28 _
~ "•
30
oz
LU_JG.
2
CO
1
O
£
-1
^/
/
T~ ""
r /
v//
Y_
//
/
m?*T * v
Iffi
^•cfvo rt/jl
\-tr*-~ ft
I 1 1
• 1
• 1i 'i 'i i
! i
1 ]..
! ii '
a
z
oc
0
v
C/)en —
-«
O -M
sc
CL
_CL__
"--^
^s.''
SM
SM
BORING B-l
ELEVATION 20 MSL DATE DRILLED 3/29/89
EQUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
FILL
Loose to medium dense, moist, medium brown
clayey SAND with some gravel
ALLUVIUM
Soft, wet green/black sandy CLAY with little
gravel
(water level)
Becomes stiff, moist, very dark brown
sandy CLAY
Becomes dark brown clay with some coarse
sand and gravel
Becomes more sandy with subangular gravel
Cobbles
DEL MAR FORMATION
Medium dense, wet, green Micaceous silty SAND
with some clay (weathered Del Mar)
Dense, moist, light green fine to medium
silty Micaceous SAND
§SK
<<|
uJ^O
5g™
-
oo
-
_
. 16
-
. 9
-
12
*
-
-
.
-
_ 20
-
t
in
Zu.
UJrj
2
C
105.1
114.1
108.7
107.2
^#
5z
7
i°
9T
20.8
18.8
19.2
22.7
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
£3 — DISTURBED OR B4G SAMPLE
U... STANDARD PENETRATION TEST
m — CHUNK SAMPLE
• _. DRIVE SAMPLE (UNDISTURBED]
?• — WATER TABLE OP SEEPAGE
NOTE TH E !-OG OF SUBSURFACE CONDITIONS SHOWN HtREON APPLIES ONLY AT THE SPECIFIC BORING OH TRENCH LOCATION AND
AT THF DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS ATOTHER LOCATIONS AND TIMES
Fil, No D-..345-H01
Jul% 7, 1989
H
32
. 34 .
. 36.
. 38.
. 40.SAMPLE NO.LITHOLOGYI1
!
1 1 'Lml '
GC
UJ
Z
O SOIL. CLASS(USCSlBORING B-l CONTINUED
ELEVATION 20MSL DATF DRILLED 3/29/89
EQUIPMENT -layhew Rotary Wash
MATERIAL DESCRIPTION
/ Becomes highly iron stained
/
BORING TERMINATED AT 36 FEET PENETRATIONRESISTANCCBLOWS/rr. 37
H-
—
. 45
.
~DRY DENSITYPCF120.8
114.9 MOISTURECONTENT %14 0
16.5
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
K DISTURBED OR B4G SAMPLE
U STANDARD PENETRATION TEST
fcj — CHUNK SAMPLE
• _. DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE L OG OF SUBSURFACE CONDITIONS SHOWN H E REON APPLIES ON LV AT THE SPEC IF 1C BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
Fil, No D--.'J45-H01
Jul. 7, 1989
I .
£2^3s*
0
-
2
Im n
4
-
6
. 8 .
. 10
-
. 12 ,
!l4.
-t f. 16 .
_ 18 .
_ 20 .
_
-
Q
Z
LU
o.
2
C/)
8
Or
-1
i °nD.OoD1 'o
1 •
1 "
t H
1 J
Lj | QnLL•KF1 /
/
s
, \
1 J
H| ,
^. I1
i• r
1
a.
UJ
3UNOWA'£
62
-^^_
^T^>
"SM
sc
SM
BORING B-2
ELEVATION 43 MSL DATF DRILLED 3/29/89
EQuiPMENTMayhew ^tary V,Tash
MATERIAL DESCRIPTION
FILL
~\ Medium dense, dry to humid, greenish brown
\ silty fine SAND with little gravel
\ cobbles
cobbles
ALLUVIUM
Loose to medium dense, moist, dark brown clayey
sand with chunks of brown and black sandy CLAY
and some gravel
DEL MAR FORMATION
Medium dense, moist greenish brown fine
Micaceous silty SAND (heavy iron staining)
Becomes very dense, damp white Micaceous
V silty SANDSTONE
BORING TERMINATED AT 21 FEET
|i|
2s°
•-..
" 25
;
~
- 12
_
-
" 30
•
-
"
" 50/
• XV 1 19"
*
-
Crtzu.LUfj
CL
Q
116.6
106.9
s
=8
10.6
16.5
SAMPLE SYMBOLS 1_J — SAMPLING UNSUCCESSFUL
H DISTURBED OR B\G SAMPLE
-STANDARD PENETRATION TEST
-CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED*
?• — WATER TABLE OR SEEPAGE
AJOTE THE LOG Or SUBSURFACE CONDITIONS SHOWN HE REON APPLIES ONLY AT THE SPEC IF 1C BORING OR TRENCH LOCATION AND
AT THf. DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMFS
Fil, No D- ,345-HOl
July 7, 1989
°- ZUJ
O ^
0
-
2
" 4 "
-
6
8 _
.10 _
— —
.12 .
-
-14 -
.16 .
» •
.18 .
O jO2(J• *— w •
-
.22 .
-
.24 .
-
.26 .
-
oz
UJ
«
oo-Jo
-1
° Mo'v
r'diOj^dd
./
j /
1 /^r/ 'V\L/
/'
r
/QOS
// (~\
/ 0 \ 'O9-'
/Or i '
j i 1
H ' iH ' ik|i|
0 1^. ! ! (
er
UJ
OUNDW,£a
^'r~
«_
65
If)
SM
sc
\\\\
\
)
/
/
/
SM
^^^
-•v
-
ELEVATION 26 MSL DATE DRILLED 3/29/89
EQUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
FILL
Very loose, moist, light brown silty sand with
cobbles and concrete slabs
TERRACE DEPOSITS
Medium dense, damp red brown fine to medium
clayey SAND
Becomes more clayey with some subangular
gravel
Boulders
DEL MAR FORMATION
Medium dense, moist, light greenish gray silty
SANDSTONE with some gravels
Boulders
"D /-i j-t nmr\ *-i r T,-\ 11 /-i nm f^r* 4-/-.1 Kl -ir-iV. T -rV\ T 4- /TWI^T OTWDGCOTIIGS WG J_ J_ CGTIlGriLGQ DXu.lSn WlllLG L*wiNLrljUll —
V EE/TE
BORING TERMINATED 25.3 FEET
Zuj
||
ujjjjo
-
-
-
_30
-
-20
.
_
-
-
^
"35
-
-
.
-50/
-4"
•
>
to
Zu.
UJtl
OQ.
enQ
114.4
120.4
111.0
11
i§
13.5
14 4
18.3
7 5
SAMPLE SYMBOLS U — SAMPLING UNSUCCESSFUL I] .
13—DISTURBED OR B*G SAMPLE EJ .
.STANDARD PENETRATION TEST
. CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE TH E LOG OF SU BSURFACE CONDI TION S SHOWN HE HEON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THC DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
Fil,.- No
JU1 ; 7 ,
D-..345-H01
1989
0
2
4
6
«
10
-
.12
H. -
. 14 .
.16 .
_ 18 .
-
. 20 .
-
-
oz
LU
Q.
2
0)
^8
o
J
7
' y'
o/'b
'Po/
Oc/O
1
X0°0
o/O
K o » %iyV
ho9'
\?/o*
E^i
r;
0 » / f
v/° .
c '/*/o
• •{.")?•^•i«i ) •
a:
ff<
z
0
o
(fl
<<H
62
SC
sc
sc
//
s
CL
SM
BORING B-4
ELEVATION 28 MSL DATE DRILLED 3/30/89
EQUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
TOPSOIL
TERRACE DEPOSITS
Medium dense, damp, reddish brown clayey SAND
with cobbles and boulders
DEL MAR FORMATION
Dense moist light greenish brown fine clayey
SAND with gravels and cobbles
cobbles
Becomes very dense to dense , li^ht
grayish green sandy CLAY and GRAVELS
(Sub rounded)
Becomes very dense, moist, greenish white silty
1 .. / -i . \~"~"V Micaceous SAND with gravels (.conglomerate^
BORING TERMINATED AT 21 FEET
O(jl~
|||
£££
.
_25
-
•507
_9"
-
-
50/
-12"_
-
-
50/
- 11"
-
£
(/)
UifJ
0
119 1
107.0
124.3
UJ-*
S1-
^8
14.2
21.4
12.3
SAMPLE SYMBOLS U — SAMPLING UNSUCCESSFUL
K—DISTURBED OR B4G SAMPLE
.STANDARD PENETRATION TEST
.CHUNK SAMPLE
• — DRIVE SAMPLE IUNOISTURBEDI
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT 'H CD ATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
Fi:, No D-.345-HOI
Jul>. 7, 1989
E^S
o
0
-
2
-
. 4 .
6
V •
. 8 .
. 10 .
. 12 .
-
14
mi —
. 16 .
-
. 18 .
. 20 .
oz
UJ
a.
5
>
0
o
t
. /
/
. x•/
/
/ '
J/
/
o C7/0
/ o o
0 x «
oS **
n^'n"
1 ' xnJ«| 1C°!.d-j:d«bit
• °i or
is$
§
o
tn
<c/i
~*o
s2
CL
SC
SC
SM
ftDRTNP R S
ELEVATION ^2 MSL DATE DRILLED 3/30/89
EOUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
FILL
Soft moist dark brown sandy CLAY with some
gravel and cobbles
TERRACE DEPOSITS
Becomes medium dense, hunid to damp dark
reddish brown clayey SAND with some gravel and
cobbles
DEL MAR FORMATION
Medium dense to dense moist light greenish
brown clayey SAND with COBBLES
Becomes dense to very dense, moist greenish
white silty Micaceous SAND with GRAVELS and
COBBLES
BORING TERMINATED AT 20 FEET
2
O(jt-ii|
a!11
••
-
" 3
-
.
35
-
-
-
"
-
^
so/
• 12"
-
>>-
c/l
>z.
Q
111.8
123.7
Uj#
§5
O ^2 O
16.2
12.3
SAMPLE SYMBOLS U — SAMPLING UNSUCCESSFUL
E3 — DISTURBED OR B*G SAMPLE
U STANDARD PENETRATION TEST
IU_ CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE TH E I. OG OF SUBSURFACE CONDITIONS SHOWN H EREONAPPLiES ON L v AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THf DATE INDICATED ITISNOT WARRANTED TO BE REPRESENTATIVEOFSUBSURFACECONDITlQNS ATOTHER LOCATIONS AND TIMES
I
Fii, No D--'t345-H01
Jul\ 7, 1989
£*S
o
0
.
2
4
.
6
"
8
-
.10 .
-
12
"
.16
.18 .
-
o
Z
Uj
a
2
en
>-
8
O
tr
__
/
/Of. Q
0 /
A Q*-)
£$C~/ L/ ~
K* <• °
• * /•'
ki or •/
JO « /
'/ I °
• y/>
-<. .'
* O'
. ° X-
0 > o ^
LT
LU
QZ
§o
CO•J) ~
°~
sc
~^^
*v
.
BORING B-6
El EVATION 34 MSL DATE DRILLED 3/30/89
EQUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
FILL
. Medium dense moist li^ht brown clavey SAND
\ ^ - o
DEL MAR FORMATION
— i Loose to medium dense Tpoist yellowish gray
, fine to medium clayey Micaceous SAND and
\ GRAVEL with some cobble (Weathered)
\
> Boulders and Cobbles
Becomes greenish white fine clayey SAND
with gravel lenses
BORING TERMINATED AT 12 FEET
<<totr»->ill
r-
*"
.
. 14
-
-
. 29
™
-
-
-
-
toZu-
a:Q
105.6
'|K
62
20.2
SAMPLE SYMBOLS LJ — SAMPl ING UNSUCCESSFUL
K— DISTURBED OR 84G SAMPLE
C STANDARD PENETRATION TEST
U CHUNK SAMPLE
• DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSU RF AC E CONDITIONS SHOWN HE REON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT l£ NOT WARRAN TED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
I
Fi'i No D-,345-HOl
Jul 7, 1989
T
C ""
0
2
4
" ™
-
6
8
_ 10
_ 12
_ 14
-
16
_ 18 .
20 _
22 _
24 _
76£. \J
-
oz
Q.
2
CO
og
o
_j
// ?
/
/'
1 '<L /Yy ,L /
yc
'o%/,,,
/'
'' /
kilI/IA \ '
1 >
m^\ \ j/
o:
UJ
zD
2o
LO
"«
O —en
sc
ctt--^.
SM-CL
BORING B 7
ELEVATION 122 MSL DATE DRILLED 3/30/89
EQUIPMENT MayheW R°tary WaSh
MATERIAL DESCRIPTION
FILL
Medium dense, damp to humid, yellowish brown
clayey SAND with COBBLES and GPAVEL
Becomes moist reddish brown
Black CLAY with roots and broken glass
(organic odor) and some cobbles
DEL MAR FORMATION
Medium dense to dense, moist orangish brown
fine to medium silty SAND interbedded with
greenish brown sandy CLAY
Cobbles
BORING TERMINATED AT 75 FEET
ZUJ
cr*>
>— ITt ^
1&
-
~
~ 37
-
-16 /
8"
-
;
-
•
-
-37 /
.12"
_
-
-
•c
ZU
SL
Q
116.3
106. 0
<nf
f^
1
16 6
21.7
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
K — DISTURBED OB BUG SAMPLE
U STANDARD PENETRATION TEST
U CHUNK SAMPLE
1 — DRIVE SAMPLE [UNDISTURBED!
?- — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEP.EON APPLIES ONLY AT THE SPECIF 1C BORING OR TRENCH LOCATION AND
AT THL DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS ATOTHEP LOCATIONS AND TIMES
Fil, No D-.345-H01
Jul 7, 1989
H
0
-
_ 2
-
. 4 ,
_ 6
_ 8
_ 10 _
-
12
. •
_ 14 _
16
_
_ 18 .
.
. 20 .
. 22 .
24 .
. 26 .
28 .
30
n
SAMPLE N(>LITHOLOG/
/
/
/
•>
/ ° ^ f^
Lx
• /
X
P^"// ^
/'/^jn
/
/i/' /
/
/:
d.
IH
(—GROUNDWAto
SOIL CLASIUSCS)sc
^f
'"
SC-CL
— . 1
SC
BORING B 8
ELEVATION 96 MSL DATE DRILLED 3/31/89
EQUIPMENT Mayhew Rotary Wash
MATERIAL DESCRIPTION
FILL
Medium dense, damp orangish brown fine clayey
SAND with some gravel and cobbles
Cobbles
Becomes moist reddish brown fine to coarse
clayey GANI> with some gravel
Becomes alternating dark reddish brown clayey
SAND with very dark brown sandy CLAY with little
roots
Wood
Becomes dark brown fine to coarse clayey SAND
-»PENETRATIOrRESISTANCEBLOWS/FT-
-
-
- 45
.
-
- 35
-_
-
16
•_
.
. 37
-
50
-
m DRY DENSITYPCF96.0
127. J
103 i
122.:
126.7 MOISTURECONTENT it23.1
9 7
22.5
12. i
10.1
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
53 — DISTURBED OR 84G SAMPLE
U STANDARD PENETRATION TEST
mJ — CHUNK SAMPLE
• DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREONAPPL'ES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THf DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND T'MES
Fil, No D--.345-H01
Julv 7, 1989
,.
£^£
0
32
-
34 _
_ «
_ 36 .
38
. 40 .
42
_ _
44
-
_ 46 .
. 48 .
_ 50 .
-
0
2
L
1
8
o
t
IwF ,
[/K^>
p /
•/
/
', /
9(5$
S
/
" '
/
' /
/
or
UJ
Z
g
Cl
Ss
°B)
a-
CL
SC-CL
J>
sc
BORING B-8 (CONTINUED)
ELEVATION DATF DRII 1 Fn
tCJUIPMENI
MATERIAL DESCRIPTION
Becomes stiff, moist dark brown and greenish
brown sandy CLAY with some gravel and trace of
wood
wood
Becomes alternating dark brown sandy CLAY and
clayey SAND with some gravel
cobbles
\
DELMAR FORMATION
Medium dense to dense moist, light yellowish
gray fine clayey SAND
BORING TERMINDATED AT 50 FEET
5yt<<!>
i^S
j'x™
20
~
-
-
-
40
-
"
-
-
-
-
-
-
i
ZL-
QG.
Q
115 9
116.8
^
25
^z5 8
16.3
18.1
SAMPLE SYMBOLS U SAMPLING UNSUCCESSFUL
K7IIS DISTURBED OR B*G SAMPLE
I] STANDARD PENETRATION TEST
ml CHUNK SAMPLE
• DRIVE SAMPLE iUNDiSTURBEDI
?• WATER TABLE OP SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCHL OCA'iON AND
AT THf DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND Ti MFS
I File -No
July 7,
D-4345-H01
1989
Izt
O
. 0
- 4 -
- 6 -
-SAMPLE NOLITHOLOGY||
'%
- v
A GROUNDWATER 1en
8-
GC-GM
GC-GM
TDT7MPU T 1IKjiiMLn 1 — 1
ELEVATION 117 MSL DATE DRILLED 4/4/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Medium to denes, damp to moist, dark orange-
brown, Clayey to Sandy COBBLE GRAVEL
i I sharp contact slopes westward
TERRACE DEPOSIT
Dense, moist, drak reddish-brown, Clayey
Sandy COBBLE GRAVEL
/ deposition contact slopes westward
\ SANTIAGO PEAK VOLCANICS
I Very dense, moist, gray-brown, fractured
1 VOLCANIC ROCK
TRENCH TERMINATED AT 8 FEET (REFUSAL)
1
.
-
-
-
zu.
cro
Is
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
BS — DISTURBED OR B*G SAMPLE
U STANDARD PENETRATION TEST
ml CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
I
File No D-4345-H01
July 7, 1989
^ZSQ "•
. 0
™ —
. 2 .
•• •
. 4 .
-
- 6 .
. 8 .
- 10 -
~ •
- 12 -
. 14 .
i £.. lo .
. 18 .
-
. 20 .
- 22 -
oz
UJ_j0.
1
1o
^
d?' ''
t?
^Y>
0
ill/
V i
4* i^i*
^0 ,00>
0 o.\^s \s g
0
o
>•' Cl "
T2-1 K'^"
12-2 M a
\ ' ° "
.a*-
00 0
n
a /)
1
i
1
tO
_)jj
-)
GM
s
\
•>
-^
SM
TRENCH T-2
ELEVATION 114MST, DATE DRILLED 4/4/89
EQUIPMENT Knmat-.sn 220 Track RAckhoe
MATERIAL DESCRIPTION
FILL
Loose to medium dense, damp to dry, medium
reddish-brown, Silty to Sandy BOULDER GRAVEL,
some clay
l'-2' diameter boulders
1 — contact inclined steeply westward to over
\ 20' depth in less than 30' lateral distance
1:
DELMAR FORMATION
Dense, moist, light brown-tan, Gravelly fine
SANDSTONE, horizontal interbedded COBBLE
CONGLOMERATES
111 i r-cemented light tan-gray silty fine
sandstone
\
TRENCH TERMINATED AT 21 FEET
|st
<r*^|i§
~.
—-•
m
.
™.
.
"
_._
-
&
ZU.
UJ(j
^
Q
BULK !
s*
25
i§
1AMPLE
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
K —. DISTUR8EDOR B*G SAMPLE
U STANDARD PENETRATION TEST
mi — CHUNK SAMPLE
• _ DRIVE SAMPLE (UNDISTURBED)
^ _. WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY. AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED I
I File No D-4345-H01
July 7, 1989
tzffi
Q ^
- 0 -
-
- 2 -
- 4 -
-
- 6 -
- 8 •
-
-10 -
-17 -_L Z.
-
-14 -
-16 -
-18 -
-
-20 -
-22 -
Z
UJ
a!
I
T3-1
T3-2
§3
g
°,°.
o
9o°
•o
o , O'
c?
0 o
O
0
'0°
" 0
^"SS^T f)
9 /
/
X ',
G/
\ '
Cx /•
0'°s
a
<
z
1
(f)
3§
S2
^GM
^>
sc
TRENCH T-3
ELEVATION 99 MSL DATE DRILLED ^/4/89
EQUIPMENT Komatsu 220 Track BAckhoe
MATERIAL DESCRIPTION
FILL
Loose, dry to damp, dark reddish-brown,
Sandy COBBLE-BOULDER GRAVEL
very dry, powdery, caving
I contact sharp, sloping slightly south
TERRACE DEPOSIT
Very dense, moist, medium to dark reddish-
brown, Clayey Gravelly medium SAND
TRENCH TERMINATED AT 21 FEET
OQI-
<<g
H-105
z'wS
-
-
-
-
-
—
-
-
-
-
-
•
-
_
-
£
<nzu.
UJ(J
cro
SULK £
UJ#
11i§
AMPLE
SAMPLE SYMBOLS — SAMPLING UNSUCCESSFUL
K — DISTURBED OR SAG SAMPLE
•J STANDARD PENETRATION TEST
•J_ CHUNK SAMPLE
M — DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLiES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
ATTHE DATE INDICATED I
I File No D-4345-H01
July 7, 1989
IHQ
"
- 2 -
. A• q. .
- 6 -
- 8 -
-10 -
* -
-12 -
.
-14 -
-
-16 -
-
-18 -
-20
oz
UJ
CL
1
§
0
£
' O°O y
0/**
V
f « o
O /
/.&* '
*§¥
0
0
0 0.
7^<2/ "
f) ' /
<2./
/ °
0 /
" O/
S 0O /;
o ^
/ 0°;OQ /
'' 0/
fi /U0/ »
'oOj'
QC
UJ
<
|
O
CO<£
°2
sc
GW
v\
^>
^ —
GM-GC
TRENCH T-4
ELEVATION 86 MgL DATE DR|LLED ^/^/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
TERRACE DEPOSIT
Dense, damp, dark reddish-brown, Clayey
Gravelly medium SAND, lenticular, pinching
out into gravel
Dense, damp, medium reddish-brown, Sandv
COBBLE-BOULDER GRAVEL
dry, friable sandy gravel, cohesionless
when disturbed
\
TERRACE DEPOSIT
Dense, moist, dark reddish-brown, Clayey to
Sandy COBBLE-BOULDER GRAVEL
TRENCH TERMINATED AT 20 FEET
°ot-
lll
£l§
-
^
—
-
-
"
-
-
-
-
-
-
— .
-
£
c/)
Zu-
>°-cr
0
UJ#
<Z>-
%o
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
H — DISTUflBEO OR BAG SAMPLE
IJ STANDARD PENETRATION TEST
kj CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?- WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPEC IF 1C BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No D-4345-H01
July 7, 1989
H
- 2 •
m m
- 4 -
- 6 •_
- 8 '
m u
-10 •
-
•12 -
-14 -
-16 -
1 O- 18 "
• •SAMPLE NCV
LITHOLOG'7
/ °' Oo • /
1 y'o
' 00. /
7°
/
/ 9
>
<3'X/
' 0
o //
/ 0
/ o
i,Ci / «ffU / t
0 &
f • 0
'/
'Q "/
&" 0
/ ' "
Or V'x
duj
GROUNDWA1M
SOIL CLASi(USCS.)GM-GC
sc
TRENCH T 5
ELEVATION 7^ MSL DATE DRILLED ^'^' 89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
TERRACE DEPOSIT
Dense, moist, dark reddish-brown, Clayev
Sandy COBBLE-BOULDER GRAVEL
Dense, wet, dark to madium reddish-brown,
Clayey medium to coarse Gravelly SAND
1
TRENCH TERMINATED AT 20 FEET PENETRATIONRESISTANCEBLOWS/ FT—
-
—
-
—
-
_
"
-
—
.
-
"
•
_
-
-DRY DENSITYPCFMOISTURECONTENT %SAMPLE SYMBOLS U SAMPLING UNSUCCESSFUL
E3 — DISTURBED OR BAG SAMPLE
U._ STANDARD PENETRATION TEST
fi CHUNK SAMPLE
• DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIF 1C BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
I
File No D-4345-H01
July 7, 1989
DEPTHINFEET- 2 -
- 4 -
-
- 6 -
« •
- 8 -
-
- 10 -
™ m
- 12 -
™ "
- 14 -
- 16 -SAMPLE NOLITHOLOG>O/
/ 0
*/
O"/
/ o 0
/
o/ g
„ °/>
/
&/
/ '
/
°"/ •
/ 0
/ /
"^ ^/O *
\ lfc^/ *
// .'&0 /
' /. o.
a.
L1J
GROUNDWATISOIL CLASSluacaiGM-GC
x
X
X>s
TRENCH T-6
ELEVATION 73 MSL DATE DRILLED ^/4/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
TERRACE DEPOSIT
Dense, damp to moist, dark reddish-brown,
Clayey Sandy COBBLE-BOULDER GRAVEL, very
firmly imbricated, no voids or porous areas,
may represent an ancient debris-flow
l'-2' subrounded boulders with pebble-cobble
matrix
\
TRENCH TERMINATED AT 15 FEET (NEAR REFUSAL)PENETRATIONRESISTANCEBLOWS/n-
-
-
-
"
-
~
-
"
-
"
-
-DRY DENSITYPCFMOISTURECONTENT %SAMPLE SYMBOLS U — SAMPLING UNSUCCESSFUL
K DISTURBED OR SAG SAMPLE
U._ STANDARD PENETRATION TEST
W — CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED!
?• _. WATER TABLE OB SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No D-4345-H01
July 7, 1989
N
. 0
"
. 2 .
. 4 .
. 6 .
• •
. 8 .
-
.10 .
.12 .
» «
.14 .
.16 .
.18 .
.20
-SAMPLE NOT7-1
T7-2 LITHOLOGY/'
/O /
•/ o/8/Jy.
0 /
Q/
/ °e 'o'/t
'0°/''
/ 0
°//C
&''.
O?/
$/'•
ttUJ
GROUNDWATlSOIL CLASS(US.CS)_^S*
GM-GC_
__. — — -""
TRENCH T-7
ELFVATION 1 1 1 MSL DATFDRIL1FD 4/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose to medium, moist, dark reddish-brown,
Clayey to Sandy COBBLE-BOULDER GRAVEL
1
' — 6" -12" very loose lift
damp to dry lift 6"
TRENCH TERMINATED AT 20 FEET PENETRATIONRESISTANCEBLOWS/ FT-
-
-
•
-
-
-
;
_
-
-
-
i-DFiV DENSITYPCFBULK 5
BULK 1 MOISTURECONTENT %IAMPLE
IAMPLE
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
K — DISTURBED OR SAG SAMPLE
U_ STANDARD PENETRATION TEST
•]_ CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?• WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No
July 7,
D-4345-H01
1989
N
~
- 2 -
- 4 -
- 6 -
_ _
- 8 -
-10 -
-12 -_
-14 -
-
1 6
~ ™
-18 -
-
?n
-
oz
UJ
a.
5
T8-1
T8-2
T8 3
T8-4
8d
-•
o /
' 0 o
(}•/
fl,' °
li'of
0 °/r/ (/ o Lx/ , o.
0 /
/O/o
/ o o
hJ i r
53 1 1
/
/ '
/
0 /
' 0
0 /3'/
/ // ,(_
o ^
°/ o
O. s
a.JUNDWATS
1
«
GM-GC
SM
CL
GM-GC
-
TRENCH T 8
ELEVATION 112 MSL DATE DRILLED ^/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose to medium dense, damp to moist, dark
to medium reddish-brown, Clayey Sandy COBBLE-
BOULDER GRAVEL
6"-12" dry to damp lift
• — irregular contact slopes southward
TOPSOIL
I Loose, damp to dry, dark brown, Silty fine
1 SAND, roots, some clav
\\
\ Soft, wet, dark brown, Sandy CLAY
I
TERRACE DEPOSIT
Dense, moist, drk yellowish-brown-orange,
Clayey to Sandy COBBLE-BOULDER GRAVEL
1
TRENCH TERMINATED AT 20 FEET
z^
aff
-
-
-
™
"
-
-
-
™
-
-
-
C/J
Zu.
UJ(J
a:0
5ULK £
3ULK 5
i re"1 rlUo u
JULK S
CCt_
*s
7.5
AMPLE
AMPLE
-L 3 • o
AMPLE
SAMPLE SYMBOLS U SAMPLING UNSUCCESSFUL
13 — DISTURBED OR BAG SAMPLE
I] STANDARD PENETRATION TEST
B CHUNK SAMPLE
DRIVE SAMPLE (UNDISTURBED!
• _. WATER TABLE OR SEEPAGE
NOTE
ATTHEDATEINDICATED I
I File No D-4345-H01
July 7, 1989
°- ?iu
• u
-
- 2 -
- 4 -
- 6 •
- 8 -
-in -ID
-
- 12 -
-
.
i f*- lo -
-
-
-
oz
UJ
a
2s
>
0
o1
^
^ °' 0 ,
V 0
v X) 0 1
\'/\"
/
T9-1 M /
N xT9-2 n/
r /
/
^"61 ^0
7 -/ " /•)
0 OQ
y 7
(I
UJt-
5
D
Z
D
£o
to
<(/}
S«
GM-GC
CL
GM
-
TRENCH T 9
ELEVATION 108 MSL DATE DRILLED 4/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose, moist, medium reddish-brown, Clayey
to Sandy COBBLE-BOULDER GRAVEL
sharp, irregular, south-inclined couLacL
A
TERRACE DEPOSIT
Hard, moist, dark reddish-brown, Sandy CLAY,
scattered gypsum crystals, small pebbles
1 — becomes more sandy
Dense, moist, medium reddish-brown, slightly
Clayey Sandy COBBLE-BOULDER GRAVEL, l'-1.5'
boulders (tightly nested)
sharp, irrepiilar, smith-inclined contact,
\ depositional
SANTIAGO PEAK VOLCANICS
Very dense, dark gray, fractured VOLCANIC
ROCK, random fractures
TRENCH TERMINATED AT 15 FEET
ZIMogj-
5^5
1^
•
-
**
-
-
•
™
-
-
-
-
-
f
Zu.
CE
Q
115.6
UJ #
cnt^
^8
12.7
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
[3 DISTURBED OR B*G SAMPLE
U_STANDARD PENETRATION TEST
B CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
I
NOTE
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS ATOTHER LOCATIONS AND TIMES
File No D-4345-H01
July 7, 1989
!*Bo u-
• —
- 2 -
• «•
- 4 -
- 6 -
- 8 -
-10 -
.
-12 -
-
-14 -
.
-16 -
-
-18 -
-
-20
§
1
T10-1
§d_
/
uV«x
Y)' /y 0
To
,^
o7.
?»•
'ty
/ '0 /
^4*
•' /
/
/
/
'
°/
' . o
/
cc
UJ
z
I
(/)
°2
GM-GC
v
^>
CL
TRENCH T-10
ELEVATION 93 MSL DATF DRILLED 4/5/89
EQUIPMENT Komatsu 220 Track BAckhoe
MATERIAL DESCRIPTION
FILL
Loose to medium dense, damp to moist, medium
reddish-brown, Clayey Sandy COBBLE-BOULDER
GRAVEL, some silt
dry to damp lift
| — sharp, irregular south-inclined (2'/30')
contact
i
V
TERRACE DEPOSIT
Hard, moist, dark reddish-brown mottled with
green, Sandy CLAY
becomes more sandy with scattered pebble
TRENCH TERMINATED AT 20 FEET
Igt
Ifl
*
.
"
-
-
-
.
-
••
-_
•
-
-
-
-
CO
ZU.
QCL
cc
Q
BULK
IE1
SAMPLE
SAMPLE SYMBOLS LJ _ SAMPLING UNSUCCESSFUL
El — DISTURBED OR BAG SAMPLE
U_STANDARD PENETRATION TEST
m CHUNK SAMPLE
_. DRIVE SAMPLE (UNDISTURBED)
?• —. WATER TABLE OR SEEPAGE
NOTE
AT THE DATE INDICATED IT IS NOT WARRANTEDTOBE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
I
File No D-4345-H01
July 7, 1989
H
0
-
- 2 -
- 4 -
- 6 -
- 8 -
-
- 10 -
- 12 -
. 14 .
. „
. 16 .
-
. 18 .
. 20 .
-SAMPLE NCLITHOLOG11 1 \
1 I,'
X /y // ,/ f/
S- x
^'y
'/ '
,' /
/
,~ °>/.
/ •/
OO o
rt.' (?•
d.
UJ
GROUNDWATSOIL CLAS.(USCSISM
CL
SC-CL
"^>
GW
TRENCH T-ll
ELEVATION 7o MSL DATE DRILLED ^/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
TOPSOIL
Loose, dry, dark brown, Silty fine SAND
\
TERRACE DEPOSIT
Hard, moist, dark reddish-brown, Sandy CLAY
becomes more moist, coarser, sandy
gravel layer
Dense, wet to saturated, medium reddish-
1 brown, Sandy COBBLE GRAVEL
TRENCH TERMINATED AT 20 FEET PENETRATIONRESISTANCEBLOWS/ FT•
•
-
-
-
-
-
-
.
.
-
-
•
"
-DRY DENSITYPCFMOISTURECONTENT %SAMPLE SYMBOLS D SAMPLING UNSUCCESSFUL
ICH
IS DISTURBED OR BAG SAMPLE
STANDARD PENETRATION TEST
kJ CHUNK SAMPLE
• _. DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE
ATTHEDATEINDICATED I
m File No D-4J4J-H01
• July 7, 1989
I
1
1
1
1
•
1
1
1
1
1
1
1
1
1
1
N
- 2 -
-
- 4 -
-
- 6 -
-
-
— m
— m
-
-
-
-
-
-
-
r\SAMPLE N(LITHOLOG/0' ?:
t i ti i i
\i er
> ys
A
A*
(r
V
1 GROUNDWAlCO
SOIL CLASIUS.CS)SC-GC
GM-GC
TRENCH T 12
ELEVATION H9 MSL RATE DRILLED ^/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose, damp, dark brown, Clayey Gravelly
SAND
TERRACE DEPOSIT
Dense, moist, orange-brown, Silty to Sandy
COBBLE-BOULDER GRAVEL, some clay
• — slopes southward
SANTIAGO PEAK VOLCANICS
Very dense, brownish-gray mottled with
orange, fractured VOLCANIC ROCK,
multiple fracture sets; N85E, 80NW; N65W, 35W
TRENCH TERMINATED AT 6 FEET (NEAR REFUSAL)PENETRATERESISTANCEBLOWS/ FT-
-
-
-
"
-
-
™
_
-
-
•
-
-
-
-DRY DENSITYPCFMOISTURECONTENT %SAMPLE SYMBOLS Ll — SAMPLING UNSUCCESSFUL
13 — DISTURBED OR SAG SAMPLE
U_STANDARD PENETRATION TEST
•I _ CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE
ATTHE DATE INDICATED I
File No D-4345-H01
July 7, 1989
Ezjjj
a "•
-
- 2 -
- 4 -
— —
- 6 -
Q- o •
- 10 -
- 12 -
_ m
- 14 -
- 16 -
-
-
-
oz
UJ
a.
Z
0-Jo
_J
^ 1 i
Ml,
/ ^
y/
/
/
<^c9 "
0
0 '
1 1 11 1 1
11)
z
§
CO
«/j
8-
sc
CL
GW
C\Jhw
SM
TRENCH T-13
ELEVATION 110MSL DATF DRILLED 4/5/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose, dry, dark brown, Silty to Clayev fine
SAND
TERRACE DEPOSIT
Hard, moist, dark reddish-brown mottled with
green, Sandy CLAY
Dense, moist, medium reddish-brown, Sandy
COBBLE GRAVEL, trace of silt
Dense, moist to wet, medium reddish-brown,
\ medium to coarse SAND, scattered pebbles,
non-cohesive when disturbed
— becomes wet
r depostion contact inclined approximately
10° eastward
DELMAR FORMATION
Very dense, moist, light tan, Silty fine
SANDSTONE, trace of clay, nearly horizontal
bedding
TRENCH TERMINATED AT 15 FEET
ZUJOoh-
<<«
z^S
•
-
-
.
••
-
-
-
-
-
-
-
-
f-
ZU.
IUCJ
cro
aj#
P
i°O
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
K — DISTURBED OR BAG SAMPLE
U_ STANDARD PENETRATION TEST
fcl_ CHUNK SAMPL-6
• DRIVE SAMPLE (UNDISTURBED!
?• — WATER TABLE OR SEEPAGE
NOTE
AT THE DATE INDICATED IT IS NOT WARRANTED TOBE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No
July 7,
D-4345-H01
1989
I ._
0 "•
• U -
-
- 2 -
- 4 -
-
- 6 -
-
- 8 -
-
-10 -
-12 -
-
-14 -•• -L ^T ™
-
1 £."* JL 0 —
-18 -
-_
-
-
Q
Z
OJ
Q.
2
3
1
O
J
-1
O/'
r/ OQ
°/o
1. '/''o/ <
' o '
L>XV
/ ^e/f-\ .
\V|
y< \°
/
"""^/C
/
/
/
/""
j j i1 > I
I ! I
(£
s
z
D
0
t/3 —
"ri
52en
GM-GC
CPoL
SM
TRENCH T-14
ELEVATION 108 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose to medium dense, moist, medium reddish-
brown, Clayey to Sandy COBBLE-BOULDER GRAVEL
becomes sandy to gravelly clay
irregular contact slopes westward (3' in 20'
f
TOPSOIL
Soft, damp to moist, dark brown, Clayey fine
I SAND to Sandy CLAY
TERRACE DEPOSIT
Dense, moist, light reddish-brown, Clayey,
fine to coarse SAND
depositional contact, slightly (less than 5°)
inclined westward
DELMAR FORMATION
Very dense, moist, light brown to reddish-
brown, Silty medium SANDSTONE, nearly
horizontal beds
TRENCH TERMINATED AT 17 FEET
Qof-iispi
•
-
™
-
-
-
-
-
-
-
-
—
m
-
-
£
I/)
Zu-
^a.
(T
O
UJ#
DZ
riZ28
cr ovyuorM cSAMPLh oYMoULo
L-" — SAMPLING UNSUCCESSFUL
K — DISTURBED OR BAG SAMPLE
B - STANDARD PENETRATION TEST
B_ CHUNK SAMPLE
-- DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HE REON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACECONDITIONS AT OTHER LOCATIONS AND TIMES
_ File No D-4345-H01
• July 7, 1989
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
^~ ~^~ LLf
0 "-
• o •
- 2 -
- 4 -
i
- 6 "
' 8 -
- 10 -
- 12 -1
-
0
- 2 -
- 4 -
-
- 6-
-
-
O
2
a
5
5
o
'-•
o'/ °/
/ Q
o, O/
^C°:'P>
! i l
! 1 1
1 1 1
i i 1
i i i
1 : i
\ i i
i ! ii i i
o
1<2-.•o V^
1 "x-
-
JQ>o°
IN;
i i i
i i i.
aw
Z
O
CO
"!n
8-
GC
5M-SC
GM
SM
TRENCH T-15
ELEVATION H2 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Loose to medium, moist, medium brown,
Clayey to Sandy COBBLE GRAVEL
DELMAR FORMATION
Dense, moist, light blue-gray, Silty fine
SANDSTONE, trace clay, horizontal bedding
becomes very dense
A
TRENCH TERMINATED AT 11 FEET
TRENCH T-16 Elev 112
TERRACE DEPOSIT
Dense, moist, light brown, Sandy BOULDER
GRAVEL, 2 '-3' diameter boulders common
DELMAR FORMATION
Dense, moist, light tan-gray, Silty fine
SANDSTONE
TRENCH TERMINATED AT 6 FEET
o1^
<fsi
-
^
-
£
inZu-
*So
^fe,-
i§
SAMPLE SYMBOLS — SAMPLING UNSUCCESSFUL C — STANDARD PENETRATION TEST 1 DRIVE SAMPLE (UNDISTURBED)
13 — DISTURBED OR B4G SAMPLE B CHUNK SAMPLE ?• „„ WATER TABLE OR SEEPAGE
NOTE TH E LOG Of S UBSUR FAC E CONDITIONS SHOWN HEBEON APPLIES ONLY AT THE SPECIFIC BORING OR TRFNCH LOCATION AND
•ju AT THC DATE INDICATED IT IS NOT WARRANT ED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
•
File No D-4345-H01
July 7, 1989
£z£
o
. 0
- 2 -
- 4 -
- 6 -
-
- 8 -
- in .
. 0
2
4
. 6 .
CL
5
o
o
-
//) -
0
°^0
0°°L/C /
I/ /L* °
0 °
0 L-i x"
& a
s^~) A °
\/
7 -
1
* "
•f
cr
<
2
2
0
</> —
"«
8-
GC
GM
TTJ TTAT^U T^ 1 7IKCjlNLn 1 — 1 /
ELEVATION 114MSL HATF DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track BAckhoe
MATERIAL DESCRIPTION
FILL
i Loose, damp , medium brown, Llayev to bandy
\ COBBLE GRAVEL
TERRACE DEPOSIT
Very dense, moist, light brown, Sandy
BOULDER GRAVEL, some silt, 2 '-4' diameter
subrounded volcanic boulders common
i . J_T_J_I 11 11-11Decomes too tightly packed with boulders
to dig
\
TRENCH TERMFINATED AT 9 FEET (REFUSAL)
TRENCH T-18 Elev 113 MSL
SANTIAGO PEAK VOLCANICS
Very dense, dark gray-orange, fractured
VOLCANIC ROCK, fracture sets, N20E.60NW,
N-S,25W
"V
TRENCH TERMINATED AT 4.5 FEET (NEAR REFUSAL)
ZUJ
cr£>
>£J,°
-
.
-
-
—
-
-
-
>
w2U.
o:D
3
= Z
i§
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
13—DISTURBED OR B*G SAMPLE
.STANDARD PENETRATION TEST
.CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED!
?• —. WATER TABLE OR SEEPAGE
NOTE THE I OG Or SUBSURFACE CONDITIONS SHOWN HE REON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THC DATE INDICATED IT IS NOT WARRANTED TO BE REPRESS NTATIVE OF SUBSURFACE CONDITIONS ATOTHER LOCATIONS AND TIMES
I File No D-4345-H01
July 7, 1989
r
u,s£
Q **•
- 0
- 2 H
-
- 4 -
-
- 6 -
- 8 H
-10 -
-12 -
.14 .
— —
.16 .
J8 .
.20
-
oz
UJ
0.
2
5
T19-1
T19-2
>-
§o
=1
O /^ /
o /
/, 0
(7 /
/ 0v/
, /
' //
'/O'/
^\\/
• 1
' i
^/
\\
' ^ /**)a U/.
(T
UJ
<
Z
5
<M
"«
52
SC-GC
ML-CL
GC
TRENCH T-19
ELEVATION 88 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Medium to dense, moist, medium to light
reddish-brown, Gravelly Clayey medium SAND
,
/ sharp contact sloping westward
Stiff to hard, moist, greenish-gray-brown
mottled, Clayey SILT, more clay in upper
part
Medium to dense, moist, dark yellow-brown,
\ Clayey to Sandy COBBLE-BOULDER GRAVEL
TRENCH TERMINATED AT 20 FEET
Oo.-
<<55
|l«
—
-
-
-
••
-
-
.
•
-
""
-
£
Zu.
H
Q
100.7
BULK
OJ#
5z
oz
17 1
SAMPLE
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
!3— DISTURBED OR B4G SAMPLE
C STANDARD PENETRATION TEST
KJ CHUNK SAMPLE
• DRIVE SAMPLE (UNDISTURBED!
?• WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HITTREONAPPL E;-> ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No D-4345-H01
July 7, 1989
i K
"• ^uj
* U "
• •
- 2 -
- -
- 4 -
- 6 •
- 8 -
- 10 -
' 12 -
.
-
- 16 -
~ *•
z
CL
3
8
o
t
0*'' s//0 0//Q'/
if '
'OS
gX,
cOy
'>'$'
Q> *Tk°-1 i
1 1
i i
\ i
' V
n
UJ<
z
s0
<5
"S
0?
GC-G^
SM
ML
TRENCH T 20
ELEVATION 83 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Medium to dense, moist, medium reddish-
brown to brown, Clayey Sandy COBBLE-BOULDER
GRAVEL
. sharp contact sloping westward
DELMAR FORMATION
Dense, moist, light blue-gray-tan, Silty
fine SANDSTONE, trace of clay, horizontally
bedded
Hard, moist, light greenish-gray, Clayey
1 SILTSTONE, massive
TRENCH TERMINATED AT 16 FEET
OOH
ll|
P
"
-
-
-
-
-
"
-
-
.
£
Zu.
a
UJ#
§z
i§o
SAMPLE SYMBOLS LJ - SAMPLING UNSUCCESSFUL
K __ DISTURBED OR B»G SAMPLE
U..STANDARD PENETRATION TEST
.CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED!
?• _ WATER TABLE OR SEEPAGE
I
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESS NTATIVE OF SUBSURFACE CONDITIONS ATOTHER LOCATIONS AND TIMES
I File No
July 7,
D-4345-H01
1989
IH
- n
~
- 2 -
- A -
- 6 -
- 8 -
-
-10 -
-
-12 -
-
-14 -
-16 -
-18 -
-20 -
-99 -£* ^.
- "
-
-
i
UJ
Q.
Si
§
_J
O
-*
/ o
O // f/ p\s/'
/o /
>/•
o./
/ <7
19/
/ o
Q'/
/ o 0
<P '(
'*••/
<fy
> i ix i i .1 ..<? /
« xX0
n
^1ozD
§
SS
6?-
;C-GM
~.
—
5M-SC
GC
TRENCH T 21
ELEVATION 75 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track BAckhoe
MATERIAL DESCRIPTION
FILL
Medium to dense, moist, medium to dark
reddish-brown, Clayey to Sandy COBBLE-BOULDER
GRAVEL
6"-12" dry lift
wood debris, brush in fill (decay odor)
TOPSOIL
Soft, damp, dark brown, Silty to Clayey fine
SAND, roots, decay odor
TERRACE DEPOSIT
Dense, moist, light reddish-brown, Clayey to
Sandy GRAVEL
TRENCH TERMINATED AT 21 FEET
§0|-
UJ — Q
-
—
-
-
-
—
-
-
-
-
-
-
-
•
-
_
t<f>Zu.
a:
Q
£*i!
i§
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
£j — DISTURBED OR B*G SAMPLE
I] STANDARD PENETRATION TEST
ml CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTUR8EDI
3? — WATER TABLE OR SEEPAGE
I
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWNHEREON APPLIES ONLY AT THE SPECIF 1C BORING OR TRENCH LOCATION AND
AT THE DATE INDICATED ITISNOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
I File No D-4345-H01
July 7, 1989
irtj
-
- 2 -
. / _4
- 6 -
-
- 8 •
-
oz
tu
a!z
>
§o
t
/
'. '
^x/0
<f 0 s
/ 0
tf/y'' «yI'/"' ./ 9
/V
1
§
CO
"I
8-
SC-SM
GC-GM
TRENCH T-22
ELEVATION ^8 MSL DATE DRILLED^ 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
SLOPEWASH
Loose, damp, dark brown, Gravelly Clayey
fine SAND, some silt
TERRACE DEPOSIT
Dense, moist, dark reddish-brown, Clayey to
Sandy COBBLE-BOULDER GRAVEL
\
TRENCH TERMINATED AT 10 FEET (NEAR REFUSAL)
2
Ooh-ill
P
-
-
-
-
-
-
-
—
-
C/J
Z li-
CC
Q
gj1"
SAMPLE SYMBOLS LJ SAMPLING UNSUCCESSFUL
K — DISTURBED OR B4G SAMPLE
U STANDARD PENETRATION TEST
K — CHUNK SAMPLE
• — DRIVE SAMPLE [UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE LOG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPEC IF 1C BORING OR TRENCH LOCATION AND
ATTHE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS ATOTHER LOCATIONS AND TIMES
IFile No D-4345-H01
July 7, 1989
£?|
Q
. 0
» w
. 2 .
. 4 .
-
. 6 .
-
_ 8 .
. 10 .
_
. 12 .
14
-
-
-
_
oz
UJ
a
IT,
T23-1
§
o
--•
/ o
/
's'C
y.
ty1 t /
' o /
/''a
• /
/ 0/ 0 ^
O's'
/Xi:
lO°/0
aLU
<
z
§
s_
rf«
0?
GC-GM
SC
GC
TRFNfH T 71
ELEVAT.ON 109MSL HATPHPiLLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Medium to dense, moist, dark to medium
reddish-brown, Clayey to Sandy COBBLE-BOULDE!
GRAVEL
brush, trash, decay odor
TOPSOIL
Loose, damp to dry, dark gray-brown, Silty
fine SAND
TERRACE DEPOSIT
Very dense, moist, dark reddish-brown,
Clayey BOULDER GRAVEL
TRENCH TERMINATED AT 14 FEET (NEAR REFUSAL)
gujiii
p5
-
-
-
-
-
_
-
•
-
-
>
a£
ff
Q
BULK
^f
§z
1
n Qo . y
SAMPLE
I
SAMPLE SYMBOLS U — SAMPLING UNSUCCESSFUL
E3 — DISTURBED OR B»G SAMPLE
STANDARD PENETRATION TEST
— CHUNK SAMPLE
• — DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE TH E L OG OF'SUBSURFACE CONDITIONS SHOWNHEREON APPLIES ONLY AT THE SPECIF 1C BORING OR TRENCH LOCATION AND
-TTHC DATF INDICATED IT IS NOT WARRAN TED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
File No D-4345-H01
July 7, 1989
I ,_
0 "•
o
™ —
- 2 -
- -
- 4 -
- 6 -
-
- 8 -
.
-10 -
-
-12 -
-14 -
-
-16 .
-18 -
-20 -
-22 -
-24 -
-
-26 -
-
o
LU
a
2
3i
T24-1
oo
o
D
'''nv£> /
•/(0o./
/ o
aX/ °/") /J/ *
UP' 0
/ /
9o/
<' o
0 / .
/ o
, °0/
v/ °
Qfr/
/ t' o/
/
W.
o./
*b/
amt-
2
D
8o
ent/: —
S
°~
GC
TRFNfH T 74J. IXilili V^li J- ^. H-
70 MST 4/fi/RQELEVATION OLl DATE DRILLED ^/D/oy
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Medium to dense, moist, dark reddish-brown,
Clayey to Sandy COBBLE-BOULDER GRAVEL
,* nn+- n S++- „ ~\ rt ^ rt „ T»«^-,-l-,Trt«J — ._ U — UI COIlL.a.CL S-LOpGS WGSL-WalQ 9 SOmG DrUSfl •
decay odor
ALLUVIUM
Soft, wet, dark gray-brown, Sandy to Gravelly
CLAY
\
TRENCH TERMINATED AT 26 FEET
Zuj
11
jjjP
~
m
-
_
-
-
_
—
-
-
.
-
-
—
_
—
-
-
-
-
-
>.
1"
o:
Q
BULKS
5 —
'§
AMPLE
SAMPLE SYMBOLS LJ — SAMPLING UNSUCCESSFUL
K — DISTURBED OR B*G SAMPLE
.STANDARD PENETRATION TEST
.CHUNK SAMPLE
• DRIVE SAMPLE (UNDISTURBED)
?• — WATER TABLE OR SEEPAGE
NOTE THE L OG OF SUBSURFACE CONDITIONS SHOWN HEREON APPLIES ONLY AT THE SPECIFIC BORING OR TRENCH LOCATION AND
AT THE OA'E INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
m File tfo D-4345-H01
• July 7, 1989
1
1
1
1
|
1
1
1
1
1
1
1
1
1
1
|
•
N
- 0 _
• 2 -1
-
. 4 .
. 6 .
. 8 .
. 10 .
- 12 .
. 14 .
_
-
-
-
-
-
"
Oz
a
2
LITHOLOGY/
/
/
/
/ ,
'/
Q*/
' 0
o</.
\ \ \\ 1 1
III.GROUNDWATERSOIL CLASS(USCS)CL-SC
CL
SM
TRENCH T-25
ELEVATION 45 MSL DATE DRILLED 4/6/89
EQUIPMENT Komatsu 220 Track Backhoe
MATERIAL DESCRIPTION
FILL
Stiff, moist, medium brown, Sandy CLAY to
very Clayey SAND
TOPSOIL
Soft, moist to wet, dark brown, Sandy to
Gravelly CLAY
DELMAR FORMATION
Dense, moist, light gray-tan, Silty fine
SANDSTONE, some clay
|
TRENCH TERMINATED AT 13 FEET PENETRATIONRESISTANCEBLOWS/ FT•
.
-
-
-
-
-
-
-
_
-
-
-
-
"
"DRY DENSITYPCFMOISTURECONTENT %SAMPLE SYMBOLS — SAMPLING UNSUCCESSFUL I] — STANDARD PENETRATION TEST I — DRIVE SAMPLE (UNDISTURBED)
K — DISTURBED OR BAG SAMPLE B — CHUNK SAMPLE ?• WATER TABLE OR SEEPAOE
NOTE THE LObOFSUBSURFACECONDITIONS SHOWN HEREON APPLIESONLY ATTHE SPECIFIC BORINGORTRENCH LOCATION AND10 AT THE DATE INDICATED IT IS NOT WARRANTED TO BE REPRESENTATIVE OF SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND TIMES
s
APPENDIX B
File No D-4345-H01
July 7, 1989
APPENDIX B
LABORATORY TESTING
Laboratory tests were performed in accordance with generally accepted test
methods of the American Society for Testing and Materials (ASTM) or other
suggested procedures
Selected relatively undisturbed drive samples were tested for their in-
place dry density, moisture content, consolidation and shear strength
The maximum dry density and optimum moisture content of selected disturbed
bulk samples were determined in accordance with ASTM D1557-78, Method C
Portions of the bulk samples were remolded into rings and subjected to
direct shear and Expansion Index tests
The results of our laboratory tests are included in tabular form herewith
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
I
I
I
I
Maximum Dry Optimum
Sample Density Moisture
I No Description pcf % Dry Wt
T2-2 Yellowish brown clayey SAND 116 8 15 0
TABLE I
Summary of Laboratory Compaction Test Results
ASTM D1557-78
T3-2 Reddish brown sandy CLAY and 120 3 12 5
cobbles
T7-2 Reddish brown clayey SAND and 129 5 10 4
cobbles
T19-2 Greenish brown clayey SILT 119 3 12 9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
TABLE II
Summary of In-Place Moisture-Density and Direct Shear Test Results
Sample
No
T2-1
*T2-2
T3-1
*T3-2
T7-1
*T7-2
T8-1
T8-3
T9-2
T19-1
*T19-2
T23-1
SB1-1
SB1-2
SB1-3
SB1-4
SB1-5
SB1-6
SB1-6
SB2-3
SB2-4
SB3-1
SB3-2
SB3-3
SB3-4
SB4-1
SB4-2
SB4-4
SB5-1
SB5-3
SB6-1
SB7-1
SB7-3
SB8-1
SB8-2
SB8-3
Dry
Density
pcf
112 6
105 5
112 7
108 6
116 5
108 6
115 6
100 7
107 5
105 1
114 1
108 7
107 2
120 8
114 9
116 6
106 9
114 4
120 4
111 0
119 1
107 0
124 3
111 8
123 7
105 6
116 3
106 0
96 0
127 3
103 4
Moisture
Content
%
15 9
14 5
14 2
12 1
14 2
10 7
7 5
13 8
12 7
17 1
12 8
8 9
22 4
20 8
18 8
19 2
22 7
14 0
16 5
10 6
16 5
13 5
14 4
18 3
7 5
14 2
21 4
12 3
16 2
12 3
20 2
16 6
21 7
23 1
9 7
22 5
Angle of
Unit Shear
Cohesion Resistance
psf Degrees
400 26
330 26
390 25
470 22
810 19
1100 34
680 25
560 30
*Sample remolded to approximately 90 percent of maximum dry density at
about optimum moisture content
File No D-4345-H01
July 7, 1989
TABLE III
Summary of Laboratory Expansion Index Test Results
Moisture Content
Before After
Test Test Dry
Sample Density Expansion
No % % pcf Index
T2-2 12 1 28 1 102 9 85
T3-2 11 0 24 1 105 3 52
T7-2 96 21 1 111 8 51
T19-2 11 5 24 9 105 0 62
File No. D-4345-H01
July 7, 1989
O
O
CO
O
O
III
ODC
UJQ.
SAMPLE NO.SB 1-2
-2
10
0.1
WATER ADDED
\
\
\
\
s
0.5 1.0 5.0 10.0
APPLIED PRESSURE (ksf)
50.0 100.0
INITIAL DRY DENSITY
INITIAL WATER CONTENT
(05 t (pcf)
208 (%)
INITIAL SATURATION
SAMPLE SATURATED AT
97 0 (%)
OI25 (ksf)
CONSOLIDATION CURVE
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure B-l
File No. D-4345-H01
July 7, 1989
PERCENT CONSOLIDATIONO iOoo~'JOtn-&OJro_O —SAMPLE NO SB 1-4
F-^.
X
1 — — »• —
—
•"^
^^
w
•v
V
/A
v.
v
re
N
s.
:F
S
S
ADDED
V
\
\
\\
^v
\\
^
\
^,
\
v.
\>
*s
\\
*s
\
V
\\-\
T
1 0.5 1.0 5.0 10.0 50.0 100.0
APPLIED PRESSURE (ksf)
INITIAL DRY DENSITY
INITIAL WATER CONTENT
108 7 fee*)
19 2 (%)
INITIAL SATURATION
SAMPLE SATURATED AT
970 (*>
0125 (kaf)
CONSOLIDATION CURVE
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure B-2
File No. D-4345-H01
July 7, 1989
O
O05
oo
oor
UJ
Q.
SAMPLE NO. SB 3-1
0.1
WATER ADDED
Si
0.5 1.0 5.0 10.0
APPLIED PRESSURE (ksf)
50.0 100.0
INITIAL DRY DENSITY
INITIAL WATER CONTENT
1 14 4 (pcf)
13 5 (%)
INITIAL SATURATION
SAMPLE SATURATED AT
80 O (*)
0 5 (ksf)
CONSOLIDATION CURVE
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure B-3
File No. D-43io-E01
July 7, 1989
Q
Ijo
COzoo
I-
UJocc
LU
Q.
SAMPLE NO SB 8-1
10
12
14
0.1
WATER ADDED
0.5 1.0 5.0 10.0
APPLIED PRESSURE (ksf)
INITIAL DRY DENSITY
INITIAL WATER CONTENT
960
23 1 (%>
INITIAL SATURATION
50.0 100.0
SAMPLE SATURATED AT
788 (*)
0 5 (ksf)
CONSOLIDATION CURVE
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure B-4
File No. D-4345-H01
July 7, 1989
SAMPLE NO SB 1-2
I6SO
1700
10
CO
o
<
UJ
1730
leoo
SAMPLE NO SB 1-4
2180
22OO
CO
CD
Q
<
2230
23OO
APPLIED PRESSURE .(ksf )
10 12
TIME in MINUTES
APPLIED PRESSURE (ksf)
4 6 8
TIME in MINUTES
10 12
TIME RATE CONSOLIDATION
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure B-5
I
I
;I
I
I ;• . , , -
I -
I :,
I •'• .' ;.. ' -,'
• APPENDIX C
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
RECOMMENDED SPECIFICATIONS FOR SITE GRADING
1 0 GENERAL
1 1 These specifications present general procedures and requirements
for grading and earthwork as shown on the approved grading plans
including preparation of areas to be filled, placement of fill,
installation of subdrains and excavations The recommendations
contained in the geotechnical report are a part of the earthwork
and grading specifications and shall supersede the provisions
contained hereinafter in the case of conflict
1 2 Prior to the commencement of grading, a qualified geotechnical
consultant (soils engineer and engineering geologist, and their
representatives) shall be employed for the purpose of observing
earthwork procedures and testing the fills for substantial
conformance with the recommendations of the geotechnical report and
these specifications It will be necessary that the consultant
provide adequate testing and observation so that he may determine
that, in his opinion, the work was accomplished in general
conformance with these specifications It shall be the
responsibility of the contractor to assist the consultant and keep
him apprised of work schedules and changes so that he may schedule
his personnel accordingly
13 It shall be the sole responsibility of the contractor to provide
adequate equipment and methods to accomplish the work in accordance
with applicable grading codes or agency ordinances, these
specifications and the approved grading plans If, in the opinion
of the consultant, unsatisfactory conditions, such as questionable
soil, poor moisture condition, inadequate compaction, adverse
weather, etc , are resulting in a quality of work less than
required in these specifications, the consultant will be empowered
to reject the work and recommend to the owner that construction be
stopped until the conditions are rectified
2 0 DEFINITIONS
2 1 Owner shall mean the owner of the property or the person on whose
behalf the grading work is being performed and who has contracted
with the Contractor to have grading performed
2 2 Contractor shall mean the Contractor performing the site grading
work
2 3 Civil Engineer or Engineer of work shall mean the duly licensed
civil engineer who has been hired by the Owner to set basic
surveying data at the site to aid Contractor in conforming with the
grading and improvement plans
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
File No D-4345-H01
July 7, 1989
2 4 Soil Engineer shall mean a duly licensed Civil Engineer qualified
in soil engineering hired by the owner who is responsible for
having qualified representatives on-site to observe and test the
Contractor's work for conformance with these Specifications
2 5 Engineering Geologist shall mean a duly licensed Engineering
Geologist hired by the Owner to provide geologic opinions and
recommendations during the site grading
3 0 MATERIALS
3 1 Materials for compacted fill shall consist of any soil excavated
from the cut areas or imported to the site that, in the opinion of
the Soil Engineer, is suitable for use in construction of fills
In general, fill materials can be classified as "soil" fills,
"soil-rock" fills or "rock" fills
311 "Soil" fills are defined as fills containing no rocks or
hard lumps up to 12 inches in maximum dimension and
containing at least 40 percent by weight of material
smaller than 3/4 inch in size and placed as indicated on
Figure C-l
3111 No rocks or hard lumps greater than 6 inches
in maximum dimension shall be placed in a
zone between finish grade surface and 3 feet
below finish grade
3112 All rocks between 6 and 12 inches in maximum
dimension shall be placed at least 3 feet
below finish grade surface
312 "Soil-rock" fills are defined as fills containing no
rocks or hard lumps larger than 4 feet in maximum
dimension and containing a sufficient matrix of "soil"
fill to allow for proper compaction of "soil" fill around
the rock fragments or hard lumps as specified in
Paragraph 6 2
313 "Rock" fills are defined as fills containing no rocks or
hard lumps larger than 3 feet in maximum dimension and
containing little or no fines Fines are defined as
material smaller than 1 inch in maximum dimension The
volume of fines shall be less than approximately 40
percent of the rock fill volume
3 2 Material of a perishable, spongy, or otherwise unsuitable nature
as determined by the Soil Engineer shall not be used in fills
3 3 "Soil" fill placed within at least the upper 3 feet of building pad
grade shall be select finish grade material that contains no rocks
or hard lumps greater than 6 inches in maximum dimension and that
has an Expansion Index of 50 or less when tested in accordance with
UBC Standard 29-2
3 4 The outer portion of fill slopes equal to at least the height of
the slope (measured horizontal to the slope face) or 15 feet,
whichever is less, should be composed of properly compacted "soil"
fill materials approved by the Soil Engineer
3 5 Representative samples of soil materials to be used for fill shall
be tested in the laboratory by the Soil Engineer in order to
determine the maximum density, optimum moisture content, and, where
appropriate, shear strength and expansion characteristics of the
soil
3 6 During grading, soil types other than those analyzed in the Soil
Investigation may be encountered by the Contractor The Soil
Engineer shall be consulted to determine the suitability of these
soils for use as fill and for use as finish grade soils conforming
to specifications in the Soil Investigation report
4 0 CLEARING AND PREPARING AREAS TO BE FILLED
4 1 Areas to be excavated and filled shall be cleared and grubbed
Clearing shall consist of complete removal above the ground surface
of all trees, stumps, brush, vegetation, man-made structures and
all similar debris Grubbing shall consist of removal of all
stumps, roots, buried logs and other unsuitable material and shall
be performed in all areas to be filled All roots and other
projections over 1-1/2 inches in diameter shall be removed to a
depth of 3 feet below the natural surface of the ground and to a
depth of 3 feet below the subgrade of areas to be filled Borrow
areas shall be grubbed to the extent necessary to provide materials
free from unsuitable matter
4 2 After clearing and grubbing of vegetable matter and objectionable
material, loose or porous soils shall be removed to the depth
recommended in the Soil Investigation The depth of removal and
compaction shall be observed and approved by a representative of
the Soil Engineer The exposed surface shall then be plowed or
scarified to a minimum depth of 6 inches and until the surface is
free from uneven features that would tend to prevent uniform
compaction by the equipment to be used
4 3 Where fills are constructed on hillsides or slopes, topsoil,
slopewash, colluvium or other loose or porous soils shall be
removed and the slope of the original ground on which the fill is
to be placed shall be stepped or "keyed" by the Contractor as
indicated on Figure C-2 in these Specifications The steps shall
extend completely through the soil mantle and into the underlying
competent formational material or, where competent formational soil
is not present, into compacted ground
4 4 After the foundation for the fill has been cleared, plowed or
scarified, it shall be disced or bladed by the Contractor until it
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
is uniform, free from large clods, brought to the proper moisture
content, then compacted as specified for fill
25 0 COMPACTION EQUIPMENT
5 1 Compaction shall be accomplished by sheepsfoot rollers, vibratory
rollers, multiple-wheel pneumatic-tired rollers, or other types of
acceptable compaction equipment Equipment shall be of such a
design that it will be capable of compacting the "soil" or
"soil-rock" fill to the specified density at the specified moisture
content
5 2 Compaction of "rock" fills shall be performed in accordance with
Paragraph 6 3
6 0 PLACING, SPREADING AND COMPACTION OF FILL MATERIAL
6 1 "Soil" fill, as defined in Paragraph 311, shall be placed by the
Contractor in accordance with the following recommendations
611 "Soil" fill shall be placed by the Contractor in layers
that, when compacted, shall not exceed 8 inches Each
layer shall be spread evenly and shall be thoroughly mixed
during spreading to obtain uniformity of material in each
layer The entire fill shall be constructed as a unit in
nearly level lifts Rock materials greater than 12 inches
in maximum dimension shall be placed in accordance with
either Paragraph 6 2 or 6 3
612 In general, the "soil" fill shall be compacted at a
moisture content at or above the optimum moisture content
as determined by ASTM D1557-78
613 When the moisture content of "soil" fill is below that
specified by the Soil Engineer, water shall be added by
the Contractor until the moisture content is in the range
specified
614 When the moisture content of the "soil" fill is above the
range specified by the Soil Engineer or too wet to achieve
proper compaction, the "soil" fill shall be aerated by the
Contractor by blading/mixing, or other satisfactory
methods until the moisture content is within the range
specified
615 After each layer has been placed, mixed, and spread
evenly, it shall be thoroughly compacted by the Contractor
to a relative compaction that is not less than 90 percent
Relative compaction is defined as the ratio (expressed in
percent) of the in-place dry density of the compacted fill
to the maximum laboratory dry density as determined in
accordance with ASTM D1557-78 Compaction shall be
continuous over the entire area, and compaction equipment
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
shall make sufficient passes so that the desired density
has been achieved throughout the entire fill
616 Potentially "medium" to "high" expansive soil (soils
having an Expansion Index of greater than 50) may be used
in fills below a depth of 3 feet below finish grade and
shall be compacted at a moisture content of 2 to 4 percent
greater than the optimum moisture content for the
material
617 Properly compacted "soil" fill shall extend to the design
surface of fill slopes The surface of fill slopes shall
be back-rolled with a heavy-duty loaded sheepsfoot or
vibratory roller at maximum 4-foot fill height intervals
and upon completion they shall be track-walked with a
dozer so that a dozer track covers all slope surfaces at
least twice
618 As an alternative to track-walking, upon completion, the
slopes may be overbuilt by at least 5 feet and then
trimmed back to the design grade
6 2 "Soil-rock" fill, as defined in Paragraph 312, shall be placed
by the Contractor in accordance with the following recommendations
621 Rocks larger than 12 inches but less than 4 feet in
maximum dimension may be incorporated into the compacted
"soil" fill, but shall be limited to the area measured 15
feet minimum horizontally from the slope face and 5 feet
below finish grade or 3 feet below the deepest utility,
whichever is deeper
622 Rocks or rock fragments up to 4 feet in maximum dimension
may either be individually placed or placed in windrows
623 For individual placement, sufficient space shall be
provided between rocks to allow for passage of compaction
equipment
624 For windrow placement, the rocks must be placed in
trenches excavated in well compacted "soil" fill
Trenches shall be 5 feet wide and 4 feet deep in maximum
dimension The voids around and beneath rocks must be
filled with approved granular soil having a Sand
Equivalent of 30 or greater and must be compacted by
flooding
625 All windrows must be parallel to each other and may be
placed either parallel to or perpendicular to the face of
the slope depending on the site geometry The minimum
horizontal spacing for windrows shall be 20 feet
center-to-center with a 5-foot stagger or offset from
lower courses to next overlying course The minimum
vertical spacing between windrow courses shall be 5 feet
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
from the top of a lower windrow to the bottom of the next
higher windrow Windrows shall be 100 feet in maximum
length with a minimum spacing of 15 feet between ends
626 All rock placement, fill placement and flooding of
approved granular soil in the windrows must be
continuously observed by the Soil Engineer or his
representative
6 3 "Rock" fills shall be placed by the Contractor in accordance with
the following recommendations
631 The base of the "rock" fill shall be placed on a sloping
surface (minimum slope of 2 percent, maximum slope of 5
percent) The surface shall slope toward suitable
drainage outlet facilities The "rock" fills shall be
drained during construction so that a hydrostatic pressure
buildup does not develop The drains shall be permanently
connected to controlled drainage facilities to control
postconstruction infiltration of water
632 "Rock" fills shall be placed in lifts not exceeding 3
feet Placement shall be by rock trucks traversing
previously placed lifts and dumping at the edge of the
currently placed lift Spreading of the "rock" fill shall
be by dozer to facilitate "seating" of the rock The
"rock" fill shall be watered heavily during placement
Watering shall consist of water trucks traversing in front
of the current rock lift face and spraying water
continuously during rock placement Compaction equipment
such as a 20-ton steel vibratory roller or other
compaction equipment providing suitable energy to achieve
the required compaction or deflection as recommended in
Paragraph 633 shall be utilized The number of passes
to be made will be determined as described in Paragraph
633
633 Plate bearing tests, in accordance with ASTM D1196-64, may
be performed in both the compacted "soil" fill and in the
"rock" fill to aid in determining the number of passes of
the compaction equipment to be performed If performed,
a minimum of three plate bearing tests shall be performed
in the properly compacted "soil" fill (minimum relative
compaction of 90 percent) Plate bearing tests shall then
be performed on areas of "rock" fill having two passes,
four passes and six passes of the compaction equipment,
respectively The number of passes required for the
"rock" fill shall be determined by comparing the results
of the plate bearing tests for the "soil" fill and the
"rock" fill and by evaluating the deflection variation
with number of passes The required number of passes of
the compaction equipment will be performed as necessary
until the plate bearing deflections are equal to or less
than required
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
634 A representative of the Soil Engineer shall be present
during rock fill operations to verify that the minimum
number of "passes" have been obtained, that water is being
properly applied and that specified procedures are being
followed The actual number of plate bearing tests will
be determined by the Soil Engineer during grading 2with
at least one test being performed for each approximately
5,000 cubic yards of "rock" fill placed
635 Test pits shall be excavated by the Contractor so that the
Soil Engineer can state that, in his opinion, sufficient
water is present and that voids between large rocks are
properly filled with smaller rock material In-place
density testing will not be required in the "rock" fills
636 To reduce the potential for "piping" of fines into the
"rock" fill from overlying "soil" fill material, a 2-foot
layer of graded filter material shall be placed above and
below the "rock" fill The gradation of the graded filter
material will be determined at the time the "rock" fill
is being excavated Materials typical of the "rock" fill
should be submitted to the Soil Engineer in a timely
manner to design the graded filter
637 All "rock" fill placement shall be continuously observed
during placement by representatives of the Soil Engineer
7 0 OBSERVATION AND TESTING
7 1 The Soil Engineer shall be the Owners representative to observe and
make tests during fill foundation preparation and filling and
compaction operations In general, no more than 2 feet of "soil"
or "soil-rock" fill in vertical elevation shall be placed without
at least one field density test being made within that interval
In addition, a minimum of one field density test shall be made for
every 2,000 cubic yards of "soil" or "soil-rock" fill placed and
compacted
7 2 The Soil Engineer shall make random field density tests of the
compacted "soil" or "soil-rock" fill to provide a basis for
expressing an opinion as to whether the fill material is compacted
as specified The basis for his opinion that the fill material has
been compacted to at least the minimum relative compaction
specified shall be that no tests in compacted or recompacted fill
areas indicate a relative compaction of less than that specified
Density tests shall be made in the compacted materials below any
disturbed surface When these tests indicate that the density of
any layer of fill or portion thereof is below that specified, the
particular layer or areas represented by the test shall be reworked
until the specified density has been achieved
7 3 The Soil Engineer shall verify that the minimum number of "passes"
have been obtained per the criteria discussed in Section 633
The Soil Engineer shall make random observation pits and may make
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
plate bearing tests of the placed "rock" fills The observation
pits will be excavated to provide a basis for expressing an opinion
as to whether the "rock" fill is properly seated and sufficient
moisture has been applied to the material If performed, plate
bearing tests will also be performed randomly on the surface of the
previously placed lift Plate bearing tests will be performed to
provide a basis for expressing an opinion as to whether the "rock"
fill is adequately seated The maximum deflection in the "rock"
fill determined in Section 633 shall be less than the maximum
deflection of the properly compacted "soil" fill When any of the
above criteria indicate that a layer of "rock" fill or any portions
thereof is below that specified, the particular layer or area
represented by the criteria shall be reworked until the "rock" fill
has been adequately seated and sufficient moisture applied
74 A settlement monitoring program designed by the Soil Engineer may
be conducted in areas of "rock" fill placement The specific
design of the monitoring program shall be as recommended in the
Conclusions and Recommendations section of the project soils report
or in the final report of grading
7 5 The Soil Engineer shall observe the placement of subdrains so that
he can state his opinion that the subdrains have been placed and
constructed in substantial accordance with project specifications
7 6 Testing shall conform to the following Standards as appropriate
761 "Soil" and "Soil-Rock" Fills
*Field Density Test, ASTM D1556-82, "Density of Soil
In-Place By the Sand-Cone Method
*Field Density Test, Nuclear Method, ASTM D2922-81,
"Density of Soil and Soil-Aggregate In-Place by Nuclear
Methods (Shallow Depth) "
laboratory Compaction Test, ASTM D1557-78,
"Moisture-Density Relations of Soils and Soil-Aggregate
Mixtures Using 10-Pound Hammer and 18-Inch Drop "
*Expansion Index Test, Uniform Building Code Standard 29-2
"Expansion Index Test "
762 "Rock" Fills
*Field Plate Bearing Test, ASTM D1196-64 (Reapproved 1977)
"Standard Method for Nonrepresentative Static Plate Load
Tests of Soils and Flexible Pavement Components, For Use
in Evaluation and Design of Airport and Highway
Pavements "
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
8 0 PROTECTION OF WORK
8 1 During construction, the Contractor shall properly grade all
excavated surfaces to provide positive drainage and prevent ponding
of water He shall control surface water to avoid damage to
adjoining properties or to finished work on the site The
Contractor shall take remedial measures to prevent erosion of
freshly graded areas and until such time as permanent drainage and
erosion control features have been installed Areas subjected to
erosion or sedimentation shall be properly prepared in accordance
with the Specifications prior to placing additional fill or
structures
8 2 After completion of grading and when the Soil Engineer has finished
his observation of the work, no further excavation or filling shall
be done except under the observation of the Soil Engineer
9 0 CERTIFICATIONS AND FINAL REPORTS
9 1 Upon completion of the work, Contractor is to furnish owner a
certification by the Civil Engineer stating that the lots are
graded to within 0 1+ foot vertically of elevations shown on the
grading plan and that all tops and toes of slopes are within 0 5
foot horizontally of the positions shown on the grading plans
After installation of the subdrain, the project civil engineer
should survey its location and prepare "as-built" plans of the
subdrain location The project civil engineer should verify the
proper outlet for the subdrains and the contractor should ensure
that the drain system is free of obstructions
9 2 Owner is also to furnish a final as-graded soils and geologic
report satisfactory to the appropriate governing or accepting
agencies and signed by a duly licensed Civil Engineer qualified in
soil engineering and by a Certified Engineering Geologist,
indicating that the work was done in substantial conformance with
the Specifications or approved changes to the Specifications as
authorized under Paragraph 1 4 of these Specifications
10 0 STREETS, STORM DRAINS, SEWERS AND LOTS IN ROCK AREAS
10 1 All streets in rock areas shall be undercut 5 feet and the storm
drains, sewerlines and sewer laterals installed The spoil from
the sewer trench is to be left in the street and the sewer trench
is to be backfilled with material as described in Paragraph 311
of these Specifications and to City of Carlsbad requirements
10 2 The lots in the rock areas shall be undercut 2 feet and material
as described in Paragraph 3 1 1 is to be placed on the lots When
the lots are fine-graded, the spoil from the lots is to be placed
in the street and the streets brought up to within 1 5 feet of top
of curb with material described in Paragraph 3 1 1 of these
Specifications
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
10 3 Storm drains in rock areas are to be backfilled with material as
described in Paragraph 3 1 1 of these Specifications and to City
of Carlsbad requirements All spoil from the storm drain trenches
is to be hauled and placed in the fill area at Contractor's expense
as specified in Paragraph 6 0 of these Specifications
File No D-4343-HCi
July 7, 1989
EXISTING GROUND SURFACE-
FINISH GRADE
BLDG PAD
STRKTEASEMENJ_
ZONE A 0<
^UINt A UNDERCUT
1 _
e'MIN UNDERCUT*
ff/ASV
r
UP TO 3'MAX UNDERCUT FOR TRANSITION LOTS AND/OR
EXPANSIVE SOILS ( EXPANSION INDEX GREATER THAN SO)
NO SCALE
• FINISH GRADE
I __ _BLDG_PAD l_
STR^EJ_EASEMENT_ f~ ~7
I ... 5'
S'MIN
1
ZONE A
ZONE B •13
L E G E N 0
ZONE A FILL MATERIAL IN ACCORDANCE WITH PARAGRAPH 3 I I
OF THE REFERENCED GRADING SPECIFICATION
ZONE B _ FILL MATERIAL IN ACCORDANCE WITH PARAGRAPH 3 1 Z OR 3 I 3
OF THE REFERENCED GRADING SPECIFICATION
* .5' OR 3' BELOW DEEPEST UTILITY, WHICH EVER IS GREATER
NO SCALE
SPECIFICATIONS FOR SITE GRADING
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure c-1
File No D-4345-H01
July 7, 1989
STRIP AS SPECIFIED
SLOPE TO 3E SUCH THAT
SLOUGHING OR SLIDING
DOES NOT OCCUR
ORIGINAL GROUND
N
\ |M SLOPE RATIO = ^-
PROPERLY COMPACTED
REMOVE ALL
UNSUITABLE MATERIAL
VARIES
\^"^^T
"B"
SEE MOTE—1
NO SCALE
NOTES
The minimum width "3" of key shall be 2 feet wider than the compaction
equipment, and not less than 10 feet.
The outside edge of bottom key shall be below topsoil or loose surface
material.
Keys are required where the natural slopes are steeper than 6 horizontal
to 1 vertical, or where specified by the Soil Engineer.
TYPICAL BENCHING DETAIL
FAIRWAYS
CARLSBAD, CALIFORNIA
Figure C-2
O
onoo
CO<=>
CO
CM
i
II
H- 4-