HomeMy WebLinkAbout2816 AVENIDA VALERA; ; CB920861; Permit. - BUXLDING PERMZT Permit 30: CB32C861 '25/92 10:45 Project No: A9203922
3 1of 1 Development No :
Job Address: 2816 AVENIDA VALERA Suite:
Permit Type: SINGLE FAMILY DWLNG - DETACHED
Parcel No: 216-460-25-00 Lot#: 11
I Valuation: 212,693
Construction Type: VN mi0 wmm 0001 01 02
Occupancy Group: R3/M2 Reference#: 92--636 St&M IS~m.00
Description: 2365 SF.+ 661 SF GARAGE PLAK 4 App 1 i ed : 0 8/ 2 4/ 9 2
: PHASE 1 Apr/Issue: 08/25/92
Validated By: MD?
Appl/Ownr : FIELDSTONE/LA COSTA ASSOC. 619 546-8226
5465 MOREHOUSE DRIVE #250
SAN DIEGO, CA 92121
*** Fees Reauired **A *** Fees Collected & Credits *** ______________-__-----------
Fees :
Adjustments:
Total Fees:
Fee description __-_________________
Building Permit
Plan Check
Strong Motion Fee
or manually enter
Enter F.M.F./G.M.F
Enter "Y" to Autoc
Enter "Y" to Autoc
Enter "Y" to 'Autoca * BUXLDING TOTAL
Enter "X" for Plumhi
Each Plumbing Fixtur
Each Building Sewer-
Each Water Heater and/or
Gas Piping System
Each Vacuum Breaker
.or)
350.00
12,787.00
Ext fee Data
---_-__I-------_
1035.00
673.00
21.00
2200.00
310.00 Ob
3871.00 Y
408. oc
3573.02
362.00 Y
530.00 Y
12983.00
7.50 Y
40.00
6.50
2.50
2.50
5.00 * PLUMBING TOTAL 0
Enter "Y" for Electric Issue Fee > 0
Single Phase Per AMP > 125 * ELECTRICAL TOTAL 0
Enter 'Y' for Mechanical Issue Fee> 0
Install Furn/Ducts > 1
Each Install/Reloc Appliance Vent > 4
Each Hood/Fireplace > 1 * MECHANICAL TOTAL 0
64.00
10.00 Y
.25 31.25
41.00
15.00 Y
9.00 9.00
4.50 18.00
6.50 6.50
49.00
W CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
3, I
FINAL BUILDING INSPECTION
1
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M
PLAN CHECK#: CB920861
PERMIT#: CB920861
PROJECT NAME: 2638 SF + 661 SF GARAGE PLAN
PHASE 1
ADDRESS: 2816 AVENIDA VALERA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
4
WATER
DATE :
PERMIT
04/23/93
TYPE: SFD
DATE
INSPECTED: 7/X!?3- APPROVED DISAPPROVED -
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
FINAL BUILDING INSPECTION
4
DEPT: BUILDING ENGINEERING FIRE NG U/M
LAN CHECK#: CB920861 F :WIT#: CB920861
PROJECT NAME: 2638 SF + 661 SF GARAGE PLAN
PHASE 1
ADDRESS: 2816 AVENIDA VALERA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
4
WATER
DATE: 04/23/93
PERMIT TYPE: SFD
INSPECTED +/ DISAPPROVED - BY: & DATE INSPECTED: -!5/5/93 APPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED __
1
FINAL BUILDING INSPECTION
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB920861
PERMIT#: CB920861
PROJECT NAME: 2638 SF + 661 SF GARAGE PLAN
PHASE 1
DATE: 04/23/93
PERMIT TYPE: SFD 4
ADDRESS: 2816 AVENIDA VALERA
CONTACT PERSON/PHONE#: ALLISON/438-0468 SEWER DIST: LC WATER DIST: CA
INSPECTED:4zg*w APPROVED - DISAPPROVED - INSPECTE DATE
BY :
' INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED: APPROVED - DISAPPROVED -
FINAL BUILDING INSPECTION
*
DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER
PLAN CHECK#: CB920861
PERMIT#: CB920861
PROJECT NAME: 2638 SF + 661 SF GARAGE PLAN
PHASE 1
DATE :
PERMIT
4
ADDRESS: 2816 AVENIDA VALERA
CONTACT PERSON/PHONE#: ALLISON/438-0468
SEWER DIST: LC WATER DIST: CA
04/23/93
TYPE: SFD
DATE INSPECTED: w3 APPROVED & DISAPPROVED - INSPECTED
BY:
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
INSPECTED DATE
BY: INSPECTED : APPROVED - DISAPPROVED -
.I CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB920861 FOR 05/04/93 INSPECTOR AREA PY DESCRIPTION: 2638 SF + 661 SF GARAGE PLAN 4 PLANCKd CB920861
TYPE: SFD CONSTR. TYPE M JOB ADDRESS: 2816 AVENIDA VALERA STE : LOT: 11 APPLICANT: FIELDSTONE/LA COSTA ASSOC. PHONE: 619 546-8226 CONTRACTOR : PHONE : OWNER: PHONE :
PHASE 1 OCC GRP R3/Ml
REMARKS: RS/ALLISON/438-0468 SPECIAL INSTRUCT: c INSPECTOR
TOTAL TIME:
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical 49 ME Final Mechanical
***** INSPECTION HISTORY *****
DATE 021793 021793 021793 021193 021193 020493 020393 012993 012793 012693 012693 012593 012093 011893 121892 101492 101492
093092
DESCRIPTION Exterior Lath/Drywall Gas/Test/Repairs Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Insulation Insulation Rough Combo Frame/Steel/Bolting/Welding Rough/Topout Frame/Steel/Bolting/Welding Frame/Steel/Bolting/Welding Shear Panels/HD’s Shear Panels/HD’s Roof/Reroof Ftg/Foundat ion/Piers Ftg/ Foundat ion/Piers Underground/Under Floor
ACT INSP COMMENTS AP PY AP PY AP PY NR PY AP PY AP PY NS PY AP PY AP PY STRAP @ GARAGE NR PY NR PY AP PY AP PY co PY NO PLANS AP PY
AP MP AP MP AP MP
CORRECTION NOTICE
i
APPROVEDPL S SHALL BE ON JOB SITE
BUILDING
0 FOUNDATION
0 REINFORCING STEEL
MASONRY
0 FLOOR AND CEILING FRAME
0 SHEATHING
0 GROUT-GUNITE
FRAME
0 EXTERIOR LATH
0 INSULATION
INTERIOR LATH OR DRYWALL
PLUMBING
UNDERGROUND PLUMBING
0 UNDERGROUND WATER
17 ROUGH PLUMBING
TOP OUT PLUMBING
0 SEWER AND PUCO.
TUB OR SHOWER PAN
0 GASTEST
WATER HEATER
.
ELECTRICAL
0 TEMPORARY SERVICE
0 ELECTRIC UNDERGROUND
0 ROUGH ELECTRIC
0 POOL BONDING
0 ELECTRIC SERVICE
0 UFERGROUND
G.F.I.
0 SMOKE DETECTOR
MISCELLANEOUS
PLENUM AND DUCTS
0 COMBUSTION AIR
CONDITIONED AIR SYSTEMS
0 SOLAR
0 GRADING
0 POOL
PATIO
SIGN
0 OTHER
TIME:
DATE
INSPECTOR
BUILDING INSPEC~ON DEPARTMENT
PHONE - 438-3550
Note: Final Inspection Required
--r-+--.- -- 1- c__ . . -~-~~~~-~-- - - - - - -_ --- --A -LA-- - -_-_- - - - - - - T.-Tr--’u--uI--u
Cr)'j€Plhl: HPDI OEPF?RMFC,
UUI-H RF,~I~I~~FP APPPCJAC PY
THE SFF,:II\I. IMT.PE,. roc2
-~.-. - -. . _. __. __A
FIELDSTONE COMPANY
CO'JTP. DOING REPORTED WORK
1/2" $, 7 STRAND, 270 KSI CABLE, MIX 86525,
~_.
STRUCT. STEEL. ASSEMBLY GLLlE - LAM. FbeRICAf:9*i E) E I N FOPS ED CON C R E T E
X FJPE-STRFSSEC CONCRETE REINFORCE0 GYPSUM OTHER
R F I N r 3 PC F 0 MA SON R Y PI(.€ DRIVING
MUELLER LEWIS CONCRETE
148. RECEIVING 6 TESTING CONSTR. tAAl*-. S~X'DCE~
GAUGE 8C826, GAUGE #C8105
RC(ILDING PEWMI r *JU..<~EP
VISTA MARIANA & AVENIDA VALERA SEE BELOW . ~- __ .-. . -- - -. __ -- -. - . - ... - .. - ..
,PI* .A!>* ,,I Y',
INSP'N..
DATE -
_.
c~4e.1 FI~ c -I-..,=E?
I P.R.I., INC. -
C3ChTIONS OF WORK INSPECTED. TEST SAMPLES TAKEN, WQRK REJECTED, JOB PROBLEMS. PROGRESS. REMARKS. ETC.
l'l'LJDE5 1P1FORhIATlO'I 4ROlJ r - AMOIJNTS OF MATERI4L FLACED OR NORV PEPFORhlED.tJ'JI~WER.TVPE, 13E'1'.'10'5.
-,r 'CST TntAr! E5 yAKrbl. 5ln J'T rC'lrlECTlONS lWFl C5.4APF. H.T ROLT5 TOROUEDI SHECVED. ETr.
The post tension concrete work requiring special inspection was,
to the best of my knowledge, in conformance with the approved
plans and specifications and the applicable workmanship provisions
Lot t2
#3
84
l/ 5 I 6
17
#8
#9
#lo *fl
#12
#13
1114
1/15
#16
#l7
of the Uniform Building Code,
IC3 thru 11.
3203 Sitio Rosalia
3207 Sitio Rosalia
3212 Sitio Rosalia
3208 Sitio Rosalia
3204 Sitio Rosalia
2808 Avenida Valera
2810 Avenida Valera
2812 Avenida Valera
2814 Avenida Valera
2816 Avenida Valera
2818 Avenida Valera
2820 Avenida Valera
2822 Avenida Valera
2826 Avenida Valera
2828 Avenida Valera
2830 Avenida Valera
CB920-840
CB920-848
CB9 20-85 5
CB920-859
CB920-849
CB920-84 1
CB 9 20-8 3 6
CB 9 2 0- 8 6 0
CB 9 20-850
CB920-861
CB920-843
CB920-837
CB920-862
CB920-85 1
CB920-863
CB920-864
1988 Edition. Inspection reports
Lot #lo9
#110
1111
5112
f113
#l14
11115
8116
#I17 8118
f126
8127
11128
11129
8130
2825 Vista Mariana CB920-839
2823 Vista Mariana CB920-866
2821 Vista Mariana CB920-844
2817 Vista Mariana CB920-854
2815 Vista Mariana CB920-834
2811 Vista Mariana CB920-857
2809 Vista Mariana CB920-846
2807 Vista Mariana CB920-858
2805 Vista Mariana CB920-835
2803 Vista Mariana CB920-847
2811 Avenida Valera CB920-845
2813 Avenida Valera CB920-853
2815 Avenida Valera CB920-838
2817 Avenida Valera CB920-865
2819 Avenida Valera CB920-852
28 Day Compression test that did not reach the required PSI
Lot #3 - 2940 - 45 Days
#6 - 2970 - 60 Days
Remaining lots did meet required PSI. //r 28'4s.
DALE REGLI
7895 Convoy Coun
Sin Diego, California 9211 1 PROFESSIONAL REGISTERED INSPECTIONS, INC. Phone 292-0661
INSP".
DATE
32- FOR WEEK 1 No.*// I ENOINQ ON .... dJf ... k? ............., INSPECTORS WEEKLY REPORT -* 5
LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAUEN, WORK REJECTED, JOB PROBLEMS. PROGRESS; REMARKS, ETC.
INCLUDES INCORMATION A80UT -AMOUNTS OC MATCRIAL PLACED OR WORK PERCORMEOI NUMeER. TYPE. b I0ENT.NO'I.
OF TEST SAMPLES TAKEN; STRUCT. CONNECTIONS lWCLOS MAOE, H.T. SOLTI TORQUED) CF)ECKCO: ETC.
COVERING WORU PERFORMED EINFORCED CONCRETE STRUCT. STEEL ASSEMBLY 0 CLUE- LAM. FABRICATION
WHICH REQUIRED APPROVAL BY RE-STRESSED CONCRETE REINFORCED GYPSUM
I
PROFESSIWAL REGISTER INSPECTIONS, INC,
7895 Convoy Court tl5
Sen Dfego, Ca. 92111 JOB NO.: hQ11
JOB: FAIRWAYS
ADDRESS: 2016 AVENIDA VALERA
OWNER: FIELDSTONE COMPANY CONTRACTOR: MUELLER LEWIS CONCRETE
CLIENT: MUELLER LEWIS CONCRETE ENGINEER : JEM I11
ARCHITECT: BERKlJS GROUP BLDG AUTH: CITY OF CARLSBAD
INSPECT@R: JEFFREY GAYLER PERMIT NO.: CB92-0881. PLAN FILE:
FIELD
SAMPLE OF: CGNCRETE
LOCATION OF SPECIMEN
IN JOB OR STRUCTURE: LOT # 11
MIX NO.: 6525 MADE BV: JEFFREY GAYLER
PROPORTIONS: SLUMP: 1) 3/4.'1
ADMIXTURE: DATE MADE: 10/16/92
TVPE OF CEMENT: I1 DATE RECEIVED: 10/20/92
CONC. SUPPLIER: NELSON & SLOAN SOURCE QF ROCK:
TICKET NQ.3 1+03710 INSPECTOR SIGN:
LABORATORY TEST DATA
7 DAVS 14 DAYS 28 DAYS 20 DAYS
SPECIMEN MARKINGS: 92802 92803 92804
DATE TESTED: 10/26 11/13 11/13
AREA-SQ.1N.t 28 28 28.28 28.28
ULTIUATE LOAD-LBS: 57000
UNIT STRESS-LBS: . : 2020 4
SPECIFIEO STRENGTH
AT 28 DAYS-PSI:
DISTRIBUTION: MUELLER LEWIS CQNCRETE
FIELDSTONE COMPANY
JEM 111
'CITY OF OCEANSI@E
2500
J ENGINEER
_-
7895 Convoy Court
San Diego, California 9211 1 ' PROFESSIONAL REGISTERED INSPECTIONS, INC . Phone 292-066
FOR WEEK c ENDING ON df?d..i k 19r. INSPECTORS WEEKLY REPORT -*? INo.'&r// I
I ...... .... .............
I
LOCATIONS OF WORK INSPECTEO, TEST SAMPLES TAKEN. WORK REJECTED. JOB PROBLEMS, PROGRESS; REMARKS. ETC.
INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMEOi NUMBER. TYPE. 1DENT.NO.S.
OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS IWELOS MADE. H.T. BOLTS TORQUED) CHECKED: ETC.
PROFESSIONAL REGISTER INSPECTIONS, INC,
7895 Convoy Court Xl5
San Diego, Ca. 92111 JOB NO.: 491 1
JOB : FAIRWAYS
AD@ RE S S : 2816 AVENIEA VALER.4
OWNER: FIELESTONE COMPANY CONTRACTOR : MVE L L E R LEWIS CONCRETE
CLIENT: MUELLEI? LEWIS CQNCRETE ENGINEER : JEM I11
ARCHITECT: BERKL~S CROQP
INSPECTOR: JEFFREY GAYLER
FIELO
SAMPLE OF: CONCREJE
MIX NO.: 6525
PROPORTIONS: .
ADMIXTURE:
TVPE OF CEUENT: I1
CONC. SUPPLIER: NELSON & SLQAN
TICKET NO.: 4 03 7 10
BLOG AVTH: CITY C!F CARLSBAE!
PERMIT NO.: CB92-0861 PLAN FILE:
LOCATION OF SPECIMEN
IN JOB OR STRUCTURE: LOT b 1 1
MARE BY: JEFFREY GAVLER
SLUMP: 4 3 / 4. "
DATE UA@E: 10/16/92
DATE RECEIVED: 10/20/92
SOURCE OF ROCK:
INSPECTOR SIGN:
LABORATORY TEST DATA
7 DAYS
SPECIMEN MARKINGS:
DATE TESTED:
AREA-SQaINa:
ULTIMATE LOAD-LBS:
UNIT STRESS-LBS:
SPECIFIEO STRENGTH
AT 28 @AYS-PSI:
DISTRIBUTION: MUELLER LEWIS CONCRETE
a
F I E LD STQNE COMPANY
CITY OF CARLSBAC!
JEM 111
10 DAYS 28 OAYS 28 OAYS
92802 92803 92804
10/26 11/13 11/13
28.28 28.28 28.20
57000 77000 84500
: 2020 : 2720 : 2990
2500
1 ENGINEER
INCOBPOBATED
FOUNDATION OBSERVATION REPORT
FOUNDATION LOCATION (if not entire building)
0 ADDlTlONAL OBSERVATION REQUIRED PERMIT NO.: PIAN FILE NO.:
OPUCOSE OF OBSERVATION ~
@ A' 0
0
Verify soil conditions exposed are similar to those anticipated. Verify footing excavations extend to minimum depth recommended in soil report. Verify foundation reinforcement complies with minimum recommended in soil report. Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report.
0 Other:
0 APPLICABLE SOIL REPORT
0 SOIL REPORT RECOMMENDATIONS BASED ON
dfl ,A j& 3 /j &y.Jw/, )!+j mWL+ ~ I/' . 1'- DATE: %,-& v '
L' /L
,4 Expansion Condition; OVERYLOW OLOW . BMEDIUM WHIGH VERY HIGH Wt FUGeometry
0 Other:
Footing Depth: 0 ~ZINCHES ,i!f18JNCHES 0 24 INCHES OTHER:
Interior Slab Reinforcement: 0.6~6-10/10 0 W/6 0 NO. 3 @ 24 ~NCHES' 0 NO. 3 @ 18 IN^
Slab Bedding Material and Thickness: Foundation Width:
If yes, identiQ and describe:
0 MINIMUM FOUNDATION RECOMMENDATION
Footing Reinforcement: 0 NO. 4 T&B 0 ZN0.4 T&B 0 NO5 T&B OTHER: k;3&& M.. .TfK f /, ** 4 i
Vapor Barrier:
0 FOUNDATION PLAN REVIEWED: YES0 NO If
0 OB ERVATIONS: &Lstantiai codommce with soil Report (see "purpose of Otmemtion").
0 Substantial COllffKmance with Foundation Plans.
0 Other:
f 0 COMMENTS:
NOTE: IT IS ASSUMED THAT ALL FOOTLNG EXCAVATIONS WILL BE CLEANED OF LOOSE MATERIAL PRIOR TO
PLACING CONCm AND THAT THE SOIL MOISIZTRE CONTENT WILL BE MAINTAINED.