HomeMy WebLinkAbout2810 WHIPTAIL LOOP; ; CBC2018-0321; Recycle·cCityof Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: Gateway Pacific View, LLC Contractor: Ryan Companies US Inc. _ REC E ~ ·~ fr . r~, ~· :. ; ·,..t C L;i 2810 Whiptail Loop (Bid. A) , Carlsbad, CA 92010 Job Address· Phone Number: (858) 812~7910 JUN 12 2018 Permlt #: TBD ---------------Estimated Cost of Project: $ $SSO,OOO Type of Project: D New Construction ~ Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) D Other ------------------------------ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: {If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area. _______ X 2 lbs. = ________ lbs.of allowable waste. Kl I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1-Estimated Waste {To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hau ling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Con!:rete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash/ Garba11.e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled ______ % Official Use Only D Plan Approved O Plan Denied D Project Valuation Approved Reviewed/ Approved by:. ________________ _ Page 1 of 2 REV.01-2017 {City of Carlsbad WASTE MANAGEMENT PLAN B-59 owner: E,il'{t'evJA'{ f>AUFIC.. '11tc'l,J \.-1..C. ~ le 1Z-ll-ee-F Nv\cl2lc.A 1..,1...C., Contractor; Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Phone Number: { ir5lO i I ;;i-7"1 d,. Permit#: c,eC ... /l ... Ol'c-oe:> \ Estimated Cost of Project: $-'II-I -"~:....:_---11>-D_....:o:......;'D ______ _ Type of Project: □New Construction OlslRemodel.QL[J.. □Residential □Commercial □Demolition (check all that apply) D Other ----------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area, _______ X 2 lbs. = ________ lbs. of allowable waste. D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1-Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to betaken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDALL RE-USED or RECYCLED Asphalt/ Concrete ~ -··---·-- Brick/ Masonry cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garbaoe other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled. ______ % I certify that the information provided herein, to the best of my knowledge, is true and correct. ~ (ptAY'"-.111;;'.:S ractoror0wne,printna '-\h~\v, tor or OWner signatu ) -o-a~te"'·==~------- Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by:. _________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only ff different than Table 1) Asphalt/ Concrete Brick/ Masonry Cardboard Drywell Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garba•e Dther: TOTAL lbs.: Actual Percentage Re-Used or Recycled. ______ % Officlal Use Only D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ ______ _ Reviewed/ Approved by,;_· ________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to lbs. of waste to. be LANDFILL RE-USED or RECYCLED Asphalt/ Concrete 0 3000 Brick / Masonry 1.00 'l50 Cardboard " S ~A Drywall 0 50 Landscape Debris 0 1.:20 Lumber/ Wood 500 0 Metals 300 :200 Mixed Waste 1.500 0 Trash / Garbage 300 0 Other: Pool CjuVl-lte 0 'JOO TOTAL lbs.: XJ-00 5,370 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re-Use Method ABC 1-1-aKU·· A '". WM I Re-1,(Sed Brlc.~ o~stte A'l:>~f''.''--If,~,., f"~ ABC ftaull"'.n Co. Mulcked E: Re-used o~slte waste Mav,,aaei,,,,.el'\.I: WM I ABC H-aull&MI WM WM w;ecl as crusnecl Base o~slte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page2of2 WASTE MAN-EMENT DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad CA 92008 ' ' DATE OF SERVICE SVC TICKET# 4/2/2018 955333 4/12/2018 958466 4/16/2018 959704 4/23/2018 961824 4/23/2018 961823 5/1/2018 964498 5/1/2018 964499 5/7/2018 966828 5/7/2018 966829 5/14/2018 969616 5/14/2018 969615 5/19/2018 971740 5/19/2018 971739 5/21/2018 972170 5/21/2018 972169 5/23/2018 972746 5/23/2018 972745 5/24/2018 972898 5/24/2018 972899 5/25/2018 · 973415 5/29/2018 973615 5/29/2018 973616 5/29/2018 973666 5/31/2018 975017 5/31/2018 975016 5/31/2018 975015 6/1/2018 975376 6/5/2018 976385 6/5/2018 976383 6/5/2018 976384 6/5/2018 976358 6/5/2018 976334 6/6/2018 976599 6/7/2018 976878 6/7/2018 976880 6/7/2018 976879 6/8/2018 977842 6/8/2018 977841 6/8/2018 977843 6/9/2018 978012 6/9/2018 978013 6/11/2018 978204 6/11/2018 978203 6/11/2018 978202 6/12/2018 978619 6/12/2018 978618 GENERAL CONTRACTOR: RYAN COMPANIES 2800 WHIPTAIL LOOP W CARLSBAD,CA.92010 Construction & Recycling Services 5701 S. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY EDCO CDI Recycling & Buy Back Center 224 S Las Posas Rd Acct: 350-72431 Sales Rep: Karrie R. Crawford ambar.ramos@ryancompanies.com Prepared Date· 04/10/2019 San Marcos CA 92078 , Total Tons RECY BIN SIZE MATERIAL TYPE Tons RCY RATE% FACILITY 40YD MSW /TRASH 5.71 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 5.15 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 4.03 3.34 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.92 · 2.42 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.73 2.27 83.00% EDCO SAN MARCOS (EDD) 40YD MSW /TRASH 2.93 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 3.14 2.61 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 3.52 2.92 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.33 1.93 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 5.09 4.22 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 4.61 3.83 83.00% EDCO SAN MARCOS (EDD) 40YD MSW /TRASH 6.99 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 6.66 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 4.09 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 4.95 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 2.23 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 2.43 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 3.08 2.56 83.00% EDCO SAN MARCOS (EDD) 40YD MSW /TRASH 4.69 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.33 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.92 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.58 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 2.86 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 4.06 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 5.43 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 1.73 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 1.11 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 2.76 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 7.63 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.30 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 4.53 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 4.11. 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.16 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 6.83 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 5.69 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 5.57 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 3.62 3.00 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 3.75 3.11 83.00% EDCO SAN MARCOS (EDD) 40YD MSW /TRASH 9.41 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 3.45 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MSW /TRASH 2.39 0.00 0.00% PALOMAR LANDFILL (PAL) 40YD MIXED DEMO 6.23 5.17 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.38 1.98 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 4.04 3.35 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.69 2.23 83.00% EDCO SAN MARCOS (EDD) 40YD MIXED DEMO 2.45 2.03 83.00% EDCO SAN MARCOS (EDD) 6/14/2018 979090 40YD MSW /TRASH 3.58 0.00 0.00% PALOMAR LANDFILL (PAL) 6/14/2018 979088 40YD MSW /TRASH 5.81 0.00 0.00% PALOMAR LANDFILL (PAL) 6/14/2018 979089 40YD MSW /TRASH 3.34 0.00 0.00% PALOMAR LANDFILL (PAL) 6/15/2018 980243 40YD MIXED DEMO 3.75 3.11 83.00% EDCO SAN MARCOS (EDD) 6/15/2018 980242 40YD MIXED DEMO 4.02 3.34 83.00% EDCO SAN MARCOS (EDD) 6/18/2018 980959 40YD MIXED DEMO 4.99 4.14 83.00% EDCO SAN MARCOS (EDD) 6/18/2018 980517 40YD MIXED DEMO 1.80 1.49 83.00% EDCO SAN MARCOS (EDD) 6/18/2018 980516 40YD MIXED DEMO 2.23 1.85 83.00% EDCO SAN MARCOS (EDD) 6/19/2018 980960 40YD MIXED DEMO 1.15 0.95 83.00% EDCO SAN MARCOS (EDD) 6/19/2018 980962 40YD MIXED DEMO 4.97 4.13 83.00% EDCO SAN MARCOS (EDD) 6/20/2018 981224 40YD MIXED DEMO 3.54 2.94 83.00% EDCO SAN MARCOS (EDD) 6/25/2018 982998 40YD MSW /TRASH 3.18 0.00 0.00% PALOMAR LANDFILL (PAL) 6/25/2018 982996 40YD MSW /TRASH 2.67 0.00 0.00% PALOMAR LANDFILL (PAL) 7/3/2018 985857 40YD MSW /TRASH 3.25 0.00 0.00% PALOMAR LANDFILL (PAL) 7/3/2018 985856 40YD MSW /TRASH 1.39 0.00 0.00% PALOMAR LANDFILL (PAL) 7/5/2018 986215 lOYD INERT 10.00 10.00 100.00% MOODYS RECYCLE (MOO) 7/9/2018 987477 lOYD INERT 100.00 100.00 100.00% MOODYS RECYCLE (MOO) 7/9/2018 987479 40YD MSW /TRASH 2.56 0.00 0.00% PALOMAR LANDFILL (PAL) 7/9/2018 987478 40YD MSW /TRASH 2.10 0.00 0.00% PALOMAR LANDFILL (PAL) 7/11/2018 988205 40YD MSW /TRASH 3.06 0.00 0.00% PALOMAR LANDFILL (PAL) 7/16/2018 990125 40YD MSW/TRASH 2.95 0.00 0.00% PALOMAR LANDFILL (PAL) 7/20/2018 992071 40YD MSW /TRASH 2.73 0.00 0.00% PALOMAR LANDFILL (PAL) 7/20/2018 992069 40YD MSW /TRASH 2.53 0.00 0.00% PALOMAR LANDFILL (PAL) 7/26/2018 993545 40YD MSW /TRASH 4.51 0.00 0.00% PALOMAR LANDFILL (PAL) 8/1/2018 995778 40YD MSW /TRASH 6.02 0.00 0.00% PALOMAR LANDFILL (PAL) 8/1/2018 995782 40YD MSW /TRASH 3.93 0.00 0.00% PALOMAR LANDFILL (PAL) 8/8/2018 997991 40YD MSW /TRASH 3.87 0.00 0.00% PALOMAR LANDFILL (PAL) 8/8/2018 997992 40YD MSW/TRASH 3.86 0.00 0.00% PALOMAR LANDFILL (PAL) 8/10/2018 999462 40YD MSW/TRASH 2.66 0.00 0.00% PALOMAR LANDFILL (PAL) 8/10/2018 999460 40YD MSW /TRASH 4.15 0.00 0.00% PALOMAR LANDFILL (PAL) 8/16/2018 639 40YD MSW /TRASH 3.49 0.00 0.00% PALOMAR LANDFILL (PAL) 8/17/2018 1831 40YD MSW/TRASH 2.55 0.00 0.00% PALOMAR LANDFILL (PAL) 8/21/2018 2445 40YD MSW /TRASH 3.13 0.00 0.00% PALOMAR LANDFILL (PAL) 8/22/2018 3633 40YD MSW/TRASH 3.00 0.00 0.00% PALOMAR LANDFILL (PAL) 8/23/2018 3927 40YD MSW /TRASH 4.04 0.00 0.00% PALOMAR LANDFILb (PAL) 8/25/2018 4345 40YD MSW /TRASH 3.49 0.00 0.00% PALOMAR LANDFILL (PAL) 8/29/2018 5742 40YD MSW /TRASH 2.82 0.00 0.00% PALOMAR LANDFILL (PAL) 8/29/2018 5741 40YD MSW/TRASH 4.85 0.00 0.00% PALOMAR LANDFILL (PAL) 9/4/2018 6838 40YD MIXED DEMO 2.90 2.44. 84.00% EDCO SAN MARCOS (EDD) 9/5/2018 7315 40YD MSW/TRASH 1.47 0.00 0.00% PALOMAR LANDFILL (PAL) 9/5/2018 7314 40YD MSW /TRASH 4.01 0.00 0.00% PALOMAR LANDFILL (PAL) 9/10/2018 8990 40YD MSW /TRASH 2.76 0.00 0.00% PALOMAR LANDFILL (PAL) 9/10/2018 8991 40YD MSW/TRASH 3.01 0.00 0.00% PALOMAR LANDFILL (PAL) 9/14/2018 10372 40YD MSW/TRASH 4.46 0.00 0.00% PALOMAR LANDFILL (PAL) 9/14/2018 10371 40YD MSW /TRASH 6.66 0.00 0.00% PALOMAR LANDFILL (PAL) 9/20/2018 12289 40YD MSW/TRASH 4.58 0.00 0.00% PALOMAR LANDFILL (PAL) 9/20/2018 12288 40YD MSW/TRASH 6.59 0.00 0.00% PALOMAR LANDFILL (PAL) 9/24/2018 13686 40YD MSW /TRASH 3.01 0.00 0.00% PALOMAR LANDFILL (PAL) 9/24/2018 14096 40YD MSW/TRASH 4.10 0.00 0.00% PALOMAR LANDFILL (PAL) 9/26/2018 14441 40YD MSW/TRASH 2.74 0.00 0.00% PALOMAR LANDFILL (PAL) 9/26/2018 14439 40YD MSW/TRASH 9.67 0.00 0.00% PALOMAR LANDFILL (PAL) 9/27/2018 16328 40YD MSW /TRASH 2.37 0.00 0.00% PALOMAR LANDFILL (PAL) 10/1/2018 16638 40YD MSW /TRASH 2.32 0.00 0.00% PALOMAR LANDFILL (PAL) 10/1/2018 16639 40YD MSW/TRASH 4.44 0.00 0.00% PALOMAR LANDFILL (PAL) 10/3/2018 17513 40YD MSW/TRASH 4.21 0.00 0.00% PALOMAR LANDFILL (PAL) 10/9/2018 18673 40YD MSW/TRASH 2.97 0.00 0.00% PALOMAR LANDFILL (PAL) 10/9/2018 18674 40YD MSW/TRASH 2.78 0.00 0.00% PALOMAR LANDFILL (PAL) 10/15/2018 20673 40YD MSW /TRASH 4.05 0.00 0.00% PALOMAR LANDFILL (PAL) 10/15/2018 20674 40YD MSW/TRASH 5.50 0.00 0.00% PALOMAR LANDFILL (PAL) 10/22/2018 22967 40YD MSW/TRASH S.29 0.00 0.00% PALOMAR LANDFILL (PAL) 10/22/2018 22966 40YD MSW /TRASH 4.73 0.00 0.00% PALOMAR LANDFILL (PAL) • 10/27/2018 25184 40YD MIXED DEMO 6.45 5.35 83.00% EDCO SAN MARCOS (EDD) 10/27/2018 25185 40YD MSW /TRASH 3.94 0.00 0.00% PALOMAR LANDFILL (PAL) 11/5/2018 27993 40YD MSW /TRASH 6.68 0.00 0.00% PALOMAR LANDFILL (PAL) 11/5/2018 27994 40YD MSW /TRASH 3.38 0.00 0.00% PALOMAR LANDFILL (PAL) 11/12/2018 30355 40YD MIXED DEMO 7.84 6.51 83.00% EDCO SAN MARCOS (EDD) 11/14/2018 31513 40YD MSW /TRASH 3.09 0.00 0.00% PALOMAR LANDFILL (PAL) 11/17/2018 32472 40YD MSW /TRASH 2.77 0.00 0.00% PALOMAR LANDFILL (PAL) 11/23/2018 34172 40YD MSW /TRASH 4.39 0.00 0.00% PALOMAR LANDFILL (PAL) 11/28/2018 35797 40YD MSW /TRASH 5.85 0.00 0.00% PALOMAR LANDFILL (PAL) 12/4/2018 37054 40YD MSW /TRASH 5.07 0.00 0.00% PALOMAR LANDFILL (PAL) 12/11/2018 39411 40YD MSW /TRASH 4.38 0.00 0.00% PALOMAR LANDFILL (PAL) 12/15/2018 41572 40YD MSW /TRASH 9.89 0.00 0.00% PALOMAR LANDFILL (PAL) 12/20/2018 43779 40YD MSW /TRASH 4.29 0.00 0.00% PALOMAR LANDFILL (PAL) 12/26/2018 44765 40YD MSW /TRASH 4.21 0.00 0.00% PALOMAR LANDFILL (PAL) 12/29/2018 45547 40YD MSW /TRASH 1.81 0.00 0.00% PALOMAR LANDFILL (PAL) 1/4/2019 47022 40YD MSW /TRASH 4.71 0.00 0.00% PALOMAR LANDFILL (PAL) 1/10/2019 49071 40YD MSW /TRASH 6.37 0.00 0.00% PALOMAR LANDFILL (PAL) 1/15/2019 50274 40YD MSW /TRASH 3.57 0.00 0.00% PALOMAR LANDFILL (PAL) 1/19/2019 52125 40YD MSW /TRASH 6.63 0.00 0.00% PALOMAR LANDFILL (PAL) 1/22/2019 52527 lOYD MSW /TRASH 8.87 0.00 0.00% PALOMAR LANDFILL (PAL) 1/22/2019 52530 40YD MSW /TRASH 2.99 0.00 0.00% PALOMAR LANDFILL (PAL) 1/24/2019 53097 40YD MSW /TRASH 6.5 0.00 0.00% PALOMAR LANDFILL (PAL) 1/29/2019 54549 40YD MSW /TRASH 14.10 0.00 0.00% PALOMAR LANDFILL (PAL) 2/9/2019 58211 40YD MSW /TRASH 6.32 0.00 0.00% PALOMAR LANDFILL (PAL) Total Tons 647.98 Total Tons Diverted 193.24 Total Tons Landfilled 454.74 Total Diversion 29.82% {cicyof NONRESIDENTIAL GREEN Develop_ment Services BUILDING CODE STANDARDS Building Division MANDATORY MEASURES 1635 Faraday Avenue Carlsbad CERTIFICATION CHECKLIST 760-602-2719 B-52 www.carlsbadca.gov This form, signed and completed, aml all 1'808fpw for the recycled materials shall b1t submitted to the Building Inspector pr/91' to Final IMpeatlon. Site Development Mandatory 5.106.1 Stonn water pollution prevention plan. For projects of one acre or less, develop a Storm Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (X) the State Stonm water NPDES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dust/particulate matter air pollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X) meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide permanenUy anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (X) passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (X) of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X) 5.106.8 Light pollution rsductlon. Comply with lighting power requirements in the California Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (X) site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: 1. Shield all exterior luminaries or use cutoff luminaries (X) 2. Contain interior lighting within each source (X) 3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) 4. Contain all exterior lighting within property boundaries (X) Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.106.10 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or drainage system will (X) manaae all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 through 503.1.3. (X) 5303.1.1 Buildings In excess of 50,000 square feet. Separate sub-meters shall be installed as follows: (X) 1. For each individual leased, rented, or other tenant space within the building projected to consume more than 100 gal/day. 2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratorv or beautv salon or barber shoo oroiected to consume more than 100 aal/dav. B-52 Page 1 of 5 Rev. 5/17 5.303.1.2 Excess consumption. Any building within a project or space within a building that is projected to consume more than 1,000 gal/day. (X) . 5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the overall use of potable water within the building by 20 percent shall be provided (Calculate (X) savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are served by more than one showerhead, the combined flow rate of all the showerheads shall not (X) exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in ooeration at a time. 5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable for each type in items listed in Table 5.303.6. 1. Water closets (toilets) -flushometer type (X) 2. Water closets (toilets) -tank type (X) 3. Urinals (X) 4. Public lavatory faucets (X) 5. Public metering self-closing faucets (X) 6. Residential bathroom lavatory sink faucets (X) 7. Residential bathroom lavatory sinks (X) 8. Residential showerheads (X) 9. Sinale shower fixtures served bv more than one showerhead (X) Outdoor Water Use 5.304.1 Water Budget A water budget shall be developed for landscaping irrigation use. (X) 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between 1,000 and 5,000 square feet. (X) 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: 1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. (X) 2. Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (X) communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan 5.408.1 Construction waste diversion. Establish a construction waste management plan or (X) meet local ordinance, whichever is more stringent. (X) 5.408.2 Construction waste management plan. Submit plan per this section to enforcement authority within the city. 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (X) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcemen( authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more stringent. (X) Exceptions: 1. Excavated soil and land-clearing debris 2. Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soll and land clearing debris. 100 nercent of trees. Stumps, rocks and 8-52 Page 2 of5 Rev. 5117 associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. Building Maintenance and Operation 5,410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of nonhazardous materials (X) for recycling. 5.410,2 Commissioning. For new buildings 10,000 square feet and over, building (X) commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include Items listed in Section 5.410.2. - 5.410.2.6 (X) 5,410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of the project begins the OPR shall include items listed in Section 5.410.4. (X) 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. (X) 5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include items listed in Section 5.410.2.3. (X) 5.410.2.4 Functional performance testing shall demonstrate the correct installation and operation of each component, system and system-to-system interface in accordance with the (X) approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training are required. (X) 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or representative and facilities operator and shall include the Items listed in Section 5.410.2.5.1. (X) 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. 5.410.2.6 Commissioning report. A complete report of commissioning process activities (X) undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (X) buildings less than 10,000 square feet. 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X) Systems to be included for testing and adjusting shall Include, as applicable to the project, the systems listed in Section 5.410.3.2. (X) 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry best practices and applicable national standards on each system. (X) 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the procedures defined by national standards listed in Section 5.410.3.3.1. (X) 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X) of testing signed by the individual responsible for perfonming those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports reauired by the enforcinA agency. B-52 Page 3 of 5 Rev. 5/17 Environmental Quality Fireplaces 5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X) t..tfA-sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. As Applicable 5.503.1.1 Woodstoves. Woodstoves shall comolv with US EPA Phase II emission limits. (X) tJ.l/lr Weather Resistance and Moisture Management . 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X) manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5.407.2 Moisture control. Employ moisture control measured by the following methods: 5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (X) 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X) into buildinos. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until final start up of the heating and cooling equipment, all duct and other related air distribution (X) component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the amount of debris or duct which mav collect in the svstem. 5.504.5.3 FIiters. In mechanically ventilated buildings, provide regularly occupied areas of the buildina with outside and return air orior to occuoancv that orovides at least a MERV of 8. 5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet the requirements of the following standards: (X) 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 voe limits as shown in Tables 5.504.4.1 and 5.504.4.2. 2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide voe standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROG in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504A.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certification and specifications 2. Chain of custody certifications 3. Other methods acceptable to the enforcing agency 5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 (X) CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the FloorScore oroaram of the Resilient Floor Coverina Institute. 8-52 Page4of5 Rev. 5/17 Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Buildina Code, Title 24 Part 2, Sections 1203 Nentilationl Chanter 14.1. /Xl Air quality and Exhaust 5.606.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (X) minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 6.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X) reouirements of the latest edition of the California Enerav Code, Title 24. Part 6. Section 120.1.ICl 14\. Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. ·As 6.508.1 CFCs. Install HVAC and refrigeration equipment that does not conlain CFCs. applicable 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. /~l I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: -ie,,o ""'"''f'"T"-11..-L-OOf' Plan Check Number: ~1.-0\ I!>-~ Print Name: M,u,, ... c.. ~u(,.. Signed: dt,P;B<::2? License Number: e1.0SOOIID\D ID-10-Date: "'/,~/ui, :,.011 r--• B-52 Page 5 of 5 Rev. 5117