Loading...
HomeMy WebLinkAbout2828 Cacatua St; ; CBR2019-0941; Recycle(city of Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Oevelopment Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Many of the materials generated from your project can be recycled. You are required to list materials that will be reused, recycled or disposed from your project. If you have questions about the recycling requirement or completing this form, please contact Waste Management at (760) 929-9400, a certified C&D recycler, or the Carlsbad Building Division at (760) 602-2700. Please note: Unless you are self-hauling, Waste Management or approved haulers must be used for all construction projects within the City of Carlsbad. PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued without a completed Construction Waste Management Plan. Permit No. Project Address 2i2i ~ )I~ Oilil(I ~~ (\ 6\JC{.-Applicant Name Last Applicant Address Phone I .°?) \D l °t9-J -7"\7?, Applicant Mailing Address {if different than project address) Project Type /check all that apply): Brief Description Applicant Information Project Title '7;) ~ . APN ~-@ Contractor Architect Other A.1'{\(t, ,/\OJ,l... 0 0 0 First E-mail Address lli$ C\\'YIO,Ml\ fod r~\)r::LQ 'luhoo. I 111b Commercial □ Publi□lding Industrial □ Project Size I \\ \\tit) ;;:,, \\'.\'Y\tA,\, t cv\J , Estimated Cost of Project $--1\~~_,._,'-------"L=---------- (square }ootage) Please check the appropriate box: ~Ian on using WASTE MANAGEMENT roll-off bin(s) for all materials and will provide all receipts after construction. □ I plan on self-hauling to a certified recycling facility and will provide all receipts after construction. D This is a proposed LEED certified project and I plan on separating materials on site in conjunction with WASTE MANAGEMENT. Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. m Print Name -b~vh ~ck ( 'bt)ll• Signature dbJ~19 IJ-___ / Date '} / lljn 'i, Page 1 of 4 Rev. 11/12118 PART l Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will (cont'd} not be issued without a completed Construction Waste Management Plan. DEBRIS RECYCLING ESTIMATE: SECTION A Permit No. ____________ Project Title Project Address 2-Z?S< G:,, Q hili ';y,-. Applicant Name Q (}(1{\9\\1 c:z:__ _____ frrro=/1\=M=~----Phone Last U First APN ("2,\l) } G\ SECTION B Complete the following fable with estimated waste tonnage to be generated by your project. This is your plan for construction waste management. Changes can be made on the final recycle report. Material Type Complete this line of the table only if only using WASTE MANAGEMENT raff-off bins. Mixed C&D Debris Asphalt & Concrete Brick/ Masonry/ Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding/ Foam Cardboard Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, trees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing Materials Sera Metal Stucco Other: TOTAL SECTION C Goal: the diversion rate shall be 65% by weights of debris. = Estimated Waste Quantity (tons) \ A B C Place a(✓) check next to items to be reused or salvaged Place a(✓) check next to items to be recycled Place a(✓) check next to items to be disposed at landfill V ··-----·--------+---------+---------1 To meet 65% Diversion Requirement (estimate) ___ 4_.__ ___ .x 0.65 = _ _,,2.,_,_, _,,U"--_____ tons Total Estimated Waste from above Minimum Required Diversion Date Page 2 of 4 Rev. 11/12/18