HomeMy WebLinkAbout2839 LOKER AVE E; ; CB940195; PermitB U I L D I N G P E R M I T Permit No: CB940195
Project No: A9400279
Development No:
05/02/94 16:40
Page 1 of 1
Job Address: 2839 LOKER AV EAST Suite:
Permit Type: INDUSTRIAL TENANT IMPROVEMENT
Parcel No: Lot#:
Valuation: 3,000
Construction Type: VN
Occupancy Group: Reference#:
Description: 120 SF MOLD ROOM
Appl/Ownr : VILLAGE BUILDERS 619
PO BOX 392
CARLSBAD, CA 921008 --------··-·-
Status:
Applied:
Apr/Issue:
Entered By:
434.:.'.1121
ISSUED
02/24/94
05/02/94
DC
I
***
.00
35.00
120.00
Ext fee Data
54.00
35. O_O
1.00
21.00
111.00
DIFFINFEE
N
10.00 Y
10.00 Y
20.00
15.00 Y
9.00
24.00
PPROVAL
I N~..,p...;;..--DATE 1.;......;.' 1_--,..1
CLEARANCE-----•
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
r v-JJ... I LfoK
'p~~CATION . PLAN CHECK NO. .
City of Carlsbad Building Department .
2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161
1. P.ID.lMlf 1YP£ • . . F.sT. VAL '"5 Ct:)O
PI.AN CK DEl'OSIT ili!j;;;c)
VAIID. BY 1 I?-'-({ --_
DATE 1 '
A -D Commercial D New Bulidmg \i!'renant Improvement
B -D Industrial D New Building ~enant Improvement
C -D Residential D Apartment D Condo D Single Family Dwelling D Addition/ Alteration
D Duplex D Demolition D Relocation D Mobile Home a Electrical D Plumbing
D Mechanical O Pool O Spa O Retaining Wall O Solar D Other ____ _
2. PROJECT INFORMATION FOR OFFICE USE ONLY
Address ~!>~ .1-ot= er~~ ~ Buildmg or Suite No.
Nearest Cross Street 1= L-~
LEGAL DESCRIPTION Lot No. subd1V1s1on Name/Number OmtNo. Phase No.
C It;:;~
CHECK B£IDW IF S0BMI11ED:
2 Energy Cales a 2 Structural Cales CJ 1 Addressed Envelope
~ s ~-
DESCRIPTION OF WORK NEUJ ~114 IY-.1 !Si'X~IJe,
SQ. Ff. fro \ # OF STORIES
NAMEj1'11,E;i:;;:,r ~ ~I~ ADDRESS ~ .J...o~~ ~
CITY~ STATE~ ZIPcoDq~ DAYTELEPHONEqz.q~
S. ~:E ~ ~1',:. c::otv\fflll1:2i=:, ADDRESS 4@2...~'1tV-!:=/ ~rte-f02_
6. ~~~ ~ STATECA ZIPCODE420116' DAY TELEPHONE
NAME vu ... t..A-~PtJILl){efL~ ADDRESS ?roBox ·:~yi 'Z-
CITYC2.fdt..t-S 6A-D sTATE c,~ zrPcoDE <9?..ooYDAYTELEPHONE ~'3£1 I 12 ( ~
STATE LIC. # 2?9-?<31LICENSE CLASS ~-I CITY BUSINESS LIC. #
DESIGNER NANih~ t-J ft¾..l.. ADDRESS I~ G::141 j.efJ-~
{.'2
er~,~~ STATE DAY TELEPHONE STATE LIC. # C:012.CA'o/
Workers' Compensation beclarat1on: I hereby afhrm that I have a cernhcate of consent to self-msure issued by the Director of Industrial
Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified
by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C).
INSURANCE COMPANY ~ fvN 0 POLICY NO. { '2-'if 1 ·-r7t"~iJ110N DATE ~r-7 :S
Cernhcate of Exemption: I certify that m the performance of the work for which this permit 1s issued, I shall not employ any person m any manner
so as to ~~o ubject to the Workers' Compensation Laws of California.
SIGNATU~-DATE
DECI.ARA11oN
Owner-Builder Deciaratlon: I hereby affirm that I am exempt from the Contracto?s Llcense Law for the followmg reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or
offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds
or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended
or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden
of proving that he did not build or improve for the purpose of sale.).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions
Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects
with contractor(s) licensed pursuant to the Contractor's License Law).
D I am exempt under Section _______ Business and Professions Code for this reason:
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair
any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the
provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code)
or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit
subjects the applicant to a civil penalty of not more than five hundred dollars [$500]).
SIGNATURE DATE
COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and
prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act?
DYES D NO
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district?
C YES CJ NO
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site?
DYES ONO
IF ANY OF TIIE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFfER JULY 1, 1989 UNLESS TIIE APPUCANT
HAS MET OR IS MEETING TIIE REQUIREMENTS OF TIIE OFFICE OF EMERGENCY SERVICES AND TIIE AIR POILUTION OONTilOL DISTRICT.
9. UJNSIROCIIDN ffiNDlNG AGENCY
I hereby afhrm that there 1s a construction lendmg agency for the performance of the work for which this permit 1s issued (Sec 3097(1) C1V11 Code).
LENDER'S NAME LENDER'S ADDRESS
10. Al>PDCANT c£1tl'MCA'l'loN
I certify that I have read the apphcat1on and state that the above mformat1on 1s correct. I agree to comply with all City ordmances and State laws
relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection
purposes. I ALSO AGREE 1'0 SAVE INDEMNIFY AND KEEP HARMLESS TIIE CTlY OF CARISBAD AGAINSf AIL UABIIITIES, JUDGMENTS, CX>SfS
AND EXPENSES WIIlCH MAY IN ANY WAY Acx::R.UE AGAINSf SAID CTlY IN OONSF.QUENCE OF TIIE GRANTING OF TIIlS PERMIT.
OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height.
Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the
building or work authorized by such permit is not commenced within 365 days from the date of such permit or if the building or work authorized by
such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 303(d) Uniform Building Code).
DATE:_a,24 -~
PINK: Finance
PERMIT# CB940195
DESCRIPTION: 120 SF MOLD. ROOM
TYPE: ITI .
CITY OF CARLSBAD
INSPECT1ION REQUEST
FOR 07/11/94
STE:
INSPECTOR AREA PD
PLANCK# GB940195
OCC GRP
CONSTR. TYPE VN
LOT: JOB ADDRESS: 2839
APPLICANT: VILLAGE
CONTRACTOR:
LOKER AV EAST
BUILDERS PHONE: 619 434-1121
OWNER:
REMARKS: MW/JACK/434-1121
SPECIAL INSTRUCT:
PHONE: ~ PHONE:
INSPECTO ~
TOTAL TIME:
--RELATED PERMITS--PERMIT# TYPE STATUS
CUP90008 CUP EXPIRED
CO930060 COFO ISSUED
AS930078 ASTI ISSUED
FA940004 FALARM ISS.UED
CB940141 · ELEC ISSUED
CD LVL DESCRIPTION ACT COMMENTS
19 ST Final Structural
29 PL Final Plumbing
39 EL Final Electrical
49 ME Final Mechanical
----------------------------"-----------------------------
***** INSPECTION HISTORY*****
DATE
062994
062494
051694
051294
DESCRIPTION
Final Combo
Final Combo
Interior Lath/Drywall
Frame/Steel/Bolting/Welding
ACT.INSP
CO PD
CO TP
AP PD
AP PD
COMMENTS
ON JOB CARD
NO PLANS ON SITE
WALLS
rpr RECEIVED JUN.V-¾1994
FINAL BUILDING INSPECTION /l/7_,,,~ r 1J
DEPT:· BUILDING ENGINEERING ~) PLANNING U{M q'./WATER . ~~
PLAN CHECK#: CB940195 DATE: 06/241/94
PERMIT#: CB940195
PROJECT NAME: 120 SF MOLD ROOM
ADDRESS: .,-zg-3·9-;-r_;-o~ETlf'Q'-:--EAST-·1 ~------~~-·----......-.. ~~ --.~ .:~ . I . 1
CONTACT PERSON/PHONE#: MW/JACK/434-1121
SEWER DIST: WATER DIST:
INSPECTE~ BY:
INSPECTED .
BY:
INSPECTED
BY:
COMMENTS:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED 7:APPROVED
APPROVED DISAPPROVED
APPROVED DISAPPROVED
, . ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619) 560-1468
DATE: Eehcuacy o2.a, t&/9'( QAPPLICANT
~RISDIC~ PLAN CHE~R JURISDICTION: Gr /shad
QFILE COPY
QUPS
QDESIGNER
PLAN CHECK NO: <t'i-1'15 SET: Z
PROJECT ADDRESS: _ _,o2=-8=3~,-=~=...;.~--=:._._A-,,,e_..LL.:O=·__,E_-=R~$-f:~---
PROJECT NAME: __ T:r:~.__ _____ C;:;._,..~.,_if"'-'-/.-e ..... t-.s ..... f:_)..__ __ _
D
D
0
D
The plans transmitted herewith have been corrected where
necessary and sµbstantially comply with the .jur~sdiction's
building codes. · · ·
The plans transmitted herewith will substantially comply
with the jurisdic~ion's building codes when minor deficien-
cies identified..,.._--------....,,....,---are resq).v~d and __
checked by bui.lding department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmit~ed for a complete recheck.
The check list transmitted herewitb is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted f~r recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
~ Esgil staff did not advise the applicant contact person th~t
plan check has been completed. _
O Esgil staff did advise applicant that the plan check has
~een completed. Person contacted: ------------
Date contacted: Telephone# ------------------0 REMARKS: --------------------------
By:· j{r~kc
ESG!L CORPORATION z/~
Enclosures: -----------
0GA OcM 0PC
: , ... •·.:·,:·· ., ....... -· .. .-·.··· , ............ .
Jurisdiction <;;;.u-lspq,.p( Dates zfzshy
Prepared bys
k'ud:C..l'a¼C: VALUATION AND PLAN CHECK FEE
· o ·· ,Bldg. Dept.
0 Esgil
PLAN CHECK NO. 9 Y-t :! 5
BUILDING ADDRESS oi~3q Loke...r-Aue. f;;ers-1-
APPLICANT/CONTACT _________ PHONE NO. _______ _
BUILDING OCCUPANCY_______ DESIGNER PHONE _____ _
TYPE OF CONSTRUCTION______ CONTRACTOR PHONE -----
BUILDING PORTION BUILDING AREA VALUATION VALUE
MULTIPLIER .
TJ::"" I :i_o ~5 ·3 Oec:;>
;
.. .. -.. ... .,
.
.
--. --· -.. '• .. " .. . ... ,, ~ .. ..
:
'. " . .
. .. --:-.. .. -.. --·-""-.. .·
Air Conditionin£
Commercial @ ..
Residential @
Res. or Comm.
Fire S'Crinklers @
Total Value I ~
Building Perm it F' e e $ _________________ ___.$'------'5~4-~CQ=----
P la n Check F' ee_$~ ____________________ $_-=.3'-"5c..::-__.I_O ___ _
COM MEN TS._:----------------------------
SHEET / OF / ---'----12/87
PLANNING/ENGINEERING APPROVALS .....
PERMIT NUMBER CB Lf{t1/qs
RESIDENTIAL
RESIDENTIAL ADDITION MINOR
( < $10,000.00)
DATE ~/;,
PLAZA CAMINO REAL
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
PLANNER _____________ DATE _______ _
C:\WP51 \FILES\BLDG.FRM Rev 11 /15/90
-~/
~
--l ~
CII CII ... ... <II <II Q Q -~, I
:,.. ~ .Q -N ,_
...: ~ u u CII CII .r: .r: u u
C: C: <II <II .... ....
Q. Q.
CII ... <II Q
PLANNING CHECKUST
Plan Check No. 94-/q s· Address 283? Lq!?£/Jtll:f ~ l/-
Planner VAN LYNCH
(Name)
APN:. zoo/-oD-lc/
Phone 438-1161 ext. 4325 --'------)
Type of Project and Use / NIJIJ e T -p:Z
Zone f /)I) Facilities Management Zone _,:;:
I
CFO(~) #(It property in, complete SPECIAL TAX CALCULATION
WORKSHEET provided by Building Departrgent.)
Legend
~
~
~ u CII .r: u
C: <II ....
Q.
[2]
@
Item Complete
Item Incomplete -Needs your action
1, 2, 3 Number in circle indicates plancheck number where deficiency was
identified
Environmental Review Required: YES _ NO~ TYPE __ _
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ______________________ _
Discretionary Action Required: YES _. _ NO /2S,_ TYPE __ _
APPROVAL/RESO. NO. ___ DATE: _____ _
PROJECT NO. ___ _
OTHER RELATED CASES: ____________________ _
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ______________________ _
California Coastal Commission Permit Required: YES _ NO~
DATE OF APPROVAL:
San Diego Coast District, 3111 Camino Del Rio North, Suite 2oo;san Diego, CA. 92108-1725
(619) 521-8036 .
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval ______________________ _
' .' ':· '',-•";:' ( ,~--: . ' -
·l:915 0 t,ndusionary Housing Fee reqµire<l: YES _ ~o ..%.
(Effective elate: ofindusion~Ho~singQl'.dinance -May 21, 1993.)
·.~o
Site Plan:
1.
2.
Ptovjde a .fully dimensioned site plan· drawn to scale. Show: North
at.row, property lines; easemepts, existing and proposed structures,
Streets,. e:xi$tipg str~et improyelllents, right-of-way Width, dii:nension;ed
setbacks and e~stj.ng topograp~cal lines. ·
·Provide le-gal. cf~scrl.ption of .property, and assessor's parc;el nurnoet.
1. Setbacks:
.2.
<3.
4 •.
Front:
· Int . .Side:
St:r.eet .Side:.
Re~:
Lot cov~rage:
Height:<
.Required
Required
Required
Rt:!quired
Reqµired
.Requited
$paces Required
Gue$t Spaces. Required
___ Shown __
__ Shown __ _
--Shown __ __ Shown ____
__ Shown __
Shown ----~-'3 a Shown·
__ Shown __
D (J 0' Additional Cohtthents ___ __....,. _____________ .,.....,.,.__,..""""-------------------
OK '!'b ISSUE AND ENTERED APPROVAL INTO COMPUTilR J . ~/Nell, , .. . . l DATE <J-0-~J/ . I
PLN'CK.FRM
City of Carlsbad . 94046
Fire Department • Bureau of ·Prevention
Plan Review: Requirements Category: Building Plan Check
Date of Report: Tuesday, March 1, 1994
Contact Name
Address
City, State
. Stephen Hall
Reviewed by:~
755 Cornish Dr
Encinitas CA 92024
Bldg. Dept. No. _9_4·_1_9_5 ___ _ Planning No.
Job Name Titleist and FootJoy
Job Address 2839 Loker ------------------Ste. or Bldg. No. ____ _
·181 Approved -The item you have submitted for review has been approved. The approval is
based on plans; information and/or specifications provided in your submittal;
therefore any changes to these items after this date, including field modifica-
tions, must be reviewed by this office to insure continued conformance with
applicable codes. Please review carefully all comments attached, as failure
to comply with instructions in this report can result in suspension of permit to
construct or install improvements.
D Disapproved -Please see the attached report of deficiencies. Please make corrections to
plans or specifications necessary to indicate compliance with applicable
codes and standards. St1bmit corrected plans and/or specifications to this
office for review.
For Fire Department Use Only
Review 1st __ _ 2nd __ _ 3rd __ _
Other Agency ID
CFD Job# __ 94--'0'--4_6 __ File# ___ _
2560 Orion Way • Carlsbad; California 92008 • (619) 931-2121
TITLE 24 REPORT FOR:
Titleist and Foot-Joy Worldwide
2839 Loker Avenue East
Carlsbad, CA
PROJECT DESIGNER:
Stephen W. Hall Architect
755 Cornish Drive
Encinitas, CA
(619)943-1915
REPORT PREPARED BY:
Steve Balderrama
Haynal & Co., Inc.
425 West Fifth Street
Escondido, CA 92025
( 619) 743-5408
Job Number:
Date: 1/31/1994
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the
Residential and Nonresidential Building Energy Efficiency Standards.
This program developed by Gabel Dodd Associates (510) 428-0803.
Table Of Contents for Title 24 Report
Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Form ENV-1 Envelope Certificate of Compliance ....................... 3
Form ENV-2 Envelope Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Form ENV-3 Construction Assemblies 9
Form LTG-1 Lighting Certificate of Compliance ....................... 12
Form LTG-2 Lighting Compliance Summary .............................. 14
Form MECH-1 Mechanical Certificate of Compliance .................... 15
Form MECH-2 Mechanical Summary ...................................... 18
Form MECH-3 Mechanical Equipment Summary ............................ 19
Form MECH-4 Mechanical Ventilation .................................. 20
HVAC Zone & Space Loads Summary ..................................... 21
CERTIFICATE OF COMPLIANCE (part 1 of 2)
Project Name: Titleist and Foot-Joy Worldwide
Address: 2839 Loker Avenue East
Carlsbad, CA
Envelope
Designer: Stephen W. Hall Architect
Documentation: Haynal & Co., Inc.-·""'J--
ENV-1 page 3 of 22
Date: 1/31/1994
Building Permit No
Checked by/ Date
COMPLY 24 User 2875
GENERAL INFORMATION
Date of Plans: Building Conditioned Floor Area: 324 sf
7 Building Type: Nonresidential Climate Zone:
Phase of Construction: ~w Construction O Addition O Alteration
Method of Envelope Compliance: Prescriptive -Overall Envelope
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building envelope requirements.
The Principal Envelope Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the envelope requirements
contained in sections 110, 116 through 118, and.143 or 149 of Title 24,
Part 6, Chapter 1.
Please check one:
0
I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
or architect.
I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section~---of the
Code to sign this document as the person responsible for its
preparation; and for the following reason: _______________ _
PRINCIPAL ENVELOPE DESIGNER
Stephen W. Hall Architect
(619)943-1915
ENVELOPE MANDATORY MEASURES
Indicate location on plans of Note Block for Mandatory Measures:
CERTIFICATE OF COMPLIANCE (part 2 of 2)
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
Const
ENV-1 page 4 of 22
Date: 1/31/1994
COMPLY 24 User 2875
OPAQUE SURFACES
Assembly Name Type Location/Comments
Note to
Field
6" Concrete Wall
Demising Wall
R-19 Ceiling
FENESTRATION Frame
None
Metal
Metal
Orient Panes Type Exterior Shade OH Glazing Type
... '
OVERALL ENVELOPE METHOD Part 1 of 4
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
WINDOW AREA TEST
A. Display Perimeter 0.0 ft X 6 ft
B. Gross Exterior Wall Area 270.0 sf X 0.40
C. Gross Exterior Wall Area 270.0 sf X 0.10
D. Enter Larger of A or B
E. Enter Proposed Window Area
=
=
=
If Eis greater than Dor less than C, proceed to
for window area adjustment.
1. If Eis greater than D:
D. Maximum Standard Area
N/A
2. If Eis less than C:
C. Minimum Standard Area
27.0
SKYLIGHT AREA TEST
If not, go to part 2
I
I
E. Proposed Area
N/A
E. Proposed Area
0.0
=
=
ENV-2 page 5 of 22
Date: 1/31/1994
COMPLY 24 User 2875
0.0 sf Display Area
108.0 sf 40% Area
27.0 sf Min Std Area
108.0 sf Max Std Area
0.0 sf Proposed Area
the next calcula_!:ion
of 4.
Window
Adjustment Factor
N/A
Window
Adjustment Factor
0.0000
Atrium Height
0.0 ft
If Height< 55 ft If Height>= 55 ft
Standard= 5% ----------+----------Standard= 10% I
V
A. Gross Exterior Roof Area 324.0 sf X 0.05 = 16.2 sf Standard Area
B. Enter Proposed Skylight Area 0.0 sf Proposed Area
If the Proposed Skylight Area is greater than the Standard Skylight Area,
proceed to the next calculation for the skylight area adjustment. If not
got to part 2 of 4.
1. If Proposed Skylight Area> Standard Skylight Area:
Standard Skylight Area
N/A I
Proposed Skylight Area
N/A =
Skylight
Adjustment Factor
N/A
OVERALL ENVELOPE METHOD Part 2 of 4
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
OVERALL HEAT LOSS
PROPOSED
Assembly Name Area HC U-Val ----------------------------------
6" Concrete Wall 270.0 15.4 0.752
R-19 Ceiling 324.0 1.7 0.089
No Glazing 0.0 N/A 0.000
Total
** OVERALL HEAT LOSS COMPLIES
UxA
------
203.0
28.8
0.0 ------
231.8
PROPOSED
ENV-2 page 6 of 22
Date: 1/31/1994
COMPLY 24 User 2875
Adj. STANDARD
Area U-Val UxA
-----------------
270.0 0.690 186.3
324.0 0.078 25.3
27.0 1.230 33.2 ------
Total 244.8
UA <= STANDARD UA **
OVERALL ENVELOPE METHOD Part 3 of 4
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
OVERALL HEAT GAIN
Glazing
North
WF
0.34
PROPOSED
Area SC H
0.0 0.00
V OHF Total
0.0
Total 0.0
ENV-2 page 7 of 22
Date: 1/31/1994
COMPLY 24 User 2875
STANDARD
Area RSHG Total
27.0 0.94
Total
8.6
8.6
** OVERALL HEAT GAIN COMPLIES PROPOSED HG<= STANDARD HG**
OVERALL ENVELOPE METHOD Part 4 of 4 ENV-2 page 8 of 22
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
Date: 1/31/1994
COMPLY 24 User 2875
Window Area Adjustment Calculations
Wall Name
North
Gross
Dir Area
N
TOTALS
270.0
270.0
Skylight Area Adjustment Calculations
Roof Name
R-19 Roof
Gross
Dir Area
H
TOTALS
324.0
324.0
Door
Area
0.0
Adjusted
Window Adjust Window Wall
Area Factor Area Area
0.0 0.0000
0.0
Skylt Adjust
Area Factor ------------
0.0 0.0000 ------
0.0
0.0
0.0
270.0
270.0
Adjusted
Skylt Roof
Area Area
------------
0.0 324.0
------------
0.0 324.0
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 9 of 22
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
Date: 1/31/1994
COMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Concrete, 140 lbr-Not Dried
2 .
3 .
4.
5.
6.
7 .
8 •
9 .
Inside Air Film
ADJUSTMENT FOR FRAMING
Assembly Name: 6 11 Concrete Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: None
Framing Spacing: "O.C.
Framing Percent: o.o· %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
6.000
Unadjusted R-Values
0.17
0.48
0.68
1.33
0.17
0.48
0.68
1. 33
(1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) = 0.752
Weight:
Heat Capacity:
70.0 lb/sqft
15.40
TOTAL U-VALUE = 0.752
=====
TOTAL R-VALUE = 1.33
=====
PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 10 of 22 ---------------------------------------------------------------------------Project Name: Titleist and Foot-Joy Worldwide Date: 1/31/1994
Documentation: Haynal & Co., Inc.
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Gypsum or Plaster Board
2. Air Space
3. Gypsum or Plaster Board
4.
5.
6.
7 .
8 .
9 .
Inside Air Film
COMPLY 24 User 2875
Assembly Name: Demising Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Framing Material: Metal
Framing Spacing: II 0.C.
Framing Percent: 12.0 %
Absorptivity: 0.00
Roughness: Brick, Plaster
Th R-Value
Fr (in) Cavity Frame
0.625 * 6.000
0.625
Unadjusted R-Values
0.17
0.56
0.85
0.56
0.68
2.83
TOTAL U-VALUE =
0.17
0.56
0.85
0.56
0.68
0.00
0.368
=====
TOTAL R-VALUE = 2.72
=====
Weight:
Heat Capacity:
5.2 lb/sgft
1.35
PROPOSED CONSTRUCTION ASSEMBLY
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
ENV-3 page 11 of 22
Date: 1/31/1994
COMPLY 24 User 2875
COMPONENT DESCRIPTION
Sketch of Construction Assembly
ASSEMBLY U-VALUE
Construction Components
Outside Air Film
1. Roofing, Built-Up
2. Membrane, Vapor-Permeable Felt
3. Plywood
4. Insulation, Mineral Fiber, R-19
5. Air Space
6. Acoustical Tile, Interior Finish
7 .
8 .
9.
Inside Air Film
Assembly Name: R-19 Ceiling
Assembly Type: Roof
Assembly Tilt: 22 deg (Tilted Up)
Framing Material: Metal
Framing Spacing: 11 o.c.
Framing Percent: 7.0 %
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Th R-Value
Fr (in) Cavity Frame
0.17 0.17
0.375 0.33 0.33
0.010 0.06 0.06 ·o. 750 0.93 0.93
* 6.000 19.00 19.00
4.000 0.80 0.80
0.500 1.43 1.43
Unadjusted R-Values
0.61
23.33
0.61
0.00
Weight:
Heat Capacity:
5.3 lb/sqft
1. 65
TOTAL U-VALUE =
TOTAL R-VALUE =
0.089
=====
11.26
=====
CERTIFICATE OF COMPLIANCE (part 1 of 2) LTG-1 page 12 of 22
Date: 1/31/1994 Project Name: Titleist and Foot-Joy Worldwide
Address: 2839 Loker Avenue East
Carlsbad, CA Building Permit No
Checked by/ Date
COMPLY 24 User 2875
Lighting
Designer:
Documentation: Haynal & Co., Inc.~~
GENERAL INFORMATION
Date of Plans: =-----r-....---,-Building Conditioned Floor Area: 324 sf
Building Type: Nonresidentia1/ Climate Zone: 7
Phase of Construction: ,.ef'New Construction O Addition O Alteration
Method of Lighting Compliance: Prescriptive
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building lighting requirements.
The Principal Lighting Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the lighting requirements
contained in sections 110, 119, 130 through 132 and 146 or 149.
Please check one:
0
I hereby affirm that I am eligible under the provisions of Division 3
of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
electrical engineer or architect.
I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section -c-:----of the
Code to sign this document as the person responsible for its
preparation; and for the following reas n: ----------------
PRINCIPAL LIGHTING DESIGNER
Lie. Date
LIGHTING MANDATORY MEASURES Ml
Indicate location on plans of Note Block for Mandatory Measures:~~---
CERTIFICATE OF COMPLIANCE (part 2 of 2)
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
INSTALLED LIGHTING SCHEDULE
No of
Name Lamp Type Lamps
-----------------------
Fluorescent 3
MANDATORY AUTOMATIC CONTROLS
Control
Watts/ Ballast
Lamp Type
----------------34 Standard
LTG-1 page 13 of 22
Date: 1/31/1994
COMPLY 24 User 2875
Ballasts/ No of Note to
Luminaire Fixt. Field ---------------------
2.0 4
Control Location ID Control Type Space Controlled
Note to
Field
Wall ------$$_
CONTROLS FOR CREDIT
Control
Dual Switch
Control Location ID Control Type
N/A -------
_Typical ______ _
Space Controlled
Note to
Field
LIGHTING COMPLIANCE SUMMARY
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
ACTUAL LIGHTING POWER
LTG-2 page 14 of 22
Date: 1/31/1994
COMPLY 24 User 2875
No of Watts Total
Name Description Lumin per Default Watts
48" T-12 Low Watt /3 Lamp (Not Tndm) 4 115.0 Y 460.0
SubTotal 460
Less Control Credits (LTG-3) O
Total Proposed Watts 460
* If not CEC Default value, please provide supporting documentation.
ALLOWED LIGHTING POWER BY SPACE Allowed
Floor LPD Total Tailored
Space Name Occupancy Area (w/sf) (watts) (watts)
-------------------------
Manufacturing Rooms Precision Industrial 324 2.000 648 0 -------------------------
TOTALS 324 2.000 648 0
* Note: Tailored Allotment requires supporting documentation on form LTG-4.
~ I
CERTIFICATE OF COMPLIANCE (part 1 of 3)
Project Name: Titleist and Foot-Joy Worldwide
Address: 2839 Loker Avenue East
Carlsbad, CA
MECH-1 page 15 of 22
Date: 2/2/1994
Building Permit No
Mechanical
Designer: Checked by/ Date
~~~~~=~=~=~~~~-~~~~~=-~-~~~~-=~~~~---~~~:~=-~~-~~==-~~~=
GENERAL INFORMATION
Date of Plans: =-=-----r--._--,-. Building Conditioned Floor Area: 324 sf
Building Type: Nonresidential · Climate Zone: 7
Phase of Construction: efNew Construction O Addition O Alteration
Method of Mechanical Compliance: Prescriptive /
Proof of Envelope Compliance: O Previous Permit ifCompliance Attached
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Part 6, Chapter 1 and Title
20, Chapter 2, Subchapter 4, Article 1 of the California Code of Regula-
tions. This certificate applies only to building mechanical requirements.
The Principal Mechanical Designer hereby certifies that the proposed build-
ing design represented in this set of construction documents is consistent
with the other compliance forms and worksheets, with the specifications,
and with any other calculations submitted with this permit application.
The proposed building has been designed to meet the mechanical requirements
contained in sections 110 through 115, 120 through 124, 140 through 142,144
and 145.
Please check one:
)J I hereby affirm that I am eligible under ~he provisions of Division 3 l~ of the Business and Professions Code to sign this document as the
person responsible for its preparation; and that I am a civil engineer
mechanical engineer or architect.
O I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section 5537.2 of the Business and
Professions Code to sign this document as the person responsible for
its preparation; and that I am a licensed contractor preparing docu-
ments for work that I have contracted to perform.
0 I affirm that I am eligible under the exemption to Division 3 of the
Business and Professions Code by Section~---of the
Code to sign this document as the person responsible for its
preparation; and for the following reason: ______________ _
~~ PRINCIPAL MECHANICAL DESIGNER
ture) (Lie. #) (Date)
MECHANICAL MANDATORY MEASURES M
Indicate location on plans of Note Block for Mandatory Measures:~'~} __ _
CERTIFICATE OF COMPLIANCE (part 2 of 3)
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
SYSTEM FEATURES
Zone Name Manufacturing Rooms
Time Control S ----Setback Control None
# of Isolation Zonesn/a
HP Thermostat Yes
Electric Heat 0.0 KW
Fan Control Constant Volume
VAV Min Position n/a
Simul. Heat/Cool n/a
Heat Supply Reset Constant Temp
Cool Supply Reset Constant Temp
Ventilation C OA Damper Control --A--
Economizer Type No Economizer
Outdoor Air CFM 49
Heat Equip Type Heat Pump
Make & Model No. Rheem RPND-018J
Cool Equip Type DX
Make and Model
Code Tables
Time Control
S:Prog Switch
O:Occ Sensor
M:Man Timer
Ventilation
B:Air Balance
C:OA Cert.
M:OA Measure
D:Demand Cont
N:Natural
OA Damper
A:Auto
G:Gravity
MECH-1 page 16 of 22
Date: 2/2/1994
COMPLY 24 User 2875
Note to
Field
CERTIFICATE OF COMPLIANCE (part 3 of 3)
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
DUCT INSULATION
System Name -----------------------Rheem RPND-018J
PIPE INSULATION
System Name
Domestic Hot Water
Type Duct Location --------------------------
Heating Ducts in Attic
Cooling Ducts in Attic
Insul
Pipe Type Required
y I N
NOTES TO FIELD -For Building Department Use Only
MECH-1 page 17 of 22
Date: 2/2/1994
COMPLY 24 User 2875
Duct Tape
Allowed
-------
y I N y I N
Insul
R-Val -----
4.2
4.2
Note to
Field
-------
Note to
Field
MECHANICAL SIZING AND FAN POWER
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
SIZING AND EQUIPMENT SELECTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Peak Load Method:
Relative Humidity:
1. DESIGN CONDITIONS FOR Carlsbad
2. SIZING
Btu/hr -------
MECH-2 page 18 of 22
Date: 2/2/1994
COMPLY 24 User 2875
Manufacturing Rooms
Rheem RPND-018J
HEATING
38 F
PEAK
1
COINCIDENT
50 %
COOLING
SENSIBLE LATENT
83 F 67 F
Btu/hr Btu/hr
--------------SPACES SERVED BY SYSTEM
Manufacturing Rooms
Manufacturing(Uncond)
PEAK
(Jan 12am)
(Jan 12am)
10420 (Aug 5pm) 4159 324
TOTAL SPACE LOAD
Duct Gains & Losses:
Ventilation: ( 49 CFM)
Return Air Lighting Gain
TOTAL SYSTEM LOAD
3. SELECTION
A. Safety/Warmup Factor
B. Maximum Adjusted Load
C. Installed Equipment Capacity
0 (Aug 5pm) -------
10420
1042
1677
-------
13139
1.43
18789
14099
If Line 3-C > Line 3-B, Explain: __ Packaged Heat Pump
FAN POWER CONSUMPTION
No. Efficiency Peak
Fan Description Sys BHP Motor Drive HP -----------------------------------------
Supply Fan 1 X 0.12 I [O. 49 X 1.00] = 0.24
-----
Totals 0.24
0 0
--------------
4159 324
416
157 62
0 --------------
4732 386
1.21
5726
14273 5019
----------
Conv Peak Supply
Fact Watts CFM -----------
X 746 = 183 600
-----------
183 600
FAN POWER DEMAND 183 watts/ 600 cfm = 0.304 watts/cfm
MECHANICAL EQUIPMENT SUMMARY
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
MECH-3 page 19 of 22
Date: 2/2/1994
COMPLY 24 User 2875
PLANT EQUIPMENT SUMMARY
Equipment Name -----------------------Std Gas 50 gal or Less
CENTRAL SYSTEM SUMMARY
Sys
No System Name
1 Rheem RPND-018J
CENTRAL SYSTEM RATINGS
Fuel Elec Total
No. Input Input Output
Equipment Type Sys (KBtu) (KW) (KBtu) -------------------------------------
Gas Fired 1 40.0 0.0 31.2
No
System Type Sys Economizer Type
Packaged Heat Pu 1 No Economizer
Sys-------Heating----------------------------------Cooling----------
No Type Output Aux KW EFF Type Output Sensible EER SEER
1 Heat Pump 17200 0.0 6.60 DX 18000 13800 9.05 10.20
CENTRAL FAN SUMMARY------------Supply Fan-----------Return Fan
Mtr Drv
CFM BHP Eff Eff
Sys Mtr Drv
No Fan Type Motor Location CFM BHP Eff Eff
1 Constant Volume Draw-Through
ZONAL FAN SUMMARY
Space Name
None
No CFM
600
Zonal Fan
Mtr
BHP Eff
0.12 49 100 None
------------Exhaust Fan
Drv Mtr
Eff No CFM BHP Eff
Drv
Eff
.·
MECHANICAL VENTILATION
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
VENTILATION SUMMARY BY SPACE
Floor
Space Name T Occupancy Area ------------------------------------------
Manufacturing Rooms Precision Indu 324
sqft
/Occ
100
MECH-4 page 20 of 22
Date: 2/2/1994
COMPLY 24 User 2875
Tran
CFM Min Design sfer
/Occ CFM CFM CFM ------
15.0 49 49
------
TOTALS 49 49
Note: If Tailored (T=*), user must document sqft/Occ and/or CFM/Occ values.
HVAC ZONE HEATING & COOLING LOAD SUMMARY
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
Manufacturing Rooms
Manufacturing(Uncond)
PEAK
(Jan 12am)
(Jan 12am)
TOTAL SPACE LOAD
Duct Gains & Losses:
Ventilation: ( 49 CFM)
Return Air Lighting Gain
TOTAL SYSTEM LOAD
SYSTEM OUTPUT AT DESIGN CONDITIONS
HEATING
10420
0
10420
1042
1677
13139
14099
page 21 of 22
Date: 2/2/1994
COMPLY 24 User 2875
Manufacturing Rooms
Rheem RPND-018J
1
Day Fans STD
COINCIDENT
50 %-
COOLING
PEAK SENSIBLE LATENT
(Aug
(Aug
5pm)
5pm)
4159
0
4159
416
157
0
4732
14273
324
0
324
62
386
5019
NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment
which will heat or cool this zone during the design conditions indicated.
These numbers include no safety factor, and the HVAC contractor should
oversize by a reasonable margin to account for variations in weather
conditions and the pick-up capacity required to bring the zone to temper-
ature as a result of a setback thermostat. Those responsible for final
equipment selection should note that Sensible and Latent Cooling Loads are
indicated to allow for accurate comparison with manufacturer's output data.
.· ,
SPACE HEATING & COOLING LOAD SUMMARY
Project Name: Titleist and Foot-Joy Worldwide
Documentation: Haynal & Co., Inc.
page 22 of 22
Date: 2/2/1994
COMPLY 24 User 2875
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name: Manufacturing Rooms
DESIGN CONDITIONS --------------------Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT ---------------------Wall Conduction
Window Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
Interior Conduction
Infiltration
Solar Gain
Lighting
Receptacle
Process
Occupants
Heating AirFlow:
Cooling AirFlow:
COOLING
HEATING SENSIBLE LATENT
---------------------
Jan 12am Aug 5pm
70 F DB 78 F DB 50 g..
0 RH
38 F DB 81 F DB 65 F WB
Quantity Btu/hr Btu/hr Btu/hr ---------------------------------
780.0 sqft 6496 1421
0.0 sqft 0 0
0.0 sqft 0 0
324.0 sqft 921 187
0.0 sqft 0 0
0.0 sqft 0 0
324.0 sqft 3003 0
0.0 sqft 0 0
0.0 AC/hr 0 0
0.0 sqft 0 0
648.0 watts 0 1592
324.0 watts 0 553
0.0 watts 0 0
3.2 occs 0 405 324
---------------------
SPACE LOADS 10420 4159 324
10420 Btu/hr
1
; [1.08 x
4159 Btu/hr [1.08 x
35 F DeltaT)] =
23 F DeltaT)] =
276 cfm
168 cfm
... ...
MANDATORY REQUIREMENTS
ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL)
1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section
116(a).
2. Site-constructed doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b).
3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit
infiltration and exfiltration per Section 117.
4. Certified insulation materials per Section 118(a).
5. Urea Formaldehyde foam insulation installed per Section 118(b).
6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c).
LIGHTING MANDATORY MEASURES
1. Each enclosed area shall have independent controls (per Section 131 (a) and exceptions).
2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire
(per Section 131 (b) and exceptions; exceptions include lights in corridors).
3. Daylit areas larger than 250 sf shall be seperately controlled and uniformly reducible by one half (per Section 131 (c) and exceptions).
4. Seperately metered spac~s 5,000 sf or greater shall have automatic shutoff controls (per Section 131 (e), no exceptions).
5. Display lighting shall be seperately switched on circuits that are 20 amps or less (per Section 131 (e), no exceptions).
6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131 (f) and exceptions).
7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions).
MECHANICAL AND PLUMBING MANDATORY MEASURES
Equipment and Systems Efficiency
1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112.
2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HVAC equipment, shall be insulated in
accordance with Section 123.
3. Air handling duct systems shall be sealed in accordance with the SMACNA HVAC Ducts Construction Standards, Metal and Flexible, 1985,
per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10.
4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115.
Ventilation
1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121 (a), (b) and (e).
2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121 (c).
3. When a return plenum is used to distribute outdoor air to a covered HVAC unit, the ducted discharge shall be in accordance with Section
121 (d).
4. Systems shall meet the completion and balancing requirements of Section 121 (f).
Controls
1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating
shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a
dead-band of 5 degrees between heating and cooling, Section 122(a) and (b).
2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b).
3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four
hours, per Section 122(e)1.
4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter
design temperature is less than 33 degrees, per Section 122(e) 2, and its exceptions.
5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas
served by the equipment, per Section 122(f).
6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be
designed, installed, and controlled to serve isolation areas, per Section 122(g).
SERVICE WATER HEATING SYSTEMS
1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) and (b).
2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3.
3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4.
Hazardous Matena1s
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUEST~ONNAiRE
No Sa,,M l; ::,·-t,:N\~ F-.;J KftlJJI'C.1 ~ l;lfil""tt.1
COtllHY OF SAij DIRCU -
Business Name Contact Porson Telephone
Titleist and Foot-Joy Worldwide Kim Tucker 745-1000
Mailing Address .. City State Zip Plan File#
1021 w. Mission Ave. Escondido CA 92025
Site Address City State Zip Plan File#
-'";)2839 Loker Ave. East Carlsbad CA 92008
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS MANAGEMENT DIVISION: OCCUPANCY CLASSIFICATION
Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any or the items are
circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
1 . Explosive or Blasting Ag ants 4. Flammable Solids 7. Pyrophorics 10. Cryogenics 13. Corrosives
2. Compressed Gases 5. Organic Peroxides 8. Unstable Reactives 11. Highly Toxic or Toxic Materials 14: Other Health Hazards @ Flammable or Combustible Liquids 6. Oxidizers 9. Water Reactives 12. Radiooctives
PART 11: COUNTY OF SAN DIEGO HEALTH DEPARTMENT -HAZARDOUS MATERIALS MANAGEMENT DIVISION:
r:ONTINGENCY PLAN REVIEW: . OFFICE USE ONLY
If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Management
Division, ,1255 Imperial Avenue,. 3rd Floor, San Diego, CA 92186-5261. Telephone (619) 338-2~22 prior to the issuance of a D RMPP Exempt
building permit.• ~ . o._ci. · . . f}1o(d ~~~~ /tJtx /l::, 1
FEES MAY BE REQUIRED Id D . 1l1 ~!f; /l'J. I w1.W.:::\ K) J Date Initials
1 c..;;, L lllV\C, D RMPP Required
Yes ~No -.. · . ·· O'-'-I /
1. D' Is your business listed on the reverse side of thiu form? ·
2. az:i Will your business dispose of Hazardous Substancas or Medical Waste in any amount?
3. D @ Will your business store or handle Hazardous Substances in quantities ·equal to or grsater than 55 gallons,
500 pounds, 200 cubic feet or carcinogens/reproductive toxins in any quantity?
Date Initials D RMPP Completed
4. D Will your business use an existing or install en underground storage tank?
5. D Will your business store or handle Acutely Hazardous Materials? Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT
If the answer to any of the questions is yes, applicant must contact the Air Pollution Control District, 9150 Chesapeake Drive, San Diego, CA 92123.
Telephone (619) 694-3307 prior to the issuancs of a building permit. ·
YES N9<
1. D c:EJ Will the intended occupant install or use any of tho equipment listed on the Usting of Air Pollution Control District Permit Categories, on the
reverse side of this form? .
2. D D (ANS_WER ONLY IF QUESTION 1 IS YES.) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through
12) as listed in the current Directory of School and Community College Districts, published by the San Diego County Office of Education and
the current California Private School Directory, compiled in accordance with provisions of Education Code Section 33190?
Briefly describe nature of the intended business acnvity:
Research and Desip;n facility for Golf Clubs
Name of Owner or Authorized Agent: Kim Tucker· Safety/Comnliance Engin_e_e_r ______________________ _
Signature of Owner or Authorized Aga : I declare under penalty of perjury that to the best of my knowledge and belief the responses made herein an, Hue
andcorrect · 2/28/94. Date: __________ _
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. _______________________________ _
BY: ___________________________________ Date: ________________ _
COUNTY-HMMO
..
E.nvironmc:nll.l Hc&l!h Service.
DHS:HM-9171 (6/92)
Al'f'ROVEO FOR BUILDING PERMIT BUT NOT OCC0UPAHCY APf'f\OVED FOR OCCUPANCY
APCO COUNTY-HMMD APCD
COWlty of San Diego
Departil:lent of Hes.lth Sttv~