Loading...
HomeMy WebLinkAbout2839 LOKER AVE E; ; CB960634; Permit\ \ 07/11/96 08:29 Page 1 of 1 8 U I L D I N G ,Job AddreGs: 2839 LOKER lW EAST Permit. Type: MECHANICAL Parcel No: Valuation: 40,0UO P E R M I T Permit No: Project No: Development No: Suite: Lot#: Construction Type: Occupancy Group: Reference#: Stq.,tL,lS: Appf'i~~]l'f Description: 3 ROOF MOUNTED H~ATERS : WITH SCREENS CITY OF CARLSBAD Apr/Issue: Entert::id By: 619-755-1800 \ 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 CB960631b A96UU8:37 NEW ISSUED U4/olM9~(, 07/11/96 RiviA '• --- U-J;t-/b6 37 PERMIT APPIJCATION City of Carlsbad Building Department 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 F.Sf. VAL.___-+_..:;..+-<i,.c..,.c..,"'----:~,,..-- PLAN CK D 1. PERMIT 'rYPE VAIID.BY_,....,....,---Hr-------- From Llst 1 (see back) give code of Permit-Type: --'M-~ ___ ..;..;;. ______ _ For Residential Projects Only: From Llst 2 (see back) give Code of Structure-Type: ____________________ _ Net Loss/Gain of Dwelling Units __________________ _ DATE '\•"; \/:;;,.. 2. PROJECf INFORMATION FOR OFFICE USE ONLY Address 2B~ ~~ ~Bmldmg or Suite No. Nearest Cross Street <[._ / r ':J LE AL E CRI TIO b t o. Su IVISIOn Name/ um er CHECK BEWW IF sUBMn"l~Lf: 2 Energy Cales D 2 Structural Cales D 2 Soils Report D 1 Addressed Envelope ASSESSOR'S PARCEL EXISTING USE PROPOSED USE DESCRIPTION OF WORK ~ ~~ ~l)~~ SQ. Ff. # OF STORIES # OF BEDROOMS # OF BATIIROOMS NAME (last nam_t first) •--= ADDRESS Ml Tl~~ -,-Fret~ wo~t-102-1 w ~aN CI'IY ~r:Jf?f~ STATEC,A ZIP COD~G° DAY TELEPHONE :J-40' /'Cri[) 5.PROP~ER NAME (last name first) ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE IJC. # LlCENSE CIASS CITY BUSINESS LIC. # DESIGNER NAME (last name hrst) ADDRESS CITY STATE ZIP CODE DAY TELEPHONE STATE LIC. # 1. rWOIUffiRS'-ooMPEN$A11QN '---------Worke_ri;' Co.mpensation Declaration: I hereby affirm that I have a cemhcate of consent to self-msure issued by the Director of Industnal Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department (Section 3800, Lab. C). INSUID\NCEGQMPANY fu: fl-'\:bc...~ llt<\'FIORDATE 4 -, ..:...9 7 SIGNATURE • DATE 8. oWNER-BUILDER. DECIARATION Owner-Budder Declaration: I hereby afhrm that I am exempt from the Contractors License Law for the followmg reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's Llcense Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's Llcense Law). D I am exempt under Section _______ Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's Llcense Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 ·by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). SIGNATIJRE DATE COMPLETE tHis SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: 227-t:,) Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES D NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? DYES D NO Is the facility to be constructed withinJ,000 feet of the outer boundary of a school site? DYES .,{'\,NO IF ANY OF TIIE ANSWERS ARE YES, A FINAL CERTIFICATE OF oa;upANCY MAY NOT BE~ AFfERJULY 1, 1989 UNLF.SS TIIE APPUCANT HAS MET OR IS MEETING TIIE REQUIREMENTS OF TIIE OFFICE OF EMERGENCY SERVICFS AND TIIE AIR POLLUTION CDN1ROL DISfRICT. 9. wNsl'RUCIIDN LENDING AGENCY l hereby affirm that there 1s a construction lendmg agency for the performance of the work for which this permit 1s issued (Sec 3097(1) GlVII Code). LENDER'S NAME LENDER'S ADDRESS 10. APPUCAN I CRR11F1CA:110N I certify that I have read the application and state that the above mformauon 1s correct. I agree to comply wnh all City ordmances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I AISO AGREE 10 SAVE INDEMNIFY AND KEEP HARMLESS TIIE CITY OF CARISBAD AGAINSf AIL IJABIIJ.TIES, JUDGMENTS, rosrs AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINSf SAID CITY IN CDNSEQUENCE OF TIIE GRANTING OF TIIIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0" deep and demolition or construction of structures over 3 stories in height. CITY OF CARLSBAD INSPECTION REQUEST PERMIT# CB960634 FOR 10/30/96 DESCRIPTION: 3 ROOF MOUNTED HEATERS WITH SCREENS TYPE: MECH INSPECTOR AREA TP PLANCK# CB960634 OCC GRP CONSTR. TYPE NEW JOB ADDRESS: 2839 LOKER AV EAST STE: LOT: APPLICANT: TITELIST & FOOT JOY,WORLDWIDE CONTRACTOR: PHONE: 619-755-:v800 PHONE: OWNER: REMARKS: BJN/JACK/755-1800 SPECIAL INSTRUCT: TOTAL TIME: --RELATED PERMITS-- CD LVL DESCRIPTION 19 ST Final Structural 29 PL Final Plumbing 39 EL Final Electrical 49 ME Final Mechanical PERMIT# CUP90008 C0930060 AS930078 FA940004 TYPE CUP COFO ASTI FALARM PHONE: INSPECTOR STATUS EXPIRED ISSUED ISSUED ISSUED ACT COMMENTS --p--------- /Uk_----------ft:&_ ~-------- --------------------------------------------------------- ***** INSPECTION HISTORY***** DATE 091896 082796 082796 081696 DESCRIPTION Final Mechanical Gas/Test/Repairs Rough Combo Final Mechanical ACT INSP CO TP AP TP NR TP CO TP COMMENTS SEE JOB CARD SEE CARD DATE: 4/24/96 JURISDICTION: Carlsbad PLAN CHECK NO.: 96-634 EsGil Corporation Professiona{ PCan !l{eview 'Engineers SET: II PROJECT ADDRESS: 2839 Loker Avenue East D APPLICANT Cf..l''"JORISJ D FIRE D PLAN REVIEWER D FILE PROJECT NAME: Titleist & Foot-Joy Worldwide T.I. New Mechanical Equipment cg] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: ~ Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone#: D REMARKS: By: David Yao Enclosures: Esgil Corporation D GA DCM D GP D PC log trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 '• DATE: 4/17/96 JURISDICTION: Carlsbad PLAN CHECK NO.: 96-634 EsGil Corporation Professiona{ PCan !l(eview 'Engineers SET:I PROJECT ADDRESS: 2839 Loker Avenue East CJ APPLICANT CJ~ CJ FIRE CJ PLAN REVIEWER CJ FILE PROJECT NAME: Titleist & Foot-Joy Worldwide T.I. New Mechanical Equipments D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's*********** codes. D The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. 1:8:] The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ·o The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. 1:8:] The applicant's copy of the check list has been sent to: Chapo & Hall Architects 777 S. Hwy 101 Suite 210 Solana Beach CA 92075 1:8:] Esgil Corporation staff did not advise the applicant that the plan check has been completed. D Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone #: D REMARKS: By: David Yao Enclosures: Esgil Corporation ~ GA DCM D GP D PC 4/8 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576 t. J ,, ,. !, i !, Carlsbad 96-634 4/17/96 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: .96-634 OCCUPANCY: F-1 TYPE OF CONSTRUCTION: V-N? ALLOWABLE FLOOR AREA: SPRINKLERS?: REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE INITIAL PLAN REVIEW COMPLETED: 4/ 17 /96 FOREWORD (PLEASE READ): JURISDICTION: Carlsbad USE: manufacture ACTUAL AREA: ? STORIES: l? HEIGHT: OCCUPANT LOAD: DATE PLANS RECEIVED BY ESGIL CORPORATION: 4/8 PLAN REVIEWER: David Yao This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1994 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3, 1994 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1994UBC) tiforw.dot '• Carlsbad 96-634 4/17/96 1. Please make all corrections on the original tracings and submit two new sets of prints, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468. 2. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 3. On the first sheet of the plans indicate: • The floor area of the remodeled area, • Type of construction of the existing building, • Present and proposed occupancy classifications of the remodel area, • The floor where the tenant improvement is located, 4. Provide a fully dimensioned floor plan showing the size of all windows(include skylight) and doors . 5. Provide complete lighting plan within the space being improved or altered. Draw the plans to scale and indicate the scale on the plan. Section 106.3.3. • ENERGY 6. On the plans clearly show the wall and roof insulation locations, thickness, and R-values, as per the energy design.(Show the aluminum foil per the energy calculation. Provide spec. for the aluminum foil.) • MISCELLANEOUS 7. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. 8. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Carlsbad 96-634 4/17/96 Have changes been made to the plans not resulting from this correction list? Please indicate: Yes D No 0 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1. 468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact David Yao at Esgil Corporation. Thank you. . c'a~lsbad 96-634 4/17/96 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 96-634 PREPARED BY: David Yao DATE: 4/17/96 BUILDING ADDRESS: 2839 Loker Avenue East BUILDING OCCUPANCY: F-1 TYPE OF CONSTRUCTION: V-N BUILDING PORTION BUILDING AREA (sq. ft.) new FAU Air Conditioning Fire Sprinklers TOTAL VALUE UBC Building Permit Fee: UBC Plan Check Fee: Comments: VALUATION MULTIPLIER per permit application VALUE 40,000.00 $ 349.50 $ 227.18 ($) Sheet 1 of 1 valuefee.dot ,,_ • I t City of Carlsbad 96082 Fire Department • Bureau of Prevention Plan Review: Requirements Category: Building Plan Check Date of Report: Tuesday, April 9, 1996 I Reviewed by: MvX. A ~ Contact Name Address City, State Gene Chappo 777 S. Hwy 101 Ste 21 O Solana Beach CA 92075 Bldg. Dept. No. _9_6-_6_3_4 ___ _ Planning No. Job Name Titleist ------------------ Job Address 2839 Loker ------------------Ste. or Bldg. No. ____ _ ~ Approved -The item you have submitted for review has been approved. The approval is based on plans; information and/or specifications provided in your submittal; therefore any changes to these items after this date, including field modifica- tions, must be reviewed by this office to insure continued conformance with applicable codes. Please review carefully all comments attached, as failure to comply with instructions in this report can result in suspension of permit to construct or install improvements. D Disapproved -Please see the attached report of deficiencies. Please make corrections to plans or specifications necessary to indicate compliance with applicable codes and standards. Submit corrected plans and/or specifications to this office for review. For Fire Department Use Only Review 1st~--2nd __ _ 3rd __ _ Other Agency ID CFD Job# __ 96_0_8_2 __ File# ___ _ 2560 Orion Way • Carlsbad, California 92008 • (619) 931-2121 TITLE 24 REPORT FOR: Titleist & Foot-Joy Worldwide Manufacturing Areas Carlsbad, CA PROJECT DESIGNER: Chapo & Hall Architects 777 S. Highway 101, Suite 210 Solana Beach, CA 92075 (619)943-1915 REPORT PREPARED BY: Steve Balderrama, CEPE Haynal & Co., Inc. 425 West Fifth Street Escondido, CA 92025 (619) 743-5408 Job Number: Date: 3/15/1996 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential Building Energy Efficiency Standards. This program developed by Gabel Dodd Associates (510) 428-0803. Table Of Contents for Title 24 Report Cover Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Nonresidential Performance Title 24 Forms ........................... 3 Form ENV-3 Construction Assemblies 17 HVAC System Loads Summary ........................................... 21 ,. PERFORMANCE CERTIFICATE OF COMPLIANCE (part 1 of 3) PERF-1 page 3 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide Address: Manufacturing Areas Carlsbad, CA Designer: Chapa & Hall Architects Documentation: Haynal & Co., Inc. STATEMENT OF COMPLIANCE !Date: 3/15/1996 , _______ _ !Building Permit No , _______ _ !Checked by/ Date I !COMPLY 24 User 2875 This Certificate of Compliance lists the Building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using the performance compliance approach. The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifi- cations, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6, Chapter 1. 1. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. 2. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. 3. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section ____ of the Code to sign this document as the person responsible for its preparation; and for the following reason: ______________ _ SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers) ENVELOPE -Required Forms: ENV-1, ENV-2 Principal Designer Chapa & Hall Architects (619)943-1915 LIGHTING - Principal Designer (619) MECHANICAL - Principal Designer (619) Location of Mandatory Measures on Plans (Signature) Required Forms: LTG-1, LTG-2 1 2 3 (Date) (Circle) Location of Mandatory Measures on Plans (Signature) 1 2 3 (Date) (Circle) Required Forms: MECH-1, MECH-2, MECH-3, MECH-4 Location of Mandatory Measures on Plans (Signature) 1 2 3 (Date) (Circle) PERFORMANCE CERTIFICATE OF COMPLIANCE (part 2 of 3) PERF-1 page 4 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide !Date: 3/15/1996 I Documentation: Haynal & Co., Inc. !COMPLY 24 User 2875 ANNUAL SOURCE ENERGY USE SUMMARY (KBtu/sqft-yr) Energy Component Space Heating Space Cooling Indoor Fans Heat Rejection Pumps Domestic Hot Water Lighting Receptacle Process TOTALS GENERAL INFORMATION Conditioned Floor Area: Standard Design -------- 4.93 17.45 15.13 0.00 0.00 0.00 58.89 16.94 0.00 -------- 113.34 16968 Average Proposed Compliance Design Margin ------------------ 17.58 -12.65 18.85 -1.40 6.58 8.56 0.00 0.00 0.00 0.00 0.00 0.00 26.77 32.13 16.94 0.00 0.00 0.00 ------------------ 86. 71 26.63 Ceiling Height: 20.0 Glass Area/ Wall Area: 0.05 Average Glazing U-Value: 1.19 Front Orientation: 0 deg (N) Number of Stories: 1 Number of Zones: 1 Number of Occupancies: 1 ZONE INFORMATION Floor Display Inst Tailored Process Tailored Area Perim. LPD Lighting Loads Vent. Zone Name (sqft) (ft) (w/sf) (watts) (w/sf) (y/n) ---------------------------------------------------------- Manufacturing 16968 0 0.91 0 0 N PERFORMANCE CERTIFICATE OF COMPLIANCE (part 3 of 3) PERF-1 page 5 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide jDate: 3/15/1996 I Documentation: Haynal & Co., Inc. jCOMPLY 24 User 2875 The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR Steve Balderrama, CEPE (619) 743-5408 (Signature) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST (Date) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Manufacturing Occupancy type of Precision Industrial has been selected BUILDING DEPARTMENT APPROVAL OF EXCEPTIONAL FEATURES JUSTIFICATION: The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. authorized signature or stamp CERTIFICATE OF COMPLIANCE -Envelope Run Initiation Time: 17: 4:30 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. Const OPAQUE SURFACES Assembly Name Type Location/Comments Warehouse Roof Exposed Slab On Grade 6 11 Concrete Wall Roll-Up Door FENESTRATION Frame Orient Panes Type -------- Front (N) 1 Metal Right (W) 1 Metal Skylight 1 Metal Wood None None None Exterior Shade ----------------------- None None None OH N N N ENV-1 page 6 of 21 Runcode: 2875-544114816 !Date: 3/15/1996 I jCOMPLY 24 User 2875 Glazing Type Note to Field ----------------------- Single Tinted Single Tinted Single White Skylight CERTIFICATE OF COMPLIANCE -Lighting Run Initiation Time: 17: 4:30 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. INSTALLED LIGHTING SCHEDULE No of Watts/ Ballast Name Lamp Type Lamps Lamp Type ---------------------------------- Fluorescent 2 96 Standard HID 1 400 Standard MANDATORY AUTOMATIC CONTROLS LTG-1 page 7 of 21 Runcode: 2875-544114816 JDate: 3/15/1996 I jCOMPLY 24 User 2875 Ballasts/ No of Note to Luminaire Fixt. Field ---------------- 1. 0 13 1. 0 29 Control Note to Control Location ID Control Type Zone Controlled Field CONTROLS FOR CREDIT Control Note to Control Location ID Control Type Zone Controlled Field CERTIFICATE OF COMPLIANCE -Mechanical (part 1 of 2) MECH-1 page 8 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. SYSTEM FEATURES Zone Name Time Control Setback Control #of Isolation Zones HP Thermostat Electric Heat Fan Control VAV Min Position Simul. Heat/Cool Heat Supply Reset Cool Supply Reset Ventilation OA Damper Control Economizer Type Outdoor Air CFM Heat Equip Type Make & Model No. Cool Equip Type Make and Model Code Tables Time Control S:Prog Switch O:Occ Sensor M:Man Timer Manufacturing s None n/a n/a n/a Constant Volume n/a n/a Constant Temp Constant Temp B A No Economizer 2545 Gas Furnace Modine WSG350A DX No Cooling Ventilation B:Air Balance C:OA Cert. M:OA Measure D:Demand Cont N:Natural OA Damper A:Auto G:Gravity JDate: 3/15/1996 I jCOMPLY 24 User 2875 Note to Field CERTIFICATE OF COMPLIANCE -Mechanical (part 2 of 2) MECH-1 page 9 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. DUCT INSULATION System Name Type Duct Location Modine WSG350A Heating Ducts in Attic Cooling Ducts in Attic PIPE INSULATION Insul System Name Pipe Type Required Domestic Hot Water Modine WSG350A y I N y I N NOTES TO FIELD -For Building Department Use Only !Date: 3/15/1996 I jCOMPLY 24 User 2875 Duct Tape Allowed ------- y I N y I N Insul R-Val 4.2 4.2 Note to Field ------- Note to Field ENVELOPE COMPLIANCE SUMMARY -Performance (part 1 of 3)ENV-2 page 10 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide !Date: 3/15/1996 I Documentation: Haynal & Co., Inc. !COMPLY 24 User 2875 GENERAL INFORMATION BY ZONE Flr Floor Display Zone Name Occupancy No Area Volume Perim. Manufacturing Precision Industrial 1 16968 339360 0 Total 16968 ENVELOPE COMPLIANCE SUMMARY -Performance (part 2 of 3)ENV-2 page 11 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide !Date: 3/15/1996 I Documentation: Haynal & Co., Inc. !COMPLY 24 User 2875 OPAQUE SURFACES Act Solar Type Area U-Val Azm Tilt Gains Form 3 Reference Location/Comments ------------------------------------------- Wall 2012 0.752 0 90 Yes 6" Concrete Wall Manufacturing Wall 1928 0.752 90 90 Yes 6" Concrete Wall Manufacturing Wall 2336 0.752 180 90 Yes 6" Concrete Wall Manufacturing Wall 1920 0.752 270 90 Yes 6" Concrete Wall Manufacturing Roof16744 0.360 0 22 Yes Warehouse Roof Manufacturing Slb 16968 0.186 0 180 No Exposed Slab On Grade Manufacturing ENVELOPE COMPLIANCE SUMMARY -Performance (part 3 of 3)ENV-2 page 12 of 21 Run Initiation Time: 17: 4:30 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide jDate: 3/15/1996 Documentation: Haynal & Co., Inc. FENESTRATION SURFACES # Type Area Frame Div U-Val ------------- 1 Wdw Front (N) 72. 0 Metal No 1.19 2 Wdw Front (N) 96.0 Metal No 1.19 3 Wdw Front (N) 120.0 Metal No 1.19 4 Wdw Right (W) 120.0 Metal No 1.19 5 Sky Front (N) 224.0 Metal No 1.21 OVERHANGS/SIDE FINS --Window-- # Type Ht Wd -----Overhang------ Len Ht LExt RExt I jCOMPLY 24 User 2875 SC Act Glass Azm Tilt Only Location/Comments --------------------- 0 90 0.65 Manufacturing 0 90 0.65 Manufacturing 0 90 0.65 Manufacturing 270 90 0.65 Manufacturing 0 0 0.68 Manufacturing ---Left Fin--- Dist Len Ht ---Right Fin-- Dist Len Ht LIGHTING COMPLIANCE SUMMARY -Performance Run Initiation Time: 17: 4:30 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. ACTUAL LIGHTING POWER Name Description 96" Slimline 400w Metal Halide /2 Lamp LTG-2 page 13 of 21 Runcode: 2875-544114816 !Date: 3/15/1996 I jCOMPLY 24 User 2875 No of Watts Total Lumin per Default Watts 13 158.0 Y 29 461. 0 Y 2054 13369 SubTotal Less Control Credits (LTG-3) 15423 0 Total Proposed Watts 15423 * If not CEC Default value, please provide supporting documentation. MODELLED LIGHTING POWER BY ZONE Zone Name Occupancy Manufacturing Precision Industrial TOTALS Modelled Floor Area LPD (w/sf) 16968 0.909 16968 0.909 Total Tailored (watts) (watts) 15423 0 15423 0 * Note: Tailored Allotment requires supporting documentation on form LTG-4. MECHANICAL EQUIPMENT ZONING SUMMARY -Performance Run Initiation Time: 17: 4:30 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. SYSTEM/ZONING SUMMARY System/Zones Served Manufacturing Manufacturing Central/Zonal System Modine WSG350A MECH-2 page 14 of 21 Runcode: 2875-544114816 !Date: 3/15/1996 I !COMPLY 24 User 2875 System Type Split FAU-A/C No Sys 3 MECHANICAL EQUIPMENT SUMMARY -Performance Run Initiation Time: 17: 4:30 MECH-3 page 15 of 21 Runcode: 2875-544114816 Project Name: Titleist & Foot-Joy Worldwide !Date: 3/15/1996 Documentation: Haynal & Co., Inc. CENTRAL SYSTEM SUMMARY Sys No System Name 1 Modine WSG350A CENTRAL SYSTEM RATINGS System Type Split FAU-A/C I !COMPLY 24 User 2875 No Sys Economizer Type 3 No Economizer Sys-------Heating----------------------------------Cooling----------- No Type Output Aux KW EFF Type Output Sensible EER SEER 1 Gas Furnace 262500 n/a 0.80 No Cooling Installed CENTRAL FAN SUMMARY ------------Supply Fan -----------Return Fan Sys No Fan Type Motor Location ------------------------------ 1 Constant Volume Draw-Through ZONAL FAN SUMMARY Zone Name No CFM None CFM BHP ------ 3000 Zonal Fan Mtr BHP Eff 0.47 Drv Eff Mtr Drv Mtr Drv Eff Eff CFM BHP Eff 66 100 None -------Exhaust Fan Mtr No CFM BHP Eff Eff Drv Eff MECHANICAL VENTILATION -Performance Run Initiation Time: 17: 4:30 Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. VENTILATION SUMMARY BY ZONE Floor Zone Name T Occupancy Area ------------------------------------- Manufacturing Precision Indu 16968 sqft /Occ 100 MECH-4 page 16 of 21 Runcode: 2875-544114816 !Date: 3/15/1996 I !COMPLY 24 User 2875 Tran CFM Dsg Min sfer /Occ CFM CFM CFM ------ 15.0 2545 2545 0 ------ TOTALS 2545 2545 Tailored OA (T=*) requires supporting documentation on MECH-5, Tailored Ventilation and Process Loads Worksheet PROPOSED CONSTRUCTION ASSEMBLY Project Name: Titleist & Foot-Joy Worldwide ENV-3 page 17 of 21 !Date: 3/15/1996 Documentation: Haynal & Co., Inc. COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Roofing, Built-Up 2. Membrane, Vapor-Permeable Felt 3. Plywood 4. Air Space 5. Aluminum Foil, Bright 6. 7. 8. 9. Inside Air Film ADJUSTMENT FOR FRAMING I jCOMPLY 24 User 2875 Assembly Name: Warehouse Roof Assembly Type: Roof Assembly Tilt: 22 deg (Tilted Up) Framing Material: Wood Framing Spacing: II 0.C. Framing Percent: 10.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th Fr (in) 0.375 0.010 0.500 * 6.000 0.020 Unadjusted R-Values R-Value Cavity Frame 0.17 0.17 0.33 0.33 0.06 0.06 0.62 0.62 0.80 5.94 0.00 0.00 0.61 0.61 2.59 7.73 (1 / 2.59) X (0.90) + (1 / 7.73) X (0.10) 0.360 Weight: Heat Capacity: 5.7 lb/sqft 1. 94 TOTAL U-VALUE 0.360 TOTAL R-VALUE 2.77 PROPOSED CONSTRUCTION ASSEMBLY Project Name: Titleist & Foot-Joy Worldwide ENV-3 page 18 of 21 !Date: 3/15/1996 Documentation: Haynal & Co., Inc. COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Earth 2. Concrete, 140 lb, Not Dried 3. 4. 5. 6. 7. 8. 9. Inside Air Film ADJUSTMENT FOR FRAMING I !COMPLY 24 User 2875 Assembly Name: Exposed Slab On Grade Assembly Type: Floor Assembly Tilt: 180 deg (Horizontal Floor) Framing Material: None Framing Spacing: "O.C. Framing Percent: 0.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R-Value Fr (in) Cavity 24.000 3.500 Unadjusted R-Values 0.17 4.00 0.28 0.92 5.37 Frame 0.17 4.00 0.28 0.92 5.37 (1 / 5.37) X (1.00) + (1 / 5.37) X (0.00) 0.186 Weight: Heat Capacity: 210.8 lb/sqft 42.17 TOTAL U-VALUE 0.186 TOTAL R-VALUE 5.37 PROPOSED CONSTRUCTION ASSEMBLY ENV-3 page 19 of 21 Project Name: Titleist & Foot-Joy Worldwide !Date: 3/15/1996 Documentation: Haynal & Co., Inc. COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Concrete, 140 lb, Not Dried 2. 3. 4. 5. 6. 7. 8. 9. Inside Air Film ADJUSTMENT FOR FRAMING I jCOMPLY 24 User 2875 Assembly Name: 6 11 Concrete Wall Assembly Type: Wall Assembly Tilt: 61 deg (Tilted Up) Framing Material: None Framing Spacing: 11 O.C. Framing Percent: 0.0 % Absorptivity: 0.70 Roughness: Concrete, Asph. Shingles Th R-Value Fr (in) Cavity Frame 6.000 Unadjusted R-Values 0.17 0.48 0.68 1.33 0.17 0.48 0.68 1. 33 (1 / 1.33) X (1.00) + (1 / 1.33) X (0.00) 0.752 Weight: Heat Capacity: 70.0 lb/sqft 14.00 TOTAL U-VALUE = 0.752 TOTAL R-VALUE 1.33 PROPOSED CONSTRUCTION ASSEMBLY Project Name: Titleist & Foot-Joy Worldwide ENV-3 page 20 of 21 !Date: 3/15/1996 Documentation: Haynal & Co., Inc. COMPONENT DESCRIPTION Sketch of Construction Assembly ASSEMBLY U-VALUE Construction Components Outside Air Film 1. Steel 2. 3. 4. 5. 6. 7. 8. 9. Inside Air Film ADJUSTMENT FOR FRAMING I jCOMPLY 24 User 2875 Assembly Name: Roll-Up Door Assembly Type: Door Assembly Tilt: 90 deg (Vertical) Framing Material: None Framing Spacing: 11 O.C. Framing Percent: 0.0 % Absorptivity: 0.70 Roughness: Smooth Plaster, Metal Th Fr (in) R-Value 0.001 Unadjusted R-Values Cavity Frame 0.17 0.00 0.68 0.85 0.17 0.00 0.68 0.85 (1 / 0.85) X (1.00) + (1 / 0.85) X (0.00) 1.176 Weight: Heat Capacity: o.o lb/sqft 0.00 TOTAL U-VALUE = 1.176 TOTAL R-VALUE = 0.85 HVAC SYSTEM HEATING & COOLING LOAD SUMMARY Project Name: Titleist & Foot-Joy Worldwide Documentation: Haynal & Co., Inc. HVAC SYSTEM DESCRIPTION HVAC System Name: Heating System Name: Cooling System Name: System Multiplier: Fan Schedule: Peak Load Method: Relative Humidity: ZONES ON THIS SYSTEM PEAK Manufacturing (Jan 12am) TOTAL ZONE LOAD Duct Gains & Losses: Ventilation: Return Air Lighting Gain Supply/Return Fan Gain: 2545 CFM) TOTAL SYSTEM LOAD SYSTEM OUTPUT AT DESIGN CONDITIONS MAIN HEATING & COOLING SYSTEM TOTAL SYSTEM OUTPUT HEATING 546707 546707 54671 87820 0 689198 787500 787500 page 21 of 21 !Date: 3/15/1996 I jCOMPLY 24 User 2875 Manufacturing Modine WSG350A No Cooling 3 CA Daytime Fans COINCIDENT 50 %- COOLING PEAK (Aug 4pm) 2545 CFM) SENSIBLE 278419 278419 27842 12899 0 0 319159 0 0 LATENT 53634 53634 11855 65489 0 0 NOTE: The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no safety factor, and the HVAC contractor should oversize by a reasonable margin to account for variations in weather conditions and the pick-up capacity required to bring the zone to temper- ature as a result of a setback thermostat. Those responsible for final equipment selection should note that Sensible and Latent Cooling Loads are indicated to allow for accurate comparison with manufacturer's output data. MANDATORY REQUIREMENTS ENVELOPE MANDATORY MEASURES (NONRESIDENTIAL) 1. Exterior manufactured doors, windows, and fenestration products shall meet the infiltration and U-value certification requirements of Section 116(a). 2. Site-construced doors, skylights, and windows shall be caulked and weather-stripped per Section 116(b). 3. All joints and openings which are potential sources of air leakage shall be caulked, gasketed, weather-stripped or otherwise sealed to limit infiltration and exfiltration per Section 117. 4. Certified insulation materials per Section 118(a). 5. Urea Formaldehyde foam insulation installed per Section 118(b). 6. Insulation installed to meet flame spread and smoke density requirements per Section 118(c). LIGHTING MANDATORY MEASURES 1. Each enclosed area shall have independent controls (per Section 131(a) and exceptions). 2. Lighting shall be uniformly reducible by one half in areas which are greater than 100 sf, exceed 1.2 watts/sf, and have more than one luminaire (per Section 131(b) and exceptions; exceptions include lights in corridors). 3. Daylit areas larger than 250 sf shall be separately controlled and uniformly reducible by one half (per Section 131(c) and exceptions). 4. Separately metered spaces 5,000 sf or greater shall have automatic shutoff controls (per Section 131(d) and exceptions). 5. Display lighting shall be separately switched on circuits that are 20 amps or less (per Section 131(e), no exceptions). 6. Exterior lighting controlled from a lighting panel within the building shall be automatically controlled (per Section 131(Q and exceptions). 7. Pairs of one-lamp and three-lamp fluorescent luminaires shall be tandem-wired where reasonable (per Section 132 and exceptions). SERVICE WATER HEATING SYSTEMS 1. Temperature controls and recirculating pump controls shall meet the requirements of Section 113(a) & (b). 2. Flow rates and temperature controls for public lavatories shall meet the requirements of Section 113(b)3. 3. Unfired service water heater storage tanks and backup tanks for solar water heating shall comply with Section 113(b)4. MECHANICAL AND PLUMBING MANDATORY MEASURES Equipment and Systems Efficiency 1. HVAC and service water heating equipment shall meet Appliance Efficiency Regulations, per Sections 111 and 112. 2. Piping, except those conveying fluids at temperatures between 60 and 105 degrees F, or within HV AC equipment, shall be insulated in accordance with Section 123. 3. Air handling duct systems shall be sealed in accordance with the SMACNA HV AC Ducts Construction Standards, Metal and Flexible, 1985, per Section 124(a) and (b). Ducts shall be installed and insulated as provided in UMC, Chapter 10. 4. Pilot lights shall not be installed for natural gas central furnaces, and pool and spa heaters, per Section 115. Ventilation 1. Every space in a building shall be designed to have outdoor air ventilation according to Section 121(a), (b) and (e). 2. Operation and control of outdoor air shall meet the time-of-occupancy and pre-occupancy requirements of Section 121(c). 3. When a return plenum is used to distribute outdoor air to a covered HV AC unit, the ducted discharge shall be in accordance with Section 121(d). 4. Systems shall meet the completion and balancing requirements of Section 121(Q. Controls 1. Each space conditioning zone shall be controlled by an individual thermostatic control that responds to temperature within the zone. Heating shall be adjustable down to 55 degrees or lower, and cooling shall be adjustable up to 85 degrees or higher. The control shall provide a dead-band of 5 degrees between heating and cooling. Section 122(a) and (b). 2. Heat pumps with supplementary electric resistance heaters shall have controls per Section 112(b). 3. Each space conditioning system shall be installed with an automatic time switch, able to shut off operation during off-hours of up to four hours, per Section 122(e)1. 4. Thermostat setup and setback controls are required if the summer design dry bulb temperature is more than 99 degrees F, or if the winter design temperature is less than 33 degrees, per Section 122(e)2, and its exceptions. 5. Outdoor air supply and exhaust equipment shall be installed with dampers that automatically close during periods of non-use for the areas served by the equipment, per Section 122(Q. 6. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be designed, installed, and controlled to serve isolation areas, per Section 122(g). c1/s-/1£-'JP >.56/L) /U'\j; G--r 7--.;.._, ~ ~~PL-+ v(l Lt[ t'-Cc~ '-\l ~d" \\-,x,_ ~/ coN,1-)2,,fu ;J, ===-~-I I 11 __.-Building _____ Planning --;t-_ .. .,.-:---Engineering 41 q_/.:1.J.,-fitG --coastal ----Health -----Assoc. ----W,.ZMATFORIA __ L--"" INDWASiEAPP ____ L.._ sc1-100LFEEFORM _J--PLANCORR ENGRGCORR eusuc wcoMP FIRE PLANS ASSESSOR PLANS coFO