Loading...
HomeMy WebLinkAbout2810 CARIBOU CT; ; CBC2018-0667; Recycle(rc ity of Carlsbad [I6111a1[ I LAJi1I MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbodco.gov Section 4.408.1 and Section 5.408.1 of the 2016 California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or salvaged for reuse. With the submitting of your application for a Building Permit or permit issuance, you must have completed a Construction Waste Management Plan (CWMP) demonstrating how you will recycle a minimum of 65% of the construction waste generated from your project. NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible. Waste Management Services can provide 2 rdll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and create receipt(s), to demonstrate the project has met a 65% diversion rate or greater. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Part 1 - Before the Project Begins Prior to issuance of a Building Permit, Applicant must submit PART 1 of the Construction Waste Management Plan (CWMP) Table. a. Submit completed and signed form to City with Building Permit application. Part 2— During and After the Project Prior to receiving inspection for final sign off of the Building Permit or Certificate of Occupancy, Applicant must submit the fully completed and approved PART 2 of the Construction Waste Management Plan (CWMP) Table. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. Complete the Debris Recycling Report (DRR) as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project. Return completed form to: City of Carlsbad Building Division - 1635 Faraday Ave, Carlsbad, CA 92008 or your inspector prior to requesting final inspection. Rev. 11/12/18 rrc ty of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Permit No. Project Title Project Address APN Owner Contractor Architect Applicant Name 0 :0 0 Last First Other 0 Applicant Address Phone ( E-mail Address Applicant Mailing Address (if different than project address) Project Type Residential Commercial Public Building (check all that apply): El El El Brief Description Project Size Estimated Cost of Project $ (square footage) Please check the appropriate box: Industrial El ElI plan on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. ElI plan on self-hauling to a certified recycling facility and will provide all receipts after construction. ElThis is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Print Name Signature Date Page 1 of 4 Rev. 11/12/18 PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd) not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: I1l[s]W Permit No. Project Title Project Address APN Applicant Name Phone ( Last First Complete the following table with estimated waste tonnage to be generated by your project. rThiss your plan for construction waste management. Changes can be made on the final recycle report. Goal: the diversion rate shall be 65% by weights of debris. ____________ A B C Estimated Place a (v') check Place a (1) check next Place a (1) check next Material Type Waste Quantity next to items to be to items to be to items to be (tons) reused or salvaged recycled disposed at landfill Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete Brick/ Masonry / Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding / Foam Cardboard Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing Materials Scrap Metal Stucco Other: TOTAL = To meet 65% Diversion Requirement (estimate) x 0.65 = tons Total Estimated Waste from above Minimum Required Diversion Contractor/Owner Signature Date Page 2 of 4 Rev. 11/12/18 PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): ___________ Acknowledgement I certify under penalty of perjury under the laws of the State of California that the information provided in and with I form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. Permit No. Print Name Address Date Use this Final Log below to track loads of materials as they leave the job site. ©©SAVE RECEIPTS©© Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available ifnecessary. Use City Conversion Table to convert volume to tons. A B C Date Material Type Actual Amt Reused or Actual Amt Recycled Actual Amt Disposed in Destination Facility (Name, Address, Phone) Salvaged Landfill Example: Palomar Transfer Station, 5960 El 01/05/2018 Concrete (broken) 5 tons Camino Real —(760) 603-0153 61(a ______ 4)fr'ri'tñ4 CoAfL/e 4 1iei4 itt,e-4 16 40 ---- 1lmf,4Ai Li (fc 4 at,i I '99 ,,,, 3c5 uiuit.iii• ~ 65% Diversion Rate Achieved = ,2'Z2 % :5 MID Total of columns A + B Total of columns A + B + C DIVERSION Contractor/Owner Signature Of F A4 Date Attach the following document ion 64his Report: Return completed form and documentation to: Original recycling weight tickets, landfill weight tickets City of Carlsbad Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 11/12/18 Conversion Table for Common Construction Waste This document is informational only. It is here to help you convert truckload quantities to tons, if necessary. Column A Column B Category Material Volume Tons/Unit Mixed Debris Construction cy x 0.18 = Demolition cy x 1.19 = Asphalt/Concrete Asphalt (broken) cy x 0.70 = Concrete (broken) cy x 1.20 = Concrete (solid slab) cy x 1.30 = Brick/Masonry/Tile Brick (broken) cy x 0.70 = Brick (whole, palletized) cy x 1.51 = Masonry brick (broken) cy x 0.60 = Tile sq ft x 0.00175 = Building Materials (cabinets, doors, windows, etc.) cy x 0.15 = Cardboard (flat) cy X 0.05 = Carpet By square foot sq ft x 0.0005 = By cubic yard cy X 0.30 = Carpet Padding/Foam sq ft x 0.000125 = Ceiling Tiles Whole (palletized) - cy x 0.0003 = Loose cy x 0.09 = Drywall (new or used) 1/2" (by square foot) sq ft x 0.0008 = 5/8" (by square foot) sq ft x 0.00105 = Demo/used (by Cu. yd.) cy x 0.25 = Landscape Debris (brush, trees, etc.) cy x 0.15 = Asphalt Composition Shingles, asphalt Shingle cy x 0.22 = Unpainted Wood/Pallets By board foot bd ft x 0.001375 = By cubic yard cy x 0.15 = Trash/Garbage cy X 0.18 = Other (estimated weight) cy x estimate = cy x estimate = cy x estimate = cy X estimate = Total all Column C Tons Page 4 of 4 Rev. 11/12/18 - : -\ 1' WASTE MANAGEMENT DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad, CA, 92008 GENERAL CONTRACTOR: TFW CONSTRUCTION 2810 CARIBOU CT CARLSBAD, CA. 92010 Construction & Recycling Services 5701 S. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY Acct: 350-73536 EDCO CDI Recycling & Buy Back Center Sales Rep: Victoria Brown-Delgado 224 S Las Posas Rd BarrvZelIertfwconstruction.com San Marcos, CA. 92078 Prepared Date: 04/16/2020 DATE OF SERVICE SVC TICKET U BIN SIZE MATERIAL TYPE Total Tons Tons RCY RECY RATE % FACILITY 7/26/2019 109654 40YD MSW / TRASH 3.56 0.00 0.00% PALOMAR LANDFILL (PAL) 8/6/2019 112879 40YD MSW / TRASH 8.67 0.00 0.00% PALOMAR LANDFILL (PAL) 8/28/2019 120227 40YD MSW / TRASH 3.81 0.00 0.00% PALOMAR LANDFILL (PAL) 9/9/2019 123028 40YD C&D DEMO 3.64 320 88.00% EDCO SAN MARCOS FACILITY (EDD) 9/9/2019 123027 40YD MSW / TRASH 6.33 0.00 0.00% PALOMAR LANDFILL (PAL) 9/17/2019 125623 40YD C&D DEMO 3.04 0.00 0.00% EDCO SAN MARCOS FACILITY (EDD) 9/17/2019 125624 40YD MSW / TRASH 7.91 0.00 0.00% PALOMAR LANDFILL (PAL) 9/25/2019 128059 40YD MSW / TRASH 11.08 0.00 0.00% PALOMAR LANDFILL (PAL) 10/7/2019 131951 40YD MSW / TRASH 4.56 0.00 10.00% PALOMAR LANDFILL (PAL) 10/7/2019 131952 40YD C&D DEMO 3.62 3.19 188.00% EDCO SAN MARCOS FACILITY (EDD) 10/22/2019 136775 40YD C&D DEMO 2.28 2.01 188.00% EDCO SAN MARCOS FACILITY (EDD) 10/22/2019 136550 40Y0 MSW / TRASH 2.14 0.00 0.00% PALOMAR LANDFILL (PAL) 11/8/2019 142744 40YD MSW / TRASH 5.17 0.00 0.00% PALOMAR LANDFILL (PAL) 11/13/2019 143506 40YD MSW / TRASH 5.19 0.00 0.00% PALOMAR LANDFILL (PAL) 12/9/2019 150714 40YD MSW / TRASH 6.06 0.00 0.00% PALOMAR LANDFILL (PAL) 12/18/2019 155179 40YD MSW/TRASH 3.93 0.00 0.00% PALOMAR LANDFILL (PAL) 1/15/2020 161644 40YD MSW / TRASH 3.36 0.00 10.00% PALOMAR LANDFILL (PAL) 1/22/2020 163689 40YD C&D DEMO 6.33 5.57 188.00% EDCO SAN MARCOS FACILITY (EDD) 2/6/2020 169217 40YD MSW / TRASH 5.44 0.00 0.00% PALOMAR LANDFILL (PAL) 2/6/2020 169218 40YD C&D DEMO 4.62 4.07 88.00% EDCO SAN MARCOS FACILITY (EDD) 2/19/2020 172729 40YD MSW / TRASH 5.80 0.00 0.00% PALOMAR LANDFILL (PAL) 2/25/2020 174303 40YD MSW / TRASH 3.50 0.00 0.00% PALOMAR LANDFILL (PAL) 3/3/2020 176487 40YD MSW / TRASH 4.44 0.00 0.00% PALOMAR LANDFILL (PAL) 3/31/2020 183822 40YD MSW / TRASH 4.86 0.00 0.00% PALOMAR LANDFILL (PAL) 4/3/2020 184729 40YD MSW / TRASH 3.08 0.00 0.00% PALOMAR LANDFILL (PAL) Total Tons 122.42 Total Tons Diverted 18.03 Total Tons Landfilled 104.39 Total Diversion 1 14.73% Acct #: 3985 Qualtech Concrete Inc Wed Apr 29, 2020 Page No. I Business: No.: 1, American Concrete Washouts Physical Address Billing Address Contact: Bruce 951-795-3159 Attention: Accounts Payable Street: Lot 4 Caribou Ct Street: P0 BOX 891926 City, St ZIP: Carlsbad, CA City, St ZIP: TEMECULA, CA 92589-1926 Phone #1: Phone 951-694-3280 Phone #1: Fax 951-694-3294 Phone #2: Phone #2: 7S-7RP V4-7RL-DRF email: email: Code Description Rate Regular $0.00 Bill to: None Billing Group: 2 Regular Account Type: Contract Late Fees: Yes Start: 713119 End: Suspend Start: Suspend End: Tax District: Tax Exempt No.: Balance: $675.00 Pay By: Balance COD: No PO#: Job 1906 Dumpster: Teleroute Activity: 7/1/19 to 8/31/19 07/08/19 9:54AM Work Order Started Placement: Lot 4 07/08/19 9:54AM Work Order Picture Placement: Lot 4 - - - - 2 - 07/08/19 9:54AM Work Order Picture Placement: Lot 4 Acct #: 3985 Qualtech Concrete Inc Wed Apr 29, 2020 Page No. 3 Note: 276 up 245 down 250 gals 70% 07/30/19 1:16PM Work Order Picture Placement: Lot 4 07/30/19 1:16PM Work Order Picture Placement: Lot 4 07/30/19 1:16PM Work Order Completed Placement: Lot 4 08/14/19 9:03AM Work Order Started Placement: Lot 4 08/14/19 9:03AM Work Order Picture Placement: Lot 4 Acct #: 3985 Qualtech Concrete Inc Wed Apr 29, 2020 Page No. 2 I - - - 76 . . • . 07/08/19 9:55AM Work Order Note Placement: Lot 4 Note: 276r1 down 07/08/19 9:55AM Work Order Completed Placement: Lot 4 07/30/19 1:13PM Work Order Started Placement: Lot 4 07/30/19 1:14PM Landfill Placement: Lot 4 Ticket#: s Tip Weight: 6.06Ton 07/30/19 1:15PM Work Order Picture Placement: Lot 4 07130/19 1:15PM Work Order Cntr Chg Placement: Lot 4 Note: rl 245 07/30/19 1:16PM Work Order Note Placement: Lot 4 Acct #: 3985 Qualtech Concrete Inc Wed Apr 29, 2020 Page No. 4 08/14/19 9:18AM Work Order Note Placement: Lot 4 Note: 245r1 up 150gals 40% 08/14/19 9:19AM Work Order Picture Placement: Lot 4 08/14/19 9:19AM 08/14/19 9:20AM 08/14/19 9:20AM Ticket#: s Tip Weight: 4.4Ton Work Order Completed Placement: Lot 4 Work Order Started Placement: Lot 4 Landfill Placement: Lot 4 08/14/19 9:20AM Work Order Completed Placement: Lot 4