Commercial/Industrial Permit Permit No:
Building Inspection Request Line (760) 602-2725
CB021383
Job Address: 2819 LOKER AV EAST CBAD
Permit Type: Tl Sub Type:
Parcel No: 2090830700 Lot#:
Valuation: $53,760.00 Construction Type:
Occupancy Group: Reference #:
Project Title: ACUSHNET COMPANY-Tl 1792 SF
COMM
0
NEW
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
ISSUED
05/07/2002
JM
07/02/2002
07/02/2002
Applicant: Owner:
DBML INC
814 DODSWORTH
COVINA CA 91724
616 966-8666
Total Fees:
Building Permit
$2,560.61
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
0536 07/02/02 0002 01 02
Total Payments To Date: $240.15 Balance Due: $2,320.46
$369.46
$0.00
$240.15
$0.00
$0.00
$11.29
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Master Drainage Fee
Sewer Fee
Redev Parking Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$562.00
$0.00
$0.00
$20.00
$24.00
$0.00
$1,333.71
$0.00
$0.00
$2,560.61
Clearance: ------
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your rightto protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired.
2320~46
J~b405
PERMIT APPLICATION
CITY OF CAl3-LSBAD BUILDING DEPARTMENT
1635 Faraday~.,_ Carl~~d, CA 92008
~
Plan Ck. Depos._.it.-='i>-----"""-''"""'--"-:-"~
Validated By__.._,_ ...... _,_ __ __,,,....,...,... _ _,_
Date ___________ '--"'-4---=---
Address (include Bldg/Suite #) Business Name (at this address)
Legal Description Total # of units
Assessor's Parcel # Existing Use
SQ. FT.
/77'/4
#of Stories
I lfi,~CW,07/02 000t fllBathr~~s
CGP 240-15
State/Zip Telephone# Fax#
i?;; . \o1. ~) q \ob-~(o(ob
Telephone#
, ', ' ' , ~,
Name Address City State/Zip Telephone#
[5 ... QQ,t,IJRJ.\PJQ.B:;wo_MJ?,~J\IY'i'iiAME, ... , ..•. "'~ . ,,· ... ., .... · ... ·•
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law
[Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged
exem tion. Any violation of Section 7031.5 b any applicant for a permit subjects the ap licant to a civil penalty of not more than five hundred dollars [$5001). D G --. o 0 \.o v, na , 3 1 to<o-.,,Cdo'=,
Name
State License # _i'--'· ,_YJ-"--'VJ'-'f.,_t\__.-:\---'· ,___
Address
License Class ---={3~-_\ _____ _
City State/Zip Telephone#
City Business License # ) 2 QCf3 C, °I e)C
Designer Name Address
State License# _________ _
,9, .. WPf!.~E.1\$~ C,Qr;;:PEN1ATJ9N .·, . . . , :_ ~. ~.. '" . . ...
City State/Zip Telephone _I i"2-oe:J_
3
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance
of the work for which this permit is issued.
1911 I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is
irs'ued. My worker's cor;rp~nsation insur:iyarrier and policy number are: I I
Insurance Company Sto.·\-e F\J n~ Policy No. 0 'I I, -11)/~f-IJ hxpiration Date \ _ \ _ o 3 ' (THIS SECTION NEED NOT BE COMPLETED IF THE PERMIT IS FOR ONE HUNDRED DOLLARS ($1001 OR LESS)
D CERTIFICATE OF EXEMPTION: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as
to become subject to the Workers' Compensation Laws of California.
WARNING: Failure ecure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred
100, 001 • t..o:HMlm!ilei:l!Sation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
SIGNATURE:_i~~~~~~_::,,;:~~~~:::::=::::=::::____________ DATE 4....._I:., -~ ~
:i.::: :.o:wmta:,»y1.(og13.0,~Q.~~A11or,1:' . . . .. ... , .
I hereby affirm that I am exempt from the Contractor's License Law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale
(Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does
such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is
sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
D I am exempt under Section ______ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. D YES ONO
2. I (have / have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name / address / phone number / contractors license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone
number/ contractors license number): _____________________________________________ _
5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone number / type of work): _______________________________________________________ _
PROPERTY OWNER SIGNATURE _____________________ _ DATE -----------)qqlytfi,L$,:_e;il;Hl!i '$;9TiQiY, FQflfiQN!:R~SIP/flY:TfAL 'B!Jll:,DiN~ <PE!\Mll:$J>NL'( · .
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? D YES ~ NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D YES JG NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 YES ~ NO
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
~J:::Zqg-Jl~Jfl\lCTlc;>N:t,.f;!:,!p!N<? Aq'EN-:CY ··::~.: .: . : : ' •:.:::. ', ' '"' .: .... '
I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097(i) Civil Code).
LENDER'S NAME _____________ _
~-Al'f~,lCA.1'\l'.tC;RJIF,~c~;nqrii: : .•... :,., 'i,, ,·, ...
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction. I hereby authorize representatives of the Cit\,' of Carlsbad to enter upon the above mentioned
property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES,
JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work
authorized by such permit is not com ed within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned
at any time after the work is comm ced or a ~eriod of 180 days (Section 106.4.4 Uniform Building Code).
APPLICANT'S SIGNATURE _JL._,,L.'...!~~::::-::::::::>~/j~__!'L...p·:=:•-~=:::::::__ ______ _ DATE s-C::, .... IJ-
WHITE: File YELLOW: Applicant PINK: Finance
F-r~[§lfilg~
City of Carlsbad Bldg Inspection Request------
For: 08/28/2002
Permit# CB021383
Title: ACUSHNET COMPANY-Tl 1792 SF
Description:
Type: Tl Sub Type: COMM
Job Address: 2819 LOKER AV EAST
Suite: Lot O
Location:
APPLICANT DBML INC
Owner:
Remarks: OR SCOTT ROBBINS 818-612-7046
Total Time:
CD Description Act Comments
19 Final Structural (
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
--
Associated PCRs/CVs
PCR00045 ISSUED
PCR01155 ISSUED
PCR99120 EXPIRED
PCR99295 ISSUED
lnsQection History:
Date Description Act lnsp Comments
08/14/2002 84 Rough Combo AP PD CEILING
07/25/2002 14 Frame/Steel/Bolting/Welding AP PD
07/25/2002 17 Interior Lath/Drywall AP PD
07/25/2002 34 Rough Electric AP PD WALLS
Inspector Assignment: PD ---
Phone: 8186127045 lnspe#L
Requested By: DAVE MENTALE
Entered By: GIOVANNA
EsGi I Corporation
'l.n Partnersfiip witfi (jovemmentfor '13uifaing Safetg
DATE: June 26, 2002
JURISDICTION: Carlsbad
PLAN CHECK NO.: 02-1383
PROJECT ADDRESS: 28,19 Loker Ave East
PROJECT NAME: Acushnet -TI
SET:11+
D~ANT
~
D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
• The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified in the attached list are resolved and checked by building
department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
Dave Minto
P.O. Box 5096, Covina, CA 91723
• Esgil Corporation staff did not advise the applicant that the plan check has been completed.
D Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dave Minto Telephone#: 626-966-8666
Date contacted: (by: ) Fax#:
Mail Telephone Fax In Person
D REMARKS:
By: Bryan Zuppiger Enclosures:
Esgil Corporation
D GA D MB D EJ D PC LOG trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
1. Applicant to provide a statement on the Title Sheet of the plans stating that this
project shall comply with the 1998 edition of the California Building Code (Title
24 ), which adopts the 1997 UBC, UMC and UPC and the 1996 NEC.
JUN.25.2002 11:13AM
DBMC, Inc.
General Building Contractors
June 25, 2002
AT1N: Bryan Zuppiger
JURISDICTION: City of Carlsbad
PLAN CHECK NUMBER: 02-1383
PROJECT ADDRESS: 2819 Loker Ave. East
PROJECT NAME: Acushnet
N0.126 P.3
As per our discussion on June 24, 2002, we are providing the following information for
your review.
The HV AC, both new and existing will be running off the same panel, OPlD.
EXISTING: 2 Ton unit fed from OPlD Spaces 022 & 023 20 Amp each.
NEW: 2 Ton Unit fed from OPlD Spaces 026 & 027 20 Amp each.
Panel OPlD is a 120v, 240v single phas~ panel.
Disconnect at new unit is to be a 30 amp,
MCAis 16.4 x 125%=20.5 amp necessary
Conductor is #8 copper stranded with #12 Ground
Length of run from Breaker, 100'
Thank you,
!J~d."J~~
David B. Minto
PO Box 5096, 814 Dodsworth.Ave. Covina, CA 91723
(626) 966-8666 Office (626) 915-3746 FAX
JUN.25.2002 11:14AM NO.126 P.4
_,..,.. _____ .,. __ ··------·--
E
't, ..
EsGil Corporation
'l,n Partnersliip witli qovemment for '.Builaing Safety
DATE: June 21, 2002
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 02-1383
PROJECT ADDRESS: 2819 Loker Ave East
PROJECT NAME: Acushnet -TI
SET:11
(J,,,-A12-~ANT
~ D PLAN REVIEWER
D FILE
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
IZ] The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
IZ] The applicant's copy of the check list has been sent to:
Dave Minto
P.O. Box 5096, Covina, CA 91723
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
IZ] Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dave Minto (-J· ~~ Telephone#: 626-966-8666
Date contacted: (e; f 2-1 l c 2 (by: Ce:-.. ) Fax #:
Mail .....-'Telephone ..,....... Fax In Person
D REMARKS:
By: Bryan Zuppiger
Esgil Corporation
D GA D MB D EJ D PC
Enclosures:
6/14/02 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 02-1383
June 21, 2002
RECHECK PLAN CORRECTION LIST
JURISDICTION: City of Carlsbad
PROJECT ADDRESS: 2819 Loker Ave East
DATE PLAN RECEIVED BY
ESGIL CORPORATION: 6/14/02
REVIEWED BY: Bryan Zuppiger
FOREWORD (PLEASE READ):
PLAN CHECK NO.: 02-1383
SET: II
DATE RECHECK COMPLETED:
June 21, 2002
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access. This plan review is
based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
A. Please make all corrections on the original tracings and submit two new sets of prints to:
ESGIL CORPORATION.
B. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon
which each correction on this sheet has been made and return this sheet with the
revised plans.
C. The following items have not been resolved from the previous plan reviews. The original
correction number has been given for your reference. In case you did not keep a copy of
the prior correction list, we have enclosed those pages containing the outstanding
corrections. Please contact me if you have any questions regarding these items.
D. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list. If there are other changes, please briefly describe them and where
they are located on the plans. Have changes been made not resulting from this list?
DYes DNo
City of Carlsbad 02-1383
June 21, 2002
Please make all corrections on the original tracings, as requested in the correction list.
Submit three sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted in one of
two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700.
The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering
and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320
Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all
remaining sets of pians and calculations/reports directly to the City of Carlsbad Building
Department for routing to their Planning, Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by
the City Planning, Engineering and Fire Departments until review by EsGil Corporation is
complete.
NOTE: The items listed below refer to the item numbers from previous list. These
remaining items have not been adequately addressed. The notes in bold at the
end of or contained within each item are to emphasize the remaining problem.
2. Provide a statement on the Title Sheet of the plans stating that this project shall comply
with the 1998 edition of the California Building Code (Title 24 ), which adopts the 1997
UBC, UMC and UPC and the 1996 NEC. Unable to find on plans.
9. Please provide electrical load calculations. No response to correction.
10. Please provide panel schedules, indicate new and existing loads. No response to
correction.
11. Please note on the plans "AC Cable is not allowed. NM cable is restricted (without City
approval) to one and two family dwellings. Note on plans that an equipment ground
conductor is to be installed in all flexible conduits". Per City of Carlsbad. No response to
correction.
13. Please indicate on the plans the circuits feeding the new HVAC equipment. No
response to correction.
15. Provide multiple switch lighting controls per Title 24, Part 6. No response to correction.
19. When alterations, structural repairs or modifications or additions are made to an existing
building, that building, or portion of the building affected, is required to comply with all of the
requirements for new buildings, per Section 1134B.2. No response to correction.These
requirements apply as follows:
a) The area of specific alteration, repair or addition must comply as "new" construction.
b) A primary entrance to the building and the primary path of travel to the altered
area, must be shown to comply with all accessibility features.
City of Carlsbad 02-1383
June 21, 2002
c) Existing sanitary facilities that serve the remodeled area must be shown to comply
with all accessibility features.
20. It is unclear from the plans if the restroom servicing the tenant improvement are disabled
accessible, please provide a dimensioned restroom plans showing the restroom to be
accessible compliant. No response to correction.
21. Show on the site plan the complying disabled accessible path of travel from the disabled
accessible parking spaces to the primary entrance of the tenant space. No response to
correction.
To speed up the review process, note on this list (or a copy) where each correction item
has been addressed, i.e., plan sheet, note or detail number, calculation page, etc.
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Bryan Zuppiger at Esgil Corporation. Thank you.
,1,
EsGil Corporation
In Partnership with Government for Building Safety
DATE: 5/20/02
JURISDICTION: City of Carlsbad
PLAN CHECK NO.: 02-1383
PROJECT ADDRESS: 2819 Loker Ave East
PROJECT NAME: Acushnet -TI
SET:I
D The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
tz:I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
tz:I The applicant's copy of the check list has been sent to:
Dave Minto
P.O. Box 5096, Covina, CA 91723
D Esgil Corporation staff did not advise the applicant that the plan check has been completed.
tz:I Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Dave Minto Telephone#: 626-966-8666
Datecontacted:5/:2°/D.l(by: /CA) Fax #:(CPzc.)g,s.J1'f~-
MaiL--,Telephone~ Fax / In Person
D REMARKS:
By: Doug Moody
Esgil Corporation
D GA D MB D EJ D PC
Enclosures:
5/9/02 trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576
City of Carlsbad 02-1383
5/20/02
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK NO.: 02-1383
OCCUPANCY: B/Fl
TYPE OF CONSTRUCTION: Unknown
ALLOWABLE FLOOR AREA:
SPRINKLERS?: Unknown
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 5/7/02
DATE INITIAL PLAN REVIEW
COMPLETED: 5/20/02
FOREWORD (PLEASE READ):
JURISDICTION: City of Carlsbad
USE: Office
ACTUAL AREA: 1801 sf
STORIES: 1
HEIGHT:
OCCUPANT LOAD: 18
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 5/9/02
PLAN REVIEWER: Doug Moody
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and access for the disabled. This plan review
is based on regulations enforced by the Building Department. You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department,
Fire Department or other departments. Clearance from those departments may be required
prior to the issuance of a building permit.
Code sections cited are based on the 1997 UBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1997 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
T_ENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1997UBC) tiforw.dot
City of Carlsbad 02-1383
5/20/02
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
Generally the plans are incomplete and a thorough plan check can not be
done, the following list is a general list only and corrections may follow.
1. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
2. Provide a statement on the Title Sheet of the plans stating that this project shall
comply with the 1998 edition of the California Building Code (Title 24 ), which
adopts the 1997 USC, UMC and UPC and the 1996 NEC.
3. On the first sheet of the plans indicate:
• The floor area of the remodeled area,
• Type of construction of the existing building,
• Sprinklers: Yes or No
• Present and proposed occupancy classifications of the remodel area,
• The occupant load of the remodel area(s).
4. Provide· a note on the site plan indicating the previous use of the tenant space or
building being remodeled. Section 106.3.3.
5. Identify existing walls to be removed, existing walls to remain and proposed new
walls. Identify bearing walls, non-bearing walls, and shear walls.
6. Please revise the section view of all new interior partitions. Show:
a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify
manufacturer and approval number or indicate "to be ICBO approved".
b) Method of attaching top and bottom plates to structure. Indicate the type,
size and gauge of studs used for lateral bracing.
City of Carlsbad 02-1383
5/20/02
c)
d)
Wall sheathing material and details of attachment (size and spacing of
fasteners).
Show height of partition and suspended ceiling, and height from floor to
roof framing or floor framing.
7. Note on plan that suspended ceilings shall comply with UBC Tables 25-A, 16-0
and 16-B.
8. Specify lever-type hardware for passage doors on floors accessible to the
disabled. Title 24.
9. Please provide electrical load calculations.
10. Please provide panel schedules, indicate new and existing loads.
11. Please note on the plans "AC Cable is not allowed. NM cable is restricted
(without City approval) to one and two family dwellings. Note on plans that an
equipment ground conductor is to be installed in all flexible conduits". Per City of
Carlsbad.
12. Please attach the City of Carlsbad Policies and Procedures for Roof Mounted
Equipment to the plans.
13. Please indicate on the plans the circuits feeding the new HVAC equipment.
14. Please revise the plans to show a GFCI protected service receptacle with 25' of
the new HP-1.
15. Provide multiple switch lighting controls per Title 24; Part 6.
16. The completed and signed ENV-1, L TG-1, and MECH-1 forms must be
imprinted on the plans.
17. On the plans clearly show the wall and roof insulation locations, thickness, and
· R-values, as per the energy design.
18. Please complete the mandatory measure checklists imprinted on the plans.
19. When alterations, structural repairs or modifications or additions are made to an
existing building, that building, or portion of the building affected, is required to
comply with all of the requirements for new buildings, per Section 1134B.2. These
requirements apply as follows:
a) The area of specific alteration, repair or addition must comply as "new"
construction.
b) A primary entrance to the building and the primary path of travel to the
altered area, must be shown to comply with all accessibility features.
City of Carlsbad 02-1383
5/20/02
c) Existing sanitary facilities that seNe the remodeled area must be shown to
comply with all accessibility features.
20. It is unclear from the plans if the restroom seNicing the tenant improvement are
disabled accessible, please provide a dimensioned restroom plans showing the
restroom to be accessible compliant.
21. Show on the site plan the complying disabled accessible path of travel from the
disabled accessible parking spaces to the primary entrance of the tenant space.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc. .
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes D No D
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
CITY OF CARLSBAD
POLICIES AND PROCEDURE
· :UMBER: 80-6 SUBJECT: ROOF MOUNTED EQUIPMENT
EFFECTIVE: 5/1 /92 SECTION: BUILDING DEPARTMENT
SUPERSEDES: 80-6(9/10/80)
80-6(5/01 /81 l
PURPOSE: PROVIDE INSTALLATION STANDARDS FOR ALL ROOF MOUNTEDP EQUIPMENT AND
PENETRATIONS ON COMMERCIAL AND INDUSTRIAL BUILDINGS.
INTENT:
POLICY:
A. Maintain roof integrity.
B. Prevent hazardous condition to firemen who must fight fire on the roof.
C. Provide an installation that is aesthetically sensitive to the building and the
adjoining properties.
1. All equipment shall be concealed from view and the design* shall meet the
approval of the Planning Department.
2. All equipment shall be ·specifically designed and approved for exterior use and
shall be approved by the City of Carlsbad Building Department.
3. All roof mounted equipment shall be on a platform which shall be an integral
part of the roof--flashed and waterproofed. When a screen is· approved, it. shall
have as few roof connections as possible and be structurally adequate.
4. All electrica[, plumbing, mechanical duct work and related piping shall be inside
the building and r;iot on the roof. All connections related to equipment shall be
made in the same roof opening on the platform or have the prior approval from
the building official.
5. Sewer vents shall be brought to one main vent below the roof and have one
penetration where restrooms or other plumbing fixtures are back to back or in
the general proximity.
Air exhaust fans and other equipment shall be within the building and use the
same roof opening where restrooms and other equip.ment are back to back or in
g~neral prox,imity.
6. Existing buildings and equipment, remodel or replacement, shall meet .thE}_-C?bove
regulations or shall have the prior approval from _the building official.
7. Where new equipment is installed, unused or abahdoned equipment, including
all roof mounted piping, electr_ic-al, mechanical, duct, ~n.d oth~r related
appurtenances shall be removed from roof and unused openings properly sealed
-to maintain roof integrity. · ·
*The architect should, through design, conceal the heating/ AC unit ~nd other equipment whether
they are pn the roof or elsewhere. ·
initiated By: C
City of Carlsbad 02-1383
5/20/02
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: Doug Moody
PLAN CHECK NO.: 02-1383
DATE: 5/20/02
BUILDING ADDRESS: 2819 Loker Ave East
BUILDING OCCUPANCY: B/Fl TYPE OF CONSTRUCTION: Unknown
BUILDING AREA Valuation Reg. VALUE
PORTION ( Sq. Ft.) Multiplier Mod.
Tl 1801 City Valuation .
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
1994 UBC Building Permit Fee I • I
1994 UBC Plan Check Fee I • I
Type of Review: 0 Complete Review D Structural Only
D Repetitive Fee =8 Repeats
Comments:
D Other
D . Hourly .,__ ____ I Hour*
Esgil Plan Review Fee
($)
53,760
53,760
$360.461
$234.301
$201.861
Sheet 1 of 1
macvalue.doc
V
Ocwe.-M ~vv-l-o
City of Carlsbad
•@O 1 ,a;:z., k:t-+11-#i U· 1 • 1144 a I U·J
BUILDING PLANCHECK CHECKLIST
I
DATE: PLANCHECK NO.:
BUILDING ADDRESS: ' ~{9 LAk..e..r Ave . ~~J-·
CB 0:J-(3£:3
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER:
,,
EST. VALUE: 53 7 ~ t) i
ENGINEERING DEPARTMENT
APPROVAL DENIAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
D A Right-of-Way permit is required prior to
construction of the following improvements:
Please se /t attached report of deficiencies
marked · D.iake necessary corrections to plans
or spe 1fi ation for compliance with applicable
codes a st ards. Submit corrected plans and/or
specifications to this office for review.
By: Date:
By: Date:
ORIZATION TO ISSUE BUILDING PERMIT:
By:
D Dedication Application
D Dedication Checklist
D Improvement Application
D Improvement Checklist
D Future Improvement Agreement
D Grading Permit Application
D Grading Submittal Checklist
D Right-of-Way Permit Application
D Right-of-Way Permit Submittal Checklist
and Information Sheet
D Sewer Fee Information Sheet
Date: 7~tf)---
Name:
ENGINEERING DEPT. CONTACT PERSON
Karen ~
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2775
CFO INFORMATION
Parcel Map No:
Lots:
Recordation:
Carlsbad Tract:
H:1Deve10Jiln6a.lii;Jmasao~citiltstlllliilllilifi:l'1.tl'!chGaislsla.ad, CA 920081-7314 • (760) 602-2720 • FAX (760) 602.£5.oa *
C,
I D D
BUILDING PLANCHECK CHECKLIST
SITE PLAN
1. Provide a f1:1_lly dimensioned site pl?n ~r wn to scale. Show:
North Arrow . Right-of-Way Width & Adjacent Streets
xisting & Proposed Structures . Driveway widths
It;( xisting Street Improvements ?.5 Existing or proposed sewer lateral
. ;;;, Property Lines )( Existing or proposed water service )?. Easements / Existing or proposed irrigation .service
2. Show on site plan:
If Drainage Patterns
/ .. 1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
Jtf Existing & Proposed Slopes and Topography Y. Size, type, location, alignment of existing or proposed sewer and water service
{s) that serves the project. Each unit requires a separate service, however,
_ recond dwelling units and apartment complexes are an exception.
!;Y. Sewer and water laterals should not be located within proposed driveways, per
standards.
3. Include on title sheet:
~" Site address ~ Assessor's Parcel Number
~ Legal Description
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
H:IWORD\DOCS\CHKLSnBulldlng Plancheck Cklst Fann (Generlc).doc 2 Rev. 7/14/00
__ _j ______ _
D D D
D D D
D D D
BUILDING PLANCHECK CHECKLIST
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for
Project No .. _______________________ _
4b. All conditions are in compliance. Date: _________ _
DEDICATION REQUIREMENTS
5. Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $15,000, pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows: ________________ _
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 ½" x 11" plat map
and submit with a title report. All ·easement documents must be approved and
signed by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completed by:____________ Date: ___ _
IMPROVEMENT REQUIREMENTS
6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $75,000, pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows: ____________ _
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improv~ment plan~ and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
H:\WORDIOOCSICHKLSnBudding Plancheck Cklst Fann (RIDDLE· HARVEY 7-12-00).doc 3 Rev. 12126/86
D D D
D D D
D D
D D D
D D D
D D D
BUILDING PLANCHECK CHECKLIST
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by: _________ _ Date: -----
6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $31 O so we may
prepare the necessary Future Improvement Agreement. This agreement must be
signed, notarized and approved by the City prior to issuance of a Building permit.
Future public improvements required as follows:
6c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading· Inspector sign off by: Date: ----------
7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
H:IWORD\OOCS\CHKLSnBu11dmg Plancheck Cklst Form (Generic 7-14-00).doc 4 Rev. 7/14/00
D
D
D D
r)I ,~
D
D
BUILDING PLANCHECK CHECKLIST
7d .No Grading Permit required.
7e. If grading is not required, write "No Grading" on plot plan.
MISCELLANEOUS PERMITS
8. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way and/or
private work adjacent to the public Right-of-Way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tying
into public storm drain, sewer and water utilities.
Right-of-Way permit required for:
9. INDUSTRIAL WASTE PERMIT If your facility is located in the City of Carlsqad
sewer service area, you need to contact the Carlsbad Municipal Water District,
located at 5950 El Camino Real, Carlsbad, CA 92008. District personnel can
provide forms and assistance, and will check to see if your business enterprise is
on the EWA Exempt List. You may telephone (760) 438-2722, extension 7153,
for assistance.
Industrial Waste permit accepted by:
Date:
10. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
11. J,< Required fees are attached -TB~ la ~o fees required
WATER METER REVIEW
12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
• All single family dwelling units received "standard" 1" service with 5/8" service.
H:\WORDIDOCSICHKLS1'8ulldlng Plancheck Cklst Form (Generic).doc 5 Rev. 7114100
1ST
D D D
,-J/ /Jr-
BUILDING PLANCHECK CHECKLIST
• If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations,
which include total fixture counts and maximum water demand in gallons
per minute {gpm). A typical fixture count and water demand worksheet is
attached. Once the gpm is provided, check against the "meter sizing
schedule" to verify the anticipated meter size for the unit.
• Maximum service and meter size is a 2" service with a 2" meter.
• If a developer is proposing a meter greater than 2", suggest the
installation of multiple 2" services as needed to provide the anticipated
demand. {manifolds are considered on case by case basis to limit
multiple trenching into the street).
12b. Irrigation Use {where recycled water is not available) .
All irrigation meters must be sized via irrigation calculations {in gpm) prior
to approval. The developer must provide these calculations. Please follow
these guidelines:
1. If the project is a newer development {newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I",
and potable water is typically a circled "W". The irrigation service should
look like:
STA 1+00 Install 2" service and
1.5: meter (estimated 100 gpm)
2. If the improvement plans do not list the irrigation meter and the
service/meter will be installed via another instrument such as the building
plans or grading plans (w/ a right of way permit of course), then the
applicant must provide irrigation calculations for estimated worst-case
irrigation demand (largest zone with the farthest reach). Typically, Larry
Black has already reviewed this if landscape plans have been prepared,
but the applicant must provide the calculations to you for your use. Once
you have received a good example of irrigation calculations, keep a set for
your reference. In general the calculations will include:
• Hydraulic grade line
• Elevation at point of connection (POC)
• Pressure at POC in pounds per square inch (PSI)
• Worse case zone (largest, farthest away from valve
• Total Sprinkler heads listed (with gpm use per head)
• Include a 10% residual pressure at point of conne9tion
3. In general, all major sloped areas of a subdivision/project are to be
irrigated via separate irrigation meters (unless the project is only SFD with
no HOA). As long as the project is located within the City recycled water
H:\WORD\DOCSICHKLSnBulldlllg Plancllecf< Cklsl Form (GenerlcJ.doc 6 Rev. 7114/00
!r
D D D
DD
BUILDING PLANCHECK CHECKLIST
service boundary, the City intends on switching these irrigation
services/meters to a new recycled water line in the future.
12c. Irrigation Use (where recycled water is available)
1. Recycled water meters are sized the same as the irrigation meter above.
2. If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County Water
Capacity fees. However, if they front a street which the recycled water is
there, but is not live (sometimes they are charged with potable water until
recycled water is available), then the applicant must pay _the San Diego
Water Capacity Charge. If within three years, the recycled water line is
charged with recycled water by CMWD, then the applicant can apply for a
refund to the San Diego County Water Authority (SDCWA) for a refund.
However, let the applicant know that we cannot guarantee the refund, and
they must deal with the SDCWA for this.
. H:IWORDIOOCS\CHKLST\Buildlng Piancheck Cl<lst Fonn (Generlc).doc 7 Rev. 7/14/00
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
D Estimate based on unconfirmed information from applicant. X_ Calculation based on building plancheck plan submittal.
Address: ;).!RLCJ UJ k~ Av,~ t_ • Bldg. Permit No. Ct& 0 d--~9!-3
Prepared by: 1~ Date: tc/-tf<fl--c:Fiecked by:--'-----Date: r I -----
EDU CALCULATIONS: List types and square footages for all uses.
Types of Use: ~ Sq. Ft./Units: _______ EDU's: __ .;__,_u_· 3 __
Types of Use: _______ Sq. Ft/Units: EDU's: _____ _
ADT CALCULATIONS: List types and square footages for all uses.
/)~ ~;:;_ .. Types of Use: vz;p= Sq. Ft./Units: _______ ADT's: _...;;c.,,.;..;:._, __ _
Types of Use: _______ Sq. Ft./Units: ADT's: _____ _
FEES REQUIRED:
WITHIN CFO: ~~ES (no bridge & thoroughfare fee in District #1, reduced Traffic Impact Fee) D NO
D 1. PARK-IN-LIEU FEE PARK AREA & #: __ _
FEE/UNIT:,____ X . NO. UNITS: __ _
M2. TRAFFIC IMPACT FEE p ADT's/UNITS: dd X FEE/ADT: $
=$. ____ _
=$-=-S--_l.P._,,;J__
/i7). BRIDGE AND THOROUGHFARE FEE (DIST. #1 v7 DIST. #2 __ DIST.#3 __ )
y ADT's/UNITS:.____ X FEE/ADT: -=e-·
I' D 4. FACILITIES MANAGEMENT FEE ZONE: __ _
UNIT/SQ.FT.: ___ _
m5. SEWER FEE
lV EDU's: ; &3
BENEFIT AREA: G,
EDU's: ,{p'3
D 6. SEWER LATERAL ($2,500)
D 7. DRAINAGE FEES PLDA. __ _
ACRES: ____ _
D 8. POTABLE WATER FEES
X FEE/SQ.FT./UNIT: __ _
X
X
FEE/EDU: ~CJ/ 7'
FEE/EDU: qg
HIGH ___ /LOW __
X FEE/AC:, __ _
UNITS CODE CONNECTION FEE METER FEE SDCWAFEE
1 of 2
F:IFEE CALCULATION WORKSHEET.doc
=$ ,_0-
=$ __ -e---=---
=$ I , ;;. 11 ~ 1 7
1
=$ lei~ 7cf"
=$, ___ _
=$__, ___ _
IRRIGATION
Rev. 7/14/00
ENGINEERING DEPARTMENT
FEE CALCULATION WORKSHEET
D 9. RECLAIMED WATER FEES
UNITS CODE CONNECTION FEE METER FEE
II \.~ 71
TOTAL OF ABOVE FEES*:$ -tJ I~ ~ I ---i1"--------=---
*NOTE: This calculation sheet-is NOT a complete list of all fees which may be due.
Dedications and Improvements may also be required with Building Permits.
~·-·
2 of 2
F:\FEE CALCULATION WORKSHEET.doc Rev. 7 /14/00
. · /rf)F ...
~ ' .
1,1q2 _:;-/j()(} ""-l~
A .~o
.. ~
I'. 1 °!'l ~ f c!UJ ~ I ~· . I . • ~ .
. . . )( 5-
·1.r-
· .. ~?/\.
/,7 Ci':J _; I ra-zJ· . :::.-, 1 (
'1 19 )-. ~ 57)7)() ::_ . ~ 3l,
. I. ·-·~~ . :tt{?$
' '
~ ~ ~ ~ I\ -'\ )
"' 2 2
"* "' "' Cl 0 0
J J -::; --::s
1i' >, >, .a .a
~ N O') 'It 'It -"' -"' -"' 0 " " Cl) Q) Q) .c .c .c (.) (.) (.)
C: C: C: .!!l "' "' a.. a: a:
@DD
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB Oz.-I> {33 Address 2-6/ ct W/!d:JL At/t:r §ti ST
Planner __ V-=---=a'-'-n-=LC4y-'--'n=c..c..:h ________ _ Phone (760) 602-4613
APN: ____________________________ _
Type of Project & Use: /JJl)uf c z;r;.: Net Project Density:_~.A4-=r--1/A-~_~D~U~/A---=C-
Zoning: {? .;i;: General Plan: p.:z= Facilities Management Zone: __ .r __ _
CFO li_nfnV).).....# -Date of participation: Remaining net dev acres: ---
C1rc1~ ----
(For non-residential development: Type of land used created by
this permit: __ ~ _________________ )
Legend: ~ Item Complete ([J) Item Incomplete -Needs your action
Environmental Review Required: YES NO .X: TYPE ----
DATE OF COMPLETION: --------
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
'KJ D D Discretionary Action Required: YES __ NO J(__ TYPE ___ _
APPROVAL/RESO. NO. _____ DATE ___ _
PROJECT NO. ---------
0 THE R RELATED CASES: __________________ _
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval: ------------------------
,3J_ D D Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES NO A--
CA Coastal Commission Authority? YES NO
If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103,
San Diego CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Coastal Permit Determination Form already completed? YES NO
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
Follow-Up Actions:
1) Stamp Building Plans as JI Exempt" or JI Coastal Permit Required" (at minimum
Floor Plans) ..
2) Complete Coastal Permit Determination Log as needed.
H:\ADMIN\COUNTER\BldgPlnchkRevChklst
~DD lnclusionary Housing Fee required: YES __ NO¼_
(Effective date of lnclusionary Housing Ordinance -May 21, 1993.)
Data Entry Completed? YES __ NO __
(A/P/Ds, Activity Maintenance, enter CB#, tool bar, Screens, Housing Fees, Construct Housing Y /N, Enter Fee, UPDATE!)
Site Plan:
D D D 1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets,· existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines (including all side and rear yard slopes).
)61 D D 2. Provide legal description of property and assessor's parcel number.
Zoning:
~DD 1 . Setbacks:
~(()~ Front: Required Shown / II Interior Side: Required Shown v~y II-' op; Street Side: Required Shown
Rear: Required Shown
Top of slope: Required Shown
,Qg_ D D 2. Accessory structure setbacks:
Front: Required ------r---Shown ------1 n t er i or Side: Required ------Shown ------Street Side: Required ------Shown ------Rear: Required --'------Shown -------
Structure separation: Required ---------Shown ------
@ D D 3. Lot Coverage: Required
/~IL wc:>l> <;.
JJ//4--Shown . ------
D D D 4. Height: Required ------Shown ------
5. Parking: Spaces Required ~ .S-0 --=--=::--'----Shown ) .CS
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required ______ Shown _____ _
Additional Comments r74f::laSS' f'A;vtD4L Altn,-1't.8t oF /JAf2.lu,.o6 .t:/JAc..BS.
btibA1JJ,,¢(b Bv: /#tr CHfiPlvf:T 1/J 't.w1t-1::,1.A16 t/J'tr A¢ #ot= f:'/JAcJJ5. />Mtbr:JD. r PU:JArrr-.>'kot:J cow /JUA~ w 1"11-f ~toW/f a,, ?T/V 6 A/2.&4-~ 1!U§'N 1::5/fJ, ,
C¥="' got) ~t:Jr90 ~~"&tu 1116-J}C-UJru ~PW HPJV ~a wPth'"'nJb
r1(:?C;(A,,J/L/Jt-0(52µ/j)N~T""" W/t.L 'fs&r .Sc_MWSJ) / -'f) c:,,J 'l-,4A/:I (!$ 0f.l.1TlP •
OK TO ISS E AND ENTERED APPROVAL INTO COMPUTER (/.{K,vj__ DATE 7-l--0'2....
/JO C/-lkovcr 'f-t.l @.,I) ..
H :\ADMI N\CO U NTER\BldgPlnchkRevChklst
~~~~~ ,~ ... ~
,/ ·,: '.:: ; .
~:t~
i
l:XIStlNG
ADDED
TOTAL
2W
-2 + 25
44 8
..... ~ ·=:;;.-....: ............. -===::;::-... .., ........... :f······.:,. •••• , ....... -:.·· ...... -:;,, ............. .:. ...... -:.'$,·::.:. ••• : ................ -:f·:, ••• :,.; ........... -:.·· ...... : •• • •.••.•••.• ·:······· .................. .:-···'-..:: ............. -: ... .$ ................... .:.··} ................... -:f:
F~ FiEGlJl~T&
l:Xl&TINGr TENANT U5E AREA FA~INGr
Gff=ICE ll)OO 5.F. 4
WARl:I-IOUSE 2l)1b SJ=. 21
MANUFACTURING ~ ~
5UB-TOTAL5 22,11b 5.1=. 25
·········· ....••... •.-.; ... ·····••········ ........ ., ............................... ················ .. _. .................... -:················· ........... ················-........... ·-··· ••••••••• •• -::, ..................... •••• •••• ••••• ••• ·····:···· •• •••• •••• .. =::;,::=--.· ···::_ •• ••• ···.{· ...... • -:-
TITLEl&T USE A~A f'AFc!<.ING
Cff=ICE i8,e'O.:! ~t= 112.
WAREI-OJSE: l., !>9S J!t J:. '-I ,
MANIJFAc~ "TS,441 &J=. I ca~-·~-
eue-totAL& 32..~
TOTAL PAA1KI~ fiEQUlfED 3;.s-0
TOT AL PARKING PROVIDED *SOK
I NOTe:
! tENANT SPACe WA5 ~YfOUSL Y A MANUFACTIJRJNG
r
'. FACILfTY FOR C~fUM GRA~ICS INC. ,,~ ,,>"-<", .... ,, .. r
'''·'-··.w"''\., .... ,", .. ,,:·,.·, .......... ,,.§.'-:,,, .... w·,··'·\,.,. .. _,,,.,,,,,_..", .. ,,'''-.,,,.,, .. ,.f'-.,.,,",., .... •'1.:, •• w ... •'' •. •'\'-.."W·<:·''.f,.,,_.",.,,<• '.•._. ,.,,·
J f I l' L ck. e.r ,4 v ~ £ d s <t-
c_o,. l1b6& c.A-
,/
p L 60. C k .t::J:. 0 d-,... \ .3 u
·~
Carlsbad Fire Department 021383
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review Requirements Category: Building Plan
Reviewed by:
Fire Prevention -t.,. (760) 602-4660
Date of Report: _0_51_09_12_0_0_2 _______ _
Name: /
DAVE MINTO
Address: PO Box 5096
City, State: Covina CA 91723
Plan Checker: Job#: 021383 -------
Job Name: Acushnet Bldg #: ------------------=--
Job Address: 2819 Loker Ste. or Bldg. No.
[g] Approved
D Approved
Subject to
D Incomplete
Review
FD Job#
The item you have submitted for review has been approved. The approval is
based on plans, information and / or specifications provided in your submittal;
therefore any changes to these items after this date, including field
modifications, must be reviewed by this office to insure continued conformance
with applicable codes and standards. Please review carefully all comments
attached as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements.
The item you have submitted for review has been approved subject to the
attached conditions. The approval is based on plans, information and/or
specifications provided in your submittal. Please review carefully all comments
attached, as failure to comply with instructions in this report can result in
suspension of permit to construct or install improvements. Please resubmit to
this office the necessary plans and / or specifications required to indicate
compliance with applicable codes and standards.
The item you have submitted for review is incomplete. At this time, this office
cannot adequately conduct a review to determine compliance with the
applicable codes and / or standards. Please review carefully all comments
attached. Please resubmit the necessary plans and/ or specifications to this
office for review and approval.
1st
021383
2nd
FD File#
3rd Other Agency ID
~
~
' ~
~-
~
~
t \J\. .
rt
,. ~ rb _"It ;~ -~ ~ _.)
~ f',
n-,
tt
'\
POOR
QUALITY
ORIGINAL S
..
. " ,, ... . , ~ ,· . ,' :, ... •. .
. . .•··. ~ .
~ ,...
0 :c I ·Z -I
~,,l\ ""'" I\ o•c ·i~ -:\-1 'fll\l• . -< I' I 6 I ~ .. ~ I ~,-. , I
. ·--.... .. . ~ .
WALL FRAMING DETAIL
.. .. . . ,· . 0 01
5. (1) LAYER I/ '2.." TYPE "Xw GYP. BO. ,1 6. 3-5/e-X 25.,GA. AT. 24"' o.c. q2---r-c.t?..o· A--,-,-N,v-~«._
7. FINISH PER NOTES ON PLi?\NS.
8. 1/4" DIA, SHOT PINS AT 32-. .. O,C.
AND 12 ... FROM-ENDS, OPENINGS.
9. BOTTOM TRACK -
10.RUBBER TOP-SET BASE
11.EXIST. CONC. SLAB
13.OIAG. BRACE STUDS AT 48"O.C.
ALTERNATE DIRECTION -TYP.
C.M.C.= CHICAGO METALLIC CORP •
I: \) ---. ~ .... ~-=,,==-·--.:. -" ·-· \.. .J n~ ,., .....___ ,; ~ s ':,.
"~
,. lt 0 I ---it) -• -
\,.) q_ A ~
~
0 tq I I 0 N !:! • r·~.
) ~ • ·,j' L...,
~ I." • --
-• -
lt en I .-cc '--
I· .
,,/ ,,/ ,,/'
o;..,
I ;-..
. ./" ./ 0 ~ .-
.Y' / ,,/ 0
IC
'7 r,o_g • ..O-.Ol ' .o-6 'b C) I b N / 15 ,/" -u:
Ill w w
/ A: u /" -,-:-, --~. tt. l!il I' ...
b w 0 ....... ... I / / /" U')
I
1:--::-·-"."""'f'" 1
~/
· 200 ... 20.0 'd 9t,ltS't6929t:Ol
\t=, " 0 ~ ,.. ~ ' I t t I I I I
; ~----~
r--t---1>~tt--+--_L ___ x ·--· -----·-----J.-'1.'L.1,,:·i-+---1
r--H~I\ -+--1-J~ --. ···--jr---fHI><,>< -+---1
., ,
1J \. ---... -t-f1~--1 -~ i 'I
i ~ • ..
r--1----1-----l--~-+---·r----1----
,.
TITLE 24 REPORT
Title 24 Report for:
Acushnet Company-Warranty Repair/Eng. Lab
2819 Loker Avenue East
Carlsbad, CA 92008
Project Designer:
Report Prepared By:
Steve Balderrama, CEPE
Stueven Engineering Consultants
425 W. 5th Ave. Suite 103
Escondido, CA 92025
(760) 735-8577
Job Number:
Date:
05/24/2002
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 883-5900.
EnergyPro 3.1 By EnergySoft Job Number: User Number: 3429
Cover Page
Table of Contents
TABLE OF CONTENTS
Nonresidential Performance Title 24 Forms
Form ENV-MM Envelope Mandatory Measures
Form L TG-MM Lighting Mandatory Measures
Form MECH-MM Mechanical Mandatory Measures
EnergyPro 3.1 By EnergySoft Job Number:
1
2
3
13
14
15
User Number: 3429
IPERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF-11
PROJECT NAME DATE
Acushnet Company -Warrantv Reoair/Ena. Lab 05/24/2002
PROJECT ADDRESS
2819 Loker Avenue East Carlsbad
PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Building Permit #
DOCUMENTATION AUTHOR TELEPHONE
Stueven Enqineerinq Consultants (760) 735-8577
Checked by/Date
Enforcement Agency Use
GENERAL INFORMATION
DATE OF PLANS !BUILDING CONDITIONED FLOOR AREA I CLIMATE ZONE
7 1,850 Sq.Ft.
BUILDING TYPE [X] NONRESIDENTIAL D HIGH RISE RESIDENTIAL D HOTEUMOTEL GUEST ROOM
PHASE OF CONSTRUCTION D NEW CONSTRUCTION D ADDITION [Zj ALTERATION D EXISTING + ADDITION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and
6, of the State Building Code. This certificate applies only to a Build in , he performance compliance approach.
DOCUMENTATION AUTHOR SIG TU DA E
Steve Balderrama CEPE · ---------S U d'L
The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled
for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title
24, Part 6.
ENV. L TG. MECH.
D D
D D
D D
D 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer,
mechanical engineer, electrical engineer or architect.
D
2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor preparing documents for work that I have contracted to perform.
3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pusuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures f-....-----------------------l
Requi d Forms ENV-1
PRINCIPAL ENVELOPE DESIGNER· NAME
LIGHTING COMPLIANCE
PRINCIPAL LIGHTING DESIGNER -NAME
MECHANICAL COMPLIANCE
PRINCIPAL MECHANICAL DESIGNER -NAME
Southcoast Heatin & Air Conditionin
EnergyPro 3.1 By EnergySoft User Number: 3429
UC. NO. DATE
DATE
MECH-2 MECH-3
Run Code: 1022258908
Job Number: Page:3 of 16
I PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-11
DATE
05/24/2002
ANNUAL SOURCE ENERGY USE SUMMARY kBtu/saft-vr)
Standard Proposed Compliance
ENERGY COMPONENT Design Design Margin iffsiir,~i.g~,--:~ '.:--:~:-:-·-:~.-:a:P&g<i!;~.,: .·: ,,,, .N,., l
Space Heating 0.00
Space Cooling 26.11
Indoor Fans 12.49
Heat Rejection 0.00
Pumps & Misc. 0.00
Domestic Hot Water 0.00
Lighting 44.11
Receptacle 16.86
Process 0.00
TOTALS: 99.57
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
f'
0.16 -0.16 1'! -~poe& HelllJng:
,, ,,Sp~Coolms,1, ,. .. , 18.16 7.95 ! --
15.41 -2.92 Indoor Fans, ;
0.00 0.00 Hoa.t ReJecllOn
0.00 0.00
; Pt.lmp$'&'M~
0.00 0.00 DHW
' -
30.16 13.95 lJghl!og
'
16.86 0.00 ! , Recept~e ,
;
0.00 0.00 : Pr~ss
: •-;.:.;t-.;::::--., •
0 10
' 80.76 18.81 ______ ..........._,,,_,.,.,., -· -~_,,,,,.,,_
BUILDING COMPLIES
1------~<N_o_rt_h~)O_d_lea= Conditioned Floor Area
1 Unconditioned Floor Area f----------1
,___ _______ _,2 Conditioned Footprint Area
3
..
,··1,
,, ...
kBIU/sqft-yr
..
3!)'
1,850 sqft
1,000 sqft.
1,850 sqfl
' ,: '
~ '!
,,
A
' ~J
,,
id . ! ;~ !
d /:•;
"I i ! 'ij
l ..
40 \
__.,_..,,,,.,,,,... ___ ,,_ -1
Orientation Gross Area Glazing Area Glazing Ratio
Remarks:
Front Elevation
Left Elevation
Rear Elevation
Right Elevation
Roof
Total
Lighting Power Density
Prescriptive Env. Heat Loss
Prescriptive Env. Heat Gain
(North
(East
(South
(West
I
Standard
~W/~ft
0 sqft. 0 sqft.
0 sqft. 0 sqft.
0 sqft. 0 sqft.
0 sqft. 0 sqft.
0 sqft. 0 sqft.
oJsqft. J olsqft.
Proposed
~W/sqft
I Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
0.0%
0.0%
0.0%
0.0%
0.0%
I 0.0%1
I
I EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:4 of 16 I
IPERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF-11
PROJECT NAME 'DATE Acushnet Company -Warranty Repair/EnQ. Lab 05/24/2002
ZONE INFORMATION
Floor Inst. Port. Ctrl. Tailored Proc.
Area LPD LPD Credits LPD Loads
System Name Zone Name Occupancy Type (sqft.) (W/sf)1 (W/sf)1 (W/sf)2 (W/sf)3 (W/sf)
HP-1 HP-1 Precision Industrial 950 1.762 0.000
Existing Heat Pump Existing Heat Pump Precision Industrial 900 0.240 0.000
Warehouse Unconditioned 1,000 0.000 0.000
Notes: 1. See L TG-1 (items marked with asterisk, see L TG-2 by others) 2. See LTG-3 3. See LTG-4 Items above require special
documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines
the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the soecial iustificati
and documentation submitted. Plan Field
The Room "Warehouse" has a Heating Indoor Design Temperature of 50 deorees F.
The Room "Warehouse" has a Cooling Indoor Desion Temperature of 95 deorees F.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Signature or Stamp ________________ _
Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:5 of 16
on
!ENVELOPE COMPLIANCE SUMMARY Performance ENV-1f
'PROJECT NAME DATE I Acushnet Company -Warranty Repair/EnQ. Lab 05/24/2002
OPAQUE SURFACES
Solar
Surface Framing Act. Gains
# Type Type Area U-Fac. Azm. Tilt Y/N Form 3 Reference Location / Comments
1 Demisina Metal 846 0.189 0 90 X R-11 Metal Stud Wall HP-1 <faces Warehouse)
2 Demisina Metal 810 0.189 0 90 X R-11 Metal Stud Wall Existina Heat Pumo <faces Warehouse)
FENESTRATION SURFACES
Site Assembled Glazing D Check box if Building is >= 100,000 sqft of CFA and >= 10,000 sqft vertical glazing then NFRC Cert1ficat1on Is required.
Follow NFRC 100-SB Procedures and submit NFRC Label Certificate Form
# Type Area U-Fac. Act. Azm. SHGC Glazing Type Location / Comments
EXTERIOR SHADING
Window Overhang Left Fin Right Fin
# Exterior Shade Type SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hat. Dist. Len. Hat.
Run Initiation Time: n5/24/02 n9:48:28 R11n r:nrlo: 1022258908
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:6 of 16
ILIGHTING COMPLIANCE SUMMARY
PROJECT NAME
Acushnet Com an
!INSTALLED LIGHTING SCHEDULE
LUMINAIRE
Code DESCRIPTION
(1) 8w Fluorescent Preheat T5
(3) 4 ft Fluorescent TB Elec
Lighting Schedule on Plans Shows Exterior Lighting
Meets
D Efficacy and Control Requirement of§130(c)
D Control Requirements of§131(f)
!MANDATORY AUTOMATIC CONTROLS
LAMPS
TYPE
DESCRIPTION
ll=RT5
F32T8
#
1
'.!
Part 1 of 2 L TG-11
DATE
05/24/2002
BALLASTS Luminaire
Watts I (Lamp + Ballast Total Per Lamp DESCRIPTION # # Watts Watts
8 Maanetic Standard 1.n 18 12.n 216
32 Electronic 1.( 18 a-:in
Subtotal from this Page
Total
Portable Lighting (From L TG-1)
Less Control Credit Watts (From L TG-3)
Adjusted Actual Watts
1 674
1,8901
1,8901
al
al
1,8901
CONTROL LOCATION CONTROL CONTROL TYPE NOTE TO
(Room#) IDENTIFICATION (Auto Time Switch, Exterior, etc.) SPACE CONTROLLED FIELD
!CONTROLS FOR CREDIT
CONTROL LOCATION CONTROL CONTROL TYPE LUMIN11IRES r-nNTROLLED NOTE TO
(Room # or Dwg. #) IDENTIFICATION (Occupant, Daylight, Dimming, etc.) TYPE # OF LUMINAIRES FIELD
NOTES TO FIELD -For Buildina Deoartment Use Onlv
Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:7 of 16
ILIGHTING COMPLIANCE SUMMARY Part 2 of 2 L TG-11
PROJECT NAME DATE
Acushnet Com 05/24/2002
!TABLE 1A -PORTABLE LIGHTING NOT SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET
ROOM# DEFAULT AREA TOTAL WATTS
ORZONEID lW/saft) {SF) CBXC)
TOTAL 0 0
ITABLE 1B -PORTABLE LIGHTING SHOWN ON PLANS FOR OFFICE AREAS >250 SQUARE FEET
ROOM#
ONEID ORZ
PORTABLE LIGHTING
Description
LUMIN. TASK
# OF WATTS PER AREA
FIXT FIXTURE (SF)
#OF
TASK
AREAS
TOTAL
0 @]
TOTAL TOTAL
AREA (SF) WATTS
X X (D E) (C E)
0 0
iTABLE 1C -PLANS SHOW PORTABLE LIGHTING IS NOT REQUIRED FOR OFFICE AREAS> 250 SQUARE FEET
ROOM# TOTAL AREA
ORZONEID (SF) Designer needs to provide detailed documentation that the lightin ;i
level provided by the overhead lighting meets the needs of the
space. The details include luminaire types, CU, and mounting
locations relative to work areas.
TOTAL 0
IBUILDING SUMMARY -PORTABLE LIGHTING
I TOTAL AREA (SF} TOTAL WATTS
BUILDING SUMMARY (FROM TABLES 1A+1B+1C) (FROM TABLES 1A+1B}
BUILDING TOTAL 0 0
I Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
I EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:8 of 16
!CERTIFICATE OF COMPLIANCE Performance MECH-11
PROJECT NAME DATE
Acushnet Com 05/24/2002
!SYSTEM FEATURES
MECHANICAL SYSTEMS
!SYSTEM NAME HP-1 Existing Heat Pump NOTE TO
FIELD
TIME CONTROL Programmable Switch Programmable Switch
SETBACK CONTROL No Setback Reouired No Setback Reauired
ISOLATION ZONES n/a n/a
HEAT PUMP THERMOSTAT? Yes Yes
ELECTRIC HEAT? 0.0kW 0.0kW
FAN CONTROL Constant Volume Constant Volume
VAV MINIMUM POSITION CONTROL? No No
SIMULTANEOUS HEAT/COOL? No No
HEATING SUPPLY RESET Constant Temo Constant Temo
COOLING SUPPLY RESET Constant Temp Constant Temp
HEAT REJECTION CONTROL n/a n/a
VENTILATION Air Balance Air Balance
OUTDOOR DAMPER CONTROL Auto Auto
ECONOMIZER TYPE No Economizer No Economizer
DESIGN 0.A. CFM CMECH-3, COLUMN I 143 cfm 135 cfm
HEATING EQUIPMENT TYPE Heat Pumo Heat Pumo
HEATING EQUIPMENT EFFICIENCY 7.10 HSPF 6.90 HSPF
COOLING EQUIPMENT TYPE Packaaed DX Packaaed DX
COOLING EQUIPMENT EFFICIENCY 12.0 SEER/ 10.4 EER 12.0 SEER/ 10.2 EER
MAKE AND MODEL NUMBER CARRIER 50JX024 CARRIER 50HX024
PIPE INSULATION REQUIRED? Yes Yes
PIPE/DUCT INSULATION PROTECTED? Yes Yes
HEATING DUCT LOCATION R-VALUE Ducts in Attic 4.2 Ducts in Attic 4.2
COOLING DUCT LOCATIOII R-VALUE Ducts in Attic 4.2 Ducts in Attic 4.2
VERIFIED SEALED DUCTS IN CEILING/ROOF SPACE No No
CODE TABLES: Enter code from table below into columns above.
HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL
ELECTRIC HEAT? S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes
0: Occupancy C:Cooling Isolation Zones. P: Variable Pitch
VAV MINIMUM POSITION CONTROL? Sensor B: Both V:VFD
SIMULTANEOUS HEAT/ COOL? Y:Yes M: Manual Timer O: Other C: Curve
N:No HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM
HIGH EFFICIENCY? B: Air Balance A: Auto A:Air Enter Outdoor Air
C: Outside Air Cert. G: Gravity W: Water CFM. PIPE INSULATION REQUIRED? M: Out. Air Measure N: Not Required Note: This shall be nc
PIPE/DUCT INSULATION PROTECTED? D: Demand Control EC: Economizer less than Col. H on
N: Natural Control See Section MECH-3.
SEALED DUCTS IN CEILING/ROOF SPACE!? 144(e)3
!NOTES TO FIELD -For Building Department Use Only
Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:9 of 16
!MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-21
!PROJECT NAME
, Acushnet Comoanv -Warrantv Reoair/Ena. Lab IDAT1)5/24/2002 I
CHILLER AND TOWER SUMMARY
PUMPS
Tot. Motor Drive Pump
Equipment Name Equipment Type Qty. Efficiency Tons Qty GPM BHP Eff. Eff. Control
DHW I BOILER SUMMARY
Energy Factor Standby TANK INSUL.
Rated Vol. or Recovery Loss or Ext.
System Name System Type Distribution Type Qt} Input (Gals.) Efficiency Pilot R-Val.
CENTRAL SYSTEM RATINGS
HEATING COOLING
Aux.
Svstem Name SvstemTvoe Qtv. Outout kW Eff. Outout Sensible Efficiency Economizer Type
CARRIER 50JX024 Packaged DX 1 23,200 0.0 7.10HSPF 23,200 16,24( 12.0 SEER/ 10.4 EER No Economizer
CARRIER 50HX024 Packaged DX 1 23,200 0.0 6.90HSPF 23,200 16,24C 12.0 SEER/ 10.2 EER No Economizer
CENTRAL SYSTEM FAN SUMMARY
.SIIDPLYFAN RETURN FAN
Motor Drive Motor Drive
System Name FanTYoe Motor Location CFM BHP Eff. Eff. CFM BHP Eff. Eff.
CARRIER 50JX024 Constant Volume Blow-Through 800 0.33 77.0% 100.0% none
CARRIER 50HX024 Constant Volume Blow-Through 800 0.33 77.0% 100.0% none
Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:10 of 16
IMECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2f
PROJECT NAME I DAT1)5/24/2002 Acushnet Comoanv -Warrantv Reoair/Ena. Lab
ZONE TERMINAL SUMMARY
VAV TERMINAL BOX TERMINAL FAN BASEBOARD
Min. CFM Reheat Coil MotoI Drive
Zon"' Name Svstem Tvoe Qtv. Ratio Tvoe DeltaT CFM BHP Eff. Eff. Type Output
EXHAUST FAN SUMMARY
1-XHAl1 SI t-AN ,a •LIA L·--i CAM
Motor Drive Motor Drive
Room Name Qty, CFM BHP Eff. Eff. Room Name Qtv. CFM BHP Eff. Eff.
Run Initiation Time: 05/24/02 09:48:28 Run Code: 1022258908
EnergyPro 3.1 Bv EnergySoft User Number: 3429 Job Number: Page:11 of16
IMECHANICAL VENTILATION
PROJECT NAME
Acushnet Com
IMECHANICAL VENTILATION
AREA BASIS OCCUPANCY BASIS REQ'D
COND. MIN. NO. CFM MIN. O.A.
ZONE/SYSTEM AREA CFM CFM OF PER CFM (MAX OF
(SF) PER SF (BxC) PEOPLE PERSON (ExF) DORG)
HP-1 950 0.15 142 142
HP-1 Total 142
Existing Heat Pump 900 0.15 135 135
Existing Heat Pump Total 135
Minimum Ventilation Rate per Section 121, Table 1-F.
Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density.
MECH-31
DATE
05/24/2002
w -DESIGN
OUTDOOF VAV TRANS
AIR MIN. FER
CFM RATIO AIR -
143 -
143 -
135 ,___
135 ,___
-
-
-
-
,-----
,-----
,-----
-
-
,-----
,-----
,___ --
-
-
,____
,____
,____
-
-
--
-
m Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans.
Must be greater than or equal to (H minus I), and, for VAV, greater than or equal to (H-J).
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:12 of 16
!ENVELOPE MANDATORY MEASURES ENV-MMI
DATE
05/24/2002
DESCRIPTION Designer Enforcement
D § 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply
with the California Quality Standards for insulating material, Title 20, Chapter 4, Article
3.
D § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
D § 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
D §116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped_ (except for unframed glass doors and
fire doors).
D § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for LI-value according to NFRC procedures.
D § 118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall have
insulation with an installed R-value of no less than R-11 between framing members.
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:13 of16
!LIGHTING MANDATORY MEASURES LTG-MMI
PROJECT NAME DATE
Acushnet Com -Warrant 05/24/2002
DESCRIPTION Designer Enforcement
D § 131 (d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
D § 131(d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area of
override is not to exceed 5,000 square feet.
D § 119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
D § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the
project are certified and listed in the Directory. All installed fixtures shall be certified.
D § 132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp
fluorescent fixtures are tandem wired with two lamp ballasts where required by
Standards Section 132; or all one and three lamp fluorescent fixtures are specified
with electronic high-frequency ballasts and are exempt from tandem wiring
requirements.
D § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with
a separate switch or occupancy sensor device for each area with floor-to-ceiling
walls.
D § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
D § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall have
50% of the lamps in each day lit area controlled by a separate switch; or the effective
use of daylight cannot be accomplished because the windows are continuously
shaded by a building on the adjacent lot. Diagram of shading during different times
of the year is included on plans.
D § 131(f) Control of Exterior Lights: Exterior mounted fixtures served from the electrical panel
inside the building are controlled with a directional photo cell control on the roof and
a corresponding relay in the electrical panel, or uses an astronomical time clock.
D § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are
20 amps or less.
D § 130(c) Efficacy of Exterior Lights: Exterior mounted fixtures with lamps over 100 Watts
served from the electrical panel inside the building have a source efficacy of at
least 60 lumens per Watt, or are controlled by a motion sensor.
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:14 of 16
!MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MMj
PROJECT NAME DATE
Acushnet Com -Warrant 05/24/2002
DESCRIPTION Designer Enforcement
Equipment and Systems Efficiencies
D §111 Any appliance for which there is a California standard established in the Appliance
Efficiency Regulations will comply with the applicable standard.
D § 115(a) Fan type central furnaces shall not have a pilot light.
~ § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
~ § 124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 603 and 604 of the Uniform Mechanical Code.
Controls
§ 122(e) Each space conditioning system shall be installed with one of'the following:
lKl § 122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the requirements
of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off-hours for
up to 4 hours. The time switch shall be capable of programming different
schedules for weekdays and weekends; incorporate an automatic holiday "shut-
off'' feature that turns off all loads for at least 24 hours, then resumes the normally
scheduled operation; and has program backup capabilities that prevent the loss of
the device's program and time setting for at least 10 hours if power is interrupted;
or
D § 122(e)1 B An occupancy sensor to control the operating period of the system; or
D § 122(e)1 C A 4-hour timer that can be manually operated to control the operating period of the
system.
D § 122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
D § 122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with isolation
zones. Each zone: shall not exceed 25,000 square feet; shall be provided with
isolation devices, such as valves or dampers, that allow the supply of heating or
cooling to be setback or shut off independently of other isolation areas; and shall
be controlled by a time control device as described above.
D § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the control
shall be adjustable up to 85 degrees F or higher. Where used for both heating and
cooling, the control shall be capable of providing a deadband of at least 5 degrees
F within which the supply of heating and cooling is shut off or reduced to a
minimum.
D § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable
~ setpoint stops accessible only to authorized personnel.
§ 112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:15 of 16
. .
!MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM I
PROJECT NAME DATE
Acushnet Com -Warrant 05/24/2002
Description Designer Enforcement
Ventilation
~ § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at
the ventilation rates as specified on these plans.
D § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
D § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible
manually operated dampers in all openings to the outside, except for combustion air
openings.
D § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
D § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the
person with overall responsibility for the design of the ventilation system; or
D § 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
D § 121(f)4 Another method approved by the Commission.
Service Water Heating Systems
D § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
D § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the
outlet temperature to 110 degrees F.
D § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the
following:
Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per
minute.
Foot actuated control valves, and outlet devices that limit the flow of hot water to a
maximum of 0.75 gallons per minute.
Proximity sensor actuated control valves, and outlet devices that limit the flow of hot .
water to a maximum of 0. 75 gallons per minute.
Self-closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons per minute, and 0.25 gallons/cycle ( circulating system).
Self-closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons per minute, and 0.50 gallons/cycle (non-circulating system).
Self-closing valves, and outlet devices that limit the flow of hot water to a maximum
of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor
controls).
EnergyPro 3.1 By EnergySoft User Number: 3429 Job Number: Page:16 of 16
_)
08021383 2819LOKERAVEASTCBAD
ACUSHNET COMPANY :Tl 1792SF
Tl COMM
Lot#: DBML INC
c;/1f6v
5 -;;M~o-:J-,
n. u~ Br/,!£
b fiJ c...Lfv} . ~
S--2-B-oz
6-2-1--02
~-e-f;C.
t;;.5 ~ (... Lh--J
,(, L~ fL'½> b ( c:
7M ul,-~ tufa
. i-/.Ml}.e-~ ~ s: -() (5 Tl'.,_, 0~ 71/4 ~ c.A-.-, IMUllNG • 'I
:;;1 ;;;::::: PLANNINl3
-/
""',q'.:'¼;=~Z-::::.::.::_::: ENGINEERINl3 FIRE APPR/FORM
HEALTH DEPT :::::::::= HAZ MAT/ AIR QI/AL OTHER SEWER D18111
TO FROM 8U>8 GRADINGLEnEII · r~·r--=-CFDFORM
PE & M WORKSIIEE1'
BLDG FEES COMPI.El'E
·"
LEGEND
SCOPE OF WORK
1. COMPLETE DRYWALL ON EXISTING STEEL STUD WALLS
2. RELOCATE DOUBLE DOORS
3. BUILD TIN CAN DIVIDER WALL, INSULATE, DRYWALL AND TAPE -J ,x-'I/
4. REMOVE NON USED AIR HANDLING UNIT AND REPLACE WITH 2 TON
HV AC UNIT ON EXISTING CURB. USING EXISTING PENETRATIONS
DUCT TO NEW WORK AREA (SEE MECHANICAL).
5. RE-DUCT EXISITNG HV AC UNIT IN NEW WORK AREA
6. INSTALL NEWT-BAR CEILING WITH CEILING INSULATION R-1.f I 3
7. DROP EXISTING AND PROVIDE NEW, FIRE SPRINKLERS TO NEW
ELEVATIONS.
8. INST ALL NEW FLOUR.ES CENT LIGHTING
9. PROVIDE WALL OUTLETS WITH NEW CIRCUITS (2) AND DATA
CONDUITS
10. FINJSH FLOORS TO BE COMMERCIAL GLUE DOWN CARPETS
SPEC'S
1. ALL WALL INSULATION TO BER-ii 13 /
2. ALL CEILING INSULATION TO BER-~ 1.1/'
3. LIGHTING TO BE 277 VOLT /
4. ELECTRJC CIRCUITS TO BE 20 AMP-yJo/
5. GYPSUM TO BE 5/8" --\ 'f:i '' / .,
-· l )
0
.--7
PRODUCTION · i I I
I I
I I QA
lc::rPAP t-P~A
--~ARKIN.G SUMMARY: I
. . STD. CCMPACT I-IC TOTAL
EXISTING 2W 6
ADDED -2 • 25 0
TOTAL 44 8
F~ REGlUIRB1ENTS
EXISTING ~T U5E
$UB-TOTAL5
T:TLE16T USE
e!JB-TOTAl..5
-r-orAL FAFiKI~ REQJIRED
70T AL PM;K!~ PROVIDED
1'iOTE:
AREA
l,'?)00 of.
21,11., &F.
0
22,11E> 5F.
4
21
(l)
25
AREA FAf.KJN:'.;
~S,cJo3 :i:: 112
2. 3,!..-9 ~ ·' r ~ 'f
15,441 SF. I '?) i
1B-IANT SPACE W.AS F'REVIOU5LY A MANUFACruRJ-t',
FACILITY FOR Cl-lRCMIUM 6R.AA-IIC5 INC . .? '"' ~· ",'
I
SERVER RM.
PRODUCTION
PUTTERS
0
COMPANY
STORE
GYM
0
ENGINEERING AND REPAIR OFFICE
'fOTAL SQUARE FOOTAGE 1,792
_·:i.:,.-~.--~J-.'L t,,r-~p
:)p;1nklz:..J
v'\--c ~ c.•·~',
f'v-c.f'C >, A
--r--
~~!t:!:!~ ea;lsbad Tract 74-21, in the City of Carlsbad, County of San Diego State of
Diego County, AprJl;. ~?2 ~:;:f:;~~!{~; ~~!:~:;;of ~e County Record~r of San
1997 as Document No. 1997-0074335 of Official: R rds mpliance recorded February 19, eco .
Assessor's Parcel No: 209-083-16 ....
. ·:~ . ~i ,, ... ,. . ,
LUNCH ROOM
CEILINGS@ 9"
. -----·· ·------------------·· ............................................................ ,
'
I
; \
···---··-------------·-····· .. ······································ ----------······-·-------················· ·--------····
.0
: PRODUCTION
GRINDING
---··.·-:::-·:_-:;--.
. ,·.:.. .. :;-:· -,·
-.. :_:_:.~~:;.-_;: :~.-. ,.
------
---~-. -...
.0
ELEC.
PHONE
r--------
MAINT./ENG./FAC./
SAFETY STORAGE
\
.o : ........ ! :z:
I ::e i ... >
"" Q
>-z
<(
(L
2
0
0
1-w z
I
Cf)
::)
0
<{
l-
'-L_
f;..-I c..c.. -. ....
-:-....:.
.., .... .... .., -...... 0 .... .=i
>< -
C, ""' -x . ;;:
C, 0 ..::~
IJ ._ !_i~~ __ _ ._ ... I
~10F -----------------------------'------=-