Loading...
HomeMy WebLinkAbout2815 JEFFERSON ST; 202; CB053881; Permit04-12-2006 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB053881 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2815 JEFFERSON ST CBAD St: 202 Tl Sub Type: 2031102900 Lot#: $59,990.00 Construction Type: Reference #: JESSEE BLDG-1714 SF OFFICE TO OFFICE INDUST 0 NEW Applicant: SMITH CONSULTING ARCHITECTS 858 793-4777 Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check*: Owner: BICAJESSEE ADVENTURES L L C 2075 CORTE DEL NOGAL #S CARLSBAD CA 92011 ISSUED 11/08/2005 RMA 03/29/2006 03/29/2006 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $392.56 Meter Size $0.00 Add'l Reel. Water Con. Fee $255.16 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $12.60 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees HMP Fee TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $48.00 $110.00 $33.00 $0.00 $0.00 $0.00 $0.00 ?? $851.32 Total Fees:$851.32 Total Payments To Date:$851.32 Balance Due:$0.00 Inspector: FINAL APPROVAL Date: —Clearance: NOTICE: Please take NOTICEfhat approval of your project includes the Imposition11 of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exaclions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. Inspection List Permit*: CB053881 Type: Tl Date Inspection Item 06/13/2006 89 Final Combo 05/23/2006 14 Frame/Steel/Bolting/Weld in 05/23/2006 34 Rough Electric 05/23/2006 44 Rough/Ducts/Dampers 05/22/2006 34 Rough Electric 05/22/2006 84 Rough Combo 05/05/2006 17 Interior Lath/Drywall 05/05/2006 18 Exterior Lath/Drywall 04/27/2006 17 Interior Lath/Drywall 04/18/2006 17 Interior Lath/Drywall 04/17/2006 17 Interior Lath/Drywall 04/11/2006 14 Frame/Steel/Bolting/Weldin 04/11/2006 24 Rough/Topout 04/11/2006 34 Rough Electric 04/11/2006 44 Rough/Ducts/Dampers INDUST JESSEE BLDG-1714 SF OFFICE TO OFFICE Inspector PY TP TP TP TP TP PY PY TP TP TP PY PY PY PY Act AP AP AP AP AP CO AP we PA PA CO AP we AP NR Comments T-CEIL CEIL LITES DUCTS, H P S SUB PNLS T-CEIL CORR CEIL TOP LAYER N/INCLCORR WALLS Wednesday, June 14, 2006 Page 1 of 1 ITNSCHEDULED BUILDING INSPECTION DATE ^7 /, V u^ INSPECTOR JOB ADDRESS DESCRIPTION /s • PLAN CHECK J CODE DESCRIPTION ACT COMMENTS