HomeMy WebLinkAbout2815 JEFFERSON ST; 300; CB112701; Permit02-13-2012
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No:
Building Inspection Request Line (760) 602-2725
CBl 12701
Job Address:
Permity Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2815 JEFFERSON ST CBADSt: 300
Tl Sub Type: COMM
2031102900 Lot#: 0
$76,909.00 Construction Type: NEW
Reference #
STAFFON DENTAL: OFF TO DENTAL
1529 SF
Status: ISSUED
Applied: 12/22/2011
Entered By: JMA
Plan Approved: 02/13/2012
Issued: 02/13/2012
Inspect Area
Plan Check #:
Applicant:
JOE WALTHOUR
166-11 N. SINGINGWOOD ST
ORANGE CA
92869
714-997-9852
Owner:
BICAJESSEE ADVENTURES LLC
2815 JEFFERSON ST #300
CARLSBAD CA 92008
Building Permit $582.92 Meter Size
Add'l Building Permit Fee $0.00 Add'l Reel. Water Con. Fee $0.00
Plan Check $408.04 Meter Fee $0.00
Addl Building Permit Fee $0.00 SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Storn Motion Fee $16.15 PFF (3105540) $0.00
Park Fee $0.00 PFF (4305540) $0.00
LFM Fee $0.00 License Tax (3104193) $0.00
Bridge Fee $0.00 Lieense Tax (4304193) $0.00
BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $2,631.20
BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $2,428.80
Renewal Fee $0.00 PLUMBING TOTAL $72.00
Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $90.00
Other Building Fee $0.00 MECHANICAL TOTAL $50.00
Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Meter Size Sewer Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00
Reel. Water Con. Fee $0.00 Additional Fees $0.00
Green BIdg Stands (SB1473) Fee $1.00 HMP Fee ??
Fire Expedidted Plan Review $205.00 Green BIdg Standards Plan Chk ??
TOTAL PERMIT FEES $6,485.11
Total Fees: $6,485.11 Total Payments To Date: $6,485.11 Balance Due: $0.00
Inspector:
FINALAPPROVAL
Date: MJM&±^ Clearance:
NOTICE: Please take NOTCE tti^pproval of your project includes the "imposition" of fees, dedications, reservations, or ottier exactions tiereafter collectively
referred to as 'fees/exactions." You have 90 days from the date this pemiit was issued to pnDtest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infomiation with the City Manager for
processing in accordance with Carisbad Municipal Code Section 3.32.030. Faiiure to timely follow that procedure will tiar any subsequent legal action to attaci<,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor pianning, zoning, grading or other similar application processing or senrice fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which vou have oreviouslv been given a NOTICE similar to this, or as to which the statute of iimitations has oreviouslv othenvise expired.
^ CITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
760-602-2717 / 2718/2719
Fax: 760-602-8558
www.ca risbadca .gov
Plan Check No. OS> ( (• 2^0{
Est. Value
Plan Ck. Deposit
Date fg>/%71/ SWPP
JOB ADDRESS
CT/PROJECT # ' \\JSr»^ ' I PHASE # I # OF UNITS |# BEDROOMS
SUITE#/SPACE#/UN1T#
# BATHROOMS TENAIJT BUSINBSMAME
D30 - WO -
'/or/iL
CONSTR. TYPE OCC GROUP
DESCRIPTION OF WORK: Inc/utfe Square Feet of Affected Areata;
EXISTINQ USE ' I PROPOSED USE inARAnF isn EXISTINQ USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE
YES • #
AIR CDNDITIONING FIRE SPRIN
NO^I^ YEsSa^NO • YE^p
FIRE SPRINKLERS
YESV3 NOD
^^^Dcec ' _ . •
PHONE FAX _ ^ ^ ^
PROPERTY OWNER NAME
ADDRESS
CITY. , tt . STAXW 1 Z CITY STATE ZIP
PHONE
EMAIL
ARCH/DESIGNER NAME & ADDRESS
(Sec. 7031.5 Business ana Professions Code: Any City or County which requires a permit to construfct,alter, improve,
applicant for such permrt to file a sIBied statement that he Is licensed pursuantto the provisions ofthe Contractor's
demoiishoTrepalTanT^^
License Law (Chapter g, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a
civil penalty of notmore than five hundred dollars ($500)).
WORKERS COIVIPENSATION
Workers' Conipensitlon Declaration: /Aerety affinn under penalty of peijury one ofthe following declarations:
n I have and will maintain a certificateof consent to seif-inaure for workers'compensation as provided by Section 3700 of the LaborCode, forthe perfomiance of the worK for which this pemnit Is Issued.
s issued. My workers' compensatkin Insi^nce oBrrier and policy
Expiration Date tO I \ / ("7 -
^^1 have and will maintain workers' compensatian, as required ly E^kin 3700 otthe Labor Code, for the perfbmiance of the work for whk;h this pemiit is iss
number are: Insurance Co.
This section need not be completed if the permit is for one hundred dollars ($100) or less.
G Certificate of Exemption: I certify that in the perfomiance of the work for which this pennit is issued, I shall not employ any person in any manner so as to become subject to the Wohters' Compensation Laws of
Califomia. WARNING: Failure to secure imriiere' oompensation coverage Is unlawful, and shall subject an employerto criminal penaitles and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, djmages if piwided fol In Sadion 3706 of the Labor code, interest and attomey's fees.
CONTRACTOR SIGNATURE V ^C^LI
OWNER-BUILr^ER ECLARATION
•AGENT DATE — \
/ hereby affimi that I am exempt from Contractor's License Law for the foliomng reason:
• I, as owner of the property or my employees with wages as their sole compensatkin, will do the work and the structure is not intended or oflered for sale (Sec. 7044, Business and Professkins Code: The Contractor's
License Law does not apply to an owner ol property who builds or improves thereon, and who does such WQrt( himself or through his own empioyees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sokl within one year of completion, the owner-builder will have the burden of proving that he did not build or Improve for the purpose of sale).
• I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such prajects with contractor(s) licensed pursuant to the Contractor's License Law).
• I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the praposed property improvement • Yes O No
2.1 (have / have not) signed an application for a building pemiit for the proposed work.
3.1 have contracted with the following person (fimi) to provide the proposed construction (include name address / phone / contractors' license number):
4.1 plan to provide portions of the work, but I have hired the folbwing person to coordinate, supenrise and provide the major work (Include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work Indicated (include name / address / phone / type of work):
vCTPROPERTir OWNER SIGNATURE •AGENT DATE
COMPtETr THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY
Is the applicant or futuro building occupant requiied to submit a business plan, acutely hazardous materials registration fomi or risk management and prevention program under Sectkins 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? OYes ONo
Is the applicant or future building occupant required to obtain a pemiit fram the air pollution control district or air quality management district? • Yes • No
Is the facility to be constructed within 1,000 feet of the outer boundaiy of a school site? DYes HUo
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPUCANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT
CONSTRUCTION LENDINQ AGENCY
I hereby aflimi that there is a constniction lending agency for the perfomiance of the work this pennit is issued (Sec. 3097 (i) Civii Code).
Lender's Name Lender's Address
PPLICANT CERTIFICATION
I ceitt^ that I have read the applkation and state tliat the above informatkin Is conBct and thatthe infbnnatkin on the plans is accuiate. I agiee to complywith all City ordinances and State lave relating to building constniction.
I hereby authorize repiEsentative ofthe City of Carlsbad to enter upon the above nnentioned property tbr inspedton purposes, i ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CiTY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CiTY IN CONSEQUENCE OF THE GRANTING OF THIS PERMfT.
OSHA An OSHA pemiit is required ibr excavations over SO deep and demolitkin or constiuction of structures over 3 skxies in height
EXPIRATION: Every permit issued by the 6i|klirn Offidal unde the provlskins of this Code shail expire by Imitatbn and become nul and vdd if the building or vwik aulhorized by sudi permit is not commenced wilhin
180 days from the date of such pemnit or ifra bi|dii|g q|^k i Mpwdfs^ such pennit is suspended or abandoned at any time after the woik is commenced for a penod of 180 days (Sedkin 106.4.4 Unifbmi Buikling Code).
APPLICANT'S SIGNATURE PATE u
i
nnaieaiiiM
Heal BuMlliig losiiaiMii
Dept: Building Engineering Pianning CMWD St Lit
Plan Check #:
Permit #: CBl 12701
Project Name: STAFFON DENTAL: OFF TO DENTAL
1529 SF
Address: 2815 JEFFERSON ST #300 Lot:
Contact Person: TONY Phone: 9492954579
Sewer DIst: CA Water Dist: CA
Date: 03/13/2012
Permit Type: Tl
Sub Type: COMM
inspected
By:
Inspected
By:
Date
Inspected:
Date
Inspected:
Date
Inspected:
'3- '7- /7^ Approved^C^ Disapproved:
.Approved:
.Approved:
Disapproved:
Disapproved:
Comments:
City ofCarlsbad BIdg Inspection Request
For: 03/13/2012
Permit# CB112701
Title: STAFFON DENTAL: OFF TO DENTAL
Description: 1529 SF
Inspector Assignment: PY
Sub Type: COMM
2815 JEFFERSON ST
300 Lot: 0
Type:TI
Job Address:
Suite:
Location:
OWNER BICAJESSEE ADVENTURES L L C
Owner: BICAJESSEE ADVENTURES LLC
Remarks:
Piione: 9492954579
Inspector:
Total Time:
CD Description
19 Final Structurai
29 Final Plumbing
39 Finai Eiectricai
49 Finai Mechanical
Act Comments
Requested By: TONY
Entered By: JANEAN
Comments/Notices/Holds
Associated PCRs/CVs/SWPPPs Originai PC#
Inspection Historv
Date Description Act Insp Comments
03/12/2012 89 Final Combo CA PY
03/09/2012 89 Final Combo CO MC COMPLETE ADA SIGNAGE AND COMPLETE ALL ELECTRICAL &
EXIIT SIGNAGE
02/27/2012 84 Rough Combo AP PY T-BAR
02/21/2012 17 Interior Lath/Drywall AP PY
EsGil Corporation
In Vartnersliip with government for (Buifdtng Safety
DATE: 2/8/12 • APPLICANT
• JURIS.
JURISDICTION: City of Carlsbad • PLAN REVIEWER
• FILE
PLANCHECKNO.: 11-2701 SET: III
PROJECT ADDRESS: 2815 Jefferson Street Suite 300
PROJECT NAME: Staffon Dental OfRce - TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
XI The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant
contact person.
^ The applicant's copy of the check list has been sent to:
Joe Walthour
166-11 North SIngingwood Street, Orange, CA 92869
I I EsGil Corporation staff did not advise the applicant that the plan check has been completed.
EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Joe Walthour Telephone #: 714-997-9852
Date contacted: (by: ) Email: Fax #: 714-997-9857
Mail Telephone Fax In Person
• REIVIARKS:
By: Doug Moody by TJ Enclosures:
EsGil Corporation
• GA • EJ • PC 1/20/12
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
CityofCarlsbad 11-2701
2/8/12
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
These corrections are in response to items not fully addressed or as the
result of information provided, the text in bold underlined print indicates
the unresolved issue.
Please provide notes on the plans to show the suspended ceilings in Seismic
Design Categories D, E & F complywith ASCE 7-05 Section 13.5.6.2.1 as
follows: These requirements apply to all new constructed suspended
ceilings as shown on the reflective ceiling plan. Demo plan, sheet D1.0
does not match the reflected ceiling plan, sheet A2.0.
a) All ceilings shall use a Heavy Duty T-bar grid system.
b) The width of the perimeter supporting closure angle shall be not less than
2 inches.
c) In each orthogonal horizontal direction, one end of the ceiling grid shall be
attached to the closure angle.
d) The other end In each horizontal direction shall have a '/i" clearance from
the wall and shall rest upon and be free to slide on a closure angle or a
listed assembly.
Ceilings without rigid bracing must have 2" oversize trim rings for
sprinklers and other ceiling penetrations.
Please indicate on the plans the location of the air intake for the compressor
showing it to complywith section 1325.3 ofthe UPC. No information provided.
Air intake shall be located above roof level, at a minimum distance not less
than 10' from anv door, window, exhaust, other intake, or opening in the
building and a distance of not less than 20' above ground.
CityofCarlsbad 11-2701
2/8/12
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes • No •
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody by
TJ at Esgil Corporation. Thank you.
EsGil Corporation
In Tartnersfiip tvith government for (Buifding Safety
DATE: 1/27/12 • APPLICANT
B^IURIS.
JURISDICTION: CityofCarlsbad • PLAN REVIEWER
• FILE
PLANCHECKNO.: 11-2701 SET: II
PROJECTADDRESS: 2815 Jefferson Street Suite 300
PROJECT NAME: Staffon Dental Office - TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
^ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
3 The applicant's copy of the check list has been sent to:
Joe Walthour
166-11 North Singingwood Street, Orange, CA 92869
I I EsGil Corporation staff did not advise the applicant that the plan check has been completed.
IXI EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Joe Walthour Telephone #: 714-997-9852
Date contacted: 27-/2(by: OX) Email: Fax #: 714-997-9857
Mail Telephone Fax In Person
• REMARKS:
By: Doug Moody Enclosures:
EsGil Corporation
• GA • EJ • PC 1/20/12
9320 Chesapeake Drive, Suite 208 • SanDiego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576
CityofCarlsbad 11-2701
1/27/12
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Cartsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carisbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed bythe City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
These corrections are in response to items not fully addressed or as the
result of information provided, the text in bold print indicates the
unresolved issue.
3. Please provide notes on the plans to show the suspended ceilings in Seismic
Design Categories D, E & F comply with ASCE 7-05 Section 13.5.6.2.1 as
follows: These requirements apply to all new constructed suspended
ceilings as shown on the reflective ceiling plan.
a) All ceilings shall use a Heavy Duty T-bar grid system.
b) The width of the perimeter supporting closure angle shall be not less than
2 inches.
c) In each orthogonal horizontal direction, one end ofthe ceiling grid shall be
attached to the closure angle.
d) The other end in each horizontal direction shall have a clearance from
the wall and shall rest upon and be free to slide on a closure angle or a
listed assembly.
e) Ceilings without rigid bracing must have 2" oversize trim rings for
sprinklers and other ceiling penetrations.
4. Please show the compressor and vacuum pump to be installed per sections
1325 and 1326 ofthe UPC. No information provided.
5. Please indicate if the vacuum pump is connected to the water system? If so
please show the required reduced pressure principle back-flow prevention. No
information provided.
7. Please provide a roof plan clearly show the exhaust discharge of the vacuum
system to complywith section 1326.2 ofthe UPC. No information provided.
CityofCarlsbad 11-2701
1/27/12
8. Please indicate on the plans the location of the air intake for the compressor
showing it to complywith section 1325.3 ofthe UPC. No information provided.
Note : When alterations, structural repairs or modifications or additions are made to an
existing building, that building, or portigoof the buildipg^ffected, is required to comply
with all of the requirerlerife^r neW'l5uildin?jST-peF^cti requirements
applyy Jk
^9
'a) j A primary entrance to the building and the primarv path of travel to the
altered area, must be shown to comply with all accessibility features. Per
section 1114B the accessible path of travel shall to the maximum
extent possible coincide with the path of travel ofthe general public.
The path shown on the plan shows a general public path of travel of
approximately 68' and an accessible path of travel of 200'. Please
revise the plans to show the path of travel to coincide with the geners
path of travel.
To speeBHp the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes • No •
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
EsGil Corporation
In (Partnership tvith government for (Buifding Safety
DATE: 1/3/12 • APELiCANT
^"lURIS
JURISDICTION: CityofCarlsbad •"PLANREVIEWER
• FILE
PLANCHECKNO.: 11-2701 SET: I
PROJECTADDRESS: 2815 Jefferson Street Suite 300
PROJECT NAME: Staffon Dental Office - TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
^ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to fonward to the applicant
contact person.
^ The applicant's copy of the check list has been sent to:
Joe Walthour
166-11 North Singingwood Street, Orange, CA 92869
I I EsGil Corporation staff did not advise the applicant that the plan check has been completed.
IXI EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Joe Walthour (>(->A) Telephone #: 714-997-9852
Date contacted: ) | ^llZ- (by: 1^ ) Email: Fax #: 714-997-9857
Mail Telephone-^ Fax in Person
• REMARKS:
By: Doug Moody Enclosures:
EsGil Corporation
• GA • EJ • PC 12/27/11
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576
CityofCarlsbad 11-2701
1/3/12
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLANCHECKNO.: 11-2701 JURISDICTION: City ofCarlsbad
OCCUPANCY: B USE: Dental Office
TYPE OF CONSTRUCTION: VA ACTUALAREA: 1529sf
ALLOWABLE FLOOR AREA: STORIES: 3
HEIGHT:
SPRINKLERS?: Yes OCCUPANT LOAD: 21
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 12/22/11
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 12/27/11
DATE INITIAL PLAN REVIEW
COMPLETED: 1/3/12
PLAN REVIEWER: Doug Moody
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2009 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list for a copy) where each
correction item has been addressed, i.e.. plan sheet number, specification section, etc.
Be sure to enclose the marlced up list when vou submit the revised plans.
CityofCarlsbad 11-2701
1/3/12
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carisbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed bythe City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
1. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
2. Provide a section view of the new hard lid ceilings. Show:
a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify
manufacturer and approval number or indicate "to be ICBO approved".
b) Method of attaching top to the structure and lateral bracing.
c) Show height of the hard lid ceilings from floor, hard lid ceilings to roof
framing or floor framing.
3. Please provide notes on the plans to show the suspended ceilings in Seismic
Design Categories D, E & F complywith ASCE 7-05 Section 13.5.6.2.1 as
follows:
a) All ceilings shall use a Heavy Duty T-bar grid system.
b) The width of the perimeter supporting closure angle shall be not less than
2 inches.
c) In each orthogonal horizontal direction, one end of the ceiling grid shall be
attached to the closure angle.
d) The other end in each horizontal direction shall have a VA clearance from
the wall and shall rest upon and be free to slide on a closure angle or a
listed assembly.
e) Ceilings without rigid bracing must have 2" oversize trim rings for
sprinklers and other ceiling penetrations.
4. Please show the compressor and vacuum pump to be installed per sections
1325 and 1326 of the UPC.
5. Please indicate if the vacuum pump is connected to the water system? If so
please show the required reduced pressure principle back-flow prevention.
CityofCarlsbad 11-2701
1/3/12
6. Please indicate if water will be supplied to the dental chairs? If so please show
the required reduced pressure principle back-flow prevention.
7. Please provide a roof plan cleariy show the exhaust discharge of the vacuum
system to comply with section 1326.2 ofthe UPC.
8. Please indicate on the plans the location of the air intake for the compressor
showing it to comply with section 1325.3 ofthe UPC.
9. Provide separate restroom facilities for each sex as per UPC, Section 412.1.
10. Please note on the plans "All patient care receptacles and fixed equipment shall
comply with Section 517.13(A) and 517.13 (B). All patient care receptacles and
fixed equipment be grounded by an insulated copper conductor sized per Table
250-122. In addition the circuits serving patient care receptacles and fixed
equipment shall be installed in a metal raceway or cable that qualifies as an
equipment grounding return path in accordance with section 250-118.
11. Please have the document author and the principle designer of the LTG-1 C form
sign the imprinted document.
Note : When alterations, structural repairs or modifications or additions are made to an
existing building, that building, or portion ofthe building affected, is required to comply
with all of the requirements for new buildings, per Section 1134B.2. These requirements
apply as follows:
a) A primary entrance to the building and the primarv path of travel to the
altered area, must be shown to comply with all accessibility features.
b) Existing sanitary facilities that serve the remodeled area must be shown to
comply with all accessibility features.
12. Please revise the plans to show the store room to be disabled accessible per
1105B.3.6ofthe CBC.
13. Revise plans, or door schedules, to show that every required passage door has
>32" clear width for door #5, per Section 1133B.2.
14. Show that the minimum strike edge distances are provided at the level area on the
side to which a door swings for door #2, per Section 1133B.2.4.3:
a) >18" at interior conditions.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
CityofCarlsbad 11-2701
1/3/12
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes • No •
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
CityofCarlsbad 11-2701
1/3/12
[DO NOT PAY- THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CityofCarlsbad PLANCHECKNO.: 11-2701
PREPARED BY: Doug Moody DATE: 1/3/12
BUILDING ADDRESS: 2815 Jefferson Street Suite 300
BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VA
BUILDING
PORTION
AREA
( Sq. Ft.)
Valu ation
Multiplier
Reg.
Mod.
VALUE ($)
Tl 1529 50.30 76,909
Air Conditioning
Fire Sprinklers
TOTAL VALUE 76,909
Jurisdiction Code cb By Ordinance
BIdg. Permit Fee by Ordinance
Plan Checl< Fee by Ordinance
Type of Review:
I [Repetitive Fee
~ Repeats
H Complete Review
• Other
|—I Hourly
EsGil Fee
• Structural Only
Hr. @
$582.92
$378.90
$326.44
Comments:
Sheet 1 of 1
macvalue.doc +
CITY OF
CARLSBAD
BUILDING PLANCHECK
CHECKLIST
QUICK-CHECK/APPROVAL
Development Services
Land Deveiopment Engineering
1635 Faraday Avenue
760-602-2750
www.carlsbadca.gov
ENGINEERING Plan Check for CB 11-2701 Date: 12/27/11
Project Address: 2815 JEFFERSON ST APN: 230-110-29
Project Description: CONVERT OFFICE SPACE INTO DENTAL OFFICE Valuation: 76,305
ENGINEERiNG Contact: Kathleen LawrencG
Phone: 760-692-2741
Email: kathleen.lawrence@carlsbadca.gov
Fax: 760-602-1052
• RESIDENTIAL !ZJ TENANT IMPROVEMENT
n RESIDENTIAL ADDITION MINOR
(<$20,000.00)
• PLAZA CAMINO REAL
• CARLSBAD COMPANY STORES COMPLETE OFFICE BUILDING
• OTHER:
OPFICIAI. USE ONLY
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMiT
BY: KATHLEEN LAWRENCE
REMARKS:
DATE: 12/27/11
Notification of Engineering APPROVAL has been sent to
via on
E-36 Page 1 of 1 REV 4/30/11
Fee Calculation Worksheet
ENGINEERING DIVISION
Prepared by: Kathleen Lawrence Date: 12/27/11 GEO DATA; LFMZ: /B&T:
Address: 2815 Jefferson (going from reg offices to med offices) BIdg. Permit #: CBl 1-2701
Fees Update by: KML Date: Fees Update by: Date:
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: MEDICAL OFF
Types of Use:
Types of Use;
Types of Use:
Sq, Ft./Units 1517 SF
Sq,Ft./Units
Sq,Ft./Units
Sq.Ft./Units
ADT CALCULATIONS: List types and square footages for all uses.
EDU's
EDU's
EDU's
EDU's
CREDIT
Sq.Ft./Units 1517 SF
Sq.Ft./Units
Sq.Ft./Units
Sq.Ft./Units
Types of Use: MEDICAL OFF
Types of Use:
Types of Use:
Types of Use:
FEES REQUIRED:
Within CFD: DYES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee)
ADT's
ADTs
ADT's
ADT's
46 ADTS
1517/1000=1.517
1.517X30 (50-20) =
46 Addtl ADT's
• NO
1, PARK-IN-LIEU FEE:nNW QUADRANT ONE QUADRANT DSE QUADARANT GSW QUADRANT
ADTS/UNITS:
2. TRAFFIC IMPACT FEE:
ADTS/UNITS: 46
3. BRIDGE & THOROUGHFARE FEE:
ADT'S/UNITS:
4. FACILITIES MANAGEMENT FEE
ADTS/UNITS:
5. SEWER FEE
EDU's
BENEFIT AREA: '
EDU's I >
6. DRAINAGE FEES: PLDA:
ACRES: I >
7. POTABLE WATER FEES:
UNITS CODE
X FEE/ADT:
X FEE/ADT: $110
• DIST#1
X FEE/ADT:
ZONE:
X FEE/SQ.FT./UNIT:
X FEE/EDU:
X FEE/EDU:
•HIGH
C FEE/AC:
CONN. FEE
=$ N/A
=$ $5,060.00
• DIST.#2
=$ N/A
=$ N/A
|DIST.#3
MED
=$ N/A
=$ N/A
UM
=$ N/A
•LOW
METER FEE SDCWA FEE TOTAL
CITY OF
CARLSBAD
STORM WATER
COMPLIANCE
ASSESSMENT
B-24
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
am applying to the City of Carlsbad for the following type(s) of construction permit:
Building Permit • Right-of-Way Permit X
y project is categorically EXEMPT from
the requirement to prepare a storm water
pollution prevention plan (SWPPP) because it
only requires issuance of one or more of the
following permit types:
Electrical
Fire Additional
Fire Alarm
Fixed Systems
Meciianical
Mobile Home
Plumbing
Patio/Deck
Photo Voltaic
Re-Roofing
Sign
Spa-Factory
Sprinkler
Water Discharge
Project Storm Water Threat Assessment Criteria''
No Thaeat Assessment Criteria
pLM^ project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because
'' >t meets the "no threaf assessment criteria on the City's Project Threat Assessment Worksheet for Detennination of Construction SWPPP Tier
Level. My project does not meet any of the High, Moderate or Low Threat criteria described below.
Tierl -
•
TVer 2 -
•
7/er3 •
•
•
LoMT r/ireaf/Assessment Criteria
My pnDject does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project
meets one or more of the following criteria:
• Results in some soil disturbance; and/or
• Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling).
Moderate TTtreat Assessment Criteria
My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria:
• Project requires a grading plan pursuantto the Carisbad Grading Ordinance (Chapter 15.16 of the Cartsbad Municipal Code); or,
• Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement
removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:
• Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or
• Disturbed area is tocated on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or
• Disturbed area is tocated along or within 30 feet of a storm drain Inlet, an open drainage channel or watercourse, and/or
• Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30).
Significant Threat Assessment Criteria
My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or
My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any
associated construction staging, equipment storage, refueling and maintenance areas: or.
My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant
potential for contributing pollutants to nearby receiving waters by way of stomi water mnoff or non-storm water discharge{s).
/ certify to tfie best of my knowledge that tlie above
checked statements are true and conect I understand
and acknowledge that even though this project does
not require preparation ofa construction SWPP, I must
stiff adhere to, and at all times during constmction
activities for tiie permit type(s) check above comply
wlOi the storm water best management practices
pursuant to Titie 15 of tiie Carlsbad Municipal Code
and to City Standards.
"The City Engineer may authorize minor variances from the Stomi
Water Threat Assessment Criteria in special circumstances where it
can be shown that a lesser or higher Constmction SWPPP Tier Level is
wananted.
Project Address: Assessor Parcel No.
Owner/Owner's Authorized Agent Name:
w
Agent Signature:
city ConcjiRWce:
a;/esauQ nB/u - Project ID: ,
B-24 Page 1 of 1 Rev.03/09
December 23, 2011
TO: BUILDING DEPARTMENT
FROM: Assistant Planner, Housing & Neighborhood Services
CB112701
I have reviewed the building plans for the above referenced building permit at
2815 Jefferson Street for a tenant improvement. The Housing and Neighborhood
Services Department supports issuing the building permit at this time. The
information has been entered into Permits Plus. If you have any questions,
please contact me at x2813.
AUSTIN SILVA
to (0 n OQQ
« $ S
OOO
m (0 a. Q.
0 • •
HDD
man
0 • •
REDEVELOPME/VT DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB ilt-lO\
Planner fto^^tV
Address
Phone (760) 434-
APN: UQ'l-'l
LL Type of Project & Use:
Zoning:_ Mk General Plan: M
CFD (in/out) #_Date of participation:
Net Project Densitv: V^/A DU/AC
Facilities Management Zone:
Remaining net dev acres:
Circle One (For non-residential development: Type of land used created by this
permit: )
Legend: ^ Item Complete [• Item Incomplete - Needs your action
Environmental Review Required: YES NO 7^ TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required:
APPROVAL/RESO. NO..
PROJECT NO.
YES NO TYPE
DATE
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone?YES_
CA Coastal Commission Authority? YES_
If California Coastal Commission Authority: Contact them at
103, San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
NO
7575 Metropolitan Drive, Suite
N0><
Habitat Management Plan
Data Entry Completed? YES _
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of Habitat
Type impacted/taken, UPDATE!)
*0 O n Inclusionary Housing Fee required: YES N
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES NO
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing
Y/N, Enter Fee, UPDATE!)
H:\ADMIN\COUNTER\BldgPlnchkRevCtiklst Rev 3/06
Site Plan:
CD CZI O Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
• • •
• • •
• • •
Policy 44 - Neighborhood Architectural Design Guidelines
1. Applicability: YES NO
2. Project complies YES NO
Zoning: \l
1. Setbacks:
Front: Required
Interior Side: Required
Street Side: Required
Rear: Required
Top of slope: Required
dl IZI CD 2. Accessory structure setbacks:
Front: Required
Interior Side: Required
Street Side: Required
Rear: Required
Structure separation: Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
• • •
• • •
• • •
• • •
3. Lot Coverage:
4. Height:
5. Parking:
Required
Required
Spaces Required
Shown
Shown
Shown
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
Additional Comments S&e Me./Aj Ki>i"(//i^^ J^Jg^
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER
H:\ADIVIIN\COUNTER\BldgPinchkRevChklst
M/<^ PATE Ip///
Rev 3/06
Carlsbad Fire Department BLDCT. nEPT copy
Plan Review Requirements Category: TI, COMM
Date of Report: 02-06-2012
Name: JOE WALTHOUR
Address: 166-11 N. SINGINGWOOD ST
ORANGE CA
92869
Permit #: CBl 12701
Job Name: STAFFON DENTAL: OFF TO DENTAL
Job Address: 2815 JEFFERSON ST CBAD St: 300
Reviewed by: _^^^^0-Z^^^
TNCDMPtETE Tin- imm yAll Tmm .MiUinittpH fnr rpYi^W ic ja<^-«iit|i1i-«n ^ I fliii- timr'^ tliin nffirn nnnnnt .
^Hp.qiia)Hly i.iiiiilm.t n i-nvinw tn di-ti-rmini-. iMiiiiplinnPf^ xnnth thp applj^^flblf <^nf!f<f 'iriH/nr Ft^lll^^l•l^^ Plnmi- I-I-I'II-VF
^.nrcfiillv nil RDTtimnntr. nttaGhoH Plonjin rwruhmit thr' nRces.sary planp anrl/nr oppn^fif'qtjnnc ^uriih r^linngnn "oUnHnH"
•to this office for review and approvalr-
Conditions;
Cond:CON0005211
[MET]
APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
Entry: 02/06/2012 By: df Action: AP
RECOMMENDED FOR APPROVAL BLDG. DEPT COPY
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
T. (760) 724-7001 Email: kitflre@sbcglobal.net
Page: 1 of 1
Checked by: Anne Marie Bland
Date: Januarv 20. 2012
APPLICANT: Joe Walthour JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Dental Office PROJECT ADDRESS: 2815 Jefferson Ste. 300
PROJECT DESCRIPTION: CBl 12701 Tenant Improvement
INSTRUCTIONS
This plan review has been conducted in order to verify conformance to minimum requirements of codes
adopted by the Carlsbad Fire Department.
The items below require correction, clarification or additional information before this plan check can be
approved for permit issuance.
Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates along with a descriptive narrative of corrections addressing all comments.
Please direct any questions regarding this review to: Anne Marie Bland 760-434-7885 or
ambland@pacbell.net
CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON
THiS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED
DIRECTLY TO:
ANNE MARIE BLAND
4380 CARMEL DRIVE
CARLSBAD, CA 92010
COMMENTS Comments emailed to: jwalthour@socal.rr.com
PN1.0 Plan Notes
Fire Notes
(Remove reference to Standard 10-1 from note 2. Current standard is NFPA 10, 2007 edition.
Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 14. Current standard is
NFPA 13, 2010 edition.
|Add the following note to the section - Plans for modifications to the existing fire sprinkler system must
be submitted to the Fire Department for review prior to making changes to the system.
IConstruction, alteration and demolition must comply with CFC Chapter 14. Add this note to the plans.
General Notes
INote 15 - reference 2010 CBC and applicable sections from this edition.
Note 20 - reference 2010 CBC and applicable sections from this edition.
Note 27 - reference 2010 CBC.
Note 30 - amend section reference 7610 to 710.
A3.0 Symbols Index; Door & Window Scheduie
Fire Notes
iRemove reference to UFC Article 81, NFPA 231, 2310 and 231D from note 12. Current standard is NFPA
13, 2010 edition.
RECOMMENDED FOR APPROVAL
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobai.net
Page: 1 of 1
Checked by: Anne Marie Bland
Date: January 20, 2012
APPLICANT: Joe Walthour JURiSDiCTION: Carlsbad Fire Department
PROJECT NAME: Dental Office PROJECT ADDRESS: 2815 Jefferson Ste. 300
PROJECT DESCRIPTiON: CBl 12701 Tenant Improvement
INSTRUCTiONS
This plan review has been conducted in order to verify conformance to minimum requirements of codes
adopted by the Carlsbad Fire Department.
The items below require correction, clarification or additional information before this plan check can be
approved for permit issuance.
Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates along with a descriptive narrative of corrections addressing all comments.
Please direct any questions regarding this review to: Anne Marie Bland 760-434-7885 or
ambiand@pacbeil.net
CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON
THiS FORM, AND A COPY OF BUiLDiNG DEPARTMENT (EsGii) COMMENTS MUST BE SUBMITTED
DIRECTLY TO:
ANNE MARIE BLAND
4380 CARMEL DRIVE
CARLSBAD, CA 92010
COMMENTS Comments emailed to: jwalthour@socal.rr.com
PN1.0 Plan Notes
Fire Notes
IRemove reference to Standard 10-1 from note 2. Current standard is NFPA 10, 2007 edition.
Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 14. Current standard is
NFPA 13, 2010 edition.
|Add the following note to the section - Plans for modifications to the existing fire sprinkler system must
be submitted to the Fire Department for review prior to making changes to the system.
IConstruction, alteration and demolition must comply with CFC Chapter 14. Add this note to the plans.
Generai Notes
iNote 15 - reference 2010 CBC and applicable sections from this edition.
iNote 20 - reference 2010 CBC and applicable sections from this edition.
[Note 27 - reference 2010 CBC.
INote 30 - amend section reference 7610 to 710.
A3.0 Symbols index; Door & Window Scheduie
Fire Notes
IRemove reference to UFC Article 81, NFPA 231, 2310 and 231D from note 12. Current standard is NFPA
13, 2010 edition.
CORRECTiON LIST BLDG. DEPT COPY
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
J. (760) 724-7001 Email: kitfire@sbcgiobai.net
Page: 1 of 1
Checked by: Anne Marie Bland
Date: Januarv 13. 2012
APPLICANT: Joe Walthour JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Dental Office PROJECT ADDRESS: 2815 Jefferson Ste. 300
PROJECT DESCRiPTiON: CBl 12701 Tenant Improvement
INSTRUCTIONS
This plan review has been conducted in order to verify conformance to minimum requirements of codes
adopted by the Carisbad Fire Department.
The items below require correction, clarification or additional information before this plan check can be
approved for permit issuance.
Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates along with a descriptive narrative of corrections addressing all comments.
Please direct any questions regarding this review to: Anne Marie Bland 760-434-7885 or
ambland@pacbell.net
CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON
THIS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGil) COMMENTS MUST BE SUBMITTED
DIRECTLY TO:
ANNE MARIE BLAND
4380 CARMEL DRIVE
CARLSBAD, CA 92010
COMMENTS
PN1.0 Plan Notes
Comments emailed to: jwalthour@socal.rr.com
Fire Notes
• Remove reference to Standard 10-1 from note 2. Current standard is NFPA 10, 2007 edition.
• Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 14. Current standard is
NFPA 13, 2010 edition.
• Add the following note to the section - Plans for modifications to the existing fire sprinkler system must be
submitted to the Fire Department for review prior to making changes to the system.
• Construction, alteration and demolition must comply with CFC Chapter 14. Add this note to the plans.
Generai Notes
• Note 15 - reference 2010 CBC and applicable sections from this edition.
• Note 20 - reference 2010 CBC and applicable sections from this edition.
• Note 27 - reference 2010 CBC.
• Note 30 - amend section reference 7610 to 710.
A3.0 Symbols index; Door & Window Schedule
Fire Notes
• Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 12. Current standard is
NFPA 13, 2010 edition.
CORRECTiON LIST
Daryl K. James & Associates, Inc.
205 Colina Terrace
Vista, CA 92084
T. (760) 724-7001 Email: kitfire@sbcglobal.net
Page: 1 of 1
Checked by: Anne Marie Bland
Date: Januarv 13. 2012
APPLICANT: Joe Walthour JURISDICTION: Carlsbad Fire Department
PROJECT NAME: Dental Office PROJECT ADDRESS: 2815 Jefferson Ste. 300
PROJECT DESCRIPTiON: CB112701 Tenant Improvement
INSTRUCTIONS
This plan review has been conducted in order to verify conformance to minimum requirements of codes
adopted by the Carlsbad Fire Department.
The items below require correction, clarification or additional information before this plan check can be
approved for permit issuance.
Corrections or modifications to the plans must be clouded and provided with numbered deltas and revision
dates along with a descriptive narrative of corrections addressing all comments.
Piease direct any questions regarding this review to: Anne Marie Bland 760-434-7885 or
ambland@pacbell.net
CORRECTED PLANS, DESCRIPTIVE NARRATIVE OF REVISIONS FOLLOWING EACH COMMENT ON
THIS FORM, AND A COPY OF BUILDING DEPARTMENT (EsGII) COMMENTS MUST BE SUBMITTED
DIRECTLY TO:
ANNE MARIE BLAND
4380 CARMEL DRIVE
CARLSBAD, CA 92010
COMMENTS Comments emailed to: jwalthour@socal.rr.com
PN1.0 Plan Notes
Fire Notes
• Remove reference to Standard 10-1 from note 2. Current standard is NFPA 10, 2007 edition.
• Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 14. Current standard is
NFPA 13, 2010 edition.
• Add the following note to the section - Plans for modifications to the existing fire sprinkler system must be
submitted to the Fire Department for review prior to making changes to the system.
• Construction, alteration and demolition must comply with CFC Chapter 14. Add this note to the plans.
General Notes
• Note 15 - reference 2010 CBC and applicable sections from this edition.
• Note 20 - reference 2010 CBC and applicable sections from this edition.
• Note 27 - reference 2010 CBC.
• Note 30 - amend section reference 7610 to 710.
A3.0 Symbols index; Door & Window Scheduie
Fire Notes
• Remove reference to UFC Article 81, NFPA 231, 231C and 231D from note 12. Current standard is
NFPA 13, 2010 edition.
TOPIC: Wall and Celling Construction - IBC/25/#2
CODE:
REVISED:
Structural Specialty Code: 2004 Edition
February 1,2006 [Paul Scarlett]
[Hank McDonald]
REFERENCE: Section 803.9.1 - Structurai Specialty Code
SUBJECT: Installation Standards for Suspended Celling System
and Lighting Fixtures
I.
QUESTION:
RESPONSE:
What standards does the Bureau use to review and Inspect
suspended ceiling systems? What are the standards for permit
application? When must existing ceilings be upgraded?
The Bureau accepts suspended ceiling systems which are either
engineered or which comply with the prescriptive design standard
as detailed below.
NEW SUSPENDED CEILiNQS - PRESCRIPTIVE DESIGN
For buildings that are classified as either Category I or II buildings by Table 1604.5
in the Oregon Structural Specialty Code (OSSC), the Bureau will accept suspended
ceilings that comply with the following prescriptive design standards without an
engineer or architect approved design.
A. Permit Application
The permit application for a suspended ceiling to be installed to this prescriptive
standard shall include three copies of manufacturer's data or ICC-ES Evaluation
Reports identifying that the system is a heavy duty system confomnlng to the
requirements of ASTM C635 - 00; provide a schedule of fixtures and other ceiling
supported equipment, devices and components and their weights; identify all
connection devices and their loading capabilities.
B. General
Celling system ciassification
All buildings within the jurisdiction of the City of Portland are considered as
seismic design category D. As such, all suspended ceiling systems tiiat
are installed using the provisions of this guide shall be classified as
"heavy-duty" ceiling systems as defined by ASTM C 635 - 00.
2. Limitations and allowances C^lhZlol
iBC/25/#2
installation Standards for Suspended Ceiling System and LIgiitIng Fixtures
Page 2 of 16
February 1,2006
a. General.
1) Use of this guide is limited to buildings with a seismic importance
factor (4) of 1.00 as determined by Table 1604.5 in the OSSC.
Suspended ceiling systems installed in buildings with a seismic
importance factor exceeding 1.00 must be engineered. For
engineered designs, see Part II of this guide.
2) Ceilings greater than 144 square feet in area with a length to width
ratio of 16:1 or greater between ceiling breaks or expansion joints
may not use the prescriptive bracing standards specified in this
guide. Such systems shall be engineered. For engineered designs
see Part II of this guide.
3) Specialty ceilings. Specialty ceilings, must be installed using an
engineered design and may not use the provisions of this guide.
Specialty ceilings include but are not limited to those:
a) Incorporating arched ceilings, curved or curvilinear ceilings or
sloped ceilings; or
b) Having no direct connection to the surrounding walls, such as
"free floating" or "cloud" ceiling elements.
4) Suspended ceilings without panels. Suspended ceilings where no
ceiling panels are installed may use the provisions of this guide
provided all of the provisions of the guide are incorporated into the
design including, but not limited to the requirements for:
a) Heavy duty grid;
b) Splay wires;
c) Lateral bracing; and
d) Compression struts.
Otherwise, such systems shall be engineered.
5) Suspended ceiling support. Each individual ceiling module must be
rigidly supported on two adjacent sides by walls, partitions or
soffits. Ceiling designs not meeting this requirement fall out of the
scope of this guide and must be engineered.
6) Weight limitation. Suspended ceilings installed according to this
prescriptive design shall not exceed 4 pounds per square foot.
This weight limitation includes the weight of the grid, panels and
any building components or elements Including but not limited to
light fixtures, mechanical services, electrical or communication or
control wiring or cables or insulation.
IBC/25/#2
Installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 3 of 16
February 1, 2006
b. interstitial space. The provisions of this guide apply to suspended
ceiling systems that have an interstitial space of 15 feet or less
between the suspended ceiling and the supporting structure.
c. Grid systems. Suspended ceilings installed to this prescriptive design
may use standard grid module systems that are not more than 5 feet in
any direction.
d. Ceiling panels.
1) Suspended ceilings installed to this prescriptive design may use
either standard acoustical lay-in ceiling panels, tegular or kerfed
ceiling panels.
2) Specialty ceiling panels such as metal or wood or similar panels
may also be used provided the panels:
a) Weigh less than 2.75 pounds per square foot; and
b) Are retained in the grid by clips or other mechanical fastening
devices designed to prevent the panels from dislodging in a
seismic event.
e. Installation of partitions. Ceilings installed according to this guide
shall not support partitions. Partitions may be attached to the grid for
cosmetic purposes provided:
1) The partition Is supported independently such that the connection
between the partition and the celling grid does not impose any
additional loads on the ceiling grid system; and
2) The connection of the partition to the grid does not cause the grid to
deflect or rotate more than allowed by other provisions of this
guide.
C. General installation Requirements [See Diagram 1]
1. Hanger requirements.
a. Hangers shall be located and sized as noted below. All hangers shall be
of soft annealed mild steel wire.
I4anger location
(measured in botii
directions)
IMinlmum Diameter
(In Inches)
American
Wire Gauge
number
4 feet on-center 0.080 12
5 feet on-center 0.102 10
b. Hangers shall be attached to ceiling suspension members and to supports
above with a minimum of three full tums within a 3 inch length.
iBC/25/#2
Installation Standards for Suspended Ceiling System and Ughting Fixtures
Page 4 of 16
February 1,2006
1) Hangers shall not press against pipes or ducts. Where hangers are
sloped they shall comply with the following:
a) Wires more than one in six out of plumb shall have countersloping
wires added.
b) Countersloping hangers shall be installed with a minimum 45
degree angle from the horizontal.
2) A trapeze or equivalent shall be used where obstructions prevent
direct attachment to the structure. Trapeze suspensions shall be level
to within 1/4 inch in 10 feet and shall be a minimum of back to back 1-
1/4 inch cold rolled channels when spans exceed 48 inches.
2. Hanger attachments. Hanger attachment devices shall be capable of
carrying either 200 pounds or 3 times the ceiling design load as shown by the
manufacturer's data or ICC-ES report, whichever is greater.
3. Carrying channels. Carrying channels and main runners shall be level to
within 1/4 inch in 10 feet. Leveling shall be perfomned with hangers taut.
Kinks or bends shall not be used to level channels or main runners. Wire
loops shall be tightly fomied to prevent any vertical movement.
4. Deflection limitations. Deflection from the installation of lighting fixtures or
other equipment shall be limited to ^/360 times the span between hangers.
Where the fixture or equipment causes a deflection in excess of ^/360 times
the span between hangers, the fixture or equipment shall be independently
supported as indicated in Section D. 2 j. A ceiling fixture installation shall not
cause the mnners to rotate more than two degrees from the horizontal.
D. Seismic Design Requirements
1. General.
a. Closure angle. The perimeter supporting closure angle horizontal leg
shall be not less than 2 inches. The closure angle supporting the grid wall
attachments as noted in b below shall be anchored to the perimeter walls
by at least one #6 screw directly attached to the wail framing at not more
than 24 inches on-center or by a means approved by BDS staff. [See
Diagram 3]
b. Grid attachment. One end of the grid shall be attached to the closure
angle at each of two adjacent walls. The grid shall be attached by screws,
rivets or other approved fasteners. The opposite end of the grid in each
horizontal direction shall rest upon the closure angle such that there is 3/4
inch clearance between the end of the grid and the wall and the grid is
free to slide on the closure angle. [See Diagrams 2,3 & 4]
2. Lateral Bracing Requirements
IBC/25/#2
installation Standards for Suspended Celling System and Lighting Fixtures
Page 5 of 16
February 1,2006
Lateral bracing shall be provided for suspended ceilings as follows:
a. Ceiling height allowance. Ceilings with a maximum of 12 inches
between the grid and structural support do not require lateral bracing or
compression struts.
b. Ceiling area bracing.
1) Ceiling areas less than 144 square feet. Ceiling areas 144 square
feet or less in area which are surrounded by walls or soffits which
connect directly to the structure above do not require additional lateral
bracing.
2) Ceiling areas greater than 144 square feet.
a) Ceilings in excess of 144 square feet in area shall be provided with
diagonal bracing (splay) wires. Bracing wires shall consist of four
0.080 inch (12 gauge) A.W.G. wires connected within 2 inches of
an intersection of a main runner with a cross runner, and splayed
90 degrees from each other at an angle not exceeding 45 degrees
from the plane of the ceiling. [See Diagrams 1 & 2]
(1) Wires are required within 6 feet of any wall and at 12 feet on-
center in each direction.
(2) Where ceilings are 12 feet or less in width, two rows of bracing
wires shall be provided. Wires shall be located off-center (less
than 6 feet from any wall) and shall be staggered in such a
manner that the wires are not directly across from one another.
Wires may be located up to 12 feet apart.
b) Splay wire alternate. As an altemate to the diagonal splay wires
specified above, ceilings may use rigid braces. Braces shall be
attached to the grid and to the stmcture above in a manner to limit
lateral deflections at the point of attachment to the ceiling to less
than 1/4 inch for the lateral loads expected for the system.
c. Perimeter wires. All perimeter wires shall conform to the requirements in
Section C, General Installation Requirements, of this guide. In addition, all
runners (mains or cross tees) shall be independently supported at the
perimeter within 8 inches of the wall or ceiling discontinuity. The wall
angle or closure strip shall not be used for this purpose. Perimeter wires
may be attached to perimeter walls instead of the stmcture above provide
the wires are positively attached to the wall by using a mechanical
fastener such as a drywall screw. The perimeter wire shall be attached to
the wall at a slope of not more than 1 horizontal:6 vertical. [See Diagrams
2, 3 & 4]
d. Compression struts [See Diagram 1]
IBC/25/#2
installation Standards for Suspended Celling System and Lighting Fixtures
Page 6 of 16
February 1,2006
1) A strut shall be provided at 12 feet on-center maximum, which shall be
fastened to the main runner and shall be extended and fastened to the
stmcture. The structure attachment shall be capable of supporting the
dead load of the compression stmt. A stmt which encapsulates a
hanger wire that is attached to the main mnner and the stmcture above
need not be separately attached to the mnner or the stmcture above.
2) Based on the maximum spacing of 12 feet on-center in each direction,
the following stmt sizes and corresponding maximum lengths may be
used:
Max. Length
1/2" diameter conduit (EMT) 5'-10"
3/4" diameter conduit (EMT) 7'-8"
1" diameter conduit (EMT) 9'-9"
Single 162S125-33 metal stud 12'-0"
(1-5/8" X 20 gauge)
Back to Back 162S125-33 metal studs 15'-0"
(1-5/8" X 20 gauge)
Single 250S125-33 metal stud 13'-6"
(2-1/2" X 20 gauge)
Back to Back 250S125-33 metal studs
(2-1/2" X 20 gauge) 15'-0"
Where utilizing a strut that is not indicated on the table above, the strut
shall be capable of resisting the vertical component of 180 pounds
induced by the wires.
e. Seismic separation Joints required. [See Diagram 7]
1) General. Ceilings with an area greater than 2,500 square feet shall be
provided with seismic separation joints. Separation joints shall divide
the ceiling area into areas less than 2,500 square feet and shall allow
for a minimum of 2 inches of lateral movement of the ceiling providing
1 inch of movement for the portions of ceiling located on either side of
the separation joint. Each 2,500 square foot ceiling area shall have its
grid attached to a closure angle or other approved device on two
adjacent sides as required in section D 1 above.
2) Alternate. In lieu of seismic separation joints, the ceiling may be
divided into areas less than 2,500 square feet by the use of partitions
or soffits as described below. [See Diagram 6]
IBC/25/#2
Installation Standards for Suspended Celling System and Lighting Fixtures
Page? of 16
February 1,2006
a) Partitions. Where used, partitions shall extend a minimum of 6
inches above the level of the plane of the grid and shall be
independently braced to the structure above.
b) Soffits. Where used, soffits shall extend to a point at least level
with the plane of the grid and shall be independently supported and
braced to the stmcture above.
f. Spacing of bracing members. Lateral force bracing members shall be
spaced a minimum of 6 inches from all horizontal piping or duct wori^ that
is not provided with horizontal bracing restraints.
g. Wire attachment. Wire attachment devices shall be attached to the
stmcture and support a design tension load of at least 200 pounds of pull
out. Powder-driven pins shall not be allowed as acceptable attachment
devices in concrete construction based on the prohibition of their use by
ASCE 9.6.1.6.5. The following table is provided to give guidance for
alternates to powder driven pins:
Construction Type Fastener
Wood 1/4" X 3" screw eyes
Steel deck Pre-drop wires, CMI DC1 or DC
2 1/4" metal deck screw eyes
Post tension concrete Pre-drop wires, embeds, 1/4 x
3/4" metal hit anchors
Poured in place concrete Pre-drop wires, embeds, 1/4 x
3/4" metal hit anchors
h. Stabilizing members. Members perpendicular to the wall at the
unattached sides of the grid shall be tied together (stabilized) to prevent
their spreading. Members shall be tied together at a point not more than 8
inches from and parallel to the wall. [See Diagrams 2 & 4]
i. Ceiling mounted light fixtures, egress lights, speakers, air terminals
and mechanicai services. [See Diagram 8]
Lighting fixtures, egress lighting, speakers, air temninals or mechanical
services weighing up to 56 pounds and directly supported by the ceiling
grid system shall be positively attached to the ceiling system. Attachment
shall be made with a minimum of 4 approved fasteners located within 3
inches of the grid intersections to suspension main runners, or to cross
runners with the same carrying capacity as the main runners.
In addition to the above grid connection fixtures weighing 20 pounds but
not more than 56 pounds, shall have two 0.080 inch (12 gauge A.W.G)
IBC/25/#2
installation Standards for Suspended Celling System and Lighting Fixtures
Page 8 of 16
February 1,2006
hangers connected from the fixture to the ceiling system hangers or to the
stmcture above. These wires may be slack.
Fixtures weighing less than 20 pounds do not require slack wires. [See
Diagram 10]
Fixtures weighing more than 56 pounds shall be supported independently
from the grid system directly from the structure above by approved
hangers.
J. Ceiling penetrations. Sprinkler heads or other similar ceiling
penetrations shall be provided with at least one inch of clearance in all
directions surrounding the sprinkler head or extension. The opening shall
allow for at least 11nch of lateral movement by the ceiling, in any
horizontal direction, without causing damage to the sprinkler head or
extension.
Where either of the following alternates is used, the opening surrounding
the penetration may be reduced to 1/4 inch.
1) Where rigid braces as described in Ceiling area bracing, splay wire
altemate above (I D 2 b 2) b)) are used or,
2) If the sprinkler head or other penetration is provided with a listed
flexible connector capable of accommodating 1 inch of ceiling
movement in all horizontal directions without banning the sprinkler
head or other protmsion. [See Diagram 9] .
k. Cable trays, electrical conduit, communication cable and other similar
installations shall be supported independently from the ceiling.
3. Special Inspection.
Special inspections will not be required for suspended ceiling systems
installed in compliance with all of the prescriptive standards specified in this
guide.
II. NEW SUSPENDED CEILINGS • ENGINEERED DESIGN
A. General
An "engineered design" for a suspended ceiling shall be designed and certified
by an architect or engineer, registered in the State of Oregon. Engineered
systems shall include support of lighting, mechanical systems or partitions.
B. Permit Application
The permit application for a suspended ceiling to be installed according to an
engineered design shall include three copies of certified drawings and
specifications, and one copy of calculations, prepared by an architect or engineer
IBC/25/#2
installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 9 of 16
February 1,2006
registered in the State of Oregon. The submittal shall show that the ceiling
system's capacity to resist vertical loads and seismic loads in compliance with
applicable code chapters and standands; shall identify whether the suspension is
light, intermediate, or heavy duty; and shall Identify all connection devices and
their allowable capacities. The submittal shall include appropriate substantiating
data, manufacturer's data and ICC-ES Evaluation Reports.
Ili. Upgrading of Existing Ceilings
A. Ceilings without Seismic Bracing
Where existing ceilings are without seismic bracing, the ceiling system shall be
brought into substantial compliance with current code requirements (Including
compression stmts at the center of the splayed wires, attachment of slack wires
from light fixtures and air terminals to the stmcture, etc.) when a substantial
amount (50% or more) of the ceiling tile is removed, altered or repaired as part of
a general space alteration, or if all the celling is removed for washing, painting or
replacement. This requirement does not trigger the need for a closure angle as
required above in part ID 1 of this guide.
These upgrades are not required when:
1. Removing portions of tiles or panels and/or grid to alter ductwori^, sprinkler
pipe, etc.
2. Lateral bracing and fixture attachment will not be required when portions
of a ceiling are removed only to facilitate the installation of sprinkler piping.
B. Ceilings without Compression Struts
Where existing ceilings have seismic bracing but do not have compression stmts
at the center of the splayed wires, the addition of compression struts will only be
required when and where the grid is replaced, altered, raised or lowered.
Attachments:
The diagrams included with this guide are intended to help clarify for the user some of
the requirements specified in the guide. These diagrams are not design or constmction
documents and are intended only to illustrate some of the technical aspects of the
guide.
Updates March 1,1999 edition
Replaces Code Guide UBC 47/#1 which replaced
Policy & Procedure #=s D-36, D-37 & D-38.
IBC/25/#2
Installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 10 of 16
February 1,2006
*J.«i(EMBERS»|Th|fi
mmmm.
CCWPRE5SI0N STRUT
*1 '?O.C.MCMWAy
SEFiWATE ajiw?r ms. cawjuiTs, ere.
SSyjRE KUKGK S TO BUIl»G WE
nW^ZE A<?aM DUCmORK AND OT»€l!
C3KSSTCEF|T
8Fr*WENMAWRUM€RS
SSBBBBSH
C£H»i1iRSlOPE
HANGERS IF W3f!E
THiW1JiaiTCyn.Uf(l6
BOBBaBBBB
tMNRUWtERSATiOi'C
SUWRT'/»|r^(#1?HA)«3Rft1l^
AT4'ac'c«»i9fff*£»rroc.-
4'j-Q.c (Siraci-
Diagram 1: General Installation Requirements
IBC/25/#2
Installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 11 of 16
February 1,2006
ATTACHED
X
o
UNATTACHED
Diagram 2: Typical Ceiling Grid Layout
IBC/25/#2
InstaUation Standards for Suspended Ceiling System and Lighting Fixtures
Page 12 of 16
February 1,2006
« SCREW
sama-
Diagram 3: Unattached End of Grid
51
•• S" HAS
2" •
Diagram 4: Attached End of Grid
BEST COPY
iBC/25/#2
installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 13 of 16
February 1,2006
7 WAI I
WTMNrOFWAll
STASUZEB BAR mm r OFWAU
TYPICAL 4'CRKS
flgOUIREO OHLV AT UNAHK^ED SIDE
APPROVED FASTNEB
SEE DIO
Diagram 5: Perimeter Wires & Stabilizer Bar
IBC/25/#2
Installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 14 of 16
February 1,2006
) n O O O O
ajpeacacacsacaesscaEacsicai
Soffit laterally braced to structure above
o o o O n o
tts3t=icac=3ac=ae3c=iE3csiajeac
Diagram 6: Soffit Detail
SEISMIC SEPARATION JOINT
PER MANUFACTURER-
^ 0 ^-iTp!.0--f -° > 0 0
k-2"-H
3-
Diagram 7: Seismic Separation Joint
iBC/25/#2
installation Standards for Suspended Ceiling System and Lighting Fixtures
Page 15 of 16
February 1,2006
HANGER MRES
mm
AWES
HAftSERWIKS
lIGHIFyclURE
siecoce SECTON t)2i
Diagrams: Fixture Support
BEST COPY
iBC/25/#2
installation Standards for Suspended Ceilmg System and LIghtInq Fixtures
Page 16 of 16
February 1, 2006
flam. (9'* " • «« • EXPCStSTE
CSCSVSTEM
Diagram 9: Alternate Sprinkler Penetration
araa SYSTEM
I
Diagram 10: Light Fixture - Less Than 20 Pounds
INDUSTRIAL WASTEWATER DISCHARGE PERIVIIT
, / SCREENING SURVEY
street Address.
Email Address
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: {ON REVERSE SIDE CHECK TYPE OF BUSINESS)
Check all below that are present at your facility:
Acid Cleaning
Assembly
Automotive Repair
Battery Manufacturing
Biofuel Manufacturing
Biotech Laboratory
Bulk Chemical Storage
Car Wash
Chemical Manufacturing
Chemical Purification
Dry Cleaning
Electrical Component
Manufacturing
Fertilizer Manufacturing
Film / X-ray Processing
Food Processing
Glass Manufacturing
Industrial Laundry
Ink Manufacturing
Laboratory
Machining/Milling
Manufacturing
Membrane Manufacturing
(i.e. water filter membranes)
Metal Casting /Forming
Metal Fabrication
Metal Finishing
Electroplating
Electroless plating
Anodizling
Coating (I.e. phosphating)
Chemical Etching / Milling
Printed Circuit Board
Manufacturing
Metal Powders Forming
Nutritional Supplement/
Vitamin Manufacturing
Painting/ Finishing
Paint Manufacturing
Personal Care Products
Manufacturing
Pesticide Manufacturing /
Packaging
Pharmaceutical Manufacturing
(including precursors)
Porcelain Enameling
Power Generation
Print Shop
Research and Development
Rubber Manufacturing
Semiconductor Manufacturing
Soap / Detergent Manufacturing
Waste Treatment / Storage
SIC Code(s) (if known):
Brief description of business activities (Production/Manufacturing Operations):
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):
Estimated volume of industrial wastewater to be discharged (gal/ day):
List hazardous wastes generated (type/volume):
Date operation began/or will begin at this location:
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority?
Yes No Ifyes, when:
Site Contact Title
Signature
ENCINA W
Phone No.
.TY, 6200 Avenida Encinas Cartsbad. OA 92011 {760)438^3941
FAX: (760) 476-9852
^ PLUIVIBING, Develooment Services
<^C^ ELECTRICAL, Building Division
^ CJY OF MECHANICAL iess Faraday Avenue
r-AOi CDA^^ WORKSHEET 7605022719
V^AKLODAU g.lg www.carlsbadca.gov
Project Adciress: Permit No.:
Information provided below refers to wortt being done on the above mentioned permit only.
This form must be completed and returned to the Buildinq Division before the permit can be issued.
Building Dept. Fax: (760) 602-8558
Number of new or reloccAed fixtures, traps, or floor drains ^
New building sewer line? Ves No
Number of new roof drains?
Install/alter water line?
Number of new water heaters?
Number of new, relocated or replaced gas outlets? ^
Number of new hose bibs? ^
Tenant Improvement/Remodels:
Number of existing Panels Onvolved in this project) Amps per panel Gn this/project)
Remodel only - (relocate/add outlets/switches) Ves \/ No
New Conttructiont Number of new panels or subpanels?
Amps per Panel:
Single Phase Number of new amperes
Three Phase Number of new amperes_
Three Phase 480 Number of new amperes
Number of new furnaces, A/C, or heat pumps? (P
New or relocated duct worb? Ves i/^ No
Number of new fireplaces? t7
Number of new exhaust fans? I
Relocate/install went? \
Number of new exhaust hoods? O
Number of new boilers or compressors? Number of HP
B-18 Page 1 of 1 Rev. 03/09
SAN DIEGO REGIONAL
HAZARDOUS IVIATERIALS QUESTIONNAIRE
OFFICE USE ONLY
upFP#
HV#
BP DATE
Business Name _ Business Contact
^ Sf. CiMUc^A CA'"' Qz-ffu
^ vA IL City , I . state Zip Cod Zip Code
APN# ,, ^ _
Plan File#
Project Cpnti ep^sne #
' L The following questions represent the facility's activities, NOT the specific project description.
PART I: FiRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSiFICATION: indicate by circling the item, whether your business
will use, process, or store any of the following hazardous materials. If any of the items are circjed^DBll^t must contact the Fire Prgjection Agency with
jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): 1^1 f \? Occupancy Rating: _
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. NoneofThese.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART il: SAN DiEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD): If the answer to anv of the
questions is yes, appiicant must contact the County of San Diego Hazardous Materials Division, 5500 Overiand Ave., Suite 110, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED. Project Completion Date: / / Expected Date of Occupancy: /___/__
(far new eewetmotion or romodoling projeete) NO
• Is your business listed on the reverse side of this form? (check all that aJply). i-» A i r\
• ^Will your business dispose of Hazardous Substances or Medical Waste i any amount? i Ml U
}^ Will your business store or handle Hazardous Substances in quantities i qual to or greater than 55 gallons, 500 pounds
•
•
•
•
200 cubic feet, or cardnogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tanl|?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 62, Article
Will your business store petroleum in tanks or containers at your fs :ilH
or greater than 1,320 gallons? (Califomia's Aboveground Petroleum Sto agi
DEC 2 2 2011
r.ni\iFM
• CalARP Exempt
I
Date Initials
• CalARP Required
Date Initials
• CalARP Complete
/
Date Initials
PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer tcrgfiyof the questions below is yes,'applicant must contact the Air
Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 priorto the issuance ofa building or demolition
permit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 vvorking days prior to
commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information.
1.
YES NO
• •
• •
• •
• •
• •
Will the subject facility or constmction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD fectsheet at http://www.sdapcd.orQ/info/fects/permits.pdf. and the list of typical equipment requiring an APCD pennit pn the reverse side
ofthis fr-om. Contact APCD if you have any questions).
(ANSWER ONLY IF QUESTION 1 IS YES) Will the subject fecility be located within 1,000 feet of the outer boundary of a school (K through 12)?
(Search the Caiifomia School Directory at http://www.cde.ca.gov/re/sd/ fbr public and private schools or contact the appropriate school district).
Has a survey been perfbrmed to determine the presence of Asbestos Confeining Materiais?
Will there be renovation that involves handling of any friable asbestos materiais, or disturbing any material that contains non-friable asbestos?
Wili there be demblitiqn involving the removal of a load supporting stmctural member?
Briefly describe business activities: Briefly describe proposed project:
i declare under penalty of perjury that to the best of my knowledge and belief the responses made herein are tme and conect.
Name of Owner or Authorized Agent Signature of Owner or Authorized Agent Date
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:.
BY:
FOR OFFICIAL USE ONLY:
DATE:
EXEMPURNO FURTHER INFORMATION REQUIREO RELEASED FOR BUILOING PERMn BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
APCD COUNTY-HMD APCD COUNTY-HMD APCD
5^ REVIEW
imf J
HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division
>
O 00
3!
-n cn
O D m
>