Owner: Gateway Pacific View, LLC Contractor: Ryan Companies US Inc.
28!~ :~~~s~_ai_l _Lo_o_P_(_B_ld_g_. _s_) _, _c_a_ris_b_a_d_, _c_A_9201 ~hone Number: __ (8_5_8_) _8_12_-_79_1_0 _______ _
Permit#: T_B_D _____________ _ Estimated Cost of Project: $_$_3_0_0_,0_Q_O ________ _
Type of Project: □ New Construction ~ Remodel or T.I. □ Residential 181 Commercial D Demolition
(check all that apply) D Other------------------------------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit. may be deemed to meet the 65% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area, _______ X 2 lbs. = ________ lbs.of allowable waste.
Kl I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 . Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash/ Garba"1e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled, ______ %
Contractor or Owner (signature)
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: ________________ _
Page 1 of 2 REV.01-2017
Table 2 -Actua I Waste (To be completed after construction.)
MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method
LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash / Garbaee
Other:
TOTAL lbs.:
Actual Percentage Re-Used or Recycled _______ %
Official Use Only
D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved by: _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt/ Concrete 0 3000
Brick/ Masonry 100 050
Cardboard 0 150
Drywall 0 50
Landscape Debris 0 120
Lumber/ Wood 500 0
Metals 300 200
Mixed \Vaste 1500 0
Trash / Garbage 300 0
Other: Pool c;uvute 0 900
TOTAL lbs.: 2700 5,3J-0
Percentage to be Re-Used or Recycled 6 7 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re~Use Method
AB,C, l·We<.Livv> Go.
WM/ Re-lA.sed 1'-rlcR ovc-slte
"-ls-l'.1-J.aullvc11 r.0 •
Als-C, fiaulivc11 Go.
Mulcvied s Re-used ovc-slte
waste Mavca11eV\,\.evct
WM/ Als-G HlH,tl[vcg
WM
WM
IA.sed as crusvievl is.ase ovc-slte
5370 X 100 = 67% Re-Used or Recycled
(2700 + 5370)
Since 67% exceeds the minimum requirement of 65%, this plan complies.
Page 2 of 2