HomeMy WebLinkAbout2841 AVENIDA HELECHO; ; CB010745; Permit1
?
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008 \ 03/07/200 1 Residential Permit Permit No:CBOI 0745
Building Inspection Request Line (760) 602-2725
Job Address: Permit Type:
Parcel No:
Valuation:
Occupancy Group: 03/07/2001
# Dwelling Units:
Bedrooms: Project Title:
2841 AVENIDA HELECHO CBAD
RESDNTL SubType: SFD
2552814100 Lot#: 628
$352,640.00 Construction Type: VN
1 Structure Type: SFD
5 Bathrooms: 4.5
Reference #: CT88-03
SHELBOURNE - LC VLLY PHASE 5
PLAN 4-SFD 3904 SF, GAR 649SF, DK 110SF
Status: ISSUED
Applied: 01/09/2001
Entered By: JM
Plan Approved:
Issued: 03/07/2001
Orig PC#: PC99-149
Inspect Area:
Plan Check#: PCOl-05
Applicant:
DAVIDSON BUILDERS
1302 CAMINO DEL MAR
DEL MAR CA 92014
858 259-8500 858 25%8R@
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee Plan Check Discount
Strong Motion Fee
Park in Lieu Fee Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$1,325.80
$0.00
$861.77
$0.00
($68.94)
$35.26
$0.00
$0.00
$310.00
$0.00
$0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00
$0.00
Meter Size
Add'l Recl. Water Con. Fee $0.00
Meter Fee $0.00 SDCWA Fee GF D Payoff Fee
PFF
PFF (CFD Fund)
License Tax $0.00
License Tax (GFO Fund) $0.00
Traffic Impact Fee $600.00
Traffic Impact (CFD Fund) $0.00
LFMZ Transportation Fee $0.00
Sidewalk Fee $0.00
PLUMBING TOTAL $203.00
ELECTRICAL TOTAL $60.00
MECHANICAL TOTAL $89.50
Housing Impact Fee $0.00
Housing InLieu Fee $0.00
Master Drainage Fee: $0.00 Sewer Fee: $0.00
TOTAL PERMIT FEES $14,208.69 .
FINAL APPROVAL
Date: Clearance:
NOTICE: Please take NOTICE that approval of your pnject includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'feeslexactiins.' You have 90 days from the date this permit was issued to protest imposition of these feeslexactiions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infwmation with the City Manager for
promsing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specifii fees/exactiins DOES NOT APPLY to water and sewer connection fees and capactiy
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this pmject NOR DOES IT APPLY to any
feedexactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
c
City d Catisbad
Final Bulldlng lnspectlan
Dept: Building Engineering Planning CMWD St Lite Fire
Pian Check#: PCOl-05 oae:
Permit I: CB010745 Permit Type:
Project Name: SHELBOURNE - LC VLLY PHASE 5 Sub Type:
Address: 2841 AVENIDA HELECHO Lot: 628
Contact Person: Phone:
Sewer Dist LC WaterDist 0
PLAN 4-SFD 3904 SF, GAR 649SF, DK 1 IOSF
10/09/2001
RESDNTL
SFD
..........................................................................................................................................................
Inspected Date
By: fl89 Inspected: /4//.,;/@/ Approved: 19 Disapproved:
Inspected Date
By: Inspected: Approved: Disapproved:
Inspected Date
By: Inspected: Approved: Disapproved: ...........................................................................................................................................................
City of Carlsbad Bldg Inspection
For: 1 1 /I 6/2001
Request
Permit# CBOl0745 Inspector Assignment: PD
Title: SHELBOURNE - LC VLLY PHASE 5
Description: PLAN 4SFD 3904 SF, GAR 649SF, DK 11OSF
Type: RESDNTL SubType: SFD
Job Address: 2841 AVENIDA HELECHO
Suite: Lot 628
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
Remarks:
Total Time:
CD DescriDtion Act Comments
19 Final Structural
29 Final Plumbing
Phone: 7609426558
Inspect &
Requested By: JORDON
Entered By: ROBIN
%- + 39 Final Electrical
1 49 Final Mechanical
bsociated PCRs
Date
11/07/2001
09/07/2001
09/07/2001
09/07/2001
08/29/2001
08/28/2001
08/24/2001
0711 712001
05/24/2001
05/23/2001
05/09/2001
05/09/2001
JnSDeCtiOn History
Description
39 Final Electrical
17 Interior LaWDrywall
18 Exterior LaWDrywall
23 GarnesVRepairs
16 Insulation
16 Insulation
84 Rough Combo
83 Roof SheathingExt Shear
11 FtglFwndationlPiers
81 Underground Combo
21 Undergroundklnder Floor
22 SewerMlater Service
Act lnsp Comments
AP PD
AP PD
AP PD
AP PD
AP PY
NS PY
A? NF
AP PD
AP PD
NR PD
AP PD
AP PD
City of Carlsbad Bldg Inspection Request
For: 1 1 /07/2001
Permit## CB010745 Inspector Assignment: PD
Title: SHELBOURNE - LC VLLY PHASE 5
Description: PLAN 4SFD 3904 SF, GAR 649SF, DK 1 I OSF
Type: RESDNTL SubType: SFD
Suite: Lot 628
Job Address: 2841 AVENlDA HELECHO
Location:
APPLICANT DAVIDSON BUILDERS
Owner:
Remarks:
Total Time:
Phone: 7609426558
Requested By: JORDON
Entered By: ROBIN
CD Description Act Comments
39 Final Electrical
Associated PCRs
Date
09/07/2001
09/07/200 I
09/07/2001
08/29/2001
08/28/2001
08/24/2001
0711 712001
05/24/2001
05/23/2001
05/09/2001
05/09/2001
JnSDect ion History
Description Act
17 Interior LathlDrywall AP
18 Exterior LathlDrywall AP
23 Gas/Test/Repairs AP
16 Insulation AP
16 Insulation NS
84 Rough Combo AP
83 Roof Sheathing/Ext Shear AP
11 Ftg/Foundation/Piers AP
81 Underground Combo NR
21 UndergrcundNnder Floor AP
22 SewerMlater Service AP
lnsp Comments
PD
PD
PD
PY
PY
NF
PD
PD
PD
PD
PD