Loading...
HomeMy WebLinkAbout2805 OCEAN ST; ; 75-524; Permit0 (1 BUILDING PERMIT APPLICATION City of CARLSBAD, CALIFORNIA 92008 A pp/icanttocompletenumberedspacesonly. Phone 729-1181 Permit No. JOB ADDA[~~ ASSESSOR'S ·-\'T.,. -< .:::, (~fdr,~,q AJ PARCEL NUMBER l.OT NO. OLK I TR4C T 80vK PAGE I PAR, L<G ... L I Qsc:£ ATTACHCO SMC.CTI L., 1 0£5CR, ~ 2t0Wl'~A \/.fJ I' Sn.L APT~ MAIL ADOR C55 ?Ip PHON[ x7n-> , I. , CON Y,u,c TOR MAIL AODAESS /2,1-J,,.,.,.. l'ft•70N t LICCNSC NO. STATE 3 /4~--/4h/_;;..5 /4..,.,,..J ~ i:;;-1',P s-.s ::r .s C,H-/1:2b l3 ~ ... ~ L, .M,.. A ...... c:;, ~;,,t, 1.1Y-?,~ V-...s-o~c7 c-,,S.._ ARCHH£CT OR DCSIG"4CR MAIL A.00A[S$ PHONE LICCNSC NO. 4 \ , 'U', .-A "1"7F /JhrHC'L-. CNGIN[[Jt MAIL ADDRESS PHONE'.. LICE.NS£ NO, 5 . ,, COMPENSATION INS, CARRI ER MAIL A0011t£5S BJIANCH 6 use 0" .UILOING 7 - 8 Class of work: 0 NEW ( 0 ADDITION 0 ALTERATION 0 REPAIR 0 MOVE 0 REMOVE 9 Describe work: -~A-WNL " R~.,,.,rk P,,.t:/IK'tE 10 Change of use from Change of use to 11 Valuation of work: $ -::;;{Ono00 PLAN CHECK FEF:J_~ ':? ~ 1 ?7 0 PERMIT FEE $ SPECIAL CONDITIONS: MICRO FILM FEE Type of Occupancy Const. Group Size of Bldg. No. of Max. (Total) SQ. Ft. Stories 0cc. Load Fire U se Fire Sprinklers l~TtON ACCEPTEO SY PLANS CHECKED SY APPROVED FOR ISSUANCE SY zone zone Requored OYes ONo I}! No. of OFFSTREET PARKING SPACES Dwelling Units No. !No. T DATE Covered So. Ft. Open NOTICE Special Approvals R equired Received Not Required SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB· PLANNING DEPT. ING, HEATING, VENTI LATING OR AIR CONDITIONING. HEALTH DEPT. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN120DAYS, OR IF FIRE DEPT. .__ CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A SOIL REPORT PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM MENCED. OTHER (Specify) I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS ENGINEERING DEPT. APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS WATER DEPT. TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR THE GRANTING OF A PERMIT DOES NOT NOT, PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING co~~.O~R THE~R~C OF CONSTRUCTION. • ~ ~ "P,vl-. ... ~ ~J /;?.) ~ .... ----------~ -/ 51GNATURl 0,-CONT,.ACTOR OR AUTH0,.11[0 AG[NT IDATE.) 5IC.NATUftr 0" OWN!.R IP" OWNCR BUILD[" IOATE) WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH /90 INSPECTOR INSPECTION RECORD DATE REMARKS INSPECTOR FOUNDATIONS: SET BACK TRENCH REINFORCING FOUNDATION WALL & WEATHER PROOFING CONCRETE SLAB FRAMING INT. LATHING OR DRYWALL EXT. LATHING MASONRY FINAL 10-15-7 )-O.K. T . Hata - USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC. 6-3-75 Beautiful pQU.:r::__n_Q problems. Engin.e.e..r_on_jn.b t.ook slump tes 3½" s lump. Cylindar was obtained on 1st truck only . T. Mata J,-~-l5_Ve.x._~ g.o_ocLpa.J1.L.,-n.o_p..r..oJil.e.m_. Engineer took cy]ande..r_for lab. T. Mata __ _n -2 7 -23 _G o_o g ,-.S t e eLw o..r..k.., E o g i u e er w:.a.s._o_n_j o..lL, w ilL pour_ 8 ; 3 0 A. M. _T • _Hat a._ 7-3-?_J__VeE_Y g.2_od_pour, goo d condition and steel and frame work. 'J.'. ~t_<!_ __ 7-1.."1=...7.5 Good s.teel wo_r__k_. J:Laed.e.d._cl earance on uort..h_end of __s_t..e..e.l arui_ ___ _ expansion felt. T. Mata MOFFATT & NICHOL, ENGINEERS LONG BEACH, CALIFORNIA • PORTLAND, OREGON Mr. R. S. Osburn, Director Building and Housing City of Carlsbad 1200 Elm Avenue JOHN Q MOFFAT' •••NK , N,CHOC April 2, 1975 ;g~fY,:'ci.(~~:~;; RE C E IVE D~'. ,~~'::~ A?R 3 1975 CITY OF CARLSBAD Building Department Carlsbad, California 92008 Re: Playa del Sol Apartments Patio Construction; Our L-1595 Dear Mr. Osburn: Pursuant to my phone call on March 31, I am forwarding for plan-check at this time two sets of drawings and one set of the specifications and calculations for Phase II of the seawall-patio construction for the Playa del Sol Apartments at 2805 South Ocean Street, Carlsbad. As you are aware, Phase I of this project has been completed. It involved construction of the base portion of the north wall of the patio, which was needed as an end dam for the rock work fronting the vacant lot to the north owned by Mr. Tony Howard-Jones. The public-access ramp and steps from Ocean Street to the beach, which crosses the south side of that lot, has been built by Mr. Howard-Jones in accordance with his agreement with the State Coastal Zone Commission. However, installation of the pipe handrails for that access way has been deferred temporarily to facilitate construction of the concrete block wall screen, which is a feature of the Phase II construction at Playa del Sol. Early construction of that block wall and installation of the handrails is desired to fulfill the requirements of the Coastal Commis- sion for a safe public-access way. At its March 21, 1975, meeting, the San Diego Coast Regional Commission approved the Phase II construction as detailed in the enclosed plans, without adverse comment by the public (Coastwatch personnel were present). The appeal period will expire April 4th, at which time the Coastal Commission permit should be issued. The Carlsbad Apartments Company, owner of Playa del Sol, plans to solicit bids for this work after issu- p_ o. BOX 7707 • 250 WEST WARDLOW ROAD • LONG BEACH • CALIFORNIA • 90807 • (213) 426-9551, 774-5650 • Mr. R. S. Osburn April 2, 1975 Page Two ance of the State permit as soon as approval by the City of Carlsbad is assured; hence, the request for plan-check at this time. The cost of the work is estimated at $22,000, and the owner agrees to pay the plan-check and building permit fees upon issuance of the building permit. As the owner's representative, I shall be happy to discuss any questions you may have concerning these plans either by phone or in person upon request. Your early consideration of this project will be appreciated. JWD:jr Enclosures cc: Mr. Howard-Jones Dr. Gunther Very truly yours, MOFFATT & NICHOL, ENGINEERS ~VO~ VJarriesw: Dunham ~TATE O; CALIFORNIA-CALIFORNIA COASTAL 2 c~,,r f;., (",j,-•? C' ... ~ MISSION Edmund G. Brown Jr ... Governor MALCOLM A. LOVE f ', TO f ::~C. FRAZEE · ice Chairman . :/2 FFERY D. FRAUTSCHY I •, T ✓ Representative to the DATE: April 5, 1975 f • 1_~, •• • €alifornia Coastal Zone CONTROL NO: F22~~d,onservati~ Commission APPLICANT: Carlsbad Apartments Company Attn: Dr. K. Gunther ~OMAS A. CRANDALL -~ecutive Director 3133 Santa Anita Avenue El Monte, CA. 91733 AGENT: PROJECT ADDRESS: 2805 South Ocean Street, Carlsbad. Lo~s 47 and 48 and the northerly 10 f eet of Lot 49 , Block A of the Hayes Land Co. Addition to Carlsbad Map No. 2. Dear Si rs: You are hereby granted a development pernri.t. This pernri.t is issued after a hearing before the Cormnission and after the Regional Commission found that the proposed development will not have any substantial adverse environmental or ecological effect and is consistent with the findings and declarations set forth in-Section 27001 and objections set f orth in Public Resource Code Secti on 27302. This perrrd.t is limited to development described be1.ow and set forth in material on file with the Commi ssion, and subject to the terms, conditions, and provisions, hereinafter stated: A. DEVELOR--IDJT: Replace. existing wood pati o with a concrete patio and provide a four foot wide low level concrete frontal walkway along the beach for .public use. Also, extend existing concrete block wall along north side of property · ·where public· beach access stairs are under .construction. · B. TERMS A..TW CONDITIONS; 1. 2. 3. 4. 5. 6. That the applicant agrees to ad.here strictly to the current plans for the project as submitted to the Commission. . That the applicant agrees to notify the Commission of any substantial changes in the project. That t he applicant wlll meet all the local code r equirements and ordiances, and obtain all necessarJ perr.its from State and Federal Agencies. That the applicant agrees to conform to the pernri.t rules and regulations of the California Coastal Zone Conservation Co~mission. That the applicant agrees that the Comrnission 'staff may make site inspections of the project during construction and upon completion. That construction en the project will start within one year following final approval of the project by the San Diego Coast Regional Commission. (SEE ATTACHED) . • Terms and Conditions are to run with the land. These terms·and conditions shall be perpetual and it is the intention of the parties to bind al:!. future owners and possessors of the subject property. 1/75 • c: STANDARD PROVISIONS (1) (2) (3) (4) (5) (6) STRICT COMPJ:.IANCE: Pennittee is under obligation to conform strictly to pennit under penalties established by California Coastal Zone Conservation Act of 1972. TIMELY DEVELOPlIB!!T fJID COMPLETION: Penni ttee shall commence development in a , timely manner an.d complete the development in a reasonable time. ASSIG1UJJILITY OF PER!1TT: This permit is not assignable unless the Penni ttee 1 s obligations under the permit are assumed by assignee in wri tine; within one year, and a copy of the required assumption agreement delivered to the Regional Cormnission. APPEAL: Unless appealed to the State Commission within ten (10) working days follo~d.ng final action by the San Diego Coast Regional Commission, all terr:1s and conditions shall be final. DISCIJ1IMER: The permit is in no way intended to effect the rights and obligations heretofore existing under private agreements nor to effect the existing regulations of other public bodies. . - PERMITTEE TO RETUPu\! COPY: This permit shall not be valid unless within ten (10) days Permittee returns a signed copy acknowledging contents to San Diego Coast Regional Commission. IT you have any question on this permit, please contact the staff of the Regional Commission. Very truly yours, Thomas A. Crandall Executive Director Directions to Permittee: Permittee is to execute below and return one copy of this permit to the San Diego Coast Regional Commission. I have read and understand the terms, conditions, limitations, and provisions of this permit and agree to abide by them. Control No. _....i:F~2,z21.i.!6.!----Signature of Pennittee Date __ '[.._· -_~....;/~1/--_--_l_s-_· _ . -·---~•-• -. •, DEVELOPMENT PERMIT ( Contirrued) F22l6 TERMS AND CONDITIONS (Cont:inued) 7. That the applicant agrees that the proposed frontal walkway will be connected by a concrete or wood extension to the public access steps cur- rently being :installed on the adjacent property to the north. Said public access steps were previously approved by the San Diego Coast Regional Commission (Fl479 ). 8. That the applicant agrees to adhere to the revised exterior treatment of the seawall in order to provide a more pleasing aesthetic effect. 9. That the applicant agrees to install a small sign where the public access steps on the adjacent property and the frontal walkway connect, indicating that the frontal walkway is for public use. Final design and location of said sign shall be subject to approval by the Executive Director of this agency. . ; .