Loading...
HomeMy WebLinkAbout2820 Whiptail Loop; ; CBC2018-0458; Recycle· Ccicyor Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: Gateway Pacific View, LLC Contractor: Ryan Companies US Inc. 28!~ :~~~s~_ai_l _Lo_o_P_(_B_ld_g_. _s_) _, _c_a_ris_b_a_d_, _c_A_9201 ~hone Number: __ (8_5_8_) _8_12_-_79_1_0 _______ _ Permit#: T_B_D _____________ _ Estimated Cost of Project: $_$_3_0_0_,0_Q_O ________ _ Type of Project: □ New Construction ~ Remodel or T.I. □ Residential 181 Commercial D Demolition (check all that apply) D Other------------------------------ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit. may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area, _______ X 2 lbs. = ________ lbs.of allowable waste. Kl I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 . Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash/ Garba"1e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled, ______ % Contractor or Owner (signature) Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: ________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actua I Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only if different than Table 1) Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash / Garbaee Other: TOTAL lbs.: Actual Percentage Re-Used or Recycled _______ % Official Use Only D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by: _________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt/ Concrete 0 3000 Brick/ Masonry 100 050 Cardboard 0 150 Drywall 0 50 Landscape Debris 0 120 Lumber/ Wood 500 0 Metals 300 200 Mixed \Vaste 1500 0 Trash / Garbage 300 0 Other: Pool c;uvute 0 900 TOTAL lbs.: 2700 5,3J-0 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re~Use Method AB,C, l·We<.Livv> Go. WM/ Re-lA.sed 1'-rlcR ovc-slte "-ls-l'.1-J.aullvc11 r.0 • Als-C, fiaulivc11 Go. Mulcvied s Re-used ovc-slte waste Mavca11eV\,\.evct WM/ Als-G HlH,tl[vcg WM WM IA.sed as crusvievl is.ase ovc-slte 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2