HomeMy WebLinkAbout2840 LOKER AV EAST; ; CB983735; Permit12/14-/98 15-13 BUILDING PER
Page 1 of 1
Job Address 2840 LOKER AV EAST
Permit Type- INDUSTRIAL TENANT IMPROVEMENT
Parcel, No. 209-082-05-00
Valuation- 363,189
Occupancy Group: Reference*
Description ITI INSTALL RACK AND CONVEYOR '
: EQUIPMENT ADIDAS GOLF USA
Appl/Owni : ADIDAS GOLF USA
19899 SW 95TH PLACE
TUALATIN OREGON 970&2
Fees Required
MIT Permit No: CB983735
Project No- A98Q4872
Development No.
Construction Type NEW
Status ISSUED
Applied: 10/30/98
Apr/Issue 12/14/98
Entered By- JM
503 612-G765
***
Fees
Adjustments
Total Fees:
Fee description
Collected & Credits
..00
12/I4/*'Pf o9° 02
Building Permit
Plan Check
Strong Motion Fee
A *
1545.00
1004,00
76.00
SECTION 106.4.4
DATE.SIGNATURE
Fl OVAL
INSR
CITY OF CARLSBAD
2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161
18
16-BB
5036126762
6192717541
ADIDAS GOLFUSA
HG FENTQN COMPANYrvn vrnvttvat UNI
APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palmas Dr., Carlsbad CA 92009
(7SO) 438-1191
2840 Loker Ave. East, Carlsbad., CA 92008
of Parcel Map
209^-082-08
EST. VAL.
H*n Ck. 0
Adidas Golf USA. lie?- 10tffiO/98 0001 01
, CounW'f S
Currently vacant
7220 Trade St.. Sts 300 CA 9.2111 (6191 -566-2QQQ
Address City
^m\^^^S^^^^ffy^*^
(619) 566-2000
•pair my ttniBtunrcaranaetar*! U«tni»
, «M tM MaH Hf ttw
my pro on m any mannw mo ••
«H cM ftaa* W * «M
Rack-and Conveyor equipment aulte size 69,700 1
c^W *&#$ WMiSJWpA^^Chrs^om"3 506lZ- "
Geoffrey Swortwood
H. G. Fentpn Company 7220 Trade St., Ste 300 __JL«tI
Address Oly
»V*^#T»*$Wi|V*w"««rp^«wifi[pMjitA* nitdfii
1 / A \ *• . I I 1 ~,1|
(Bto, 7011.8 lufflftttt md t>n»foaa)ana Coda; Arty Cny w County whioh miutrn a ptrmtt to oonnnMt anar,
l, |l«« rtqulrv thv npplleftnt for mch pwmit to ffi* ft «igr*d Ctatamant Ihtt D» It llOtnMd Dur«u*m «n the
9, cwrniBndintf wtth Soction 700O or Pivixlen 9 Ot «» BtfalnW ind l*T»t*UlOW CO*) 9r that It tt tMmPT
Any vWitiftrt ef sa«ten 7031.5 t>y any appucam «v " pwmrt suhjact* v*a appflant W18M1 pwlty of nw men tfw
Nwni
CtfMPENfATttM - ' -' rf, -,-V,-, ;' ,*" • "" ' *»-^ -.- '. T,*rrT
Worhora' Comporwvtiort BecJ«rtt!*«: I haraby flffirrn und0r pflntttV of p*r|WV *T» ftt thf ttHwMnff dtflJantt^n
D 1 havt tntf win maintain • etrttflcata ot aennnt to Mff-Inaur* far wortma' «oni»aflMfJon M preyidad by 8*efion V7QO «f
a' IN* work lor wMoh thlv pannft 1» hiautd.
Q i h*va and vwHI maintafn vrorMra' «0mt«naatl«n. M ragulf*** by Saotlan 87OO of the LBbor CAdB, for the
luutd My wffrtwr** e«m*tnHti«rt ttuunno« cirri«r «nd paitoy mimbtf arti
Injurant* Company
ITHB SECTIOH NCtD NOT II COMPUttP tf THE fERMFTtS FOR ONfi NVMOttbMUJtM (I1MJ OflliW
G eamnCATE OF tXOWTTOW: I etntfv that <n th* patfonmnoa of th« work for wMch tHs nrmrt n: testuwl-
ta b»coma ufajool te th« Work«r«\CornHntttton Uws of Cadfemla
WAnMnG: P*Hufa to aopm wwtnra' mn^wmvttan omrae* t» untawtul. *n<i IMI wvjMt an omplorar to
,000), In atfJWM to «h* «eH «f Mmpanaattan. (tam»OM •• pnwUid fur In S*cHon 37OT of itw iJMr 00*«,
OAf«
lot fntondod or atfai«tf for aMa
antf wtw
mmvomvnt
«mftitfya»» wiTh wig«i n ttwir uto oonwannttBa wffl *> tft« work and th*
: Th« camrscttr'f
such wott Nrnwlf orthriujh Mcftwn *mpifly«iM, wovlri«d thtt nwh tnvmnmimi atl not W«niJ«d or otfafwi fw salt, B,
orm yM
I BS ownar of the orcnrtrty, am «ch«iv»lv eontriolfno with
Contf*ewr'fl U»nD* La«u doa* not •Pdly t« «n ewn«r of
punutnt to tw» C«*rtractof 'a Ucam* Uw)
n vrt Profoaaioni CoMi TM
with OMtfr*ROJ(i)
Mmraoton H «mainict tt»
itwrwrn, »nd
ProNaafeni Cod* ftrf tHt rtwon;i pm «ompr undo?
antwui
r (ft»v< / A*V» net? ai0n«d an wrmwtiwi for •
ram* / aifcfrMs / ohoo*(fV ml to n«rvW» «h«
/ MlaVaai / ptwnaprtvlda tha majatut I havt Wrwt th« n«n«i«rin| paven w «ooraVawi pitn to pfcWd* eartiwa ot tn«
/ phima nyMbaf /<TM f aOawino c*nar* n provnu tM woilc taMfleatad timlud*torn* of tN wvrh. but
MOFEATV OWNER BIGNATURI
COM^£T£TW MCH0N ftlf «**>0*tD(iSmSC
10/29/1998 18.10 503612B762 ADIDAS GQLFUSA
9. I wW »f*vfO MfTM af Ifw work, but I h»v« <HH4r**»d <Wrft» th* fofewtbte pvum tn pnnnifo iM wwk {mfiatlKt ttftOJW** nw
WflW*«??<3!»rt^fftjnaJli*1 •:r!fl '- i*x
rMtetrlttan formis ttw appfieam at futur* MMnf two**
U tfo «pplicwrt or future bL**n« OCtt**nt r«qiiir«d 10 etmln • pwmtt trtnl th» dr poUurton OontW) fisWct or rtr WBdtir mtnpfwn*
D YES O NO
A MWL C«im«CATl OP QCCUWNCr »WT HOT Dt J5WTO VTttt« Ttf» A^UCAWT H^^ICT tm 1* «rtfTT»»* T«£» ANV OP THi AHSWIH* ME ft*.
RtaUIRBWWT* OFTHf 0**Htf ttf BflttOTKOV »««V>OB AHO THI «• PQLUIT1OII COHTROL BHrTMOT
-a,, :.^s«tihj«ldftlJ^Hff*ftBW,rr^ft*KU(hM/^-WIIH.,l't ^-("r*>"T«7^^* „* Vi - Is1;'1 , - -
[QOMlCMM
LENDER'S NAME
•9,
UNMrVS ADDftESS .
JSTO£W*»'«^
i cmHf y thai I twm rant tha wpRoctfon and ant» thtt VM «b»v> hAmnftion I* WMNH» and wtt MM Momutton « mt txvrui ta
try urdtnvuM «n« sww tawk rrtrt«g to BuWing cmnnviton 1 hwrtv nuttwix* npnMnwtfVM «* tM OHV of C«M*d TO
fWrpom. I «UO AORK TO SAVE. MBEMNWY AHD KCBT HMMLE&S THE «nV <* «*HL
!. COfiTB AM M>GNM« UWKH MAV (N Ainr WA V ACCWfl AflAMVT 1^
OCHA> An OSMA pwmfT to mutrcd f«r txetvKlonj ov»r 8'0* «^«P *fwt tfwmflMon or wwtrwiion of strvrtu*** wtr * ttgrMt in
ExiWAtlOVh Bv%fv Dtrmh (wwd br th« tu'KWf OfttHAi unMr V4 pwiifions of oa co« crwK wnitr* vV HmRvtfen iml
wane tutnorfiwd by «uch fwmit >• not coaww«^w;TWfi 3^S-j(»v» ftiwn tf» <teu of «** fMrmtt er tf ih* tvMas at vw«rk
ar abBndoniri it any itnw «n» tfMI *ttt<1t»f(<^C«^^
*SKJNATUM S 5<fc*!f ?&9*+C-^ _ &AT6
•utttwa W cuon
PAGE 02
/ phnnt nuAMf / tVM
DrtrtttT O YK Q NO
. I IBTM w eemtfy wnh w
npon V» vftav* m*rai*n»d
AO*m« All. UAIHUTlEa,
v«M If th« buH*>g
ptnntt
City of Carlsbad
Building Department
May 25, 1999 -
CHRIS COMBS
19899 SW95TH PLACE
TUALATIN OR 97062
RE: BUILDING PERMIT EXPIRATION
PERMIT TYPE: ITI
Permit Number
Issue Date
CB983735
12/14/98
ADDRESS: 2840 LOKER AV EAST
PLEASE CALL FOR AN INSPECTION IF WORK IS
COMPLETE
Our records indicate that your building permit will expire by limitation of time on 6/20/99
The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state "EXPIRATION
Every permit issued by the Building Official under the provisions of this code shall expire by limitation and
become null and void if the building or work authorized by such permit is not commenced within one calendar
year from the date of such permit, or if the building or work authorized by such permit is stopped at any time
after the work is commenced for a period of six consecutive calendar months or if the building or work
authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be
presumed to have commenced if the permittee has obtained a required inspection approval of work authorized
by the permit by the Building Official within one year of the date of permit issuance Work shall be presumed
to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official
within each six month period upon the initial commencement of work authorized by such permit "
Before such work can be recommenced, a new permit, or a renewal permit as specified in the attached copy of
the code, shall be obtained
Any person holding an unexpired permit may apply for an extension of the time within which he may
commence work under that permit when he is unable to commence work within the time required by this
section for good and satisfactory reasons The Building Official may extend the time for action by the
permittee for a period not exceeding 180 days upon written request by the permittee showing that
circumstances beyond the control of the permittee have prevented action from being taken No permit shall be
extended more than once
Please check below indicating your intentions and return this letter to us
Project abandoned A new permit will be obtained prior to commencing work
No fee extension requested for 180 days (attach a letter of explanation)
Renewal permit requested
If the project has been completed and only a final inspection is needed, please call the inspection request line at
(760)438-3101
If you have any questions, please contact the Building Inspection Department at (760) 438-3550
PAT KELLEY
Principal Building Inspector
Attachment
2O75 Las Palmas Dr • Carlsbad, CA 92009-1576 • (76O) 438-1161 • FAX (760) 438-O894
City of Carlsbad^ ^^^^^^i^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
Building Department
May 25, 1999
ADIDAS GOLF USA
2840 LOKER AVE EAST
CARLSBAD CA 92008
RE: BUILDING PERMIT EXPIRATION
PERMIT TYPE: ITI
Permit Number
Issue Date
CB983735
12/14/98
ADDRESS: 2840 LOKER AV EAST
PLEASE CALL FOR AN INSPECTION IF WORK IS
COMPLETE
Our records indicate that your building permit will expire by limitation of time on 6/20/99
The provisions of UBC, Section 106 4 4 as amended by the Carlsbad Municipal Code state "EXPIRATION
Every permit issued by the Building Official under the provisions of this code shall expire by limitation and
become null and void if the building or work authorized by such permit is not commenced within one calendar
year from the date of such permit, or if the building or work authorized by such permit is stopped at any time
after the work is commenced for a period of six consecutive calendar months or if the building or work
authorized by such permit exceeds three calendar years from the issuance date of permit Work shall be
presumed to have commenced if the permittee has obtained a required inspection approval of work authorized
by the permit by the Building Official within one year of the date of permit issuance Work shall be presumed
to be stopped if the permittee has not obtained a required inspection approval of work by the Building Official
within each six month period upon the initial commencement of work authorized by such permit "
Before such work can be recommenced, a new permit, or a renewal permit as specified in the attached copy of
the code, shall be obtained
Any person holding an unexpired permit may apply for an extension of the time within which he may
commence work under that permit when he is unable to commence work within the time required by this
section for good and satisfactory reasons The Building Official may extend the time for action by the
permittee for a period not exceeding 180 days upon written request by the permittee showing that
circumstances beyond the control of the permittee have prevented action from being taken No permit shall be
extended more than once
Please check below indicating your intentions and return this letter to us,
Project abandoned A new permit will be obtained prior to commencing work
No fee extension requested for 180 days (attach a letter of explanation)
Renewal permit requested
If the project has been completed and only a final inspection is needed, please call the inspection request line at
(760)438-3101
If you have any questions, please contact the Building Inspection Department at (760) 438-3550
PAT KELLEY
Principal Building Inspector
Attachment
2O75 Las Palmas Dr • Carlsbad, CA 92OO9-1576 • (76O) 438-1161 • FAX (760) 438-O894
CITY OF CARLSBAD
INSPECTION REQUEST
PERMIT# CB983735 FOR 12/22/98
DESCRIPTION: ITI INSTALL RACK AND CONVEYOR
EQUIPMENT ADIDAS GOLF USA
TYPE: ITI
JOB ADDRESS: 2840 LOKER AV EAST
APPLICANT:
CONTRACTOR:
OWNER:
ADIDAS GOLF USA
REMARKS: C/CHRIS
SPECIAL INSTRUCT:
PHONE:
PHONE:
PHONE:
INSPECTOR AREA
PLANCK# CB983735
OCC GRP
CONSTR. TYPE NEW
STE: LOT:
503 612-6765
INSPECTO
TOTAL TIME:
—RELATED PERMITS—PERMIT* TYPE
SE970094
GR970027
AS970132
RW970273
CB983509
AS980198
SE980230
AS980201
FAD98080
CD LVL DESCRIPTION
SWOW
GRADING
ASC
ROW
CTI
ASC
SWOW
ASTI
FADD
STATUS
ISSUED
ISSUED
ISSUED
ISSUED
ISSUED
ISSUED
ISSUED
ISSUED
ISSUED
ACT COMMENTS
14 ST Frame/Steel/Bolting/Welding
DATE DESCRIPTION
***** INSPECTION HISTORY *****
ACT INSP COMMENTS
EsGil Corporation
In Partners/tip iVitfi. government for Bui&fing Safety
DATE 12/14/98
JURISDICTION Carlsbad
PLAN CHECK NO 98-3735 SET II
PROJECT ADDRESS 2840 Loker Ave. East
PROJECT NAME Storage Racks for Adidas Golf
'LAN REVIEWER
Q FILE
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
X] The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
The applicant's copy of the check list has been sent to
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted* Telephone #
Date contacted. (by: ) Fax #.
Mail Telephone Fax In Person
REMARKS' 1 The designer stated that the existing bathrooms serving the rack area comply
with all the current disabled access requirements Please verify 2 Fire Department approval is
required 3 The applicant hand carried the approved plan back to the city (OK. Per Mr Peterson)
By. David Yao
Esgil Corporation
D GA D MB D
Enclosures
PC 12/9 trnsmtl dot
9320 Chesapeake Drive, Suite 208 ^ San Diego, California 92123 + (619)560-1468 4 Fax (619) 560-1576
EsGil Corporation
In ^Partnership with, Qovtmmtntfor $ui&hng Safety
DATE 11/10/98 Q APPLICANT
JURISDICTION Carlsbad a PLAN REVIEWER
Q FILE
PLAN CHECK NO 98-3735 SET I
PROJECT ADDRESS 2840 Loker Ave. East
PROJECT NAME Storage Racks for Adidas golf
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes
The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck
XI The check list transmitted herewith is for your information The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck
The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person
XI The applicant's copy of the check list has been sent to
Chris Colmbs 19899 SW 95th Place Tualatin Oregon 97062
XI Esgil Corporation staff did not advise the applicant that the plan check has been completed
Esgil Corporation staff did advise the applicant that the plan check has been completed
Person contacted Telephone #
Date contacted (by ) Fax #
Mail Telephone Fax In Person
REMARKS
By David Yao Enclosures
Esgil Corporation
D GA n MB D EJ D PC 11/2 trnsmtldot
9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 * (619)560-1468 + Fax (619) 560-1576
Carlsbad 98-3735
11/10/98
GENERAL PLAN CORRECTION LIST
JURISDICTION Carlsbad PLAN CHECK NO. 98-3735
PROJECT ADDRESS 2840 Loker Ave. East
DATE PLAN RECEIVED BY DATE REVIEW COMPLETED
ESGIL CORPORATION 11/2 11/10/98»
REVIEWED BY- David Yao
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building Code,
Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws
regulating energy conservation, noise attenuation and disabled access This plan review is
based on regulations enforced by the Building Department You may have other corrections
based on laws and ordinances enforced by the Planning Department, Engineering Department
or other departments
The following items listed need clarification, modification or change All items must be satisfied
before the plans will be in conformance with the cited codes and regulations Per Sec 106 4 3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law
1 Please make all corrections on the original tracings' and submit two new sets of prints to
ESGIL CORPORATION
2 To facilitate rechecking, please identify, next to each item, the sheet of the plans
upon which each correction on this sheet has been made and return this sheet
with the revised plans
3. Please indicate here if any changes have been made to the plans that are not a result of
corrections from this list If there are other changes, please briefly describe them and
where they are located on the plans Have changes been made not resulting from this
list?
Q Yes - a- No
4 Provide a rack layout plan showing the location of a(f racks Sheet 2 of the pfan shall
clearly shows which type of rack will be used (5L S/R, 5L D/R, 4L P/B etc )
5 Only the storage racks are included in this plan review
6 Provide a statement on the Title Sheet of the plans that this project shall comply with
Title 24
Carlsbad 98-3735
11/10/98
7 Provide a note on the plans indicating if any hazardous materials will be stored and/or
used within the building which exceed the quantities listed in UBC Tables 3-D and 3-E
8 The tenant space and new and/or existing facilities serving the remodeled area must be
accessible to and functional for the physically disabled See the attached correction
sheet Title 24, Part 2
9 Obtain Fire Department approval for groups F, M and S occupancy storage per UBC
Sections 306 8, 309 8 and 311 8
10 Indicate the clearance from the new racks to the existing building walls and building
columns per Section 1631 2.11 The clearance must be at least ZRJS times the
deflections of both the rack and the building
11 Note on the plans that the rack design loads will be posted per Section 1604 5
12, Provide forklift protection per Section 2231 5
Recheck the "pallet" racks as follows:
13 Include the 25% increase in vertical loading for impact per Section 2237.2 Sheet 5 and 6
of the calculation shows the load for some of the level is not 2000lb Note 2 on the plan
(98-1302A) shows all level is 2000lb Please check
14 Recheck all connections on sheet 98-1302A as follows;
a) 'The rivet bearing capacity is only dtF, = 0 406(0.0747)65 = 2 kips
b) Provide calculations for all beam to bracket weld capacities per Section 2230
(allowable weld stress is the member thickness times 26 ksi times 1,33, or the
weld stress, whichever is lower)
c) Check the bracket maximum weak axis moment
15. Indicate the safety pin size and verify it is adequate for the 1000# load. Section 2236 1
16 Recheck the base plate anchors as follows'
a) Check the transverse seismic for overturning with only the top shelf loaded with
the force acting through the center of gravity of the top load per Section 2237 7
17 Provide calculations for the column weak axis bending plus axial for transverse seismic
loading The axial load is the maximum compression load at the base from vertical plus
seismic overturning The column moment will probably be maximum for the lateral load
from the base plate to the first diagonal brace (not only to the first horizontal member)
18 Check the slab stress for the maximum transverse overturning axial load
19 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123, telephone number of 619/560-1468, to
perform the plan review for your project If you have any questions regarding these plan
review items, please contact David Yao at Esgil Corporation Thank you
Carlsbad 98-3735
11/10/98
VALUATION AND PLAN CHECK FEE
JURISDICTION Carlsbad ' PLAN CHECK NO 98-3735
PREPARED BY. David Yao DATE 11/10/98
BUILDING ADDRESS. 2840 Loker Ave. East
BUILDING OCCUPANCY S-l TYPE OF CONSTRUCTION
BUILDING PORTION
Storage racks
Air Conditioning
Fire Sprinklers
TOTAL VALUE
BUILDING AREA
(ft2)
-
VALUATION
MULTIPLIER
VALUE
($)
•
363189
(per city)
gj 1994 UBC Building Permit Fee Q Bldg Permit Fee by ordinance $ 1545.08
03 1994 UBC Plan Check Fee D Plan Check Fee by ordinance $ 10043
Type of Review £<] Complete Review [H Structural Only Q Hourly
O Repetitive Fee Applicable Q Other
Esgil Plan Review Fee $ 803 44
Comments
Sheet 1 of 1
macva!uedoc5196
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB DATE
ADDRESS
RESIDENTIAL TENANT IMPROVEMENT
RESIDENTIAL ADDITION MINOR
(< $10,000.00)
PLAZA CAMINO REAL
CARLSBAD COMPANY STORES
VILLAGE FAIRE
COMPLETE OFFICE BUILDING
OTHER
PLANNER DATE | /> 2. V
ENGINEER DATE
Docs/Misforms/Planning Engineering Approvals
SCHIRMER ENGINEERING CORPORATION
11770 BERNARDO PLAZA COURT SUITE 112 A SAN DIEGO, CA 92128-251 9 A PHONE [619) 673-5845 A FAX (61 9) 673-5849
October 28, 1998
VIA COURIER
Mr Mike Peterson
Building Department
2075 Las Palmas
Carlsbad, California 92009
Re High-Piled Storage Analysis For
Adidas Golf Distribution Center
Carlsbad, California
SEC Project No 2098070-000
Dear Mike
Enclosed are two copies of the High-Piled Storage Analysis for the referenced project Please
call with any questions or comments
Sincerely,
SCHIRMER ENGINEERING CORPORATION
David
DS/GAP kc
Fire Protection Engineering A Code Consulting A Loss Control A Security System Design
1
1
1
1
1
1
1
1
1
1
SCHIRMEH ENG<II\IEERII\IG CORPORATION
1 1 770 BERNARDO PLAZA COURT, SUITE 1 ^ 2 A SAN DIEGO, CA 921 28-251 9 A PHONE (619) 673-5B45 A FAX (619) 673-5849
HIGH-PILED STORAGE ANALYSIS
FOR
ADIDAS GOLF DISTRIBUTION CENTER
CARLSBAD, CALIFORNIA
Prepared for:
Mr. Chris Combs
Adidas Golf Companyi'1 9899 SW 95th Place
Tualatin, Oregon 97062i
i
i
i
-
SEC Project No 2098070-000
October 28, 1998
This report is the property of Schirmer Engineering Corporation Copies retained by the client shall be utilized
1
1
1
only for his use and occupancy of the project, not for the purpose of construction of any other projects
Fire Protection Engineering A Code Consulting A Loss Control A Security System Design
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center i October 28, 1998
Carlsbad, California SEC 2098070-000
TABLE OF CONTENTS
INTRODUCTION 1
APPLICABLE CODES AND STANDARDS 1
PROJECT DESCRIPTION 1
HIGH-PILED STORAGE SUMMARY 2
Fire Department Access (Roads and Doors) " 3
Small Hose Valves 3
Aisles 4
Fire Flow Requirements 4
Smoke/Heat Vents and Curtain Boards 5
FIRE SUPPRESSION ANALYSIS 10
Existing Fire Protection 10
Automatic Fire Sprinkler System Design 11
Existing Fire Protection Capability 11
RECOMMENDATIONS 11
CONCLUSION 12
APPENDIX A - DRAWINGS
1 Storage Layout
2 Sections
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 1 October 28, 1998
Carlsbad, California SEC 2098070-000
INTRODUCTION
The new Adidas Golf Distribution Center will be located at 2840 Loker Avenue East in Carlsbad,
California The new facility will perform all distribution activities presently conducted at the
existing facility in Portland, Oregon Schirmer Engineering Corporation (SEC) has been retained
by Adidas Golf Company to assist the Client with evaluation of the new facility's fire and life
safety code requirements Specifically, this report will address the requirements for high-piled
storage
APPLICABLE GODES AND STANDARDS
The following codes and standards are referenced in this report
• California Building Code (CBC) -1995 Edition
• California Fire Code (CFC) as amended by the City of Carlsbad -1995 Edition
• National Fire Protection Association (NFPA) 13, Installation of Sprinkler Systems 1996
Edition
• National Fire Protection Association (NFPA) 231, General Storage, 1995 Edition
• National Fire Protection Association (NFPA) 231C, Rack Storage of Materials, 1995 Edition
• Factory Mutual Engineering Corporation (FMEC) Data Sheet 8-9, Storage of Class 1, 2, 3, 4,
and Plastic Commodities, November 1995 Edition
PROJECT DESCRIPTION
The new Adidas Golf Distribution Center will be used primarily for rack storage and solid pile
storage of golf apparel, shoes, and children's golf club The one story building is a maximum 33
feet high and has an area of approximately 104,000 square feet The Adidas Golf Company
1
1
•
1
1
1
1
1
Adidas Golf Distribution Center 2
Carlsbad, California
tenant space will have approximately 70,000 square feet of the building area
and occupancy classification is as follows
• Rack Storage 51,000 square feet (Group S, Division 1
• Palletized Storage 17,000 square feet (Group S, Division 1
• Office 2,000 (Group B occupancy)
October 28, 1998
SEC 2098070-000
An area utilization
occupancy)
occupancy)
The building complies with the CBC requirements for Type V-non-rated construction and
currently is fully spnnklered
The storage array throughout the building will consist primarily of golf products in boxes on
pallets within single and double row racks In addition, golf products will be
array
stored in palletized
The single and double row racks will have six tiers of storage and a maximum storage height of
28 75 feet Aisles separating storage piles or racks will be a minimum of 8 feet throughout the
facility All racks will be provided with minimum 6 inches transverse and longitudinal flue space
1
1
I
•
i
i
The palletized storage will consist of products within corrugated cardboard boxes up to 20 feet
in height and is assumed to have an open array of more than 6 inches
dimension will be 50 feet
HIGH-PILED STORAGE SUMMARY
The maximum pile
Article 81 of the CFC requires specific fire protection features for the protection of high-piled
storage These requirements are based on the heat release rate of the material stored, and the
proposed storage array Following is a summary of the products proposed to
respective commodity classification
be stored and their
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 3 October 28, 1998
Carlsbad, California SEC 2098070-000
• Golf Shoes - Golf shoes were determined to be comprised of 50% Group A plastic due to
the ethylene vinyl acetate (EVA) sole Because of this amount of plastic, the heat release
rate of this product would be similar to that of a Group A plastic In accordance with the
California Fire Code and other nationally recognized standards, the product will be classified
as a high-hazard commodity and protected as a Group A plastic
• Sports Apparel - Apparel will be classified as a Class III commodity
• Golf Clubs - Clubs within cardboard boxes will be classified as a Class II product, with the
exception of clubs with graphite shafts which will be classified as a Class IV product
• Golf Bags - Bags due to there composition of vinyl and plastic will be classified as a high-
hazard commodity and protected as a Group A plastic
Based upon these findings, and due to the substantial amount of golf shoes (approximately 30
percent of the storage) the overall commodity classification of this storage will be high hazard
Fire Department Access (Roads and Doors)
The fire department access roadways are presently within 150 feet of all portions of the exterior
walls of the storage building in accordance with the requirement of the CFC 8102 5 1 for high-
piled storage The fire department access doors are presently in each 100 lineal feet of the
exterior walls in accordance with the requirements of the CFC 8102 5 2 2
Small Hose Valves
Small hose vatves (1 1/2 inch) will be provided throughout the storage area such that all storage
is within reach of 100 feet of fire hose and a 30-foot hose stream Since these outlets are used
for fire department overall operations, fire hose will not be provided
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 4 October 28, 1998
Carlsbad, California SEC 2098070-000
Aisles
Aisles of at least 96 inches in width will be provided for access to exits and fire department
doors (CFC Section 8102 9)
Fire Flow Requirements
The required fire flow (water required for fighting fire) is determined according to CFC Appendix
///-A Fire Flow Requirements for Buildings The fire flow requirement is intended to provide
sufficient water supply to limit the fire to within the building and prevent fire spread to adjacent
buildings The fire flow is determined as a function of building construction, automatic sprinkler
systems, fire loading and building area
The base fire flow from CFC Appendix lll-A is 7,250 gpm at a residual pressure of 20 psi for a
duration of four hours Since the building is provided with an approved automatic sprinkler
system, a reduction in required fire flow of 50 percent is allowed as approved by the Carlsbad
Fire Department The reduction will result in a required fire flow of 3,625 gpm
A flow test was performed by the City of Carlsbad Fire Department on September 9, 1997 The
water flow test results are summarized as follows
Location 2841 Loker Avenue
Static Pressure 128 psi
Residual Pressure 124 psi
Pitot Pressure 79 psi
Outlet Size 2 1/2 inch
Calculated Flow 1491 gpm
I
I
Adidas Golf Distribution Center 5 October 28, 1998
Carlsbad, California SEC 2098070-000
The available water supply at 20 psi was calculated utilizing the following equation
Where
P = specified pressure
Ps = static pressure, flow test
PR - residual pressure, flow test
QF = flow in flow test
Q = flow at specified pressure
Based on the above data, a flow of 8,800 gpm was calculated Therefore, the fire flow is
adequate
Smoke/Heat Vents and Curtain Boards
CBC Section 906 requires smoke vents and draft curtains in single story buildings with Groups
B, F, M, and S occupancies having over 50,000 square feet in undivided area The CBC
requires a ventilation ratio of 1 square foot of venting to every 100 square feet of roof area In
addition, CFC Sections 8102 6 and 8102 7 require smoke vents and draft curtains in high-piled
storage facilities based on specific size and commodity type Since the building has an
undivided area of 70,000 square feet and the storage areas exceed 2,500 square feet in size,
smoke vents and draft curtains are required
Requirements for smoke vents and draft curtains first appeared in the 1971 Edition of the
Uniform Fire Code (UFC) The requirements for draft curtains were partially the result of the
General Motors Livonia, Michigan Fire of 1953 Fire traveled horizontally along the roof of this
unsprmklered, automobile transmission manufacturing building, which eventually caused the
collapse and destruction of the entire 1 5 million square foot facility It was thought that vertical
barriers, such as draft curtains, would have limited the fire spread and seventy Applying this
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 6 October 28, 1998
Carlsbad, California SEC 2098070-000
concept in a non-sprmklered building has merit However, the effect of these vertical barriers on
the performance of the sprinkler system requires additional analysis
The 1979 Edition of the UFC changed ventilation requirements to require mechanical exhaust
and did not require smoke vents and draft curtains in fully sprmklered buildings The 1985
Edition of the UFC changed again to requirements similar to those found in the 1994 Edition of
the UFC
Until recently, no conclusive fuli-scaie fire testing had been conducted to determine the
interaction of automatic fire sprinklers and smoke vents and draft curtains The most recent
testing, including the only tests with draft curtains, was conducted at the Factory Mutual
Research Corporation Test Center, in February 1994, by the Group A Plastic Committee Since
the Factory Mutual Research Corporation Test Center does not have the ability to provide an
appropriate smoke ventilation system, only draft curtains were provided
The response of automatic fire sprinklers is based on the accumulation of hot gases at the
ceiling of the building These gases form a high-velocity jet (ceiling jet) which immerses the
sprinkler thermal link, ultimately causing the melting of the link material and activation of the
sprinkler By installing draft curtains, the dynamics of the ceiling jet will respond to the
placement of the draft curtains, not the escalation and progression of the fire This could cause
irregular opening of sprinklers, ultimately opening an excessive number of sprinklers In
addition, the pre-wettmg effect of the sprinklers could be greatly reduced, also resulting in an
excess number of sprinklers operating
Experimentally, these concerns were confirmed in the Group A Plastic Committee's tests as four
sprinklers operated in the tests without draft curtains A much greater number (18 in Test*i
Number 7 and 35 in Test Number 6)! activated in the tests in which draft curtains were installed
1 Factory Mutual Research Technical Report Extended Abstract, Large-Scale Fire Tests of Rack Stored
Group A Plastic in Retail Operation Scenarios Protected by Extra Large Orifice fELOi Sprinklers.
November 1994
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 7 October 28, 1998
Carlsbad, California SEC 2098070-000
The Group A Plastic Committee testing was conducted with standard-response extra large
orifice sprinklers Since ESFR sprinklers depend on quicker response, the negative effect of the
draft curtains could be greater
The CFC prescribes the number of smoke vents required for a given commodity type and
storage height CFC Table 81-A requires a ventilation ratio of 1 square foot of venting to every
40 feet of floor area These numbers have remained basically the same since the creation of
high-piled stock requirements in the 1971 UFC The origin of these numbers are somewhat of a
mystery However they greatly exceed the amount of ventilation required by other referenced
standards such as the National Fire Protection Association (NFPA) Standard 204M, Smoke and
Heat Venting
The purpose of the smoke vents is to ventilate the building in an effort to maintain tenability
during occupant egress, improve visibility during fire department operations, and assist with the
evacuation of smoke during fire department overhaul Their usefulness in a building equipped
with ESFR sprinklers is somewhat questionable Since the thermal link of the ESFR sprinkler is
a quick-response type sprinkler (Response Time Index of approximately 40 ft1/2 s1/2), the
sprinkler should activate much sooner that the standard-response thermal link (Response Time
Index of 200 ft172 s1/2) which rele
before the smoke vents operate
1/2 1/2Index of 200 ft s ) which releases the smoke vent The fire would then be suppressed long
The typical warehouse building has a ceiling height of at least 30 feet All occupants should be
capable of egress prior to the conditions within the warehouse becoming untenable Given
these factors, the only benefit of smoke vents in a building equipped with ESFR sprinklers is to
assist with manual overhaul of the fire
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 8 October 28, 1998
Carlsbad, California SEC 2098070-000
ESFR sprinklers are designed for fire suppression, versus fire control as standard type
sprinklers are designed A large amount of water is delivered at high momentum during the
early stages of the fire The system stops the fire during the initial stage of development This
requires high discharge pressures and a larger droplet size to penetrate the fire plume The
design of the system is a function of the size of fire rather than heat release rate as with
standard sprinkler systems The two critical variables of the success of this system are the
sensitivity of the sprinkler and the amount of water delivered to the seat of the fire
The installation of curtain boards, as shown in the Group A Plastic Committee's tests, could
interfere with the ceiling jet, thus delaying the response of the sprinkler system Results of
these tests showed that sprinkler operation was dependent on the location of the curtain boards,
thereby causing addition sprinklers to open regardless of the fire location or size Since the
success of the ESFR sprinkler is dependent on the operation of the first or second sprinkler, any
delay or interference with this response could have catastrophic effects on the performance of
the system A delay in response equates to a larger fire size thereby causing more sprinklers to
operate
The 1997 UFC2, which was recently completed at the August 1996 International Fire Code
Institute Code (IFCI) Hearings, has recognized the potential problems with draft curtains and
ESFR sprinklers and will require curtain boards only at the intersection of ESFR and standard
sprinklers In other words, if ESFR sprinklers are installed throughout the facility, no curtain
boards would be required
Factory Mutual Research Corporation, which developed the concept of the ESFR sprinkler,
recommends the deletion of draft curtains and smoke vents in buildings equipped with ESFR
sprinklers because smoke vents and draft curtains can interfere with the proper discharge and
activation of the sprinklers This is documented in Factory Mutual Engineering Loss
Prevention's Data Sheet 2-2, Guidelines For Early Suppression-Fast Response Sprinklers, and
2 IFCI FIRE CODE JOURNAL. Agenda for the Code Change Session at the 1996 Annual Meeting of the
International Fire Code Institute. International Fire Code Institute, Inc , May-June 1996, Pg 86
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 9 October 28, 1998
Carlsbad, California SEC 2098070-000
Loss Prevention Data Sheet 8-9, Storage of Class 1,2,3,4, and Plastic Commodities3 In
addition, NFPA 231C, Rack Storage of Materials4, specifically excludes buildings with smoke
vents and draft curtains from the system design parameters found within the standard
The mass flow rate injected into the smoke layer is approximately equal to the air entrainrnent
rate of the plume from the clear layer (NFPA Fire Protection Handbook, Page 6-111) Equation
11 from the same publication may be used to calculate the required vent area such that the
mass flow through the smoke vents is equal to smoke production rate of the design fire
(Eqn 11) Av = 0 075 Q 3/5 (H-d)/d *
Where Av = Required aerodynamic vent area (square feet)
Q = Heat release rate of the design fire (Btu/sec)
H = Distance of the ceiling above the floor (feet)
d = Depth of the upper smoke layer (feet)
For the new Adidas Golf building, the maximum ceiling height is 33 feet The upper smoke layer
is assumed to be 3 3 feet deep This is a conservative assumption, since the more shallow the
upper layer, the greater the entertainment rate An aerodynamic discharge coefficient of 0 6 is
assumed, which is standard for commercial vents The design fire chosen is 16 square feet
(approximately one pallet) of polystyrene jars nested in cardboard boxes stored 15 feet high
This is the standard Factory Mutual Research Corporation plastic commodity
A heat release rate of 1300 Btu/sec/ sq ft is used, based upon full-scale fire testing data from
Factory Mutual Research (NFPA Fire Protection Handbook, Table 6-8A) This heat release
rate, although based upon a storage height of 15 feet is very conservative since a 100%
3 Factory Mutual Research, Loss Prevention Data Sheet 2-2, Guidelines for Early Suppression-Fast
Response Sprinklers and Loss Prevention Data Sheet 8-9, Storage of Class 1, 2. 3. 4. and Plastic
Commodities. Factory Mutual Engineering
4 National Fire Protection Association, Standard 231C, Rack Storage of Materials. Qumcy, MA Pg 10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 10 October 28, 1998
Carlsbad, California - SEC 2098070-000
combustion efficiency is assumed With the ESFR sprinkler system, a much smaller
combustion efficiency would be expected
Based on the above data, a venting area of 800 square feet and a ratio of 1 87 were calculated
The 70,000 square foot area protected by the ESFR sprinklers is presently provided with thirty-
eight smoke/heat vents having an area of 32 square feet each, giving a total venting area of
1216 square feet This will provide a vent ratio of approximately 1 57, which is in excess of the
venting required by calculation
The existing smoke and heat vents will be utilized primarily for manual overall or cleanup
operations, as such, compliance with the spacing requirement of the CFC is determined to be
unnecessary
Curtain boards will be deleted over the storage area due to the potential derogatory effect on
the performance of the ESFR sprinklers
FIRE SUPPRESSION ANALYSIS
Existing Fire Protection
The building is presently fully spnnklered with three (3) gridded systems designed to provide a
water application density of 0 60 gpm/square feet over the most remote 3,000 square foot area
The existing sprinklers are "Central" ELO, 200° Fahrenheit rated, installed in the pendent
position
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Adidas Golf Distribution Center 11 October 28, 1998
Carlsbad, California SEC 2098070-000
Automatic Fire Sprinkler System Design
Based upon the occupancy and the client request to use a design method which will allow the
deletion of rack sprinklers, the proposed storage will be protected by Early Suppression Fast
Response (ESFR) sprinklers
The systems will be designed to provide a minimum of 30 psi utilizing Ultra K-25 ESFR
sprinklers to the twelve most hydraulically remote sprinklers based on four flowing sprinklers on
each of three branch lines (NFPA 231C Section 10-2) The ESFR sprinkler systems are
adequate for protection of cartoned and uncartoned unexpanded plastic commodity storage up
to 30 feet in a building up to 35 feet in height The actual storage height will be 28 75 feet in
height and the ceiling height of the building will be approximately 33 feet
Existing Fire Protection Capability
The capacity of the existing automatic fire sprinkler systems to protect rack storage of Group A
plastic, 28 feet in height was analyzed by utilization of the MASS 6 3 hydraulic calculation
program As a result of this analysis, it has become evident that upgrade of the systems will be
necessary to adequately provide the required water demand for the proposed storage
i
RECOMMENDATIONS
SEC's recommends to upgrade the existing automatic fire sprinkler systems as follows
a Replace all the existing Extra Large Orifice (ELO) sprinklers with Early Suppression Fast
Response (ESFR) Ultra K-25
b Replace all the existing 2 inch grid lines with 2 1/2 inch
I
i
i
i
i
i
i
i
i
Adidas Golf Distribution Center 12 October 28, 1998
Carlsbad, California SEC 2098070-000
I
I
I
I c Install additional 2 1/2 inch grid lines in order to achieve 10 feet maximum spacing between
i
i
I In conclusion, this facility meets or exceeds the requirements of the CBC and CFC, due to the
ESFR sprinkler system and ample fire department access In addition, the ESFR sprinkler
system will provide an exception level of fire protection for future use of the building
Prepared By
•
the lines
CONCLUSION
SCHIRMER ENGINEERING CORPORATION
Garner A Palenske, P E(Engineering Manager
DS/GAP kc
APPENDIX A
DRAWINGS
ho,
m O7J r
cm w
:at|^sg
'S2SPS3!SB?E iis
mJE5
i
T.H/IM/IXI/I
SEIZMIC
MATERIAL HANDLING ENGINEERING
EST 1985
STORAGE 3ACKS
CfiM-tN RACKS
CANTILEVER RACKS
CONVEYORS
CAROUSELS
STEEL SHELVING
MOVABLE SHELVING
STCRAGET.ANKS
MCOJLAR OFFCES
GONDOLAS
BOCKS'ACKS
CITY APPROVALS
PERMfTTNGSERv'CES
PRODUCT TES'ING
FELDNSFECTCN
SPECIAL FASRCAT1OJ
ALASKA
AR12DNA
CAL1FORNEA
COLORADC
IDAHO
MISSOURI
NEW MEXCD
OREGON
PENNSYLVANIA
UTAH
WASHINGTON
I
I
I
I
I
I
I
I
I
I
I
I
I
OF STORAGE RACKS FOR
ADI DAS GOLF
2840 LOCKER AVE.
CARLSBAD, CA 92008
161 ATLANTIC STREET • POMONA • CA 91768 • TEL (909)869-0989 • FAX (909)869-0981 ^
SEIZMIC PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET * POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
TABLE OF CONTENTS
DESCRIPTION
COVER SHEET
TABLE OF CONTENTS
SCOPE
PARAMETERS
CONFIGURATIONS
COMPONENTS & SPECS
LOADS AND DISTRIBUTION
LONGITUDINAL ANALYSIS
COLUMN
BEAM
BEAM TO COLUMN
BRACING
OVERTURNING
BASE PLATE
SLAB& SOIL
PAGE #
1
2
2
3
4- 6
7- 12
13
14
15
16
17
18
19
20
21
SCOPE:
THIS ANALYSIS OF THE STORAGE SYSTEM IS TO DETERMINE ITS COMPLIANCE WITH
THE APPROPRIATE BUILDING CODES WITH RESPECT TO STATIC AND SEISMIC FORCES
THE STORAGE RACKS ARE PREFABRICATED AND ARE TO BE Fl ELD ASSEMBLED ONLY,
Wl THOUT ANY Fl ELD WELDING.
PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
OF,21
CALCULATED BY M. OBI DATE.10-15-T998
HAHAMETEHS
STORAGE RACKS CONSIST OF SEVERAL BAYS, INTERCONNECTED IN ONE OR BOTH
DIRECTIONS WITH THE COLUMNS OF THE VERTICAL FRAMES BEING COMMON BETWEEN
ANY ADJACENT BAYS
THE ANALYSIS WILL FOCUS ON A TRIBUTARY BAY TO BE ANALYZED IN BOTH
LONGITUDINAL AND TRANSVERSE DIRECTION
STABILITY LONGITUDINALLY IS DEPENDANT ON BEAM TO COLUMN MOMENT,
WHILE THE BRACING ACT TRANSVERSELY
1 COLUMN
2 BEAM
3 BEAM TO COLUMN
4 BASE PLATE
5 HORIZONTAL BRACING
6 DIAGONAL BRACING
7 BACK CONNECTOR
TRIBUTARY AREA
TRANSVERSE
I
LONGITUDINAL
TOP VIEW
PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED RY . OBI
OF
DATE.
21
10-15-1998
CONFIGURATIONS
66"
66"
LJ
> *-
TYPE5LS/R
2,000 tb
2,000 Ib
2,000 Ib
2,000 Ib
^ x
108"-
TYPE 5L D/R
2,000 Ib
264"
66"
66"
66"
L T
2,000 Ib
2,000 Ib
2,000 Ib
1 08"-
73"
73"
52"
48"-?
73
73
52
48"
iii
iii
i
i
i
i
i
i
i
i
i
i
i
PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
SHEET NO OF.21
CALCULATED BY.M. OBI 10-15-1998DATE.
CONFIGURATIONS
r62"
300"T-
TYPE 4LP/B EXT
2,000 Ib
7
2,000 Ib
2,000 ib
2,000 Ib
800 Ib
800 Ib
800 Ib
108"-
6.1"
6.1"
6.1"
)f-
300"
62"
100"
TYPE4LP/B INT
2,000 Ib
2,000 Ib
2,000 Ib
2,000 Ib
Olb
6.1"
48" ^T^ 48"^
108"-)f- 48" 4 ^
PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M OBI DATE.10-15-1998
CONFIGURATIONS
TYPE3LP/BEXT
2,000 Ib
240"
62
62
2,000 Ib
2,000 Ib
800 Ib
800 Ib
800 Ib
61"
108"-48"^^ 48"H
7 t
62"
240"
100
TYPE 3L P/B I NT
2,000 Ib
2,000 Ib
2,000 Ib
Olb
108"-48"
SEIZM1C PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 7
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
OF.21
CALCULATED BY.M. OBI DATE.10-15-1998
TYPE 5L S/R
' SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR- WEDGETYPE 1/2 x 3-1/2 WIN
- FLOOR SLAB 6" X 3000 PSI REINFORCED
- SOIL BEARING PRESSURE 1000 PSF
- SEISM 1C ZONE 4
- TYPE = SINGLE ROW UNITS
- BASE SHEAR FORMULA = 2IC(wLL+wDL)/Rw
2 000 Ib 462#
66
-£.
EMbEC 66
264"
66
-?<-
66
2,000 Ib
2,000 fb
2,000 Ib
SECTION AXIAL FCRCE MOMENT
iU =
108"-
108"
346#
73"
73"
231#
11 5#
T_
.*- 48"
61 6#
462#
308#
154#
BEAM MOMENT
1 4,200lb 21,660mlb
2 3,150lb 17,152mlb
3 2,100lb 13,340mlb.
4 1,050lb 7,623mlb
21,406m
17,246m
12,482 in
5,812 in
Ib <- recfdH D conn
b <- req"dH D ccnn
b <- stdccnn
b <- stdconn
TYPE 5L S/R DESIGN LOAD = 2000#
BASE PLATE
V
8X8X 375
Mbase= 15300 in Ib.
OVERTURNING
V
ANCHOR STRESS =0,8 9
# OF ANCHORS - 4
V
COLUMN
COLUMN
3X3X1 1GA(LU79)
STRESS =0 90
BEAM
V
4- 1/32x2- 3/4x1 4GA/485H
MAXLCAD/LEVEL= 3,729 Ib
BEAM IS O.K.
BRACING
HORIZONTAL ^
1 1/2X1- 1/2X14GA
STRESS = 0 23
DIAGONAL ^/
1 1/2X1- 1/2X 14GA
STRESS = 0.67
SLAB & SOIL
V
PUNCT. STRESS « 0 63
BENDING STRESS =073
NOTE BOTTOM 2 BEAM LEVELS USE H.D CONN. (4-PIN & "D" WELD) ANCHORS ARE
HILTI KWIKBOLT II, 1/2"D X 4-1/2"L (3-1/2"MIN. EMBED.), 4 PER PLATE REVISED
DESIGN BASED ON AT DESIGN LOAD OF 2000# PER LEVEL (1000# PER PALLET)
PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO 8 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
TYPE 5LD/R
SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR- WEDGE TYPE 1/2x 3-1/2M1N EM
-FLOOR SLAB 6" X 3000 PSI REINFORCED 264"
- SOIL BEARING PRESSURE 1000 PSF
- SEISM 1C ZONE 4
- TYPE = INTERCONNECTED UNITS
- BASE SHEAR FORMULA = ZICfwLL / 2 +wDL)/Rv
2,000 Ib 242#322#
EM
\
66"
SEC 6
264"
/Rv
6
-)
1 6
C
s"
f
5"
£
fi"
,f f
4
2,000 Ib
3
2,000 Ib
2
1
<- — i no" —
t~1
7
181#
y
7
121#
5
60#
3"
3"
.
2"
52"
y
'
/
/
/
e. /ID"
241
161
80#
,
SECTION AXIAL FORCE MOMENT
lu= 108"
BEAM MCMENT
1 4,200lb 9, 680 in Ib
2 3,150lb 8,984mlb
3 2,100ib 6,988m!b
4 1,050lb 3,993mlb
11,332 in
9,986m
7,490 in
3,996m
b <- stdccnn,
b <- stdconn
Ib <- stdconn
b <- stdconn
TYPE 5L D/R DESIGN LOAD = 2000#
BASE PLATE
V
7 75X5X 375
Mbase= 9680 mlb
OVERTURNING
V
ANCHOR STRESS =0 17
# OF ANCHCRS = 2
V
COLUMN
COLUMN
3X3X1 3GA(LU75)
STRESS =066
BEAM
V
4- 1/32x2- 3/4x14GA/485H
MAX LOAD/LEVEL = 3,729 Ib
BEAM IS OK
BRACING
HORIZONTAL ^/
1 1/2X1- 1/2X14GA
STRESS =012
DIAGONAL ^/
1 1/2X1- 1/2X14GA
STRESS = 035
SLAB & SOIL
V
PUNCT STRESS = 0 50
BENDING STRESS =0 46
I
PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO OF 21
- MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY,M.OBI 10-15-1998DATF
TYPE 4L P/B EXT
SPECIFICATION t~
- MAIN STEEL 55000 PSI 6f
- BASE PLATE STEEL 36000 PSI "*
- ANCHOR - WEDGE TYPE 1/2 x 3-1/2 MIN EM 3ED 6f '
- FLOOR SLAB 6" X 3000 PSI REINFORCED 300" ^~~
- SOIL BEARING PRESSURE 1000PSF T—
- SEISM 1C ZONE 4 -f —
28"
- TYPE - INTERCONNECTED UNITS -I
- BASE SHEAR FORMULA - ZlC(wl_L / 2 +wDL)/R\ > 2|"
, I"
SECTION AXIAL FORCE MCMENT
7
2,000 Ib
6
2,000 Ib
5
2,000 Ib
4 800 Ib
800 Ib
2 800 Ib
1
•T 1 Uii 4
lu= 108"
BEAM
— MWH^
61"
221# 1* r~T_
26# T~
^3# 52"
*
MCMENT
^^^^m
4#
— fc
/ 295#
\ „
/ _^3
5#
6#
\45#
/ >4#
*• 48" 4
1 i'?nn!h M«m-h 4.336. nib <- stdcc™,
i 1'ecn h c«5!!I u 6, 504 in b. <- stdconn3 4,650lb 5,552tnlb 7701mb <- stdconn4 4,200 Ib 8, 050 in Ib ' 'I,' ' °* siaconnc o icrtiu moAi iu 11.175m b <- stdconn5 o,150 b 10,301 in b in n^-? u *.jc ? innih 7 7Q^ k 11,047m b <- stdconno t. • i \j \j * L* /.'z/oiriL/ fx^v"?/"* ii j_i
7 1 OSOIb 4 35Q h 8,076 mlb. <- stdconn
' ' 4, 1 80 i n b <- stdconn
TYPE 4L P/B EXT DESIGN LOAD = VARIES
BASE PLATE COLUMN BEAM
^/ V 3X3X1 1GA(LU79) V
775X5X 375 COLUMN STRESS =0 44 4- 1/32x2- 3/4x1 4GA/485H
Mbase=1216.n)b MAX LOAD/LEVEL = 3,729lb
BEAM IS O.K.
OVERTURNING BRACING
V HORIZONTAL ^ DIAGONAL ^/
ANCHOR STRESS = 0 34 1 1/2 X 1- 1/2 X 14 GA 1 1/2 X 1- 1/2 X 14 GA
# OF ANCHORS = 2 STRESS =016 STRESS = 0 47
SLAB & SOIL
PUNCT STRESS = 0 70
BENDING STRESS =074
SEIZMIC PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M.OBI 10-15-1998DATE.
TYPE4LP/B INT
SPECIFICATION f 5
-MAIN STEEL 55000 PSI f 2,000 Ib
- BASE PLATE STEEL 36000 PSI j 4
- ANCHOR - WEDGE TYPE l/2x3-1/2MIN EM 3ED 6f
Z,000 Ib
-FLOOR SLAB 6" X 3000 PSI REINFORCED 300" ' 3
- SOIL BEARING PRESSURE 1000PSF 6f"
_t 2,000 Ib
- SEISMIC ZONE 4 ' -£
- RASE SHEAR FORMUI A - ZlffwLL / 2 +«,DLVRv L 0 Ib
-f i
' s
4 1 Uo -i
lu= 108"SECTION AXIAL FORCE MOMENT BEAM
226# „ „ 30» —2#
^~ V61" /
178# L / 238#— v | . —
T \1 30ff y > 1 v
* ' / *r /
82# -T N. 10
5L \"*
0# 52" / 0#
^ 1 / »
^48" 4
MOMENT
1 4,250lb 619 in b Q . .. . _
2 4,200lb 15,463, n.lb. ,2'™ '" u <' St*COnn
3 3,150lb 8,310m b ^'fSI'" K * s^conn
4 2,100lb 6,287. n b ?'l^in'u * SSCOnn
c i n^n ik Q ci7,rtiu 6, 902 in b <- stdconn5 I.UbUlb o,517inlb *> -»ro u *.j3,758 in b <- stdconn
TYPE 4L P/B INT DESIGN LOAD = VARIES
BASE PLATE COLUMN BEAM
^ V 3X3X1 1GA(LU79) ^
7 75 X 5 X 375 COLUMN STRESS =0 89 4- 1/32x2- 3/4x14GA/485H
Mbase-618mfb MAX LCW/LE\^L = 3,729lb.
BEAM IS O.K.
OVERTURNING BRACING
•>y HORI ZONTAL ^J Dl AGONAL ^J
ANCHOR STRESS = 032 1 1/2X1- 1/2X14GA 1 1/2X1- 1/2X14GA
# OF ANCHORS = 2 STRESS =012 STRESS =036
SLAB & SOIL
V
PUNCT STRESS = 0 55
BENDING STRESS =052
4#»
9#
SEIZMIC PROJECT,
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 11 OF,21
MATERIAL HANDLING ENGINEERING
TEL {909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M.OBI DATE.10-15-1998
TYPE3LP/B EXT
SPECIFICATION
- MAIN STEEL 55000 PSI
- BASE PLATE STEEL 36000 PSI
- ANCHOR - WEDGE TYPE 1/2x 3-1/2 MIN EM 3ED
- FLOOR SLAB 6" X 3000 PSI REINFORCED 240"
- SOIL BEARING PRESSURE 1000 PSF
- SEISM 1C ZONE 4
- TYPE = INTERCONNECTED UNITS
- BASE SHEAR FORMULA = ZIC(wLL / 2 +wDL)/Rvt
£-
^
^
Ib
2,000 Ib
2,000 Ib
800 Ib
80° lb
800 Ib
275#
6 "
201# ,t-
61"
127#
32# W
18##•
4#
SECTION AXIAL FORCE MOMENT
108"-
u = 108"
4
367#
268#
69#
48"4"
BEAM MOMENT
1 4,500lb 990m!b
2 4,050 Ib 4,591 mlb
3 3,600lb 4,462,nlb
4 3,150lb 6,347, nib
5 2,100lb 7,399mlb
6 1,050!b 4,276mlb
TYPE 3L P/B EXT DESIGN LOAD
BASE PLATE
V
7 75X5 X 375
Mbase= 990 mlb
OVERTURNING
V
ANCHOR STR ESS = 0 12
# OF ANCHORS - 2
COLUMN
- VARIE
COLUMN
3X3X1 3GA(LU75)
STRESS =041
3,691 in
5,426m
6,304m
4j38m
b <- stdconn
Ib <- stdconn
b <- stdconn
b <- stdconn
b <- stdconn
b <- stdconn
S
BEAM
4- 1/32x2- 3/4xl4GA/485H
MAXLOMVLEVEL = 3,729Ib
BEAM IS 0 K.
BRACING
HORIZONTAL ^
1 1/2X 1- 1/2X14GA
STRESS = 0 13
DIAGONAL ^/
1 1/2X1- 1/2X14GA
STRESS =038
SLAB & SOIL
V
PUNCT STRESS = 0 51
BENDING STRESS =047
SE1ZM1C PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO 12 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M OBI DATE.10-15-1998
TYPE 3LP/B INT
SPECIFICATION
- MAIN STEEL 55000 PSi
- BASE PLATE STEEL 36000 PSI
- ANCHOR- WEDGETYPE 1/2 x 3-1/2 MIN EM
- FLOOR SLAB 6" X 3000 PSI REINFORCED 240"
- SOIL BEARING PRESSURE 1000 PSF
- SEISMIC ZONE 4
- TYPE = INTERCONNECTED UNITS
- BASE SHEAR FORMULA = ZIC(wLL / 2 +wDL)/Rv
'
EM
1—
6
->
BED
6240" "
/Rv
1C
'
?"
^ —
pi*
£
0"
£ —
„
* \f
—7
2,000 Ib
4
3
2,000 Ib
2
Olb
1
inr-
£, \ Off.11 -fc z
'
6
1 55#
6
98# '
5
i
0# 5
n
"
>"
£
>"
L_
'
//
/
j
/
/
t- A Q"
^O^f
207»
131
0#
'
SECTION AXIAL FCRCE MOMENT
!u= 108"
BEAM MOMENT
1 3,2001b 468mlb
2 3,150lb 11,681 mlb
3 2,100lb 5,719mlb
4 l.OSOIb 3,305mlb
TYPE 3L P/B INT DESIGN LOAD = VARIE
BASE PLATE
V
775X5X 375
Mbase= 467 mlb
OVERTURNING
V
ANCHOR STRESS = 0 08
# OF ANCHORS = 2
V
COLUMN
COLUMN
3X3X1 3GA(LU75)
STRESS =085
6,074m
10,700m
6,512 m
3,652m
b <- stdccnn
b <- stdconn
b <- stdconn
b <- stdconn
S
BEAM
V
4- 1 /32x2- 3/4x1 4GA/485H
MAX LOAD/LEVEL = 3,729 Ib
BEAM IS O.K.
BRACING
HORIZONTAL ^/
1 1/2X1- 1/2X14GA
STRESS = 0 09
DIAGONAL ^/
1 1/2X1- 1/HX14GA
STRESS- 027
SLAB & SOIL
V
PUNCT STRESS = 037
BENDING STRESS =029
SEIZMIC PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
'SHEET NO 13 OF 21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET * POMONA « CA 91768
CALCULATED BY.M.OBI DATE.10-15-1998
LOADS & DISTRIBUTION:TYPE5LS/R 1
LIVE LOAD PER SHELF (BASED ON CLIENT SUPPLIED DATA )
DEAD LOAD PER SHELF
SEISMIC SHEAR BASED ON DIVISION VI OF THE 1994 U B C
WHERE V=ZIC[wDL+wLL]/Rw
SEISMIC ZONE-4
Z = .4
1 =1
C-275
Rw (LONGITUDINAL) =8
Rw (TRANSVERSE) =6
wDL= lOOIb
INTERCONNECTED UNITS.
LONGITUDINAL DIRECTION
Vlong = .4* 1 * 2 75 * ( 8000 + 400 )/ 8
Vlong = 1,155 Ib.
Fi =VWhi/IWh
TRANSVERSE DIRECTION
Vlong = .4* 1 * 2.75 * ( 8000 + 400 )/ 6
Vtrans = l,540ib.
Fi =VWhi/ZWh
= wLL
= wDL
= V
TOTAL FRAME LOAD = 8,400 I b
2,000 Ib 462#
'
6
6
264"
6
6
6"
e
5"
t —
5"
'
fi"
, I.f f
4
2,000 Ib
3
2,000 Ib
2
Z.OOO Ib
1
p
346#
231#
115#
r — i no' v
lu= 108"
616#
SEIZMIC PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 14 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET * POMONA * CA 91768
CALCULATED BY.M OBI 10-15-1998DATE.
LONGITUDINAL ANALYSIS :TYPE 5L S/R
THE ANALYSIS iS BASED ON THE PORTAL METHOD, WITH THE POINT OF CONTRA FLEXURE OF THE
COLUMNS ASSUMED AT MID-HEIGHT BETWEEN BEAMS, EXCEPT FOR THE LOWEST PORTION, WHERE
THE BASE PLATE PROVIDES ONLY PARTIAL FIXITY, THE CONTRA FLEXURE IS ASSUMED TO OCCUR
CLOSER TO THE BASE (OR AT THE BASE FOR PINNED CONDITION, WHERE THE BASE PLATE CANNOT
CARRY MOMENT)
Vlong =
F 1 -
F2 -
F 3 -
F4=
* Vcol =
Vcol -
58lb
116lb
1 73 I b.
231 Ib
1,155 Ib
578 (b.
F2-
66 in
Fl
66 in
I
b= 64 in
Beam lo
Col Conn
Col to slab
BASE PROVIDE PARTIAL FIXITY. SEE BASE PLATE SHT
Mbase = 15300m.lb.
Mupper + Ml ower = Mconn'R' + Mconn'L1
Mconn'R' = Mconn'L'
Mconn * 2 = Mupper + Ml ower
Mconn = [Mupper + Mlower]/2
Mconn "I-"
Mupper
RESULTING FORCES ON COLUMN
SECTION
1
2
3
4
AXIAL LOAD
4200
3150
2100
1050
MOMENT
21660
17151
13340
7623
Mconn
21405
17246
12481
—-jf SLAB
SEIZMIC PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO 15 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M OBI DATE.10-15-1998
COLUMN ANALYSIS :TYPE 5L S/R
COLUMN IS ANALYZED PER AiSI COLD-FORMED STEEL DESIGN MANUAL
Pmax « 4,200 Ib Mmax = 21,660 mlb.
Kxlx/rx = 1.2 * 64 / 1.21 57 = 63 2 <- GOVERNS
Kyly/ry = .8* 527 1.0665= 390
Cc =(2n'2E/Fy)'.5
= 102.0
SINCEKI/r <=Cc,
Fa =.522Fy- [(kl/r*Fy)/1494]'2
= 23,301 psi
fa = Pmax/Area
«= 4,080 psi.
fb = Mmax/Sx
= 21,242 psi.
fa/Fa =0.18 >.15
F'e = 12TT'2E/23(Kxlx/rx)'2
F'e= 37,418 psi.
Fb = .6*Fy= 33,000 psi.
Cm*fb/Fb[1-fa/F'e] =
COMBINED STRESS =0.90
A
\i ^i
-A \-
B
C
SECTION PROPERTIES
A =3» B=3"
C= 75" D = 0"
E = 0" Wt = 3 635#
tl = 1196" t2 = 0"
Area= 1 OH93IIA2
lx= 1 5295"A4ly= 1 1708"M
Sx= 1 0197"A3Sy-
rx= 1 215
66"
64"
52"
52
Front View
SE1ZMIC PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO 16 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)369-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
BEAM ANALYSIS '.TYPE 5L S/R
BEAM TO COLUMN CONNECTIONS PROVIDE ADEQUATE MOMENT CAPACITY TO STABLIZE THE SYSTEM,
ALTHOUGH IT DOES NOT PROVIDE 100% FIXfTY THUS, THE BEAMS WILL BE ANALYSED ASSUMING
THEY HAVE PINNED ENDS FOR THE COMPUTATION OF BEAM TO COL MOMENT CAPACITY, THE
PARTIAL FIXITY OF THE BEAM,(ASSUMED AT AN ARBITRARY 25% OF THE FIXED END MOMENT OR
2,000 in Ib WHICH EVER IS SMALLER) WILL BE ADDED
lact = 1080 in.
1 max = [1950 + 12QO(M1 /M2)]b/Fy
SINCE M1/M2 = 1.0
Imax =3150*b/Fy « 158 in
SfNCE (max >lact Fb = .60Fy = 33,000 psi.
MAXIMUM STATIC LOAD PER LEVEL DEPENDS ON
1) BENDING CAPACITY
M = Sx* Fb«wl>2/8
= 28314m Ib.
CAPACITY = 2(8* M/l) = 37281 b.
2) MAXIMUM ALLOWABLE DEFLECTION (L/180).
A = 5wl/4/384EI
CAPACITY = 2[(384EI)/ (5*180*1/2)] = 3975lb
MAXIMUM STATIC LOAD PER LEVEL IS 3,729 I b.
ALLOWABLE AND ACTUAL BENDING MOMENT AT EACH LEVEL.
1 625"
4035'
Sx = 0858m
lx= 1 842 in
= LIVE.LC£D*L/(2*8) M all ow( stati c) = Sx * Fb
Mimpact= 1.125*Mstatic MalIow(seismic) = 1 33 * Sx * Fb
Mseismic = Mconn (SEE LONG ANALYSIS)
LEVEL Mstatic
1
2
3
4
13499
13499
13499
13499
Mimpact
1 125 Mstatic
15187
15187
15187
15187
Mallow
(static)
28313
28313
28313
28313
Mseismic
21405
17246
12481
5811
Mallow
(seismic)
37751
37751
37751
37751
RESULT
GOOD
GOOD
GOOD
GOOD
1 r*^SF|7Mir^ PROJECT AUlUAb bULh
LD
1 ^^^^^^^^^^ SHEET NO _ I? OF 21
MATERIAL HANDLING ENGINEERING u ORl 10-1^-lQQRTEL (Q09)86Q-n98Q - FAV (QriQ)869-nQS1 CALCULATED BY W1 UD1 DATE 1U 10 '^^o
161 ATLANTIC STREET • POMONA • CA 91768
1
1
|
1
1
f-I
1
I
1m
I
I
1ii
•i
BEAM TO COLUMN CONNECTION: f
&dMconn= ( Mlower + Mupper )/2 + Mend /^^
Y^^^
4-9
CAPACITY OF CONNECTOR ^ /^
a") SHEAR CAPACITY OF 7/1 6" DIA STUD ^
^
x.
^^«&f
9
1
?ll
M^X^ Z 4
rl "^^ 10.X]
\3^>
»\z 7 16
T RIVETC^
Fy= S^, 700(f pa = J 5 ^ J^r
Pmax= 3000 #
b) BEARING ON COLUMN. Mconn "L"
/ j
Abrn - t * D t- 1 0^ mm 1 r
= .5 * t Fu=65,000psi mm.
Pmax brg = A * F ^
fv
1
k,
"^•l
Mconn "R"
i \ij' /r
m*
t ru \^_— J
= 3412# > 3000# Mlower
c} MOMENT CAPACITY OF BRACKET. ,
• -• ^^ ''r
Mcap=S * f-bending <9^^ '
= .105*.66*Fy 7 .„J / 4
/"v Kdr-in/ /rt 1111 P1 ^ 5^^^.L>— IvILdp/ 1 J — I . ( ! I I I A •" ^^2^
Pl= 1.20 Mcap ^^—
= 083Fy = 4158#>3000#
c
^,M/2"
. _?M/T'
SINCE SHEAR GOVERNS PI =3000# ' y
S bracket = .10 5" A3
Mconn. cap ~ PI * 4.5 + P2 * .5
= 4.555*3000 p"2^.f^
= 13,665 "# P1 + P2 = C
P2 = P1 * (.5/4.5)
Mconn seis.= 1 .33 * Mconn = 1 8,174 "# =.111 PI
C= 1.111P1ii
SEiZMtC PROJECT.
FOR
ADI DAS GOLF
DESIGN BUILD
SHEET NO 17A OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
BEAM TO COLUMN CONNECTION: H.D. 4-STUD CONNECTOR
Mconn= ( Mlower + Mupper )/2 + Mend
CAPACITY OF CONNECTOR
a) SHEAR CAPACITY OF 7/16" DtA STUD
A= 4375A2n/4 = 15 "A2
Fy=50,000 psi (A108 steel)
Pmax=3000 #
[ D
I D
( 0
b) BEARING ON COLUMN
Abrg =t * D
= 05 * t
Mconn "L1
t= 105 mm
Fu=65000psi mm
Pmax brg = A * F
= 05 * t * Fu
= 3413 # > 3000#
MOMENT CAPACITY OF BRACKET
Mcap=S * Fbendmg
= 105 * 6 * Fy
C=Mcap/5 = 2 15 P1
P1= 93 Mcap
= 058 Fy = 2930# < 3000#
SINCE BEARING GOVERNS P=2930#
Mconn cap = 6 5P1+4 5P2+2 5P3+5P4
=10 615P
-31,102 "#
3"
1
o
oo
ooo
Mupper
HV:
Mlower
Mconn "R"
S bracket = 105"A3
1-5/8"
Mconn seis = 1 33 * Mconn = 41,365 "# C = P1 + P2 + P3 + P4
C = P1 +P1(4 5/6 5)
P1(2 5/6 5) + P1( 5/6 5)
C = 2 15P1
SEIZMIC PROJECT,
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 18 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
TRANSVERSE ANALYSIS :BRACING :TYPE 5L S/R
IT IS ASSUMED THAT THE LOWER PANEL RESISTS THE FRAME SHEAR IN TENSION AND
COMPRESSION IF HORIZONTAL AND DIAGONAL MEMBERS ARE THE SAME, ANALYSIS WILL BE DONE
ON THE DIAGONAL MEMBER AS IT WILL GOVERN
DIAGONAL BRACING : COMPRESSION MEMBER
Ldiag = [(L-6)'2+(D-2*Bcol)'2]'.5
= 62.2
Vdiag =Vtrans * Ldiag / D
= 1998#
kl/rmin = [1 * 62.2 J/.488
= 127.6
Fa=[12TT'2E]/[23(kl/ry2]
= 9165 psi
fa/Fa =Vdiag/(Area*Fa)
-067
L= 52"
DIAGONAL AND
HORIZONTAL BRACING
\V
H
Area= 325 "A2
rmm= 488 "
t= 0747 "
W= 1 5 "
H= 1 5 "
SE1ZMIC PROJECT,
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 19 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE 10-15-1998
I
OVERTURNING :TYPE 5LS/R
ANALYSIS OF OVERTURNING WILL BE BASED ON SECTION 2237 7 1 OF THE 1994 Uniform Building
Code
FULLYLQADED
TOTAL SHEAR
Mot
TOP SHELF LOADED
73"
73"
52"
L
= 1540lb.
-Vtrans * ht * 1.15
= 1540* 198* 1.15
= 350658 mlb
Mst = I(Wp+.85wDL)* d/2
= ( 8000+.85 * 400) * 48/2
= 200160m.lb
Puphft - 1(Mot- Mst)/d
= 3135 Ib. <- CRITICAL
SHEAR =385 Ib,
Mot =Vtop* h* 1.15
= 385* 264* 1 15
= 116886 mlb
Mst =(Wp+wDL)* d/2
= (2000+85* 400)* 48/2
«56160mlb.
Puphft =1(Mot- Mst)/d
= 1265 Ib.
USE 4 ea 1/2x3-1/2 Ml N. EMBED Ml N. EMBED ANCHOR.
CAPACITY OF 1/2x3-1/2 Ml N. EMBED. = 1000 I b PULLOUT & 1 840 I b. SHEAR
COMBINED STRESS! = 31 35 / 4000 + 770 / 7360 = 0.89
COMBI NED STRESS2 = 1265 / 4000 + 192 / 7360 « 0.34
48'
616#
462#
308#
154#
SEIZMIC PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 20
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
OF.21
CALCULATED BY.M OBI DATE.10-15-1998
BASE PLATE :TYPE5LS/R
BASE PLATE WILL BE ANALYZED WITH THE RECTANGULAR STRESS RESULTING FROM THE VERTICAL
LOAD P, COMBINED WITH THE TRIANGULAR STRESSES RESULTING FROM THE MOMENT Mb (IF ANY)
THERE ARE 3 CRITERIA IN DETERMINING Mb THEY ARE 1) MOMENT CAPACITY OF THE BASE PLATE,
2) MOMENT CAPACITY OF THE ANCHOR BOLTS, AND 3) Vh/2 (FULL FIXITY) Mb IS THE SMALLEST
VALUE OBTAINED FROM THE 3 CRITERIA ABOVE
Pcoi = 4200lb. B =8m.
Mb= 15300 i n.lb.
D = 8 in.
b = 3 in
t =.375 in
bl =25 in
P/A =Pcol/(D*B) = 65.62 psi.
M/S = Mb/((D*B'2)/6) = 179.2 psi.
fb2=2b/B*fb = 1120 psi.
fb1 = fb-fb2 =67.23 psi.
Mbase = wbl '2/2 = bl /2/2[ f a + f bl + .67fb2]
Mbase = 648.7 m.lb
Sbase = 1*t'2/6 - 00234 m'3
Fbase = .75Fy* 1.33 =36000 psi.
fb/Fb = Mbase/(Sbase* Fbase) = .76
ANCHOR TENSION
IMo = 0
- T*d2=[Mbase- Pcol*b/2]
T = Mbase/d2 - Pcol*b/2d2
T = 2000ib.
Pcol
bl-bl-
fa 1 1 111!!i
/
fbl
dl
Tt ^--T^Nr K ft\-\^i Ct*
Pcol
Mbase
b
dl
Mbase
dl
PROJECT.
FOR
ADIDAS GOLF
DESIGN BUILD
SHEET NO 21 OF.21
MATERIAL HANDLING ENGINEERING
TEL (909)869-0989 • FAX (909)869-0981
161 ATLANTIC STREET • POMONA • CA 91768
CALCULATED BY.M. OBI DATE.10-15-1998
SLAB AND SOIL :TYPE 5L S/R
THE SLAB WILL BE CHECKED FOR PUNCTURE STRESS IF NO PUNCTURE OCCURS, IT WILL BE
ASSUMED TO DISTRIBUTE THE LOAD OVER A LARGER AREA OF SOIL AND WILL ACT AS A FOOTING
(a) PUNCTURE
P max = 1.4 DEAD LOAD + 1.7 LI VE LOAD
Pmax * 1.4 * Pcol + 1.7 * (Mot/d)
- 18,299 Ib
Fpunct =2*sqrt(fc)= 109 5 psi.
Apunct = t(w+t/2)+(d+t/2)]*2*t = 264.0 in/2
fv/Fv = Pmax/(Apunct* Fpunct) = 0 63
(b) SLAB TENSION
Asoil =Pmax/(l 33 * fsoil) = 13.72 ft.'2
= 1,976 m/2
L = sqrt(Asoil) = 44.5 in.
B =sqrt(w*d) +t * 140 in.
b = (L-B)/2 = 15.2 in.
Mconc - wb'2/2 « (1.33*f soi I * b'2)/(l44* 2)
= 1,073.6 mlb
Scone « 7*t^2/6 = 6.00 fn/3
Fconc = 50*sqrt(f'c) = 24648 psi.
fb/Fb = Mconc/(Sconc*Fconc) = 0 73
' b,' B
t
>|
^
L
BASE PLATE
w = 8 in.
d = 8 in.
CONCRETE
t = 6 in.
f'c =3000 psi.
SOIL
fs = lOOOpsf.