Loading...
HomeMy WebLinkAbout2820 AVENIDA VALERA; ; CB920837; PermitII c, BUILD 08/25/92 10:43 Page 1 of"' 1 Job AdtWess: 2820 AVENIDA VALERA Permit Type: SINGLE FAMILY DWLNG Parcel No: 216-460-25-00 Con:; t ruc t ion Type : VN Occupancy Group: R3/Ml I Valuation: 185,483 ING PERMIT Permit No: CB92(:537 Project Nu: A92!11897 Development No: Suite: Lot#: 13 - DETACHED Wi0 08/2!5/92 0001 01 02 Reference#: 92-636 s t &WT IS &3tiB*00 Description: 2365 SF.+ 413 SF GARAGE PLAN 2 Applied: 08/21/92 : PHASE 1 Apr/issue: 08/25/92 Validated By: MDP Appl/Ownr : FIELDSTONE/LA COSTA ASSOC. 619 546-8226 5465 MOREHOIJSE DRIVE #250 SAN DIEGO, CA 92121 Fees Required *** *** Fees Collected & Fees : Adjustments : Total Fees: Fee description Building Permit Plan Check Strong Motion Fee or manually enter Enter F.M.F./G.M.F Enter "Y" to Autoc Enter "Y" to Autoc Enter "Y" to 'Autoca * BUILDING TOTAL Enter "Y 'I for Plumbi Each Plumbing Fixt Each Building Sewer Each Water Heater and/or Gas Piping System Each Vacuum Breaker dits 350 1,678 Ext, f 941 b12 19 310 3376 3116 362 438 5 :+ 0 11874 7 40 E; 2 2 5 ----- 22013 * PLUMBING TOTAL Enter "Y" for Electric Issue Fee > Single Phase Per AMP > * ELECTRICAL TOTAL Enter 'Y' for Mechanical Issue Fee> Install Furn/Ducts > Each Install/Reloc Appliance Vent > Each Hood/Fireplace >. * MECHANICAL TOTAL 64. 00 10.30 Y .25 31.25 41. (30 15.00 Y 9.0'3 9.00 4.50 18.00 6.50 6.50 49.00 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER PLAN CHECK#: CB920837 PERMIT#: CB920837 PROJECT NAME: 2365 SF + 413 SF GARAGE PLAN PHASE 1 ADDRESS: 2820 AVENIDA VALERA CONTACT PERSON/PHONE#: ALLISON/438-0468 SEWER DIST: LC WATER DIST: CA DATE : PERMIT 2 04/23/93 TYPE: SFD INSPECTED DATE BY: INSPECTED: APPROVED - DISAPPROVED - INSPECTED DATE BY: INSPECTED : APPROVED - DISAPPROVED - n .f' FINAL BU\LDING INSPECTION I DEPT: BUILDING ENGINEERING FIRE PUNNING U/M PLAN CHECK#: CB920837 PERMIT#: CB920837 PROJECT NAME: 2365 SF + 413 SF GARAGE PLAN 2 PHASE 1 ADDRESS: 2820 AVENIDA VALERA CONTACT PERSON/PHONE#: ALLISON/438-0468 SEWER DIST: LC WATER DIST: CA WATER DATE : PERMIT 04/23/93 TYPE: SFD BY : INSPECTED : APPROVED - DISAPPROVED __ INSPECTED INSPECTED FINAL BUILDING INSPECTION I DEPT: BUILDING ENGINEERING FIRE PLANNING U/M WATER PLAN CHECK#: CB920837 PERMIT#: CB920837 PROJECT NAME: 2365 SF + 413 SF GARAGE PLAN 2 PHASE 1 ADDRESS: 2820 AVENIDA VALERA CONTACT PERSON/PHONE#: ALLISON/438-0468 SEWER DIST: LC WATER DIST: CA DATE: 04/23/93 PERMIT TYPE: SFD FINAL BUILDING INSPECTION DEPT: BUILDING ENGINEERING FIRE U/M WATER ('%AN CHECK#: CB920837 DATE: 04/23/93 JRMIT#: CB920837 PERMIT TYPE: SFD PROJECT NAME: 2365 SF + 413 SF GARAGE PLAN 2 PHASE 1 ADDRESS: 2820 AVENIDA VALERA INSPECTED INSPECTED: BY: 3 DATE INSPECTED DATE BY: INSPECTED : INSPECTED DATE BY: INSPECTED: APPROVED APPROVED APPROVED DISAPPROVED - - DISAPPROVED - DISAPPROVED CITY OF CARLSBAD INSPECTION REQUEST PERNIT# CB920837 FOR 05/04/93 INSPECFOR AREA PY DESCRIPTION: 2365 SF + 413 SF GARAGE PLAN 2 PLANCK# CB920837 TYPE: SFD CONSTR. TYPE VN APPLICANT: FIELDSTONE/LA COSTA ASSOC. PHONE: 619 546-8226 OWNER: REMARKS: RS/ALLISON/438-0468 PHASE 1 OCC GRP R3/l4l JOB ADDRESS: 2820 AVENIDA VALERA STE: LOT: 13 CONTRACTOR: PHONE: INSPECTOR SPECIAL INSTRUCT: TOTAL TIME: CD LVL DESCRIPTION ACP COMMENTS 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical -- -7 DATE 021793 021793 021793 021193 021193 021093 020493 020393 012793 012693 012593 121892 121892 101492 093092 ***** INSPECTION HISTORY ***** DESCRIPTION Exterior Lath/Drywall Cas/Tes t/Repa i rs Interior Lath/Drywall Exterior Lath/Drywall Interior Lath/Drywall Interior Lath/Drywall Insulation Insulation Frame/Steel/Bolting/Welding Rough/Topout Shear Panels/HD's Roof/Reroof Roof /Reroof F'tg/Foundation/Piers Underground/Under Floor ACT INSP COMMENTS AP PY AP PY AP PY AP PY AP PY AP PY AP PY NS PY NR PY AP PY AP PY AP TP AP PY AP l4P AP MP 1ST LAYER LID GARAGE POST@STAIRS/POST IN GARAGE SEE INSP NOTES 7895 Convoy Court PROFESSIONAL REGISTERED INSPECTIONS, INC . San Diego, California 921 11 FIELDSTONE COMPANY COW TR. DOING REPORTED WOPK 1/2" 8, 7 STRAND, 270 KSI CABLE, MIX 116525, MUELLER LEWIS CONCRETE LAR. RECEIVING 6 TESTtNG CONSTR. MAT':. SA\'OCES GAUGE %C826, GAUGE #C8105 I NSP'N . DATE - _. I P.R.I., INC. I ~- L3CATIONS OF WORK INSPECTED. TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS. PROGRESS. REMARKS. ETC. ->r- YEST SAMP, ES TAWTFJ. 51niic~ ~C~J~IECTIONS IWFL CS-.~A~F. ii.~. eo~rs TOPOUEOI CHFCYC'~. ET^. l*lcL 2@ES IrlFDRUATlOIJ 4RO'Jr - AMOIJNTS OF MATERIAL FLACEO OR Y!ORV PERFORLIE0:tJU~AEER. TYPE. b 'DE'I':IO'S. Lot a2 #3 d 4 a5 #6 t 7 # 8 # 9 # 10 /I11 #14 #15 #16 #17 The post tension concrete work requiring special inspection was, to the best of my knowledge, in conformance with the approved plans and specifications and the applicable workmanship provisions of the Uniform Building Code, 53 thru 11. 3203 Sitio Rosalia 3207 Sitio Rosalia 3212 Sitio Rosalia 3208 Sitio Rosalia 3204 Sitio Rosalia 2808 Avenida Valera 2810 Avenida Valera 2812 Avenida Valera 2814 Avenida Valera 2816 Avenida Valera 2818 Avenida Valera 2820 Avenida Valera 2822 Avenida Valera 2826 Avenida Valera 2828 Avenida Valera 2830 Avenida Valera CB920-840 CB920-848 CB 9 2 0- 8 5 5 CB920-859 CB9 20-84 9 CB920-841 CB920-836 CB920-860 CB920-850 CB920-86 1 CB920-843 CB920-837 CB9 20-862 CB920-851 CB9 20-863 CB 920-864 1988 Edition. Inspection reports Lot #lo9 #110 #111 #112 #113 #114 5115 #116 C117 F118 1126 W127 #128 #l29 #130 2825 Vista Mariana CB920-839 2823 Vista Mariana CB920-866 2821 Vista Mariana CB920-844 2817 Vista Mariana CB920-854 2815 Vista Mariana CB920-834 2811 Vista Mariana CB920-857 2809 Vista Mariana CB920-846 2807 Vista Mariana CB920-858 2805 Vista Mariana CB920-835 2803 Vista Mariana CB920-847 2811 Avenida Valera CB920-845 2813 Avenida Valera CB920-853 2815 Avenida Valera CB920-838 2817 Avenida Valera CB920-865 2819 Avenida Valera CB920-852 28 Day Compression test that did not reach the required PSI Lot 53 - 2940 - 45 Days 56 - 2970 - 60 Days Remaining lots did meet required PSI. /& z&+S. DALE REGLI 51GN4dRE OF REGISTERED INSDF'I -?F 4/12/93 280 OA rE OF REPOR r yc 3 c. E:, .. '.'e; 7895 Convoy Court San Diego, California 9211 1 PROFESSIONAL REGISTERED INSPECTIONS, INC . Phone 292-0661 INSP". DATE ~ INSPECTORS WEEKLY REPORT -X 5 I NO.~// I %I%?& .... [Jf ... &? .............. idc7 COVERING WORK PERFORMED 3 REINFORCEO CONCRETE 0 STRUCT. STEEL ASSEMBLY 0 GLUE - LAM. FABRICATION wnicu REQUIRED APPROVAL BY ~PRE-STRESSED CONCRETE a REINFORCEO GYPSUM THE SPECIAL INSPECTOR OC 0 REINFORCE0 MASONRY 3 PILE DRIVING .................................................... 0 OTHER LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS; REMARKS. ETC. INCLUDCS INFORMATION AOOUT - AMOUNTS OF MATERIAL PLACCO OR WORK PLRCORMCOINUMOCR. TVPC. b IDCNT.NO'S. OF TC8T SAMPLCS TAKIN: 8TRUCT. CONNCCTlON8 IWLLDI MADE. W.T. OOLT8 TOROUCDI CWCCKCD; f TC. PROFESSIONAL REGISTER INSPECTIONS, INC, 7895 Convoy Court #15 San Diego, Ca. 92111 JOB: FAIRWAYS JOB NO.: 491 1 ADDRESS : 2820 AVENIDA VALERA OWNER: FIELOSTONE CQMPANY CONTRACTOR: MUELLER LEWIS CONCRETE CLIENT: MQELLER LEWIS CONCRETE ENGINEER: *JEM I11 ARCHITECT: BERKUS GRQLJP BLDG AUTH: CITY OF CARLSBAD INSPECT@R: *JEFFREY GAVLER PERMIT NO.: CB92-0837 PLAN FILE: FIELD SAMPLE OF: CONCRETE LOCATION OF SPECIMEN IN JO6 OR STRLICTI-IRE: LOT #13 MIX NO.: 6525 HADE BY: JEFFREY GAYLER PROPORTIONS: SLUMP: 3/4" AQMIXTVRE: @ATE MADE: 10/16/92 TYPE OF CEMENT: XI DATE RECEIVED: 10/20/92 CONC. SUPPLIER: NELSQN & SLOAN SOURCE OF ROCK: TICKET NO.: 403650 INSPECTOR SIGN: LABORATORY TEST DATA 7 DAYS 1@ DAYS 28 DAYS SPECIMEN MARKINGS: 92800 92809 DATE TESTED: 10/26 11/13 AREA-SQ.INa: 28 128 28.28 ULTIMATE LOAD-LBS: 56000 UNIT STRESS-LBS: : 1900 SPECIFIEL! STRENGTH AT 28 @AYS-PSI: DISTRIBUTION! MUELLER LEWIS CQNCRETE F IELOSTONE COMPANY JEM 111 CITY QF QCEANSIDE . . 2500 28 RAYS 92810 11/13 28.28 7895 Convoy Court San Diego, California 92111 PROFESSIONAL REGISTERED INSPECTIONS, INC, Phone 292-066 . .- --- --- FOR WEEK /.I ' / c iNo.pf// I ENDING ON ...... Ad..! ..... k... .......... 191. INSPECTORS WEEKLY REPORT -* 7 COVERING WORK PERFORMED 3 REINFORCED CONCRETE 0 STRUCT. STEEL ASSEMBLY 0 GLUE - LAM. FABRICATION WHICH REQUIRED APPROVAL BY &~'PRE-STRESSED CONCRETE OTHER 0 REINFORCED GYPSUM THE SPECIAL INSPECTOR OF .................................................... 0 REINFORCED MASONRY 0 PILE DRIVING OWN.ER OR PROJECT NAME - / OF rEsT SAMPLES TAKEN: STRUCT. CONNECTIONS IWELOS Mho€. n.1. BOLTS TORQUED) CHECKEO: ETC. DATE OF REPORT REGISTER NUMBER .'....'-re PROFESSIONAL REGISTER INSPECTIONS, INC, 7895 Convoy Court #lS San Diego, Ca. 92111 JOB NO.: 4911 JOB: FAIRWAYS ADDRESS : 2820 AYENIEA YALERA OWNER: FIELOSTONE COMPANY CONTRACTOR: MVELLER LEWIS CQNCRETE CLIENT: MUELLER LEWIS CQNCRETE ENGINEER: 3EM I11 ARCHITECT: BERKVS GRQUP INSPECTOR: JEFFREY GAYLER FIELD SAMPLE OF: CONCRETE MIX NO.: 6525 PROPORTIONS: ADMIXTURE: TYPE OF CEMENT: 11 CONC. SUPPLIER: NELSON F3r SLOAN TICKET NO.: 4 0 3 6 5 0 BLDG AUTH: CITY OF CARLSBAC! PERMIT NO,: CB92-0837 PLAN FILE: LOCATION OF SPECIMEN IN JOB OR STRUCTURE: LQT #13 MARE BY: JEFFREY GAYLER SLUMP: 11 3 / 4 " DATE UADE: 1 O/ 16/92 PATE RECEIVED: 10/20/92 SOURCE OF ROCK: INSPECTOR SIGN: LABORATORY TEST DATA 7 DAYS SPECIMEN UARKINGS: DATE TESTED: AREA-SQaXNa: ULTIUATE LOAD-LBS: UNIT STRESS-LBS: . SPECIFIED STRENGTH AT 28 DAYS-PSI: DISTRIBUTION: MUELLER LEWIS CONCRETE FIELOSTQNE COMPANY CITY QF CARLSBAD JEM 111 19 DAYS 28 PAYS 28 DAYS 92808 92809 928 10 10/26 11/13 11/13 28 28 28 28 28 28 56000 8 1500 83500 : 1980 : 2880 : 2950 2500 1 ENGINEER 0 PERMIT NO.: 1 0 ADDlTIONAL OBSERVATION REQUIRED PLAN FILE NO.: GEOCCN . 6 INCOBPOBATED VU FOUNDATION OBSERVATION REPORT 0 PURPOSE OF OBSERVATION: )d .H 0 0 Verify soil conditions exposed are similar to those anticipated. Verify footing excavations extend to minimum depth recommended in soil report. Verify foundation reinforcement complies with minimum recommended in soil report. Verify slab reinforcement, sand bedding and moisture barrier comply with minimum recommended in soil report. J /f L' 0 SOIL REPORT RECOMMENDATIONS BASED ON ,El Expansion Condition; 0 VERY LOW 0 LOW BMEDIUM WHIGH 0 VERY HIGH ,& FillGeometry 0 Other: Pozting Depth: 0 12INcHEs ,tflSINCHES 0 2rlINcI-i~~ OTHER: Interior Slab Reinforcement: 0,6~&10/10 0 6x6-6/6 0 NO. 3 @ 24 INCHES' 0 NO. 3 @ 18 IN& Slab Bedding Material and Thickness: Foundation Width If yes, identify and descrik dhbstantial cod-ce with Soil Report (see "Pwpose of Observation"). 0 Substantial codbmmw with Foundation Plans. 0 MINIMUM FOUNDATION RECOMMENDATION Footing Reinforcement: 0 NO. 4 T&B 0 ZN0.4 T&B 0 NO5 T&B m"Ek iC31.f-&~, r/&. I . / e', *-t y I Vapor Barrier: 0 FOUNDATION PLAN REVIEWED: YES0 NO If 0 OB ERVATIONS: 0 Other: r 0 COMMENTS: ~ ~ ~ ~~ ~~ ~ NOTE: IT IS ASSUMED THAT ALL FOOTING EXCAVATIONS WILL BE CLEANED OF LOOSE MATERIAL PRIOR TO PLACING CONCRETE AND THAT THE !WE M0ISIWR.E CONTENT WLLL BE MAINTAINED. 7895 Convoy Court San Diego, California 92111 PROFESSIONAL REGISTERED INSPECTIONS, INC . Phone 292-066 COVERING WORK PERFORMED wnicn REQUIRED APPROVAL EY THE SPECIAL INSPECTOR OF 3 REINFORCED CONCRETE NPRE-STRESSED CONCRETE a REINFORCED GYPSUM 0 OTHER 0 STRUCT. STEEL ASSEMBLY 0 GLUE- LAM. FABRICATION 0 REINFORCED MASONRY 0 PILE DRIVING .................................................... DATE I INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PBRFOAMED:NUMOIR. TYPE, LIDENT.NO'S. OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS IWELDS MADE. H.T. 8OLTS TORQUED) CHECKED: ETC. JOB AODRES,S BUILOING P.ERMIT NUMBhR ' PLAN FILE NUMBER OWNER OR PROJECT NAME "+.. -; CONSTR. MA T*L.(TYPf; GRADE. trC.1 MFGR. . (MIX Dt4lGN. IIL-BAR CIADT '& MCGR.. WELD-100, kTC.) .- ARCHITECT ENGINEER .C G EN ERA L CON T R,AC'TO R